This document is a comprehensive bid specification for the Department of Veterans Affairs (VA) project 523A4-20-208 to replace boilers and upgrade controls at the West Roxbury VA Medical Center. The project involves a complete renovation of the existing Central Boiler Plant (Building 8), including demolition, modification, and installation of new infrastructure. Key requirements include installing four 500 BHP dual-fuel fire tube boilers, a new deaerator and skid assembly, condensate tank system, underground steam tunnel, new electrical systems, fuel oil storage tanks, emergency water storage tank, and associated mechanical and control systems.
The project scope encompasses multiple phases of construction, with specific requirements for utility relocations, temporary steam generation for the Research Building, and stringent safety and infection control protocols. The contractor must provide comprehensive documentation, commissioning services, and training for VA personnel. Notable technical specifications include blast-resistant building construction, seismic restraints, wireless steam trap monitoring, hazardous gas detection systems, and compliance with extensive VA and industry standards. The project will require careful coordination to maintain existing facility operations during construction, with specific limitations on steam system shutdowns and a focus on minimizing disruption to medical center activities.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID DOCUMENTS
SPECIFICATIONS
VOLUME I
DIV 00 – DIV 13
REPLACE BOILERS AND UPGRADE CONTROLS
BUILDING 8
Project 523A4-20-208
West Roxbury VA Medical Center VA Boston Healthcare System, MA
1040 Kings Highway North Suite 700
Cherry Hill, New Jersey 08034
(856) 429-4000
November 14, 2025
Department of Veterans Affairs VA Project No. 523A4-20-208 VA Boston Healthcare System Replace Boilers & Upgrade Controls West Roxbury VA Medical Center Bid Documents: 11/14/2025
08-01-22
00 01 10-1
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
SECTION NO. DIVISION AND SECTION TITLES DATE
DIVISION 00 - SPECIAL SECTIONS
00 01 15 List of Drawing Sheets 05-20
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 11-21 01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 11-21 01 33 23 Shop Drawings, Product Data, and Samples 06-21 01 35 26 Safety Requirements 08-22 01 35 26.10 Attachment A - Infection Prevention and Control
Construction/Renovation/Maintenance Permit
01 35 26.20 Attached B - Pre-Construction Risk Assessment (PCRA) 01 42 19 Reference Standards 11-20 01 45 00 Quality Control 02-21 01 45 29 Testing Laboratory Services 11-18 01 45 35 Special Inspections 06-21 01 45 35.10 Attach A – Schedule of Special Inspections 01 45 35.20 Attach B – Statement of Special Inspections 01 74 19 Construction Waste Management 04-22 01 91 00 General Commissioning Requirements 04-22
DIVISION 02 – EXISTING CONDITIONS
02 21 13 Site Surveys 01-21 02 41 00 Demolition 08-17 02 65 00 Underground Storage Tank Removal 01-21 02 82 11 Traditional Asbestos Abatement 01-21 02 83 33.13 Lead-Based Paint Removal and Disposal 01-21
DIVISION 03 – CONCRETE
03 30 00 Cast-in-Place Concrete 01-21
DIVISION 04 – MASONRY
04 01 00 Maintenance of Masonry 01-21 04 05 13 Masonry Mortaring 10-17 04 05 16 Masonry Grouting 01-21 04 20 00 Unit Masonry 08-17 04 72 00 Cast Stone Masonry 01-21
00 01 10-2
DIVISION 05 – METALS
05 12 00 Structural Steel Framing 11-18 05 50 00 Metal Fabrications 08-18 05 51 00 Metal Stairs 01-21
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry 10-17 06 16 63 Cementitious Sheathing 01-21 06 20 00 Finish Carpentry 01-21
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 13 00 Sheet Waterproofing 01-21 07 21 13 Thermal Insulation 01-21 07 22 00 Roof and Deck Insulation 01-21 07 27 27 Fluid-Applied Membrane Air Barrier, Vapor Retarding 01-21 07 52 00 Modified Bituminous Roofing 07 60 00 Flashing and Sheet Metal 01-21 07 71 00 Roof Specialties 01-21 07 72 00 Roof Accessories 01-21 07 84 00 Firestopping 01-21 07 92 00 Joint Sealants 04-22 07 95 13 Expansion Joint Cover Assemblies 01-21
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 01-21 08 31 13 Access Doors and Frames 04-22 08 33 00 Coiling Doors and Grilles 01-21 08 51 13 Aluminum Windows 01-21 08 56 53 Blast Resistant Windows 01-21 08 71 00 Door Hardware 05-22 08 80 00 Glazing 01-21 08 90 00 Louvers and Vents 01-21
DIVISION 09 – FINISHES
09 05 16 Subsurface Preparation for Floor Finishes 01-21 09 06 00 Schedule for Finishes 01-21 09 22 16 Non-Structural Metal Framing 06-18 09 29 00 Gypsum Board 04-20 09 30 13 Ceramic/Porcelain Tiling 01-21 09 51 00 Acoustical Ceilings 12-18 09 65 13 Resilient Base and Accessories 01-21 09 67 23.20 Resinous Epoxy Base With Vinyl Chip Broadcast (RES 2) 12-21 09 91 00 Painting 01-21
00 01 10-3
DIVISION 10 – SPECIALTIES
10 14 00 Signage 01-21 10 26 00 Wall and Door Protection 01-21 10 28 00 Toilet, Bath, and Laundry Accessories 01-21 10 44 13 Fire Extinguisher Cabinets 08-18 10 51 13 Lockers
DIVISION 12 – FURNISHINGS
12 31 00 Manufactured Metal Casework 01-21
DIVISION 13 - SPECIAL CONSTRUCTION
13 05 41 Seismic Restraint Requirements for Non-Structural
Components 01-21
DIVISION 21- FIRE SUPPRESSION
21 08 00 Commissioning of Fire Suppression System 11-16 21 13 13 Wet-Pipe Sprinkler Systems 06-15 21 30 13 Electric-driven, Fire Pumps 05-15
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 09-20 22 05 12 General Motor Requirements for Plumbing Equipment 09-20 22 05 19 Meters and Gages for Plumbing Piping 09-20 22 05 23 General-Duty Valves for Plumbing Piping 09-20 22 05 33 Heat Tracing for Plumbing Piping 09-20 22 07 11 Plumbing Insulation 09-19 22 08 00 Commissioning of Plumbing Systems 11-16 22 11 00 Facility Water Distribution 05-21 22 11 23 Domestic Water Pumps 09-15 22 13 00 Facility Sanitary and Vent Piping 09-20 22 13 23 Sanitary Waste Interceptors 09-20 22 14 00 Facility Storm Drainage 09-15 22 14 29 Sump Pumps 09-15 22 15 00 General Service Compressed-Air Systems 09-20 22 31 11 Water Softeners 09-15 22 34 00 Fuel-Fired Domestic Water Heaters 09-20 22 40 00 Plumbing Fixtures 09-15
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 10 Common Work Results for Boiler Plant and Steam 04-23
00 01 10-4
Generation 23 05 12 General Motor Requirements for HVAC and Steam
Generation Equipment 03-23
23 05 51 Noise and Vibration Control for Boiler Plant 03-22 23 05 93 Testing, Adjusting, and Balancing for HVAC 03-23 23 07 11 HVAC and Boiler Plant Insulation 02-20 23 08 00 Commissioning of HVAC Systems 03-23 23 08 11 Demonstrations and Tests for Boiler Plant 04-20 23 09 11 Instrumentation and Control for Boiler Plant 03-22 23 09 23 Direct-Digital Control System for HVAC 03-23 23 10 00 Facility Fuel Systems 04-20 23 11 23 Facility Natural-Gas Piping 04-20 23 21 11 Boiler Plant Piping Systems 04-23 23 22 13 Steam and Condensate Heating Piping 04-23 23 22 23 Steam Condensate Pumps 04-20 23 23 00 Refrigerant Piping 03-23 23 31 00 HVAC Ducts and Casings 03-23 23 34 00 HVAC Fans 03-23 23 36 00 Air Terminal Units 02-23 23 37 00 Air Outlets and Inlets 02-23 23 40 00 HVAC Air Cleaning Devices 03-23 23 50 11 Boiler Plant Mechanical Equipment 03-22 23 51 00 Breechings, Chimneys, and Stacks 04-20 23 52 39 Fire Tube Boilers 03-23 23 73 00 Indoor Central-Station Air-Handling Units 03-23 23 81 00 Decentralized Unitary HVAC Equipment 03-23 23 81 43 Air-Source Unitary Heat Pumps 03-23 23 82 00 Convection Heating and Cooling Units 03-23 23 82 16 Air Coils 03-23 23 99 99.10 Boiler Safety Device Testing Manual 7th Edition
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 01-16 26 05 13 Medium-Voltage Cables 01-17 26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17 26 05 26 Grounding and Bonding for Electrical Systems 01-17 26 05 33 Raceway and Boxes for Electrical Systems 01-18 26 05 41 Underground Electrical Construction 01-17 26 05 73 Overcurrent Protective Device Coordination Study 01-18 26 08 00 Commissioning of Electrical Systems 11-16 26 09 23 Lighting Controls 01-18 26 11 16 Secondary Unit Substations 01-18 26 13 13 Medium-Voltage Circuit Breaker Switchgear 01-17 26 13 16 Medium-Voltage Fusible Interrupter Switches 01-17 26 22 00 Low-Voltage Transformers 01-18 26 23 00 Low-Voltage Switchgear 01-17 26 24 16 Panelboards 01-18
00 01 10-5
26 27 26 Wiring Devices 01-18 26 29 11 Motor Controllers 01-18 26 29 21 Enclosed Switches and Circuit Breakers 01-17 26 32 13 Engine Generators 01-18 26 33 53 Static Uninterruptible Power Supply 01-17 26 36 23 Automatic Transfer Switches 01-17 26 41 00 Facility Lightning Protection 01-17 26 43 13 Surge Protective Devices 01-17 26 51 00 Interior Lighting 01-18 26 56 00 Exterior Lighting 01-18
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations 09-19 27 05 26 Grounding and Bonding for Communications Systems 06-15 27 05 33 Raceways and Boxes for Communications Systems 10-18 27 08 00 Commissioning of Communications Systems 11-16 27 11 00 Communications Equipment Room Fittings 06-15 27 15 00 Communications Structured Cabling 01-16 27 31 31 Voice Communications Switching and Routing Equipment -
Extension 06-15
27 51 23 Intercommunications and Program Systems 06-15
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 00 Common Work Results for Electronic Safety and Security 04-18 28 05 13 Conductors and Cables for Electronic Safety and
Security 10-18
28 05 26 Grounding and Bonding for Electronic Safety and Security
09-11
28 05 28.33 Conduits and Backboxes for Electronic Safety and Security
09-11
28 08 00 Commissioning of Electronic Safety and Security Systems 11-16 28 13 00 Physical Access Control System 10-11 28 13 16 Physical Access Control System and Database Management 09-11 28 23 00 Video Surveillance 09-11 28 31 00 Fire Detection and Alarm 10-11
DIVISION 31 – EARTHWORK
31 20 00 Earthwork 07-16 31 20 10.10 Geotechnical Report 31 23 19 Dewatering 10-12 31 23 23.33 Flowable Fill 10-12
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 05 23 Cement and Concrete for Exterior Improvements 08-16 32 12 16 Asphalt Paving 09-15
00 01 10-6
32 17 23 Pavement Markings 08-16 32 31 13 Chain Link Fences and Gates 06-18 32 31 40 High Security Fences and Gates 08-16 32 90 00 Planting 08-16
DIVISION 33 – UTILITIES
33 16 15 Water Storage Steel Tanks 11-20 33 10 00 Water Utilities 03-17 33 40 00 Storm Sewer Utilities 12-17 33 63 00 Steam Energy Distribution 09-17
DIVISION 34 – TRANSPORTATION
34 71 13 Passive Vehicle Barriers 04-18
05-01-20
00 01 15 - 1
SECTION 00 01 15
LIST OF DRAWINGS
The drawings listed below accompanying this specification form a part of the contract.
DRAWING NO. TITLE
GENERAL
GI001 COVER SHEET AND DRAWING INDEX
GI002 PHASING PLAN
HAZMAT
HA101 ABATEMENT PLAN BUILDING 8 MAIN LEVEL
CIVIL SITE
VF101.T STEAM TUNNEL EXISTING CONDITIONS
C-101.T STEAM TUNNEL GENERAL NOTES
C-102.T STEAM TUNNEL BORING LOGS
CD101.T STEAM TUNNEL DEMOLITION PLAN
CS101.T STEAM TUNNEL SITE PLAN AND PROFILE
CG101.T STEAM TUNNEL EROSION CONTROL PLAN
CS501.T STEAM TUNNEL SITE DETAILS
S-001.T STEAM TUNNEL GENERAL NOTES
S-002.T STEAM TUNNEL GENERAL NOTES
S-101.T STEAM TUNNEL FOUNDATION PLAN
S-102.T STEAM TUNNEL LID PLAN
S-301.T STEAM TUNNEL WALL SECTIONS & DETAILS
S-302.T STEAM TUNNEL WALL SECTIONS & DETAILS
S-501.T STEAM TUNNEL TYPICAL FOUNDATION DETAILS
CIVIL (WBRC)
C001 GENERAL NOTES AND ABBREVIATIONS
VU101 EXISTING CONDITIONS PLAN
00 01 15 - 2
CD101 SITE REMOVALS PLAN
CS101 SITE LAYOUT PLAN
CG101 GRADING PLAN
CU101 UTILITY PLAN
C-501 DETAILS
C-502 DETAILS
C-503 DETAILS
C-504 DETAILS
STRUCTURAL
S-001 ABBREVIATIONS & NOTES
S-002 NOTES
S-003 LIVE LOAD DIAGRAM
SS101.1 SITE PLAN - PHASE 1
SD111.2 DEMOLITION PLAN - PHASE 2
SD301.2 DEMOLITION SECTIONS - PHASE 2
SD451.2 PUMP HOUSE DEMOLITION - PHASE 2
SD121.3E DEMOLITION PLAN - FUEL STORAGE ROOF - PHASE 3,
AREA E
SD501.3 DEMOLITION SECTIONS - PHASE 3
SS101.3 SITE PIPE SUPPORT PLAN - TUNNEL - PHASE 3
SF101.3A FOUNDATION PLAN - PHASE 3, AREA A
SF101.3B FOUNDATION PLAN - PHASE 3, AREA B
SF101.3E FOUNDATION PLAN - PHASE 3, AREA E
SF111.3A SLAB REINFORCING PLAN - MAIN LEVEL - PHASE 3,
AREA A
SF111.3B SLAB REINFORCING PLAN - MAIN LEVEL - PHASE 3,
AREA B
SF112.3A FLOOR PLAN - MAIN LEVEL - PHASE 3, AREA A
SF112.3B FLOOR PLAN - MAIN LEVEL - PHASE 3, AREA B
SF121.3A FRAMING PLAN - MEZZANINE - PHASE 3, AREA A
SF121.3B FRAMING PLAN - MEZZANINE - PHASE 3, AREA B
SF121.3E ROOF PLAN - FUEL STORAGE - PHASE 3
SF131.3A FRAMING PLAN - UPPER MEZZANINE - PHASE 3, AREA A
00 01 15 - 3
SF131.3B FRAMING PLAN - UPPER MEZZANINE - PHASE 3, AREA B
SF131.3E FRAMING PLAN - PIPE BRIDGE - PHASE 3, AREA E
SF141.3A FRAMING PLAN - ROOF PLAN - PHASE 3, AREA A
SF141.3B FRAMING PLAN - ROOF PLAN - PHASE 3, AREA B
SF451.3 PUMP HOUSE RENOVATIONS - PHASE 3
SF461.3 FIRE PUMP HOUSE FOUNDATION PLAN - PHASE 3
SF462.3 FIRE PUMP HOUSE ROOF FRAMING PLAN - PHASE 3
SF463.3 FIRE PUMP HOUSE ROOF FINISH PLAN - PHASE 3
S-201.3 BRACE FRAMING SECTIONS
S-211.3 PIPE BRIDGE ELEVATIONS PHASE 3, AREA E
S-212.3 PIPE BRIDGE SECTIONS PHASE 3
S-301.3 BUILDING SECTION - PHASE 3
S-302.3 WALL SECTIONS - PHASE 3
SD111.4 DEMOLITION PLAN - PHASE 4
SD301.4 DEMOLITION SECTIONS - PHASE 4
SD401.4 DEMOLITION PARTIAL PLAN - MAIN LEVEL - PHASE 4
SF101.5 FOUNDATION PLAN - PHASE 5
SF111.5 SLAB REINFORCING PLAN - MAIN LEVEL - PHASE 5
SF112.5 FLOOR PLAN - MAIN LEVEL - PHASE 5
SF121.5 FLOOR PLAN - MEZZANINE - PHASE 5
SF131.5 FRAMING PLAN - UPPER MEZZANINE - PHASE 5
SF141.5 FRAMING PLAN - ROOF - PHASE 5
S-202.5 BRACE FRAMING SECTIONS
S-211.5 BUILDING SECTIONS - PHASE 5, AREA C & D
S-501 FOUNDATIONS-SECTIONS & DETAILS
S-502 CONCRETE-SECTIONS & DETAILS
S-503 CONCRETE-SECTIONS & DETAILS
S-504 CONCRETE-SECTIONS & DETAILS
S-511 CONCRETE SLAB - SECTIONS & DETAILS
S-512 CONCRETE SLAB - SECTIONS & DETAILS
S-521 FLOOR SLAB DETAILS
S-522 FLOOR SLAB DETAILS
S-523 FLOOR SLAB DETAILS
S-531 PLATFORMS & MEZZANINE - SECTIONS & DETAILS
00 01 15 - 4
S-532 PLATFORMS & MEZZANINE - SECTIONS & DETAILS
S-541 FRAMING SECTIONS & DETAILS
S-542 SECTIONS & DETAILS
S-543 CONCRETE SLAB - SECTIONS & DETAILS
S-551 SECTIONS & DETAILS
S-552 SECTIONS & DETAILS
S-561 SITE -SECTIONS & DETAILS
S-562 EMERGENCY WATER TANK & GENERATOR FOUNDATIONS
S-563 FUEL TANK FOUNDATION
S-701 COLUMN SCHEDULE PHASE 3 & 5
S-702 SCHEDULES
S-703 FOUNDATION SCHEDULES
ST401.3 TEMPORARY STEAM PIPE BRIDGE - ENLARGED PLAN
ST501.3 TEMPORARY STEAM PIPE BRIDGE - PLANS & SECTIONS
ST511.3 TEMPORARY STEAM PIPE BRIDGE - DETAILS
ARCHITECTURAL
AG001 SYMBOLS AND ABBREVIATIONS
AD101.1 GROUND FLOOR REMOVALS - PHASE 1
AD101.2 CONTROL ROOM, ASH TOWER DEMO - PHASE 2
LS101.3 LIFE SAFETY MAIN FLOOR PHASE 3
LS102.3 LIFE SAFETY - MEZZANINE- PHASE 3
LS103.3 LIFE SAFETY - UPPER MEZZANINE - PHASE 3
AE101.3 BOILER PLANT & ELEC SPACES MAIN LEVEL FLOOR PLAN
- PHASE 3
AE102.3 BOILER PLANT & ELEC SPACES MEZZANINE LEVEL -
PHASE 3
AE103.3 BOILER PLANT & ELEC SPACES UPPER MEZZANINE -
PHASE 3
AE104.3 BOILER PLANT & ELEC SPACES ROOF PLAN - PHASE 3
AE201.3 EXTERIOR BUILDING ELEVATIONS - PHASE 3
AE301.3 BUILDING SECTIONS - PHASE 3
AE310.3 WALL SECTIONS - PHASE 3
00 01 15 - 5
AE311.3 WALL SECTIONS - PHASE 3
AF101.3 FINISH PLAN MAIN FLOOR - PHASE 3 & FINISH
SCHEDULE
AF102.3 MEZZANINE LEVEL FINISH PLAN - PHASE 3
AF103.3 UPPER MEZZANINE FINISH PLAN - PHASE 3
AI101.3 SIGNAGE PLAN MAIN FLOOR - PHASE 3
AI102.3 SIGNAGE PLAN MEZZANINE - PHASE 3
AI103.3 SIGNAGE PLAN UPPER MEZZANINE - PHASE 3
AD101.4 EXISTING BOILER PLANT GROUND FLOOR DEMO - PHASE 4
LS101.5 LIFE SAFETY MAIN FLOOR - PHASE 5
AE101.5 MAIN LEVEL FLOOR PLAN - PHASE 5
AE104.5 ROOF PLAN - PHASE 5
AE201.5 EXTERIOR BUILDING ELEVATIONS - PHASE 5
AE301.5 BUILDING SECTIONS - PHASE 5
AE310.5 WALL SECTIONS - PHASE 5
AF101.5 FINISH PLAN MAIN FLOOR - PHASE 5 & FINISH PLAN
AI101.5 SIGNAGE PLAN MAIN FLOOR - PHASE 5
AE401 ENLARGED PLAN
AE501 PLAN DETAILS
AE502 SECTION DETAILS
AE503 STAIR SECTIONS AND DETAILS
AE504 TYPICAL STAIR DETAILS
AE510 INTERIOR DETAILS
AE601 DOOR SCHEDULES AND DETAILS
AE602 DOOR DETAILS
AE603 WINDOW AND LOUVER DETAILS
AE604 PARTITION TYPES & FLOOR CEILING ASSEMBLY
AE605 EXTERIOR WALL ASSEMBLY, ROOF TYPES AND DETAILS
AI501 SIGNAGE SCHEDULE
FIRE PROTECTION
FA000 NOTES, SYMBOLS, ABBREVIATIONS & MATRIX
FA101.3 FLOOR PLAN - MAIN LEVEL - PHASE 3
FA102.3 FLOOR PLAN - MEZZANINE LEVEL - PHASE 3
00 01 15 - 6
FA103.3 FLOOR PLAN - UPPER MEZZANINE LEVEL - PHASE 3
FA104.3 FLOOR PLAN - TUNNEL - PHASE 3
FA400.3 FIRE PUMP HOUSE FLOOR PLAN - PHASE 3
FA101.5 FLOOR PLAN - MAIN LEVEL - PHASE 3 AND PHASE 5
FA500 DETAILS
FS000 NOTES, SYMBOLS AND ABBREVIATIONS
FS101.3 FLOOR PLAN - MAIN LEVEL - PHASE 3
FS102.3 FLOOR PLAN - MEZZANINE LEVEL - PHASE 3
FS103.3 FLOOR PLAN - UPPER MEZZANINE LEVEL - PHASE 3
FS104.3 FLOOR PLAN - TUNNEL - PHASE 3
FS400.3 FIRE PUMP HOUSE PLAN - PHASE 3
FS101.5 FLOOR PLAN - MAIN LEVEL - PHASE 3 AND PHASE 5
FS500 DETAILS
PLUMBING
P001 ABBREVIATIONS, NOTES AND SYMBOLS
PS100 PIPING POINT OF ENTRANCES SITE
PP401.2 ENLARGED PLANS - PHASE 2
PS101.3 PIPING PLAN TUNNEL LEVEL - PHASE 3
PP101.3A UNDERSLAB PIPING PLAN MAIN LEVEL - PHASE 3, AREA
A
PP101.3B UNDERSLAB PIPING PLAN MAIN LEVEL - PHASE 3, AREA
B
PP111.3A PIPING PLAN MAIN LEVEL - PHASE 3, AREA A
PP111.3B PIPING PLAN MAIN LEVEL - PHASE 3, AREA B
PP121.3A PIPING PLAN MEZZANINE - PHASE 3, AREA A
PP121.3B PIPING PLAN MEZZANINE - PHASE 3, AREA B
PP131.3A PIPING PLAN UPPER MEZZ - PHASE 3, AREA A
PP131.3B PIPING PLAN UPPER MEZZ - PHASE 3, AREA B
PP141.3A PIPING PLAN ROOF - PHASE 3, AREA A
PP141.3B PIPING PLAN ROOF - PHASE 3, AREA B
PP401.3 PLUMBING ENLARGED PLANS
PP411.3 FIRE PUMP BUILDING - PHASE 3
PD111.4 DEMOLITION PLAN MAIN LEVEL - PHASE 4
00 01 15 - 7
PD121.4 DEMOLITION PLAN EXISTING MEZZANINE LEVEL - PHASE
PP111.5 PIPING PLAN MEZZANINE LEVEL - PHASE 5
PP121.5 PIPING PLAN MEZZANINE LEVEL - PHASE 5
PP141.5 PIPING PLAN ROOF - PHASE 5
PP501 DETAILS
PP601 FLOW DIAGRAMS
PP602 FLOW DIAGRAMS
PP603 RISER DIAGRAMS
PP701 PLUMBING SCHEDULES
MECHANICAL
M-001 ABBREVIATIONS, NOTES, & SYMBOLS
MD111.1 DEMOLITION PLAN - MAIN LEVEL - PHASE 1, AREA C
MP111.1 PIPING PLAN MAIN LEVEL - PHASE 1, AREA C
MD111.2 DEMOLITION PLAN MAIN LEVEL - PHASE 2, AREA C
MS101.3 SITE PIPING PLAN - TUNNEL, PHASE 3
MS102.3 PART PLANS PIPING FEEDING BUILDING 21 DEMOLITION
AND NEW, PHASE 3
MD111.3E DEMOLITION PLAN - MAIN LEVEL - PHASE 3, AREA E
MQ111.3A EQUIPMENT PLAN MAIN LEVEL - PHASE 3, AREA A
MQ111.3B EQUIPMENT PLAN MAIN LEVEL - PHASE 3, AREA B
MQ121.3A EQUIPMENT PLAN MEZZANINE - PHASE 3, AREA A
MQ121.3B EQUIPMENT PLAN MEZZANINE - PHASE 3, AREA B
MQ141.3A EQUIPMENT PLAN ROOF - PHASE 3, AREA A
MQ141.3B EQUIPMENT PLAN ROOF - PHASE 3, AREA B
MP111.3A PIPING PLAN - MAIN LEVEL - PHASE 3, AREA A
MP111.3B PIPING PLAN - MAIN LEVEL - PHASE 3, AREA B
MP111.3E PIPING PLAN - MAIN LEVEL - PHASE 3, AREA E
MP121.3A PIPING PLAN - MEZZANINE - PHASE 3, AREA A
MP121.3B PIPING PLAN - MEZZANINE - PHASE 3, AREA B
MP131.3A PIPING PLAN - UPPER MEZZANINE - PHASE 3, AREA A
MP131.3B PIPING PLAN - UPPER MEZZANINE - PHASE 3, AREA B
MP131.3E PIPING PLAN - PHASE 3, AREA E
00 01 15 - 8
MP141.3A PIPING PLAN - ROOF - PHASE 3, AREA A
MP141.3B PIPING PLAN - ROOF - PHASE 3, AREA B
MH111.3A DUCTWORK PLAN - MAIN LEVEL - PHASE 3, AREA A
MH111.3B DUCTWORK PLAN - MAIN LEVEL - PHASE 3, AREA B
MH121.3A DUCTWORK PLAN - MEZZANINE - PHASE 3, AREA A
MH121.3B DUCTWORK PLAN - MEZZANINE - PHASE 3, AREA B
MH131.3A DUCTWORK PLAN - UPPER MEZZANINE LEVEL - PHASE 3,
AREA A
MH131.3B DUCTWORK PLAN - UPPER MEZZANINE LEVEL - PHASE 3,
AREA B
MS101.4 DEMOLITION EXISTING STEAM TUNNEL
MD111.4 DEMOLITION PLAN - MAIN LEVEL - PHASE 4
MD121.4 DEMOLITION PLAN - MEZZANINE - PHASE 4
MP111.5 PIPING PLAN - MAIN LEVEL - PHASE 5
MP141.5 PIPING PLAN - ROOF - PHASE 5
MP301 INTERIOR 3D VIEWS
MP302 INTERIOR 3D VIEWS
MP303 INTERIOR 3D VIEWS
MP304 SECTION VIEWS
MP305 SECTION VIEWS
MP306 SECTION VIEWS
MP307 SECTION VIEWS
MP308 NORTH ELEVATION - STACK HEIGHT
MP501 PIPING DETAILS
MP502 PIPING DETAILS
MP503 PIPING DETAILS
MP504 PIPING DETAILS
MP505 PIPING DETAILS
MP506 PIPING DETAILS
MP507 PIPING DETAILS
MP508 PIPING DETAILS
MH501 DETAILS
MH502 DETAILS
MP601 STEAM GENERATION FLOW DIAGRAM - BOILERS
00 01 15 - 9
MP602 STEAM GENERATION FLOW DIAGRAM - DEAERATOR &
CONDENSATE SURGE TANK
MP603 MECHANICAL SITE SIMPLIFIED STEAM & CONDENSATE
FLOW DIAGRAM
MP604 STEAM GENERATION FLOW DIAGRAM - DISTRIBUTION
PIPING
MP605 STEAM GENERATION NATURAL GAS AND BOILER N.O. 2
FUEL OIL FLOW DIAGRAM
MP606 N.O. 2 FUEL OIL FLOW DIAGRAM - GENERATOR
M-701 SCHEDULES
M-702 SCHEDULES
M-703 SCHEDULES
M-704 SCHEDULES
M-705 SCHEDULES
M-801 CONTROLS, ABBREVIATIONS, NOTES & SYMBOLS
M-802 SEQUENCE OF OPERATIONS
M-803 SEQUENCE OF OPERATIONS
MT101.3 SITE PIPING PLAN - TEMPORARY STEAM PIPING FEEDING
BUILDING 21
MT301.3 PIPE PROFILE PHASE 3
MT501 PIPING DETAILS
MT502 PIPING DETAILS
MT503 PIPING DETAILS
ELECTRICAL
E-001 ABBREVIATIONS, NOTES & SYMBOLS
E-002 NOTES
ED111.1 DEMOLITION PLAN - MAIN LEVEL - PHASE 1
ES101.1 SITE PLAN - NEW WORK - PHASE 1
EP111.1 POWER & SYSTEMS PLAN - MAIN LEVEL - PHASE 1
EP121.1 POWER & SYSTEMS PLAN - MEZZANINE - PHASE 1
ED111.2 DEMOLITION PLAN - MAIN LEVEL - PHASE 2
ED451.2 PUMP HOUSE DEMOLITION - PHASE 2
EP111.2 POWER & SYSTEMS PLAN - MAIN LEVEL - PHASE 2
00 01 15 - 10
ED111.3 DEMOLITION PLAN - MAIN LEVEL - PHASE 3
ES101.3 SITE PLAN - NEW WORK - PHASE 3
EL111.3A LIGHTING PLAN - MAIN LEVEL - PHASE 3, AREA A
EL111.3B LIGHTING PLAN - MAIN LEVEL - PHASE 3, AREA B
EL121.3A LIGHTING PLAN - MEZZANINE LEVEL - PHASE 3, AREA A
EL121.3B LIGHTING PLAN - MEZZANINE LEVEL - PHASE 3, AREA B
EL131.3A LIGHTING PLAN - UPPER MEZZANINE LEVEL - PHASE 3,
AREA A
EL131.3B LIGHTING PLAN - UPPER MEZZANINE LEVEL - PHASE 3,
AREA B
EL141.3A LIGHTING PLAN - ROOF - PHASE 3, AREA A
EL141.3B LIGHTING PLAN - ROOF - PHASE 3, AREA B
EP111.3A POWER & SYSTEMS PLAN - MAIN LEVEL - PHASE 3, AREA
A
EP111.3B POWER & SYSTEMS PLAN - MAIN LEVEL - PHASE 3, AREA
B
EP121.3A POWER & SYSTEMS PLAN - MEZZANINE LEVEL - PHASE 3,
AREA A
EP121.3B POWER & SYSTEMS PLAN - MEZZANINE LEVEL - PHASE 3,
AREA B
EP131.3A POWER & SYSTEMS PLAN - UPPER MEZZANINE LEVEL -
PHASE 3, AREA A
EP131.3B POWER & SYSTEMS PLAN - UPPER MEZZANINE LEVEL -
PHASE 3, AREA B
EP141.3A POWER & SYSTEMS PLAN - ROOF - PHASE 3, AREA A
EP141.3B POWER & SYSTEMS PLAN - ROOF - PHASE 3, AREA B
E-401.3 ENLARGED CONTROL ROOM
E-402.3 HOT BOX, WATER STORAGE TANK & FUEL OIL STORAGE
TANK
E-403.3 NEW TUNNEL
ED101.4 DEMOLITION PLAN - BASEMENT LEVEL - PHASE 4
ED111.4 DEMOLITION PLAN - MAIN LEVEL - PHASE 4
ED121.4 DEMOLITION PLAN - MEZZANINE - PHASE 4
ED131.4 DEMOLITION PLAN - UPPER MEZZANINE - PHASE 4
00 01 15 - 11
ED141.4 DEMOLITION PLAN - ROOF - PHASE 4
EP451.4 PUMP HOUSE NEW WORK - PHASE 4
E-101.5 BASEMENT - PHASE 5
E-111.5 MAIN LEVEL - PHASE 5
E-121.5 MEZZANINE - PHASE 5
E-131.5 UPPER MEZZANINE - PHASE 5
E-141.5 ROOF - PHASE 5
E-501 DETAILS
E-502 DETAILS
E-503 DETAILS
E-504 DETAILS
E-505 DETAILS
E-506 DETAILS
E-600 SITE DISTRIBUTION - SINGLE LINE DIAGRAM
E-601 TEMPORARY, DEMO, & NEW WORK - SINGLE LINE
DIAGRAMS
E-602 NEW WORK - SINGLE LINE DIAGRAM
E-603 TELECOM RISER DIAGRAM
E-701 PANELBOARD SCHEDULES
E-702 PANELBOARD SCHEDULES
E-703 LIGHTING FIXTURE SCHEDULE & LIGHTING CONTROL
SCHEDULE
SECURITY ELECTRONICS
TY001 SYMBOLS, ABBREVIATIONS AND GENERAL NOTES
TY100 SITE PLAN
TY101.3 EXISTING TUNNEL
TY111.3A MAIN LEVEL PHASE 3 AREA A
TY111.3B MAIN LEVEL PHASE 3 AREA B
TY121.3A MEZZANINE LEVEL PHASE 3 AREA A
TY121.3B MEZZANINE LEVEL PHASE 3 AREA B
TY141.3A ROOF LEVEL PHASE 3, AREA A
TY141.3B ROOF LEVEL PHASE 3, AREA B
TY201.3 BUILDING 1 GROUND LEVEL
00 01 15 - 12
TY101.5D BASEMENT LEVEL PHASE 5, AREA D
TY111.5C MAIN LEVEL PHASE 5, AREA C
TY141.5C ROOF LEVEL PHASE 5, AREA C
TY501 PHYSICAL ACCESS CONTROL SYSTEM DOOR CONTROL
DETAILS
TY502 PHYSICAL ACCESS CONTROL SYSTEM SITE RELATED
DETAILS
TY503 SECURITY SURVEILLANCE TELEVISION CAMERA MOUNTING
DETAILS
TY601 PHYSICAL ACCESS CONTROL SYSTEM RISER DIAGRAM I
TY602 PHYSICAL ACCESS CONTROL SYSTEM RISER DIAGRAM II
TY603 PHYSICAL ACCESS CONTROL SYSTEM RISER DIAGRAM III
TY604 PHYSICAL ACCESS CONTROL SYSTEM RISER DIAGRAM IV
TY605 INTERCOM SYSTEMS RISER DIAGRAM
TY606 SECURITY SURVEILLANCE TELEVISION RISER DIAGRAM
- - - E N D - - -
11-01-21
01 00 00 - 1
SECTION 01 00 00
GENERAL REQUIREMENTS
GENERAL
1.1 SAFETY REQUIREMENTS
A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
1.2 GENERAL INTENTION
A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for the “Replace Boilers and
Upgrade Controls” project located at the West Roxbury VA Medical Center in West Roxbury, Massachusetts as required by drawings and specifications.
B. The VA Contracting Officer will schedule an organized site visit during the solicitation process.
C. Offices of Miller-Remick, LLC, as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.
D. All testing shall be done in accordance with Specification 01 45 29, Testing Laboratory Services. Before placement and installation of work subject to tests by testing laboratory retained by Department of
Veterans Affairs or Contractor, the Contractor shall notify the COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than three workdays unless otherwise designated by the COR.
E. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
1.3 STATEMENT OF BID ITEM(S)
A. ITEM I, All work as required by drawings and specifications, including general construction, demolition, modification and renovation of the
01 00 00 - 2 existing Central Boiler Plant (Building 8). This project includes but is not limited to the following general outline of the project and shall be worked with all drawings included with the contract documents:
1. The locations of underground utilities found and shown within these project documents, were conducted for design purposes only, therefore locations shown within these design documents are approximate and the existence and location of any underground obstruction or utility cannot be guaranteed, therefore the project area must be fully investigated and verified in the field by the contractor prior to excavation/construction. The contractor is responsible to locate and identify all public and private underground utilities associated with the project area. The contractor shall enlist the assistance of the owner, sub-contractor, public utilizes etc. to obtain their opinion as to the locations of underground utilities that may exist within the construction area and that may or may not be presented in the contract documents.
2. Provide land survey signed and sealed by a licensed land surveyor in the state of Massachusetts. Perform survey on ground according to
Accuracy Standards for ALTA-ACSM Land Title Surveys and FGDC
STD-007.3 and FGDC STD-007.4 (see specification section 02 21 13).
a. Provide topo contours at 1’intervals.
b. Boundary Retracement Survey:
1) Perform research at the Suffolk County Registry of Deeds, City of Boston Engineering Department, Massachusetts Land Court, and Massachusetts Department of Transportation, as necessary.
2) Perform field survey to include the parcel boundary monuments, street right-of-way boundary lines, lines of occupation, potential encroachments, and structures on the property.
3) Produce plan of land survey at suitable scale in PDF for your records.
4) Perform our survey work in compliance with the Code of
Massachusetts Regulations 250 CMR 6.0.
c. Topographic Survey:
Vertical Control: National Geodetic Survey or existing VA Medical
Center benchmark.
1) Determine project site contours at maximum 1 foot) interval.
2) Determine spot elevations at specified locations.
01 00 00 - 3
d. Utility Survey:
1) Locate piped utilities and utility structures. Identify service type, sizes, depths, and pressures. Establish inverts in and out on gravity sewer manholes. If depth is critical and manholes are not available identify depth with ground-penetrating radar (GPR).
2) Locate fire hydrants.
3) Locate wired utilities and utility structures. Identify service type, rated capacities, and elevations above and below grade.
4) Identify each utility authority including contact person and phone number.
5) Locate permanent structures within survey boundary by perpendicular dimension to property lines.
6) Determine structure plan dimensions, heights, and vertical offsets.
7) Determine projections and overhangs beyond structure perimeter at grade.
8) Determine number of stories and primary building materials.
3. The health facility steam system operates year-round for HVAC (i.e., building heating and ac reheat), medical equipment sterilization and domestic water heating. It is crucial that all tie-in work associated with the steam and condensate systems will be accomplished and completed during the warmer months (approximately
April 1 through November 1) to minimize critical system shutdowns.
All other work can be performed at any time as long as a phasing plan is submitted to the VA. The contractor shall plan and coordinate all required steam shut-downs with the VA COR. Steam shut-downs are limited to eight (8)-hours maximum unless approved by the VA COR and medical administration. The contractor shall also develop a construction phasing plan utilizing the phasing steps shown withing the contract documents and Drawing GI002. The contractor's phasing plan is subject to final approval by the VA.
Final approved phasing plan shall not be grounds for a change order.
4. With the exception of building 21 (research building), the construction phasing of this project will be carried out without the use of rental steam generation trailers. The objective is to leave
01 00 00 - 4 the existing central boiler plant fully operational during construction. The new central boiler plant and emergency generator/electrical rooms and new steam tunnel will be constructed, fully operational, tested, and commissioned prior to demolition of the existing central boiler plant. Once the existing plant is removed the building shell of the central chiller plant will be erected. The design anticipates that the construction of this project will occur during five (5) major phases of construction. See
Drawing GI002.
5. Provide temporary steam boilers to supply steam to the Research
Building (Building 21) during construction. Provide all temporary piping, utilities, pipe supports and appurtenances.
6. Based upon the brittle nature of cast iron, the VA prohibits the use of cast iron or malleable fittings and components in high and medium pressure steam systems (15 psi or above). All new construction or repairs must not use cast iron fittings and components or malleable fittings anywhere in the high-pressure and medium pressure steam system (15psi or above). All new construction or repairs must use cast steel or forged steel fittings only.
7. Relocate underground utilities within the construction area of the new central energy plant.
8. Provide new storage and salt storage shelters and new concrete pads.
9. Relocate the existing boiler control system from the ash tower to the existing plant breakroom. Contractor shall coordinate this effort with Automated Control Concepts, LLC
Contact information for Automated Control Concepts, LLC
George Forde, Director of Engineering
M 774.258.1802 | O 508.691.6033
45 Main Street, Hudson MA 01747 gforde@automated-control.com
Scope of Work for the relocation of the existing boiler controls:
a. Test for Boilers Autonomy from Boiler Plant Master Controller (By Automated Control Concepts, LLC):
Applies to Boilers 1 through 5.
Modify as necessary individual Boiler Control programs to enable
Boiler autonomy from that of Plant Master Control mailto:gforde@automated-control.com
01 00 00 - 5
Test for Boiler Autonomy from Boiler Plant Master by process of electrical & Communication divorce from Boiler Plant Master
Generate relevant Test Documentation and proof of execution thereof.
Provide Summary Installation Drawings and modifications of existing drawings as appropriate.
Host regular Planning meeting / progress / schedule meetings.
b. Provide fresh 120VAC electrical panel with rating at or above that of existing panel 08-UPSP1 in existing Control Room (By
Contractor):
Make new alternate 120VAC source from a UPS source outside of the control room possibly in break room (call it 08-UPSP1xxx).
Provide UPS Transfer switch if appropriate in break room as appropriate.
Provide new UPS as appropriate in break room to limit risk of downtime.
c. Provide fresh 120VAC electrical panel with rating at or above that of existing panel 08-LV2 in control Room (By Contractor):
Make new alternate 120VAC regular (non-UPS) source outside of the control room possibly in break room (call it 08-LV2xxx).
d. Relocate Other Monitoring Equipment from Control Room to Break room (By Automated Control Concepts, LLC):
Generator Monitor
Radio
Intercomm
Gas Kill Switch.
DA Monitor
Others (Phone)
Others?
e. Provide temporary network runs from Break Room HMI to (4) Boilers
Combustion Control System enclosures on mezzanine and (1) Boiler in remote room (By Automated Control Concepts, LLC):
Install network runs from Break Room HMI to (4) Boilers
Combustion Control System enclosures on mezzanine and (1) Boiler in remote room:
Test break room HMI / modify program as appropriate to allow monitoring and control of each Boiler from Break room.
01 00 00 - 6
f. Test for Boilers autonomy in regulation of plant header pressure
(By Automated Control Concepts, LLC):
Test for a subset of Boilers to maintain plant header pressure with a baseline setting on one or more boilers and Automatic mode on one.
g. Re-electrify Boiler Combustion Controls and Burner Management
Systems (BMS & CCS) from new 120 VAC source (By Automated Control
Concepts, LLC):
Applies to Boilers 1 thru 5
Feed newly supplied 120VAC (from 08-UPSP1xxx) to Boiler CCS
Controls on Messanine (4) & (1) in separate room for a total of
5.
Feed newly supplied 120VAC (from 08-UPSP1xxx) to Boiler BMS
Controls 1 on each Boiler for a total of 5.
Test each
h. Disassemble the Boiler Plant Master Controller Enclosure (By
Automated Control Concepts, LLC):
Label all relevant conductors
Remove backplane of enclosure w/ control components intact
Relocate backplane into new compatible slim enclosure
Relocate newly housed boiler master enclosure in main plant outside of operator control room.
i. Re-assemble Boiler Plant Master Controller Enclosure (By
Automated Control Concepts, LLC):
Reland all relevant conductors
Reland all relevant network connections
j. Re-electrify relocated Plant Boiler Master enclosure with new 120 VAC source (By Automated Control Concepts, LLC):
Feed newly supplied 120VAC (from 08-UPSP1xxx) to Boiler Master
Control enclosure (in hallway).
Test each / document results.
k. Re-locate plant SCADA Computer and peripheral in Break Room (By Automated Control Concepts, LLC):
Test / document results.
10. Provide new potable water, fire water, new and temporary natural gas, fuel oil, storm sewer, sanitary sewer, electric, communications, and security systems required.
01 00 00 - 7
a. Coordinate new and temporary natural gas services with National
Grid.
b. Provide temporary underground natural gas supply to the existing central boiler plant.
c. Provide new underground natural gas supply to the new central boiler plant.
11. Provide a new blast protected central energy building. The completed building will be divided into a central boiler plant, future chiller plant, and electrical/emergency generator rooms. The building will have a second story mezzanine for offices, break room, locker room, toilets and storage areas. In addition, a third floor will be used for storage.
12. Provide micropile foundation system designed by a Professional
Engineer registered in the State of Massachusetts.
13. Provide a structural steel frame for central energy building with steel connections designed by a Professional Engineer registered in the State of Massachusetts.
14. Provide field-testing, laboratory-testing, and special inspections for all new construction as required by code and project documents.
15. Relocate and or temporarily support underground utilities within the construction area of the underground pipe tunnel.
16. Provide a new underground walk-through pipe tunnel, connecting Buildings 1 and 8. The tunnel shall be provided with lights, ventilation, sump pumps, fire protection, grade access and pipe racks.
17. Provide new steam pipe vault adjacent Building 8.
18. Fire pump addition @ building no. 1:
a. Disconnect and relocate identified items in the contract documents. Partially demolish the addition for construction of the new pipe tunnel and construct temporary walls, roof, door, etc. Reconnect all disconnected items and ensure the system is fully operational.
b. Relocate identified items in the contract documents. Reconstruct the fire pump addition and reconnect all disconnected items and ensure system is fully operational.
19. Provide new blast-protected pipe bridge with catwalk and caged ladders.
01 00 00 - 8
20. Provide four (4) 500 BHP, dual fuel, four-pass, wet-back fire tube boilers, exhaust stacks, burner and master boiler controls. Note:
Burner shall be manufactured and tested by the boiler manufacturer.
Boiler exhaust stack heights shall be 1.5 X the height of the building. The contractor shall submit signed and sealed engineered drawings of the boiler stacks by a licensed professional engineer in the state of Massachusetts.
21. Provide deaerator and skid assembly with four (4) feed water pumps and controls.
22. Provide condensate tank and skid assembly with two (2) transfer pumps and controls.
23. Provide all required piping, valves, and appurtenances.
24. Provide all required access platforms and catwalks.
25. Provide an electric scissor lift for moving storage to and from the third level.
26. Provide a final valve list and identify all installed valves with brass medallions with embossed identifier.
27. Provide coordination drawings prior to installation.
28. Provide a pipe stress analysis, signed, and sealed by a professional engineer with a current license in the state of Massachusetts for any section(s) of the piping systems that were altered or changed in addition to any alternative to component(s) originally specified within the contract design documents. The contractor will also be responsible for locating all supports, guides, expansion compensation and anchors.
29. Provide a new wireless steam trap monitoring system to all new steam traps. The new steam trap monitoring system shall include all necessary steam trap transmitters, batteries, signal repeaters, wireless trap monitor gateway, steam trap monitoring analytics software, and system training. The steam trap monitoring system must be coordinated with Utility Systems Solutions Inc. ((US2) and connected to the facility’s existing steam trap monitoring system.
30. Provide hazardous gas detection (carbon monoxide; propane & natural gas) and monitoring system.
31. Provide blast-resistant exterior wall intake and exhaust louvers.
32. Provide exhaust and HVAC systems.
33. Provide steam unit heaters.
01 00 00 - 9
34. Provide air compressor and compressed air piping and hose reels.
35. Provide new water softener, and brine tank.
36. Provide chemical treatment system for steam generation equipment.
37. Drain and properly dispose of the fuel oil from the existing two (2) underground 25,000-gallon tanks, flush tanks and refill with fresh ultra-low sulfur no. 2 fuel oil.
a. Saw cut concrete pad above tanks and remove existing fuel oil piping.
b. Provide new fuel oil piping, valves and appurtenances as shown in the contract documents.
c. Provide fuel oil filtration system.
38. Provide new 30,000-gallon double wall vertical fuel oil storage tank for emergency generators, fill box, filtration system, piping, valve, appurtenances, and concrete foundation.
39. Provide containment wall around new fuel oil tank. The new containment area shall have access stairs and platform.
40. Provide ultra-low sulfur no.2 fuel oil for existing and new fuel oil tanks. Contractor is responsible to provide all fuel oil for project including start-up and testing. Tanks must be filled upon project delivery to the VA.
41. Provide exterior mounted fuel oil filtration skid for 30,000-gallon tank.
42. Provide fuel oil fill station for 30,000-gallon tank.
43. Provide HS-20 road crossing utility trench for fuel oil piping.
44. Provide fuel oil skids boilers and emergency generators.
45. Provide 60,000-gallon emergency water storage tank, appurtenances and concrete foundation.
46. Provide pump building to house a fire pump, jockey pump and make-up water pump assembly, appurtenances, electric unit heater.
47. Relocate existing Generator with walk-in enclosure. Provide new concrete foundation.
48. Provide new MV duct bank from existing switchgear in Building 70 to Building 8.
49. Relocated/Re-route underground utilities to accommodate new tunnel.
50. Provide new lighting and power as required in the new tunnel.
51. Provide a new standby diesel Generator, day tank, bypass isolation
ATS and 3-way MTS.
01 00 00 - 10
52. Provide load bank on roof.
53. Provide a new unit Substation to include a HVL switch, Medium- Voltage transformer and Switchboard section.
54. Provide distribution panels, step-down transformers and panelboards.
55. All new equipment shall be rated NEMA 3R or 4X as indicated on the drawings.
56. Provide power to new hotbox.
57. Provide new LED lighting throughout the Boiler plant and future
Chiller Plant. Provide a new lighting control system.
58. Provide exterior lighting as shown on the drawings.
59. Provide lighting near new fuel oil/make-up water tanks.
60. Provide new lightning protection system for Building 8.
61. Provide connections to all new and existing to remain equipment within the original Boiler plant.
62. Provide a new fire alarm system tied into the existing fire alarm network.
63. Provide new fiber optic cable and telephone cable back from Building 2 to Building 8.
64. Provide new telecom outlets and WAPS connected to new IT equipment (data rack).
65. Remove existing pad-mounted transformer previously feeding the original Boiler Plant.
66. Connect existing emergency panels in Garage and Engineer Building to the new emergency system in the Boiler Plant.
67. Provide central energy building with security system as shown in the contract documents.
68. Provide all requirements to create a secure compound around the central energy as shown in the contract documents:
69. Provide 10-foot-high blast wall at property line.
70. Provide 8-foot-high security fence.
71. Provide security cameras.
72. Provide anti-ram gates at compound access roads with license reader.
73. Provide PIV enabled pedestrian gates.
74. Prior to the start of demolition, the contractor shall coordinate with the facility all equipment that will be retained by the owner.
75. Provide new condensate pump, receiver, flash tank, piping, electrical service and appurtenances at Building No. 1.
01 00 00 - 11
76. Modify the existing steam and condensate mains at Building No. 1 to accommodate new steam and condensate piping while maintaining operation of the existing steam and condensate systems.
77. Remove steam piping, valves and appurtenances within the existing boiler plant and steam tunnel as shown in the contract documents.
78. Remove condensate return piping, valves and appurtenances within the existing boiler plant and steam tunnel as shown in the contract documents.
79. Remove four (4) 300 BHP fire tube boilers and one (1) 200 BHP fire tube boiler.
80. Remove deaerator, feed water pumps, piping valves and appurtenances.
81. Remove condensate tanks, transfer pumps, piping and appurtenances.
82. Remove duplex condensate return assembly with 875-gallon receiver.
83. Remove duplex condensate return assembly with 2,000-gallon receiver.
84. Remove fuel oil pump skids, piping, valves, and appurtenances.
85. Remove air compressors, piping, valves, and appurtenances.
86. Remove roof-mounted exhaust fans.
87. Remove platforms, mezzanine, associated steel and stairs indicated in the contract documents.
88. Demolish existing central boiler plant building as shown in the project contract documents.
89. Provide temporary shoring designed by a professional engineer for wall to remain in existing central boiler plant.
90. Provide new hazardous material storage container and required utilities and concrete pad.
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.
1.5 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.
01 00 00 - 12
B. Security Procedures:
1. General Contractor’s employees shall not enter the project site without an appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.
a. In accordance with VA Directive 0735 Personal Identity
Verification of Federal Employees and Contractors, all contractors on VA premises are require to obtain proper identification cards. The following information describes the criteria for each type of identification card:
b. PIV CARD is required for all unsupervised, full time, logical and/or physical access for more than 6 months OR more than 180 aggregate days in one year period. In this description unsupervised is to mean unescorted by VA personnel into areas off public corridors that would require the possession of a key or being granted access control privileges to enter through a secured door. Time onsite is determined by the Period of
Performance of the contract/task order and is to include all prime and sub-contractor personnel (to include sub-subcontractors) regardless of the actual personal time on site.
The issuance of a PIV Card requires two forms of acceptable identification, a favorable SAC adjudication and an initiated
National Agency Check with Written Inquiries (NACI).
c. Non-PIV CARD is required for all unsupervised, full time, logical and/or physical access for less than 6 months OR less than 180 aggregate days in one year period. In this description unsupervised is to mean unescorted by VA personnel into areas off public corridors that would require the possession of a key or being granted access control privileges to enter through a secured door. Time onsite is determined by the Period of
Performance of the contract/task order and is to include all prime and sub-contractor personnel (to include sub-subcontractors) regardless of the actual personal time on site.
The issuance of a PIV Card requires two forms of acceptable identification and a favorable SAC adjudication.
d. Flash Badge is required for common access ONLY for less than 6 months or less than 180 aggregate days in one year period. Time
01 00 00 - 13 onsite is determined by the Period of Performance of the contract/task order and is to include all prime and sub-contractor personnel (to include sub-subcontractors) regardless of the actual personal time on site. The issuance of a Flash
Badge requires one form of acceptable identification.
e. Contractors are required to submit to the Contracting Officer a list of personnel to be mobilized for the work associated with the contract/task order scope of work to be completed under this specification to the CO and COR. The list is to include current status of SAC background investigation, i.e. – SAC + NACI, date completed; SAC, date completed; None.
f. Determination of the level of identification required will be determined by the COR based on the contract/task order scope of work and level of access required.
g. Contractors are to contact the COR regarding credentialing requirements.
h. COR will facilitate contractor submission of information through the CO, PIV Sponsor and PIV Office at the Medical Center to obtain proper credentials for each contractor personnel to be on campus to complete the contract/task order scope of work to be completed under this specification.
2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.
3. No photography of VA premises is allowed without written permission of the Contracting Officer. Patients and staff are not to be photographed at any time.
4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.
C. Key Control:
1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative (COR) for the purpose of security inspections of every area of project
01 00 00 - 14 including toolboxes and parked machines and take any emergency action.
2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation. See Section 08 71
00, DOOR HARDWARE and coordinate.
D. Document Control:
1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of
“sensitive information”.
2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.
3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”.
Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.
4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting
Officer.
5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.
6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.
7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document
Management Software (EDMS).
Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the
EDMS system.
“Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.
E. Motor Vehicle Restrictions
01 00 00 - 15
1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.
2. A limited number of (2 to 5) permits shall be issued for General