S02 Exhibit D.xlsx

XLSX spreadsheet 29 KB Posted

Attached to
Y1DZ--523A4-20-208 Replace Boilers and Upgrade Controls
Solicitation number
36C24125R0077Solicitation
Issued by

About this file

This file is a cost breakdown template (Exhibit D) for a VA construction project at the West Roxbury Campus. The spreadsheet provides a detailed cost structure for potential bidders to itemize labor, material, and project costs across 34 construction divisions, including general requirements, earthwork, electrical, HVAC, plumbing, and other building systems. The template includes sections for overhead, profit, and bonding percentages, with sample calculations demonstrating how to input labor rates, hours, material costs, and equipment expenses. The associated federal contract opportunity (Solicitation 36C24125R0077) involves replacing boilers and upgrading controls at the VA Medical Center, specifically focusing on general construction, demolition, modification, and renovation of the Central Boiler Plant (Building 8), with the Department of Veterans Affairs Veterans Health Administration as the sponsoring agency.

View the file

Other files

File Type Posted
Amendment 5 RFI Response.xlsx XLSX spreadsheet
SF111.3A A0004.pdf PDF
S-002 A0004.pdf PDF
SF121.3A A0004.pdf PDF
SF101.3A A0004.pdf PDF
MH131.3A A0004.pdf PDF
MQ141.3A A0004.pdf PDF
AE102_3 A0004.pdf PDF
AE103_3 A0004.pdf PDF
Geotechnical Report 8 of 8 A0004.pdf PDF
SS101.1 A0004.pdf PDF
SF131.3A A0004.pdf PDF
ES101.1 A0004.pdf PDF
AE101_5 A0004.pdf PDF
AE101_3 A0004.pdf PDF
AE503 A0004.pdf PDF
CD101 A0004.pdf PDF
Geotechnical Report 5 of 8 A0004.pdf PDF
Regulated Building Materials Survey Report A0004.pdf PDF
Hazmat A0004.pdf PDF
PreBid RFIs 36C24125R0077 523A4-20-208 Replace Boilers FINAL.xlsx XLSX spreadsheet
S06 Construction Class Deviation VAAR 852.207-70 and New Clause VAAR 852.204-72.pdf PDF
S06 36C24125R0077 0003.pdf PDF
S02 PCRA 523A4 20 208 Replace Boilers and Upgrade Controls.pdf PDF
S02 Exhibit B.pdf PDF
523A4 20 208_Bid Specifications Volume III.pdf PDF
09c_Mechanical.pdf PDF
11_Security Electronics.pdf PDF
06b_Architectural.pdf PDF
06a_Architectural.pdf PDF
05b_Structural.pdf PDF
07_Fire Protection.pdf PDF
S02 VHA Boiler and Associated Plant Safety Device Testing Manual 8th Edition 1.pdf PDF
S02 RFP 36C24125R0077 Solicitation.pdf PDF
S02 SOW 523A4 20 208 Replace Boilers and Upgrade Controls.pdf PDF
S02 ICRA 523A4 20 208 Replace Boilers and Upgrade Controls.pdf PDF
S02 Exhibit A.pdf PDF
P03 Brand Name CB Boiler Burner Fire Tube_Redacted.pdf PDF
P03 Brand Name ATS_Redacted.pdf PDF
523A4 20 208_Bid Specifications Volume I.pdf PDF
09b_Mechanical.pdf PDF
08_Plumbing.pdf PDF
05a_Structural.pdf PDF
03b_Civil Site.pdf PDF
S02 WD MA20250001 12122025.pdf PDF
P03 Brand Name Door Hardware_Redacted.pdf PDF
P03 Brand Name Trane_Redacted.pdf PDF
P03 Brand Name Fire Alarm_Redacted.pdf PDF
523A4 20 208_Bid Specifications Volume II.pdf PDF
09a_Mechanical.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer

Base Offer Cost Breakdown

Project Number:

Edward L Roy: VA assigned project #

Date:
Project Title
Edward L Roy: VA assigned Project TitleProject Location
Offeror Name
Offeror Street
Offeror CityStateZip

Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division

Material Cost
Edward L Roy: Enter all Material Costs by DivisionTotal Cost

Edward L Roy: This Column is the sum of the Division's Labor and Material Costs

Division 1General Requirements$ - 0$ - 0$ - 0
Division 2Existing Conditions- 0- 0- 0
Division 3Concrete- 0- 0- 0
Division 4Masonry- 0- 0- 0
Division 5Metals- 0- 0- 0
Division 6Wood and Plastic- 0- 0- 0
Division 7Thermal & Moisture Protect- 0- 0- 0
Division 8Doors and Windows- 0- 0- 0
Division 9Finishes- 0- 0- 0
Division 10Specialties- 0- 0- 0
Division 11Equipment- 0- 0- 0
Division 12Furnishings- 0- 0- 0
Division 13Special Construction- 0- 0- 0
Division 14Conveying Equipment- 0- 0- 0
Division 21Fire Suppression- 0- 0- 0
Division 22Plumbing- 0- 0- 0
Division 23HVAC- 0- 0- 0
Division 26Electrical- 0- 0- 0
Division 27Communications- 0- 0- 0
Division 28Electronic Safety & Security- 0- 0- 0
Division 31Earthwork- 0- 0- 0
Division 32Exterior Improvements- 0- 0- 0
Division 33Utilities- 0- 0- 0
Division 34Transportation Subtotal- 0- 0- 0
Division Subtotals :$ - 0$ - 0$ - 0

Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).

Edward L Roy: Date Offer Prepared/Submitted

- 0
Profit %0.00%
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).- 0
Bond %0.00%

Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).

Edward L Roy: Enter all Labor Costs by Division

- 0
Overhead/Profit Subtotals :$ - 0

Edward L Roy: Sum of Overhead, Profit and Bond %.

Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0

Labor Detail

Sample Example
DivisionLabor CategoryLabor RateHoursTotal
1Plumber$35.00123$4,305.00
1Laborer14.7570$1,032.50
$5,337.50

Materials and Equipment Details

Sample Example
DivisionItemRateUnitsTotal
1Pipe - 150'$1.50150$225.00
190 Degree Coupling$1.105$5.50
1Pump Rental - Hour$200.006$1,200.00
$1,430.50

File details come from the government source that posted it. Updated .