08_Plumbing.pdf

PDF 10 MB Posted

Attached to
Y1DZ--523A4-20-208 Replace Boilers and Upgrade Controls
Solicitation number
36C24125R0077Solicitation
Issued by

About this file

These documents are plumbing design drawings for a boiler and control upgrade project at the West Roxbury VA Medical Center. The project, numbered 523A4-20-208, involves replacing boilers and upgrading controls across multiple phases in Building 8, with work spanning from the underground tunnel level to the roof. The design documents include detailed plumbing plans, demolition plans, flow diagrams, riser diagrams, and equipment schedules for various systems including sanitary, domestic water, compressed air, chemical treatment, and fire protection.

Key components include a 60,000-gallon water storage tank, water softening system, package booster pumps, air compressors, oil-water separators, and various piping connections across main, mezzanine, and roof levels. The project is being managed by Miller-Remick LLC as the consultant, with multiple engineering sub-consultants including Mabbett & Associates for hazardous materials, WBRC for architectural and civil engineering, and Koffel Associates for fire and life safety. The bid documents are dated 11/14/2025, with an issued for construction status, indicating the project is in the final design stage and preparing for potential bidding and construction.

View the file

Other files

File Type Posted
Amendment 5 RFI Response.xlsx XLSX spreadsheet
SF111.3A A0004.pdf PDF
S-002 A0004.pdf PDF
SF121.3A A0004.pdf PDF
SF101.3A A0004.pdf PDF
MH131.3A A0004.pdf PDF
MQ141.3A A0004.pdf PDF
AE102_3 A0004.pdf PDF
AE103_3 A0004.pdf PDF
Geotechnical Report 8 of 8 A0004.pdf PDF
SS101.1 A0004.pdf PDF
SF131.3A A0004.pdf PDF
ES101.1 A0004.pdf PDF
AE101_5 A0004.pdf PDF
AE101_3 A0004.pdf PDF
AE503 A0004.pdf PDF
CD101 A0004.pdf PDF
Geotechnical Report 5 of 8 A0004.pdf PDF
Regulated Building Materials Survey Report A0004.pdf PDF
Hazmat A0004.pdf PDF
PreBid RFIs 36C24125R0077 523A4-20-208 Replace Boilers FINAL.xlsx XLSX spreadsheet
S06 Construction Class Deviation VAAR 852.207-70 and New Clause VAAR 852.204-72.pdf PDF
S06 36C24125R0077 0003.pdf PDF
S02 PCRA 523A4 20 208 Replace Boilers and Upgrade Controls.pdf PDF
S02 Exhibit B.pdf PDF
523A4 20 208_Bid Specifications Volume III.pdf PDF
09c_Mechanical.pdf PDF
11_Security Electronics.pdf PDF
06b_Architectural.pdf PDF
06a_Architectural.pdf PDF
05b_Structural.pdf PDF
07_Fire Protection.pdf PDF
S02 VHA Boiler and Associated Plant Safety Device Testing Manual 8th Edition 1.pdf PDF
S02 RFP 36C24125R0077 Solicitation.pdf PDF
S02 SOW 523A4 20 208 Replace Boilers and Upgrade Controls.pdf PDF
S02 ICRA 523A4 20 208 Replace Boilers and Upgrade Controls.pdf PDF
S02 Exhibit A.pdf PDF
P03 Brand Name CB Boiler Burner Fire Tube_Redacted.pdf PDF
P03 Brand Name ATS_Redacted.pdf PDF
523A4 20 208_Bid Specifications Volume I.pdf PDF
09b_Mechanical.pdf PDF
05a_Structural.pdf PDF
03b_Civil Site.pdf PDF
S02 WD MA20250001 12122025.pdf PDF
S02 Exhibit D.xlsx XLSX spreadsheet
P03 Brand Name Door Hardware_Redacted.pdf PDF
P03 Brand Name Trane_Redacted.pdf PDF
P03 Brand Name Fire Alarm_Redacted.pdf PDF
523A4 20 208_Bid Specifications Volume II.pdf PDF
09a_Mechanical.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseMILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEER

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t o n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t th re e in c h o n e fo o t

523A4-20-208

/3

/2

:1

:2

P

M

REPLACE BOILERS AND

UPGRADE CONTROLS

11/14/2025

BID DOCUMENTS

ISSUED FOR CONSTRUCTION

Revisions: Date:

WEST ROXBURY VA MEDICAL CENTER

WEST ROXBURY, MA

M-R PROJECT NO: 0506-0012

ENGINEER OF RECORD PLUMBING

ABBREVIATIONS, NOTES

AND SYMBOLS

P001

KBGS

(D)TEST HEADER

(D)FDC

DISCONNECT

(E)6"FP MAIN

(D)REMOVE DRAIN

(E)8"DRAIN

(E)8"DCV IN

VERTICAL

(E)8"WATER DROP

TO FIRE PUMP

(E)8"FP RISE

DISCONNNECT 6"FP

FROM MAIN

DISCONNECT

(E)2"DRAIN

DISCONNECT

(E)6"FP MAIN

(E)4" FP

(E)8" CW

(E)6" FP

(E)8" FP

(E)6" FP

(D)6"

(D)2"

(E)6" FP

(D)6" (D)6"FP DN

IN (E) PIT

DISCONNECT

(E)4"FP

(E)-FIRE

PUMP-1

(E)4" SAN

(E)4" SAN

(E)4" SAN

(E)6" FP

(D)4"

DISCONNECT

(E)4"SAN FROM

MAIN PREPARE

FOR NEW

CONNECTION EXISTING UNDERGROUND

STEAM TUNNEL

TEST HEADER

FDC

CONNECT

6"FP MAIN &

EXTEND

2"DRAIN DROP

TO GRADE

(E)8"DRAIN

(E)8"DCV IN

VERTICAL

(E)8"WATER DROP

TO FIRE PUMP

(E)8"FP RISE

CONNECT

2"D TO MAIN

& EXTEND

CONNECT 6"FP

TO (E)6"FP &

EXTEND

CONNECT 4"FP TO (E)4"FP

& EXTEND

CONNNECT

6"FP TO MAIN

(E)4" FP

(E)8" FP

(E)8" CW

(E)6" FP

(E)-FIRE

PUMP-1

(E)6" FP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANTS

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEER

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

523A4-20-208

MR PROJECT NO:

Hazardous Materials:

MABBETT & ASSOCIATES

Architect & Civil Engineering:

WBRC

Fire & Life Safety:

KOFFEL ASSOCIATES

Electronic Security:

GRW

Tunnel Structural & Civil Engineering:

PEC

Physical Security:

FORCE PROTECT

/1 /2

:2

:2

P M

PP401.2

PLUMBING

ENLARGED PLANS - PHASE 2

REPLACE BOILERS AND

UPGRADE CONTROLS

WEST ROXBURY VA MEDICAL CENTER

WEST ROXBURY, MA

11/14/2025 JJM AHTM

BID DOCUMENTS

ISSUED FOR CONSTRUCTION

0506-0012

SCALE: 1/4" = 1'-0"1

ENLARGED BLDG 1 FIRE PUMP ROOM DEMO PLAN- PHASE 1

SCALE: 1/4" = 1'-0"2

ENLARGED BLDG 1 FIRE PUMP ROOM PLAN - PHASE 2

NO. DESCRIPTION DATE

(E)PIPING EXTENDS

TO BLDG 1

NEW TUNNEL

T

EXISTING TUNNEL

ExTBUILDING 1 BASEMENT

MER

F O

R C

O N

T

IN

U A

T

IO

N

S E

E D

R A

W

IN

G P

S

1.

8-SSP-01C

(E)4" SAN

(E)4" SAN

4"CO

4"CO

4"SAN

4"SAN

4"SAN

(E)4"SAN UP

4"SAN UP TO

(E)FD IN FIRE

PUMP ROOM

CONNECT 4"SAN

TO (E)4"SAN

/8

(E)4" SAN

1/8" / 1'-0"

3"FM

1/8" / 1'-0"

INV. ELEV.

105.41'

4"SAN

4"SAN

PP401.2

Sim

X1

D X2

C.7

XE

E

F

NEW TUNNEL

T

EXISTING TUNNEL

ExT

F O

R C

O N

T

IN

U A

T

E D

R A

W

IN

G P

S

1.

BUILDING 8

PUMP ROOM - LOWER LEVEL

PR

8-SSP-01A

8-SSP-01B 1

1/8" / 1'-0"1/8" / 1'-0"

2"FM3"FM

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANTS

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEER

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

PLAN

NORTH

KEYPLAN

ACTUAL

NORTH

MR PROJECT NO:

Hazardous Materials:

MABBETT & ASSOCIATES

Architect & Civil Engineering:

WBRC

Fire & Life Safety:

KOFFEL ASSOCIATES

Electronic Security:

GRW

Tunnel Structural & Civil Engineering:

PEC

Physical Security:

FORCE PROTECT

EXISTING

BOILER

PLANT

NEW

EMERGENCY

GENERATOR

BLDG.

NEW BOILER

PLANT

TUNNEL

BLDG 1

/1 /2

:0

:3

P M

PS101.3

PLUMBING

PIPING PLAN

TUNNEL LEVEL - PHASE 3

REPLACE BOILERS AND

UPGRADE CONTROLS

WEST ROXBURY VA MEDICAL CENTER

WEST ROXBURY, MA

11/14/2025 JJM AHTM

BID DOCUMENTS

ISSUED FOR CONSTRUCTION

0506-0012

SCALE: 1/4" = 1'-0"1 PLUMBING PIPING - NEW TUNNEL @ BLDG 1

SCALE: 1/4" = 1'-0"2 PLUMBING PIPING - NEW TUNNEL @ BLDG 8

GENERAL SHEET NOTES:

1. REFER TO DRAWING P-001 FOR PLUMBING GENERAL NOTES, SYMBOLS, AND

ABBREVIATIONS.

2. REFER TO DRAWING SERIES P-500 FOR DETAILS

3. REFER TO DRAWING SERIES P-600 FOR FLOW AND RISER DIAGRAMS

4. REFER TO DRAWING SERIES P-700 FOR SCHEDULES.

SHEET KEYNOTES:

1. NEW EJECTOR PUMP WITH LEAK DETECTION IN 2'X2'X2' SUMP. CONTROL PANELS

LOCATED IN BUILDING 1 AND BUILDING 8.

2. 2" FORCED MAIN DROP TO SLOPED FORCE MAIN, COORDINATED INVERT WITH FUTURE

24" CHILLER WATER PIPING ROUTINGS.

3. 2"FORCE MAIN RISE AND COORDINATE WITH WITH FUTURE 24" CHILLER WATER PIPING

ROUTINGS.

4. 4" PIPE LINK SEAL.

5. REPAIR EXISTING COLLAPSED SANITARY LINE IN BUILDING 1. VERIFY LOCATION AND

EXTENT OF REPAIR WITH COR BEFORE PROCEEDING WITH WORK.

A

9 8 7 6 5 4

C

D

B.3

B

8.7 8.4 7.6

A.7

A.6

A.4

C.7

E

F

8-CS-1

8-DA-1

8-B-1 8-B-2 8-B-3

S A N

8-B-4

2"SAN UP

4"SAN

4"SAN

4"SAN

S A N

B

S A N

4"SAN

8-OWS-01

S A N

8-WS-01

8-SSP-04

/8

1/8" / 1'-0"

/8

1/8" / 1'-0"

S A N

S A N

4"V UP

4"ICW

8"FP

V

6"SD

4"ICW UP

W/SOV

4"FD-E

6"FD-S

6"FD-S

6"FD-S

6"FD-S

6"FD-S

6"FD-S 6"FD-S

6"FD-S 6"FD-S 6"FD-S

6"FD-S

6"FD-S

4"FD-E

P-707

P-530

4" UP TO

4"FCO

6"SD UP & DN WITH

4"WCO 18"ABV FLR

6"SAN

UP 6"FIRE WATER ENTRANCE

REFER TO FIRE PROTECTION

PLANS FOR CONTINUATION

8"GCO

2"SAN UP

4"FD-E 4"FD-E 4"FD-E

6"FD-S

CHEMICAL TREATMENT

EQUIPMENT HOUSEKEEPING PAD

(SEE STRUCTURAL DWGS)

FIRE WATER PAD

(SEE FIRE

PROTECTION DWGS)

/8

4"FS-S

4"FD-S

4"FD-S

4"SAN UP

4"FCO

4"SAN

3"SAN

6"GCO

4"V UP

6"SAN

4"V

S A N

2"FM RISE W/

CHECK & SHUT OFF

VALVE

2"FM UP

EXTEND OIL

SEPERATOR

COVER TO

FLOOR LEVEL

4" WATER ENTRANCE

EQUIPMENT AREA

WATER TREATMENT

EQUIPMENT

HOUSEKEEPING PAD

(SEE STRUCTURAL

DWGS)

2"V UP

4"DCW

6"FD-S

4"V UP

PIPE SLEEVE W/LINK-SEAL

WATER TIGHT (TYP.)

8-CA-02

8-CA-01

1/8" / 1'-0"

/8

/8

4" UP TO

4"FCO

6" UP TO

6"FCO

4"SD

S D

S D

8" UP TO

8"FCO

4" UP TO

4"FCO

6" UP TO

6"FCO

4" UP TO

4"FCO

4" UP TO

4"FCO

4" UP TO

4"FCO

/8

4" SD UP

TO 4"FD-E

P-707

F O

R C

O N

T

IN

U A

T

E D

R A

W

IN

G P

P

.3

B

6"FD-S

94.00 I.E. 94.00 I.E.

94.86 I.E. 96.64 I.E.

2" SD UP REFER TO

P121.3A FOR CONTINUATION

6"SAN

6"SAN6"SAN6"SAN

S A N

S A N

S A N

S A N

S A N

S A N

S A N

S A N

S A N

S A N

S A N

6"SAN 6"SAN 6"SAN

S A N

2"SAN

6"SAN

2"V6"SAN

6"SAN

4"SAN4"SAN4"SAN

4"SAN

4"SAN 6"SAN

6"SAN

6"SAN

6"SD 4"SD

4"SAN

2"V

2" V UP

6" SAN UP

TO 6" FCO

2" V

RISE

8-BDS-1

4"SAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANTS

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEER

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

PLAN

NORTH

KEYPLAN

ACTUAL

NORTH

NEW

EMERGENCY

GENERATOR

BLDG.

MR PROJECT NO:

Hazardous Materials:

MABBETT & ASSOCIATES

Architect & Civil Engineering:

WBRC

Fire & Life Safety:

KOFFEL ASSOCIATES

Electronic Security:

GRW

Tunnel Structural & Civil Engineering:

PEC

EXISTING

BOILER

PLANT

NEW BOILER

PLANT

TUNNEL

BLDG 1

Physical Security:

FORCE PROTECT

/1 /2

:1

:3

P M

PP101.3A

PLUMBING

UNDERSLAB PIPING PLAN

MAIN LEVEL - PHASE 3, AREA A

REPLACE BOILERS AND

UPGRADE CONTROLS

WEST ROXBURY VA MEDICAL CENTER

WEST ROXBURY, MA

11/14/2025 KB AHTM

BID DOCUMENTS

ISSUED FOR CONSTRUCTION

0506-0012

SCALE: 1/4" = 1'-0"1

PLUMBING PLAN UNDERSLAB MAIN LEVEL - PHASE 3, AREA A

GENERAL SHEET NOTES:

1. REFER TO DRAWING P-001 FOR PLUMBING GENERAL NOTES, SYMBOLS, AND

ABBREVIATIONS.

2. REFER TO DRAWING SERIES P-500 FOR DETAILS

3. REFER TO DRAWING SERIES P-600 FOR FLOW AND RISER DIAGRAMS

4. REFER TO DRAWING SERIES P-700 FOR SCHEDULES.

4 1

C

D

B.3

B

3 2

A.7

A.6

A.4

C.7

F O

R C

O N

T

IN

U A

T

E D

R A

W

IN

G P

P

.3

A

6"GCO

6"SD

6"SD UP WITH

4"WCO 18"ABV FLR

PIPE SLEEVE W/LINK-SEAL

WATER TIGHT (TYP.)

4"SAN UP

8-CRU-3

4"FS-S

6" SAN UP

TO 6" FCO

4" SAN UP

TO 4" FCO

6"SAN

2"V

2" V UP

2" V

RISE

4" SAN UP

TO 4" FCO

S A N

S A N

4"SAN

6"SAN

4"SAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANTS

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEER

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

PLAN

NORTH

KEYPLAN

ACTUAL

NORTH

MR PROJECT NO:

Hazardous Materials:

MABBETT & ASSOCIATES

Architect & Civil Engineering:

WBRC

Fire & Life Safety:

KOFFEL ASSOCIATES

Electronic Security:

GRW

Tunnel Structural & Civil Engineering:

PEC

EXISTING

BOILER

PLANT

NEW

EMERGENCY

GENERATOR

BLDG.

NEW BOILER

PLANT

Physical Security:

FORCE PROTECT

TUNNEL

BLDG 1

/1 /2

:1

:4

P M

PP101.3B

PLUMBING

UNDERSLAB PIPING PLAN

MAIN LEVEL - PHASE 3, AREA B

REPLACE BOILERS AND

UPGRADE CONTROLS

WEST ROXBURY VA MEDICAL CENTER

WEST ROXBURY, MA

11/14/2025 JJM AHTM

BID DOCUMENTS

ISSUED FOR CONSTRUCTION

0506-0012

SCALE: 1/4" = 1'-0"1

PLUMBING PLAN UNDERSLAB MAIN LEVEL - PHASE 3, AREA B

NO. DESCRIPTION DATE

GENERAL SHEET NOTES:

1. REFER TO DRAWING P-001 FOR PLUMBING GENERAL NOTES, SYMBOLS, AND

ABBREVIATIONS.

2. REFER TO DRAWING SERIES P-500 FOR DETAILS

3. REFER TO DRAWING SERIES P-600 FOR FLOW AND RISER DIAGRAMS

C

D

B.3

B

8-CS-1

8-DA-1

8-B-1 8-B-2 8-B-3

F O

R C

O N

T

IN

U A

T

E D

R A

W

IN

G P

P

.3

B

2 1/2"SW

REFER TO MP111.3A

FOR CONTINUATION

CONTROL ROOM

STAIR

8.7 8.4 7.6

A.7

A.6

A.4

C.7

E

F

3"NPW

3"SCW

2"DCW

1 1/2"DHW

3/4"DHWR

3"NPW

3"SCW

2"DCW

1 1/2"DHW

3/4"DHWR

3"NPW

3"SCW

2"DCW

1 1/2"DHW

3/4"DHWR

1"DCW

2 1/2"SCW

2 1/2"NPW

N P W

S C W

D C W

D H W

D H W R

REFER TO MP111.3A

FOR CONTINUATION

2 1/2"SCW UP

S C W

D C W

D H W

D H W R

1 1/4"DCW

1 1/4"DHW

8-B-4

2 1/2"SCW

UP

8-WS-01

8-POLY-1

8-CAUSTIC-1

8-AMINE-1

PP401.3

IC

W

IC

W

4"SAN

3"SCW

S C W

S C W

1/8" / 1'-0"

4"ICW UP

3"SCW

DROP

4"V UP

3/4"DCW

UP

3/4"DCW

UP

3/4"DCW

UP

3/4"DCW

UP

4"ICW UP

W/SOV

6"FD-S

6"FD-S

6"FD-S

6"FD-S

6"FD-S

6"FD-S 6"FD-S

6"FD-S 6"FD-S 6"FD-S

6"FD-S

6"FD-S

6"FD-S

4"FD-E

P-707

P-531

3"FCO 4"CO

4"FCO

4"FCO4"FCO

6"SD UP &DN WITH

4"WCO 18"ABV FLR

6"SAN RISE&DROP

WITH 6"WCO

24"ABV FLR

4"V UP.

1 1/4"DCW &DHW

DROP TO MIXING

VALVE

8"FIRE WATER ENTRANCE

REFER TO FIRE PROTECTION

PLANS FOR CONTINUATION

8"GCO

6"GCO

4"FCO

6"FD-S

4"FD-E 4"FD-E 4"FD-E

P-804

P-801

P-801 P-801

P-804

P-804

1 1/2"CA

1 1/2"CA

1 1/2"CA

DROP

1"NPW DROP SEE

DRAWING MP111.3A

1"NPW

1"NPW DROP

SEE DRAWING

MP111.3A

1 1/2"CA

4"SAN

3"SAN

4"SAN4"SAN

3"SAN

S A N

1/2"DCW

3/4"DCW

DROP

2"SAN DN

1 1/2"V UP

1/2"DCW

DROP

4"SAN UP

3"SAN UP

2"SAN UP

1 1/2"V UP

1 1/2"V UP

3"SAN UP

2"SAN UP

4"SAN UP

3"SAN UP

2"FM DN TO

SUMP

3"SAN UP

4"SAN UP

2"SAN DN

1 1/2"V RISE

REFER TO

PP401.3 FOR

CONTINUATION

1 1/2" V

UP

2"V UP

2"V UP

1 1/2"CA UP

3"SCW DROP

REFER TO MP111.3A

FOR CONTINUATION

8-BDS-1

3"V UP

2"V DN

4"CO

4"CO

4"CO

4"CO

4"CO

4"SAN

4"CO

4"CO

4"CO

4"V UP

3/4"CA UP

3/4"CA UP

3/4"CA UP 3/4"CA UP

4"V RISE

& DN

4"SAN DN

4"V RISE

4"V UP

4"V UP

BOILER ROOM

4"SAN

4"SAN

4"SAN

4"SAN

3"SAN

3"SAN

4"V 4"V

N P W

N P W

S C W

2"DCW UP

4"V RISE

& DROP

4"V DN

4"V UP

6"FCO

8-CA-02

8-CA-01

AIR DRYER

AIR

COMPRESSOR

AIR

COMPRESSOR

1/2"TP UP

2 1/2"NPW

UP

8-OXYSCAV-1

REFER TO

PP401.3 FOR

CONTINUATION

REFER TO

PP401.3 FOR

CONTINUATION

4"CO

4"SAN DROP

3"V RISE

4"SAN

4"FCO

6"FCO

4"FCO

4"FD-E

3/4"SCW UP

P-707

2"SD UP/DN.

REFER TO

PP101.3A FOR

CONTINUATION

CONNECT 2"SD PIPING

TO EXISTING WEEP HOLES

6"FCO

P-610

4"FD-E

4" WCO

8"FCO

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANTS

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEER

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

PLAN

NORTH

KEYPLAN

ACTUAL

NORTH

NEW

EMERGENCY

GENERATOR

BLDG.

MR PROJECT NO:

Hazardous Materials:

MABBETT & ASSOCIATES

Architect & Civil Engineering:

WBRC

Fire & Life Safety:

KOFFEL ASSOCIATES

Electronic Security:

GRW

Tunnel Structural & Civil Engineering:

PEC

EXISTING

BOILER

PLANT

NEW BOILER

PLANT

TUNNEL

BLDG 1

Physical Security:

FORCE PROTECT

/1 /2

:0

:0

P M

PP111.3A

PLUMBING

PIPING PLAN

MAIN LEVEL - PHASE 3, AREA A

REPLACE BOILERS AND

UPGRADE CONTROLS

WEST ROXBURY VA MEDICAL CENTER

WEST ROXBURY, MA

11/14/2025 GS AHTM

BID DOCUMENTS

ISSUED FOR CONSTRUCTION

0506-0012

SCALE: 1/4" = 1'-0"1

PLUMBING PLAN MAIN LEVEL - PHASE 3, AREA A

GENERAL SHEET NOTES:

1. REFER TO DRAWING P-001 FOR PLUMBING GENERAL NOTES, SYMBOLS, AND

ABBREVIATIONS.

2. REFER TO DRAWING SERIES P-500 FOR DETAILS

3. REFER TO DRAWING SERIES P-600 FOR FLOW AND RISER DIAGRAMS

C

D

B.3

B

3 2

F O

R C

O N

T

IN

U A

T

E D

R A

W

IN

G P

P

.3

A

SUBSTATION ROOM

GENERATOR ROOM

STAIR

A.7

A.6

A.4

C.7

3/4"DCW

UP

6"SD UP

6"SD

6"GCO

6"SD

SLEEVE

6"FCO

4"FCO

4"SAN DN

4"SAN RISE

4"V UP

4"SAN UP TO DRAIN

4"WCO

18"ABV FF

PIPING TO BE W/

DRIP PAN & LEAK

DETECTION

4"FCO

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANTS

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEER

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

PLAN

NORTH

KEYPLAN

ACTUAL

NORTH

MR PROJECT NO:

Hazardous Materials:

MABBETT & ASSOCIATES

Architect & Civil Engineering:

WBRC

Fire & Life Safety:

KOFFEL ASSOCIATES

Electronic Security:

GRW

Tunnel Structural & Civil Engineering:

PEC

EXISTING

BOILER

PLANT

NEW

EMERGENCY

GENERATOR

BLDG.

NEW BOILER

PLANT

Physical Security:

FORCE PROTECT

TUNNEL

BLDG 1

/1 /2

:0

:0

P M

PP111.3B

PLUMBING

PIPING PLAN

MAIN LEVEL - PHASE 3, AREA B

REPLACE BOILERS AND

UPGRADE CONTROLS

WEST ROXBURY VA MEDICAL CENTER

WEST ROXBURY, MA

11/14/2025 JJM AHTM

BID DOCUMENTS

ISSUED FOR CONSTRUCTION

0506-0012

SCALE: 1/4" = 1'-0"1

PLUMBING PLAN MAIN LEVEL - PHASE 3, AREA B

GENERAL SHEET NOTES:

1. REFER TO DRAWING P-001 FOR PLUMBING GENERAL NOTES, SYMBOLS, AND

ABBREVIATIONS.

2. REFER TO DRAWING SERIES P-500 FOR DETAILS

3. REFER TO DRAWING SERIES P-600 FOR FLOW AND RISER DIAGRAMS

C

D

B.3

B

8-FHX-1 8-FHX-2 8-FHX-3 8-FHX-4

8-DA-1

18' - 0 1/4" 18' - 0" 18' - 0"

12' - 10 3/4" 12' - 10 1/2" 12' - 10 1/2"

STORAGE

STAIR

TLT/SHOWER

SHOWER

LOCKERS

LOUNGE

TLT

BEDROOM

I.T.

SECURITY

CORRIDOR

8.7 8.4 7.6

A.7

A.6

A.4

C.7

3/4"DHWR

1 1/2"DHW

2"DCW

3/4"DHWR

1 1/2"DHW

2"DCW

3/4"DHWR

2"DCW

1 1/2"DCW

3/4"DHWR

1 1/2"DHW

8-DWH-01

3"FD-C

3"FD-C

3"FD-C

2"FD-C

2"FD-C

1 1/2"DHW

1 1/2"DCW

1/2"DCW

1/2"DHW

1/2"DCW&DHW

DROP IN CHASE

JAN.

ELEC

4"ICW

2"DCW

1 1/2"DHW

3/4"DHWR

DN ON WALL

4"FD-D

PP121.3A

P-401

P-103 P-528

P-401

P-103

P-701

P-701

P-502

1/2"DCW&DHW

DROP IN CHASE

1"DCW DROP

IN CHASE

1/2"DCW&DHW

DROP IN WALL

1/2"DCW&DHW

DROP IN CHASE

1/2"DCW DROP

IN CHASE

1/2"DCW&DHW

DROP IN CHASE

1 1/2"DCW

DROP IN CHASE

4"ICW DROP

3/4"CA DROP

3/4"CA DROPCOMPRESSED

AIR HOSE

COMPRESSED

AIR HOSE

6"SD UP

& DN

4"ICW DROP

4"ICW 4"ICW

4"V UP

3"V DN

8-DCP-01

3/4"DCW

3/4"DHWR

1/2"DCW DROP

IN CHASE TO

TP-1

1/2"TRAP PRIMER

WATER TO FLOOR

DRAINS

1"DHW

2"DCW

2"DCW

1 1/2"DHW

3/4"DHWR

1 1/2"CW

DROP

4"V UP

& DN

4"V UP

& DN

4"V UP

& DN

2 1/2" SCW

RISE & DN

REFER TO MP121.3A

FOR CONTINUATION

3" SCW UP

& DN

2" DCW DN

3/4"CA

DROP

3/4" DCW

DN

3/4" DCW

DN

3/4"CA

DROP

4"V UP

& DN

3/4"CA

DROP

3/4" CA

DROP

3/4" DCW

DN

3"V UP

& DN

2"DCW

1 1/2"CA

2"DCW

1 1/2"CA

2"DCW

1 1/2"CA

2"DCW

1 1/2"CA

2"DCW

1"DCW

3/4"CA3/4"CA3/4"CA3/4"DCW

3/4"CA

3/4"CA3/4"DCW

1"CA4"ICW

BOILER ROOM

PIPING HUNG

FROM ABOVE

CATWALK

PIPING HUNG

FROM ABOVE

CATWALK

4"ICW4"ICW

4" V UP

& DN

F O

R C

O N

T

IN

U A

T

E D

R A

W

IN

G P

P

.3

B

3/4"SCW DN

2 1/2"SCW

2 1/2"NPW

2 1/2" NCW

RISE & DN

CONNECT 2"SD PIPING

TO EXISTING WEEP HOLES

2"SD DN.

REFER TO

PP101.3A FOR

CONTINUATION

8 7 6 5

D

7.6

C.7

3"V 2 V

V

V

2"V RISE

1 1/2"V DN

3"FD-C

3"FD-C

3"FD-C

2"FD-C

2"FD-C

2"V RISE

1 1/2"V DN

4"FD-D

1 1/2"V RISE

2"SAN DROP IN

CHASE4"V RISE

4"SAN DN

IN CHASE

3"V RISE

4"SAN DN

IN CHASE

1 1/2"V RISE

2"SAN DROP IN

CHASE

1 1/2"V RISE

2"SAN DROP IN

CHASE

8-DWH-01

P-401

P-103

P-528

P-401

P-103

P-701

P-701

4"V UP

&DN

2"V RISE

&DN

P-5023"V UP

1 1/2"V

RISE &DN

2"V RISE&DN

3"SAN DN

LOCKERS

LOUNGE

TLT

BEDROOM

JAN.

CORRIDOR

SHOWER

TLT/SHOWER

2"V RISE

2"V DN IN

CHASE

8-DCP-01

3"V FROM

BELOW

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANTS

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEER

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

PLAN

NORTH

KEYPLAN

ACTUAL

NORTH

NEW

EMERGENCY

GENERATOR

BLDG.

MR PROJECT NO:

Hazardous Materials:

MABBETT & ASSOCIATES

Architect & Civil Engineering:

WBRC

Fire & Life Safety:

KOFFEL ASSOCIATES

Electronic Security:

GRW

Tunnel Structural & Civil Engineering:

PEC

EXISTING

BOILER

PLANT

NEW BOILER

PLANT

TUNNEL

BLDG 1

Physical Security:

FORCE PROTECT

/1 /2

:0

:1

P M

PP121.3A

PLUMBING

PIPING PLAN

MEZZANINE - PHASE 3, AREA A

REPLACE BOILERS AND

UPGRADE CONTROLS

WEST ROXBURY VA MEDICAL CENTER

WEST ROXBURY, MA

11/14/2025 JJM AHTM

BID DOCUMENTS

ISSUED FOR CONSTRUCTION

0506-0012

SCALE: 1/4" = 1'-0"1

PLUMBING PLAN MEZZANINE - PHASE 3, AREA A

GENERAL SHEET NOTES:

1. REFER TO DRAWING P-001 FOR PLUMBING GENERAL NOTES, SYMBOLS, AND

ABBREVIATIONS.

2. REFER TO DRAWING SERIES P-500 FOR DETAILS

3. REFER TO DRAWING SERIES P-600 FOR FLOW AND RISER DIAGRAMS

4. REFER TO DRAWING SERIES P-700 FOR SCHEDULES.

SCALE: 1/4" = 1'-0"2

SANITARY & VENT TOILET ROOMS PLAN - PHASE 3

C

D

B.3

B

3 2

8-LVR-4 8-LVR-5

SECURITY

GENERATOR ROOM

MEZZANINE

STORAGE

CORRIDOR

STAIR

STORAGE

A.7

A.6

A.4

C.7

6"SD UP&DN

4"FD-D

MECH

4"V

UP&DN

F O

R C

O N

T

IN

U A

T

E D

R A

W

IN

G P

P

.3

A

3/4"SCW DROP

TO HUMIDFIER

3/4"SCW DROP

TO COORDINATE

W/STRUCTURAL &

DUCT WORK

3/4"SCW DROP

TO COORDINATE

W/STRUCTURAL &

DUCT WORK

3/4"SCW

3/4"SCW

HUMIDFIER DRAIN

DROP

8-AHU-5

8-CSG-1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANTS

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEER

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

PLAN

NORTH

KEYPLAN

ACTUAL

NORTH

MR PROJECT NO:

Hazardous Materials:

MABBETT & ASSOCIATES

Architect & Civil Engineering:

WBRC

Fire & Life Safety:

KOFFEL ASSOCIATES

Electronic Security:

GRW

Tunnel Structural & Civil Engineering:

PEC

EXISTING

BOILER

PLANT

NEW

EMERGENCY

GENERATOR

BLDG.

NEW BOILER

PLANT

Physical Security:

FORCE PROTECT

TUNNEL

BLDG 1

/1 /2

:0

:1

P M

PP121.3B

PLUMBING

PIPING PLAN

MEZZANINE - PHASE 3, AREA B

REPLACE BOILERS AND

UPGRADE CONTROLS

WEST ROXBURY VA MEDICAL CENTER

WEST ROXBURY, MA

11/14/2025 JJM AHTM

BID DOCUMENTS

ISSUED FOR CONSTRUCTION

0506-0012

SCALE: 1/4" = 1'-0"1

PLUMBING PLAN MEZZANINE - PHASE 3, AREA B

GENERAL SHEET NOTES:

1. REFER TO DRAWING P-001 FOR PLUMBING GENERAL NOTES, SYMBOLS, AND

ABBREVIATIONS.

2. REFER TO DRAWING SERIES P-500 FOR DETAILS

3. REFER TO DRAWING SERIES P-600 FOR FLOW AND RISER DIAGRAMS

C

D

B.3

B

STORAGE

STAIR

8.7 8.4 7.6

A.7

A.6

A.4

C.7

E

F

4"SD

4"SD

4"SD

6"SD

4"SD

6"SD

4"SD

6"SD DN

4"SD UP4"SD UP4"SD UP

4"CO

4"CO

4"CO

1/8" / 1'-0"

1/8" / 1'-0"1/8" / 1'-0" 1/8" / 1'-0"

4"V

4"V

4"V

4"V 4"V

4"V

4"V

4"V DN

4"V DN

4"V DN

4"V DN

4"V DN

3"V UP

& DN

4" V DN 4" V UP

4"V UP

4"V UP

4"V UP

4"V UP

4"V

DROP

4"V DN

8-DA-1

8-UH-1

8-UH-2

4"V UP

3"V UP

& DN

F O

R C

O N

T

IN

U A

T

E D

R A

W

IN

G P

P

.3

B

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANTS

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEER

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

PLAN

NORTH

KEYPLAN

ACTUAL

NORTH

NEW

EMERGENCY

GENERATOR

BLDG.

MR PROJECT NO:

Hazardous Materials:

MABBETT & ASSOCIATES

Architect & Civil Engineering:

WBRC

Fire & Life Safety:

KOFFEL ASSOCIATES

Electronic Security:

GRW

Tunnel Structural & Civil Engineering:

PEC

EXISTING

BOILER

PLANT

NEW BOILER

PLANT

TUNNEL

BLDG 1

Physical Security:

FORCE PROTECT

/1 /2

:0

:1

P M

PP131.3A

PLUMBING

PIPING PLAN

UPPER MEZZANINE - PHASE 3, AREA A

REPLACE BOILERS AND

UPGRADE CONTROLS

WEST ROXBURY VA MEDICAL CENTER

WEST ROXBURY, MA

11/14/2025 JJM AHTM

BID DOCUMENTS

ISSUED FOR CONSTRUCTION

0506-0012

SCALE: 1/4" = 1'-0"1

PLUMBING PLAN UPPER MEZZANINE - PHASE 3, AREA A

GENERAL SHEET NOTES:

1. REFER TO DRAWING P-001 FOR PLUMBING GENERAL NOTES, SYMBOLS, AND

ABBREVIATIONS.

2. REFER TO DRAWING SERIES P-500 FOR DETAILS

3. REFER TO DRAWING SERIES P-600 FOR FLOW AND RISER DIAGRAMS

C

D

B.3

B

3 2

STORAGE

STAIR

A.7

A.6

A.4

C.7

6"SD DN

6"SD UP

6"SD

6"SD

4"CO

4"CO

1/8" / 1'-0"

4"V DN

4"V UP

F O

R C

O N

T

IN

U A

T

E D

R A

W

IN

G P

P

.3

A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANTS

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEER

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

PLAN

NORTH

KEYPLAN

ACTUAL

NORTH

MR PROJECT NO:

Hazardous Materials:

MABBETT & ASSOCIATES

Architect & Civil Engineering:

WBRC

Fire & Life Safety:

KOFFEL ASSOCIATES

Electronic Security:

GRW

Tunnel Structural & Civil Engineering:

PEC

EXISTING

BOILER

PLANT

NEW

EMERGENCY

GENERATOR

BLDG.

NEW BOILER

PLANT

Physical Security:

FORCE PROTECT

TUNNEL

BLDG 1

/1 /2

:0

:1

P M

PP131.3B

PLUMBING

PIPING PLAN

UPPER MEZZANINE - PHASE 3, AREA B

REPLACE BOILERS AND

UPGRADE CONTROLS

WEST ROXBURY VA MEDICAL CENTER

WEST ROXBURY, MA

11/14/2025 JJM AHTM

BID DOCUMENTS

ISSUED FOR CONSTRUCTION

0506-0012

SCALE: 1/4" = 1'-0"1

PLUMBING PLAN UPPER MEZZANINE - PHASE 3, AREA B

GENERAL SHEET NOTES:

1. REFER TO DRAWING P-001 FOR PLUMBING GENERAL NOTES, SYMBOLS, AND

ABBREVIATIONS.

2. REFER TO DRAWING SERIES P-500 FOR DETAILS

3. REFER TO DRAWING SERIES P-600 FOR FLOW AND RISER DIAGRAMS

C

D

B.3

B

8.7 8.4 7.6

A.7

A.6

A.4

C.7

4"RD-1 4"RD-1 4"RD-1

SCUPPER

SEE ARCHITECTUAL

DRAWINGS

SCUPPER

SEE ARCHITECTUAL

DRAWINGS

SCUPPER

SEE ARCHITECTUAL

DRAWINGS

3"VTR &

DN

4" VTR

& DN

4"VTR

& DN

4"VTR

& DN

4"VTR

& DN

4"VTR

& DN

4"VTR

& DN

3"VTR

& DN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANTS

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEER

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

PLAN

NORTH

KEYPLAN

ACTUAL

NORTH

NEW

EMERGENCY

GENERATOR

BLDG.

MR PROJECT NO:

Hazardous Materials:

MABBETT & ASSOCIATES

Architect & Civil Engineering:

WBRC

Fire & Life Safety:

KOFFEL ASSOCIATES

Electronic Security:

GRW

Tunnel Structural & Civil Engineering:

PEC

EXISTING

BOILER

PLANT

NEW BOILER

PLANT

TUNNEL

BLDG 1

Physical Security:

FORCE PROTECT

/1 /2

:0

:1

P M

PP141.3A

PLUMBING

PIPING PLAN

ROOF - PHASE 3, AREA A

REPLACE BOILERS AND

UPGRADE CONTROLS

WEST ROXBURY VA MEDICAL CENTER

WEST ROXBURY, MA

11/14/2025 JJM AHTM

BID DOCUMENTS

ISSUED FOR CONSTRUCTION

0506-0012

SCALE: 1/4" = 1'-0"1

PLUMBING PLAN ROOF - PHASE 3, AREA A

GENERAL SHEET NOTES:

1. REFER TO DRAWING P-001 FOR PLUMBING GENERAL NOTES, SYMBOLS, AND

ABBREVIATIONS.

2. REFER TO DRAWING SERIES P-500 FOR DETAILS

3. REFER TO DRAWING SERIES P-600 FOR FLOW AND RISER DIAGRAMS

C

D

B.3

B

3 2

A.7

A.6

A.4

C.7

6"RD-1

SCUPPER

SEE ARCHITECTUAL

DRAWINGS

4"VTR &

DN

F O

R C

O N

T

IN

U A

T

E D

R A

W

IN

G P

P

.3

A

STAIR

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANTS

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEER

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

PLAN

NORTH

KEYPLAN

ACTUAL

NORTH

MR PROJECT NO:

Hazardous Materials:

MABBETT & ASSOCIATES

Architect & Civil Engineering:

WBRC

Fire & Life Safety:

KOFFEL ASSOCIATES

Electronic Security:

GRW

Tunnel Structural & Civil Engineering:

PEC

EXISTING

BOILER

PLANT

NEW

EMERGENCY

GENERATOR

BLDG.

NEW BOILER

PLANT

Physical Security:

FORCE PROTECT

TUNNEL

BLDG 1

/1 /2

:0

:1

P M

PP141.3B

PLUMBING

PIPING PLAN

ROOF - PHASE 3, AREA B

REPLACE BOILERS AND

UPGRADE CONTROLS

WEST ROXBURY VA MEDICAL CENTER

WEST ROXBURY, MA

11/14/2025 JJM AHTM

BID DOCUMENTS

ISSUED FOR CONSTRUCTION

0506-0012

SCALE: 1/4" = 1'-0"1

PLUMBING PLAN ROOF - PHASE 3, AREA B

GENERAL SHEET NOTES:

1. REFER TO DRAWING P-001 FOR PLUMBING GENERAL NOTES, SYMBOLS, AND

ABBREVIATIONS.

2. REFER TO DRAWING SERIES P-500 FOR DETAILS

3. REFER TO DRAWING SERIES P-600 FOR FLOW AND RISER DIAGRAMS

5 4

D

C.7

3"NPW

3"SCW

2"DCW

1 1/2"DHW

3/4"DHWR

3"SCW

1 1/4"DHW

1 1/4"DCW

S C W

D C W

D H W

8-WS-01

8-AMINE-1

8-CAUSTIC-18-POLY-1

3"NPW DROP

3"SCW

3"DCW

3" DCW BY-PASS

DROP TO BFP

3" DCW BY-PASS

RISE TO WATER

SOFTENER

3" SCW FOR

CHEMICAL

TREATMENT SIDE

STREAM COOLING

NC

4"DCW RISE & DN REFER TO

PP101.3A FOR CONTINUATION

1/2"DCW

1/2"DHW

S C W

4"ICW

4"DCW

8-BFP-1

8-BFP-3

NC

2"SAN DN

1 1/2"V RISE

1/2"DCW & DHW

DROP TO SINK

1 1/2"DCW & DHW

DROP

P-531

P-804

3"SCW RISE

4"DCW

3"DCW

3"DCW

1 1/4"DHW

2"DCW

4"DCW RISE

8-OXYSCAV-1

2"DCW

1 1/2"DHW

3/4"DHWR

DN ON WALL

3/4"SCW

3/4"SCW

3/4"SCW

SEE PP111.3A DWG

FOR CONTINUATION

SEE PP111.3A DWG

FOR CONTINUATION

SEE PP111.3A.DWG

FOR CONTINUATION

4"FD-E

4"FD-E

P-707

4"FD-E 8-TNK-01

8-HBX-01

8-PWP-01

8"OVER FLOW(@708")

DOWN TO 18" ABV

GRADE

4" INLET UP

W/HEAT TAPE &

INSULATION

4" OUTLET DN

W/HEAT TAPE &

INSULATION

4" DRAIN

4" DN TO BLW GRADE

4"BY-PASS RISE

4"TANK

BY-PASS

INV. ELEV 5.0'

BWL FROST

INV. ELEV 5.0'

BWL FROST

(3) 3" IMMERSION

HEATERS BY

HIGHLAND TANK

(208V/3PH)

36" CLEAN-OUT

MANWAY (@36")

LADDER &

PLATFORM BY

HIGHLAND TANK

WATER TANK

FOUNDATION BY

OTHERS

INV. ELEV 5.0'

BWL FROST

8"VENT

4" FIRE DEPARTMENT

CONNECTION

2"INSULATION

1500W, 120V, 1PH

HEATER (TYP. OF 4)

IMMERSION HEATER

CONTROL PANEL

PUMP

CONTROL

PANEL

4" ICW DN TO

1'-0"BLW FROST LINE

TO BUILDING 8

4" CW RISE & DN

TO 1'-0"BLW FROST

LINE FROM SITE

(2)4"BFP-3

4" TOWER CW RISE

TO PUMP

4"BYPASS DROP

TO PUMP

4" LEVEL/TEMPERATUE

PROBE FOR REMOTE

MONITORING

24" MANWAY

4" LEVEL PROBE FOR

PUMPS START/STOP &

LOW LEVEL SENSOR

4" LEVEL/TEMPERATURE

PROBE

36" MANWAY

60,000 GAL WATER

STORAGE TANK

60FT - 6 INCH TALL

13 FT DIAMETER

ø 13' - 4"

FILL & LOW WATER

CONTROL PANEL

6" HIGH SLAB

4" INLET DROP W/HEAT

TAPE & INSULATION TO

CONNECT TO TANK

FLANGE

4"ICW 3"ICW

4"DCW

4" NPW. INV. ELEV.

5.0" BLW FROST LINE

TO BUILDING 8

TO BUILDING 8

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANTS

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEER

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

MR PROJECT NO:

Hazardous Materials:

MABBETT & ASSOCIATES

Architect & Civil Engineering:

WBRC

Fire & Life Safety:

KOFFEL ASSOCIATES

Electronic Security:

GRW

Tunnel Structural & Civil Engineering:

PEC

Physical Security:

FORCE PROTECT

/1 /2

:0

:3

P M

PP401.3

PLUMBING

ENLARGED PLANS

REPLACE BOILERS AND

UPGRADE CONTROLS

WEST ROXBURY VA MEDICAL CENTER

WEST ROXBURY, MA

11/14/2025 JJM AHTM

BID DOCUMENTS

ISSUED FOR CONSTRUCTION

0506-0012

SCALE: 1/2" = 1'-0"1

ENLARGED CHEMICAL TREATMENT AREA PLAN

SCALE: 1/2" = 1'-0"2

ENLARGED WATER STORAGE TANK PLAN

4"

4"

PLUMBING

FIRE PUMP BUILDING

PHASE 3

PP411.3

KBSC

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseMILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEER

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

523A4-20-208

/3

/2

:1

:2

P

M

REPLACE BOILERS AND

UPGRADE CONTROLS

11/14/2025

BID DOCUMENTS

ISSUED FOR CONSTRUCTION

Revisions: Date:

WEST ROXBURY VA MEDICAL CENTER

WEST ROXBURY, MA

M-R PROJECT NO: 0506-0012

ENGINEER OF RECORD

X1 X3

XB

X2 X5 X6

XC

XD

XE

(D)4"SAN

(E)6" CW

(E)2 1/2"

(D)4"SAN

(D)6"CW

(D)4"SAN

(D)4"SAN

(E)6" CW

(D)4"SAN

(D)AMINE

(E)1"

(D)TNK-2

(D)TNK-1

(D)WS-01

(D)WS-02

(D)BRINE

(D)ANTI-SC

(D)CAUSTIC

(D)3 1/2"DCW

(E)3 1/2"CW

(E)6" CW

(D)3 1/2"CW

(D)1 1/2"DCW

2 2

(D)FD (D)FD

(D)FD

(D)FD(D)FD(D)FD

(D)FD (D)FD (D)FD (D)FD

(D)FD

(D)FD

(D)FD

(D)FD(D)FD

(D)FD

(D)FD

(D)FD

(D)FD

(D)EMERGENCY

SHOWER

(D)1"SWC

(D)4"SAN

(D)1"SWC

(D)1 1/4"DCW

(D)1 1/2"DCW

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANTS

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEER

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

PLAN

NORTH

KEYPLAN

ACTUAL

NORTH

MR PROJECT NO:

Hazardous Materials:

MABBETT & ASSOCIATES

Architect & Civil Engineering:

WBRC

Fire & Life Safety:

KOFFEL ASSOCIATES

Electronic Security:

GRW

Tunnel Structural & Civil Engineering:

PEC

EXISTING

BOILER

PLANT

NEW

EMERGENCY

GENERATOR

BLDG.

NEW BOILER

PLANT

Physical Security:

FORCE PROTECT

TUNNEL

BLDG 1

A R

E A

D

/1 /2

:5

:5

P M

PD111.4

PLUMBING

DEMOLITION PLAN

MAIN LEVEL - PHASE 4

REPLACE BOILERS AND

UPGRADE CONTROLS

WEST ROXBURY VA MEDICAL CENTER

WEST ROXBURY, MA

11/14/2025 JJM AHTM

BID DOCUMENTS

ISSUED FOR CONSTRUCTION

0506-0012

SCALE: 1/4" = 1'-0"1

PLUMBING DEMOLITION PLAN MAIN LEVEL - PHASE 4

GENERAL SHEET NOTES:

1. REFER TO DRAWING P-001 FOR PLUMBING GENERAL NOTES, SYMBOLS, AND

ABBREVIATIONS.

2. REFER TO DRAWING SERIES P-500 FOR DETAILS

3. REFER TO DRAWING SERIES P-600 FOR FLOW AND RISER DIAGRAMS

4. REFER TO DRAWING SERIES P-700 FOR SCHEDULES.

SHEET KEYNOTES:

1. REMOVE ALL EXISTING SANITARY, VENT, DOMESTIC WATER, ETC. PIPING FROM WORK

AREA. ALL PIPING SHALL BE CAPPED 5'-0" OUTSIDE BUILDING. REFER TO CIVIL PLANS

FOR CONTINUATION.

2. REMOVE EXISTING PLUMBING FIXTURES, REMOVE ALL APPURTENANCES AND ASSOCIATED

PIPING.

3. REMOVE EXISTING PLUMBING EQUIPMENT. REMOVE ALL APPURTENANCES AND ASSOCIATED

PIPING.

4. REMOVE EXISTING WATER SOFTENER AND BRINE TANK. REMOVE ALL APPURTENANCES

AND ASSOCIATED PIPING.

5. REMOVE EXISTING CHEMICAL TREATMENT TANKS. REMOVE ALL APPURTENANCES AND

ASSOCIATED PIPING.

X1 X3

XB

X2

XC

XD

XE

E

F

(D)4"SAN

(D)SH

(D)FD

2 (D)LAV

(D)WC

(D)KS

(D)4"SAN

(D)2"V

DISCONNECT &

REMOVE (E)4"SAN

DN

(D)CO

(D)4"SAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANTS

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEER

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

PLAN

NORTH

KEYPLAN

ACTUAL

NORTH

MR PROJECT NO:

Hazardous Materials:

MABBETT & ASSOCIATES

Architect & Civil Engineering:

WBRC

Fire & Life Safety:

KOFFEL ASSOCIATES

Electronic Security:

GRW

Tunnel Structural & Civil Engineering:

PEC

Physical Security:

FORCE PROTECT

A R

E A

D EXISTING

BOILER

PLANT

NEW

EMERGENCY

GENERATOR

BLDG.

NEW BOILER

PLANT

TUNNEL

BLDG 1

/1 /2

:5

:5

P M

PD121.4

PLUMBING

DEMOLITION PLAN

EXISTING MEZZANINE LEVEL - PHASE 4

REPLACE BOILERS AND

UPGRADE CONTROLS

WEST ROXBURY VA MEDICAL CENTER

WEST ROXBURY, MA

11/14/2025 JJM AHTM

BID DOCUMENTS

ISSUED FOR CONSTRUCTION

0506-0012

GENERAL SHEET NOTES:

1. REFER TO DRAWING P-001 FOR PLUMBING GENERAL NOTES, SYMBOLS, AND

ABBREVIATIONS.

2. REFER TO DRAWING SERIES P-500 FOR DETAILS

3. REFER TO DRAWING SERIES P-600 FOR FLOW AND RISER DIAGRAMS

4. REFER TO DRAWING SERIES P-700 FOR SCHEDULES.

SHEET KEYNOTES:

1. REMOVE ALL EXISTING SANITARY, VENT, DOMESTIC WATER, ETC. PIPING FROM WORK

AREA.

2. REMOVE EXISTING PLUMBING FIXTURES, REMOVE ALL APPURTENANCES AND ASSOCIATED

PIPING.

SCALE: 1/4" = 1'-0"1

PLUMBING DEMOLITION PLAN EXISTING MEZZANINE - PHASE 4

13 12 11 10 9

C

D

10.5

B.3

B

(E)2 1/2" NPW

(E)2 1/2" SCW

A.7

A.6

A.4

C.7

E

F

(E)6" CW

4"CW

(E)3 1/2" CW

4"CW

6"SD

PHASE 3

REFER TO CIVIL PLANS

FOR CONTUNUATION

6"FD-S 6"FD-S 6"FD-S

6"FD-S 6"FD-S 6"FD-S

S A N

S A N

6"SAN

6"SAN 6"SAN

6"SAN

6"SAN 6"SAN

6"V

5"V

5"V

5"V UP

5"V UP

6"SAN UP

TO 6"FCO

6"SAN UP

TO 6"FCO

6"SAN UP

TO 6"FCO

6"V

6"SAN REFER TO CIVIL PLANS

FOR CONTINUATION

6"SAN DN 6"SD UP

6"V UP

I.E. 94.23

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANTS

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEER

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

PLAN

NORTH

KEYPLAN

ACTUAL

NORTH

NEW

CHILLER

PLANT

MR PROJECT NO:

Hazardous Materials:

MABBETT & ASSOCIATES

Architect & Civil Engineering:

WBRC

Fire & Life Safety:

KOFFEL ASSOCIATES

Electronic Security:

GRW

Tunnel Structural & Civil Engineering:

PEC

NEW

EMERGENCY

GENERATOR

BLDG.

NEW BOILER

PLANT

Physical Security:

FORCE PROTECT

TUNNEL

BLDG 1

/1 /2

:0

:0

P M

PP111.5

PLUMBING

PIPING PLAN

MAIN LEVEL - PHASE 5

REPLACE BOILERS AND

UPGRADE CONTROLS

WEST ROXBURY VA MEDICAL CENTER

WEST ROXBURY, MA

11/14/2025 JJM AHTM

BID DOCUMENTS

ISSUED FOR CONSTRUCTION

0506-0012

SCALE: 1/4" = 1'-0"1

PLUMBING PLAN MAIN LEVEL - PHASE 5

GENERAL SHEET NOTES:

1. REFER TO DRAWING P-001 FOR PLUMBING GENERAL NOTES, SYMBOLS, AND

ABBREVIATIONS.

2. REFER TO DRAWING SERIES P-500 FOR DETAILS

3. REFER TO DRAWING SERIES P-600 FOR FLOW AND RISER DIAGRAMS

13 12 11 10

C

D

10.5

B.3

B

A.7

A.6

A.4

C.7

E

F

6"SD UP & DN

5"V

5"V

5"V

5"V

6" V DN

6" VTR

5"V DN

5"V DN

4"SD

4"SD

6"SD 4"SD

4"SD

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANTS

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEER

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

PLAN

NORTH

KEYPLAN

ACTUAL

NORTH

NEW

CHILLER

PLANT

MR PROJECT NO:

Hazardous Materials:

MABBETT & ASSOCIATES

Architect & Civil Engineering:

WBRC

Fire & Life Safety:

KOFFEL ASSOCIATES

Electronic Security:

GRW

Tunnel Structural & Civil Engineering:

PEC

NEW

EMERGENCY

GENERATOR

BLDG.

NEW BOILER

PLANT

Physical Security:

FORCE PROTECT

TUNNEL

BLDG 1

A R

E A

D

/1 /2

:2

:2

P M

PP121.5

PLUMBING

PIPING PLAN

MEZZANINE LEVEL - PHASE 5

REPLACE BOILERS AND

UPGRADE CONTROLS

WEST ROXBURY VA MEDICAL CENTER

WEST ROXBURY, MA

11/14/2025 JJM AHTM

BID DOCUMENTS

ISSUED FOR CONSTRUCTION

0506-0012

SCALE: 1/4" = 1'-0"1

PLUMBING PLAN - MEZZANINE LEVEL PHASE 5

GENERAL SHEET NOTES:

1. REFER TO DRAWING P-001 FOR PLUMBING GENERAL NOTES, SYMBOLS, AND

ABBREVIATIONS.

2. REFER TO DRAWING SERIES P-500 FOR DETAILS

3. REFER TO DRAWING SERIES P-600 FOR FLOW AND RISER DIAGRAMS

13 12 11 10

C

D

10.5

B.3

B

A.7

A.6

A.4

C.7

4"RD-14"RD-1

SCUPPER

SEE ARCHITECTUAL

DRAWINGS

SCUPPER

SEE ARCHITECTUAL

DRAWINGS

6" VTR

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANTS

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEER

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

PLAN

NORTH

KEYPLAN

ACTUAL

NORTH

NEW

CHILLER

PLANT

MR PROJECT NO:

Hazardous Materials:

MABBETT & ASSOCIATES

Architect & Civil Engineering:

WBRC

Fire & Life Safety:

KOFFEL ASSOCIATES

Electronic Security:

GRW

Tunnel Structural & Civil Engineering:

PEC

NEW

EMERGENCY

GENERATOR

BLDG.

NEW BOILER

PLANT

Physical Security:

FORCE PROTECT

TUNNEL

BLDG 1

/1 /2

:0

:1

P M

PP141.5

PLUMBING

PIPING PLAN

ROOF - PHASE 5

REPLACE BOILERS AND

UPGRADE CONTROLS

WEST ROXBURY VA MEDICAL CENTER

WEST ROXBURY, MA

11/14/2025 JJM AHTM

BID DOCUMENTS

ISSUED FOR CONSTRUCTION

0506-0012

SCALE: 1/4" = 1'-0"1

PLUMBING PLAN ROOF - PHASE 5, AREA C

GENERAL SHEET NOTES:

1. REFER TO DRAWING P-001 FOR PLUMBING GENERAL NOTES, SYMBOLS, AND

ABBREVIATIONS.

2. REFER TO DRAWING SERIES P-500 FOR DETAILS

3. REFER TO DRAWING SERIES P-600 FOR FLOW AND RISER DIAGRAMS

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseMILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEER

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

523A4-20-208

/3

/2

:1

:2

P

M

REPLACE BOILERS AND

UPGRADE CONTROLS

11/14/2025

BID DOCUMENTS

ISSUED FOR CONSTRUCTION

Revisions: Date:

WEST ROXBURY VA MEDICAL CENTER

WEST ROXBURY, MA

M-R PROJECT NO: 0506-0012

ENGINEER OF RECORD PLUMBING DETAILS

PP501

KBJJM

60,000 GALLON

WATER STORAGE TANK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseMILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEER

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

523A4-20-208

/3

/2

:1

:2

P

M

REPLACE BOILERS AND

UPGRADE CONTROLS

11/14/2025

BID DOCUMENTS

ISSUED FOR CONSTRUCTION

Revisions: Date:

WEST ROXBURY VA MEDICAL CENTER

WEST ROXBURY, MA

M-R PROJECT NO: 0506-0012

ENGINEER OF RECORD PLUMBING

FLOW DIAGRAMS

PP601

AHTMGS

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseMILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEER

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

523A4-20-208

/3

/2

:1

:2

P

M

REPLACE BOILERS AND

UPGRADE CONTROLS

11/14/2025

BID DOCUMENTS

ISSUED FOR CONSTRUCTION

Revisions: Date:

WEST ROXBURY VA MEDICAL CENTER

WEST ROXBURY, MA

M-R PROJECT NO: 0506-0012

ENGINEER OF RECORD PLUMBING

FLOW DIAGRAMS

PP602

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseMILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEER

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

523A4-20-208

/3

/2

:1

:2

P

M

REPLACE BOILERS AND

UPGRADE CONTROLS

11/14/2025

BID DOCUMENTS

ISSUED FOR CONSTRUCTION

Revisions: Date:

WEST ROXBURY VA MEDICAL CENTER

WEST ROXBURY, MA

M-R PROJECT NO: 0506-0012

ENGINEER OF RECORD PLUMBING

RISER DIAGRAMS

PP603

AHTMGS

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseMILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEER

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

523A4-20-208

/3

/2

:1

:2

P

M

REPLACE BOILERS AND

UPGRADE CONTROLS

11/14/2025

BID DOCUMENTS

ISSUED FOR CONSTRUCTION

Revisions: Date:

WEST ROXBURY VA MEDICAL CENTER

WEST ROXBURY, MA

M-R PROJECT NO: 0506-0012

ENGINEER OF RECORD PLUMBING SCHEDULES

PP701

P-001
PS100
PP401-2
PS101.3
PP101.3A
PP101.3B
PP111.3A
PP111.3B
PP121.3A
PP121.3B
PP131.3A
PP131.3B
PP141.3A
PP141.3B
PP401-3
PD111.4
PD121.4
PP111.5
PP121.5
PP141.5
PP501
PP701

File details come from the government source that posted it. Updated .