531-325 - Drawings-11-P1.pdf
PDF 4 MB Posted
- Attached to
- Y1DZ--TIERED EVALS - Construct Primary Care/Mental Health Building Minor Construction - Boise 531-325
- Solicitation number
- 36C77624R0096
About this file
This document appears to be a set of construction drawings for the Construct Primary Care/Mental Health Building Minor Construction Project (Project 531-325) at the VA Medical Center in Boise, ID. The drawings provide detailed specifications and plans for the plumbing systems, including the domestic water, sanitary sewer, storm drainage, and plumbing fixtures required for the new building. Key details include the size, routing, and connections of the various water supply and waste piping, locations of floor drains, cleanouts, and roof drains, and schedules for plumbing fixtures and equipment such as water heaters, mixing valves, and expansion tanks. The drawings also include details and specifications for items like cleanout covers, roof drain assemblies, and the fire protection system. This comprehensive set of construction documents would be necessary for a contractor to properly install the plumbing systems for this new healthcare facility.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CO
FE
CONCENTRIC REDUCER/INCREASER
ECCENTRIC REDUCER/INCREASER
UNION
TOP CONNECTION, 45° OR 90°
EXTENSION & CONTINUATION
CAPPED OUTLET
POINT OF CONNECTION BETWEEN NEW AND EXISTING WORK
LIMIT OF DEMOLITION
ANCHOR
DIRECTION OF FLOW
DIRECTION OF PIPE PITCH (DOWN)
BOTTOM CONNECTION, 45° OR 90°
PIPE UP
SIDE CONNECTION
RISE OR DROP IN PIPE
PIPE UP
PIPE DOWN
INVERTED BUCKET TRAP SET INCLUDING PIPING ACCESSORIES
FLOAT & THERMOSTATIC TRAP SET INCLUDING PIPING ACCESSORIES
STRAINER
PRESSURE GAGE
THERMOMETER
CLEAN-OUT
PTRAP
HOSE BIB
FLOW ELEMENT
PLATE HEAT EXCHANGER SCHEDULE
TAG
MANUF/
MODEL
NUMBER
LOCATION SERVICE TYPE
CAPACITY
(MBH)
QTY
PLATES
PASSES
HOT SIDE COLD SIDE WORKING
PRESSURE
(PSI)
WEIGHT
(LBS)
NOTES
EWT
(°F)
LWT
(°F)
GPM PD (FT) GLYCOL % EWT (°F) LWT (°F) GPM PD (FT) GLYCOL %
AICOO
SAHARA/
LA14DW-40
MECH RM
DOMESTIC WATER
HEATING
BRAZED
PLATE &
FRAME
100 40 1 150 140 10 4.8 0 40 140 2 0.3 0 150 6 1
MIXING VALVE SCHEDULE
TAG MANUFACTURER /MODEL NUMBER LOCATION SERVICE TYPE
CAPACITY
(GPM)
MINIMUM
FLOW
(GPM)
PRESS.
DROP
(PSI)
OUTLET
TEMP.
(°F)
ENCLOSURE
WEIGHT
(LBS)
NOTES
LEONARD / TM-520B-LF-DT MECHANICAL ROOM
DOMESTIC WATER
HEATING
BI-METAL
HI-LOW
FLOW
21 0.5 10 120 NONE 6 1
EXPANSION TANK SCHEDULE
TAG TYPE LOCATION SERVICE
SYSTEM
TEMPERATURES TANK RATED
PRESSURE
(PSI)
MINIMUM TANK
VOLUME
(GALLONS)
MINIMUM TANK
ACCEPTANCE
VOLUME
(GALLONS)
NOTES
MIN (°F) MAX (°F)
DIAPHRAGM MECH RM
BUILDING HEATING
SYSTEM
40 140 150 6.4 0.5 1
NOTES:
1. TANK TO BE ANTIMICROBIAL POLYPROPYLENE WITH ANTI-LEGIONELLA PROTECTION
NOTES:
1. DOUBLE WALL CONSTRUCTION.
HX
NOTES:
1. PROVIDE OUTLET THERMOMETER.
TMV
EXP
PLUMBING FIXTURE SCHEDULE
SYMBOL DESCRIPTION
MANUFACTURER AND CATALOG #
(BASIS OF DESIGN ONLY OTHER
MANUFACTURES THAT MEET THE
SPECIFICATIONS ARE ACCEPTABLE)
FAUCET/FLUSH VALVE
CONNECTIONS
NOTES
HW CW W V
WATER CLOSET, FLOOR
MOUNT, FLUSH VALVE
(ACCESSIBLE)
KOHLER HIGHCLIFF K-96057-0
SLOAN UPPERCUT WES 111-1.6/1.1
(1.6/1.1 GPF) MANUAL DUAL FLUSH
VALVE
- 1" 3" 2" PROVIDE ELONGATED OPEN FRONT SEAT
WALL MOUNT LAVATORY
AMERICAN STANDARD LUCERNE
0355.012
AMERICAN STANDARD,
MONTERREY 6114.114.002, 0.35 BPM
FLOW, SINGLE HANDLE MANUAL
1/2" 1/2" 1-1/2" 1-1/2"
GRID STRAINER, TAIL PIECE, P-TRAP, SUPPLIES, STOPS, INSULATION
ON SUPPLIES AND DRAIN ON ADA FIXTURES, PROVIDE MANUAL MIXING
VALVE TO LIMIT HOT WATER SUPPLY TO 105°F
EXAM ROOM LAV
ELKAY DLR151710, 15"X17"X10",
STAINLESS STEEL
CHCAGO 895-317GN2AE72XKAB, 0.5
GPM, 5-1/4" RIGID GOOSENECK, 4"
WRIST BLADE HANDLES
1/2" 1/2" 1-1/2" 1-1/2"
GRID STRAINER, TAIL PIECE, P-TRAP, SUPPLIES, STOPS, PROVIDE
MANUAL MIXING VALVE TO LIMIT HOT WATER SUPPLY TO 105°F
SERVICE SINK
FIAT TSB100, 24"X24"X12" CORNER
MOUNT
FIAT 830-AA, WALL MOUNTED WITH
SUPPORT AND VACUUM BREAKER
1/2" 1/2" 3" 2"
832AA 4' HOSE & HOSE HANGER, WALL GUARDS FOR TWO WALLS,
STAINLESS STEEL CURB CAPS
SINGLE COMPARTMENT,
COUNTER MOUNT,
STAINLESS STEEL, ADA
SINK
ELKAY
LRAD222255
22"X22"X5.5"
ELKAY LK1001CR, BELOW DECK
MOUNT, SINGLE HANDLE, ADA, 8"
SPOUT, W/HOSE SPRAY
1/2" 1/2" 2" 2"
BASKET STRAINER, TAIL PIECE, P-TRAP, SUPPLIES, STOPS, INSULATION
ON SUPPLIES AND DRAIN ON ADA FIXTURES, PROVIDE MANUAL MIXING
VALVE TO LIMIT HOT WATER SUPPLY TO 105°F
SINGLE COMPARTMENT,
COUNTER MOUNT,
STAINLESS STEEL
ELKAY
DLR222210
22"X22"X10"
CHCAGO 895-317GN8AE67VAB, 0.5
GPM, 8" RIGID GOOSENECK, 4"
WRIST BLADE HANDLES
1/2" 1/2" 2" 2"
BASKET STRAINER, TAIL PIECE, P-TRAP, SUPPLIES, STOPS, INSULATION
ON SUPPLIES AND DRAIN ON ADA FIXTURES, PROVIDE MANUAL MIXING
VALVE TO LIMIT HOT WATER SUPPLY TO 105°F
WATER COOLER
(DUAL HEIGHT)
ELKAY LZSTL8WSLK WITH FILTER
AND BOTTLE FILLER
WALL CARRIER, STOP, SUPPLY,
TAIL PIECE, P-TRAP
- 1/2" 2" 2" 8.0 GPH, 115 V, 1 PH, 3.8 FLA, 260 WATTS
EMERGENCY FACE/EYE
WASH
GUARDIAN G1814-TP
TAIL PIECE AND PTRAP, TMV
G3607LF MIXING VALVE
W/RECESSED ENCLOSURE
1/2" 1/2" 2" 2" -
NON-FREEZE HOSE BIBB JR SMITH 5609QT
VACUUM BREAKER, LOOSE KEY
OPERATOR
- 3/4" - - -
WATER SUPPLY BOX OATEY 39140
WITH WATER HAMMER ARRESTER
AND 1/4 TURN VALVE
- 1/2" - - -
ROOF DRAIN J.R. SMITH FIG 1010
UNDER DECK CLAMP, DOME
STRAINER
- - - - SEE FLOOR PLANS FOR SIZE
OVER FLOW ROOF DRAIN J.R. SMITH FIG 1080
UNDER DECK CLAMP, DOME
STRAINER, 2" DAM
- - - - SEE FLOOR PLANS FOR SIZE
DOWN SPOUT NOZZLE J.R. SMITH FIG 1770 CAST BRONZE BODY AND SPOUT - - - - SEE FLOOR PLANS FOR SIZE
FLOOR DRAIN JR SMITH FIG 2005
ROUND STRAINER, NICKEL BRONZE
STRAINER, TRAP PRIMER
CONNECTION
SEE DRAWINGS FOR DRAIN WASTE AND VENT SIZE, PROVIDE P-TRP
WITH TRAP PRIMER CONNECTION.
FLOOR SINK JR SMITH FIG 9693
12"X12" RECTANGULAR TOP, DOME
BOTTOM STRAINER, TRAP PRIMER
CONNECTION
- - 3" 2"
FLOOR DRAIN JR SMITH FIG 2005
RECTANGULAR STRAINER, NICKEL
BRONZE STRAINER, TRAP PRIMER
CONNECTION, 3581 FUNNEL DRAIN
- - - 2"
SEE FLOOR PLANS FOR DRAIN SIZE. MATCH PIPE SIZE CONNECTED TO
DRAIN
TRAP PRIMER
(ELECTRIC)
PPP MPB-500
WITH DISTRIBUTION UNITS AS
REQUIRED
- 1/2" - - 120V/1PH/60HZ, 12.1 AMPS IN RUSH, 8.8 AMPS HOLDING
TRAP PRIMER
(HYDRAULIC)
PPP P1-500
WITH DISTRIBUTION UNITS AS
REQUIRED
- 1/2" - - -
REDUCED PRESSURE
BACK FLOW PREVENTER
WATTS LF909 NRS (OR EQUAL)
LEAD FREE, NON RISING STEM
VALVES, AIR GAP FITTING
- 2" - - -
REDUCED PRESSURE
BACK FLOW PREVENTER
WATTS LF909 NRS (OR EQUAL)
LEAD FREE, NON RISING STEM
VALVES, AIR GAP FITTING
- 2" - - -
HEATING SYSTEM FILL
REDUCED PRESSURE
BACK FLOW PREVENTER
WATTS LF009M3 QT
LEAD FREE, QUARTER TURN
VALVES AIR GAP FITTING
- 3/4" - - -
GENERAL PLUMBING SYMBOLSPLUMBING PIPING SYMBOLS
DEFINITIONSYMBOL
DOMESTIC COLD WATER, COLD WATER
DOMESTIC HOT WATER, HOT WATER
DOMESTIC HOW WATER RETURN, HOT WATER RETURN
MEDICAL AIR
VENT (SANITARY)
SOIL, WASTE, OR SANITARY SEWER
SANITARY SEWER, BELOW GRADE (SHOWN ON FLOOR PLAN)
MEDICAL VACUUM
LAB AIR
LAB VACUUM
ORAL EXTRACTION
INDUSTRIAL AIR
DRAIN
STORM WATER
STORM WATER, BELOW GRADE (SHOWN ON FLOOR PLAN)
SOFTEN COLD WATER
FILTERED COLD WATER
DRINKING WATER SUPPLY
DRINKING WATER RETURN
TEMPERED WATER SUPPLY
TEMPERED WATER RETURN
NITROUS OXIDE
OXYGEN
NITROGEN
NATURAL GAS
NATURAL GAS, BELOW GRADE
INDIRECT DOMESTIC WATER HEATER STORAGE TANK SCHEDULE
SYMBOL DESCRIPTION SERVICE
TANK SIZE
(GALLONS)
BACKUP ELECTRIC HEATER
NOTES
KW VOLT/PH AMPS
INLET
TEMP.
(°F)
OUTLET
TEMP.
(°F)
GPH CAPACITY
TANK TYPE BUILDING 119 4.5 208/3 12.5 40 140 5.4 1, 2
NOTES:
1. PROVIDE P&T RELIEF VALVE
2. PROVIDE EXPANSION TANK AMTROL ST-12
PLUMBING PUMP SCHEDULE
SYMBOL
MANUFACTURER
/MODEL NUMBER
DESCRIPTION SERVICE
FLOW
(GPM)
HEAD
(FEET)
ELECTRICAL
NOTES
VOLTAGE PHASE HP RPM
ARMSTRONG/
ASTRO 250SS
INLINE
HEAT EXCHANGER
CIRCULATION
2.0 15 115 1 28 WATTS - 1, 2, 3
ARMSTRONG/
ASTRO 250SS
INLINE
HEAT EXCHANGER
CIRCULATION
2.0 15 115 1 28 WATTS - 1, 2, 3
ARMSTRONG/
ASTRO 250SS
INLINE
BUILDING
RECIRCULATION
2.5 35 115 1 28 WATTS - 1, 2, 3, 4
ARMSTRONG/
ASTRO 250SS
INLINE
BUILDING
RECIRCULATION
2.5 35 115 1 28 WATTS - 1, 2, 3, 4
NOTES:
1. PROVIDE ECM MOTOR AND MOTOR SPEED ADJUSTMENT
2. PROVIDE UNION FITTINGS AND BUILT IN CHECK AND STOP VALVES
3. PROVIDE ADJUSTABLE SPEED SWITCH
4. PROVIDE INTEGRAL AQUASTAT CONTROL
PLUMBING ABBREVIATIONS
SS
SS
MA
MV
LV
LA
OA
IA
D
SD
SD
SCW
FCW
DWS
DWR
TWS
TWR
N2O
O
N
NG
NG
WATER BALANCING VALVE
PROJECT NOTES
1. SINCE WORK WILL TAKE PLACE IN A HOSPITAL, THERE IS THE POSSIBILITY OF THE
CONTRACTOR COMING IN CONTRACT WITH BLOOD AND BODY FLUIDS WHENEVER
WORKING ON THE SANITARY SEWER SYSTEM. CONTRACTOR IS REQUIRED TO PROVIDE
AND USE APPROPRIATE PERSONAL PROTECTIVE EQUIPMENT WHENEVER WORKING ON
THE SANITARY SEWER SYSTEM TO PREVENT EXPOSURE TO THEIR
EMPLOYEES
2. WHEN MANUFACTURER AND CATALOG MODEL NUMBERS ARE LISTED THEY ARE
FOR BASIS OF DESIGN ONLY OTHER MANUFACTURES THAT MEET THE
SPECIFICATIONS ARE ACCEPTABLE FOR BIDDING IF THEY MEET THE
SPECIFICATION REQUIREMENTS.
P-401
P-502
P-115
P-413
RD-1
P-708
DSN-1
RD-2
P-528
FD-C
FD-M
TP-1
P-HW
P-HW
P-HW
P-HW
WH
FD-S
P-608
P-812
P-801
BPF-1
BPF-2
TP-2
BPF-3
P-532
A/E ARCHITECT / ENGINEER
AD AREA DRAIN/ACCESS DOOR
AFF ABOVE FINISH FLOOR
AFG ABOVE FINISH GRADE
AG AIR GAP
AP ACCESS PANEL
AS AUTOMATIC SPRINKLER
ASD ADJUSTABLE SPEED DRIVES
ASD AUTOMATIC SPRINKLER DRAIN
ASHRAE AMERICAN SOCIETY OF HEATING,
REFRIGERATION, AIR CONDITIONING
ENGINEERS
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
ASPE AMERICAN SOCIETY OF PLUMBING
ENGINEERS
ASR AUTOMATIC SPRINKLER RISER
AV ACID VENT
AW ACID WASTE
BFP REDUCED PRESSURE BACKFLOW
PREVENTER
BHP BREAK HORSEPOWER
BSP BLACK STEEL PIPE
BT BATHTUB
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
C CELSIUS
CA COMPRESSED AIR
CGA COMPRESSED GAS ASSOCIATION
CFM CUBIC FEET PER MINUTE
CI CAST IRON
CO CLEANOUT
CS CLINICAL SINK
CV CONTROL VALVE
DCW DOMESTIC COLD WATER
DFU DRAINAGE FIXTURE UNITS
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DHWS DOMESTIC HOT WATER SUPPLY
DI DEIONIZED WATER
DN DOWN
DOE DEPARTMENT OF ENERGY
DS DOWNSPOUT
DW DISHWASHER
DWG DRAWING
DWH DOMESTIC WATER HEATER
DWR DRINKING WATER RETURN
DWS DRINKING WATER SUPPLY
DWV DRAIN WASTE VENT
EL ELEVATION
EMCS ENERGY MONOSERRAT
AND CENTRAL SYSTEM
EPA ENVIROMENTAL PROTECTION
AGENCY
EPACT ENERGY POLICY ACT
ESC ESCUTCHEON
ESH EMERGENCY SHOWER
ET EXPANSION TANK
EWH ELECTRIC WATER HEATER
EWS EYE WASH STATION
EWS/SH EYE WASH/DRENCH SHOWER
EX EXISTING
F FAHRENHEIT
FCO FLOOR CLEANOUT
FCW FILTERED COLD WATER
FD FLOOR DRAIN
FDC FIRE DEPARTMENT
(HOSE)CONNECTION
FM FLOW METER
FOP FUEL OIL PUMP
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FOV FUEL OIL VENT
FS FLOOR SINK
FS FLOW SWITCH
FU FIXTURE UNITS
GAL GALLON
GCO GRADE CLEANOUTS
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GRS GAS REGULATOR STATION
GT GREASE TRAP
GVTR GAS VENT THROUGH ROOF
GWH GAS FIRED WATER HEATER
H&CW HOT AND COLD WATER
HB HOSE BIBB
HD HUB DRAIN
HEX HEAT EXCHANGER
HP HORSEPOWER
HS HAND SINK
HST HOT WATER STORAGE TANK
(DOMESTIC)
HWB HOT WATER BOILER
HWCP HOT WATER CIRCULATING PUMP
HWP HOT WATER PUMP
HYD HYDRANT
ID INSIDE DIAMETER
IE INVERT ELEVATION
ICW INDUSTRIAL COLD WATER
IHW INDUSTRIAL HOT WATER
INV INVERT
IPC INTERNATIONAL PLUMBING CODE
IRW IRRIGATION WATER
IW INDIRECT WASTE
IWH INSTANTANEOUS WATER HEATER
IWR INDUSTRIAL WATER RETURN
IWS INDUSTRIAL WATER SUPPLY
KW KILOWATT
KWH KILOWATT-HOUR
L/S LITER PER SECOND
LA LABORATORY AIR
LAV LAVATORY
LBS/HR POUNDS PER HOUR
LCW LABORATORY COLD WATER
LHW LABORATORY HOT WATER
LNG LIQUID NATURAL GAS
LOX LIQUID OXYGEN
LV LABORATORY VACUUM
LW LOW WATER
M METER
MA MEDICAL AIR
MAV MANUAL AIR VENT
MBH 1000 BTUH
MED MEDICAL
MER MECHANICAL EQUIPMENT
ROOM
MGDU MEDICAL GAS DISTRIBUTION UNIT
MH MANHOLE
MOU MEMORANDUM OF
UNDERSTADING
MSB MOP SERVICE BASIN
MV MEDICAL VACUUM
N2 NITROGEN
N20 NITROUS OXIDE
NC NORMALLY CLOSED
NG NATURAL GAS
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NOM. NOMINAL
NPW NON POTABLE WATER
NTS NOT TO SCALE
O2 OXYGEN
OC ON CENTER
OD OUTSIDE DIAMETER
OFD OVERFLOW DRAIN
OR OPERATING ROOM
OVFL OVERFLOW LEADER
PA PASCAL
PBPU PREFABRICATED BEDSIDE PATIENT
UNIT
PD PRESSURE DROP OR DIFFERENCE
PDI PLUMBING AND DRAINAGE INSTITUTE
PG PRESSURE GAGE
PP PLUMBING PUMP
PPM PARTS PER MILLION
PRS PRESSURE REDUCING STATION
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH ATMOSPHERE
PSIG POUNDS PER SQUARE INCH GAGE
PTRV PRESSURE TEMPERATURE RELIEF VALVE
PW POTABLE WATER
RD ROOF DRAIN
RDL ROOF DRAIN LEADER
RL ROOF LEADER
RP RECIRCULATION PUMP
RO REVERSE OSMOSIS WATER
SAN SANITARY SEWER
SMACNA SHEET METAL AND AIR
CONDITIONING CONTRACTORS
NATIONAL ASSOCIATION
SCFM STANDARD CUBIC FOOT/MINUTE
SCW SOFTENED COLD WATER
SDMH STORM DRAIN MANHOLE
SMH SANITARY MANHOLE
SP SUMP PUMP
SPR SPRINKLER LINE
SQFT/SF SQUARE FEET
SS STAINLESS STEEL
ST STORAGE TANK
SW STORM WATER
TCV TEMPERATURE CONTROL
VALVE
TD TEMPERATURE DIFFERENCE
TD TRENCH DRAIN
TDH TOTAL DYNAMIC HEAD
TEMP TEMPERATURE
TMV THERMOSTATIC MIXING VALVE
TP TRAP PRIMER
TSTAT THERMOSTAT
TWR TEMPERED WATER RETURN
TWS TEMPERED WATER SUPPLY
TYP TYPICAL
V VENT
VAC VACUUM
VB VACUUM BREAKER
VCO VACUUM CLEANER OUTLET
VP VACUUM PUMP
VS VENT STACK
VSD VARIABLE SPEED DRIVE
VTR VENT THROUGH ROOF
W WASTE
WC WATER CLOSET
WCO WALL CLEANOUT
WG WATER GAGE
WH WALL HYDRANT
WH WATER HEATER
WHA WATER HAMMER ARRESTER
WL WATER LINE
WM WATER METER
WPD WATER PRESSURE DROP
WS WASTE STACK
WSFU WATER SUPPLY FIXTURE UNITS
YCO YARD CLEANOUT
YH YARD HYDRANT
NECIL
CE D
S
T A
T
E I
FO
D A
H O
NOISSEF
O
R P
ENG
NI
E E
R
R
N
E
HCTRAK
KR
A
M
A
A L
P-14003
2-20-22
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY
CARE / MENTAL HEALTH
BUILDING
BOISE VA MEDICAL CENTER - BOISE, ID
531-325
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590-2118
RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE
07/23/2021
MEDICAL CENTER DIRECTOR
P-001
NOTES, LEGENDS, & SCHEDULES -
PLUMBING
JCJ DLO
Revisions: Date: 146 OF 206
GENERAL NOTES
1. SLOPE ALL SEWERS @ 1/4" PER FOOT UNLESS APPROVED BY LOCAL
JURISDICTION. LINES 4" AND LARGER MAY BE SLOPED AT 1/8" PER
FOOT UPON APPROVAL OF LOCAL JURISDICTION AND COMPLYING
WITH REDUCED FIXTURE UNIT CAPACITY PER THE UPC.
2. FOR THE PURPOSES OF CLEARNESS AND LEGIBILITY, DRAWINGS ARE
DIAGRAMMATIC AND FOR DESIGN INTENT ONLY. CONTRACTOR MUST
VERIFY ALL DIMENSIONS BY FIELD MEASUREMENT BEFORE
BEGINNING ANY FABRICATION OR CONSTRUCTION.
3. ALL WORK SHALL BE COMPLETED IN STRICT ACCORDANCE WITH THE
CURRENT VA GUIDES AND LOCAL PLUMBING CODES AND
ORDINANCES.
4. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT
ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS.
5. COORDINATE EXACT LOCATION OF PIPING WITH OTHER TRADES.
6. ALL VENT PIPING SHALL BE ABOVE FLOOD RIM LEVEL OF HIGHEST
FIXTURE BEFORE CONNECTION TO COMMON VENTS.
7. HORIZONTAL DRAINAGE PIPE SHALL BE PROVIDED WITH A CLEANOUT
AT ITS UPPER TERMINAL, AND EACH RUN OF PIPING, THAT IS MORE
THAN 100' IN TOTAL DEVELOPED LENGTH. CLEANOUTS SHALL BE
PROVIDED IN A DRAINAGE LINE FOR EACH AGGREGATE HORIZONTAL
CHANGE OF DIRECTION EXCEEDING ONE HUNDRED THIRTY FIVE
DEGREES.
8. THE CONTRACTOR SHALL PROVIDE FIRE CAULKING AT ALL PIPING
PENETRATIONS OF FIRE RATED ASSEMBLIES OR PROVIDE FIRE RATED
SEALS FOR NON-RATED PLASTIC PIPING PENETRATIONS OF RATED
ASSEMBLIES AS REQUIRED.
2 2.5 3 4A
A.1
B
B.8
C
D
E
F
G
H
I
J
K
L
L.2
M
6"
3"
S S
S S
2"
3"
SD
2"
3"
2"
3"SD UP
(564 SF)
W/WCO
3"SD UP
(722 SF)
W/WCO
3"SD UP
(570 SF)
W/WCO
3"CAMPUS HEATING SUPPLY &
RETURN SEE CIVIL PLANS FOR
CONTINUATION.
3"
SD
(2) 2"CW LINES SEE
CIVIL PLANS FOR
CONTINUATION.
ROUTE TRAP PRIMER
PIPING FROM DRAIN TRAP
UP TO TRAP PRIMER.
6"FIRE LINE SEE
CIVIL PLANS FOR
CONTINUATION.
F
SS
4" 4"
SSSS
4"
4" 3"
S S
S S
2" (TYP)
2" (TYP)
3"3"4"
S S
S S
SS
4"4"
3"
SS
S S4"
S S
2" (TYP)
2" (TYP)
S S
S S
S S
S S
S S
S S
S S
S S
S S
4"
SD
4"
3" 2"
4"SD UP
(3212 SF)
3"SD UP
(2285 SF)
S D
3"
S D
4"
SD
S S
S S
S S
S S
4"SD UP
(5497 SF)
4"SD. IE=2722.25'
(21,183 SQ FT)
SEE CIVIL PLANS
FOR CONTINUATION.
COTG
SS
4" 3"
COTF
2" UP
W/WCO
6"
6"COTF
(FFE=2725.85)
8"
SD
S D
5"
S D
2"
2" UP
W/WCO 3"
4"
3"SD UP
(2171 SF)
SD
SD
SD
2"
3"
3"
2"2" 3"
3"SD UP
(835 SF)
SS
5"
S D
3"
3"SS UP SEE
PL403 FOR
CONTINUATION.
COTF
3"
S D
SDSD
3" 3"
3"SD UP
(835 SF) 3"SD UP
W/WCO
(651 SF)
SS
2"W UP TO EYE
WASH W/2"V
3" 3"
3"SD UP
(2171 SF)
3"SD UP
(835 SF)
S S
S S
S S
S S
3" 3"
2"
3"
3"SD UP
(835 SF)
ROUTE TRAP PRIMER
PIPING FROM DRAIN
TRAP UP TO TRAP
PRIMER (TP-2)
SS
S
SS
S
3"
3"
3"
4"
COTG
6"W. IE=2720.35'
SEE CIVIL PLANS FOR
CONTINUATION.
2 7
5 7
12 7
12 10
2 7
6"
WCO
NECIL
CE D
S
T A
T
E I
FO
D A
H O
NOISSEF
O
R P
ENG
NI
E E
R
R
N
E
HCTRAK
KR
A
M
A
A L
P-14003
2-20-22
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY
CARE / MENTAL HEALTH
BUILDING
BOISE VA MEDICAL CENTER - BOISE, ID
531-325
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590-2118
RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE
07/23/2021
MEDICAL CENTER DIRECTOR
PW101
FOUNDATION PLAN - PLUMBING
Checker Author
SCALE: 1/8" = 1'-0"
NORTH
FOUNDATION PLAN - PLUMBING
KEY NOTES
3"W UP TO WATER CLOSET AND 2"V UP IN WALL.
ROUTE 2"W BELOW SLAB TO 1-1/2"W UP TO LAV
ROUTE 2"W BELOW SLAB TO 1-1/2"W UP TO EXAM SINK
3"W WITH P-TRAP UP TO SERVICE SINK AND 2"V UP
2"W UP TO SINK
ROUTE 2"W BELOW SLAB TO 1-1/2" UP TO EXAM SINK. ROUTE
PIPING TO AVOID FOOTINGS. OFFSET PIPE IN WALL ABOVE TO
ALIGN WITH SINK.
ROUTE PIPE FULL SIZE UP TO ABOVE SLAB TO WALL CLEANOUT
3"W WITH P-TRAP UP TO FLOOR DRAIN AND 2"V UP
4"W WITH P-TRAP UP TO FLOOR DRAIN AND 2"V UP
ROUTE WASTE UP TO FLOOR CLEANOUT FLUSH WITH FLOOR
FINISH.
2"W UP TO DRINKING FOUNTAIN WITH WALL CLEANOUT ABOVE
GRADE
2"W WITH P-TRAP UP TO FLOOR SINK OR FLOOR DRAIN AND 2"V
UP
ROUTE 2"W BELOW GRADE STUB UP ABOVE SLAB AND CAP FOR
FUTURE CONNECTION TO EXAM SINK UNDER BASE BID
ROUGH IN 3"W AND 2"V FOR FUTURE FLOOR MOUNTED WATER
CLOSET UNDER BASE BID
ROUTE 2"W BELOW GRADE ROUTE 1-1/2"W UP IN WALL AND
ROUGH IN FOR FUTURE LAV UNDER BASE BID
ROUTE 2"W BELOW GRADE ROUTE 1-1/2"W UP IN WALL AND
ROUGH IN FOR FUTURE EXAM SINK UNDER BASE BID
Revisions: Date: 147 OF 206
JURISDICTION. LINES 4" AND LARGER MAY BE SLOPED AT 1/8" PER
FOOT UPON APPROVAL OF LOCAL JURISDICTION AND COMPLYING
WITH REDUCED FIXTURE UNIT CAPACITY PER THE UPC.
2. FOR THE PURPOSES OF CLEARNESS AND LEGIBILITY, DRAWINGS ARE
DIAGRAMMATIC AND FOR DESIGN INTENT ONLY. CONTRACTOR MUST
VERIFY ALL DIMENSIONS BY FIELD MEASUREMENT BEFORE
BEGINNING ANY FABRICATION OR CONSTRUCTION.
3. ALL WORK SHALL BE COMPLETED IN STRICT ACCORDANCE WITH THE
CURRENT VA GUIDES AND LOCAL PLUMBING CODES AND
ORDINANCES.
4. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT
ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS.
5. COORDINATE EXACT LOCATION OF PIPING WITH OTHER TRADES.
6. ALL VENT PIPING SHALL BE ABOVE FLOOD RIM LEVEL OF HIGHEST
FIXTURE BEFORE CONNECTION TO COMMON VENTS.
7. HORIZONTAL DRAINAGE PIPE SHALL BE PROVIDED WITH A CLEANOUT
AT ITS UPPER TERMINAL, AND EACH RUN OF PIPING, THAT IS MORE
THAN 100' IN TOTAL DEVELOPED LENGTH. CLEANOUTS SHALL BE
PROVIDED IN A DRAINAGE LINE FOR EACH AGGREGATE HORIZONTAL
CHANGE OF DIRECTION EXCEEDING ONE HUNDRED THIRTY FIVE
DEGREES.
8. THE CONTRACTOR SHALL PROVIDE FIRE CAULKING AT ALL PIPING
PENETRATIONS OF FIRE RATED ASSEMBLIES OR PROVIDE FIRE RATED
SEALS FOR NON-RATED PLASTIC PIPING PENETRATIONS OF RATED
ASSEMBLIES AS REQUIRED.
1 2 2.5 3 4A
A.1
B
B.8
C
D
E
F
G
H
I
J
K
L
L.2
M
ELEC
OIT
SERVER
OFFICE
OFFICE
STAFF TLT
STAFF TLT
SOILED
MED EQUIP
STAFF TLT
STAFF TLT
STAFF
LOUNGE
MECH
CORRIDOR
C15STAFF
LOCKERS
EXAM
ROOM 07
EXAM
ROOM 06
EXAM
ROOM 05
CORRIDOR
C12
EXAM
ROOM 04
PUBLIC
TLT
ALCOVE
EXAM
ROOM 03
EXAM
ROOM 02
EXAM
ROOM 01
WOMEN'S
HEALTH 01
WOMEN'S
HEALTH
TLT
118A
STORAGE
107A
STORAGE
CORRIDOR
C10
PUBLIC
TLT
PUBLIC
TLT
109 MSA &
BUSINESS
SERVICES
HOUSEKEEPING
AND
LADDER
GROUP
ROOM
LOBBY
VESTIBULE
LOBBY
POLICE
FAMILY
TLT
PUBLIC
TLT
LACTATION
CLEAN
SUPPLY
PROCEDURE
ROOM 01
ALCOVE,
H/W
ALCOVE,
H/W
CORRIDOR
C11
PACT
TEAM
PACT
TEAM
SHELL
CORRIDOR
C14
EXAM
ROOM 08
EXAM
ROOM 09
EXAM
ROOM 10
PACT
TEAM
CORRIDOR
C13
EXAM
ROOM 11
EXAM
ROOM 12
EXAM
ROOM 13
EXAM
ROOM 14
PACT
TEAM
SHELL
CORRIDOR
C15
CORRIDOR
C14
STAFF
LOCKERS
STAFF
LOCKERS
P-401
P-115
P-401
P-115
P-401 P-401
P-115P-115
P-528
P-413
P-413
P-413
P-413
P-115
P-401
P-413
P-413
P-413
P-413
P-413
P-413
P-413
P-115
P-401
P-413
P-413
P-413
P-413
P-413
P-413
P-115
P-115
P-401
P-401
P-608
P-502
P-708
P-115
P-401
P-115
P-401
P-413
NECIL
CE D
S
T A
T
E I
FO
D A
H O
NOISSEF
O
R P
ENG
NI
E E
R
R
N
E
HCTRAK
KR
A
M
A
A L
P-14003
2-20-22
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY
CARE / MENTAL HEALTH
BUILDING
BOISE VA MEDICAL CENTER - BOISE, ID
531-325
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590-2118
RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE
07/23/2021
MEDICAL CENTER DIRECTOR
PL102
FLOOR PLAN - PLUMBING
Checker Author
SCALE: 1/8" = 1'-0"
PROJECT
NORTH
FLOOR PLAN - PLUMBING
KEY NOTES
SEE 1/PL401 FOR
PIPING IN THIS AREA
SEE 1/PL402 FOR
PIPING IN THIS AREA
SEE 1/PL403 FOR
PIPING IN THIS AREA
Revisions: Date: 148 OF 206
JURISDICTION. LINES 4" AND LARGER MAY BE SLOPED AT 1/8" PER
FOOT UPON APPROVAL OF LOCAL JURISDICTION AND COMPLYING
WITH REDUCED FIXTURE UNIT CAPACITY PER THE UPC.
2. FOR THE PURPOSES OF CLEARNESS AND LEGIBILITY, DRAWINGS ARE
DIAGRAMMATIC AND FOR DESIGN INTENT ONLY. CONTRACTOR MUST
VERIFY ALL DIMENSIONS BY FIELD MEASUREMENT BEFORE
BEGINNING ANY FABRICATION OR CONSTRUCTION.
3. ALL WORK SHALL BE COMPLETED IN STRICT ACCORDANCE WITH THE
CURRENT VA GUIDES AND LOCAL PLUMBING CODES AND
ORDINANCES.
4. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT
ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS.
5. COORDINATE EXACT LOCATION OF PIPING WITH OTHER TRADES.
6. ALL VENT PIPING SHALL BE ABOVE FLOOD RIM LEVEL OF HIGHEST
FIXTURE BEFORE CONNECTION TO COMMON VENTS.
7. HORIZONTAL DRAINAGE PIPE SHALL BE PROVIDED WITH A CLEANOUT
AT ITS UPPER TERMINAL, AND EACH RUN OF PIPING, THAT IS MORE
THAN 100' IN TOTAL DEVELOPED LENGTH. CLEANOUTS SHALL BE
PROVIDED IN A DRAINAGE LINE FOR EACH AGGREGATE HORIZONTAL
CHANGE OF DIRECTION EXCEEDING ONE HUNDRED THIRTY FIVE
DEGREES.
8. THE CONTRACTOR SHALL PROVIDE FIRE CAULKING AT ALL PIPING
PENETRATIONS OF FIRE RATED ASSEMBLIES OR PROVIDE FIRE RATED
SEALS FOR NON-RATED PLASTIC PIPING PENETRATIONS OF RATED
ASSEMBLIES AS REQUIRED.
1 2 2.5 3 4
I
J
K
L
L.2
M
3/4"CW DN
2"V DN
FD-M
FD-S
2"V DN
& 3"VTR
P-805
NECIL
CE D
S
T A
T
E I
FO
D A
H O
NOISSEF
O
R P
ENG
NI
E E
R
R
N
E
HCTRAK
KR
A
M
A
A L
P-14003
2-20-22
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY
CARE / MENTAL HEALTH
BUILDING
BOISE VA MEDICAL CENTER - BOISE, ID
531-325
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590-2118
RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE
07/23/2021
MEDICAL CENTER DIRECTOR
PL103
MECHANICAL ROOM PLAN -
PLUMBING
Checker Author
SCALE: 1/4" = 1'-0"
PROJECT
NORTH
MECHANICAL ROOM PLAN - PLUMBING
KEY NOTES
AREA OF WORK
KEY PLAN
Revisions: Date: 149 OF 206
1 2 2.5 3 4
A
A.1
B
B.8
C
D
E
F
G
H
I
J
K
L
L.2
M
RD-2
RD-1
(1155) (1155)
RD-2 RD-1(1155) (1155)
(651) (651)
RD-2 (1155)RD-1(1155)
RD-2
RD-1
(1155) (1155)
(2300)
(2300)
(1757)
(1757) RD-1
RD-2(1757)
(1757)
(570)RD-1
RD-2
RD-1RD-2
RD-1RD-2
(570)
RD-1RD-2
RD-1RD-2
(722) (722) (570)(570)
(2300) RD-1
(2300) RD-2
3" VTR
3" VTR
3" VTR
3" VTR
3" VTR
3" VTR
3" VTR
3" VTR
RD-2
RD-1
3" VTR
GENERAL NOTES
1. SLOPE ALL SEWERS @ 1/4" PER FOOT UNLESS APPROVED BY LOCAL
JURISDICTION. LINES 4" AND LARGER MAY BE SLOPED AT 1/8" PER
FOOT UPON APPROVAL OF LOCAL JURISDICTION AND COMPLYING
WITH REDUCED FIXTURE UNIT CAPACITY PER THE UPC.
2. FOR THE PURPOSES OF CLEARNESS AND LEGIBILITY, DRAWINGS ARE
DIAGRAMMATIC AND FOR DESIGN INTENT ONLY. CONTRACTOR MUST
VERIFY ALL DIMENSIONS BY FIELD MEASUREMENT BEFORE
BEGINNING ANY FABRICATION OR CONSTRUCTION.
3. ALL WORK SHALL BE COMPLETED IN STRICT ACCORDANCE WITH THE
CURRENT VA GUIDES AND LOCAL PLUMBING CODES AND
ORDINANCES.
4. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT
ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS.
5. COORDINATE EXACT LOCATION OF PIPING WITH OTHER TRADES.
6. ALL VENT PIPING SHALL BE ABOVE FLOOD RIM LEVEL OF HIGHEST
FIXTURE BEFORE CONNECTION TO COMMON VENTS.
7. HORIZONTAL DRAINAGE PIPE SHALL BE PROVIDED WITH A CLEANOUT
AT ITS UPPER TERMINAL, AND EACH RUN OF PIPING, THAT IS MORE
THAN 100' IN TOTAL DEVELOPED LENGTH. CLEANOUTS SHALL BE
PROVIDED IN A DRAINAGE LINE FOR EACH AGGREGATE HORIZONTAL
CHANGE OF DIRECTION EXCEEDING ONE HUNDRED THIRTY FIVE
DEGREES.
8. THE CONTRACTOR SHALL PROVIDE FIRE CAULKING AT ALL PIPING
PENETRATIONS OF FIRE RATED ASSEMBLIES OR PROVIDE FIRE RATED
SEALS FOR NON-RATED PLASTIC PIPING PENETRATIONS OF RATED
ASSEMBLIES AS REQUIRED.
NECIL
CE D
S
T A
T
E I
FO
D A
H O
NOISSEF
O
R P
ENG
NI
E E
R
R
N
E
HCTRAK
KR
A
M
A
A L
P-14003
2-20-22
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY
CARE / MENTAL HEALTH
BUILDING
BOISE VA MEDICAL CENTER - BOISE, ID
531-325
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590-2118
RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE
07/23/2021
MEDICAL CENTER DIRECTOR
P-104
ROOF PLAN - PLUMBING
Checker Author
KEY NOTES
SCALE: 1/8" = 1'-0"
PROJECT
NORTH
ROOF PLAN - PLUMBING
Revisions: Date: 150 OF 206
1 2 3 4
B
C
D
E
F
G
H
I
J
K
L
M
N
1.1 3.9
L.2
A.1
2.1 2.92.5
B.8
A
2 1 1 1 1 1
1 1
1 111
3 3
F
F
FFFF
F
F
F
OFFICE
OFFICE
SOILED MED
EQUIP
STAFF LOUNGE
MECH
STAFF LOCKERS
STAFF LOCKERS
STAFF LOCKERS
STAFF LOCKERS
EXAM ROOM 07
EXAM ROOM 06
EXAM ROOM 05
EXAM RM 04
EXAM ROOM 14
EXAM ROOM 13
EXAM ROOM 12
EXAM ROOM 11
EXAM ROOM 21
EXAM ROOM 20
EXAM ROOM 19
EXAM ROOM 18
EXAM ROOM 28
EXAM ROOM 27
EXAM ROOM 26
EXAM ROOM 25
PACT TEAM
EXT TEAM
EQUIP
EXT TEAM
EQUIP
PACT TEAM
P TLT
P TLT
159MED ALCOVE
MED ALCOVE
EXAM ROOM 03
EXAM ROOM 02
EXAM ROOM 01
WOMEN'S
HEALTH 01
EXAM ROOM 10
EXAM ROOM 09
EXAM ROOM 08
PROCEDURE
ROOM 01
WH TLT
118A
PROCEDURE
ROOM 01
EXAM ROOM 15
EXAM ROOM 16
EXAM ROOM 17
PACT TEAM
PACT TEAM
EXAM ROOM 24
EXAM ROOM 23
EXAM ROOM 22
WH TLT
163A
WOMEN'S
HEALTH 02
CLEAN SUPPLY
CLEAN SUPPLY
ALCOVE, H/W
ALCOVE, H/W
STORAGE
STORAGE
114A
GROUP ROOM
TLT PUBLIC
TLT PUBLIC
108 POLICE
FAMILY TLT
TLT PUBLIC
LACTATION
RECEPTION
WAITING
VESTIBULE
WC ALCOVE
101A
WAITING
COFFEE
102D
LOBBY
S TLT
ELEC
170 OIT SERVER
CORRIDOR
C10
MSA & BUSINESS
SERVICES
HOUSEKEEPING
AND LADDER
CORRIDOR
C12
S TLT
S TLT
177 S TLT
CORRIDOR
C15
MED 1
MED 2
CORRIDOR
C11
CORRIDOR
C13 CORRIDOR
C14
6"FIRE LINE SEE
CIVIL PLANS FOR
CONTINUATION
FIRE DEPARTMENT
CONNECTION
FIRE PROTECTION
RISER
P-501
4"
4"
GENERAL NOTES
1. SLOPE ALL SEWERS @ 1/4" PER FOOT UNLESS APPROVED BY LOCAL
JURISDICTION. LINES 4" AND LARGER MAY BE SLOPED AT 1/8" PER
FOOT UPON APPROVAL OF LOCAL JURISDICTION AND COMPLYING
WITH REDUCED FIXTURE UNIT CAPACITY PER THE UPC.
2. FOR THE PURPOSES OF CLEARNESS AND LEGIBILITY, DRAWINGS ARE
DIAGRAMMATIC AND FOR DESIGN INTENT ONLY. CONTRACTOR MUST
VERIFY ALL DIMENSIONS BY FIELD MEASUREMENT BEFORE
BEGINNING ANY FABRICATION OR CONSTRUCTION.
3. ALL WORK SHALL BE COMPLETED IN STRICT ACCORDANCE WITH THE
CURRENT VA GUIDES AND LOCAL PLUMBING CODES AND
ORDINANCES.
4. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT
ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS.
5. COORDINATE EXACT LOCATION OF PIPING WITH OTHER TRADES.
6. ALL VENT PIPING SHALL BE ABOVE FLOOD RIM LEVEL OF HIGHEST
FIXTURE BEFORE CONNECTION TO COMMON VENTS.
7. HORIZONTAL DRAINAGE PIPE SHALL BE PROVIDED WITH A CLEANOUT
AT ITS UPPER TERMINAL, AND EACH RUN OF PIPING, THAT IS MORE
THAN 100' IN TOTAL DEVELOPED LENGTH. CLEANOUTS SHALL BE
PROVIDED IN A DRAINAGE LINE FOR EACH AGGREGATE HORIZONTAL
CHANGE OF DIRECTION EXCEEDING ONE HUNDRED THIRTY FIVE
DEGREES.
8. THE CONTRACTOR SHALL PROVIDE FIRE CAULKING AT ALL PIPING
PENETRATIONS OF FIRE RATED ASSEMBLIES OR PROVIDE FIRE RATED
SEALS FOR NON-RATED PLASTIC PIPING PENETRATIONS OF RATED
ASSEMBLIES AS REQUIRED.
NECIL
CE D
S
T A
T
E I
FO
D A
H O
NOISSEF
O
R P
ENG
NI
E E
R
R
N
E
HCTRAK
KR
A
M
A
A L
P-14003
2-20-22
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY
CARE / MENTAL HEALTH
BUILDING
BOISE VA MEDICAL CENTER - BOISE, ID
531-325
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590-2118
RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE
07/23/2021
MEDICAL CENTER DIRECTOR
PF105
FIRE PROTECTION - AUTOMATIC
SPRINKLER SYSTEM - FLOOR PLAN
Checker Author
KEY NOTES
LIGHT HAZARD LEVEL FIRE PROTECTION REQUIRED IN THIS AREA.
ORDINARY HAZARD GROUP 1 LEVEL FIRE PROTECTION REQUIRED IN THIS AREA.
ORDINARY HAZARD GROUP 2 LEVEL FIRE PROTECTION REQUIRED IN THIS AREA.
SCALE: 1/8" = 1'-0"
PROJECT
NORTH
AUTOMATIC SPRINKLER SYSTEM - FIRE PROTECTION - FLOOR PLAN
Revisions: Date: 151 OF 206
1 2 3 4
I
J
K
L
M
N
1.1 3.9
L.2
2.1 2.92.5
1/4" / 1'-0"
/4
1/4" / 1'-0"
/4
1/ 4"
1'
-0 "1/4" / 1'-0"
/4
1/ 4"
1'
-0 " 1/4" / 1'-0"
MECH
PENTHOUSE
GENERAL NOTES
1. SLOPE ALL SEWERS @ 1/4" PER FOOT UNLESS APPROVED BY LOCAL
JURISDICTION. LINES 4" AND LARGER MAY BE SLOPED AT 1/8" PER
FOOT UPON APPROVAL OF LOCAL JURISDICTION AND COMPLYING
WITH REDUCED FIXTURE UNIT CAPACITY PER THE UPC.
2. FOR THE PURPOSES OF CLEARNESS AND LEGIBILITY, DRAWINGS ARE
DIAGRAMMATIC AND FOR DESIGN INTENT ONLY. CONTRACTOR MUST
VERIFY ALL DIMENSIONS BY FIELD MEASUREMENT BEFORE
BEGINNING ANY FABRICATION OR CONSTRUCTION.
3. ALL WORK SHALL BE COMPLETED IN STRICT ACCORDANCE WITH THE
CURRENT VA GUIDES AND LOCAL PLUMBING CODES AND
ORDINANCES.
4. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT
ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS.
5. COORDINATE EXACT LOCATION OF PIPING WITH OTHER TRADES.
6. ALL VENT PIPING SHALL BE ABOVE FLOOD RIM LEVEL OF HIGHEST
FIXTURE BEFORE CONNECTION TO COMMON VENTS.
7. HORIZONTAL DRAINAGE PIPE SHALL BE PROVIDED WITH A CLEANOUT
AT ITS UPPER TERMINAL, AND EACH RUN OF PIPING, THAT IS MORE
THAN 100' IN TOTAL DEVELOPED LENGTH. CLEANOUTS SHALL BE
PROVIDED IN A DRAINAGE LINE FOR EACH AGGREGATE HORIZONTAL
CHANGE OF DIRECTION EXCEEDING ONE HUNDRED THIRTY FIVE
DEGREES.
8. THE CONTRACTOR SHALL PROVIDE FIRE CAULKING AT ALL PIPING
PENETRATIONS OF FIRE RATED ASSEMBLIES OR PROVIDE FIRE RATED
SEALS FOR NON-RATED PLASTIC PIPING PENETRATIONS OF RATED
ASSEMBLIES AS REQUIRED.
NECIL
CE D
S
T A
T
E I
FO
D A
H O
NOISSEF
O
R P
ENG
NI
E E
R
R
N
E
HCTRAK
KR
A
M
A
A L
P-14003
2-20-22
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY
CARE / MENTAL HEALTH
BUILDING
BOISE VA MEDICAL CENTER - BOISE, ID
531-325
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590-2118
RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE
07/23/2021
MEDICAL CENTER DIRECTOR
PF106
FIRE PROTECTION - AUTOMATIC
SPRINKLER SYSTEM - PENTHOUSE
PLAN
Checker Author
KEY NOTES
LIGHT HAZARD LEVEL FIRE PROTECTION REQUIRED IN THIS AREA.
ORDINARY HAZARD GROUP 1 LEVEL FIRE PROTECTION REQUIRED IN THIS AREA.
ORDINARY HAZARD GROUP 2 LEVEL FIRE PROTECTION REQUIRED IN THIS AREA.
SCALE: 1/4" = 1'-0"
PROJECT
NORTH
AUTOMATIC SPRINKLER SYSTEM - PENTHOUSE PLAN
AREA OF WORK
Revisions: Date:
B F
P B
F P
B F
P
2 2.5 3 4
A
A.1
B
B.8
C
D
E
3"SD UP TO RD-1 (564 SF)
3"SD UP TO RD-2 (564 SF) 3"SD DN
3"SD UP TO RD-2 (722 SF)
3"SD UP TO RD-1 (722 SF)
3"SD DN
SD
3"
2"
1" 1"
2"
1-1/2"
1/2"
3/4"
SD
3"
3"
2"
3"VTR 2"
3"SD DN
1/2"
3"SD UP TO RD-1 (570 SF)
3"SD UP TO RD-2 (570 SF)
2" 2"
2"
TMV
2"
WH
P-HW
P-HW
HX
2"V DN
2"V DN
1- 1/4"HW & CW DN
TO MIXING VALVE.
1- 1/2"HW & CW
DN TO WH-1.
P-HWR
P-HWR
EXP
3"VTR
1-1/2"
2-1/2"
2"V DN (TYP 2)
CALIBRATED BALANCE
VALVE SET AT 0.5 GPM
1/2"CW DN TO
TRAP PRIMER
FIRE RISER
2"V DN
(2)2"CW DN. SEE
PW101 FOR
CONTINUATION.
3/4"CW DN TO HEATING
SYSTEM FILL BACK FLOW.
BUILDING HEATING
HEAT EXCHANGER
2-1/2"
1-1/2"1"
3/4"
2"
1-1/4" 2"
3"SD UP TO GUTTER
OUTLET (803 SF). SEE
DETAIL 5/A-504
3"
SD
SD
S D
S D
3"SD UP TO RD-1 (2285 SF)
3"SD UP TO RD-2 (2285 SF)
3"SD DN TO
DSN-1
3"SD UP TO GUTTER
OUTLET (803 SF). SEE
DETAIL 5/A-504
3"
4"
CO
4"SD DN
S D
3"
1-1/4" 2"
1-1/2"
1"
1/2"
3"VTR
2"
1/2"
3/4"
2"
2"
2"
1" 3/4"
3"VTR
1-1/2"
3/4"
3/4"
2"
1/2" 3/4"
1/2"
1/2"
3/4"
1-1/2"
1-1/2"
3"
3"SD UP TO GUTTER
OUTLET (803 SF). SEE
DETAIL 5/A-504
SD
SD
S D
SD
S D
S D
3"SD UP TO RD-1 (2285 SF)
3"SD UP TO RD-2 (2285 SF)
3"SD DN TO
DSN-1
3"SD UP TO GUTTER
OUTLET (803 SF). SEE
DETAIL 5/A-504
CO
3"
4"
3"
4"SD DN
2"VDN
& 3"VTR
3"SD DN
2"
1-1/2"
S D
P-115
SD SD
DNS-1
P-4012
P-115 1
P-4012
P-532 3
P-1151 P-812 7
P-115 1
P-528 3 P-4012
P-812 7
P-401 2
BFP-1
BFP-2
FD-M
TP-1
FD-M
FD-E
BFP-3
FD-M
DSN-1
P-501
7 9
WCO
DSN-1
P-501
SD
P-1151
P-1152
1-1/2"
1"
1" 1"
ELEC
OIT
SERVER
OFFICE
OFFICE
STAFF
LOCKERS
CORRIDOR
C15
CORRIDOR
C12
EXAM
ROOM 07
EXAM
ROOM 06
PACT
TEAM
STAFF TLT
174 STAFF TLT
SOILED
MED EQUIP
STAFF TLT
STAFF TLT
STAFF
LOUNGE
MECH
STAFF
LOCKERS
CORRIDOR
C15
CORRIDOR
C14
PACT
TEAM
SHELL
STAFF
LOCKERS
STAFF
LOCKERS
EXAM
ROOM 14
EXAM
ROOM 13
CORRIDOR
C13
EXAM
ROOM 12
EXAM
ROOM 11
EXAM
ROOM 04
ALCOVE
PUBLIC
TLT
CORRIDOR
C12
EXAM
ROOM 03
PACT
TEAM
EXAM
ROOM 10
CORRIDOR
C13
PACT
TEAM
SHELL
PACT
TEAM
SHELL
CORRIDOR
C14
COTF
2"
3"SD PIPING SEE
PL402 FOR
CONTINUATION.
2"CW, 2"V & 3/4"HW
PIPING SEE PL402
FOR CONTINUATION.
1"HW, 1-1/2"V &
3/4"CW PIPING SEE
PL402 FOR
CONTINUATION.
1"CW, 2"V &
3/4"HW PIPING
SEE PL402 FOR
CONTINUATION.
2"CW, 1-1/4"HW
PIPING SEE PL402 FOR
CONTINUATION.
3"SD PIPING SEE
PL402 FOR
CONTINUATION.
FOR CONTINUATION
SEE 1/ PL402
A
FOR CONTINUATION
SEE 1/ PL402
A
P-413
P-413
P-413
P-413
P-413
P-413
4P-413
4P-413
4P-413
FD-M
2"
EXAM
ROOM 05
P-501
P-501
P-501
P-501
P-501
P-501
P-501
P-501
3"VTR STUBBED IN
BELOW CEILING
FOR FUTURE.
GENERAL NOTES
1. SLOPE ALL SEWERS @ 1/4" PER FOOT UNLESS APPROVED BY LOCAL
JURISDICTION. LINES 4" AND LARGER MAY BE SLOPED AT 1/8" PER
FOOT UPON APPROVAL OF LOCAL JURISDICTION AND COMPLYING
WITH REDUCED FIXTURE UNIT CAPACITY PER THE UPC.
2. FOR THE PURPOSES OF CLEARNESS AND LEGIBILITY, DRAWINGS ARE
DIAGRAMMATIC AND FOR DESIGN INTENT ONLY. CONTRACTOR MUST
VERIFY ALL DIMENSIONS BY FIELD MEASUREMENT BEFORE
BEGINNING ANY FABRICATION OR CONSTRUCTION.
3. ALL WORK SHALL BE COMPLETED IN STRICT ACCORDANCE WITH THE
CURRENT VA GUIDES AND LOCAL PLUMBING CODES AND
ORDINANCES.
4. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT
ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS.
5. COORDINATE EXACT LOCATION OF PIPING WITH OTHER TRADES.
6. ALL VENT PIPING SHALL BE ABOVE FLOOD RIM LEVEL OF HIGHEST
FIXTURE BEFORE CONNECTION TO COMMON VENTS.
7. HORIZONTAL DRAINAGE PIPE SHALL BE PROVIDED WITH A CLEANOUT
AT ITS UPPER TERMINAL, AND EACH RUN OF PIPING, THAT IS MORE
THAN 100' IN TOTAL DEVELOPED LENGTH. CLEANOUTS SHALL BE
PROVIDED IN A DRAINAGE LINE FOR EACH AGGREGATE HORIZONTAL
CHANGE OF DIRECTION EXCEEDING ONE HUNDRED THIRTY FIVE
DEGREES.
8. THE CONTRACTOR SHALL PROVIDE FIRE CAULKING AT ALL PIPING
PENETRATIONS OF FIRE RATED ASSEMBLIES OR PROVIDE FIRE RATED
SEALS FOR NON-RATED PLASTIC PIPING PENETRATIONS OF RATED
ASSEMBLIES AS REQUIRED.
NECIL
CE D
S
T A
T
E I
FO
D A
H O
NOISSEF
O
R P
ENG
NI
E E
R
R
N
E
HCTRAK
KR
A
M
A
A L
P-14003
2-20-22
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY
CARE / MENTAL HEALTH
BUILDING
BOISE VA MEDICAL CENTER - BOISE, ID
531-325
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590-2118
RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE
07/23/2021
MEDICAL CENTER DIRECTOR
PL401
ENLARGED FLOOR PLAN - EAST -
PLUMBING
Checker Author
SCALE: 1/4" = 1'-0"
PROJECT
NORTH
ENLARGED FLOOR PLAN - EAST - PLUMBING
KEY NOTES
1"CW WITH BALL VALVE AND 2"V DOWN TO WATER CLOSET
1/2"HW & CW WITH BALL VALVES AND 1-1/2"V DOWN TO
LAVATORY
1/2"HW & CW WITH BALL VALVES AND 2"V DOWN TO SINK
1/2"HW & CW WITH BALL VALVES AND 1-1/2"V DOWN TO EXAM
SINK.
1/2"CW WITH BALL VALVE DN TO REFRIGERATOR ICE MAKER
WATER CONNECTION
CALIBRATED BALANCING VALVES SET AT 1 GPM.
1/2" WATER LINE STUBBED OUT WITH SHUTOFF VALVE FOR
FUTURE SINK AND CAPPED
1-1/2"CW STUBBED OUT WITH SHUTOFF VALVE FOR FUTURE
TOILET ROOM AND CAPPED
1-1/2"V STUBBED OUT AND CAPPED FOR CONNECTION TO
FUTURE EXAM SINK
AREA OF WORK
Revisions: Date: 153 OF 206
F
G
H
3"
1-1/4" 2"
2"
2"
2"
S D
S D
S D
S D
3"
3"SD UP TO GUTTER
OUTLET (803 SF). SEE
DETAIL 5/A-504
3"SD DN TO
DSN-1
3"SD UP TO GUTTER
OUTLET (803 SF). SEE
DETAIL 5/A-504
3"
3"SD UP TO RD-2 (2171 SF)
3"SD UP TO RD-1 (2171 SF)
3"
1-1/4"
3"SD DN TO
DSN-1
3"
1-1/4"
2"
DSN-1
P-501
DSN-1
P-501
S D
SD SD
S D
SD
3"
3"SD UP TO GUTTER
OUTLET (803 SF). SEE
DETAIL 5/A-504
3"SD DN TO
DSN-1
DSN-1
P-501
3"SD DN TO
DSN-1
DSN-1
P-501
3"SD UP TO GUTTER
OUTLET (803 SF). SEE
DETAIL 5/A-504
3"
3"
S D
3/4"
2"
3"SD UP TO RD-2 (2171 SF)
3"SD UP TO RD-1 (2171 SF)
3"SD DN
1-1/2"
1" P-401 2
2"
3/4"
P-1151
P-532 3
1"
P-532 4
1-1/2"
1-1/2"
3/4"
3/4"
1"
3/4"
1"
1"
3/4"
2"
2"
3/4"
3/4"
SDSD
S D
3"SD DN
1"HW PIPING SEE
PL403 FOR
CONTINUATION
2"CW, 1-1/4"HW, &
3"SD PIPING SEE
PL403 FOR
CONTINUATION.
CORRIDOR
C11
WOMEN'S
HEALTH
TLT
118A
WOMEN'S
HEALTH 01
CLEAN
SUPPLY
PACT
TEAM
ALCOVE
CORRIDOR
C12 EXAM
ROOM 03
PACT
TEAM
EXAM
ROOM 02
EXAM
ROOM 01
PACT
TEAM
ALCOVE,
H/W
ALCOVE,
H/W
CORRIDOR
C13
PROCEDURE
ROOM 01
PACT
TEAM
SHELL
EXAM
ROOM 08
EXAM
ROOM 09
EXAM
ROOM 10
PACT
TEAM
SHELL
CORRIDOR
C14
PACT
TEAM
SHELL
CORRIDOR
C14
CORRIDOR
C11
COTF
FOR CONTINUATION
SEE 1/ PL401
A
FOR CONTINUATION
SEE 1/ PL401
A
FOR CONTINUATION
SEE 1/ PL403
B
FOR CONTINUATION
SEE 1/ PL403
B
3"SD PIPING SEE
PL401 FOR
CONTINUATION.
2"CW, 2"V & 3/4"HW
PIPING SEE PL401\
FOR CONTINUATION.
1"HW, 1-1/2"V & 3/4"CW
PIPING SEE PL401 FOR
CONTINUATION.
3"SD PIPING SEE
PL403 FOR
CONTINUATION.
2"CW & 3/4"HW
PIPING SEE PL403
FOR CONTINUATION.
3/4"CW, & 3/4"HW, &
2"V PIPING SEE
PL403 FOR
CONTINUATION
1"CW, 2"V & 3/4"HW
PIPING SEE PL401
FOR CONTINUATION.
2"CW & 1-1/4"HW
PIPING SEE PL401
FOR CONTINUATION.
3"SD PIPING SEE PL401
FOR CONTINUATION.
P-413
4P-413
4P-413
4P-413
4P-413
4P-413
4P-413
GENERAL NOTES
1. SLOPE ALL SEWERS @ 1/4" PER FOOT UNLESS APPROVED BY LOCAL
JURISDICTION. LINES 4" AND LARGER MAY BE SLOPED AT 1/8" PER
FOOT UPON APPROVAL OF LOCAL JURISDICTION AND COMPLYING
WITH REDUCED FIXTURE UNIT CAPACITY PER THE UPC.
2. FOR THE PURPOSES OF CLEARNESS AND LEGIBILITY, DRAWINGS ARE
DIAGRAMMATIC AND FOR DESIGN INTENT ONLY. CONTRACTOR MUST
VERIFY ALL DIMENSIONS BY FIELD MEASUREMENT BEFORE
BEGINNING ANY FABRICATION OR CONSTRUCTION.
3. ALL WORK SHALL BE COMPLETED IN STRICT ACCORDANCE WITH THE
CURRENT VA GUIDES AND LOCAL PLUMBING CODES AND
ORDINANCES.
4. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT
ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS.
5. COORDINATE EXACT LOCATION OF PIPING WITH OTHER TRADES.
6. ALL VENT PIPING SHALL BE ABOVE FLOOD RIM LEVEL OF HIGHEST
FIXTURE BEFORE CONNECTION TO COMMON VENTS.
7. HORIZONTAL DRAINAGE PIPE SHALL BE PROVIDED WITH A CLEANOUT
AT ITS UPPER TERMINAL, AND EACH RUN OF PIPING, THAT IS MORE
THAN 100' IN TOTAL DEVELOPED LENGTH. CLEANOUTS SHALL BE
PROVIDED IN A DRAINAGE LINE FOR EACH AGGREGATE HORIZONTAL
CHANGE OF DIRECTION EXCEEDING ONE HUNDRED THIRTY FIVE
DEGREES.
8. THE CONTRACTOR SHALL PROVIDE FIRE CAULKING AT ALL PIPING
PENETRATIONS OF FIRE RATED ASSEMBLIES OR PROVIDE FIRE RATED
SEALS FOR NON-RATED PLASTIC PIPING PENETRATIONS OF RATED
ASSEMBLIES AS REQUIRED.
NECIL
CE D
S
T A
T
E I
FO
D A
H O
NOISSEF
O
R P
ENG
NI
E E
R
R
N
E
HCTRAK
KR
A
M
A
A L
P-14003
2-20-22
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY
CARE / MENTAL HEALTH
BUILDING
BOISE VA MEDICAL CENTER - BOISE, ID
531-325
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590-2118
RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE
07/23/2021
MEDICAL CENTER DIRECTOR
PL402
ENLARGED FLOOR PLAN - CENTER -
PLUMBING
Checker Author
SCALE: 1/4" = 1'-0"
NORTH
ENLARGED FLOOR PLAN - CENTER - PLUMBING
KEY NOTES
1"CW WITH BALL VALVE AND 2"V DOWN TO WATER CLOSET
1/2"HW & CW WITH BALL VALVES AND 1-1/2"V DOWN TO
LAVATORY
1/2"HW & CW WITH BALL VALVES AND 2"V DOWN TO SINK
1/2"HW & CW WITH BALL VALVES AND 1-1/2"V DOWN TO EXAM
SINK.
NOT USED
NOT USED
1/2" WATER LINE STUBBED OUT WITH SHUTOFF VALVES FOR
FUTURE SINK AND CAPPED
1-1/2"CW STUBBED OUT WITH SHUTOFF VALVE FOR FUTURE
TOILET ROOM AND CAPPED
1-1/2"V STUBBED OUT AND CAPPED FOR CONNECTION TO
FUTURE EXAM SINK
1-1/2"V FROM FIXTURE ROUGH IN UP TO ABOVE 12'-6" AND
CAPPED FOR FUTURE INSTALLATION OF SINK AND CONNECTION
TO VTR.
AREA OF WORK
Revisions: Date: 154 OF 206
I
J
K
L
L.2
M
3"
SD
S D
CO
3"
1-1/2"
3"SD UP TO
RD-2 (835 SF)
3"SD UP TO RD-1 (835 SF)
AND DN IN CHASE
3"VTR
2"V DN
P-115 1
P-4012
P-115 1
P-4012
3/4"
1"
P-608 8
3/4"
3"
3/4"CW UP TO HOSE BIBB
SEE PL103 FOR CONTINUATION.
CO
3"
3"W AND 2"V UP TO
FLOOR DRAIN SEE
PL103 FOR CONT. (TYP 2)
3"W DN SEE PW101
FOR CONTINUATION
1"
2"
1/2"
1-1/4"
P-502 5
3/4"
2"V DN
3/4"
P-708 6
P-502 5
3"SD UP TO RD-2 (835 SF)
3"SD UP TO RD-1 (835 SF)
AND DN IN CHASE
3"VTR
2"V DN
P-1151
P-4012
3"SD DN
2"
P-4012
SDSD
SD
S D
S D
SD
SD
S D
CO
2"
2"
1-1/4"
P-1151 1-1/2"
COTF
FD-C
FD-S
PROVIDE SOLID COVER
UNDER BASE BID
2"V DN
(TYP 3)
COTF
3/4"CW & HW, AND 2"V STUBBED OUT
FOR FUTURE ADD ALT 1 COFFEE SHOP.
CO
3"SD DN TO DSN-1
DSN-1
P-501
3"SD UP TO RD-2 (835 SF)
3"SD UP TO RD-1 (835 SF)
CO
CO
3"SD UP TO RD-2 (651 SF)
3"SD UP TO RD-1 (651 SF)
3"SD DN TO DSN-1
DSN-1
P-501
3"SD UP TO RD-2 (835 SF)
3"SD DN
3"SD UP TO RD-1 (835 SF)
WCO
CORRIDOR
C11
CORRIDOR
C11
STORAGE
CORRIDOR
C10
PUBLIC
TLT
PUBLIC
TLT
CORRIDOR
C11
LOBBY
GROUP
ROOM
LOBBY
LOBBY
MSA &
BUSINESS
SERVICES
HOUSEKEEPING
AND
LADDER
POLICE
FAMILY
TLT
PUBLIC
TLT
LACTATION
LOBBY
VESTIBULE
COTF
FOR CONTINUATION
SEE 1/ PL402
B
FOR CONTINUATION
SEE 1/ PL402
B
3"SD PIPING SEE
PL402 FOR
CONTINUATION.
2"CW & 3/4"HW
PIPING SEE PL402
FOR CONTINUATION.
1"HW PIPING SEE
PL402 FOR
CONTINUATION
3/4"CW, & 3/4"HW, &
2"V PIPING SEE
PL402 FOR
CONTINUATION.
2"CW, 1-1/4"HW, &
3"SD PIPING SEE
PL402 FOR
CONTINUATION.
ACCESS PANEL
GENERAL NOTES
1. SLOPE ALL SEWERS @ 1/4" PER FOOT UNLESS APPROVED BY LOCAL
JURISDICTION. LINES 4" AND LARGER MAY BE SLOPED AT 1/8" PER
FOOT UPON APPROVAL OF LOCAL JURISDICTION AND COMPLYING
WITH REDUCED FIXTURE UNIT CAPACITY PER THE UPC.
2. FOR THE PURPOSES OF CLEARNESS AND LEGIBILITY, DRAWINGS ARE
DIAGRAMMATIC AND FOR DESIGN INTENT ONLY. CONTRACTOR MUST
VERIFY ALL DIMENSIONS BY FIELD MEASUREMENT BEFORE
BEGINNING ANY FABRICATION OR CONSTRUCTION.
3. ALL WORK SHALL BE COMPLETED IN STRICT ACCORDANCE WITH THE
CURRENT VA GUIDES AND LOCAL PLUMBING CODES AND
ORDINANCES.
4. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT
ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS.
5. COORDINATE EXACT LOCATION OF PIPING WITH OTHER TRADES.
6. ALL VENT PIPING SHALL BE ABOVE FLOOD RIM LEVEL OF HIGHEST
FIXTURE BEFORE CONNECTION TO COMMON VENTS.
7. HORIZONTAL DRAINAGE PIPE SHALL BE PROVIDED WITH A CLEANOUT
AT ITS UPPER TERMINAL, AND EACH RUN OF PIPING, THAT IS MORE
THAN 100' IN TOTAL DEVELOPED LENGTH. CLEANOUTS SHALL BE
PROVIDED IN A DRAINAGE LINE FOR EACH AGGREGATE HORIZONTAL
CHANGE OF DIRECTION EXCEEDING ONE HUNDRED THIRTY FIVE
DEGREES.
8. THE CONTRACTOR SHALL PROVIDE FIRE CAULKING AT ALL PIPING
PENETRATIONS OF FIRE RATED ASSEMBLIES OR PROVIDE FIRE RATED
SEALS FOR NON-RATED PLASTIC PIPING PENETRATIONS OF RATED
ASSEMBLIES AS REQUIRED.
NECIL
CE D
S
T A
T
E I
FO
D A
H O
NOISSEF
O
R P
ENG
NI
E E
R
R
N
E
HCTRAK
KR
A
M
A
A L
P-14003
2-20-22
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY
CARE / MENTAL HEALTH
BUILDING
BOISE VA MEDICAL CENTER - BOISE, ID
531-325
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590-2118
RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE
07/23/2021
MEDICAL CENTER DIRECTOR
PL403
ENLARGED FLOOR PLAN - WEST -
PLUMBING
Checker Author
SCALE: 1/4" = 1'-0"
NORTH
ENLARGED FLOOR PLAN - WEST - PLUMBING
KEY NOTES
AREA OF WORK
KEY PLAN
1"CW WITH BALL VALVE AND 2"V DOWN TO WATER CLOSET
1/2"HW & CW WITH BALL VALVES AND 1-1/2"V DOWN TO
LAVATORY
1/2"HW & CW WITH BALL VALVES AND 2"V DOWN TO SINK
1/2"HW & CW WITH BALL VALVES AND 1-1/2"V DOWN TO EXAM
SINK.
1/2"HW & CW WITH BALL VALVES AND 2"V DOWN TO MOP SINK
1/2"HW & CW WITH BALL VALVES DOWN TO EMERGENCY
FIXTURE, TEMPERING VALVE, AND 1/2" TEMPERED WATER FROM
VALVE TO EYE/FACE WASH.
1/2"CW WITH BALL VALVE DN TO REFRIGERATOR ICE MAKER
WATER CONNECTION
1/2"CW WITH BALL VALVE AND 2"V DN TO WATER COOLER
Revisions: Date: 155 OF 206
PLUMBING FIXTURE SCHEDULE
SYMBOL DESCRIPTION
MANUFACTURER AND CATALOG #
(BASIS OF DESIGN ONLY OTHER
MANUFACTURES THAT MEET THE
SPECIFICATIONS ARE ACCEPTABLE)
FAUCET/FLUSH VALVE
CONNECTIONS
NOTES
HW CW IW V
TRIPLE COMPARTMENT
COUNTER MOUNTED SINK
ELKAY LTR542210
ELKAY LKAV2061 SINGLE HANDLE
WITH SPRAY
1/2" 1/2" 2" - ROUTE INDIRECT WASTE TO NEAREST FLOOR SINK
COUNTER MOUNT HAND
WASH SINK
ELKAY BCR15
15"X15"X6.125"
ELKA LKA2475LF, BELOW DECK
MOUNT, TWO HANDLE, 4" ADA
BLADE, 8" GOOSENECK, W/HOSE
SPRAY
1/2" 1/2" 1-1/2" - ROUTE INDIRECT WASTE TO NEAREST FLOOR SINK
ESPRESSO MACHINE
REDUCED PRESSURE
BACK FLOW DEVICE
WATTS LF009 QT
LEAD FREE, QUARTER TURN
VALVES AIR GAP FITTING
- 1/2" - - ROUTE AIR GAP DRAIN LINE TO NEAREST FLOOR SINK
COFFEE MAKER DOUBLE
CHECK BACK FLOW
DEVICE
WATTS LF007 QT
LEAD FREE, QUARTER TURN
VALVES
- 1/2" - - -
REMOVE SOLID TOP FROM
EXISTING FLOOR SINK
ROUTE 1/2"CW UP TO
COFFEE MAKER
ROUTE 1/2"CW UP TO
ESPRESSO MAKER
1/2"HW & CW UP
TO HAND SINK
BFP-5
BFP-4
P-531
BFP-5
P-524
BFP-4
1/2"
MOUNT BACK FLOW
DEVICES IN CABINET
BELOW SINK. PROVIDE
ACCESS FOR SERVICE
AND TESTING
P-531 P-524
GENERAL NOTES
1. SLOPE ALL SEWERS @ 1/4" PER FOOT UNLESS APPROVED BY LOCAL
JURISDICTION. LINES 4" AND LARGER MAY BE SLOPED AT 1/8" PER
FOOT UPON APPROVAL OF LOCAL JURISDICTION AND COMPLYING
WITH REDUCED FIXTURE UNIT CAPACITY PER THE UPC.
2. FOR THE PURPOSES OF CLEARNESS AND LEGIBILITY, DRAWINGS ARE
DIAGRAMMATIC AND FOR DESIGN INTENT ONLY. CONTRACTOR MUST
VERIFY ALL DIMENSIONS BY FIELD MEASUREMENT BEFORE
BEGINNING ANY FABRICATION OR CONSTRUCTION.
3. ALL WORK SHALL BE COMPLETED IN STRICT ACCORDANCE WITH THE
CURRENT VA GUIDES AND LOCAL PLUMBING CODES AND
ORDINANCES.
4. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT
ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS.
5. COORDINATE EXACT LOCATION OF PIPING WITH OTHER TRADES.
6. ALL VENT PIPING SHALL BE ABOVE FLOOD RIM LEVEL OF HIGHEST
FIXTURE BEFORE CONNECTION TO COMMON VENTS.
7. HORIZONTAL DRAINAGE PIPE SHALL BE PROVIDED WITH A CLEANOUT
AT ITS UPPER TERMINAL, AND EACH RUN OF PIPING, THAT IS MORE
THAN 100' IN TOTAL DEVELOPED LENGTH. CLEANOUTS SHALL BE
PROVIDED IN A DRAINAGE LINE FOR EACH AGGREGATE HORIZONTAL
CHANGE OF DIRECTION EXCEEDING ONE HUNDRED THIRTY FIVE
DEGREES.
8. THE CONTRACTOR SHALL PROVIDE FIRE CAULKING AT ALL PIPING
PENETRATIONS OF FIRE RATED ASSEMBLIES OR PROVIDE FIRE RATED
SEALS FOR NON-RATED PLASTIC PIPING PENETRATIONS OF RATED
ASSEMBLIES AS REQUIRED.
I
J
K
3"VTR
SDSD
S D
FOR CONTINUATION
SEE 1/ PL402
B
NECIL
CE D
S
T A
T
E I
FO
D A
H O
NOISSEF
O
R P
ENG
NI
E E
R
R
N
E
HCTRAK
KR
A
M
A
A L
P-14003
2-20-22
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY
CARE / MENTAL HEALTH
BUILDING
BOISE VA MEDICAL CENTER - BOISE, ID
531-325
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590-2118
RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE
07/23/2021
MEDICAL CENTER DIRECTOR
PL404
COFFEE AREA - ADD ALT 1 -
PLUMBING
Checker Author
SCALE: 1/4" = 1'-0"
PROJECT
NORTH
COFFEE AREA - ADD ALT 1 - PLUMBING
KEY NOTES
AREA OF WORK
Revisions: Date: 156 OF 206
JURISDICTION. LINES 4" AND LARGER MAY BE SLOPED AT 1/8" PER
FOOT UPON APPROVAL OF LOCAL JURISDICTION AND COMPLYING
WITH REDUCED FIXTURE UNIT CAPACITY PER THE UPC.
2. FOR THE PURPOSES OF CLEARNESS AND LEGIBILITY, DRAWINGS ARE
DIAGRAMMATIC AND FOR DESIGN INTENT ONLY. CONTRACTOR MUST
VERIFY ALL DIMENSIONS BY FIELD MEASUREMENT BEFORE
BEGINNING ANY FABRICATION OR CONSTRUCTION.
3. ALL WORK SHALL BE COMPLETED IN STRICT ACCORDANCE WITH THE
CURRENT VA GUIDES AND LOCAL PLUMBING CODES AND
ORDINANCES.
4. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT
ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS.
5. COORDINATE EXACT LOCATION OF PIPING WITH OTHER TRADES.
6. ALL VENT PIPING SHALL BE ABOVE FLOOD RIM LEVEL OF HIGHEST
FIXTURE BEFORE CONNECTION TO COMMON VENTS.
7. HORIZONTAL DRAINAGE PIPE SHALL BE PROVIDED WITH A CLEANOUT
AT ITS UPPER TERMINAL, AND EACH RUN OF PIPING, THAT IS MORE
THAN 100' IN TOTAL DEVELOPED LENGTH. CLEANOUTS SHALL BE
PROVIDED IN A DRAINAGE LINE FOR EACH AGGREGATE HORIZONTAL
CHANGE OF DIRECTION EXCEEDING ONE HUNDRED THIRTY FIVE
DEGREES.
8. THE CONTRACTOR SHALL PROVIDE FIRE CAULKING AT ALL PIPING
PENETRATIONS OF FIRE RATED ASSEMBLIES OR PROVIDE FIRE RATED
SEALS FOR NON-RATED PLASTIC PIPING PENETRATIONS OF RATED
ASSEMBLIES AS REQUIRED.
2.5 3 4
E
F
G
H
I
3"
2"
S D
S D
S D
3" 3"
3"SD UP TO RD-2 (2171 SF)
3"SD UP TO RD-1 (2171 SF)
3"
P-115 1
2"
SDSD
S D
S D
3 P-532
P-5323 P-401 2
2"
2"
EXAM
ROOM 17
EXAM
ROOM 16
EXAM
ROOM 15
PROCEDURE
ROOM 01
CORRIDOR
C13
CORRIDOR
C13
CLEAN
SUPPLY
PUBLIC
TLT
EXAM
ROOM 24
EXAM
ROOM 23
EXAM
ROOM 22
WOMEN'S
HEALTH 02
WOMEN'S
HEALTH
TLT
163A
P-413
4P-413
4P-413
P-413
4 P-413
4 P-413
4 P-413
NECIL
CE D
S
T A
T
E I
FO
D A
H O
NOISSEF
O
R P
ENG
NI
E E
R
R
N
E
HCTRAK
KR
A
M
A
A L
P-14003
2-20-22
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSTRUCT PRIMARY
CARE / MENTAL HEALTH
BUILDING
BOISE VA MEDICAL CENTER - BOISE, ID
531-325
SPEES DESIGN BUILD
625 1ST AVE #301
SEATTLE, WA, 98014
(206) 590-2118
RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE
07/23/2021
MEDICAL CENTER DIRECTOR
PL405
ENLARGED FLOOR PLAN - PACT
(WEST) - ADD ALT 3 - PLUMBING
Checker Author
SCALE: 1/4" = 1'-0"
NORTH
ENLARGED FLOOR PLAN - PACT (WEST) - ADD ALT 3 - PLUMBING
KEY NOTES
1"CW WITH BALL VALVES AND 2"V DOWN TO WATER CLOSET
1/2"HW & CW WITH BALL VALVES AND 1-1/2"V DOWN TO
LAVATORY
1/2"HW & CW WITH BALL VALVES AND 2"V DOWN TO SINK
1/2"HW & CW WITH BALL VALVES AND 1-1/2"V DOWN TO EXAM
SINK.
AREA OF WORK
Revisions: Date: 157 OF 206
JURISDICTION. LINES 4" AND LARGER MAY BE SLOPED AT 1/8" PER
FOOT UPON APPROVAL OF LOCAL JURISDICTION AND COMPLYING
WITH REDUCED FIXTURE UNIT CAPACITY PER THE UPC.
2. FOR THE PURPOSES OF CLEARNESS AND LEGIBILITY, DRAWINGS ARE
DIAGRAMMATIC AND FOR DESIGN INTENT ONLY. CONTRACTOR MUST
VERIFY ALL DIMENSIONS BY FIELD MEASUREMENT BEFORE
BEGINNING ANY FABRICATION OR CONSTRUCTION.
3. ALL WORK SHALL BE COMPLETED IN STRICT ACCORDANCE WITH THE
CURRENT VA GUIDES AND LOCAL PLUMBING CODES AND
ORDINANCES.
4. CONTRACTOR SHALL INSTALL ALL EQUIPMENT IN STRICT
ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS.
5. COORDINATE EXACT LOCATION OF PIPING WITH OTHER TRADES.
6. ALL VENT PIPING SHALL BE ABOVE FLOOD RIM LEVEL OF HIGHEST
FIXTURE BEFORE CONNECTION TO COMMON VENTS.
7. HORIZONTAL DRAINAGE PIPE SHALL BE PROVIDED WITH A CLEANOUT
AT ITS UPPER TERMINAL, AND EACH RUN OF PIPING, THAT IS MORE
THAN 100' IN TOTAL DEVELOPED LENGTH. CLEANOUTS SHALL BE
PROVIDED IN A DRAINAGE LINE FOR EACH AGGREGATE HORIZONTAL
CHANGE OF DIRECTION EXCEEDING ONE HUNDRED THIRTY FIVE
DEGREES.
8. THE CONTRACTOR SHALL PROVIDE FIRE CAULKING AT ALL PIPING
PENETRATIONS OF FIRE RATED ASSEMBLIES OR PROVIDE FIRE RATED
SEALS FOR NON-RATED PLASTIC PIPING PENETRATIONS OF RATED
ASSEMBLIES AS REQUIRED.
2.5 3 4
B
B.8
C
D
E
3"