09b_Mechanical.pdf
PDF 15 MB Posted
- Solicitation number
- 36C24125R0077Solicitation
About this file
These mechanical engineering documents are detailed design drawings for a boiler replacement and control upgrade project at the West Roxbury VA Medical Center in West Roxbury, Massachusetts. The project involves replacing multiple boilers, upgrading steam and feedwater piping systems, installing new steam headers, and modifying existing mechanical infrastructure. The drawings provide comprehensive 3D isometric and section views of the boiler room, detailing pipe routing, valve locations, steam traps, expansion joints, and stack elevations. The design includes specifications for 24-inch exhaust stacks, liquid propane tanks, steam connections to multiple buildings, and intricate piping networks with various pipe sizes and types including high-pressure steam (HPS), feedwater, and natural gas lines. The project is scheduled for bid documents issued for construction on 11/14/2025, with Miller-Remick LLC as the engineering consultant and multiple specialized subcontractors involved, including firms for hazardous materials, architectural, civil, fire safety, and security engineering.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
8-DA-1
8-CS-1
8-CTP-2
8-CTP-1
8-B-1
8-B-2 8-B-3
8-B-4
8-FHX-4
8-FHX-3
8-FHX-2
8-FHX-1
8-GRV-1
8-GRV-2
8-GRV-3
8-GRV-4
8-GRV-5
8-FWP-4
8-FWP-3
8-FWP-2
8-FWP-1
24"DIA. BOILER
EXHAUST STACK (TYP.)
6" VT
4"SV
4"SV
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANTS
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t o n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t th re e in c h o n e fo o t
523A4-20-208
MR PROJECT NO:
Hazardous Materials:
MABBETT & ASSOCIATES
Architect & Civil Engineering:
WBRC
Fire & Life Safety:
KOFFEL ASSOCIATES
Electronic Security:
GRW
Tunnel Structural & Civil Engineering:
PEC
Physical Security:
FORCE PROTECT
/1 /2
:5
:4
A M
MP301
MECHANICAL
INTERIOR 3D VIEWS
REPLACE BOILERS AND
UPGRADE CONTROLS
WEST ROXBURY VA MEDICAL CENTER
WEST ROXBURY, MA
11/14/2025 JJM AHTM
BID DOCUMENTS
ISSUED FOR CONSTRUCTION
0506-0012
SCALE: N.T.S.1
BOILERS ISOMETRIC VIEW
NO. DESCRIPTION DATE
10" HPS
6" VT
8" HPS
3" HPS
8-DA-1
8-CS-1
8-CTP-1
8-CTP-2
8-FWP-4
8-FWP-3
8-FWP-2
8-FWP-1
2"HPR
3"SV
2"HPR
4"PC
2 1/2"NPW
2 1/2"CTPD
CONTRACTOR SHALL
COORDINATE ROUTING OF
ALL PIPING TO KEEP
ACCESS AISLE OPEN
6" VENT
2 1/2"FWPD
2 1/2"FWPD
24"Ø
8-B-2
3"NG
2 1/2"FWPD
8"HPS
2 1/2"FWPD
2 1/2"FWPD
8-FHX-2
THE AUTOMATIC SHUTOFF VALVES (MAXON) FOR EACH BOILER
MUST BE ORIENTED SO THAT VALVE MOTOR/PROFF OF CLOSURE
SWITCH TERMINALS ARE READILY ACCESSIBLE OR INCLUDES AN
EXTERNAL WIRING/TERMINAL POINT LOCAL TO THE VALVES TO FICILITATE
MAINTENANCE AND TESTING
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANTS
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
MR PROJECT NO:
Hazardous Materials:
MABBETT & ASSOCIATES
Architect & Civil Engineering:
WBRC
Fire & Life Safety:
KOFFEL ASSOCIATES
Electronic Security:
GRW
Tunnel Structural & Civil Engineering:
PEC
Physical Security:
FORCE PROTECT
/1 /2
:5
:1
A M
MP302
MECHANICAL
INTERIOR 3D VIEWS
REPLACE BOILERS AND
UPGRADE CONTROLS
WEST ROXBURY VA MEDICAL CENTER
WEST ROXBURY, MA
11/14/2025 JJM AHTM
BID DOCUMENTS
ISSUED FOR CONSTRUCTION
0506-0012
SCALE: N.T.S.1 STEAM HEADER
SCALE: N.T.S.3 3D @ 8-D/A-1 & 8-CS-1
SCALE: N.T.S.2 FEED WATER ROUTING TO BOILERS
8-B-1
8"HPS
4"HPS
10"HPS
8-FHX-1
2 1/2"FWPD
2 1/2"FWPD
4"SV
4"SV
2 1/2"SV
2 1/2"FWPD
2 1/2"FWPD
32"x32"
DUCT
3"NG
2"FOR
1 1/2"FOS
1 1/2"FOS
2"FOR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANTS
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
MR PROJECT NO:
Hazardous Materials:
MABBETT & ASSOCIATES
Architect & Civil Engineering:
WBRC
Fire & Life Safety:
KOFFEL ASSOCIATES
Electronic Security:
GRW
Tunnel Structural & Civil Engineering:
PEC
Physical Security:
FORCE PROTECT
/1 /2
:5
:3
A M
MP303
MECHANICAL
INTERIOR 3D VIEWS
REPLACE BOILERS AND
UPGRADE CONTROLS
WEST ROXBURY VA MEDICAL CENTER
WEST ROXBURY, MA
11/14/2025 JJM AHTM
BID DOCUMENTS
ISSUED FOR CONSTRUCTION
0506-0012
SCALE: N.T.S.1
BOILER - 8-B-1
PIPE TRENCH
MP304
(T O
B L G
U
N
IT
H E
A T
E R
S
H P
S
(S
A R
E
H
(F R
O M
-B
-1
H
A R
E
H
A R
E
H
(T O
D /A
H
O M
-B
-2
H
(T
S T
E A
M S
IL
E
N C
E R
H
O M
B -8
-3
H
(B U
IL
D
IN
G
H
O M
-B
-4
H
(E M
E R
G E
N C
Y S
T E
A M
H
R M
A S
T E
R S
T E
A M
P R
E S
S U
E
T
A
N S
M
IT
T E
R
(S P
A R
E
(P R
E S
S U
R E
I N
D
IC
A T
O R
(S P
A R
E
MP304
/4
"6
/4
8 7 6 5
MEZZANINE
113' - 5"
UPPER MEZZ
125' - 11"
ROOF
140' - 6"
(T O
B L D
G
H
8.7 8.4 7.6
2 1/2" FWPD
NEW
CATWALK
2 1/2" FWPD2 1/2" FWPD2 1/2" FWPD
STEAM TRAP
(SEE DETAIL 3
ON MP503.DWG)
STEAM TRAP
(SEE DETAIL 3
ON MP503.DWG)
ROOF DRAIN
REFER TO PLUMBING DRAWINGS
FOR ADDITIONAL INFORMATION
/4
(S P
A R
E
H
A R
E
H
2' - 7"4' - 8"3' - 0"6' - 0"4' - 0"2' - 0"3' - 0"3' - 0"9' - 0"9' - 0"3' - 0"9' - 0"3' - 0"3' - 0"7' - 0"3' - 0"3' - 11"1' - 5"
3" NG
6" NG2 1/2" FWPD
3" NG
3" NG
6" NG
2 1/2" FWPD
3" NG
2 1/2" FWPD
6" NG8" NG
3" FWPD
2"MPS
4" MPR
1 1/2"MPS
4" MPR
4" MPR
12' - 8"12' - 8"12' - 8"12' - 8"13' - 4"12' - 0"
1 1/2"MPS
1 1/2"MPS 3" MPS
4" MPR
10" HPS 10" HPS
6" NG
MAIN LEVEL
100' - 0"
8-CTP-28-CTP-1
MP304
6"SV
4"OFL
2 1/2"CTPD
4"PC
C B.3 B
MEZZANINE
113' - 5"
UPPER MEZZ
125' - 11"
ROOF
140' - 6"
3"SV
4"PC
8-FWP-4
8-FWP-3
8-FWP-2
8-CS-1
8-DA-1CORRIDOR
STORAGE
3"FWPD
3"FWPD
2"D
4"FWPS
2"R
2 1/2"CTPD
A.7 A.6 A.4
4"PC
1 1/2"HPR
3"HPS
2"HPR
BOILER ROOM
2 1/2"CTPD
3"FWPD
3"FWPD
2"R
4"FWPS
8-FWP-1
4"OFL
3"FWPD
3"FWPD
4"CTPS
6"SV
2"HPR
1 1/2"VT
2"HPR
2"D
2"R
4' - 11 1/2"
4"OFL
6"PC
1 1/2"PC
2 1/2"FP
2 1/2"FP
2 1/2"FP
10"SV
4"HPS
8"LPS8-PRV-1
NC
BYPASS
1 1/4"R
1 1/2"R
1 1/4"R
2 1/2"SW
3"SW
3"CTPD
8"LPS
1"NPW
2 1/2"FP
2"R
3"CTPD
8"NG
4"MPR
4"MPR
2"FOS
2"FOR
1 1/2"HPR
6"SV
2"PC
SRV-9
MAIN LEVEL
100' - 0"
MP304
Ø
8"HPS
Ø
8"HPS
8-B-1
2 1/2"FWPD
2 1/2"FWPD
2 1/2"FWPD
CB.3B
MEZZANINE
113' - 5"
UPPER MEZZ
125' - 11"
ROOF
140' - 6"
A.7A.6A.4
8-GRV-1
4"PC
MP305
1 1/2"HPR
1 1/2"PC
4"SV
4"SV
3"FWPD3"FWPD
2 1/2"FWPD
4"HPS
8-UH-3
8-UH-1
8-EF-1
3/4"MPS 3/4"MPR
1"LPG
8-EF-9
x
2 1/2"SV
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANTS
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
MR PROJECT NO:
Hazardous Materials:
MABBETT & ASSOCIATES
Architect & Civil Engineering:
WBRC
Fire & Life Safety:
KOFFEL ASSOCIATES
Electronic Security:
GRW
Tunnel Structural & Civil Engineering:
PEC
Physical Security:
FORCE PROTECT
/1 /2
:5
:4
A M
MP304
MECHANICAL
SECTION VIEWS
REPLACE BOILERS AND
UPGRADE CONTROLS
WEST ROXBURY VA MEDICAL CENTER
WEST ROXBURY, MA
11/14/2025 JJM AHTM
BID DOCUMENTS
ISSUED FOR CONSTRUCTION
0506-0012
SCALE: 1/4" = 1'-0"1 STEAM HEADER SECTION VIEW
SCALE: 1/4" = 1'-0"3 SECTION @ 8-D/A-1 & 8-CS-1SCALE: 1/4" = 1'-0"2 SECTIONS @ 8-B-1
UPPER MEZZ
125' - 11"
ROOF
140' - 6"
MP306
8" HPS
10" HPS
7.6
24' - 1 1/4"
FOR STEAM TRAP
REFER TO DETAIL 5
ON DRAWING MP-503
(TYP.)
10" SV
8-PRV-3
8-PRV-4
REFER TO PRV STATION
DETAIL #6 ON
DRAWING MP-503
FOR DRIP POCKET
REFER TO DETAIL 5
ON DRAWING MP-503
(TYP.)
DRIP PAN ELBOW
REFER TO DETAIL #8
ON DRAWING MP503
SAFETY RELIEF VALVE
6"HPS
10"HPS
6"HPS
(100PSIG)
(65PSIG)
LOUNGE
LOCKERS
STORAGE
TLT/SHOWER
BEDROOM
1 1/2" HPR
VALVE W/
CHAINWHEEL
VALVE W/
CHAINWHEEL
16' - 6"
NEW 1" HPS (100PSI)
ROUTED TO EXISTING
PRV STATION IN EXISTING PUMP
ROOM THAT SERVES BLDG #5 & #17
4" PC
DOUBLE ISOLATION ASSEMBLY
REFER TO DETAIL #9 ON
DRAWING MP5058"x8"
CD-5
285 CFM
CD-1
55 CFM EG-6
225 CFM
12"x8"
CD-1
50 CFM
EG-4
100 CFM
6"x8"
6"Ø
8"x12"
6"Ø
10"x8"
1 1/2"HPR
8"x8"
CD-3
75 CFM
UPPER MEZZ
125' - 11"
7.6
8-PRV-2
SAFETY RELIEF VALVE
(SVR-11) SEE DETAIL
#8 ON MP503
2 1/2"SV
3"MPS
3"HPS
REFER TO PRV DETAIL #7
ON DRAWING MP503
1-1/2"MPS
FOR CONTINUATION
TO UNIT HEATERS
(100 PSI)
(30 PSI)
3"MPS
1 1/2"BY-PASS
8-GRV-2
8-UH-1
REFER TO DETAIL
#5 ON MP503
(TYP.)
9' - 0 1/4"
2 1/2"SV
AB
UPPER MEZZ
125' - 11"
A.7 A.6 A.4
10"SV
8"LPS
4"HPS
2 1/2"HPS
FOR STEAM TRAP
REFER TO DETAIL 5
ON DRAWING MP-503
(TYP.)
DRIP PAN ELBOW
REFER TO DETAIL #8
ON DRAWING MP503 SAFETY
RELIEF VALVE
2 1/2"FP
2 1/2"FP
1' - 1" 13' - 5"
8-PRV-1
/2
MAIN LEVEL
100' - 0"
UPPER MEZZ
125' - 11"
12"HPS
8"HPS 8-STS-1
8-B-3
3/4"LPG
2 1/2"FWPD
2 1/2"FWPD
2 1/2"FWPD
8-FHX-3
8"HPS
2 1/2"FWPD
3/4"SAN
3/4"V
2 1/2"FWPD
3"HPS
8-CV-1
CURB
SEE DETAIL 2 ON
DRAWING MP502
FOR DRIP POCKET
REFER TO DETAIL 5
ON DRAWING MP-503
(TYP.)
NC
MAIN LEVEL
100' - 0"
DC.7
8-LVR-2
1 1/2" PC
3" HPS
8-SSP-04
PROVIDE LINK SEAL &
SLEEVE. REFER TO
DETAIL 1 ON MP504
DIELECTRIC FLANGE
ISOLATION KIT (TYP.)
C3H8
REFER TO PLUMBING
DRAWING PP101.3A
PROVIDE SLEEVE.
COORDINATE PIPING W/
NEW RETAINING WALL
1 1/2" PC
3" HPS
OF 1 1/2"PC
(PRE-ENGINEERED PIPING 6.62" OD)
OF 3"HPS
(PRE-ENGINEERED PIPING 8.62" OD)
DIELECTRIC FLANGE
ISOLATION KIT (TYP.)
FOR DRIP POCKET
REFER TO DETAIL 5
ON DRAWING MP503
(TYP.)
ANCHORANCHOR
MAIN LEVEL
100' - 0"
41 32
MEZZANINE
113' - 5"
SUBSTATION-B
2"MPR
2"MPR
2"PC
2"PC
1"RL 1"RS
1"MPS
2"MPR
1"RL
1"RS
8-AHU-5
8-AHU-2
8-AHU-4
8-UH-8
1 1/2"MPR
1"MPS
x
1"MPR
3/4"MPS
1"RL
1"RS
8-FT-3
8-CRU-3
3/4"D
3/4"D3/4"D
3/4"D
3/4"D
2"MPR
4"VT
4 13 2
MEZZANINE
113' - 5"
8-LVR-5
8-EF-4
30"x30"
8-UH-6
1 1/2"MPR
1 1/2"MPS
8-GEN-BP-1
8-UH-5
8-DT-08
1 1/2"MPS
1 1/2"MPS
1"MPR
1"MPR
2"FOR
1 1/2"FOS
8-DT-01
8-ELPG
8-LVR-4
8-LVR-11
8 DIA. GENERATOR
PIPE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANTS
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
MR PROJECT NO:
Hazardous Materials:
MABBETT & ASSOCIATES
Architect & Civil Engineering:
WBRC
Fire & Life Safety:
KOFFEL ASSOCIATES
Electronic Security:
GRW
Tunnel Structural & Civil Engineering:
PEC
Physical Security:
FORCE PROTECT
/1 /2
:5
:5
A M
MP305
MECHANICAL
SECTION VIEWS
REPLACE BOILERS AND
UPGRADE CONTROLS
WEST ROXBURY VA MEDICAL CENTER
WEST ROXBURY, MA
11/14/2025 JJM AHTM
BID DOCUMENTS
ISSUED FOR CONSTRUCTION
0506-0012
SCALE: 1/4" = 1'-0"3 SECTION @ PRV 3&4 STATION
SCALE: 1/4" = 1'-0"2 SECTION @ PRV-2 STATION
SCALE: 1/4" = 1'-0"1 SECTION @ PRV-1 STATION
SCALE: 1/4" = 1'-0"4 SECTION @ STEAM TEST SILENCER
SCALE: 1/4" = 1'-0"5 SECTION @ TO BLDG 21 EXIT
SCALE: 1/4" = 1'-0"7 SECTION @ SUBSTATION ROOM
SCALE: 1/4" = 1'-0"6 SECTION @ GENERATOR ROOM
MAIN LEVEL
100' - 0"
X1 X313 12 11 10 9 810.5
UPPER MEZZ
125' - 11"
ROOF
140' - 6"
MP306
X2 X5 X6 8.7 8.4 7.61415
MP306
4"PC
10"HPS
10"HPS
4"PC
10"HPS
4"PC
LIQUID
PROPANE
TANKS &
CAGE
1"LPG
10"HPS
4"PC
1 1/2"HPR
1 1/2"HPR
1 1/2"HPR
1 1/2"HPR
10"HPS
4"PC
PIPE RISER SUPPORT
LOCATIONS
SEE DET 5 ON DWG
MP501(TYP 2 PLCS)
PIPE BRIDGE SUPPORT
SEE DRAWING MP501 DTEAIL 2
1 1/2"HPR
BASEMENT
95' - 1"
EXIST. MEZZ
108' - 6"
MEZZANINE
113' - 5"
UPPER MEZZ
125' - 11"
ROOF
140' - 6"
EXIST. CATWALK
118' - 3 3/4"
EXIST. UPPER
MEZZ
124' - 0 3/4"
EXIST. ROOF
131' - 1 3/4"
XE
E F
10"HPS
4"PC
REFER TO
DETAIL 5 ON
DRAWING MP503
4"PC
10"HPS
10"HPS
4"PC
LOW POINT
DRAIN STRAINER SHOWN
IN HORIZONTAL
POSITION
MP306
(E)3 1/2" CW
REFER TO
PLUMBING DRAWING
FOR CONTINUATION
1 1/2"HPR
1 1/2"HPR
PIPE RISER SUPPORTS
SEE DET 5 ON DWG
MP501 (TYP 2 PLCS)
CD
UPPER MEZZ
125' - 11"
ROOF
140' - 6"
MP305
C.7EF
5' - 10"
1' - 1 1/4"
10" HPS
10" HPS
4" PC
4" PC
1 1/2" HPR
MP306
4" PC
4" PC
TO DEAERATOR
TO 8-PRV-3 &4
TO 8-CS-1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANTS
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
MR PROJECT NO:
Hazardous Materials:
MABBETT & ASSOCIATES
Architect & Civil Engineering:
WBRC
Fire & Life Safety:
KOFFEL ASSOCIATES
Electronic Security:
GRW
Tunnel Structural & Civil Engineering:
PEC
Physical Security:
FORCE PROTECT
/1 /2
:5
:5
A M
MP306
MECHANICAL
SECTION VIEWS
REPLACE BOILERS AND
UPGRADE CONTROLS
WEST ROXBURY VA MEDICAL CENTER
WEST ROXBURY, MA
11/14/2025 JJM AHTM
BID DOCUMENTS
ISSUED FOR CONSTRUCTION
0506-0012
SCALE: 1/4" = 1'-0"2 SECTION @ PIPE BRIDGE
SCALE: 1/4" = 1'-0"1 SECTION @ WEST TOWER TO TUNNEL
SCALE: 1/4" = 1'-0"3 SECTION @ BLDG EXIT
MAIN LEVEL
100' - 0"
MEZZANINE
113' - 5"
TUNNEL LID
3' - 2"
OF 10"HPS
(PRE-ENGINEERED PIPING 15.51" OD)
OF 4"PC
(PRE-ENGINEERED PIPING 8.75" OD)
OF 1 1/2"HPR
(PRE-ENGINEERED PIPING 6.5" OD)
11' - 0"
OF FUTURE CHS
(PRE-ENGINEERED PIPING)
OF FUTURE CHR
(PRE-ENGINEERED PIPING)
1' - 3"
FOR PIPE SUPPORT REFER
TO MP501 DETAIL #2
8-EF-5
(E)3" LPR
(E)3" LPR
(E)4" LPR(E)4" PC
(E)3" LPR
(E)4" LPR
(E)8" HPS
6"FP
2"D
8"HPS
4"HPR
(E)8" HPS
8"HPS
4"HPR
(2)8"-150# SLIP ON
FLANGES W/
SPECTACAL BLIND
8"HPS DRIP LEG.
REFER TO DETAIL 5
ON DRAWING MP503.
10"HPS
4"PC
10"HPS
1 1/2"HPR
8-SSP-01C
REFER TO
DETAIL 5 ON
DRAWING MP503
REFER TO
DETAIL 5 ON
DRAWING MP503
STRAINER IN
HORIZONTAL POSITION
STRAINER IN
HORIZONTAL POSITION
MP307
10" 300# SINGLE
SLIP EXPANSION
JOINT W/ANCHOR
SEE DWG MP508
DETAIL 3
TP
S
TP
S
TP
S
TP
S
TP
S
SSP CONTROL PANEL
4" 150# WELD NECK
FLG (TYP)
4" 150# SINGLE
SLIP EXPANSION
JOINT W/ANCHOR.
SEE DWG MP508
DETAIL 3
10" 300#
WELD NECK
FLG (TYP)
8' - 0"
4' - 0"
PRIMARY PIPE ALIGNMENT GUIDE.
SEE DWG MP508 DETAIL 1
TP
S A
G A
TP
S
G
TP
S A
G
TP
S
TP
S
TP
S
TP
S
45' - 0"
TP
S A
G
12' - 0"
INTERMEDIATE PIPE
ALIGNMENT GUIDE.
SEE DWG MP508
DETAIL 1
PRIMARY PIPE ALIGNMENT GUIDE.
SEE DWG MP508 DETAIL 1
CUT BACK PRE-ENGINEERED
PIPING SYSTEM FAR ENOUGH TO
INSTALL WELD NECK FLANGES.
RE-INSTALL SYSTEM BACK TO
ORIGINAL INTEGRITY
CUT BACK PRE-ENGINEERED
PIPING SYSTEM FAR ENOUGH TO
INSTALL WELD NECK FLANGES.
RE-INSTALL SYSTEM BACK TO
ORIGINAL INTEGRITY
INTERMEDIATE PIPE ALIGNMENT GUIDE.
SEE DWG MP508 DETAIL 1
REFER TO DETAIL 9
ON MP505 FOR
DOUBLE ISOLATION
VALVE ASSEMBLY
(E)3"LPR(E)3"LPR
ABANDONED
GLYCOL
PIPING
(E)8" HPS
10"HPS
4"PC
(E)3/4" LPR
(E)1" LPR
(E)1" HPS
1 1/2"LPR
CAP
2"FM
MP307
3"FM
3"HPS
3"HPS1 1/2"LPR
(E)1 1/2" LPR
(E)1 1/2" LPR
(E)3" HPS
1 1/2"LPR
10"HPS
8-GV-1
2 1/2"VT
4"VT
10"HPS
1 1/2"HPR
2"LPR
4"PC
4"LPR
8"HPS
8-CRU-1
8-FT-1
8"HPS
4"LPR
REFER TO DETAIL
5 ON DRAWING
MP503
(E)6" FP
8" #300 BLIND FLG
BUILDING 1 BASEMENT
MER
(E) CONDUIT
FOR DRIP POCKET
REFER TO DETAIL 5
ON DRAWING MP-503
(TYP.)
4" #150 BLIND FLANGE
OF 8"HPS
(PIPING 17" OD)
(PIPING 13" OD)
OF 4"PC
1 1/2"HPR
2"LPR
8-CRU-1
8"HPS
1 1/2"HPR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANTS
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
MR PROJECT NO:
Hazardous Materials:
MABBETT & ASSOCIATES
Architect & Civil Engineering:
WBRC
Fire & Life Safety:
KOFFEL ASSOCIATES
Electronic Security:
GRW
Tunnel Structural & Civil Engineering:
PEC
Physical Security:
FORCE PROTECT
/1 /2
:5
:0
A M
MP307
MECHANICAL
SECTION VIEWS
REPLACE BOILERS AND
UPGRADE CONTROLS
WEST ROXBURY VA MEDICAL CENTER
WEST ROXBURY, MA
11/14/2025 JJM RD
BID DOCUMENTS
ISSUED FOR CONSTRUCTION
0506-0012
SCALE: 1/4" = 1'-0"1 SECTION @ NEW TUNNEL
SCALE: 1/4" = 1'-0"5 SECTION @ BLDG 1 STEAM MAIN CONNECTION
SCALE: 1/4" = 1'-0"4 SECTION @ STEAM TRAPS IN TUNNEL
SCALE: 1/4" = 1'-0"2 SECTION @ BLDG 10 STEAM PIPE CONNECTIONS
SCALE: 1/4" = 1'-0"3 SECTION @ NEW TUNNEL
SCALE: 1/2" = 1'-0"6 SECTION @ CRU-1 IN BLDG 1
SCALE: 1/2" = 1'-0"7 SECTION @ BLDG 1 - TEMPORARY CONNECTIONS
24"D EXHAUST STACK TYP
24"D RAIN HOOD TYP
(A P P R O X
FLOOR EL.
100'-0"
ROOF 41'-4 3/4"
(APPROX)
8" DIA GENERATOR STACK
8-CU-8
8-GRV-5
8-CU-6
8-CU-5
8-CU-48-CU-7
8-CU-1
3" SV
6"' SV
10" SV
10" SV
6" SV TYP
8-LVR-5 8-LVR-4
8-LVR-3
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANTS
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
MR PROJECT NO:
Hazardous Materials:
MABBETT & ASSOCIATES
Architect & Civil Engineering:
WBRC
Fire & Life Safety:
KOFFEL ASSOCIATES
Electronic Security:
GRW
Tunnel Structural & Civil Engineering:
PEC
Physical Security:
FORCE PROTECT
/1 /2
:5
:0
A M
MP308
MECHANICAL
NORTH ELEVATION - STACK HEIGHT
REPLACE BOILERS AND
UPGRADE CONTROLS
WEST ROXBURY VA MEDICAL CENTER
WEST ROXBURY, MA
11/14/2025 JJM RHD
BID DOCUMENTS
ISSUED FOR CONSTRUCTION
0506-0012
SCALE: 3/16" = 1'-0"1
BOILER STACK ELEVATION
File details come from the government source that posted it. Updated .