Y1DZ--523A4-20-208 Replace Boilers and Upgrade Controls
Solicitation number
36C24125R0077Solicitation
Issued by

About this file

These mechanical engineering documents are detailed design drawings for a boiler replacement and control upgrade project at the West Roxbury VA Medical Center in West Roxbury, Massachusetts. The project involves replacing multiple boilers, upgrading steam and feedwater piping systems, installing new steam headers, and modifying existing mechanical infrastructure. The drawings provide comprehensive 3D isometric and section views of the boiler room, detailing pipe routing, valve locations, steam traps, expansion joints, and stack elevations. The design includes specifications for 24-inch exhaust stacks, liquid propane tanks, steam connections to multiple buildings, and intricate piping networks with various pipe sizes and types including high-pressure steam (HPS), feedwater, and natural gas lines. The project is scheduled for bid documents issued for construction on 11/14/2025, with Miller-Remick LLC as the engineering consultant and multiple specialized subcontractors involved, including firms for hazardous materials, architectural, civil, fire safety, and security engineering.

View the file

Other files

File Type Posted
Amendment 5 RFI Response.xlsx XLSX spreadsheet
SF111.3A A0004.pdf PDF
S-002 A0004.pdf PDF
SF121.3A A0004.pdf PDF
SF101.3A A0004.pdf PDF
MH131.3A A0004.pdf PDF
MQ141.3A A0004.pdf PDF
AE102_3 A0004.pdf PDF
AE103_3 A0004.pdf PDF
Geotechnical Report 8 of 8 A0004.pdf PDF
SS101.1 A0004.pdf PDF
SF131.3A A0004.pdf PDF
ES101.1 A0004.pdf PDF
AE101_5 A0004.pdf PDF
AE101_3 A0004.pdf PDF
AE503 A0004.pdf PDF
CD101 A0004.pdf PDF
Geotechnical Report 5 of 8 A0004.pdf PDF
Regulated Building Materials Survey Report A0004.pdf PDF
Hazmat A0004.pdf PDF
PreBid RFIs 36C24125R0077 523A4-20-208 Replace Boilers FINAL.xlsx XLSX spreadsheet
S06 Construction Class Deviation VAAR 852.207-70 and New Clause VAAR 852.204-72.pdf PDF
S06 36C24125R0077 0003.pdf PDF
WD MA20260001 01022026.pdf PDF
S02 PCRA 523A4 20 208 Replace Boilers and Upgrade Controls.pdf PDF
S02 Exhibit B.pdf PDF
523A4 20 208_Bid Specifications Volume III.pdf PDF
09c_Mechanical.pdf PDF
11_Security Electronics.pdf PDF
06b_Architectural.pdf PDF
06a_Architectural.pdf PDF
05b_Structural.pdf PDF
07_Fire Protection.pdf PDF
S02 VHA Boiler and Associated Plant Safety Device Testing Manual 8th Edition 1.pdf PDF
S02 RFP 36C24125R0077 Solicitation.pdf PDF
S02 SOW 523A4 20 208 Replace Boilers and Upgrade Controls.pdf PDF
S02 ICRA 523A4 20 208 Replace Boilers and Upgrade Controls.pdf PDF
S02 Exhibit A.pdf PDF
P03 Brand Name CB Boiler Burner Fire Tube_Redacted.pdf PDF
P03 Brand Name ATS_Redacted.pdf PDF
523A4 20 208_Bid Specifications Volume I.pdf PDF
08_Plumbing.pdf PDF
05a_Structural.pdf PDF
03b_Civil Site.pdf PDF
S02 Exhibit C.pdf PDF
P03 Brand Name Generator_Redacted.pdf PDF
523A4 20 208_Bid Specifications Volume IV.pdf PDF
10_Electrical.pdf PDF
03a_Civil Site.pdf PDF
02_Hazmat.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

8-DA-1

8-CS-1

8-CTP-2

8-CTP-1

8-B-1

8-B-2 8-B-3

8-B-4

8-FHX-4

8-FHX-3

8-FHX-2

8-FHX-1

8-GRV-1

8-GRV-2

8-GRV-3

8-GRV-4

8-GRV-5

8-FWP-4

8-FWP-3

8-FWP-2

8-FWP-1

24"DIA. BOILER

EXHAUST STACK (TYP.)

6" VT

4"SV

4"SV

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANTS

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEER

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t o n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t th re e in c h o n e fo o t

523A4-20-208

MR PROJECT NO:

Hazardous Materials:

MABBETT & ASSOCIATES

Architect & Civil Engineering:

WBRC

Fire & Life Safety:

KOFFEL ASSOCIATES

Electronic Security:

GRW

Tunnel Structural & Civil Engineering:

PEC

Physical Security:

FORCE PROTECT

/1 /2

:5

:4

A M

MP301

MECHANICAL

INTERIOR 3D VIEWS

REPLACE BOILERS AND

UPGRADE CONTROLS

WEST ROXBURY VA MEDICAL CENTER

WEST ROXBURY, MA

11/14/2025 JJM AHTM

BID DOCUMENTS

ISSUED FOR CONSTRUCTION

0506-0012

SCALE: N.T.S.1

BOILERS ISOMETRIC VIEW

NO. DESCRIPTION DATE

10" HPS

6" VT

8" HPS

3" HPS

8-DA-1

8-CS-1

8-CTP-1

8-CTP-2

8-FWP-4

8-FWP-3

8-FWP-2

8-FWP-1

2"HPR

3"SV

2"HPR

4"PC

2 1/2"NPW

2 1/2"CTPD

CONTRACTOR SHALL

COORDINATE ROUTING OF

ALL PIPING TO KEEP

ACCESS AISLE OPEN

6" VENT

2 1/2"FWPD

2 1/2"FWPD

24"Ø

8-B-2

3"NG

2 1/2"FWPD

8"HPS

2 1/2"FWPD

2 1/2"FWPD

8-FHX-2

THE AUTOMATIC SHUTOFF VALVES (MAXON) FOR EACH BOILER

MUST BE ORIENTED SO THAT VALVE MOTOR/PROFF OF CLOSURE

SWITCH TERMINALS ARE READILY ACCESSIBLE OR INCLUDES AN

EXTERNAL WIRING/TERMINAL POINT LOCAL TO THE VALVES TO FICILITATE

MAINTENANCE AND TESTING

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANTS

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEER

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

MR PROJECT NO:

Hazardous Materials:

MABBETT & ASSOCIATES

Architect & Civil Engineering:

WBRC

Fire & Life Safety:

KOFFEL ASSOCIATES

Electronic Security:

GRW

Tunnel Structural & Civil Engineering:

PEC

Physical Security:

FORCE PROTECT

/1 /2

:5

:1

A M

MP302

MECHANICAL

INTERIOR 3D VIEWS

REPLACE BOILERS AND

UPGRADE CONTROLS

WEST ROXBURY VA MEDICAL CENTER

WEST ROXBURY, MA

11/14/2025 JJM AHTM

BID DOCUMENTS

ISSUED FOR CONSTRUCTION

0506-0012

SCALE: N.T.S.1 STEAM HEADER

SCALE: N.T.S.3 3D @ 8-D/A-1 & 8-CS-1

SCALE: N.T.S.2 FEED WATER ROUTING TO BOILERS

8-B-1

8"HPS

4"HPS

10"HPS

8-FHX-1

2 1/2"FWPD

2 1/2"FWPD

4"SV

4"SV

2 1/2"SV

2 1/2"FWPD

2 1/2"FWPD

32"x32"

DUCT

3"NG

2"FOR

1 1/2"FOS

1 1/2"FOS

2"FOR

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANTS

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEER

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

MR PROJECT NO:

Hazardous Materials:

MABBETT & ASSOCIATES

Architect & Civil Engineering:

WBRC

Fire & Life Safety:

KOFFEL ASSOCIATES

Electronic Security:

GRW

Tunnel Structural & Civil Engineering:

PEC

Physical Security:

FORCE PROTECT

/1 /2

:5

:3

A M

MP303

MECHANICAL

INTERIOR 3D VIEWS

REPLACE BOILERS AND

UPGRADE CONTROLS

WEST ROXBURY VA MEDICAL CENTER

WEST ROXBURY, MA

11/14/2025 JJM AHTM

BID DOCUMENTS

ISSUED FOR CONSTRUCTION

0506-0012

SCALE: N.T.S.1

BOILER - 8-B-1

PIPE TRENCH

MP304

(T O

B L G

U

N

IT

H E

A T

E R

S

H P

S

(S

A R

E

H

(F R

O M

-B

-1

H

A R

E

H

A R

E

H

(T O

D /A

H

O M

-B

-2

H

(T

S T

E A

M S

IL

E

N C

E R

H

O M

B -8

-3

H

(B U

IL

D

IN

G

H

O M

-B

-4

H

(E M

E R

G E

N C

Y S

T E

A M

H

R M

A S

T E

R S

T E

A M

P R

E S

S U

E

T

A

N S

M

IT

T E

R

(S P

A R

E

(P R

E S

S U

R E

I N

D

IC

A T

O R

(S P

A R

E

MP304

/4

"6

/4

8 7 6 5

MEZZANINE

113' - 5"

UPPER MEZZ

125' - 11"

ROOF

140' - 6"

(T O

B L D

G

H

8.7 8.4 7.6

2 1/2" FWPD

NEW

CATWALK

2 1/2" FWPD2 1/2" FWPD2 1/2" FWPD

STEAM TRAP

(SEE DETAIL 3

ON MP503.DWG)

STEAM TRAP

(SEE DETAIL 3

ON MP503.DWG)

ROOF DRAIN

REFER TO PLUMBING DRAWINGS

FOR ADDITIONAL INFORMATION

/4

(S P

A R

E

H

A R

E

H

2' - 7"4' - 8"3' - 0"6' - 0"4' - 0"2' - 0"3' - 0"3' - 0"9' - 0"9' - 0"3' - 0"9' - 0"3' - 0"3' - 0"7' - 0"3' - 0"3' - 11"1' - 5"

3" NG

6" NG2 1/2" FWPD

3" NG

3" NG

6" NG

2 1/2" FWPD

3" NG

2 1/2" FWPD

6" NG8" NG

3" FWPD

2"MPS

4" MPR

1 1/2"MPS

4" MPR

4" MPR

12' - 8"12' - 8"12' - 8"12' - 8"13' - 4"12' - 0"

1 1/2"MPS

1 1/2"MPS 3" MPS

4" MPR

10" HPS 10" HPS

6" NG

MAIN LEVEL

100' - 0"

8-CTP-28-CTP-1

MP304

6"SV

4"OFL

2 1/2"CTPD

4"PC

C B.3 B

MEZZANINE

113' - 5"

UPPER MEZZ

125' - 11"

ROOF

140' - 6"

3"SV

4"PC

8-FWP-4

8-FWP-3

8-FWP-2

8-CS-1

8-DA-1CORRIDOR

STORAGE

3"FWPD

3"FWPD

2"D

4"FWPS

2"R

2 1/2"CTPD

A.7 A.6 A.4

4"PC

1 1/2"HPR

3"HPS

2"HPR

BOILER ROOM

2 1/2"CTPD

3"FWPD

3"FWPD

2"R

4"FWPS

8-FWP-1

4"OFL

3"FWPD

3"FWPD

4"CTPS

6"SV

2"HPR

1 1/2"VT

2"HPR

2"D

2"R

4' - 11 1/2"

4"OFL

6"PC

1 1/2"PC

2 1/2"FP

2 1/2"FP

2 1/2"FP

10"SV

4"HPS

8"LPS8-PRV-1

NC

BYPASS

1 1/4"R

1 1/2"R

1 1/4"R

2 1/2"SW

3"SW

3"CTPD

8"LPS

1"NPW

2 1/2"FP

2"R

3"CTPD

8"NG

4"MPR

4"MPR

2"FOS

2"FOR

1 1/2"HPR

6"SV

2"PC

SRV-9

MAIN LEVEL

100' - 0"

MP304

Ø

8"HPS

Ø

8"HPS

8-B-1

2 1/2"FWPD

2 1/2"FWPD

2 1/2"FWPD

CB.3B

MEZZANINE

113' - 5"

UPPER MEZZ

125' - 11"

ROOF

140' - 6"

A.7A.6A.4

8-GRV-1

4"PC

MP305

1 1/2"HPR

1 1/2"PC

4"SV

4"SV

3"FWPD3"FWPD

2 1/2"FWPD

4"HPS

8-UH-3

8-UH-1

8-EF-1

3/4"MPS 3/4"MPR

1"LPG

8-EF-9

x

2 1/2"SV

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANTS

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEER

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

MR PROJECT NO:

Hazardous Materials:

MABBETT & ASSOCIATES

Architect & Civil Engineering:

WBRC

Fire & Life Safety:

KOFFEL ASSOCIATES

Electronic Security:

GRW

Tunnel Structural & Civil Engineering:

PEC

Physical Security:

FORCE PROTECT

/1 /2

:5

:4

A M

MP304

MECHANICAL

SECTION VIEWS

REPLACE BOILERS AND

UPGRADE CONTROLS

WEST ROXBURY VA MEDICAL CENTER

WEST ROXBURY, MA

11/14/2025 JJM AHTM

BID DOCUMENTS

ISSUED FOR CONSTRUCTION

0506-0012

SCALE: 1/4" = 1'-0"1 STEAM HEADER SECTION VIEW

SCALE: 1/4" = 1'-0"3 SECTION @ 8-D/A-1 & 8-CS-1SCALE: 1/4" = 1'-0"2 SECTIONS @ 8-B-1

UPPER MEZZ

125' - 11"

ROOF

140' - 6"

MP306

8" HPS

10" HPS

7.6

24' - 1 1/4"

FOR STEAM TRAP

REFER TO DETAIL 5

ON DRAWING MP-503

(TYP.)

10" SV

8-PRV-3

8-PRV-4

REFER TO PRV STATION

DETAIL #6 ON

DRAWING MP-503

FOR DRIP POCKET

REFER TO DETAIL 5

ON DRAWING MP-503

(TYP.)

DRIP PAN ELBOW

REFER TO DETAIL #8

ON DRAWING MP503

SAFETY RELIEF VALVE

6"HPS

10"HPS

6"HPS

(100PSIG)

(65PSIG)

LOUNGE

LOCKERS

STORAGE

TLT/SHOWER

BEDROOM

1 1/2" HPR

VALVE W/

CHAINWHEEL

VALVE W/

CHAINWHEEL

16' - 6"

NEW 1" HPS (100PSI)

ROUTED TO EXISTING

PRV STATION IN EXISTING PUMP

ROOM THAT SERVES BLDG #5 & #17

4" PC

DOUBLE ISOLATION ASSEMBLY

REFER TO DETAIL #9 ON

DRAWING MP5058"x8"

CD-5

285 CFM

CD-1

55 CFM EG-6

225 CFM

12"x8"

CD-1

50 CFM

EG-4

100 CFM

6"x8"

6"Ø

8"x12"

6"Ø

10"x8"

1 1/2"HPR

8"x8"

CD-3

75 CFM

UPPER MEZZ

125' - 11"

7.6

8-PRV-2

SAFETY RELIEF VALVE

(SVR-11) SEE DETAIL

#8 ON MP503

2 1/2"SV

3"MPS

3"HPS

REFER TO PRV DETAIL #7

ON DRAWING MP503

1-1/2"MPS

FOR CONTINUATION

TO UNIT HEATERS

(100 PSI)

(30 PSI)

3"MPS

1 1/2"BY-PASS

8-GRV-2

8-UH-1

REFER TO DETAIL

#5 ON MP503

(TYP.)

9' - 0 1/4"

2 1/2"SV

AB

UPPER MEZZ

125' - 11"

A.7 A.6 A.4

10"SV

8"LPS

4"HPS

2 1/2"HPS

FOR STEAM TRAP

REFER TO DETAIL 5

ON DRAWING MP-503

(TYP.)

DRIP PAN ELBOW

REFER TO DETAIL #8

ON DRAWING MP503 SAFETY

RELIEF VALVE

2 1/2"FP

2 1/2"FP

1' - 1" 13' - 5"

8-PRV-1

/2

MAIN LEVEL

100' - 0"

UPPER MEZZ

125' - 11"

12"HPS

8"HPS 8-STS-1

8-B-3

3/4"LPG

2 1/2"FWPD

2 1/2"FWPD

2 1/2"FWPD

8-FHX-3

8"HPS

2 1/2"FWPD

3/4"SAN

3/4"V

2 1/2"FWPD

3"HPS

8-CV-1

CURB

SEE DETAIL 2 ON

DRAWING MP502

FOR DRIP POCKET

REFER TO DETAIL 5

ON DRAWING MP-503

(TYP.)

NC

MAIN LEVEL

100' - 0"

DC.7

8-LVR-2

1 1/2" PC

3" HPS

8-SSP-04

PROVIDE LINK SEAL &

SLEEVE. REFER TO

DETAIL 1 ON MP504

DIELECTRIC FLANGE

ISOLATION KIT (TYP.)

C3H8

REFER TO PLUMBING

DRAWING PP101.3A

PROVIDE SLEEVE.

COORDINATE PIPING W/

NEW RETAINING WALL

1 1/2" PC

3" HPS

OF 1 1/2"PC

(PRE-ENGINEERED PIPING 6.62" OD)

OF 3"HPS

(PRE-ENGINEERED PIPING 8.62" OD)

DIELECTRIC FLANGE

ISOLATION KIT (TYP.)

FOR DRIP POCKET

REFER TO DETAIL 5

ON DRAWING MP503

(TYP.)

ANCHORANCHOR

MAIN LEVEL

100' - 0"

41 32

MEZZANINE

113' - 5"

SUBSTATION-B

2"MPR

2"MPR

2"PC

2"PC

1"RL 1"RS

1"MPS

2"MPR

1"RL

1"RS

8-AHU-5

8-AHU-2

8-AHU-4

8-UH-8

1 1/2"MPR

1"MPS

x

1"MPR

3/4"MPS

1"RL

1"RS

8-FT-3

8-CRU-3

3/4"D

3/4"D3/4"D

3/4"D

3/4"D

2"MPR

4"VT

4 13 2

MEZZANINE

113' - 5"

8-LVR-5

8-EF-4

30"x30"

8-UH-6

1 1/2"MPR

1 1/2"MPS

8-GEN-BP-1

8-UH-5

8-DT-08

1 1/2"MPS

1 1/2"MPS

1"MPR

1"MPR

2"FOR

1 1/2"FOS

8-DT-01

8-ELPG

8-LVR-4

8-LVR-11

8 DIA. GENERATOR

PIPE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANTS

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEER

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

MR PROJECT NO:

Hazardous Materials:

MABBETT & ASSOCIATES

Architect & Civil Engineering:

WBRC

Fire & Life Safety:

KOFFEL ASSOCIATES

Electronic Security:

GRW

Tunnel Structural & Civil Engineering:

PEC

Physical Security:

FORCE PROTECT

/1 /2

:5

:5

A M

MP305

MECHANICAL

SECTION VIEWS

REPLACE BOILERS AND

UPGRADE CONTROLS

WEST ROXBURY VA MEDICAL CENTER

WEST ROXBURY, MA

11/14/2025 JJM AHTM

BID DOCUMENTS

ISSUED FOR CONSTRUCTION

0506-0012

SCALE: 1/4" = 1'-0"3 SECTION @ PRV 3&4 STATION

SCALE: 1/4" = 1'-0"2 SECTION @ PRV-2 STATION

SCALE: 1/4" = 1'-0"1 SECTION @ PRV-1 STATION

SCALE: 1/4" = 1'-0"4 SECTION @ STEAM TEST SILENCER

SCALE: 1/4" = 1'-0"5 SECTION @ TO BLDG 21 EXIT

SCALE: 1/4" = 1'-0"7 SECTION @ SUBSTATION ROOM

SCALE: 1/4" = 1'-0"6 SECTION @ GENERATOR ROOM

MAIN LEVEL

100' - 0"

X1 X313 12 11 10 9 810.5

UPPER MEZZ

125' - 11"

ROOF

140' - 6"

MP306

X2 X5 X6 8.7 8.4 7.61415

MP306

4"PC

10"HPS

10"HPS

4"PC

10"HPS

4"PC

LIQUID

PROPANE

TANKS &

CAGE

1"LPG

10"HPS

4"PC

1 1/2"HPR

1 1/2"HPR

1 1/2"HPR

1 1/2"HPR

10"HPS

4"PC

PIPE RISER SUPPORT

LOCATIONS

SEE DET 5 ON DWG

MP501(TYP 2 PLCS)

PIPE BRIDGE SUPPORT

SEE DRAWING MP501 DTEAIL 2

1 1/2"HPR

BASEMENT

95' - 1"

EXIST. MEZZ

108' - 6"

MEZZANINE

113' - 5"

UPPER MEZZ

125' - 11"

ROOF

140' - 6"

EXIST. CATWALK

118' - 3 3/4"

EXIST. UPPER

MEZZ

124' - 0 3/4"

EXIST. ROOF

131' - 1 3/4"

XE

E F

10"HPS

4"PC

REFER TO

DETAIL 5 ON

DRAWING MP503

4"PC

10"HPS

10"HPS

4"PC

LOW POINT

DRAIN STRAINER SHOWN

IN HORIZONTAL

POSITION

MP306

(E)3 1/2" CW

REFER TO

PLUMBING DRAWING

FOR CONTINUATION

1 1/2"HPR

1 1/2"HPR

PIPE RISER SUPPORTS

SEE DET 5 ON DWG

MP501 (TYP 2 PLCS)

CD

UPPER MEZZ

125' - 11"

ROOF

140' - 6"

MP305

C.7EF

5' - 10"

1' - 1 1/4"

10" HPS

10" HPS

4" PC

4" PC

1 1/2" HPR

MP306

4" PC

4" PC

TO DEAERATOR

TO 8-PRV-3 &4

TO 8-CS-1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANTS

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEER

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

MR PROJECT NO:

Hazardous Materials:

MABBETT & ASSOCIATES

Architect & Civil Engineering:

WBRC

Fire & Life Safety:

KOFFEL ASSOCIATES

Electronic Security:

GRW

Tunnel Structural & Civil Engineering:

PEC

Physical Security:

FORCE PROTECT

/1 /2

:5

:5

A M

MP306

MECHANICAL

SECTION VIEWS

REPLACE BOILERS AND

UPGRADE CONTROLS

WEST ROXBURY VA MEDICAL CENTER

WEST ROXBURY, MA

11/14/2025 JJM AHTM

BID DOCUMENTS

ISSUED FOR CONSTRUCTION

0506-0012

SCALE: 1/4" = 1'-0"2 SECTION @ PIPE BRIDGE

SCALE: 1/4" = 1'-0"1 SECTION @ WEST TOWER TO TUNNEL

SCALE: 1/4" = 1'-0"3 SECTION @ BLDG EXIT

MAIN LEVEL

100' - 0"

MEZZANINE

113' - 5"

TUNNEL LID

3' - 2"

OF 10"HPS

(PRE-ENGINEERED PIPING 15.51" OD)

OF 4"PC

(PRE-ENGINEERED PIPING 8.75" OD)

OF 1 1/2"HPR

(PRE-ENGINEERED PIPING 6.5" OD)

11' - 0"

OF FUTURE CHS

(PRE-ENGINEERED PIPING)

OF FUTURE CHR

(PRE-ENGINEERED PIPING)

1' - 3"

FOR PIPE SUPPORT REFER

TO MP501 DETAIL #2

8-EF-5

(E)3" LPR

(E)3" LPR

(E)4" LPR(E)4" PC

(E)3" LPR

(E)4" LPR

(E)8" HPS

6"FP

2"D

8"HPS

4"HPR

(E)8" HPS

8"HPS

4"HPR

(2)8"-150# SLIP ON

FLANGES W/

SPECTACAL BLIND

8"HPS DRIP LEG.

REFER TO DETAIL 5

ON DRAWING MP503.

10"HPS

4"PC

10"HPS

1 1/2"HPR

8-SSP-01C

REFER TO

DETAIL 5 ON

DRAWING MP503

REFER TO

DETAIL 5 ON

DRAWING MP503

STRAINER IN

HORIZONTAL POSITION

STRAINER IN

HORIZONTAL POSITION

MP307

10" 300# SINGLE

SLIP EXPANSION

JOINT W/ANCHOR

SEE DWG MP508

DETAIL 3

TP

S

TP

S

TP

S

TP

S

TP

S

SSP CONTROL PANEL

4" 150# WELD NECK

FLG (TYP)

4" 150# SINGLE

SLIP EXPANSION

JOINT W/ANCHOR.

SEE DWG MP508

DETAIL 3

10" 300#

WELD NECK

FLG (TYP)

8' - 0"

4' - 0"

PRIMARY PIPE ALIGNMENT GUIDE.

SEE DWG MP508 DETAIL 1

TP

S A

G A

TP

S

G

TP

S A

G

TP

S

TP

S

TP

S

TP

S

45' - 0"

TP

S A

G

12' - 0"

INTERMEDIATE PIPE

ALIGNMENT GUIDE.

SEE DWG MP508

DETAIL 1

PRIMARY PIPE ALIGNMENT GUIDE.

SEE DWG MP508 DETAIL 1

CUT BACK PRE-ENGINEERED

PIPING SYSTEM FAR ENOUGH TO

INSTALL WELD NECK FLANGES.

RE-INSTALL SYSTEM BACK TO

ORIGINAL INTEGRITY

CUT BACK PRE-ENGINEERED

PIPING SYSTEM FAR ENOUGH TO

INSTALL WELD NECK FLANGES.

RE-INSTALL SYSTEM BACK TO

ORIGINAL INTEGRITY

INTERMEDIATE PIPE ALIGNMENT GUIDE.

SEE DWG MP508 DETAIL 1

REFER TO DETAIL 9

ON MP505 FOR

DOUBLE ISOLATION

VALVE ASSEMBLY

(E)3"LPR(E)3"LPR

ABANDONED

GLYCOL

PIPING

(E)8" HPS

10"HPS

4"PC

(E)3/4" LPR

(E)1" LPR

(E)1" HPS

1 1/2"LPR

CAP

2"FM

MP307

3"FM

3"HPS

3"HPS1 1/2"LPR

(E)1 1/2" LPR

(E)1 1/2" LPR

(E)3" HPS

1 1/2"LPR

10"HPS

8-GV-1

2 1/2"VT

4"VT

10"HPS

1 1/2"HPR

2"LPR

4"PC

4"LPR

8"HPS

8-CRU-1

8-FT-1

8"HPS

4"LPR

REFER TO DETAIL

5 ON DRAWING

MP503

(E)6" FP

8" #300 BLIND FLG

BUILDING 1 BASEMENT

MER

(E) CONDUIT

FOR DRIP POCKET

REFER TO DETAIL 5

ON DRAWING MP-503

(TYP.)

4" #150 BLIND FLANGE

OF 8"HPS

(PIPING 17" OD)

(PIPING 13" OD)

OF 4"PC

1 1/2"HPR

2"LPR

8-CRU-1

8"HPS

1 1/2"HPR

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANTS

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEER

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

MR PROJECT NO:

Hazardous Materials:

MABBETT & ASSOCIATES

Architect & Civil Engineering:

WBRC

Fire & Life Safety:

KOFFEL ASSOCIATES

Electronic Security:

GRW

Tunnel Structural & Civil Engineering:

PEC

Physical Security:

FORCE PROTECT

/1 /2

:5

:0

A M

MP307

MECHANICAL

SECTION VIEWS

REPLACE BOILERS AND

UPGRADE CONTROLS

WEST ROXBURY VA MEDICAL CENTER

WEST ROXBURY, MA

11/14/2025 JJM RD

BID DOCUMENTS

ISSUED FOR CONSTRUCTION

0506-0012

SCALE: 1/4" = 1'-0"1 SECTION @ NEW TUNNEL

SCALE: 1/4" = 1'-0"5 SECTION @ BLDG 1 STEAM MAIN CONNECTION

SCALE: 1/4" = 1'-0"4 SECTION @ STEAM TRAPS IN TUNNEL

SCALE: 1/4" = 1'-0"2 SECTION @ BLDG 10 STEAM PIPE CONNECTIONS

SCALE: 1/4" = 1'-0"3 SECTION @ NEW TUNNEL

SCALE: 1/2" = 1'-0"6 SECTION @ CRU-1 IN BLDG 1

SCALE: 1/2" = 1'-0"7 SECTION @ BLDG 1 - TEMPORARY CONNECTIONS

24"D EXHAUST STACK TYP

24"D RAIN HOOD TYP

(A P P R O X

FLOOR EL.

100'-0"

ROOF 41'-4 3/4"

(APPROX)

8" DIA GENERATOR STACK

8-CU-8

8-GRV-5

8-CU-6

8-CU-5

8-CU-48-CU-7

8-CU-1

3" SV

6"' SV

10" SV

10" SV

6" SV TYP

8-LVR-5 8-LVR-4

8-LVR-3

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANTS

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR

ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND

SIGNATURE OF THE PROFESSIONAL ENGINEER

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

MR PROJECT NO:

Hazardous Materials:

MABBETT & ASSOCIATES

Architect & Civil Engineering:

WBRC

Fire & Life Safety:

KOFFEL ASSOCIATES

Electronic Security:

GRW

Tunnel Structural & Civil Engineering:

PEC

Physical Security:

FORCE PROTECT

/1 /2

:5

:0

A M

MP308

MECHANICAL

NORTH ELEVATION - STACK HEIGHT

REPLACE BOILERS AND

UPGRADE CONTROLS

WEST ROXBURY VA MEDICAL CENTER

WEST ROXBURY, MA

11/14/2025 JJM RHD

BID DOCUMENTS

ISSUED FOR CONSTRUCTION

0506-0012

SCALE: 3/16" = 1'-0"1

BOILER STACK ELEVATION