These documents are plumbing design drawings for a boiler and control upgrade project at the West Roxbury VA Medical Center. The project, numbered 523A4-20-208, involves replacing boilers and upgrading controls across multiple phases in Building 8, with work spanning from the underground tunnel level to the roof. The design documents include detailed plumbing plans, demolition plans, flow diagrams, riser diagrams, and equipment schedules for various systems including sanitary, domestic water, compressed air, chemical treatment, and fire protection.
Key components include a 60,000-gallon water storage tank, water softening system, package booster pumps, air compressors, oil-water separators, and various piping connections across main, mezzanine, and roof levels. The project is being managed by Miller-Remick LLC as the consultant, with multiple engineering sub-consultants including Mabbett & Associates for hazardous materials, WBRC for architectural and civil engineering, and Koffel Associates for fire and life safety. The bid documents are dated 11/14/2025, with an issued for construction status, indicating the project is in the final design stage and preparing for potential bidding and construction.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseMILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t o n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t th re e in c h o n e fo o t
523A4-20-208
/3
/2
:1
:2
P
M
REPLACE BOILERS AND
UPGRADE CONTROLS
11/14/2025
BID DOCUMENTS
ISSUED FOR CONSTRUCTION
Revisions: Date:
WEST ROXBURY VA MEDICAL CENTER
WEST ROXBURY, MA
M-R PROJECT NO: 0506-0012
ENGINEER OF RECORD PLUMBING
ABBREVIATIONS, NOTES
AND SYMBOLS
P001
KBGS
(D)TEST HEADER
(D)FDC
DISCONNECT
(E)6"FP MAIN
(D)REMOVE DRAIN
(E)8"DRAIN
(E)8"DCV IN
VERTICAL
(E)8"WATER DROP
TO FIRE PUMP
(E)8"FP RISE
DISCONNNECT 6"FP
FROM MAIN
DISCONNECT
(E)2"DRAIN
DISCONNECT
(E)6"FP MAIN
(E)4" FP
(E)8" CW
(E)6" FP
(E)8" FP
(E)6" FP
(D)6"
(D)2"
(E)6" FP
(D)6" (D)6"FP DN
IN (E) PIT
DISCONNECT
(E)4"FP
(E)-FIRE
PUMP-1
(E)4" SAN
(E)4" SAN
(E)4" SAN
(E)6" FP
(D)4"
DISCONNECT
(E)4"SAN FROM
MAIN PREPARE
FOR NEW
CONNECTION EXISTING UNDERGROUND
STEAM TUNNEL
TEST HEADER
FDC
CONNECT
6"FP MAIN &
EXTEND
2"DRAIN DROP
TO GRADE
(E)8"DRAIN
(E)8"DCV IN
VERTICAL
(E)8"WATER DROP
TO FIRE PUMP
(E)8"FP RISE
CONNECT
2"D TO MAIN
& EXTEND
CONNECT 6"FP
TO (E)6"FP &
EXTEND
CONNECT 4"FP TO (E)4"FP
& EXTEND
CONNNECT
6"FP TO MAIN
(E)4" FP
(E)8" FP
(E)8" CW
(E)6" FP
(E)-FIRE
PUMP-1
(E)6" FP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANTS
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
523A4-20-208
MR PROJECT NO:
Hazardous Materials:
MABBETT & ASSOCIATES
Architect & Civil Engineering:
WBRC
Fire & Life Safety:
KOFFEL ASSOCIATES
Electronic Security:
GRW
Tunnel Structural & Civil Engineering:
PEC
Physical Security:
FORCE PROTECT
/1 /2
:2
:2
P M
PP401.2
PLUMBING
ENLARGED PLANS - PHASE 2
REPLACE BOILERS AND
UPGRADE CONTROLS
WEST ROXBURY VA MEDICAL CENTER
WEST ROXBURY, MA
11/14/2025 JJM AHTM
BID DOCUMENTS
ISSUED FOR CONSTRUCTION
0506-0012
SCALE: 1/4" = 1'-0"1
ENLARGED BLDG 1 FIRE PUMP ROOM DEMO PLAN- PHASE 1
SCALE: 1/4" = 1'-0"2
ENLARGED BLDG 1 FIRE PUMP ROOM PLAN - PHASE 2
NO. DESCRIPTION DATE
(E)PIPING EXTENDS
TO BLDG 1
NEW TUNNEL
T
EXISTING TUNNEL
ExTBUILDING 1 BASEMENT
MER
F O
R C
O N
T
IN
U A
T
IO
N
S E
E D
R A
W
IN
G P
S
1.
8-SSP-01C
(E)4" SAN
(E)4" SAN
4"CO
4"CO
4"SAN
4"SAN
4"SAN
(E)4"SAN UP
4"SAN UP TO
(E)FD IN FIRE
PUMP ROOM
CONNECT 4"SAN
TO (E)4"SAN
/8
(E)4" SAN
1/8" / 1'-0"
3"FM
1/8" / 1'-0"
INV. ELEV.
105.41'
4"SAN
4"SAN
PP401.2
Sim
X1
D X2
C.7
XE
E
F
NEW TUNNEL
T
EXISTING TUNNEL
ExT
F O
R C
O N
T
IN
U A
T
E D
R A
W
IN
G P
S
1.
BUILDING 8
PUMP ROOM - LOWER LEVEL
PR
8-SSP-01A
8-SSP-01B 1
1/8" / 1'-0"1/8" / 1'-0"
2"FM3"FM
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANTS
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
PLAN
NORTH
KEYPLAN
ACTUAL
NORTH
MR PROJECT NO:
Hazardous Materials:
MABBETT & ASSOCIATES
Architect & Civil Engineering:
WBRC
Fire & Life Safety:
KOFFEL ASSOCIATES
Electronic Security:
GRW
Tunnel Structural & Civil Engineering:
PEC
Physical Security:
FORCE PROTECT
EXISTING
BOILER
PLANT
NEW
EMERGENCY
GENERATOR
BLDG.
NEW BOILER
PLANT
TUNNEL
BLDG 1
/1 /2
:0
:3
P M
PS101.3
PLUMBING
PIPING PLAN
TUNNEL LEVEL - PHASE 3
REPLACE BOILERS AND
UPGRADE CONTROLS
WEST ROXBURY VA MEDICAL CENTER
WEST ROXBURY, MA
11/14/2025 JJM AHTM
BID DOCUMENTS
ISSUED FOR CONSTRUCTION
0506-0012
SCALE: 1/4" = 1'-0"1 PLUMBING PIPING - NEW TUNNEL @ BLDG 1
SCALE: 1/4" = 1'-0"2 PLUMBING PIPING - NEW TUNNEL @ BLDG 8
GENERAL SHEET NOTES:
1. REFER TO DRAWING P-001 FOR PLUMBING GENERAL NOTES, SYMBOLS, AND
ABBREVIATIONS.
2. REFER TO DRAWING SERIES P-500 FOR DETAILS
3. REFER TO DRAWING SERIES P-600 FOR FLOW AND RISER DIAGRAMS
4. REFER TO DRAWING SERIES P-700 FOR SCHEDULES.
SHEET KEYNOTES:
1. NEW EJECTOR PUMP WITH LEAK DETECTION IN 2'X2'X2' SUMP. CONTROL PANELS
LOCATED IN BUILDING 1 AND BUILDING 8.
2. 2" FORCED MAIN DROP TO SLOPED FORCE MAIN, COORDINATED INVERT WITH FUTURE
24" CHILLER WATER PIPING ROUTINGS.
3. 2"FORCE MAIN RISE AND COORDINATE WITH WITH FUTURE 24" CHILLER WATER PIPING
ROUTINGS.
4. 4" PIPE LINK SEAL.
5. REPAIR EXISTING COLLAPSED SANITARY LINE IN BUILDING 1. VERIFY LOCATION AND
EXTENT OF REPAIR WITH COR BEFORE PROCEEDING WITH WORK.
A
9 8 7 6 5 4
C
D
B.3
B
8.7 8.4 7.6
A.7
A.6
A.4
C.7
E
F
8-CS-1
8-DA-1
8-B-1 8-B-2 8-B-3
S A N
8-B-4
2"SAN UP
4"SAN
4"SAN
4"SAN
S A N
B
S A N
4"SAN
8-OWS-01
S A N
8-WS-01
8-SSP-04
/8
1/8" / 1'-0"
/8
1/8" / 1'-0"
S A N
S A N
4"V UP
4"ICW
8"FP
V
6"SD
4"ICW UP
W/SOV
4"FD-E
6"FD-S
6"FD-S
6"FD-S
6"FD-S
6"FD-S
6"FD-S 6"FD-S
6"FD-S 6"FD-S 6"FD-S
6"FD-S
6"FD-S
4"FD-E
P-707
P-530
4" UP TO
4"FCO
6"SD UP & DN WITH
4"WCO 18"ABV FLR
6"SAN
UP 6"FIRE WATER ENTRANCE
REFER TO FIRE PROTECTION
PLANS FOR CONTINUATION
8"GCO
2"SAN UP
4"FD-E 4"FD-E 4"FD-E
6"FD-S
CHEMICAL TREATMENT
EQUIPMENT HOUSEKEEPING PAD
(SEE STRUCTURAL DWGS)
FIRE WATER PAD
(SEE FIRE
PROTECTION DWGS)
/8
4"FS-S
4"FD-S
4"FD-S
4"SAN UP
4"FCO
4"SAN
3"SAN
6"GCO
4"V UP
6"SAN
4"V
S A N
2"FM RISE W/
CHECK & SHUT OFF
VALVE
2"FM UP
EXTEND OIL
SEPERATOR
COVER TO
FLOOR LEVEL
4" WATER ENTRANCE
EQUIPMENT AREA
WATER TREATMENT
EQUIPMENT
HOUSEKEEPING PAD
(SEE STRUCTURAL
DWGS)
2"V UP
4"DCW
6"FD-S
4"V UP
PIPE SLEEVE W/LINK-SEAL
WATER TIGHT (TYP.)
8-CA-02
8-CA-01
1/8" / 1'-0"
/8
/8
4" UP TO
4"FCO
6" UP TO
6"FCO
4"SD
S D
S D
8" UP TO
8"FCO
4" UP TO
4"FCO
6" UP TO
6"FCO
4" UP TO
4"FCO
4" UP TO
4"FCO
4" UP TO
4"FCO
/8
4" SD UP
TO 4"FD-E
P-707
F O
R C
O N
T
IN
U A
T
E D
R A
W
IN
G P
P
.3
B
6"FD-S
94.00 I.E. 94.00 I.E.
94.86 I.E. 96.64 I.E.
2" SD UP REFER TO
P121.3A FOR CONTINUATION
6"SAN
6"SAN6"SAN6"SAN
S A N
S A N
S A N
S A N
S A N
S A N
S A N
S A N
S A N
S A N
S A N
6"SAN 6"SAN 6"SAN
S A N
2"SAN
6"SAN
2"V6"SAN
6"SAN
4"SAN4"SAN4"SAN
4"SAN
4"SAN 6"SAN
6"SAN
6"SAN
6"SD 4"SD
4"SAN
2"V
2" V UP
6" SAN UP
TO 6" FCO
2" V
RISE
8-BDS-1
4"SAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANTS
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
PLAN
NORTH
KEYPLAN
ACTUAL
NORTH
NEW
EMERGENCY
GENERATOR
BLDG.
MR PROJECT NO:
Hazardous Materials:
MABBETT & ASSOCIATES
Architect & Civil Engineering:
WBRC
Fire & Life Safety:
KOFFEL ASSOCIATES
Electronic Security:
GRW
Tunnel Structural & Civil Engineering:
PEC
EXISTING
BOILER
PLANT
NEW BOILER
PLANT
TUNNEL
BLDG 1
Physical Security:
FORCE PROTECT
/1 /2
:1
:3
P M
PP101.3A
PLUMBING
UNDERSLAB PIPING PLAN
MAIN LEVEL - PHASE 3, AREA A
REPLACE BOILERS AND
UPGRADE CONTROLS
WEST ROXBURY VA MEDICAL CENTER
WEST ROXBURY, MA
11/14/2025 KB AHTM
BID DOCUMENTS
ISSUED FOR CONSTRUCTION
0506-0012
SCALE: 1/4" = 1'-0"1
PLUMBING PLAN UNDERSLAB MAIN LEVEL - PHASE 3, AREA A
GENERAL SHEET NOTES:
1. REFER TO DRAWING P-001 FOR PLUMBING GENERAL NOTES, SYMBOLS, AND
ABBREVIATIONS.
2. REFER TO DRAWING SERIES P-500 FOR DETAILS
3. REFER TO DRAWING SERIES P-600 FOR FLOW AND RISER DIAGRAMS
4. REFER TO DRAWING SERIES P-700 FOR SCHEDULES.
4 1
C
D
B.3
B
3 2
A.7
A.6
A.4
C.7
F O
R C
O N
T
IN
U A
T
E D
R A
W
IN
G P
P
.3
A
6"GCO
6"SD
6"SD UP WITH
4"WCO 18"ABV FLR
PIPE SLEEVE W/LINK-SEAL
WATER TIGHT (TYP.)
4"SAN UP
8-CRU-3
4"FS-S
6" SAN UP
TO 6" FCO
4" SAN UP
TO 4" FCO
6"SAN
2"V
2" V UP
2" V
RISE
4" SAN UP
TO 4" FCO
S A N
S A N
4"SAN
6"SAN
4"SAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANTS
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
PLAN
NORTH
KEYPLAN
ACTUAL
NORTH
MR PROJECT NO:
Hazardous Materials:
MABBETT & ASSOCIATES
Architect & Civil Engineering:
WBRC
Fire & Life Safety:
KOFFEL ASSOCIATES
Electronic Security:
GRW
Tunnel Structural & Civil Engineering:
PEC
EXISTING
BOILER
PLANT
NEW
EMERGENCY
GENERATOR
BLDG.
NEW BOILER
PLANT
Physical Security:
FORCE PROTECT
TUNNEL
BLDG 1
/1 /2
:1
:4
P M
PP101.3B
PLUMBING
UNDERSLAB PIPING PLAN
MAIN LEVEL - PHASE 3, AREA B
REPLACE BOILERS AND
UPGRADE CONTROLS
WEST ROXBURY VA MEDICAL CENTER
WEST ROXBURY, MA
11/14/2025 JJM AHTM
BID DOCUMENTS
ISSUED FOR CONSTRUCTION
0506-0012
SCALE: 1/4" = 1'-0"1
PLUMBING PLAN UNDERSLAB MAIN LEVEL - PHASE 3, AREA B
NO. DESCRIPTION DATE
GENERAL SHEET NOTES:
1. REFER TO DRAWING P-001 FOR PLUMBING GENERAL NOTES, SYMBOLS, AND
ABBREVIATIONS.
2. REFER TO DRAWING SERIES P-500 FOR DETAILS
3. REFER TO DRAWING SERIES P-600 FOR FLOW AND RISER DIAGRAMS
C
D
B.3
B
8-CS-1
8-DA-1
8-B-1 8-B-2 8-B-3
F O
R C
O N
T
IN
U A
T
E D
R A
W
IN
G P
P
.3
B
2 1/2"SW
REFER TO MP111.3A
FOR CONTINUATION
CONTROL ROOM
STAIR
8.7 8.4 7.6
A.7
A.6
A.4
C.7
E
F
3"NPW
3"SCW
2"DCW
1 1/2"DHW
3/4"DHWR
3"NPW
3"SCW
2"DCW
1 1/2"DHW
3/4"DHWR
3"NPW
3"SCW
2"DCW
1 1/2"DHW
3/4"DHWR
1"DCW
2 1/2"SCW
2 1/2"NPW
N P W
S C W
D C W
D H W
D H W R
REFER TO MP111.3A
FOR CONTINUATION
2 1/2"SCW UP
S C W
D C W
D H W
D H W R
1 1/4"DCW
1 1/4"DHW
8-B-4
2 1/2"SCW
UP
8-WS-01
8-POLY-1
8-CAUSTIC-1
8-AMINE-1
PP401.3
IC
W
IC
W
4"SAN
3"SCW
S C W
S C W
1/8" / 1'-0"
4"ICW UP
3"SCW
DROP
4"V UP
3/4"DCW
UP
3/4"DCW
UP
3/4"DCW
UP
3/4"DCW
UP
4"ICW UP
W/SOV
6"FD-S
6"FD-S
6"FD-S
6"FD-S
6"FD-S
6"FD-S 6"FD-S
6"FD-S 6"FD-S 6"FD-S
6"FD-S
6"FD-S
6"FD-S
4"FD-E
P-707
P-531
3"FCO 4"CO
4"FCO
4"FCO4"FCO
6"SD UP &DN WITH
4"WCO 18"ABV FLR
6"SAN RISE&DROP
WITH 6"WCO
24"ABV FLR
4"V UP.
1 1/4"DCW &DHW
DROP TO MIXING
VALVE
8"FIRE WATER ENTRANCE
REFER TO FIRE PROTECTION
PLANS FOR CONTINUATION
8"GCO
6"GCO
4"FCO
6"FD-S
4"FD-E 4"FD-E 4"FD-E
P-804
P-801
P-801 P-801
P-804
P-804
1 1/2"CA
1 1/2"CA
1 1/2"CA
DROP
1"NPW DROP SEE
DRAWING MP111.3A
1"NPW
1"NPW DROP
SEE DRAWING
MP111.3A
1 1/2"CA
4"SAN
3"SAN
4"SAN4"SAN
3"SAN
S A N
1/2"DCW
3/4"DCW
DROP
2"SAN DN
1 1/2"V UP
1/2"DCW
DROP
4"SAN UP
3"SAN UP
2"SAN UP
1 1/2"V UP
1 1/2"V UP
3"SAN UP
2"SAN UP
4"SAN UP
3"SAN UP
2"FM DN TO
SUMP
3"SAN UP
4"SAN UP
2"SAN DN
1 1/2"V RISE
REFER TO
PP401.3 FOR
CONTINUATION
1 1/2" V
UP
2"V UP
2"V UP
1 1/2"CA UP
3"SCW DROP
REFER TO MP111.3A
FOR CONTINUATION
8-BDS-1
3"V UP
2"V DN
4"CO
4"CO
4"CO
4"CO
4"CO
4"SAN
4"CO
4"CO
4"CO
4"V UP
3/4"CA UP
3/4"CA UP
3/4"CA UP 3/4"CA UP
4"V RISE
& DN
4"SAN DN
4"V RISE
4"V UP
4"V UP
BOILER ROOM
4"SAN
4"SAN
4"SAN
4"SAN
3"SAN
3"SAN
4"V 4"V
N P W
N P W
S C W
2"DCW UP
4"V RISE
& DROP
4"V DN
4"V UP
6"FCO
8-CA-02
8-CA-01
AIR DRYER
AIR
COMPRESSOR
AIR
COMPRESSOR
1/2"TP UP
2 1/2"NPW
UP
8-OXYSCAV-1
REFER TO
PP401.3 FOR
CONTINUATION
REFER TO
PP401.3 FOR
CONTINUATION
4"CO
4"SAN DROP
3"V RISE
4"SAN
4"FCO
6"FCO
4"FCO
4"FD-E
3/4"SCW UP
P-707
2"SD UP/DN.
REFER TO
PP101.3A FOR
CONTINUATION
CONNECT 2"SD PIPING
TO EXISTING WEEP HOLES
6"FCO
P-610
4"FD-E
4" WCO
8"FCO
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANTS
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
PLAN
NORTH
KEYPLAN
ACTUAL
NORTH
NEW
EMERGENCY
GENERATOR
BLDG.
MR PROJECT NO:
Hazardous Materials:
MABBETT & ASSOCIATES
Architect & Civil Engineering:
WBRC
Fire & Life Safety:
KOFFEL ASSOCIATES
Electronic Security:
GRW
Tunnel Structural & Civil Engineering:
PEC
EXISTING
BOILER
PLANT
NEW BOILER
PLANT
TUNNEL
BLDG 1
Physical Security:
FORCE PROTECT
/1 /2
:0
:0
P M
PP111.3A
PLUMBING
PIPING PLAN
MAIN LEVEL - PHASE 3, AREA A
REPLACE BOILERS AND
UPGRADE CONTROLS
WEST ROXBURY VA MEDICAL CENTER
WEST ROXBURY, MA
11/14/2025 GS AHTM
BID DOCUMENTS
ISSUED FOR CONSTRUCTION
0506-0012
SCALE: 1/4" = 1'-0"1
PLUMBING PLAN MAIN LEVEL - PHASE 3, AREA A
GENERAL SHEET NOTES:
1. REFER TO DRAWING P-001 FOR PLUMBING GENERAL NOTES, SYMBOLS, AND
ABBREVIATIONS.
2. REFER TO DRAWING SERIES P-500 FOR DETAILS
3. REFER TO DRAWING SERIES P-600 FOR FLOW AND RISER DIAGRAMS
C
D
B.3
B
3 2
F O
R C
O N
T
IN
U A
T
E D
R A
W
IN
G P
P
.3
A
SUBSTATION ROOM
GENERATOR ROOM
STAIR
A.7
A.6
A.4
C.7
3/4"DCW
UP
6"SD UP
6"SD
6"GCO
6"SD
SLEEVE
6"FCO
4"FCO
4"SAN DN
4"SAN RISE
4"V UP
4"SAN UP TO DRAIN
4"WCO
18"ABV FF
PIPING TO BE W/
DRIP PAN & LEAK
DETECTION
4"FCO
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANTS
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
PLAN
NORTH
KEYPLAN
ACTUAL
NORTH
MR PROJECT NO:
Hazardous Materials:
MABBETT & ASSOCIATES
Architect & Civil Engineering:
WBRC
Fire & Life Safety:
KOFFEL ASSOCIATES
Electronic Security:
GRW
Tunnel Structural & Civil Engineering:
PEC
EXISTING
BOILER
PLANT
NEW
EMERGENCY
GENERATOR
BLDG.
NEW BOILER
PLANT
Physical Security:
FORCE PROTECT
TUNNEL
BLDG 1
/1 /2
:0
:0
P M
PP111.3B
PLUMBING
PIPING PLAN
MAIN LEVEL - PHASE 3, AREA B
REPLACE BOILERS AND
UPGRADE CONTROLS
WEST ROXBURY VA MEDICAL CENTER
WEST ROXBURY, MA
11/14/2025 JJM AHTM
BID DOCUMENTS
ISSUED FOR CONSTRUCTION
0506-0012
SCALE: 1/4" = 1'-0"1
PLUMBING PLAN MAIN LEVEL - PHASE 3, AREA B
GENERAL SHEET NOTES:
1. REFER TO DRAWING P-001 FOR PLUMBING GENERAL NOTES, SYMBOLS, AND
ABBREVIATIONS.
2. REFER TO DRAWING SERIES P-500 FOR DETAILS
3. REFER TO DRAWING SERIES P-600 FOR FLOW AND RISER DIAGRAMS
C
D
B.3
B
8-FHX-1 8-FHX-2 8-FHX-3 8-FHX-4
8-DA-1
18' - 0 1/4" 18' - 0" 18' - 0"
12' - 10 3/4" 12' - 10 1/2" 12' - 10 1/2"
STORAGE
STAIR
TLT/SHOWER
SHOWER
LOCKERS
LOUNGE
TLT
BEDROOM
I.T.
SECURITY
CORRIDOR
8.7 8.4 7.6
A.7
A.6
A.4
C.7
3/4"DHWR
1 1/2"DHW
2"DCW
3/4"DHWR
1 1/2"DHW
2"DCW
3/4"DHWR
2"DCW
1 1/2"DCW
3/4"DHWR
1 1/2"DHW
8-DWH-01
3"FD-C
3"FD-C
3"FD-C
2"FD-C
2"FD-C
1 1/2"DHW
1 1/2"DCW
1/2"DCW
1/2"DHW
1/2"DCW&DHW
DROP IN CHASE
JAN.
ELEC
4"ICW
2"DCW
1 1/2"DHW
3/4"DHWR
DN ON WALL
4"FD-D
PP121.3A
P-401
P-103 P-528
P-401
P-103
P-701
P-701
P-502
1/2"DCW&DHW
DROP IN CHASE
1"DCW DROP
IN CHASE
1/2"DCW&DHW
DROP IN WALL
1/2"DCW&DHW
DROP IN CHASE
1/2"DCW DROP
IN CHASE
1/2"DCW&DHW
DROP IN CHASE
1 1/2"DCW
DROP IN CHASE
4"ICW DROP
3/4"CA DROP
3/4"CA DROPCOMPRESSED
AIR HOSE
COMPRESSED
AIR HOSE
6"SD UP
& DN
4"ICW DROP
4"ICW 4"ICW
4"V UP
3"V DN
8-DCP-01
3/4"DCW
3/4"DHWR
1/2"DCW DROP
IN CHASE TO
TP-1
1/2"TRAP PRIMER
WATER TO FLOOR
DRAINS
1"DHW
2"DCW
2"DCW
1 1/2"DHW
3/4"DHWR
1 1/2"CW
DROP
4"V UP
& DN
4"V UP
& DN
4"V UP
& DN
2 1/2" SCW
RISE & DN
REFER TO MP121.3A
FOR CONTINUATION
3" SCW UP
& DN
2" DCW DN
3/4"CA
DROP
3/4" DCW
DN
3/4" DCW
DN
3/4"CA
DROP
4"V UP
& DN
3/4"CA
DROP
3/4" CA
DROP
3/4" DCW
DN
3"V UP
& DN
2"DCW
1 1/2"CA
2"DCW
1 1/2"CA
2"DCW
1 1/2"CA
2"DCW
1 1/2"CA
2"DCW
1"DCW
3/4"CA3/4"CA3/4"CA3/4"DCW
3/4"CA
3/4"CA3/4"DCW
1"CA4"ICW
BOILER ROOM
PIPING HUNG
FROM ABOVE
CATWALK
PIPING HUNG
FROM ABOVE
CATWALK
4"ICW4"ICW
4" V UP
& DN
F O
R C
O N
T
IN
U A
T
E D
R A
W
IN
G P
P
.3
B
3/4"SCW DN
2 1/2"SCW
2 1/2"NPW
2 1/2" NCW
RISE & DN
CONNECT 2"SD PIPING
TO EXISTING WEEP HOLES
2"SD DN.
REFER TO
PP101.3A FOR
CONTINUATION
8 7 6 5
D
7.6
C.7
3"V 2 V
V
V
2"V RISE
1 1/2"V DN
3"FD-C
3"FD-C
3"FD-C
2"FD-C
2"FD-C
2"V RISE
1 1/2"V DN
4"FD-D
1 1/2"V RISE
2"SAN DROP IN
CHASE4"V RISE
4"SAN DN
IN CHASE
3"V RISE
4"SAN DN
IN CHASE
1 1/2"V RISE
2"SAN DROP IN
CHASE
1 1/2"V RISE
2"SAN DROP IN
CHASE
8-DWH-01
P-401
P-103
P-528
P-401
P-103
P-701
P-701
4"V UP
&DN
2"V RISE
&DN
P-5023"V UP
1 1/2"V
RISE &DN
2"V RISE&DN
3"SAN DN
LOCKERS
LOUNGE
TLT
BEDROOM
JAN.
CORRIDOR
SHOWER
TLT/SHOWER
2"V RISE
2"V DN IN
CHASE
8-DCP-01
3"V FROM
BELOW
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANTS
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
PLAN
NORTH
KEYPLAN
ACTUAL
NORTH
NEW
EMERGENCY
GENERATOR
BLDG.
MR PROJECT NO:
Hazardous Materials:
MABBETT & ASSOCIATES
Architect & Civil Engineering:
WBRC
Fire & Life Safety:
KOFFEL ASSOCIATES
Electronic Security:
GRW
Tunnel Structural & Civil Engineering:
PEC
EXISTING
BOILER
PLANT
NEW BOILER
PLANT
TUNNEL
BLDG 1
Physical Security:
FORCE PROTECT
/1 /2
:0
:1
P M
PP121.3A
PLUMBING
PIPING PLAN
MEZZANINE - PHASE 3, AREA A
REPLACE BOILERS AND
UPGRADE CONTROLS
WEST ROXBURY VA MEDICAL CENTER
WEST ROXBURY, MA
11/14/2025 JJM AHTM
BID DOCUMENTS
ISSUED FOR CONSTRUCTION
0506-0012
SCALE: 1/4" = 1'-0"1
PLUMBING PLAN MEZZANINE - PHASE 3, AREA A
GENERAL SHEET NOTES:
1. REFER TO DRAWING P-001 FOR PLUMBING GENERAL NOTES, SYMBOLS, AND
ABBREVIATIONS.
2. REFER TO DRAWING SERIES P-500 FOR DETAILS
3. REFER TO DRAWING SERIES P-600 FOR FLOW AND RISER DIAGRAMS
4. REFER TO DRAWING SERIES P-700 FOR SCHEDULES.
SCALE: 1/4" = 1'-0"2
SANITARY & VENT TOILET ROOMS PLAN - PHASE 3
C
D
B.3
B
3 2
8-LVR-4 8-LVR-5
SECURITY
GENERATOR ROOM
MEZZANINE
STORAGE
CORRIDOR
STAIR
STORAGE
A.7
A.6
A.4
C.7
6"SD UP&DN
4"FD-D
MECH
4"V
UP&DN
F O
R C
O N
T
IN
U A
T
E D
R A
W
IN
G P
P
.3
A
3/4"SCW DROP
TO HUMIDFIER
3/4"SCW DROP
TO COORDINATE
W/STRUCTURAL &
DUCT WORK
3/4"SCW DROP
TO COORDINATE
W/STRUCTURAL &
DUCT WORK
3/4"SCW
3/4"SCW
HUMIDFIER DRAIN
DROP
8-AHU-5
8-CSG-1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANTS
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
PLAN
NORTH
KEYPLAN
ACTUAL
NORTH
MR PROJECT NO:
Hazardous Materials:
MABBETT & ASSOCIATES
Architect & Civil Engineering:
WBRC
Fire & Life Safety:
KOFFEL ASSOCIATES
Electronic Security:
GRW
Tunnel Structural & Civil Engineering:
PEC
EXISTING
BOILER
PLANT
NEW
EMERGENCY
GENERATOR
BLDG.
NEW BOILER
PLANT
Physical Security:
FORCE PROTECT
TUNNEL
BLDG 1
/1 /2
:0
:1
P M
PP121.3B
PLUMBING
PIPING PLAN
MEZZANINE - PHASE 3, AREA B
REPLACE BOILERS AND
UPGRADE CONTROLS
WEST ROXBURY VA MEDICAL CENTER
WEST ROXBURY, MA
11/14/2025 JJM AHTM
BID DOCUMENTS
ISSUED FOR CONSTRUCTION
0506-0012
SCALE: 1/4" = 1'-0"1
PLUMBING PLAN MEZZANINE - PHASE 3, AREA B
GENERAL SHEET NOTES:
1. REFER TO DRAWING P-001 FOR PLUMBING GENERAL NOTES, SYMBOLS, AND
ABBREVIATIONS.
2. REFER TO DRAWING SERIES P-500 FOR DETAILS
3. REFER TO DRAWING SERIES P-600 FOR FLOW AND RISER DIAGRAMS
C
D
B.3
B
STORAGE
STAIR
8.7 8.4 7.6
A.7
A.6
A.4
C.7
E
F
4"SD
4"SD
4"SD
6"SD
4"SD
6"SD
4"SD
6"SD DN
4"SD UP4"SD UP4"SD UP
4"CO
4"CO
4"CO
1/8" / 1'-0"
1/8" / 1'-0"1/8" / 1'-0" 1/8" / 1'-0"
4"V
4"V
4"V
4"V 4"V
4"V
4"V
4"V DN
4"V DN
4"V DN
4"V DN
4"V DN
3"V UP
& DN
4" V DN 4" V UP
4"V UP
4"V UP
4"V UP
4"V UP
4"V
DROP
4"V DN
8-DA-1
8-UH-1
8-UH-2
4"V UP
3"V UP
& DN
F O
R C
O N
T
IN
U A
T
E D
R A
W
IN
G P
P
.3
B
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANTS
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
PLAN
NORTH
KEYPLAN
ACTUAL
NORTH
NEW
EMERGENCY
GENERATOR
BLDG.
MR PROJECT NO:
Hazardous Materials:
MABBETT & ASSOCIATES
Architect & Civil Engineering:
WBRC
Fire & Life Safety:
KOFFEL ASSOCIATES
Electronic Security:
GRW
Tunnel Structural & Civil Engineering:
PEC
EXISTING
BOILER
PLANT
NEW BOILER
PLANT
TUNNEL
BLDG 1
Physical Security:
FORCE PROTECT
/1 /2
:0
:1
P M
PP131.3A
PLUMBING
PIPING PLAN
UPPER MEZZANINE - PHASE 3, AREA A
REPLACE BOILERS AND
UPGRADE CONTROLS
WEST ROXBURY VA MEDICAL CENTER
WEST ROXBURY, MA
11/14/2025 JJM AHTM
BID DOCUMENTS
ISSUED FOR CONSTRUCTION
0506-0012
SCALE: 1/4" = 1'-0"1
PLUMBING PLAN UPPER MEZZANINE - PHASE 3, AREA A
GENERAL SHEET NOTES:
1. REFER TO DRAWING P-001 FOR PLUMBING GENERAL NOTES, SYMBOLS, AND
ABBREVIATIONS.
2. REFER TO DRAWING SERIES P-500 FOR DETAILS
3. REFER TO DRAWING SERIES P-600 FOR FLOW AND RISER DIAGRAMS
C
D
B.3
B
3 2
STORAGE
STAIR
A.7
A.6
A.4
C.7
6"SD DN
6"SD UP
6"SD
6"SD
4"CO
4"CO
1/8" / 1'-0"
4"V DN
4"V UP
F O
R C
O N
T
IN
U A
T
E D
R A
W
IN
G P
P
.3
A
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANTS
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
PLAN
NORTH
KEYPLAN
ACTUAL
NORTH
MR PROJECT NO:
Hazardous Materials:
MABBETT & ASSOCIATES
Architect & Civil Engineering:
WBRC
Fire & Life Safety:
KOFFEL ASSOCIATES
Electronic Security:
GRW
Tunnel Structural & Civil Engineering:
PEC
EXISTING
BOILER
PLANT
NEW
EMERGENCY
GENERATOR
BLDG.
NEW BOILER
PLANT
Physical Security:
FORCE PROTECT
TUNNEL
BLDG 1
/1 /2
:0
:1
P M
PP131.3B
PLUMBING
PIPING PLAN
UPPER MEZZANINE - PHASE 3, AREA B
REPLACE BOILERS AND
UPGRADE CONTROLS
WEST ROXBURY VA MEDICAL CENTER
WEST ROXBURY, MA
11/14/2025 JJM AHTM
BID DOCUMENTS
ISSUED FOR CONSTRUCTION
0506-0012
SCALE: 1/4" = 1'-0"1
PLUMBING PLAN UPPER MEZZANINE - PHASE 3, AREA B
GENERAL SHEET NOTES:
1. REFER TO DRAWING P-001 FOR PLUMBING GENERAL NOTES, SYMBOLS, AND
ABBREVIATIONS.
2. REFER TO DRAWING SERIES P-500 FOR DETAILS
3. REFER TO DRAWING SERIES P-600 FOR FLOW AND RISER DIAGRAMS
C
D
B.3
B
8.7 8.4 7.6
A.7
A.6
A.4
C.7
4"RD-1 4"RD-1 4"RD-1
SCUPPER
SEE ARCHITECTUAL
DRAWINGS
SCUPPER
SEE ARCHITECTUAL
DRAWINGS
SCUPPER
SEE ARCHITECTUAL
DRAWINGS
3"VTR &
DN
4" VTR
& DN
4"VTR
& DN
4"VTR
& DN
4"VTR
& DN
4"VTR
& DN
4"VTR
& DN
3"VTR
& DN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANTS
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
PLAN
NORTH
KEYPLAN
ACTUAL
NORTH
NEW
EMERGENCY
GENERATOR
BLDG.
MR PROJECT NO:
Hazardous Materials:
MABBETT & ASSOCIATES
Architect & Civil Engineering:
WBRC
Fire & Life Safety:
KOFFEL ASSOCIATES
Electronic Security:
GRW
Tunnel Structural & Civil Engineering:
PEC
EXISTING
BOILER
PLANT
NEW BOILER
PLANT
TUNNEL
BLDG 1
Physical Security:
FORCE PROTECT
/1 /2
:0
:1
P M
PP141.3A
PLUMBING
PIPING PLAN
ROOF - PHASE 3, AREA A
REPLACE BOILERS AND
UPGRADE CONTROLS
WEST ROXBURY VA MEDICAL CENTER
WEST ROXBURY, MA
11/14/2025 JJM AHTM
BID DOCUMENTS
ISSUED FOR CONSTRUCTION
0506-0012
SCALE: 1/4" = 1'-0"1
PLUMBING PLAN ROOF - PHASE 3, AREA A
GENERAL SHEET NOTES:
1. REFER TO DRAWING P-001 FOR PLUMBING GENERAL NOTES, SYMBOLS, AND
ABBREVIATIONS.
2. REFER TO DRAWING SERIES P-500 FOR DETAILS
3. REFER TO DRAWING SERIES P-600 FOR FLOW AND RISER DIAGRAMS
C
D
B.3
B
3 2
A.7
A.6
A.4
C.7
6"RD-1
SCUPPER
SEE ARCHITECTUAL
DRAWINGS
4"VTR &
DN
F O
R C
O N
T
IN
U A
T
E D
R A
W
IN
G P
P
.3
A
STAIR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANTS
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
PLAN
NORTH
KEYPLAN
ACTUAL
NORTH
MR PROJECT NO:
Hazardous Materials:
MABBETT & ASSOCIATES
Architect & Civil Engineering:
WBRC
Fire & Life Safety:
KOFFEL ASSOCIATES
Electronic Security:
GRW
Tunnel Structural & Civil Engineering:
PEC
EXISTING
BOILER
PLANT
NEW
EMERGENCY
GENERATOR
BLDG.
NEW BOILER
PLANT
Physical Security:
FORCE PROTECT
TUNNEL
BLDG 1
/1 /2
:0
:1
P M
PP141.3B
PLUMBING
PIPING PLAN
ROOF - PHASE 3, AREA B
REPLACE BOILERS AND
UPGRADE CONTROLS
WEST ROXBURY VA MEDICAL CENTER
WEST ROXBURY, MA
11/14/2025 JJM AHTM
BID DOCUMENTS
ISSUED FOR CONSTRUCTION
0506-0012
SCALE: 1/4" = 1'-0"1
PLUMBING PLAN ROOF - PHASE 3, AREA B
GENERAL SHEET NOTES:
1. REFER TO DRAWING P-001 FOR PLUMBING GENERAL NOTES, SYMBOLS, AND
ABBREVIATIONS.
2. REFER TO DRAWING SERIES P-500 FOR DETAILS
3. REFER TO DRAWING SERIES P-600 FOR FLOW AND RISER DIAGRAMS
5 4
D
C.7
3"NPW
3"SCW
2"DCW
1 1/2"DHW
3/4"DHWR
3"SCW
1 1/4"DHW
1 1/4"DCW
S C W
D C W
D H W
8-WS-01
8-AMINE-1
8-CAUSTIC-18-POLY-1
3"NPW DROP
3"SCW
3"DCW
3" DCW BY-PASS
DROP TO BFP
3" DCW BY-PASS
RISE TO WATER
SOFTENER
3" SCW FOR
CHEMICAL
TREATMENT SIDE
STREAM COOLING
NC
4"DCW RISE & DN REFER TO
PP101.3A FOR CONTINUATION
1/2"DCW
1/2"DHW
S C W
4"ICW
4"DCW
8-BFP-1
8-BFP-3
NC
2"SAN DN
1 1/2"V RISE
1/2"DCW & DHW
DROP TO SINK
1 1/2"DCW & DHW
DROP
P-531
P-804
3"SCW RISE
4"DCW
3"DCW
3"DCW
1 1/4"DHW
2"DCW
4"DCW RISE
8-OXYSCAV-1
2"DCW
1 1/2"DHW
3/4"DHWR
DN ON WALL
3/4"SCW
3/4"SCW
3/4"SCW
SEE PP111.3A DWG
FOR CONTINUATION
SEE PP111.3A DWG
FOR CONTINUATION
SEE PP111.3A.DWG
FOR CONTINUATION
4"FD-E
4"FD-E
P-707
4"FD-E 8-TNK-01
8-HBX-01
8-PWP-01
8"OVER FLOW(@708")
DOWN TO 18" ABV
GRADE
4" INLET UP
W/HEAT TAPE &
INSULATION
4" OUTLET DN
W/HEAT TAPE &
INSULATION
4" DRAIN
4" DN TO BLW GRADE
4"BY-PASS RISE
4"TANK
BY-PASS
INV. ELEV 5.0'
BWL FROST
INV. ELEV 5.0'
BWL FROST
(3) 3" IMMERSION
HEATERS BY
HIGHLAND TANK
(208V/3PH)
36" CLEAN-OUT
MANWAY (@36")
LADDER &
PLATFORM BY
HIGHLAND TANK
WATER TANK
FOUNDATION BY
OTHERS
INV. ELEV 5.0'
BWL FROST
8"VENT
4" FIRE DEPARTMENT
CONNECTION
2"INSULATION
1500W, 120V, 1PH
HEATER (TYP. OF 4)
IMMERSION HEATER
CONTROL PANEL
PUMP
CONTROL
PANEL
4" ICW DN TO
1'-0"BLW FROST LINE
TO BUILDING 8
4" CW RISE & DN
TO 1'-0"BLW FROST
LINE FROM SITE
(2)4"BFP-3
4" TOWER CW RISE
TO PUMP
4"BYPASS DROP
TO PUMP
4" LEVEL/TEMPERATUE
PROBE FOR REMOTE
MONITORING
24" MANWAY
4" LEVEL PROBE FOR
PUMPS START/STOP &
LOW LEVEL SENSOR
4" LEVEL/TEMPERATURE
PROBE
36" MANWAY
60,000 GAL WATER
STORAGE TANK
60FT - 6 INCH TALL
13 FT DIAMETER
ø 13' - 4"
FILL & LOW WATER
CONTROL PANEL
6" HIGH SLAB
4" INLET DROP W/HEAT
TAPE & INSULATION TO
CONNECT TO TANK
FLANGE
4"ICW 3"ICW
4"DCW
4" NPW. INV. ELEV.
5.0" BLW FROST LINE
TO BUILDING 8
TO BUILDING 8
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANTS
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
MR PROJECT NO:
Hazardous Materials:
MABBETT & ASSOCIATES
Architect & Civil Engineering:
WBRC
Fire & Life Safety:
KOFFEL ASSOCIATES
Electronic Security:
GRW
Tunnel Structural & Civil Engineering:
PEC
Physical Security:
FORCE PROTECT
/1 /2
:0
:3
P M
PP401.3
PLUMBING
ENLARGED PLANS
REPLACE BOILERS AND
UPGRADE CONTROLS
WEST ROXBURY VA MEDICAL CENTER
WEST ROXBURY, MA
11/14/2025 JJM AHTM
BID DOCUMENTS
ISSUED FOR CONSTRUCTION
0506-0012
SCALE: 1/2" = 1'-0"1
ENLARGED CHEMICAL TREATMENT AREA PLAN
SCALE: 1/2" = 1'-0"2
ENLARGED WATER STORAGE TANK PLAN
4"
4"
PLUMBING
FIRE PUMP BUILDING
PHASE 3
PP411.3
KBSC
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseMILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
523A4-20-208
/3
/2
:1
:2
P
M
REPLACE BOILERS AND
UPGRADE CONTROLS
11/14/2025
BID DOCUMENTS
ISSUED FOR CONSTRUCTION
Revisions: Date:
WEST ROXBURY VA MEDICAL CENTER
WEST ROXBURY, MA
M-R PROJECT NO: 0506-0012
ENGINEER OF RECORD
X1 X3
XB
X2 X5 X6
XC
XD
XE
(D)4"SAN
(E)6" CW
(E)2 1/2"
(D)4"SAN
(D)6"CW
(D)4"SAN
(D)4"SAN
(E)6" CW
(D)4"SAN
(D)AMINE
(E)1"
(D)TNK-2
(D)TNK-1
(D)WS-01
(D)WS-02
(D)BRINE
(D)ANTI-SC
(D)CAUSTIC
(D)3 1/2"DCW
(E)3 1/2"CW
(E)6" CW
(D)3 1/2"CW
(D)1 1/2"DCW
2 2
(D)FD (D)FD
(D)FD
(D)FD(D)FD(D)FD
(D)FD (D)FD (D)FD (D)FD
(D)FD
(D)FD
(D)FD
(D)FD(D)FD
(D)FD
(D)FD
(D)FD
(D)FD
(D)EMERGENCY
SHOWER
(D)1"SWC
(D)4"SAN
(D)1"SWC
(D)1 1/4"DCW
(D)1 1/2"DCW
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANTS
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
PLAN
NORTH
KEYPLAN
ACTUAL
NORTH
MR PROJECT NO:
Hazardous Materials:
MABBETT & ASSOCIATES
Architect & Civil Engineering:
WBRC
Fire & Life Safety:
KOFFEL ASSOCIATES
Electronic Security:
GRW
Tunnel Structural & Civil Engineering:
PEC
EXISTING
BOILER
PLANT
NEW
EMERGENCY
GENERATOR
BLDG.
NEW BOILER
PLANT
Physical Security:
FORCE PROTECT
TUNNEL
BLDG 1
A R
E A
D
/1 /2
:5
:5
P M
PD111.4
PLUMBING
DEMOLITION PLAN
MAIN LEVEL - PHASE 4
REPLACE BOILERS AND
UPGRADE CONTROLS
WEST ROXBURY VA MEDICAL CENTER
WEST ROXBURY, MA
11/14/2025 JJM AHTM
BID DOCUMENTS
ISSUED FOR CONSTRUCTION
0506-0012
SCALE: 1/4" = 1'-0"1
PLUMBING DEMOLITION PLAN MAIN LEVEL - PHASE 4
GENERAL SHEET NOTES:
1. REFER TO DRAWING P-001 FOR PLUMBING GENERAL NOTES, SYMBOLS, AND
ABBREVIATIONS.
2. REFER TO DRAWING SERIES P-500 FOR DETAILS
3. REFER TO DRAWING SERIES P-600 FOR FLOW AND RISER DIAGRAMS
4. REFER TO DRAWING SERIES P-700 FOR SCHEDULES.
SHEET KEYNOTES:
1. REMOVE ALL EXISTING SANITARY, VENT, DOMESTIC WATER, ETC. PIPING FROM WORK
AREA. ALL PIPING SHALL BE CAPPED 5'-0" OUTSIDE BUILDING. REFER TO CIVIL PLANS
FOR CONTINUATION.
2. REMOVE EXISTING PLUMBING FIXTURES, REMOVE ALL APPURTENANCES AND ASSOCIATED
PIPING.
3. REMOVE EXISTING PLUMBING EQUIPMENT. REMOVE ALL APPURTENANCES AND ASSOCIATED
PIPING.
4. REMOVE EXISTING WATER SOFTENER AND BRINE TANK. REMOVE ALL APPURTENANCES
AND ASSOCIATED PIPING.
5. REMOVE EXISTING CHEMICAL TREATMENT TANKS. REMOVE ALL APPURTENANCES AND
ASSOCIATED PIPING.
X1 X3
XB
X2
XC
XD
XE
E
F
(D)4"SAN
(D)SH
(D)FD
2 (D)LAV
(D)WC
(D)KS
(D)4"SAN
(D)2"V
DISCONNECT &
REMOVE (E)4"SAN
DN
(D)CO
(D)4"SAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANTS
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
PLAN
NORTH
KEYPLAN
ACTUAL
NORTH
MR PROJECT NO:
Hazardous Materials:
MABBETT & ASSOCIATES
Architect & Civil Engineering:
WBRC
Fire & Life Safety:
KOFFEL ASSOCIATES
Electronic Security:
GRW
Tunnel Structural & Civil Engineering:
PEC
Physical Security:
FORCE PROTECT
A R
E A
D EXISTING
BOILER
PLANT
NEW
EMERGENCY
GENERATOR
BLDG.
NEW BOILER
PLANT
TUNNEL
BLDG 1
/1 /2
:5
:5
P M
PD121.4
PLUMBING
DEMOLITION PLAN
EXISTING MEZZANINE LEVEL - PHASE 4
REPLACE BOILERS AND
UPGRADE CONTROLS
WEST ROXBURY VA MEDICAL CENTER
WEST ROXBURY, MA
11/14/2025 JJM AHTM
BID DOCUMENTS
ISSUED FOR CONSTRUCTION
0506-0012
GENERAL SHEET NOTES:
1. REFER TO DRAWING P-001 FOR PLUMBING GENERAL NOTES, SYMBOLS, AND
ABBREVIATIONS.
2. REFER TO DRAWING SERIES P-500 FOR DETAILS
3. REFER TO DRAWING SERIES P-600 FOR FLOW AND RISER DIAGRAMS
4. REFER TO DRAWING SERIES P-700 FOR SCHEDULES.
SHEET KEYNOTES:
1. REMOVE ALL EXISTING SANITARY, VENT, DOMESTIC WATER, ETC. PIPING FROM WORK
AREA.
2. REMOVE EXISTING PLUMBING FIXTURES, REMOVE ALL APPURTENANCES AND ASSOCIATED
PIPING.
SCALE: 1/4" = 1'-0"1
PLUMBING DEMOLITION PLAN EXISTING MEZZANINE - PHASE 4
13 12 11 10 9
C
D
10.5
B.3
B
(E)2 1/2" NPW
(E)2 1/2" SCW
A.7
A.6
A.4
C.7
E
F
(E)6" CW
4"CW
(E)3 1/2" CW
4"CW
6"SD
PHASE 3
REFER TO CIVIL PLANS
FOR CONTUNUATION
6"FD-S 6"FD-S 6"FD-S
6"FD-S 6"FD-S 6"FD-S
S A N
S A N
6"SAN
6"SAN 6"SAN
6"SAN
6"SAN 6"SAN
6"V
5"V
5"V
5"V UP
5"V UP
6"SAN UP
TO 6"FCO
6"SAN UP
TO 6"FCO
6"SAN UP
TO 6"FCO
6"V
6"SAN REFER TO CIVIL PLANS
FOR CONTINUATION
6"SAN DN 6"SD UP
6"V UP
I.E. 94.23
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANTS
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
PLAN
NORTH
KEYPLAN
ACTUAL
NORTH
NEW
CHILLER
PLANT
MR PROJECT NO:
Hazardous Materials:
MABBETT & ASSOCIATES
Architect & Civil Engineering:
WBRC
Fire & Life Safety:
KOFFEL ASSOCIATES
Electronic Security:
GRW
Tunnel Structural & Civil Engineering:
PEC
NEW
EMERGENCY
GENERATOR
BLDG.
NEW BOILER
PLANT
Physical Security:
FORCE PROTECT
TUNNEL
BLDG 1
/1 /2
:0
:0
P M
PP111.5
PLUMBING
PIPING PLAN
MAIN LEVEL - PHASE 5
REPLACE BOILERS AND
UPGRADE CONTROLS
WEST ROXBURY VA MEDICAL CENTER
WEST ROXBURY, MA
11/14/2025 JJM AHTM
BID DOCUMENTS
ISSUED FOR CONSTRUCTION
0506-0012
SCALE: 1/4" = 1'-0"1
PLUMBING PLAN MAIN LEVEL - PHASE 5
GENERAL SHEET NOTES:
1. REFER TO DRAWING P-001 FOR PLUMBING GENERAL NOTES, SYMBOLS, AND
ABBREVIATIONS.
2. REFER TO DRAWING SERIES P-500 FOR DETAILS
3. REFER TO DRAWING SERIES P-600 FOR FLOW AND RISER DIAGRAMS
13 12 11 10
C
D
10.5
B.3
B
A.7
A.6
A.4
C.7
E
F
6"SD UP & DN
5"V
5"V
5"V
5"V
6" V DN
6" VTR
5"V DN
5"V DN
4"SD
4"SD
6"SD 4"SD
4"SD
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANTS
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
PLAN
NORTH
KEYPLAN
ACTUAL
NORTH
NEW
CHILLER
PLANT
MR PROJECT NO:
Hazardous Materials:
MABBETT & ASSOCIATES
Architect & Civil Engineering:
WBRC
Fire & Life Safety:
KOFFEL ASSOCIATES
Electronic Security:
GRW
Tunnel Structural & Civil Engineering:
PEC
NEW
EMERGENCY
GENERATOR
BLDG.
NEW BOILER
PLANT
Physical Security:
FORCE PROTECT
TUNNEL
BLDG 1
A R
E A
D
/1 /2
:2
:2
P M
PP121.5
PLUMBING
PIPING PLAN
MEZZANINE LEVEL - PHASE 5
REPLACE BOILERS AND
UPGRADE CONTROLS
WEST ROXBURY VA MEDICAL CENTER
WEST ROXBURY, MA
11/14/2025 JJM AHTM
BID DOCUMENTS
ISSUED FOR CONSTRUCTION
0506-0012
SCALE: 1/4" = 1'-0"1
PLUMBING PLAN - MEZZANINE LEVEL PHASE 5
GENERAL SHEET NOTES:
1. REFER TO DRAWING P-001 FOR PLUMBING GENERAL NOTES, SYMBOLS, AND
ABBREVIATIONS.
2. REFER TO DRAWING SERIES P-500 FOR DETAILS
3. REFER TO DRAWING SERIES P-600 FOR FLOW AND RISER DIAGRAMS
13 12 11 10
C
D
10.5
B.3
B
A.7
A.6
A.4
C.7
4"RD-14"RD-1
SCUPPER
SEE ARCHITECTUAL
DRAWINGS
SCUPPER
SEE ARCHITECTUAL
DRAWINGS
6" VTR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANTS
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
PLAN
NORTH
KEYPLAN
ACTUAL
NORTH
NEW
CHILLER
PLANT
MR PROJECT NO:
Hazardous Materials:
MABBETT & ASSOCIATES
Architect & Civil Engineering:
WBRC
Fire & Life Safety:
KOFFEL ASSOCIATES
Electronic Security:
GRW
Tunnel Structural & Civil Engineering:
PEC
NEW
EMERGENCY
GENERATOR
BLDG.
NEW BOILER
PLANT
Physical Security:
FORCE PROTECT
TUNNEL
BLDG 1
/1 /2
:0
:1
P M
PP141.5
PLUMBING
PIPING PLAN
ROOF - PHASE 5
REPLACE BOILERS AND
UPGRADE CONTROLS
WEST ROXBURY VA MEDICAL CENTER
WEST ROXBURY, MA
11/14/2025 JJM AHTM
BID DOCUMENTS
ISSUED FOR CONSTRUCTION
0506-0012
SCALE: 1/4" = 1'-0"1
PLUMBING PLAN ROOF - PHASE 5, AREA C
GENERAL SHEET NOTES:
1. REFER TO DRAWING P-001 FOR PLUMBING GENERAL NOTES, SYMBOLS, AND
ABBREVIATIONS.
2. REFER TO DRAWING SERIES P-500 FOR DETAILS
3. REFER TO DRAWING SERIES P-600 FOR FLOW AND RISER DIAGRAMS
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseMILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
523A4-20-208
/3
/2
:1
:2
P
M
REPLACE BOILERS AND
UPGRADE CONTROLS
11/14/2025
BID DOCUMENTS
ISSUED FOR CONSTRUCTION
Revisions: Date:
WEST ROXBURY VA MEDICAL CENTER
WEST ROXBURY, MA
M-R PROJECT NO: 0506-0012
ENGINEER OF RECORD PLUMBING DETAILS
PP501
KBJJM
60,000 GALLON
WATER STORAGE TANK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseMILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
523A4-20-208
/3
/2
:1
:2
P
M
REPLACE BOILERS AND
UPGRADE CONTROLS
11/14/2025
BID DOCUMENTS
ISSUED FOR CONSTRUCTION
Revisions: Date:
WEST ROXBURY VA MEDICAL CENTER
WEST ROXBURY, MA
M-R PROJECT NO: 0506-0012
ENGINEER OF RECORD PLUMBING
FLOW DIAGRAMS
PP601
AHTMGS
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseMILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
523A4-20-208
/3
/2
:1
:2
P
M
REPLACE BOILERS AND
UPGRADE CONTROLS
11/14/2025
BID DOCUMENTS
ISSUED FOR CONSTRUCTION
Revisions: Date:
WEST ROXBURY VA MEDICAL CENTER
WEST ROXBURY, MA
M-R PROJECT NO: 0506-0012
ENGINEER OF RECORD PLUMBING
FLOW DIAGRAMS
PP602
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseMILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
523A4-20-208
/3
/2
:1
:2
P
M
REPLACE BOILERS AND
UPGRADE CONTROLS
11/14/2025
BID DOCUMENTS
ISSUED FOR CONSTRUCTION
Revisions: Date:
WEST ROXBURY VA MEDICAL CENTER
WEST ROXBURY, MA
M-R PROJECT NO: 0506-0012
ENGINEER OF RECORD PLUMBING
RISER DIAGRAMS
PP603
AHTMGS
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseMILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
523A4-20-208
/3
/2
:1
:2
P
M
REPLACE BOILERS AND
UPGRADE CONTROLS
11/14/2025
BID DOCUMENTS
ISSUED FOR CONSTRUCTION
Revisions: Date:
WEST ROXBURY VA MEDICAL CENTER
WEST ROXBURY, MA
M-R PROJECT NO: 0506-0012
ENGINEER OF RECORD PLUMBING SCHEDULES
PP701
| P-001 |
| PS100 |
| PP401-2 |
| PS101.3 |
| PP101.3A |
| PP101.3B |
| PP111.3A |
| PP111.3B |
| PP121.3A |
| PP121.3B |
| PP131.3A |
| PP131.3B |
| PP141.3A |
| PP141.3B |
| PP401-3 |
| PD111.4 |
| PD121.4 |
| PP111.5 |
| PP121.5 |
| PP141.5 |
| PP501 |
| PP701 |
File details come from the government source that posted it. Updated .