This document appears to be drawings and associated information related to a federal contract opportunity to construct a Primary Care / Mental Health Building at the Boise VA Medical Center.

The key details include:

  • The project number is 531-325, with the solicitation number 36C77624R0096.
  • The work involves constructing a new Primary Care / Mental Health Building at the Boise VA Medical Center, including interior and exterior elements such as walls, floors, ceilings, roof, windows, and mechanical/electrical systems.
  • The drawings provide detailed plans, sections, and elevations for the proposed building, including room layouts, dimensions, material callouts, and specification references.
  • Relevant federal agency is the Department of Veterans Affairs Technology Acquisition Center Austin.
  • The document does not appear to contain a Performance Work Statement, Statement of Objectives, or pricing/award details, but rather focuses on providing the technical design drawings and associated information.

View the file

Other files

File Type Posted
0005 - Tech Questions Tracker - Boise PCMH - 8-7-24.pdf PDF
36C77624R0096 0005.pdf PDF
36C77624R0096 0004.pdf PDF
0004 - Tech Questions Tracker - Boise PCMH - 8-5-24.pdf PDF
0004 - Brand Name Justification.pdf PDF
36C77624R0096 0003.pdf PDF
0003 - Tech Questions Tracker - Boise PCMH - 8-1-24.pdf PDF
36C77624R0096 0002.pdf PDF
0001 - Site Visit Sign-in - 7-16-24.pdf PDF
36C77624R0096 0001.pdf PDF
531-325 - Drawings-14-E3.pdf PDF
531-325 - Drawings-07-A2.pdf PDF
531-325 - SOW 4-15-24.pdf PDF
531-325 - Drawings-05-S1.pdf PDF
531-325 - Specs-Vol-1.pdf PDF
Small Business Subcontracting Plan Model.docx DOCX document
531-325 - Drawings-09-A4.pdf PDF
531-325 - Drawings-03-C2.pdf PDF
Division Cost Breakdown.xlsx XLSX spreadsheet
531-325 - Drawings-15-E4.pdf PDF
Limitations on Subcontracting - Construction.docx DOCX document
Site Visit Instructions.pdf PDF
531-325 - Drawings-16-E5.pdf PDF
531-325 - Specs-Appx-B.pdf PDF
531-325 - Drawings-04-L1.pdf PDF
531-325 - Specs-Vol-2.pdf PDF
531-325 - Drawings-10-M1.pdf PDF
531-325 - Specs-Appx-A.pdf PDF
Site Visit Map.pdf PDF
531-325 - Drawings-01-G1.pdf PDF
RFP 36C77624R0096.docx DOCX document
531-325 - Drawings-02-C1.pdf PDF
531-325 - Drawings-11-P1.pdf PDF
531-325 - Drawings-13-E2.pdf PDF
531-325 - Drawings-08-A3.pdf PDF
531-325 - Specs-Appx-C.pdf PDF
531-325 - Specs-Appx-E.pdf PDF
DBA Wage Rates - Ada County - 01-12-24.pdf PDF
531-325 - Drawings-12-E1.pdf PDF
531-325 - Specs-Appx-F.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AB

ABA

AC(T)

ACM

ACW

ADA

ADJ

A/E

AF

AFF

AGG

ALT

ALUM

APPROX

ARCH

ASPH

A/V

BARR

BATH

BLDG

BLK

BLKG

BLW

BM

BMTU

BO

BOC

BOS

BRC

BRKT

BRNG

BTM

BTWN

CA

CAB

CD

CJ

CLG

CLR

CMU

CO

COL

COMP

CONC

CONN

CONST

CONT

COORD

COR

CORR

CS

CT

CTR

DBL

DC

DD

DEMO

DEPT

DG

DIA

DIM

DWN

DR

DTL

DWG

E

EA

EJ

ELEC

ELEV

EOC

EOP

EPDM

EF

EQ

AND

ANGLE

AT

CENTERLINE

DEGREES

NUMBER

ANCHOR BOLT

ARCHITECTURAL BARRIERS ACT

ACOUSTICAL CEILING (TILE)

ASBESTOS CONTAINING MATERIAL

ACOUSTICAL WALL

AMERICANS W/ DISABILITIES ACT

ADJACENT

ARCHITECT/ENGINEER

ACCESS FLOOR

ABOVE FINISH FLOOR

AGGREGATE

ALTERNATE

ALUMINUM

APPROXIMATELY

ARCHITECT(URAL)

ASPHALT

AUDIO / VIDEO

BARRIER

BATHROOM

BUILDING

BLOCK

BLOCKING

BELOW

BEAM

BONE MARROW TRANSPLANT UNIT

BOTTOM OF

BOTTOM OF CURB

BOTTOM OF SLAB

BRACE, BRACING

BRACKET

BEARING

BOTTOM

BETWEEN

CONSTRUCTION ADMINISTRATION

CABINET

CONSTRUCTION/CONTRACT DOCUMENTS

CONTROL JOINT

CEILING

CLEAR(ANCE)

CONCRETE MASONRY UNIT

CONTRACTING OFFICER

COLUMN

COMPOSITION

CONCRETE

CONNECTION

CONSTRUCTION

CONTINUOUS

COORDINATE

CONTRACTING OFFICER REP.

CORRIDOR

CONCRETE SEALER

CERAMIC TILE

CENTER

DOUBLE

DIRECT CURRENT

DESIGN DEVELOPMENT

DEMOLISH(ION)

DEPARTMENT

DESIGN GUIDE

DIAMETER

DIMENSION

DOWN

DOOR

DETAIL

DRAWING(S)

EAST

EACH

EXPANSION JOINT

ELECTRIC(AL)

ELEVATION OR ELEVATOR

EDGE OF CURB

EDGE OF PAVEMENT

ETHYLENE PROPYLENE DIENE TERPOLYMER

EACH FACE

EQUAL

EQUIP

ES

ETS

EW

EX(IST)

EXP

EXT

FA

FD

FE(C)

FF

FFB

FFL

FIN

FLASH

FLR

FLRSNT

FNDN

FOC

FOF

FOS

FP

FRCP

FRM

FT

FR

FTG

FUR

FURN

GA

GALV

GE

G(W)B

GC

GFGI

GL

GLB

GMU

GOVT

GYP

HDR

HDWE

HM

HORZ

HPDL

HR

HT

HVAC

ICRA

ID

ILSM

INCL

INST

INSUL

INT

JT

KV

LAM

LAV

LCM

LT

MAT

MAX

MDF

MECH

MEP

MFR

MIN

MISC

MOD

MTL

N N/A

NEG

NO.

NOM

NTS

EQUIPMENT

EACH SIDE

EXPOSED TO STRUCTURE

EACH WAY

EXISTING

EXPANSION

EXTERIOR

FIRE ALARM

FLOOR DRAIN

FIRE EXTINGUISHER (CABINET)

FACTORY FINISH

FINISH FLOOR BREAK

FINISH FLOOR LINE

FINISH(ED)

FLASHING

FLOOR(ING)

FLORESCENT

FOUNDATION

FACE OF CONCRETE

FACE OF FINISH

FACE OF STUDS

FIRE PROOF

FIBERGLASS-REINFORCED CONRETE PANEL

FRAME

FOOT, FEET

FIRE RATED

FOOTING

FURRING

FURNISHED

GAGE, GAUGE

GALVANIZED

GENERAL ELECTRIC

GYPSUM (WALL) BOARD

GENERAL CONTRACTOR

GOVT FURN, GOVT INSTALLED

GRID LINE

GLUE LAMINATED BEAM

GLASS MASONRY UNIT

GOVERNMENT

GYPSUM

HEADER

HARDWARE

HOLLOW METAL

HORIZONTAL

HIGH PRESSURE DECORATIVE LAM

HOUR

HEIGHT

HEATING, VENTILATION & AIR CONDITIONING

INFECTIOUS CONTROL RISK ASSESSMENT

INSIDE DIAMETER OR DIM

INTERIM LIFE SAFETY MEASURES

INCLUDE(D,ING)

INSTALL

INSULATION

INTERIOR

JOINT

KILOVOLT

LAMINATE(D)

LAVATORY

LEAD CONTAINING MATERIAL(S)

LIGHT

MATERIAL(S)

MAXIMUM

MEDIUM-DENSITY FIBREBOARD

MECHANIC(AL)

MECHANICAL, ELECTRICAL, PLUMBING

MANUFACTURE(R)

MINIMUM

MISCELLANEOUS

MODIFIED

METAL

NORTH

NOT APPLICABLE

NEGATIVE

NUMBER

NOMINAL

NOT TO SCALE

OC

OFCI

OFOI

OPNG

OPP

OVHD

P

PCONC

PCRA

PL

PLAM

PLY(WD)

PNL

PR

PRFB

PS

PT

PTN(S)

PVMT

QTY

RAD

REF

RCP

REINF

REP

REQ('D)

RESIL

REV

RF

RM

RMV

RO

S

SCHED

SD

SECT

SF

SHG

SHT(G)

SIM

SM

SMS

SOW

SPEC

SQ

SS

ST

STDG

STL

STOR

STRUCT

SUSP

SV

SYS

TEMP

T&G

THK

THRESH

TLT

TOC

TOS

TPH

TRANS

TS

TYP

UON

VA

VAR

VB

VERT

VIF

W W/

WD

WDW

WGHT

WH

W/O

WP

WR

WT

WMN

ON CENTER(S)

OWNER FURN, CONTRACTOR INST

OWNER FURN, OWNER INST

OPENING

OPPOSITE

OVERHEAD

PAINT

PRECAST CONCRETE

PRE-CONSTRUCTION RISK ASSESSMENT

PLATE

PLASTIC LAMINATE

PLYWOOD

PANEL

PAIR

PREFABRICATED

PLASTIC

PRESSURE TREATED

PARTITION(S)

PAVEMENT

QUANTITY

RADIUS

REFERENCE

REFLECTED CEILING PLAN

REINFORCE(D,ING)

REPRESENTATIVE

REQUIRE(D,S,MENT)

RESILIENT

REVERSE

RADIO FREQUENCY / ROOF

ROOM

REMOVE

ROUGH OPENING

SOUTH

SCHEDULE

SCHEMATIC DESIGN

SECTION

SQUARE FEET

SHINGLES

SHEET (SHEATHING)

SIMILAR

SEAM

SHEET METAL SCREW

SCOPE OF WORK

SPECIFICATION

SQUARE

STAINLESS STEEL

STAIN

STANDING

STEEL

STORAGE

STRUCTURAL

SUSPENDED

SHEET VINYL

SYSTEM

TEMPORARY

TONGUE AND GROOVE

THICK(NESS)

THRESHOLD

TOILET

TABLE OF CONTENTS

TOP OF SLAB

TOILET PAPER HOLDER

TRANSITION

TUBE STEEL

TYPICAL

UNLESS OTHERWISE NOTED

VETERANS AFFAIRS

VARIES

VAPOR BARRIER

VERTICAL

VERIFY IN FIELD

WEST

WITH

WOOD

WINDOW

WEIGHT

WATER HEATER

WITHOUT

WATERPROOF(ING)

WATER RESISTANT

WOOD TRIM

WOMEN

101.1

INTERIOR ELEVATION SIGN

EXTERIOR ELEVATION SIGN

BUILDING SECTION FLAG

CALLOUT FLAG

HORIZONTAL GRID LINE

VERTICAL GRID LINE

ELEVATION MARKER

EQUIPMENT TAG

WALL TYPE TAG

WINDOW TAG

FLOOR TAG

ROOF TAG

DOOR TAG

ROOM TAG

CEILING HEIGHT TAG

11A

A

KEY NOTE

NEW

EXISTING

TO DEMOLISH

HIDDEN ABOVE OR BELOW

EXISTING WALL TO REMAIN

EXISTING WALL TO DEMOLISH

NEW WALL CONSTRUCTION

NEW DOOR

INSULATION

SIGNAGE TAG

W1

9'-0"

(N)

(E)

A-101

A-101

A-101

ACT

F-1

R1

IN-01.03-01

A5075

SOAP

DISPENSER

A-101

150 SF

VESTIBULE

7. THE CONTRACTOR SHALL CHECK AND FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS BEFORE BEGINNING WORK. ANY CONFLICTS BETWEEN EXISTING CONDITIONS AND THE DRAWINGS AND SPECIFICATIONS

SHALL BE BROUGHT IMMEDIATELY TO THE ATTENTION OF THE COR.

8. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING ALL PRODUCT TYPES AND QUANTITIES DURING SITE WALK THROUGH WITH THE COR, BEFORE PURCHASING ANY MATERIALS, EQUIPMENT, PRODUCTS OR LABOR.

9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION AND COORDINATION WITH ALL INSTALLERS TO

ENSURE COMPLIANCE TO THE DRAWINGS AND SPECIFICATIONS.

10. ALL WORK DONE BY THE CONTRACTOR OR SUB-CONTRACTORS SHALL BE PERFORMED WITH A HIGH LEVEL OF

WORKMANSHIP.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING A CONSTRUCTION SCHEDULE IN ACCORDANCE WITH IN-HOUSE VA WORK. THE PLAN WILL BE REVIEWED AND APPROVED BY THE COR PRIOR TO BEGINNING WORK.

12. DIMENSIONS ARE NOT ADJUSTABLE UNLESS NOTED WITH A +/- SYMBOL. ONLY NORMAL INDUSTRY STANDARD TOLERANCES ARE ACCEPTABLE DEVIATIONS FROM DIMENSIONS INDICATED. DO NOT SCALE DRAWINGS. ALL DIMENSIONS NOTED AS CLEAR SHALL MAINTAIN THE FULL SPACE INDICATED WITHOUT ENCROACHMENTS. ALL VERTICAL HEIGHTS INDICATED ARE FROM THE FINISH FLOOR ELEVATION UNLESS OTHERWISE NOTED.

13. SEE ABOVE FOR ARCHITECTURAL SYMBOLS & ABBREVIATIONS.

14. SEE SHEET G-002 FOR DRAWING INDEX.

15. FURNISH ALL PRODUCTS TO COMPLY WITH VA STANDARDS, UON.

1. COORDINATE WORK WITH ALL CONTRACT DOCUMENTS, INCLUDING BUT NOT LIMITED TO

DRAWINGS AND SPECIFICATIONS.

2. COORDINATE ALL WORK WITH IN-HOUSE VA CONSTRUCTION.

3. SPECIFICATIONS SHALL SUPERSEDE DRAWING PLANS IN THE CASE OF ANY CONFLICTING

INFORMATION. VERIFY WITH THE VA COR BEFORE PROCEEDING.

4. CONTRACTOR AND ANY SUB-CONTRACTORS SHALL ENSURE ALL WORK IS DONE IN

CONFORMANCE WITH ALL APPLICABLE CODES, ORDINANCES AND REGULATIONS. RELEVANT

CODES INCLUDE, BUT ARE NOT LIMITED TO THE FOLLOW:

A. 2018 INTERNATIONAL BUILDING CODE

B. 2018 INTERNATIONAL MECHANICAL CODE

C. 2018 INTERNATIONAL PLUMBING CODE

D. 2018 INTERNATIONAL ELECTRICAL CODE

E. 2019 VA SEISMIC DESIGN REQUIREMENTS

F. 2018 NFPA 101

G. 2018 NFPA 99

H. 2018 INTERNATIONAL GREEN CONSTRUCTION CODE

5. CONTRACTOR AND ANY SUB-CONTRACTORS SHALL FAMILIARIZE THEMSELVES WITH EXISTING

CONDITIONS, LOCATIONS AND PROJECT REQUIREMENTS PRIOR TO SUBMITTING A BID.

6. CONTRACTOR AND ANY SUB-CONTRACTORS SHALL FIELD VERIFY DIMENSIONS, AND FAMILIARIZE

THEMSELVES WITH PROJECT REQUIREMENTS PRIOR TO COMMENCING WORK. CONTRACTOR

SHALL REPORT ANY DISCREPANCIES DIRECTLY TO THE VA COR. NO ALLOWANCES WILL BE MADE

ON BEHALF OF THE CONTRACTOR OR SUB-CONTRACTORS FOR FAILURE TO VISIT THE SITE.

16. TYPICAL FURNITURE AND CASEWORK DETAILS APPLY TO ALL ROOMS IN THE BUILDING.

17. THE CEILING SPACE FROM THE BOTTOM OF THE CEILING GRID TO A MINIMUM OF 6" ABOVE THE BOTTOM OF THE CEILING GRID IS RESERVED FOR INSTALLATION OF CEILING MOUNTED ITEMS (I.E. LIGHT FIXTURES, SPEAKERS, DIFFUSERS). NO PIPING, DUCTWORK, CONDUITS, ETC., EXCEPT DROPS SERVING THE CEILING MOUNTED ITEMS, IS ALLOWED TO BE INSTALLED IN THIS SPACE, UNLESS OTHERWISE APPROVED BY THE COR.

18. ANY AND ALL WALL MOUNTED EQUIPMENT SHALL HAVE BLOCKING IN WALL BEHIND, THIS INCLUDES BACKING FOR WALL MOUNTED DOOR STOPS. ASSURE THAT ALL REQUIRED BACKING IS INSTALLED IN WALLS PRIOR TO

INSTALLING DRYWALL.

19. IN TOILET ROOMS, PROVIDE STAINLESS STEEL FILLER BEHIND ANY MIRRORS AND OTHER WALL MOUNTED

ACCESSORIES WHEN ITEM IS INSTALLED PARTIALLY OVER CERAMIC TILE.

20. CONTRACTOR IS REQUIRED TO FOLLOW ALL OSHA REGULATIONS CONCERNING CONSTRUCTION. THE SUPERINTENDENT IS REQUIRED TO HAVE COMPLETED, AS A MINIMUM, OSHA'S 10-HOUR TRAINING AND BE KNOWLEDGEABLE OF GENERAL SAFETY REQUIREMENTS FOR CONFINED SPACES, FALL PROTECTION, PERSONAL PROTECTIVE EQUIPMENT, TRENCHING, SCAFFOLDING, CRANES, ELECTRICAL, ETC. APPLICABLE SUBCONTRACTORS ARE TO HAVE A COMPETENT PERSON ON SITE WHEN REQUIRED BY OSHA. IF ACCESSING A CONFINED SPACE, THE CONTRACTOR IS REQUIRED TO HAVE THEIR OWN CONFINED SPACE AIR MONITOR, THEY MUST HAVE PROPER OSHA RESCUE EQUIPMENT FOR A PERMIT REQUIRED CONFINED SPACE. WHERE IT IS NOT POSSIBLE FOR THE VA TO SHUTDOWN AN ELECTRICAL PANEL OR CIRCUIT, THE CONTRACTOR MUST PROVIDE AND USE THE APPROPRIATE SAFETY CLOTHING AND EQUIPMENT AS REQUIRED BY NFPA 70E. THE VA WILL BE MONITORING THE CONTRACTOR'S COMPLIANCE WITH OSHA REGULATIONS. FAILURE TO COMPLY IS GROUNDS

FOR STOPPING WORK.

21. THE VA REQUIRES THAT ALL PENETRATIONS THROUGH FIRE RATED BARRIERS BE

ACCOMPLISHED BY A QUALIFIED FIRESTOP CONTRACTOR IN ACCORDANCE WITH

SPECIFICATION 07 84 00. FIREBRICKS OR FIRE PLUGS MUST BE USED TO SEAL

PENETRATIONS IN TEMPORARY OR PERMANENT FIRE SEPARATIONS (FLOORS AND WALLS)

UNTIL THEY CAN BE PROPERLY FIRE SEALED (I.E. CORE DRILLS FOR NEW SEWER LINES

PRIOR TO INSTALLATION AND FIRE STOPPING OF SEWER LINES).

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT PRIMARY

CARE / MENTAL HEALTH

BUILDING

BOISE VA MEDICAL CENTER - BOISE, ID

531-325

SPEES DESIGN BUILD

625 1ST AVE #301

SEATTLE, WA, 98014

(206) 590-2118

RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE A-001

SYMBOLS & ABBREVIATIONS

MEDICAL CENTER DIRECTOR

07/23/2021 MK AJ 051 OF 206

SYMBOLS ABBREVIATIONS

ARCHITECTURAL GENERAL NOTES

Revisions: Date:

118 SF

ELEC

108 SF

OFFICE

108 SF

OFFICE

104 SF

SOILED MED

EQUIP

67 SF

STAFF TLT

369 SF

STAFF LOUNGE

107 SF

OIT SERVER

229 SF

MECH

29 SF

STAFF LOCKERS

28 SF

STAFF LOCKERS

41 SF

STAFF LOCKERS

29 SF

STAFF LOCKERS

124 SF

EXAM ROOM 07

124 SF

EXAM ROOM 06

124 SF

EXAM ROOM 05

124 SF

EXAM ROOM 04

124 SF

EXAM ROOM 14

124 SF

EXAM ROOM 13

124 SF

EXAM ROOM 12

124 SF

EXAM ROOM 11

5064 SF

PACT TEAM

SHELL

65 SF

PUBLIC TLT

122 25 SF

ALCOVE

124 SF

EXAM ROOM 03

124 SF

EXAM ROOM 02

124 SF

EXAM ROOM 01

124 SF

WOMEN'S

HEALTH 01

124 SF

EXAM ROOM 10

124 SF

EXAM ROOM 09

124 SF

EXAM ROOM 08

180 SF

PROCEDURE

ROOM 01

79 SF

ALCOVE, H/W

66 SF

WOMEN'S

HEALTH TLT

118A

2427 SF

PACT TEAM

223 SF

CLEAN SUPPLY

79 SF

ALCOVE, H/W

41 SF

STORAGE

100 SF

STORAGE

107A

467 SF

GROUP ROOM

74 SF

PUBLIC TLT

75 SF

PUBLIC TLT

173 SF

MSA & BUSINESS

SERVICES

160 SF

HOUSEKEEPING

AND LADDER

111 87 SF

POLICE

80 SF

FAMILY TLT

74 SF

PUBLIC TLT

84 SF

LACTATION

317 SF

RECEPTION

603 SF

VESTIBULE

2620 SF

LOBBY

67 SF

STAFF TLT

1 2 3 4

B

C

D

E

F

G

H

I

J

K

L

M

N

44' - 9" 32' - 9" 44' - 9"

1.1 3.9

L.2

A.1

2.1 2.9

122' - 3"

CHECK IN CHECK IN

679 SF

CORRIDOR

C13

779 SF

CORRIDOR

C11

118 SF

CORRIDOR

C10

608 SF

CORRIDOR

C12

609 SF

CORRIDOR

C14

67 SF

STAFF TLT

68 SF

STAFF TLT

968 SF

CORRIDOR

C15

2.5

B.8

A

FUTURE SECURITY

SCREENING

EQUIPMENT

1. FIELD VERIFY ALL DIMENSIONS AND REPORT

DISCREPANCIES, IF ANY, TO VA COR PRIOR TO

CONSTRUCTION.

2. DIMENSIONS SHOWN ARE FROM GRID LINES TO FACE OF

STUD, CENTERLINE OF STRUCTURAL COLUMNS,

CENTERLINE OF OPENINGS, UON.

3. DIMENSIONS SHOWN ARE FROM FINISH FACE OR

OPENINGS TO FINISH FACE OF WALLS (VENEER BRICK

WALLS).

4. DIMENSIONS NOTED WITH THE SUFFIX 'CLR', 'CLEAR', OR

'MIN' ARE FROM FACE OF FINISH INCLUDING TRIM WORK

(UON).

5. REFERENCE SHEETS A-404 THRU A-406 FOR ADDITIONAL

DIMENSIONS AND WALL TYPES.

6. ASSURE THAT ALL REQUIRED BACKING IS INSTALLED IN

WALLS PRIOR TO INSTALLING DRYWALL. THIS INCLUDES

BACKING FOR WALL MOUNTED DOOR STOPS.

7. REFERENCE SHEET IWP01 FOR HANDRAIL LOCATIONS.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT PRIMARY

CARE / MENTAL HEALTH

BUILDING

BOISE VA MEDICAL CENTER - BOISE, ID

531-325

SPEES DESIGN BUILD

625 1ST AVE #301

SEATTLE, WA, 98014

(206) 590-2118

RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE A-101

FLOOR PLAN

MEDICAL CENTER DIRECTOR

07/23/2021 MK MA 052 OF 206

PROJECT

NORTH

1/8" = 1'-0"1

LEVEL 1 FLOOR PLAN

GENERAL NOTES

AE301

AE301

AE301

1 2 3 4

B

C

D

E

F

G

H

I

J

K

L

M

N

ROOF DRAIN AND

OVERFLOW (TYP)

AE302

AE302

AE302

AE302

/4

1/4" / 1'-0" 1/4" / 1'-0"

ROOF DRAIN AND

OVERFLOW (TYP)

AE302

R1

R1

R1

R1

2.5

HVAC UNIT PER

MECHANICAL

REINFORCED ROOF

AREA PER MECHANICAL

/ STRUCTURAL (BELOW

TAPERED INSULATION)

R2

8" / 1'-0" 8" / 1'-0"

8" / 1'-0"

RIDGE VENT RIDGE VENT

RIDGE VENT

R3

R2

R1

ROOF RIDGE ROOF RIDGE

R1

ROOF DRAIN AND

OVERFLOW (TYP)

HIGH POINT

HIGH POINT

A

1/4" / 1'-0" 1/4" / 1'-0"

1/4" / 1'-0"

1/4" / 1'-0" 1/4" / 1'-0"

17' - 11 7/8"

3/4" / 1'-0"

1/4" / 1'-0"

1/4" / 1'-0"

1/4" / 1'-0"

HIGH POINT

1/4" / 1'-0"

PROVIDE

CRICKET AT

SKYLIGHT

CURBS, TYP

LOW POINT

PROVIDE

ROOF

CRICKET

SLOPED TO

DRAINS, TYP

PROVIDE

ROOF

CRICKET

SLOPED TO

DRAINS, TYP

1/4" / 1'-0"

AE303

1/4" / 1'-0" 1/ 4"

1'

-0

/4

/4

1/ 4"

1'

-0

1/4" / 1'-0"

ROOF CRICKET,

TYP

/4

/4

1/ 4"

1'

-0

1/ 4"

1'

-0 " 1/4" / 1'-0"

15' - 8 1/2"

/4

1/4" / 1'-0" 1/ 4"

1'

-0

/4

" 1/

4"

1' -0

1/4" / 1'-0"

ROOF DRAIN AND

OVERFLOW (TYP) ROOF DRAIN AND

OVERFLOW (TYP)

ROOF DRAIN AND

OVERFLOW (TYP)

SK1

SK1

SK1

SK1

SK1

SK1

SK1

SK1

SK1

SK1

ROOF AREA 6757 SQ FT

ROOF AREA 577 SQ FT

ROOF AREA 397 SQ FT

MANSARD AREA 1615

TOTAL =2012 SQ FT ROOF AREA 575 SQ FT

ROOF AREA 1693 FT

ROOF AREA 1695 FT

AREA FROM ROOF ABOVE

= 1674x1/2 = 987

TOTAL AREA = 2682

ROOF AREA 680 FT

ROOF AREA 1974 FT

ROOF AREA 1693 FT

AREA FROM ROOF ABOVE

= 1674x1/2 = 987

TOTAL AREA = 2680

ROOF AREA 1055 SQ FT

ROOF AREA 280 SQ FTROOF AREA 280 SQ FT

ROOF AREA 2941 SQ FT ROOF AREA 2941 SQ FT

R2

CORNICE AND

GUTTER

CORNICE AND

GUTTER

R1

1. REFER TO FOR ROOF TYPES./4 A-611

ROOFTOP

PROTECTION

WALKING

MAT

SKYLIGHT, TYP

A-506

1/4

'-0

1/4" / 1'-0"

1/4

'-0

1/4

'-0

1/4" / 1'-0"

R4

RAINFALL RATE BOISE, IDAHO = 3.3 IN/HOUR

3" DIAMETER DRAIN FOR 4" HOURLY RATE RAINFALL

= 720 SQ FT/ PER DRAIN

TOTAL MAIN ROOF AREA = 6757 SQ FT

FROM MANSARD AREA = 1626 SQ FT

TOTAL AREA = 8383 SQ FT

TOTAL REQUIRED DRAINS = 4

PROVIDE = 4

ROOF MANSARD AREA = 2941 SQ FT

RAINFALL RATE BOISE, IDAHO = 3.3 IN/HOUR

ROOF PITCH FACTOR FOR 8"/1'-0" = 1.1

SIZING GUTTER

3445x1.1x3.3 = 12505 SQ FT

K-STYLE GUTTER 6" = 7960 SQ FT

PROVIDE 10"x7 3/8" RECTANGULAR GUTTER

4" DOWNSPOUT 12505/4600 = 3 DOWNSPOUTS

PROVIDE 4 - 3"x4" RECTANGULAR DOWNSPOUTS

1. APPROXIMATE LOCATION OF DOWNSPOUT. REFER TO

DETAIL 5 / A-504.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT PRIMARY

CARE / MENTAL HEALTH

BUILDING

BOISE VA MEDICAL CENTER - BOISE, ID

531-325

SPEES DESIGN BUILD

625 1ST AVE #301

SEATTLE, WA, 98014

(206) 590-2118

RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE A-102

ROOF PLAN

MEDICAL CENTER DIRECTOR

07/23/2021 MK MA 053 OF 206

1/8" = 1'-0"1

ROOF PLAN

PROJECT

NORTH

ROOF DRAINAGE CALCULATION

ROOF GUTTER CALCULATION

GENERAL NOTES

KEY NOTES (THIS SHEET ONLY)

2. REFER TO SHEET A-601 FOR SKYLIGHT INFORMATION.

8062 SF

MECH

PENTHOUSE

OPEN

1 2 3 4

I

J

K

L

M

N

PREMANUFACTURED

8' x 2'-6" ROOF HATCH

AE302

1.1 3.9

EQ EQ

L.2

AE302

67F

2' - 8 1/2" 32' - 9" 2' - 8 1/2"

44' - 9" 32' - 9" 44' - 9"

42' - 0 1/2" 19' - 1" 19' - 1"

F-2

R1

1/4" / 1'-0"

/4

1/4" / 1'-0"

RD

OD

AE302

AE302

2.1 2.9

/4

2.5

122' - 3"

15' - 8 3/8"

/4

1/ 4"

1'

-0 "1/4" / 1'-0"

/4

1/ 4"

1'

-0 " 1/4" / 1'-0"

EQ EQ

AE303

MECH PENTHOUSE IS

NOT TO BE USED AS

STORAGE

14' - 8 1/2"

DIAGONAL

STRUCTURAL

MEMBER -

PER STRUCT

ROOF HATCH SAFETY

GUARDRAIL AND GATE

A-502

RD OD

RD ODRD

RD OD

OD

1. FIELD VERIFY ALL DIMENSIONS AND REPORT

DISCREPANCIES, IF ANY, TO VA COR PRIOR TO

CONSTRUCTION.

2. DIMENSIONS SHOWN ARE FROM GRID LINES TO FACE OF

STUD, CENTERLINE OF STRUCTURAL COLUMNS,

CENTERLINE OF OPENINGS, UON.

3. DIMENSIONS SHOWN ARE FROM FINISH FACE OR

OPENINGS TO FINISH FACE OF WALLS (VENEER BRICK

WALLS).

4. DIMENSIONS NOTED WITH THE SUFFIX 'CLR', 'CLEAR', OR

'MIN' ARE FROM FACE OF FINISH INCLUDING TRIM WORK

(UON).

5. ASSURE THAT ALL REQUIRED BACKING IS INSTALLED IN

WALLS PRIOR TO INSTALLING DRYWALL. THIS INCLUDES

BACKING FOR WALL MOUNTED DOOR STOPS.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT PRIMARY

CARE / MENTAL HEALTH

BUILDING

BOISE VA MEDICAL CENTER - BOISE, ID

531-325

SPEES DESIGN BUILD

625 1ST AVE #301

SEATTLE, WA, 98014

(206) 590-2118

RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE A-114

PENTHOUSE FLOOR PLAN

MEDICAL CENTER DIRECTOR

07/23/2021 MK MA 054 OF 206

1/4" = 1'-0"1

PENTHOUSE

PROJECT

NORTH

GWB-1

9' - 11"

2x4 ACT

11' - 3"

2x4 ACT

9' - 0" 2x4 ACT

9' - 0"

2x4 ACT

9' - 0"

2x4 ACT

9' - 0" 2x4 ACT

9' - 0"

2x4 ACT

9' - 0"

2x4 ACT

9' - 0"

2x4 ACT

11' - 0"

2x4 ACT

9' - 0"

2x4 ACT

9' - 0"

2x4 ACT

9' - 0"

2x4 ACT

9' - 0"

2x4 ACT

9' - 0"

2x4 ACT

9' - 0"

2x4 ACT

9' - 0"

2x4 ACT

9' - 0"

2x4 ACT

9' - 0"

2x4 ACT

9' - 0"

2x4 ACT

9' - 0"

2x4 ACT

9' - 0"

2x4 ACT

9' - 0"

2x4 ACT

9' - 0"

2x4 ACT

9' - 0"

2x4 ACT

9' - 0"

2x4 ACT

9' - 0"

GWB-1

9' - 11"

4' - 0"

2x4 ACT

9' - 0"

2x4 ACT

9' - 0"

2x4 ACT

9' - 0"

2x4 ACT

9' - 0"

2x4 ACT

9' - 0"

2x4 ACT

9' - 0"

1 2 3 4

B

C

D

E

F

G

H

I

J

K

L

M

N

2x4 ACT

10' - 0"

GWB-1

9' - 0"

GWB-1

9' - 0"

GWB-1

9' - 0"

2x4 ACT

10' - 0"

COVE LIGHTING

2x4 ACT

9' - 0"

GWB-1

9' - 0"

GWB-1

9' - 0"

GWB-1

9' - 0"

LWC3

10' - 0"

OPENOPEN

2x4 ACT

10' - 11" 2x4 ACT

10' - 11"

L.2

A.1

2x4 ACT

10' - 0" 2x4 ACT

10' - 0"

2x4 ACT

11' - 0"

2x4 ACT

11' - 0"

2x4 ACT

12' - 0"

2x4 ACT

9' - 0"

GWB-1

9' - 6" LWC1

10' - 0"

GWB-1

9' - 6"

GWB-1

11' - 0"

2.5

B.8

GWB-1

11' - 0"

A

GWB-1

8' - 10"

2x4 ACT

9' - 0"

2x4 ACT

9' - 0"

VARIES

LWC3

BLAST

26' - 10"

BLAST

26' - 10"

HIGH CEILING NEAR UPPER ROOF PER BUILDING SECTIONS

(CONTINUE CEILING MATERIAL THROUGHOUT PORTION OF

UPPER ROOF THAT WILL BE VISIBLE FROM BELOW)

BLAST

26' - 10"

VARIES

BLAST

VARIES

BLAST

VARIES

BLAST

VARIES

BLAST

BLAST

26' - 10"

OPEN

PATIENT

LIFT (TYP)

2x4 ACT

11' - 0"

OPEN

OPEN OPEN

SKYLIGHT, TYP

OVERHEAD MECHANICAL EQUIPMENT

REFER TO MECHANICAL DRAWINGS

FOR ADDITIONAL INFORMATION, TYP.

VARIES

LWC3

GWB-1

7' - 8"

GWB-1

9' - 11"

GWB-1

7' - 8"

GWB-1

7' - 8"

GWB-1

9' - 0"2x4 ACT

10' - 4"

10' - 2"

2x4 ACT

9' - 0"

2x4 ACT

9' - 0"

2x4 ACT

9' - 0"

1. REFERENCE MEP DRAWINGS FOR DETAILED SCOPE OF

SYSTEMS.

2. CEILING FIXTURES ARE CENTERED IN CEILING TILE OR

CENTERED IN ROOM, UON.

3. DIMENSIONS IN CEILING PLANS ARE TO FACE OF FINISH,

UON.

RECESSED DOWNLIGHT

LIGHTING

RECESSED WALL WASHER

RECESSED TROFFER, 2X2

RECESSED TROFFER, 2X4

PENDANT LINEAR

PENDANT ROUND

SURFACE MOUNT LINEAR

SURFACE MOUNT ROUND

SURFACE MOUNT STRIP

FRONT/BACK BLDG WALL

SCONCE

UNDER CABINET

ACT 2X4

GWB

OPEN TO

STRUCTURE

EXHAUST

RETURN GRILL

SUPPLY DIFFUSER

CEILING

MECHANICAL

LCW1 WOOD

CEILING SYSTEM

ACCESS PANEL

24" x 24"

ACCESS PANEL

12" x 12"

SIDE BLDG WALL SCONCE

HANGING TROFFER, 2X2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT PRIMARY

CARE / MENTAL HEALTH

BUILDING

BOISE VA MEDICAL CENTER - BOISE, ID

531-325

SPEES DESIGN BUILD

625 1ST AVE #301

SEATTLE, WA, 98014

(206) 590-2118

RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE AC101

REFLECTED CEILING PLAN

MEDICAL CENTER DIRECTOR

07/23/2021 MK MA 055 OF 206

LEGEND

GENERAL NOTES

1/8" = 1'-0"1

LEVEL 1 - CEILING PLAN

PROJECT

NORTH

LEVEL 1

0' - 0"

PENTHOUSE

16' - 6"

BO ROOF DECK - GABLE

35' - 3 1/2"

1 2 3 4

A-602

S1

4x8x2 1/4" BRICK VENEER

OVER RAIN SCREEN

SYSTEM

FIBER CEMENT SIDING

PANEL AT PARAPET

4x8x2 1/4" BRICK

VENEER OVER RAIN

SCREEN SYSTEM

ASPHALT SHINGLE

OVER

PREFABRICATED

METAL STUD

MANSARD ROOF

TRUSSES

2.5

A-602

A-602

S3A S3B S3AS3AS3BS3A

S6 W1 W1

BO DECK - ENTRY

12' - 8"

COMPOSITE

ALUMINUM WALL

CLADDING

SWISSPEARL

PANEL

PRECAST

CONCRETE

HEAD AND

SILL

A-602

E Q

E Q

E Q

E Q

E Q

E Q

OR APPROVED ALTERNATE

- FOAM CORNICEFC-1

- FASCIAF-1

- FASCIAF-1

- FASCIAF-1

LEVEL 1

0' - 0"

LEVEL 1

0' - 0"

PENTHOUSE

16' - 6"

BO ROOF DECK - GABLE

35' - 3 1/2"

AE301

AE301

B C D E F G H I J K L M N

W2

W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 A-602

AE302

AE302

AE302

4x8x2 1/4" BRICK VENEER OVER

RAIN SCREEN SYSTEM

FRCP TRIM FASCIA

MANSARD, ASPHALT SHINGLE

OVER METAL STUDS

FIBER CEMENT

SIDING PANEL OVER

RAINSCREEN SYSTEM

ASPHALT SHINGLE

ROOFING

R3

AE302

VERTICAL EXPANSION

JOINT AT BRICK VENEER

HORIZONTAL EXPANSION

JOINT AT BRICK VENEER

A

S4D S4A S4B S2

A-602

L1 L1 L1

AE303

BO DECK - LOW ROOF

13' - 7 1/2" BO DECK - ENTRY

12' - 8"

A-602

FIRE DEPARTMENT CONNECTION

EXTERIOR LIGHTING PER

ELECTRICAL, TYP. CENTER

LIGHT ON WINDOW UNLESS

DIMENSIONED OTHERWISE.

2' - 0" 2' - 0"2' - 0"2' - 0"

E Q

E Q

E Q

E Q

ALIGN LIGHT FIXTURES, TYP, UON

- FOAM CORNICEFC-1

17' - 5"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT PRIMARY

CARE / MENTAL HEALTH

BUILDING

BOISE VA MEDICAL CENTER - BOISE, ID

531-325

SPEES DESIGN BUILD

625 1ST AVE #301

SEATTLE, WA, 98014

(206) 590-2118

RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE AE201

EXTERIOR ELEVATIONS

MEDICAL CENTER DIRECTOR

07/23/2021 MK MA 056 OF 206

3/16" = 1'-0"1

WEST EXTERIOR ELEVATION

1/8" = 1'-0"2

NORTH EXTERIOR ELEVATION

GENERAL NOTES

1. REFER TO SHEET A-601 & A-602 FOR SCHEDULES AND

STOREFRONT ELEVATIONS. STOREFRONT TAGS THAT ARE

THE SAME SHALL REFERENCE THE SAME CALLOUT TAG AS

ITS CORRESPONDING TAG.

2. REFER TO SHEET A-601 FOR WINDOW SCHEDULE

PENTHOUSE

16' - 6"

BO ROOF DECK - GABLE

35' - 3 1/2"

AE301

23 1.13.9

4x8x2 1/4" BRICK VENEER OVER

RAIN SCREEN SYSTEM

FRCP TRIM FASCIA

FRCP TRIM FASCIA

MANSARD, ASPHALT

SHINGLE OVER

PREFABRICATED METAL

STUD MANSARD ROOF

TRUSSES

8" / 1'-0

" 8" / 1'-0"

PRECAST CONCRETE

SILL AND HEADER RIDGE VENT, TYPICAL

2.5

9' - 8 1/2"6"8' - 0"6"8' - 0"6"8' - 0"6"8' - 0"

10 1/2"

9' - 9 1/2"6"9' - 0 1/2"6"8' - 0"6"8' - 0"6"7' - 5"4"EQEQEQ

/2

S5AS5AS5B S5A S5A

W1

A-602

A-602

BO DECK - ENTRY

12' - 8"

1' - 4 15/16"

W1

- FOAM CORNICEFC-1

LEVEL 1

0' - 0"

PENTHOUSE

16' - 6"

BO ROOF DECK - GABLE

35' - 3 1/2"

AE301

AE301

BCDEFGHIJKLMN

W2

W1W1W1

W3

W1 W1 W1 W1 W1 W1 W1

AE302

AE302

AE302

S2

4x8x2 1/4" BRICK VENEER OVER

RAIN SCREEN SYSTEM

FRCP TRIM FASCIA

MANSARD, ASPHALT SHINGLE

OVER METAL STUDS

FIBER CEMENT SIDING

PANELS OVER RAIN

SCREEN SYSTEM

ASPHALT SHINGLE ROOFING

AE302

VERTICAL EXPANSION

JOINT AT BRICK VENEER

HORIZONTAL EXPANSION

JOINT AT BRICK VENEER

A

S4B S4E S4C

A-602

A-602

L1 L1 L1

AE303

" 8

16' - 6"

A-602

EXTERIOR LIGHTING

PER ELECTRICAL,

TYP. CENTER LIGHT

ON WINDOW UNLESS

DIMENSIONED

OTHERWISE.

2' - 0" 2' - 0" 2' - 0" 2' - 0"

S

IL

L

E Q

E Q

ALIGN LIGHT FIXTURES, TYP, UON

E Q

E Q

- FOAM CORNICEFC-1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT PRIMARY

CARE / MENTAL HEALTH

BUILDING

BOISE VA MEDICAL CENTER - BOISE, ID

531-325

SPEES DESIGN BUILD

625 1ST AVE #301

SEATTLE, WA, 98014

(206) 590-2118

RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE AE202

EXTERIOR ELEVATIONS

MEDICAL CENTER DIRECTOR

07/23/2021 MK MA 057 OF 206

3/16" = 1'-0"1

EAST EXTERIOR ELEVATION

1/8" = 1'-0"2

SOUTH EXTERIOR ELEVATION

GENERAL NOTES

1. REFER TO SHEET A-601 & A-602 FOR SCHEDULES AND

STOREFRONT ELEVATIONS. STOREFRONT TAGS THAT ARE

THE SAME SHALL REFERENCE THE SAME CALLOUT TAG AS

ITS CORRESPONDING TAG.

2. REFER TO SHEET A-601 FOR WINDOW SCHEDULE

PENTHOUSE

16' - 6"

PENTHOUSE

16' - 6"

AE301

AE301

B C D E F G H I J K L M N

CORRIDOR

C13

MECH

PENTHOUSE

RECEPTION

LOBBY

VESTIBULE

AE302

L.2

AE302

A.1

R1

R2

R3

67F

85F

AE491

AE491

AE491

AE491

AE491

AE302

173 SF

MSA & BUSINESS

SERVICES

110CORRIDOR

C15

STAFF TLT

177 CORRIDOR

C13

A

AE303

BO DECK - LOW ROOF

13' - 7 1/2" BO DECK - ENTRY

12' - 8"

A-506

A-506

8" / 1'-0

AE303

TYP 4' - 0" TYP

L3L3

TYP

REINFORCED ROOF AREA PER

MECHANICAL / STRUCTURAL

(BELOW TAPERED INSULATION)

R4

LEVEL 1

0' - 0"

PENTHOUSE

16' - 6"

BO ROOF DECK - GABLE

35' - 3 1/2"

AE301

1 2 3

PUBLIC TLT

FAMILY TLT

LACTATION

POLICE

HOUSEKEEPING

AND LADDER

MSA & BUSINESS

SERVICES

PUBLIC TLT

PUBLIC TLT

STORAGE

STORAGE

107A

MECH

PENTHOUSE

3.9

AE492

1F

AE492

2D

AE492

4A

R3

AE492

6F

2.5

BO DECK HIGH ROOF

14' - 6"

8" / 1'-0

" 8" / 1'-0"

CORRIDOR

C10

LEVEL 1

0' - 0"

PENTHOUSE

16' - 6"

BO ROOF DECK - GABLE

35' - 3 1/2"

AE301

AE301

PACT TEAM

SHELL

CORRIDOR

C13

EXAM ROOM 13

EXAM ROOM 06

2.12.9

608 SF

CORRIDOR

C12

2.5

609 SF

CORRIDOR

C14

AE491

8" / 1'-0

" 8" / 1'-0" 8" / 1'-0

8" / 1'-0"

PACT TEAM

82 82

A-509

REINFORCED ROOF AREA PER

MECHANICAL / STRUCTURAL

(BELOW TAPERED INSULATION)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT PRIMARY

CARE / MENTAL HEALTH

BUILDING

BOISE VA MEDICAL CENTER - BOISE, ID

531-325

SPEES DESIGN BUILD

625 1ST AVE #301

SEATTLE, WA, 98014

(206) 590-2118

RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE AE301

BUILDING SECTIONS

MEDICAL CENTER DIRECTOR

07/23/2021 MK MA 058 OF 206

1/8" = 1'-0"1

BUILDING LONGITUDINAL SECTION - BETWEEN GRIDS 2 AND 3

1/8" = 1'-0"2

BUILDING CROSS SECTION AT GRID I

1/8" = 1'-0"3

BUILDING CROSS SECTION AT GRID C

AE301

2 31.1 3.9

ELEC

OIT SERVER

OFFICE

OFFICE

STAFF TLT

SOILED MED

EQUIP

STAFF TLT

STAFF LOUNGE

MECH

2.5

BO DECK - LOW ROOF

13' - 7 1/2"

STAFF TLT

STAFF TLT

LEVEL 1

0' - 0"

BO ROOF DECK - GABLE

35' - 3 1/2"

AE301

2 3

VESTIBULE

2.1 2.92.5

BO DECK - ENTRY

12' - 8"

S7

S6

ALIGN FACE OF STEMWALL

WITH STOREFRONT @ VESTIBULE

A-602

LEVEL 1

0' - 0"

BO ROOF DECK - GABLE

35' - 3 1/2"

AE301

LOBBY

RECEPTION

GROUP ROOM

2.5

BO DECK - ENTRY

12' - 8"

BO DECK HIGH ROOF

14' - 6"

LOBBY

10" 10"

LEVEL 1

0' - 0"

PENTHOUSE

16' - 6"

AE301

AE301

B C D E F G H I J K L

AE302

AE302

AE302

STAFF LOUNGE

PACT TEAM

SHELL

LOBBY

FAMILY TLT

CORRIDOR

C15

AE492

4F

A

AE303

BO DECK - LOW ROOF

13' - 7 1/2"

BO DECK HIGH ROOF

14' - 6"

15' - 8"

HIGH POINT

TYP

4' - 0"

L3 L3

TYP TYP

87R182

4' - 3"

65F

VARIES

BLAST

LEVEL 1

0' - 0"

PENTHOUSE

16' - 6"

BO ROOF DECK - GABLE

35' - 3 1/2"

AE301

STORAGE

107A

STORAGE

PUBLIC TLT

PUBLIC TLT

LOBBY

MSA & BUSINESS

SERVICES

HOUSEKEEPING

AND LADDER

MECH

PENTHOUSE

LOBBY

POLICE

FAMILY TLT

PUBLIC TLT

LACTATION

2.12.9 2.5

BO DECK HIGH ROOF

14' - 6"

8" / 1'-0

8" / 1'-0"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT PRIMARY

CARE / MENTAL HEALTH

BUILDING

BOISE VA MEDICAL CENTER - BOISE, ID

531-325

SPEES DESIGN BUILD

625 1ST AVE #301

SEATTLE, WA, 98014

(206) 590-2118

RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE AE302

BUILDING SECTIONS

MEDICAL CENTER DIRECTOR

07/23/2021 MK MA 059 OF 206

1/8" = 1'-0"4

BUILDING CROSS SECTION BETWEEN GRIDS A AND B

1/8" = 1'-0"2

BUILDING CROSS SECTION AT GRID M

1/8" = 1'-0"3

BUILDING CROSS SECTION AT GRID K

1/8" = 1'-0"1

BUILDING LONGITUDINAL SECTION BETWEEN GRIDS 3 AND 4

1/8" = 1'-0"5

BUILDING CROSS SECTION AT GRID J

PENTHOUSE

16' - 6"

AE301

1 2 3 41.1 3.92.5

W4 W4 W5 W5 W5W5

8" / 1'-0

8" / 1'-0" 8" /

1'-0

8" / 1'-0"

W1

CORRIDOR

C15

CORRIDOR

C15

LIGHT WELL, TYP

W1

65F 65F

BLAST

26' - 10"

BLAST

26' - 10"

VARIES

BLAST

VARIES

BLAST

LEVEL 1

0' - 0"

PENTHOUSE

16' - 6"

BO ROOF DECK - GABLE

35' - 3 1/2"

AE301

1234 1.13.9 2.12.9 2.5

W1 W1

8" / 1'-0

" 8" / 1'-0" 8" / 1'-0

" 8" / 1'-0"

CORRIDOR

C11

CORRIDOR

C11

LIGHT WELL, TYP

65F

BLAST

26' - 10"

65F

BLAST

26' - 10"

VARIES

BLAST

VARIES

BLAST

LEVEL 1

0' - 0"

PENTHOUSE

16' - 6"

BO ROOF DECK - GABLE

35' - 3 1/2"

I J K M

BO DECK - ENTRY

12' - 8"

BO DECK HIGH ROOF

14' - 6"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT PRIMARY

CARE / MENTAL HEALTH

BUILDING

BOISE VA MEDICAL CENTER - BOISE, ID

531-325

SPEES DESIGN BUILD

625 1ST AVE #301

SEATTLE, WA, 98014

(206) 590-2118

RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE AE303

BUILDING SECTIONS

MEDICAL CENTER DIRECTOR

07/23/2021 MK MA 060 OF 206

1/8" = 1'-0"1

BUILDING CROSS SECTION AT BACK CORRIDOR

1/8" = 1'-0"2

BUILDING SECTION AT FRONT CORRIDOR

1/4" = 1'-0"3

ENLARGED LONGITUDINAL SECTION - AT RECEPTION

AE301

AE301

118 SF

ELEC

108 SF

OFFICE

108 SF

OFFICE

104 SF

SOILED MED

EQUIP

67 SF

STAFF TLT

369 SF

STAFF LOUNGE

107 SF

OIT SERVER

229 SF

MECH

29 SF

STAFF LOCKERS

28 SF

STAFF LOCKERS

41 SF

STAFF LOCKERS

29 SF

STAFF LOCKERS

124 SF

EXAM ROOM 07

124 SF

EXAM ROOM 06

124 SF

EXAM ROOM 05

124 SF

EXAM ROOM 04

124 SF

EXAM ROOM 14

124 SF

EXAM ROOM 13

124 SF

EXAM ROOM 12

124 SF

EXAM ROOM 11

5064 SF

PACT TEAM

SHELL

65 SF

PUBLIC TLT

25 SF

ALCOVE

/1 A-402 /1 A-402

AE410

1 2 3 4

B

C

D

E

67 SF

STAFF TLT

AE410

AE414

AE412

1.1 3.9

AE302

AE302

AE302

A.1

MATCH LINE A-A

A A

FACE OF STUDS, TYP UON

ALIGN ALIGN

ALIGN ALIGN

679 SF

CORRIDOR

C13

FOR CONTINUATION

SEE

67 SF

STAFF TLT

17768 SF

STAFF TLT

968 SF

CORRIDOR

C15

AE413

AE414

AE414

AE414

2.5

B.8

A

A-503

A-503

OPP

HAND

A-503

A-503

AE438

AE303

AE438

A-503

A-503

OPP

HAND

IN-09.03-09

IN-09.03-10

IN-01.26-03

IN-01.26-02

IN-07.02-09

IN-07.02-11

IN-07.02-13

IN-07.02-10

IN-07.02-12

IN-07.02-14

IN-07.02-16

IN-07.02-25

IN-07.02-27

IN-07.02-29

IN-07.02-31

IN-07.02-26

IN-07.02-28

IN-07.02-30

IN-07.02-32

IN-07.02-15

IN-04.02-10

IN-04.02-11

IN-04.02-12

IN-04.02-13

IN-04.02-14

IN-04.02-15

IN-04.02-16

IN-04.02-20

IN-08.02-04

IN-08.02-05

IN-08.02-06

FIRE DEPT CONNECTION

2427 SF

PACT TEAM

DO NOT CONSTRUCT THIS WALL IF

PACT (EAST) - ADD ALT 4 IS

SELECTED

FOR CONTINUATION

SEE

IN-09.08-04

IN-01.02-04

A-509

1. REFER TO THE FOLLOWING SHEETS:

DIMENSIONS & TAGS A-404 THRU A-406

WALL TYPES A-611 & A-612

SIGNAGE AW SERIES

DOORS, WINDOWS, EQUIP A-601

2. TYP FURNITURE/CASEWORK PLANS APPLY TO ALL ROOMS IN

THE BUILDING. ESPECIALLY FOR BUILT-INS LIKE CABINETS.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT PRIMARY

CARE / MENTAL HEALTH

BUILDING

BOISE VA MEDICAL CENTER - BOISE, ID

531-325

SPEES DESIGN BUILD

625 1ST AVE #301

SEATTLE, WA, 98014

(206) 590-2118

RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE A-401

PARTIAL FLOOR PLAN - EAST

MEDICAL CENTER DIRECTOR

07/23/2021 MK MA 061 OF 206

1/4" = 1'-0"1

PARTIAL FLOOR PLAN - EAST

GENERAL NOTES

PROJECT

NORTH

AE2022

124 SF

EXAM ROOM 03

124 SF

EXAM ROOM 02

124 SF

EXAM ROOM 01

124 SF

WOMEN'S

HEALTH 01

124 SF

EXAM ROOM 10

124 SF

EXAM ROOM 09

124 SF

EXAM ROOM 08

180 SF

PROCEDURE

ROOM 01

2427 SF

PACT TEAM

223 SF

CLEAN SUPPLY

79 SF

ALCOVE, H/W

/1 A-401

/1 A-401

/1 A-403

/1 A-403

1 2 3 4

F

G

H

I

AE411

AE411

AE413

1.1 3.9

MATCH LINE A-A

A A

MATCH LINE B-B

B B

FOR CONTINUATION

SEE

79 SF

ALCOVE, H/W

ALIGN ALIGN

AE410

2.5

A-502

IN-01.02-02

IN-07.02-03

IN-07.02-05

IN-07.02-04

IN-07.02-06

IN-07.02-08

IN-07.02-07

IN-07.02-17 IN-07.02-18

IN-07.02-20

IN-07.02-19

IN-07.02-21

IN-07.02-22

IN-07.02-24

IN-04.02-08

IN-04.02-18 IN-04.02-19

779 SF

CORRIDOR

C11

608 SF

CORRIDOR

C12

609 SF

CORRIDOR

C14

679 SF

CORRIDOR

C13

AE303

5064 SF

PACT TEAM

SHELL

FOR CONTINUATION

SEE

FOR CONTINUATION

SEEFOR CONTINUATION

SEE

IN-08.02-01

IN-07.02-01

IN-07.02-02

66 SF

WOMEN'S

HEALTH TLT

118A

IN-07.02-23

IN-08.02-02

779 SF

CORRIDOR

C11

AE438

1. REFER TO THE FOLLOWING SHEETS:

DIMENSIONS & TAGS A-404 THRU A-406

WALL TYPES A-611 & A-612

SIGNAGE AW SERIES

DOORS, WINDOWS, EQUIP A-601

2. TYP FURNITURE/CASEWORK PLANS APPLY TO ALL ROOMS IN

THE BUILDING. ESPECIALLY FOR BUILT-INS LIKE CABINETS.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT PRIMARY

CARE / MENTAL HEALTH

BUILDING

BOISE VA MEDICAL CENTER - BOISE, ID

531-325

SPEES DESIGN BUILD

625 1ST AVE #301

SEATTLE, WA, 98014

(206) 590-2118

RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE A-402

PARTIAL FLOOR PLAN - CENTER

MEDICAL CENTER DIRECTOR

07/23/2021 MK MA 062 OF 206

1/4" = 1'-0"1

PARTIAL FLOOR PLAN - CENTER

PROJECT

NORTH

AE301

41 SF

STORAGE

100 SF

STORAGE

107A

467 SF

GROUP ROOM

173 SF

MSA & BUSINESS

SERVICES

110 160 SF

HOUSEKEEPING

AND LADDER

87 SF

POLICE

80 SF

FAMILY TLT

106 74 SF

PUBLIC TLT

84 SF

LACTATION

317 SF

RECEPTION

603 SF

VESTIBULE

/1 A-402 /1 A-402

1 2 3 4

I

J

K

L

M

N

AE433 2

AE410

AE414

AE412

1.1 3.9

L.2

MATCH LINE B-B

B B

AE302

LOBBY

2.1 2.9

AE413

AE413

4 AE413

AE414

AE414

FOR CONTINUATION

SEE

FOR CONTINUATION

SEE

CHECK IN CHECK IN

AE414

AE413

ALIGN

ALIGN

FACE OF

STUDS &

COLUMNS

2.5

118 SF

CORRIDOR

C10

SHIPS

LADDER

A-503

A-502

A-502

A-502

75 SF

PUBLIC TLT

74 SF

PUBLIC TLT

IN-09.08-01

IN-09.03-01

IN-09.03-02IN-09.08-02

IN-09.03-03

IN-09.03-04

IN-02.08-01

IN-02.07-01

IN-01.26-01

IN-02.10-01

IN-02.01-01

IN-04.02-01

IN-04.02-02

IN-04.02-03

IN-04.02-04 IN-04.02-05

IN-04.02-06

IN-02.02-01

IN-02.03-01

AE432

IN-02.04-01

• HOT & COLD DOMESTIC

WATER CONNECTION

• ELECTRICAL SERVICE

• FLOOR DRAIN / SINK

WASTE LINE AND VENT

STUB UTILITIES IN WALL FOR

COFFEE STATION. BID ALT

WILL CONTINUE THESE

UTILITIES IF APPROVED.

DRINKING FOUNTAIN /

BOTTLE FILL STATION

IN-09.08-05

IN-09.08-06 IN-09.08-07

FUTURE SECURITY

SCREENING

EQUIPMENT

779 SF

CORRIDOR

C11

A-502

A-507

AE432 10 AE43211

AW007

IN-04.02-17

F1

IN-01.02-01

IN-99.01-01

IN-99.02-01

1. REFER TO THE FOLLOWING SHEETS:

DIMENSIONS & TAGS A-404 THRU A-406

WALL TYPES A-611 & A-612

SIGNAGE AW SERIES

DOORS, WINDOWS, EQUIP A-601

2. TYP FURNITURE/CASEWORK PLANS APPLY TO ALL ROOMS IN

THE BUILDING. ESPECIALLY FOR BUILT-INS LIKE CABINETS.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSTRUCT PRIMARY

CARE / MENTAL HEALTH

BUILDING

BOISE VA MEDICAL CENTER - BOISE, ID

531-325

SPEES DESIGN BUILD

625 1ST AVE #301

SEATTLE, WA, 98014

(206) 590-2118

RAY SPEES, PRESIDENT Approved: CHIEF, FACILITY MANAGEMENT SERVICE A-403

PARTIAL FLOOR PLAN - WEST

MEDICAL CENTER DIRECTOR

07/23/2021 MK MA 063 OF 206

1/4" = 1'-0"1

PARTIAL FLOOR PLAN - WEST

PROJECT

NORTH

File details come from the government source that posted it. Updated .