MECHANICAL
ABBREVIATIONS & SYMBOLS
M-001
LMJJM
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseMILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t o n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t th re e in c h o n e fo o t
523A4-20-208
/3
/2
:1
:2
P
M
REPLACE BOILERS AND
UPGRADE CONTROLS
11/14/2025
BID DOCUMENTS
ISSUED FOR CONSTRUCTION
Revisions: Date:
WEST ROXBURY VA MEDICAL CENTER
WEST ROXBURY, MA
M-R PROJECT NO: 0506-0012
ENGINEER OF RECORD
X1 X3
XB
X2 X5 X6
XC
XD
XE
(E)B-1 (E)B-2 (E)B-3 (E)B-4
(E)BOILER
(E)CT
(E)D/A
(E)CR-1
(E)MAIN STEAM HEADER
(E) WATER SOFTENER &
ALL APPURTENANCES.
(E) 16x24
SUPPLY DUCT
(D)8"NG
(E) WATER CHEMICAL
TREATMENT & ALL
APPURTENANCES.
(E)8" NG
(E)4" NG
(E)2" NG(E)2" NG (E)1 1/2" BD(E)3 1/2" SV(E)2" NG
(E)4" NG
(E)PROPANE TANKS
TO BE RELOCATED
DISCONNECT (E)8"NG PIPE
FROM VALVE. PREPARE VALVE
FOR NEW CONNECTION
DISCONNECT (E)1 1/2"LPG
PIPE FROM VALVE. PREPARE
VALVE FOR NEW
CONNECTION
(D)1 1/2"LPG
(D)MAXON
VALVE
(D)FLOW METER
(E)6" FWPD
(E)6" CW
(E)1 1/4" LPS
(E)2" LPS
(E)6"
(E)3" FWPD
(E)3" FWPD
(E)8" HPS
CONTROL ROOM
BOILER ROOM
WATER TREATMENT ROOM
PUMP ROOM
(E)MASTER BOILER
CONTROLLER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANTS
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
523A4-20-208
PLAN
NORTH
KEYPLAN
ACTUAL
NORTH
MR PROJECT NO:
Hazardous Materials:
MABBETT & ASSOCIATES
Architect & Civil Engineering:
WBRC
Fire & Life Safety:
KOFFEL ASSOCIATES
Electronic Security:
GRW
Tunnel Structural & Civil Engineering:
PEC
BLDG 1
TUNNEL
BLDG 1
TUNNEL
EXISTING
BOILER
PLANT
EXISTING
BOILER
PLANT
Physical Security:
FORCE PROTECT
/1 /2
:5
:4
A M
MD111.1
MECHANICAL
DEMOLITION PLAN
MAIN LEVEL - PHASE 1, AREA C
REPLACE BOILERS AND
UPGRADE CONTROLS
WEST ROXBURY VA MEDICAL CENTER
WEST ROXBURY, MA
11/14/2025 JJM AHTM
BID DOCUMENTS
ISSUED FOR CONSTRUCTION
0506-0012
SCALE: 1/4" = 1'-0"1
MECHANICAL DEMOLITION PLAN MAIN LEVEL - PHASE 1
GENERAL SHEET NOTES:
1. REFER TO DRAWING M-001 FOR MECHANICAL GENERAL NOTES, ABBREVIATIONS AND
SYMBOLS.
2. REFER TO DRAWINGS MP500 SERIES FOR MECHANICAL DETAILS.
3. REFER TO DRAWING MP600 SERIES FOR MECHANICAL FLOW DIAGRAMS.
4. REFER TO DRAWING M-700 SERIES FOR MECHANICAL SCHEDULES.
5. REFER TO OTHER DISCIPLINE DRAWINGS OF THIS PACKAGE FOR COORDINATION.
6. DO NOT SCALE THIS DRAWING FOR EXACT DIMENSIONS. VERIFY ALL DIMENSIONS,
CLEARANCES, AS-BUILT CONDITIONS, ETC. IN FIELD.
NO. DESCRIPTION DATE
X1 X3
X2 X5 X6
XC
XD
XE
(E)2" NG(E)2" NG
(E)B-2 (E)B-3 (E)B-4(E)B-1
(E)BOILER
(E)D/A(E)CT
(E)BLOWOFF
(E)CR-1
(E)3 1/2" HPS
(E)3 1/2" HPS
(E)16" HPS
(E)1 1/2" BD
(E )4
N G
(E )4
F W P D
(E )3
F W P D
(E )3
F W P D
(E )4
(E)2 1/2"
(E)6" FWPD
(E)5" FWPD
(E)4" SV
(E)WS-01
(E)BRINE
(E)AMINE
(E)CAUSTIC
(E)ANTI-SC
(E)4"
(E)4"
CONNECT (N)8"NG TO
(E)VALVE
8"NG
(T)8"NG
(E)2 1/2" LPS
(E)8" NG
(E)16" HPS
(N)8"NG RISE
(T)8"NG RISE
W/SOV&FLOW
METER
(E)4" NG(E)6" NG
(E)4" NG
(E)PROPANE TANKS
NEW LOCATION
INV. ELEV.
95.65'
(T)MAXON VALVE
CONNECT (N)1 1/2"LPG
TO (E)1 1/2"LPG
(E)1 1/2" LPG
(T)8"NG
(T)LPG
(T)LPG
(N)SLEEVE THRU
WALL
(N)SLEEVE THRU
WALL
(E)SLEEVE THRU WALL
CAULK & SEAL WALL
PENETRATION
WATERTIGHT
8"NG DROP
(T)1 1/2"LPG DROP
(T)1"LPG DROP
(T)LPG
(T)LPG
(T)1"LPG DROP
(T)1 1/2"LPG DROP
(T)LPG
(T)LPG
(E)PROPANE TANKS
NEW LOCATION
(T)1"LPG RISE
W/ TO FLOW
METER & SOV
(T)MAXON VALVE
(N)SLEEVE THRU
WALL
(N)SLEEVE THRU
WALL
(E)MASTER BOILER
CONTROLLER
CONTROL ROOM
BOILER ROOM
WATER TREATMENT ROOM
PUMP ROOM
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANTS
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
PLAN
NORTH
KEYPLAN
ACTUAL
NORTH
MR PROJECT NO:
Hazardous Materials:
MABBETT & ASSOCIATES
Architect & Civil Engineering:
WBRC
Fire & Life Safety:
KOFFEL ASSOCIATES
Electronic Security:
GRW
Tunnel Structural & Civil Engineering:
PEC
BLDG 1
TUNNEL
BLDG 1
TUNNEL
EXISTING
BOILER
PLANT
EXISTING
BOILER
PLANT
Physical Security:
FORCE PROTECT
/1 /2
:5
:1
A M
MP111.1
MECHANICAL
PIPING PLAN
MAIN LEVEL - PHASE 1, AREA C
REPLACE BOILERS AND
UPGRADE CONTROLS
WEST ROXBURY VA MEDICAL CENTER
WEST ROXBURY, MA
11/14/2025 JJM AHTM
BID DOCUMENTS
ISSUED FOR CONSTRUCTION
0506-0012
SCALE: 1/4" = 1'-0"1
PIPING PLAN - MAIN LEVEL - PHASE 1, AREA C
GENERAL SHEET NOTES:
1. REFER TO DRAWING M-001 FOR MECHANICAL GENERAL NOTES, ABBREVIATIONS AND
SYMBOLS.
2. REFER TO DRAWINGS MP500 SERIES FOR MECHANICAL DETAILS.
3. REFER TO DRAWING MP600 SERIES FOR MECHANICAL FLOW DIAGRAMS.
4. REFER TO DRAWING M-700 SERIES FOR MECHANICAL SCHEDULES.
5. REFER TO OTHER DISCIPLINE DRAWINGS OF THIS PACKAGE FOR COORDINATION.
6. DO NOT SCALE THIS DRAWING FOR EXACT DIMENSIONS. VERIFY ALL DIMENSIONS,
X6
XC
XD
(E)B-4
(E)8" NG
RELOCATED (E)MASTER
BOILER CONTROLLER
(T)LPG
X1 X3
XB
X2 X5 X6
XC
XD
XE
(E)2" NG(E)2" NG
(E)B-2 (E)B-3 (E)B-4(E)B-1
(E)BOILER
(E)D/A(E)CT
(E)BLOWOFF
(E)CR-1
(E)3 1/2" HPS
(E)3 1/2" HPS
(E)16" HPS
(E)1 1/2" BD
(E )4
N G
(E )4
F W P D
(E )3
F W P D
(E )3
F W P D
(E )4
(E)2 1/2"
(E)6" FWPD
(E)5" FWPD
(E)4" SV
(E)WS-01
(E)BRINE
(E)AMINE
(E)CAUSTIC
(E)ANTI-SC
(E)4"
(E)4"
8"NG
(T)8"NG
(E)2 1/2" LPS
(E)8" NG
(E)16" HPS
(N)8"NG RISE
(T)8"NG RISE
W/SOV&FLOW
METER
(E)4" NG(E)6" NG
(E)4" NG
(E)PROPANE TANKS
NEW LOCATION
INV. ELEV.
95.65'
(T)MAXON VALVE
(E)1 1/2" LPG
(T)8"NG
(T)LPG
(T)LPG
(N)SLEEVE THRU
WALL
(N)SLEEVE THRU
WALL
8"NG DROP
(T)1 1/2"LPG DROP
(T)1"LPG DROP
(T)LPG
(T)LPG
(T)1"LPG DROP
(T)1 1/2"LPG DROP
(T)LPG
(T)LPG
(E)PROPANE TANKS
NEW LOCATION
(T)1"LPG RISE
W/ TO FLOW
METER & SOV
(T)MAXON VALVE
(N)SLEEVE THRU
WALL
(N)SLEEVE THRU
WALL
DISCONNECT (E)MASTER
BOILER CONTROLLER &
PREPARE FOR RELOCATION
(E)PANEL LV-2
CONTROL ROOM
BOILER ROOM
WATER TREATMENT ROOM
PUMP ROOM
(E)UPS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANTS
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
PLAN
NORTH
KEYPLAN
ACTUAL
NORTH
MR PROJECT NO:
Hazardous Materials:
MABBETT & ASSOCIATES
Architect & Civil Engineering:
WBRC
Fire & Life Safety:
KOFFEL ASSOCIATES
Electronic Security:
GRW
Tunnel Structural & Civil Engineering:
PEC
BLDG 1
TUNNEL
EXISTING
BOILER
PLANT
Physical Security:
FORCE PROTECT
/1 /2
:5
:5
A M
MD111.2
MECHANICAL
DEMOLITION PLAN
MAIN LEVEL - PHASE 2, AREA C
REPLACE BOILERS AND
UPGRADE CONTROLS
WEST ROXBURY VA MEDICAL CENTER
WEST ROXBURY, MA
11/14/2025 LM AHTM
BID DOCUMENTS
ISSUED FOR CONSTRUCTION
0506-0012
SCALE: 1/4" = 1'-0"2
PIPING PLAN - MAIN LEVEL - PHASE 2
SCALE: 1/4" = 1'-0"1
MECHANICAL DEMOLITION PLAN MAIN LEVEL - PHASE 2
GENERAL SHEET NOTES:
1. REFER TO DRAWING M-001 FOR MECHANICAL GENERAL NOTES, ABBREVIATIONS AND
SYMBOLS.
2. REFER TO DRAWINGS MP500 SERIES FOR MECHANICAL DETAILS.
3. REFER TO DRAWING MP600 SERIES FOR MECHANICAL FLOW DIAGRAMS.
4. REFER TO DRAWING M-700 SERIES FOR MECHANICAL SCHEDULES.
5. REFER TO OTHER DISCIPLINE DRAWINGS OF THIS PACKAGE FOR COORDINATION.
6. DO NOT SCALE THIS DRAWING FOR EXACT DIMENSIONS. VERIFY ALL DIMENSIONS,
CLEARANCES, AS-BUILT CONDITIONS, ETC. IN FIELD.
7. REFER TO SPECIFICATION SECTION 010000 GENERAL REQUIREMENTS FOR THE
RELOCATION WORK FOR THE EXISTING BOILER CONTROL ROOM.
(E)14"
(E)3" LPR
(E)8" HPS
(E)3" HPS
(E)3" HPS
ABANDONED EXISTING PIPING TO BE REMOVED
IN ITS ENTIRETY AFTER NEW STEAM SYSTEM IS
COMPLETE & OPERATIONAL
(E)DIRT LEG & TRAP
(E)DIRT LEG
& TRAP
(E)PIPING EXTENDS
TO BLDG 7
(E)PIPING EXTENDS
TO BLDG 1
8"HTPS RISE, W/ DRIP LEG.
REFER TO DETAIL 5 ON
DRAWING MP503. REFER TO
DRAWING MP603 FOR
ADDITIONAL INFORMATION.
NEW TUNNEL
T
EXISTING TUNNEL
ExT
BUILDING 1 BASEMENT
MER
F O
R C
O N
T
IN
U A
T
IO
N
S E
E D
R A
W
IN
G M
S
1.
(E)3" LPR (E)3" LPR
(E)3" LPR
REPLACE (E)TRENCH &
CONNECT TO NEW TUNNEL
MP307
10"HPS
TP
S
TP
S
TP
S
TP
S
TP
S
TP
S
TP
S
TP
S
TP
S
(E)8"
(E)8"
(E)3 1/2"
8-EF-5 ABOVE
8-FT-1
ROUTE 4" TEMPORARY CONNECTION
FOR CONDENSATE UP THRU FLOOR.
SEE DWG MP306 FOR CONTINUATION
ROUTE 8" TEMPORARY CONNECTION
FOR STEAM UP THRU FLOOR. SEE DWG
MP306 FOR CONTINUATION
REFER TO DRAWING MP603
FOR ADDITIONAL INFORMATION
1 1/2"HPR
10"HPS
4"PC
10"HPS
SLEEVE & LINK-SEAL
(TYP.)
8-CRU-1
4"VT
MP307
MP307
4"PC
1 1/2"LPR
10"HPS
1 1/2"LPR
8"HPS
3/64" / 1'-0"
1/8" / 1'-0"1/8" / 1'-0"
3/64" / 1'-0"
MP307
4"PC
4"HPR
(E)8" HPS
MP307
ROUTE 4" VENT
CONNECTION
UP THRU FLOOR.
ROUTE 2" VENT
CONNECTION
UP THRU FLOOR.
4"HPR
8"HPS
8"HTPS DROP
W/DRIP POCKET
4"LPR RISE
3"LPR RISE 1 1/2"LPR
DROP
4"LPR
2 1/2"LPR
1 1/2"HPR
1 1/2"HPR
4"PC RISE
10"HPS
1 1/2"HPR
4"PC
2"LPR
8"HPS
8"HTPS RISE W/ DRIP LEG.
REFER TO DETAIL 5 ON
DRAWING MP503. REFER TO
DRAWING MP603 FOR
ADDITIONAL INFORMATION.
1 1/2"HPR
8"HTPS RISE, W/ DRIP LEG.
REFER TO DETAIL 5 ON
DRAWING MP503.
1 1/2"HPR
(E)3 1/2"
(E)8" HPS
(E)3" LPR
(E)4" LPR
(E)4" PC
(E)4" LPR
(E)8" HPS
PIPE ALIGNMENT
GUIDE
REFER TO SECTION 4 ON
DRAWING MP307
PIPE ALIGNMENT
GUIDE
REFER TO SECTION 4
ON DRAWING MP307
TP
S A
G
TP
S
G
TP
S A
G
PIPE ALIGNMENT GUIDE
REFER TO SECTION 4
ON DRAWING MP307
SLIP JOINT
X1
X3
D X2
C.7
E
F
(E)8" HPS
(E)CR-1
(E)CR-2
(E)BFP-6
(E)BFP-7
(E)COND P
RECEIVER TANK
STORAGE TANK
(E)8" HPS
REFER TO DRAWING
MP603 FOR ADDITIONAL DETAILS
ABANDONED EXISTING GLYCOL
PIPING TO BE REMOVED IN ITS
ENTIRETY DURING PHASE 4
NEW TUNNEL
T
EXISTING TUNNEL
ExT
F O
R C
O N
T
IN
U A
T
E D
R A
W
IN
G M
S
1.
(E)3" LPR
BUILDING 8
PUMP ROOM - LOWER LEVEL
PR
4" PC UP TO BRIDGE
1 1/2" HPS UP TO BRIDGE
10" HTPS UP TO BRIDGE
W/ DRIP LEG. REFER TO
DETAIL 5 ON DRAWING
MP503.
MP307
MP306
TP
S
1TP
S
TP
S
TP
S
TP
S
TP
S
TP
S
TP
S
TP
S
TP
S
BUILDING 10
GR
(E)1" HPS
(E)3/4" LPR
8-GV-1 ABOVE
MP307
10"HPS
(E)1" HPS
(E)3/4" LPR
SLEEVE & LINK-SEAL
MP307
PIPING TO BUILDING 10
1 2
REFER TO DETAIL 9 ON
MP505 FOR DOUBLE
ISOLATION VALVE ASSEMBLY
MP306
87°
3/64" / 1'-0" 3/64" / 1'-0"
1/8" / 1'-0"
10"HPS
10"HPS
4"PC
1"HPS
1 1/2"LPR 1"HPS
1 1/2"LPR
PIPE ALIGNMENT GUIDE
REFER TO SECTION 4 ON
DRAWING MP307
TP
S A
G
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANTS
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
KEYPLAN
PLAN
NORTH
ACTUAL
NORTH
MR PROJECT NO:
Hazardous Materials:
MABBETT & ASSOCIATES
Architect & Civil Engineering:
WBRC
Fire & Life Safety:
KOFFEL ASSOCIATES
Electronic Security:
GRW
Tunnel Structural & Civil Engineering:
PEC
TUNNEL
BLDG 1
Physical Security:
FORCE PROTECT
/1 /2
:5
:3
A M
MS101.3
MECHANICAL
SITE PIPING PLAN -TUNNEL
PHASE 3
REPLACE BOILERS AND
UPGRADE CONTROLS
WEST ROXBURY VA MEDICAL CENTER
WEST ROXBURY, MA
11/14/2025 JJM AHTM
BID DOCUMENTS
ISSUED FOR CONSTRUCTION
0506-0012
SCALE: 1/4" = 1'-0"1 PIPING - NEW TUNNEL @ BLDG 1
SCALE: 1/4" = 1'-0"2 PIPING - NEW TUNNEL @ BLDG 8
GENERAL SHEET NOTES:
1. REFER TO DRAWING M-001 FOR MECHANICAL GENERAL NOTES, ABBREVIATIONS AND
SYMBOLS.
2. REFER TO DRAWINGS MP500 SERIES FOR MECHANICAL DETAILS.
3. REFER TO DRAWINGS MP600 SERIES FOR MECHANICAL FLOW DIAGRAMS.
4. REFER TO DRAWINGS M-700 SERIES FOR MECHANICAL SCHEDULES.
5. REFER TO OTHER DISCIPLINE DRAWINGS OF THIS PACKAGE FOR COORDINATION.
6. DO NOT SCALE THIS DRAWING FOR EXACT DIMENSIONS. VERIFY ALL DIMENSIONS,
CLEARANCES, AS-BUILT CONDITIONS, ETC. IN FIELD.
SHEET KEY NOTES:
1. DISCONNECT EXISTING BUILDING 10 STEAM SUPPLY & CONDENSTE RETURNS FROM
EXISTING HEADERS. CAP PIPES AT MAIN, SEE MS101.4 FOR FUTURE DEMOLITION OF
EXSTING STEAM AND CONDENSTATE MAINS.
2. CONNECT 1"HPS STEAM TO EXISTING, CONNECT 3/4" LPR TO EXISTING, AND
CONNECT 1" LPR TO EXISTING AND EXTEND.
3. DISCONNECT EXISTING BUILDING 7 STEAM SUPPLY & CONDENSTE RETURNS FROM
EXISTING HEADERS. CAP PIPES AT MAIN, SEE MS101.4 FOR FUTURE DEMOLITION OF
EXSTING STEAM AND CONDENSTATE MAINS.
4. CONNECT 3"HPS STEAM TO EXISTING, CONNECT 1 1/2" LPR TO EXISTING, AND
CONNECT 1 1/2" LPR TO EXISTING AND EXTEND.
5. INSTALL NEW 4" VALVE TO EXISTING PIPING AND EXTEND
6. INSTALL NEW 8" VALVE TO EXISTING 8"HIGH PRESSURE STEAM AND EXTEND
7. INSTALL NEW 3" VALVE TO EXISTING AND EXTEND.
BUILDING 8
(EXISTING BOILER PLANT)
C3H8
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseMILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
523A4-20-208
/3
/2
:1
:2
P
M
REPLACE BOILERS AND
UPGRADE CONTROLS
11/14/2025
BID DOCUMENTS
ISSUED FOR CONSTRUCTION
Revisions: Date:
WEST ROXBURY VA MEDICAL CENTER
WEST ROXBURY, MA
M-R PROJECT NO: 0506-0012
ENGINEER OF RECORD PART PLANS - PIPING FEEDING BLDG 21
DEMOLITION AND NEW
PHASE 3
MS102.3
GDSJJM
13 12 11 10 9 8
D
10.5 8.7 8.4 7.6
C.7
E
F
FOS & FOR
TO EXSITING
BOILER PLANT
MP306
MP306
REMOVE 1-1/2" FOS & FOR
PIPING BELOW CONCRETE
DECK
SAW CUT CONCRETE DECK AS
REQUIRED TO REMOVE EXISTING
FOS & FOR PIPING. PATCH DECK
AFTER NEW WORK IS COMPLETE.
MATCH EXISTING. REFER TO
STRUCTURAL DRAWINGS.
EXISTING COAL BUNKERS
(FUEL OIL STORAGE TANK LOCATIONS)
TO REMAIN
TOILET ROOM
(E)
SHOWER ROOM
(E)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANTS
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
PLAN
NORTH
KEYPLAN
ACTUAL
NORTHAREA E
MR PROJECT NO:
Hazardous Materials:
MABBETT & ASSOCIATES
Architect & Civil Engineering:
WBRC
Fire & Life Safety:
KOFFEL ASSOCIATES
Electronic Security:
GRW
Tunnel Structural & Civil Engineering:
PEC
Physical Security:
FORCE PROTECT
EXISTING
BOILER
PLANT
NEW
EMERGENCY
GENERATOR
BLDG.
NEW BOILER
PLANT
TUNNEL
BLDG 1
/1 /2
:5
:5
A M
MD111.3E
MECHANICAL
DEMOLITION PLAN
MAIN LEVEL - PHASE 3, AREA E
REPLACE BOILERS AND
UPGRADE CONTROLS
WEST ROXBURY VA MEDICAL CENTER
WEST ROXBURY, MA
11/14/2025 LM AHTM
BID DOCUMENTS
ISSUED FOR CONSTRUCTION
0506-0012
SCALE: 1/4" = 1'-0"1 MECHANICAL DEMOLITION PLAN MAIN LEVEL - PHASE 3, AREA E
GENERAL SHEET NOTES:
1. REFER TO DRAWING M-001 FOR MECHANICAL GENERAL NOTES, ABBREVIATIONS AND
SYMBOLS.
2. REFER TO DRAWINGS MP500 SERIES FOR MECHANICAL DETAILS.
3. REFER TO DRAWING MP600 SERIES FOR MECHANICAL FLOW DIAGRAMS.
4. REFER TO DRAWING M-700 SERIES FOR MECHANICAL SCHEDULES.
5. REFER TO OTHER DISCIPLINE DRAWINGS OF THIS PACKAGE FOR COORDINATION.
6. DO NOT SCALE THIS DRAWING FOR EXACT DIMENSIONS. VERIFY ALL DIMENSIONS,
CLEARANCES, AS-BUILT CONDITIONS, ETC. IN FIELD.
1 SAW CUT EXISTING COAL STORAGE ROOF AS REQUIRED TO ALLOW FOR THE REMOVAL OF THE
EXISTING 1-1/2" FOS & FOR PIPING TO THE EXISTING STORAGE TANKS AND THE
INSTALLATION OF THE NEW 3" FOS & FOR. SEE DRAWING MP111.3E FOR NEW WORK. PIPING
SHALL BE DEMOLISHED AND INSTALLED FOR ONE STORAGE TANK AT A TIME TO ALLOW FOR
ONE STORAGE TANK TO REMAIN OPERATIONAL.
2 REMOVE EXISTING 1-1/2" FOS & FOR VERTICAL RISER PIPING TO ALLOW 2" FOS & FOR
BRANCH PIPING CONNECTIONS. RECONNECT 1-1/2" FOS & FOR TO THE NEW 2" RISER TO
KEEP EXISTING BOILERS IN SERVICE. REFER TO DRAWING MP111.3E.
3 EXISTING FUEL OIL PUMPS, ASSOCIATED PIPING, CONTROLS, ETC. TO REMAIN UNTIL THE
COMPLETION OF PHASE 3.
SHEET KEYNOTES:#
9' - 6"
F O
R C
O N
T
IN
U A
T
E D
R A
W
IN
G M
Q
.3 B
F O
R C
O N
T
IN
U A
T
E D
R A
W
IN
G M
Q
.3 B
8-CTP-2
8-CTP-1
A
9 8 7 6 5 4
C
D
B.3
B
8-FWP-4
8-FWP-3
8-FWP-2
CONTROL ROOM
STAIR
BOILER ROOM
8-FWP-1
8.7 8.4 7.6
A.7
A.6
A.4
C.7
E
F
9' - 6" 9' - 6"
SURGE TANK
HOUSEKEEPING PAD
(SEE STRUCTURAL DWGS)
DEARATOR
HOUSEKEEPING PAD
(SEE STRUCTURAL DWGS)
BOILER RAILS
(SEE STRUCTURAL DWGS)
BOILER RAILS
(SEE STRUCTURAL DWGS)
BOILER RAILS
(SEE STRUCTURAL DWGS)
BOILER RAILS
(SEE STRUCTURAL DWGS)
CHEMICAL TREATMENT SYSTEM
HOUSEKEEPING PAD
(SEE STRUCTURAL DWGS)
STEAM PIPE PIT
(SEE STRUCTURAL DWGS)
SAFETY SHOWER
FLOOR SINK
(TYP.)
SAFETY SHOWER
FOOTPRINT
OF 8-B-1
FUEL OIL PUMP SKID
HOUSEKEEPING PAD
(SEE STRUCTURAL DWGS)
FOOTPRINT
OF 8-B-2
FOOTPRINT
OF 8-B-3
FOOTPRINT
OF 8-B-4
PIPE TRENCH
(TYP.)
(SEE STRUCTURAL DWGS)
8-B-1
CONTROL
PANEL
8-B-2
CONTROL
PANEL
8-B-3
CONTROL
PANEL
8-B-4
CONTROL
PANEL
OVERHEAD DOOR
(SEE STRUCTURAL &
ARCHITECTURAL DWGS.)
OVERHEAD DOOR
(SEE STRUCTURAL &
ARCHITECTURAL DWGS.)
OVERHEAD DOOR
(SEE STRUCTURAL &
ARCHITECTURAL DWGS.)
OVERHEAD DOOR
(SEE STRUCTURAL &
ARCHITECTURAL DWGS.)
FIRE WATER ENTRANCE
(SEE FIRE PROTECTION &
PLUMBING DWGS.)
BOILER MASTER
CONTROL PANEL
HAZARDOUS GAS
DETECTION SYSTEM
CONTROLLER
8-BDS-1
18' - 0" 18' - 0" 18' - 0"
3' - 0"
1' - 6"
COMPRESSED AIR HOSE REEL
REFER TO PLUMBING DRAWINGS
FOR ADDITIONAL INFORMATIONS
(TYP.)
REFER TO THE
PLUMBING DRAWINGS
FOR ADDITIONAL
INFORMATION
SINK
(SEE PLUMBING DWGS)
BOTTLE FILLER
(SEE PLUMBING DWGS)
AIR COMPRESSORS
(SEE PLUMBING DWGS)
14' - 7"
RETAINING WALL
(SEE CIVIL DRAWINGS)
BOILER TUBE PULL
REQUIRED CLEARANCE
BOILER TUBE PULL
REQUIRED CLEARANCE
BOILER TUBE PULL
REQUIRED CLEARANCE
BOILER TUBE PULL
REQUIRED CLEARANCE
WATER SOFTNER &
BRINE TANK
(SEE PLUMBING
DWGS)
8-UH-9
WATER ENTRANCE
(SEE PLUMBING DWGS)
8-BDS-1
8-LVR-1 8-LVR-2
CO
C3H8
CO COCO
C3H8
LIQUID
PROPANE
TANKS &
CAGE
CO
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANTS
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
PLAN
NORTH
KEYPLAN
ACTUAL
NORTH
NEW
EMERGENCY
GENERATOR
BLDG.
MR PROJECT NO:
Hazardous Materials:
MABBETT & ASSOCIATES
Architect & Civil Engineering:
WBRC
Fire & Life Safety:
KOFFEL ASSOCIATES
Electronic Security:
GRW
Tunnel Structural & Civil Engineering:
PEC
EXISTING
BOILER
PLANT
NEW BOILER
PLANT
TUNNEL
BLDG 1
Physical Security:
FORCE PROTECT
/1 /2
:3
:1
P M
MQ111.3A
MECHANICAL
EQUIPMENT PLAN
MAIN LEVEL - PHASE 3, AREA A
REPLACE BOILERS AND
UPGRADE CONTROLS
WEST ROXBURY VA MEDICAL CENTER
WEST ROXBURY, MA
11/14/2025 JJM AHTM
BID DOCUMENTS
ISSUED FOR CONSTRUCTION
0506-0012
SCALE: 1/4" = 1'-0"1
EQUIPMENT PLAN MAIN LEVEL - PHASE 3, AREA A
GENERAL SHEET NOTES:
1. REFER TO DRAWING M-001 FOR MECHANICAL GENERAL NOTES, ABBREVIATIONS AND
SYMBOLS.
2. REFER TO DRAWINGS MP500 SERIES FOR MECHANICAL DETAILS.
3. REFER TO DRAWING MP600 SERIES FOR MECHANICAL FLOW DIAGRAMS.
4. REFER TO DRAWING M-700 SERIES FOR MECHANICAL SCHEDULES.
5. REFER TO OTHER DISCIPLINE DRAWINGS OF THIS PACKAGE FOR COORDINATION.
6. DO NOT SCALE THIS DRAWING FOR EXACT DIMENSIONS. VERIFY ALL DIMENSIONS,
CLEARANCES, AS-BUILT CONDITIONS, ETC. IN FIELD.
HAZARDOUS GAS SENSOR SYMBOL LEGEND
CARBON MONOXIDE SENSOR: MOUNT AT BREATHING LEVEL NEAR FRONT OF EACH
BOILER AND WHERE THERE IS EXHAUST VENTILATION.
COMBUSTABLE GAS SENSOR (NATURAL GAS): MOUNT AT CEILING OF THE BOILER
ROOM ABOVE EACH BOILER.
COMBUSTABLE GAS SENSOR (PROPAINE): MOUNT AT LOW POINTS OF THE BOILER
ROOM.
CH3
C3H8
CO
F O
R C
O N
T
IN
U A
T
E D
R A
W
IN
G M
Q
.3 A
A
4 1
C
D
B.3
B
3 2
8-LVR-3 8-LVR-4 8-LVR-5
SUBSTATION ROOM
GENERATOR ROOM
STAIR
8-EF-4
A.7
A.6
A.4
C.7
GENERATOR PAD
(FUTURE)
GENERATOR PAD
(FUTURE)
GENERATOR PAD
ATS PAD
DAYTANK-BP PAD
SUBSTATION PAD
8-UH-5 8-UH-6
8-UH-88-UH-7
DAYTANK-CP PAD FOR
FUTURE DAYTANK
(2 PLCS)
8-UH-10
8-FT-3
8-CRU-3
8-GEN-BP-1
CO
RETAINING WALL
(SEE CIVIL DRAWINGS)
8-LVR-11
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANTS
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
PLAN
NORTH
KEYPLAN
ACTUAL
NORTH
MR PROJECT NO:
Hazardous Materials:
MABBETT & ASSOCIATES
Architect & Civil Engineering:
WBRC
Fire & Life Safety:
KOFFEL ASSOCIATES
Electronic Security:
GRW
Tunnel Structural & Civil Engineering:
PEC
EXISTING
BOILER
PLANT
NEW
EMERGENCY
GENERATOR
BLDG.
NEW BOILER
PLANT
Physical Security:
FORCE PROTECT
TUNNEL
BLDG 1
/1 /2
:5
:1
A M
MQ111.3B
MECHANICAL
EQUIPMENT PLAN
MAIN LEVEL - PHASE 3, AREA B
REPLACE BOILERS AND
UPGRADE CONTROLS
WEST ROXBURY VA MEDICAL CENTER
WEST ROXBURY, MA
11/14/2025 JJM AHTM
BID DOCUMENTS
ISSUED FOR CONSTRUCTION
0506-0012
SCALE: 1/4" = 1'-0"1
EQUIPMENT PLAN MAIN LEVEL - PHASE 3, AREA B
GENERAL SHEET NOTES:
1. REFER TO DRAWING M-001 FOR MECHANICAL GENERAL NOTES, ABBREVIATIONS AND
SYMBOLS.
2. REFER TO DRAWINGS MP500 SERIES FOR MECHANICAL DETAILS.
3. REFER TO DRAWING MP600 SERIES FOR MECHANICAL FLOW DIAGRAMS.
4. REFER TO DRAWING M-700 SERIES FOR MECHANICAL SCHEDULES.
5. REFER TO OTHER DISCIPLINE DRAWINGS OF THIS PACKAGE FOR COORDINATION.
6. DO NOT SCALE THIS DRAWING FOR EXACT DIMENSIONS. VERIFY ALL DIMENSIONS,
CLEARANCES, AS-BUILT CONDITIONS, ETC. IN FIELD.
HAZARDOUS GAS SENSOR SYMBOL LEGEND
CARBON MONOXIDE SENSOR: MOUNT AT BREATHING LEVEL NEAR FRONT OF EACH
BOILER AND WHERE THERE IS EXHAUST VENTILATION.
COMBUSTABLE GAS SENSOR (NATURAL GAS): MOUNT AT CEILING OF THE BOILER
ROOM ABOVE EACH BOILER.
COMBUSTABLE GAS SENSOR (PROPAINE): MOUNT AT LOW POINTS OF THE BOILER
ROOM.
CH3
C3H8
A
9 8 7 6 5 4
C
D
B.3
B
8-FHX-1
8-FHX-2
8-FHX-3
8-FHX-4
8-CS-1
8-DA-1
F O
R C
O N
T
IN
U A
T
E D
R A
W
IN
G M
Q
.3 B
/2
/4
/4
18' - 7"
3' - 7"
4' - 2 1/4" 6' - 0 1/4"
7' - 2 1/4"
STORAGE
STAIR
TLT/SHOWER
SHOWER
LOCKERS
LOUNGE
TLT
BEDROOM
I.T.
CORRIDOR
8.7 8.4 7.6
A.7
A.6
A.4
C.7
E
F
8-B-1 8-B-2 8-B-3
JAN.
ELEC
8-B-4
18' - 0"18' - 0" 18' - 0" 18' - 0" 14' - 7"7' - 2"
CATWALK
CATWALK
CATWALK
8-EH-1
8-UH-48-UH-3
8-ACU-2
8-ACU-1
BOILER BELOW
(TYP)
CO
CO
14'-0" OVERHEAD DOORS (TYP)
5-VAV-12
5-VAV-11
5-VAV-10
5-VAV-09
5-VAV-08
5-VAV-07
CH3 CH3 CH3 CH3
CO
CO
CO
CO
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANTS
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
PLAN
NORTH
KEYPLAN
ACTUAL
NORTH
NEW
EMERGENCY
GENERATOR
BLDG.
MR PROJECT NO:
Hazardous Materials:
MABBETT & ASSOCIATES
Architect & Civil Engineering:
WBRC
Fire & Life Safety:
KOFFEL ASSOCIATES
Electronic Security:
GRW
Tunnel Structural & Civil Engineering:
PEC
EXISTING
BOILER
PLANT
NEW BOILER
PLANT
TUNNEL
BLDG 1
Physical Security:
FORCE PROTECT
/1 /2
:5
:1
A M
MQ121.3A
MECHANICAL
EQUIPMENT PLAN
MEZZANINE LEVEL - PHASE 3, AREA A
REPLACE BOILERS AND
UPGRADE CONTROLS
WEST ROXBURY VA MEDICAL CENTER
WEST ROXBURY, MA
11/14/2025 JJM AHTM
BID DOCUMENTS
ISSUED FOR CONSTRUCTION
0506-0012
GENERAL SHEET NOTES:
1. REFER TO DRAWING M-001 FOR MECHANICAL GENERAL NOTES, ABBREVIATIONS AND
SYMBOLS.
2. REFER TO DRAWINGS MP500 SERIES FOR MECHANICAL DETAILS.
3. REFER TO DRAWING MP600 SERIES FOR MECHANICAL FLOW DIAGRAMS.
4. REFER TO DRAWING M-700 SERIES FOR MECHANICAL SCHEDULES.
5. REFER TO OTHER DISCIPLINE DRAWINGS OF THIS PACKAGE FOR COORDINATION.
6. DO NOT SCALE THIS DRAWING FOR EXACT DIMENSIONS. VERIFY ALL DIMENSIONS,
CLEARANCES, AS-BUILT CONDITIONS, ETC. IN FIELD.
SCALE: 1/4" = 1'-0"1
EQUIPMENT PLAN - MEZZANINE LEVEL - PHASE 3, AREA A
HAZARDOUS GAS SENSOR SYMBOL LEGEND
CARBON MONOXIDE SENSOR: MOUNT AT BREATHING LEVEL NEAR FRONT OF EACH
BOILER AND WHERE THERE IS EXHAUST VENTILATION.
COMBUSTABLE GAS SENSOR (NATURAL GAS): MOUNT AT CEILING OF THE BOILER
ROOM ABOVE EACH BOILER.
COMBUSTABLE GAS SENSOR (PROPAINE): MOUNT AT LOW POINTS OF THE BOILER
ROOM.
CH3
C3H8
4 1
C
D
B.3
B
3 2
F O
R C
O N
T
IN
U A
T
E D
R A
W
IN
G M
Q
.3 A
F O
R C
O N
T
IN
U A
T
E D
R A
W
IN
G M
Q
.3 A
SECURITY
GENERATOR ROOM
MEZZANINE
STORAGE
CORRIDOR
STAIR
STORAGE
A.7
A.6
A.4
C.7
8-AHU-5
8-LVR-10
5-VAV-05
5-VAV-04
5-VAV-06
5-VAV-02
5-VAV-03
5-VAV-01
8-CSG-1
OFFICE
MECH
CO
BMS PANEL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANTS
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
PLAN
NORTH
KEYPLAN
ACTUAL
NORTH
MR PROJECT NO:
Hazardous Materials:
MABBETT & ASSOCIATES
Architect & Civil Engineering:
WBRC
Fire & Life Safety:
KOFFEL ASSOCIATES
Electronic Security:
GRW
Tunnel Structural & Civil Engineering:
PEC
EXISTING
BOILER
PLANT
NEW
EMERGENCY
GENERATOR
BLDG.
NEW BOILER
PLANT
Physical Security:
FORCE PROTECT
TUNNEL
BLDG 1
/1 /2
:5
:1
A M
MQ121.3B
MECHANICAL
EQUIPMENT PLAN
MEZZANINE - PHASE 3, AREA B
REPLACE BOILERS AND
UPGRADE CONTROLS
WEST ROXBURY VA MEDICAL CENTER
WEST ROXBURY, MA
11/14/2025 JJM AHTM
BID DOCUMENTS
ISSUED FOR CONSTRUCTION
0506-0012
GENERAL SHEET NOTES:
1. REFER TO DRAWING M-001 FOR MECHANICAL GENERAL NOTES, ABBREVIATIONS AND
SYMBOLS.
2. REFER TO DRAWINGS MP500 SERIES FOR MECHANICAL DETAILS.
3. REFER TO DRAWING MP600 SERIES FOR MECHANICAL FLOW DIAGRAMS.
4. REFER TO DRAWING M-700 SERIES FOR MECHANICAL SCHEDULES.
5. PROVIDE ISOLATION VALVES FOR EACH WATER FEED WHETHER SHOWN OR NOT.
6. REFER TO OTHER DISCIPLINE DRAWINGS OF THIS PACKAGE FOR COORDINATION.
7. DO NOT SCALE THIS DRAWING FOR EXACT DIMENSIONS. VERIFY ALL DIMENSIONS,
CLEARANCES, AS-BUILT CONDITIONS, ETC. IN FIELD.
SCALE: 1/4" = 1'-0"1
EQUIPMENT PLAN - MEZZANINE LEVEL - PHASE 3, AREA B
C
D
B.3
B
8-EF-38-EF-28-EF-1
F O
R C
O N
T
IN
U A
T
E D
R A
W
IN
G M
Q
.3 B
F O
R C
O N
T
IN
U A
T
E D
R A
W
IN
G M
Q
.3 B
8-GRV-1 8-GRV-2 8-GRV-3 8-GRV-4
8.7 8.4 7.6
A.7
A.6
A.4
C.7
ROOF DRAIN
REFER TO PLBG DRAWINGS (TYP.)
8-CU-18-CU-2
8-EF-9
24" BOILER STACK (TYP)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANTS
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
PLAN
NORTH
KEYPLAN
ACTUAL
NORTH
NEW
EMERGENCY
GENERATOR
BLDG.
MR PROJECT NO:
Hazardous Materials:
MABBETT & ASSOCIATES
Architect & Civil Engineering:
WBRC
Fire & Life Safety:
KOFFEL ASSOCIATES
Electronic Security:
GRW
Tunnel Structural & Civil Engineering:
PEC
EXISTING
BOILER
PLANT
NEW BOILER
PLANT
TUNNEL
BLDG 1
Physical Security:
FORCE PROTECT
/1 /2
:3
:0
P M
MQ141.3A
MECHANICAL
EQUIPMENT PLAN
ROOF - PHASE 3, AREA A
REPLACE BOILERS AND
UPGRADE CONTROLS
WEST ROXBURY VA MEDICAL CENTER
WEST ROXBURY, MA
11/14/2025 JJM AHTM
BID DOCUMENTS
ISSUED FOR CONSTRUCTION
0506-0012
GENERAL SHEET NOTES:
1. REFER TO DRAWING M-001 FOR MECHANICAL GENERAL NOTES, ABBREVIATIONS AND
SYMBOLS.
2. REFER TO DRAWINGS MP500 SERIES FOR MECHANICAL DETAILS.
3. REFER TO DRAWING MP600 SERIES FOR MECHANICAL FLOW DIAGRAMS.
4. REFER TO DRAWING M-700 SERIES FOR MECHANICAL SCHEDULES.
5. REFER TO OTHER DISCIPLINE DRAWINGS OF THIS PACKAGE FOR COORDINATION.
6. DO NOT SCALE THIS DRAWING FOR EXACT DIMENSIONS. VERIFY ALL DIMENSIONS,
CLEARANCES, AS-BUILT CONDITIONS, ETC. IN FIELD.
SCALE: 1/4" = 1'-0"1
EQUIPMENT PLAN - ROOF LEVEL - PHASE 3, AREA A
C
D
B.3
B
3 2
F O
R C
O N
T
IN
U A
T
E D
R A
W
IN
G M
Q
.3 A
F O
R C
O N
T
IN
U A
T
E D
R A
W
IN
G M
Q
.3 A
8-GRV-5
A.7
A.6
A.4
C.7
8-CU-3 8-CU-6 8-CU-5 8-CU-4 8-CU-78-CU-8
STAIR
8-GRV-6 8-GRV-7
8-GRV-6
8" GENERATOR EXHAUST
RD
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANTS
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
PLAN
NORTH
KEYPLAN
ACTUAL
NORTH
MR PROJECT NO:
Hazardous Materials:
MABBETT & ASSOCIATES
Architect & Civil Engineering:
WBRC
Fire & Life Safety:
KOFFEL ASSOCIATES
Electronic Security:
GRW
Tunnel Structural & Civil Engineering:
PEC
EXISTING
BOILER
PLANT
NEW
EMERGENCY
GENERATOR
BLDG.
NEW BOILER
PLANT
Physical Security:
FORCE PROTECT
TUNNEL
BLDG 1
/1 /2
:3
:0
P M
MQ141.3B
MECHANICAL
EQUIPMENT PLAN
ROOF - PHASE 3, AREA B
REPLACE BOILERS AND
UPGRADE CONTROLS
WEST ROXBURY VA MEDICAL CENTER
WEST ROXBURY, MA
11/14/2025 JJM AHTM
BID DOCUMENTS
ISSUED FOR CONSTRUCTION
0506-0012
GENERAL SHEET NOTES:
1. REFER TO DRAWING M-001 FOR MECHANICAL GENERAL NOTES, ABBREVIATIONS AND
SYMBOLS.
2. REFER TO DRAWINGS MP500 SERIES FOR MECHANICAL DETAILS.
3. REFER TO DRAWING MP600 SERIES FOR MECHANICAL FLOW DIAGRAMS.
4. REFER TO DRAWING M-700 SERIES FOR MECHANICAL SCHEDULES.
5. PROVIDE ISOLATION VALVES FOR EACH WATER FEED WHETHER SHOWN OR NOT.
6. REFER TO OTHER DISCIPLINE DRAWINGS OF THIS PACKAGE FOR COORDINATION.
7. DO NOT SCALE THIS DRAWING FOR EXACT DIMENSIONS. VERIFY ALL DIMENSIONS,
CLEARANCES, AS-BUILT CONDITIONS, ETC. IN FIELD.
SCALE: 1/4" = 1'-0"1
EQUIPMENT PLAN - ROOF LEVEL - PHASE 3, AREA B
MP304
2 1/2"CTPD
8-CS-1
MP304
MP304
2 1/2"CTPD
8-B-1 8-B-2 8-B-3
A
10 9 8 7 6 5 4
C
D
B.3
B
F O
R C
O N
T
IN
U A
T
E D
R A
W
IN
G M
P .3
B
3"FWPD
3"FWPD
8-CTP-1
8-CTP-2
8-FWP-1
8-FWP-2
8-FWP-3
8-FWP-4
2 1/2"FWPD
2 1/2"FWPD
2 1/2"FWPD
2 1/2"FWPD
2 1/2"FWPD
2 1/2"FWPD 2 1/2"FWPD
2 1/2"FWPD
2"R
2"R
3"FWPD
3"FWPD
4"FWPS
4"FWPS
2 1/2"CTPD
2 1/2"CTPD
1"HPR
CONTROL ROOM
BOILER ROOM
STAIR
8.7 8.4 7.6
A.7
A.6
A.4
C.7
E
F
1 1/2"PC
PLUMBING EQUIPMENT
HOUSEKEEPING PAD
(SEE PLUMBING &
STRUCTURAL DWGS)
7FT.Wx5FT.Wx7FT.D PIT
(SEE STRUCTURAL DWGS)
SAFETY SHOWER
FLOOR SINK (TYP.)
SAFETY SHOWER
FUEL OIL PUMP SKID
HOUSEKEEPING PAD
(SEE STRUCTURAL DWGS)
PIPE TRENCH
(TYP.)
(SEE STRUCTURAL DWGS)
8-B-1
CONTROL
PANEL
8-B-2
CONTROL
PANEL
8-B-3 CONTROL PANEL
(PROVIDE UNISTRUT
SUPPORT) TYP
8-B-4
CONTROL
PANEL
BOILER MASTER
CONTROL PANEL
HAZARDOUS GAS
DETECTION SYSTEM
PANEL
8-BDS-1
3"HPS RISE W/DOUBLE
ISOLATION VALVES & DN IN
PIT W/DRIPLEG & STEAM
TRAP
1-1/2"PC RISE &
DN IN PIT
W/VALVE
3"HPS
UP
1-1/2"PC
UP
4"SV UP
2 1/2" UP
24" UP
24" UP 24" UP 24" UP
6"VT UP
2 1/2" UP
8"HPS DRIPLEG
& STEAM TRAP.
(SEE DETAIL 3
ON MP503)2 1/2" UP
2 1/2" UP 2 1/2" UP
FOR CONTINUATION
SEE DRAWING MP111.3E
2"BD DROP INTO TRENCH
2"BD DROP
INTO TRENCH
2"BD DROP
INTO TRENCH
2"BD DROP
INTO TRENCH
8-B-4
6"VT
8-OWS-01
8"HPS DRIPLEG
& STEAM TRAP.
(SEE DETAIL 3
ON MP503)
8"HPS DRIPLEG
& STEAM TRAP.
(SEE DETAIL 3
ON MP503) 8"HPS DRIPLEG
& STEAM TRAP.
(SEE DETAIL 3
ON MP503)
1"HPR1"HPR
1"HPR
2 1/2"SW UP
8-FHX-48-FHX-3
8-FHX-28-FHX-1
MP305
4"PC
UP
HOSE REELS SEE
PLUMBING (TYP)
PIPING IN TRENCH
2"BD
6" DRAIN DOWN TO FLOOR DRAIN
REFER TO PLUMBING DRAWINGS
AIR
COMPRESSOR
3" FWPD RISE
DA ABOVE
REFER TO DRAWING MP121.3A
CHEMICAL TREATMENT
EQUIPMENT HOUSEKEEPING PAD
(SEE STRUCTURAL DWGS)
SLEEVES
(TYP.)
2"BD
2"BD
2"BD
2"BD
2"BD
PIPING IN TRENCH
1/8" / 1'-0"
2"BDBOILER SAFETY
RELIEF VALVES
BOILER SAFETY
RELIEF VALVES
BOILER SAFETY
RELIEF VALVES BOILER SAFETY
RELIEF VALVES
6"NG
3"NG3"NG3"NG3"NG
6"NG
6"NG
6"NG
4"SV UP
4"SV UP 4"SV UP
FIRE WATER ENTRANCE
(SEE FIRE PROTECTION
DWGS)
CHEM
TESTING
SINK
1"LPG DROP
TO MAXON AUTOMATED LIQUID
PROPANE SHUT-OFF VALVE.
8-POLY-1
8-CAUSTIC-1
8-AMINE-1
3"HPS
1/8" / 1'-0"
PIPE SUPPORT (TYP)
SEE 11/MP503
3"CTPD UP
6"SV UP
4"OFL DROP
TO DRAIN
4"TANK BYPASS
DROP TO DRAIN
3" FWPD
DROP
2"D DROP
3"CTPD
BYPASS
4"PC
DROP
2 1/2" RISE
2 1/2"
UP
2 1/2"
RISE
2 1/2"
UP
2 1/2"
RISE
2 1/2"
UP
2 1/2"
RISE
2"BD
3"NG
3"NG
DROP TO
GAS TRAIN
3"NG
DROP TO
GAS TRAIN
3"NG DROP
TO GAS TRAIN
1"LPG DROP TO LPG TRAIN
8"HPS DROP
2-1/2" FIRE HOSE
CONNECTION FOR EMERGENCY
MAKE-UP WATER
3"EMERGENCY BOILER
FEEDWATER CONNECTION
3"FWPD
TO BUILDING 21
(SEE SITE/CIVIL DWGS FOR
CONTINUATION)
2-1/2"FIRE WATER
EMERGENCY CONNECTION
UP& DN
2"R UP&DN
2" NPW
DROP
1" NPW CONNECTION
(SEE PLUMBING DWGS
FOR CONTINUATION)
2"R
DROP&UP 2"D UP TO DA
2"R
2"R
DROP&UP
4"OFL DROP
TO DRAIN
2"D
8"NG RISE
& DROP
8"NG
W/FLOW METER
IN VERT.
8"NG
INV. ELEV
BLW FLR -4.42'
REFER TO SITE/CIVIL
DRAWING FOR CONTINUATION
1-1/2"PC
3"HPS
3"CTPD
UP
2 1/2"SW & 2 1/2"NPW
CONNECTIONS
(SEE PLUMBING DWGS
FOR CONTINUATION)
1 1/4"R
1" NPW CONNECTION
(SEE PLUMBING DWGS
FOR CONTINUATION)
8-UH-9
MAXON AUTOMATED NATURAL
GAS SHUT-OFF VALVE.
3/4"MPS
3/4"MPR
2"PC UP
PLUMBING EQUIPMENT
WATER ENTRANCE
(SEE PLUMBING DWGS)
2"FOS
2"FOR
2"FOS
2"FOR
2 1/2" DROP
2 1/2"
DROP 2 1/2"
DROP
2 1/2"
DROP
2"FOR
1 1/2"FOS
3/4"LPG
1"LPG
3/4"LPG 3/4"LPG
3/4"LPG
3"SW3"SW UP
REFER TO PLUMBING
DRAWINGS FOR
CONTINUATION
2"BD
AIR
COMPRESSOR
1 1/2"MPS
UP
8"HPS DROP 8"HPS DROP 8"HPS DROP
3/4"MPR UP
3/4"MPS UP
LPG, MPS & MPR
ROUTED ABOVE
FOS & FOR
ROUTED IN TRENCH
3/4"FOR
3/4"FOS
3/4"FOS
3/4"FOR
3/4"FOR
3/4"FOS
3/4"FOR
3/4"FOS
1"LPG DROP
TO LPG TRAIN
1"LPG DROP
TO LPG TRAIN
1"LPG DROP
TO LPG TRAIN
8-FOP-1/2
3/4"LPG
3/4"LPG
3/4"LPG
1"LPG
1"LPG
2 1/2"SW
UP
2"FOR
2"FOS
BELOW GRADE
TYP.
100LB PROPANE STORAGE TANKS (BY OTHERS).
4'-0" HIGH 8" DIAMETER (CHAIN SECURED).
PROVIDE SIGNAGE TO SAY "DANGER PROPANE NO
SMOKING/SPARK PRODUCING"
LPG TANKS
EMERGENCY FUEL FOR IGNITERS
(PILOTS), VA FURNISHED
3/4"MPS
3/4"MPR
8-LVR-1
T
8-UH-9
T 8-UH-3 T 8-UH-4
8-LVR-2
FOR CONTINUATION
SEE DWG MP111.3B
FOR CONTINUATION
SEE DWG MP111.3B
8"HPS UP
8"HPS UP8"HPS UP8"HPS UP
6"NG UP
REFER TO DRAWING MP121.3A
FOR CONTINUATION
3"FWPD
3"FWPD
2 1/2"FWPD
2 1/2"FWPD
3"NG
PIPING HUNG
FROM CATWALK
PIPING HUNG FROM CATWALK
PIPING HUNG
FROM CATWALK
PIPING HUNG
FROM CATWALK
2 1/2" UP 2 1/2" UP 2 1/2" UP2 1/2" UP
(SEE PLUMBING DWGS)
2"MPR UP
2 1/2"MPR
2 1/2"MPR
1"LPG
1 1/2"FOS
2"FOR
3/4"LPG
3"MPR UP
MP305
MP305
2"D UP TO DA
ANCHOR
3"HPS
1 1/2"PC
MP306
ANCHOR
3/4"LPG
2 1/2"MPR UP
MP305
MP305
3"VT UP&DN
8-OXYSCAV-1
1"LPG RISE
1"CBD
1"CBD 1"CBD
1"CBD
3"NG UP
3"NG UP3"NG UP3"NG UP
3"NG DROP
TO GAS TRAIN
COORDINATE FINAL LOCATION AND
TANK QUANITY WITH CHEMICAL
TREATMENT CONTRACTOR AND
VA FACILITY
COORDINATE LOCATION OF MAXON SHUT OFF VALVE
WITH VA FACILITY. VALVE SHALL BE VISIBLE AND EASILY
ACCESSIBLE IN CASE OF EMERGENCY
3"VT UP
2 3
T 8-UH-1 T 8-UH-2
T8-EF-1,2,3 T8-EF-1,2,3
2"NG TRAIN SAFETY VENTS UP
TYP
SEE DRAWING
MP111.3E
FOR CONTINUATION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANTS
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
PLAN
NORTH
KEYPLAN
ACTUAL
NORTH
NEW
EMERGENCY
GENERATOR
BLDG.
MR PROJECT NO:
Hazardous Materials:
MABBETT & ASSOCIATES
Architect & Civil Engineering:
WBRC
Fire & Life Safety:
KOFFEL ASSOCIATES
Electronic Security:
GRW
Tunnel Structural & Civil Engineering:
PEC
EXISTING
BOILER
PLANT
NEW BOILER
PLANT
TUNNEL
BLDG 1
Physical Security:
FORCE PROTECT
/1 /2
:2
:0
A
M
MP111.3A
MECHANICAL
PIPING PLAN
MAIN LEVEL - PHASE 3, AREA A
REPLACE BOILERS AND
UPGRADE CONTROLS
WEST ROXBURY VA MEDICAL CENTER
WEST ROXBURY, MA
11/14/2025 JJM AHTM
BID DOCUMENTS
ISSUED FOR CONSTRUCTION
0506-0012
SCALE: 1/4" = 1'-0"1
PIPING PLAN
GENERAL SHEET NOTES:
1. REFER TO DRAWING M-001 FOR MECHANICAL GENERAL NOTES, ABBREVIATIONS AND
SYMBOLS.
2. REFER TO DRAWINGS MP500 SERIES FOR MECHANICAL DETAILS.
3. REFER TO DRAWING MP600 SERIES FOR MECHANICAL FLOW DIAGRAMS.
4. REFER TO DRAWING M-700 SERIES FOR MECHANICAL SCHEDULES.
5. REFER TO OTHER DISCIPLINE DRAWINGS OF THIS PACKAGE FOR COORDINATION.
6. DO NOT SCALE THIS DRAWING FOR EXACT DIMENSIONS. VERIFY ALL DIMENSIONS,
CLEARANCES, AS-BUILT CONDITIONS, ETC. IN FIELD.
1 TRENCH PIPE SUPPORT. REFER TO DETAIL 10/MP503.
2 PROVIDE NEW VEEDER-ROOT SYSTEM, MODEL TLS-450, FOR THE 30,000 GALLON VERTICAL
FUEL OIL STORAGE TANK. PROVIDE WITH UNIVERSAL SENSOR/PROBE INTERFACE MODULE,
UNIVERSAL INPUT/OUTPUT INTERFACE MODULE, USB/ETHERNET DUAL INTERFACE MODULE, 4'
PROBE FOR LEAK DETECTION WITH 4" PRODUCT AND WATER FLOATS, MAGNETOSTRICTIVE
PROBE INSTALLATION KIT, SUMP SENSOR WITH 12' CABLE AND UNIVERSAL MOUNTING KIT,
OVERFILL ALARM AND ALARM ACKNOWLEDGEMENT SWITCH, ETHERNET-IP COMMUNICATIONS
CARD, AND SINGLE SITE MANAGEMENT SOFTWARE.
3 PROVIDE NEW VEEDER-ROOT SYSTEM, MODEL TLS-450, FOR THE EXISTING 25,000 GALLON
FUEL OIL TANKS. PROVIDE WITH UNIVERSAL SENSOR/PROBE INTERFACE MODULE, UNIVERSAL
INPUT/OUTPUT INTERFACE MODULE, USB/ETHERNET DUAL INTERFACE MODULE, 4' PROBE FOR
LEAK DETECTION WITH 4" PRODUCT AND WATER FLOATS, MAGNETOSTRICTIVE PROBE
INSTALLATION KIT, SUMP SENSOR WITH 12' CABLE AND UNIVERSAL MOUNTING KIT, OVERFILL
ALARM AND ALARM ACKNOWLEDGEMENT SWITCH, ETHERNET-IP COMMUNICATIONS CARD, AND
SINGLE SITE MANAGEMENT SOFTWARE.
C
D
B.3
B
3 2
SUBSTATION ROOM
GENERATOR ROOM
STAIR
A.7
A.6
A.4
C.7
F O
R C
O N
T
IN
U A
T
E D
R A
W
IN
G M
P .3
A
8-UH-5 8-UH-6
8-UH-7 8-UH-8
8-EF-4
ATS PAD
DAYTANK-BP PAD
8-UH-10
1 1/2"MPS
1"MPR
2"MPR
M P R
8-AHU-3 8-AHU-4
8-AHU-28-AHU-1
3/4"MPS
3/4"MPS 3/4"MPR 3/4"MPS
3/4"MPR
1"MPR
1 1/2"MPS
1"MPR
1 1/2"MPS
8" GENERATOR EXHAUST MUFFLER
(HUNG FROM CEILING STRUCTURE)
8-LVR-58-LVR-48-LVR-3
FOR CONTINUATION
SEE DWG MP111.3A
1 1/2"MPR
1"MPS
ROUTE PIPES UP TO 8-AHU-5
FOR CONTINUATION SEE DRAWING
MP121.3B
FUTURE GENERATOR FUTURE GENERATOR
SUBSTATION-B
1 1/8" RS UP (TYP 2)
7/8" RL UP (TYP 2)
FOR CONTUATION SEE DRAWING
MP121.3B
7/8" RL UP (TYP 2)
1 1/8" RS UP (TYP 2)
FOR CONTUATION SEE DRAWING
MP121.3B
8-GEN-BP-1
2"MPR DN
2"PC DN
MP305
MP305
3/4"D
3/4"D
3/4"D
3/4"D
3/4" DR. DN TO DRAIN
3/4" DR. UP
3"VT DN3"VT UP&DN
3/4"D
1"MPS 1 1/2"MPS
1 1/2"MPS
1 1/2"MPR
3"VT UP
8-LVR-11
A
4 1
C
D
B.3
B
3 2
A.7
A.6
A.4
C.7
F O
R C
O N
T
IN
U A
T
E D
R A
W
IN
G M
P .3
B
SUBSTATION ROOM
GENERATOR ROOM
STAIR
F O
R C
O N
T
IN
U A
T
E D
R A
W
IN
G M
P .3
A
ATS PAD
DAYTANK-BP PAD
DAYTANK-CP PAD
FOR FUTURE
DAYTANK (2 PLCS)
8-CRU-3 8-FT-3
2"FOR
1 1/2"FOS
2"FOR
1 1/2"FOS
3/4"FOR
3/4"FOS
3/4"FOR
3/4"FOS
8" UP TO EXHAUST MUFFLER
REFER TO DRAWING MH111.3B FOR
CONTINUATION
1-1/2" FOS & 2"
FOR PIPING IN
TRENWA TRENCH TO
30,000 GALLON
STORAGE TANK.
REFER TO DRAWING
PS100
8-GEN-BP-1
8-LVR-58-LVR-48-LVR-3
FUTURE GENERATOR FUTURE GENERATOR
SUBSTATION-B
2"MPR UP
2"PC UP
2"LPR DROP
2"LPR RISE
MP305
MP305 3"VT UP
4" VENT UP
THRU ROOF
8-FOP-7
8-LVR-11
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANTS
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
PLAN
NORTH
KEYPLAN
ACTUAL
NORTH
MR PROJECT NO:
Hazardous Materials:
MABBETT & ASSOCIATES
Architect & Civil Engineering:
WBRC
Fire & Life Safety:
KOFFEL ASSOCIATES
Electronic Security:
GRW
Tunnel Structural & Civil Engineering:
PEC
EXISTING
BOILER
PLANT
NEW
EMERGENCY
GENERATOR
BLDG.
NEW BOILER
PLANT
Physical Security:
FORCE PROTECT
TUNNEL
BLDG 1
/1 /2
:5
:5
A M
MP111.3B
MECHANICAL
PIPING PLAN
MAIN LEVEL - PHASE 3, AREA B
REPLACE BOILERS AND
UPGRADE CONTROLS
WEST ROXBURY VA MEDICAL CENTER
WEST ROXBURY, MA
11/14/2025 JJM AHTM
BID DOCUMENTS
ISSUED FOR CONSTRUCTION
0506-0012
SCALE: 1/4" = 1'-0"2
PIPING PLAN MAIN LEVEL UPPER - PHASE 3, AREA B
GENERAL SHEET NOTES:
1. REFER TO DRAWING M-001 FOR MECHANICAL GENERAL NOTES, ABBREVIATIONS AND
SYMBOLS.
2. REFER TO DRAWINGS MP500 SERIES FOR MECHANICAL DETAILS.
3. REFER TO DRAWING MP600 SERIES FOR MECHANICAL FLOW DIAGRAMS.
4. REFER TO DRAWING M-700 SERIES FOR MECHANICAL SCHEDULES.
5. REFER TO OTHER DISCIPLINE DRAWINGS OF THIS PACKAGE FOR COORDINATION.
6. DO NOT SCALE THIS DRAWING FOR EXACT DIMENSIONS. VERIFY ALL DIMENSIONS,
CLEARANCES, AS-BUILT CONDITIONS, ETC. IN FIELD.
1 PROVIDE NEW 275 GALLON DAY TANK. BASIS OF DESIGN PREFERRED UTILITIES MODEL DT-275.
2 FUEL OIL PIPING TRENCH REFER TO DETAIL 10/MP503 AND STRUCTURAL DRAWINGS.
3 TRENCH PIPE SUPPORT. REFER TO DETAIL 10/MP503.
4 PROVIDE (2) 3/4" TEES, VALVES AND CAPS ON THE (FOS) AND (FOR) IN TRENCH FOR
FUTURE DAY TANKS.
SHEET KEYNOTES:#
SCALE: 1/4" = 1'-0"1
PIPING PLAN MAIN LEVEL - PHASE 3, AREA B
(E)1 1/2"
(E)1 1/2"
4" PC UP TO
PIPE BRIDGE.
4"PC DN TO
TUNNEL
1 1/2" HPR UP
TO PIPE BRIDGE.
1 1/2"HRP DN
TO TUNNEL
13 12 11 10 9 8
D
10.5
STAIR
8.7 8.4 7.6
XD
C.7
E
F
PIPE TRENCH
(TYP.)
(SEE STRUCTURAL DWGS)
FOR CONTINUATION
SEE DRAWING MP111.3A
REFER TO DRAWING MP131.3E
FOR CONTINUATION UP
REFER TO DRAWING MS101.3
FOR CONTINUATION DOWN
8-EF-5
8-UH-9
MP306
3/4"MPS
3/4"MPR
2"FOS
2"FOR
2"FOS
2"FOR
PS-
FOS & FOR
ROUTED IN TRENCH
1"LPG
2"FOS
2"FOR
2"FOS
2"FOR
2 TYP.
1 1/2"FOS
1 1/2"FOS
1 1/2"FOR
1 1/2"FOR
2"FOR
2"FOS
BELOW GRADE
EXISTING CONDENSING
UNITS TO REMAIN
LPG TANKS
EMERGENCY FUEL FOR IGNITERS
(PILOTS), VA FURNISHED
3/4"MPS
3/4"MPR
T
8-UH-9
MP306
CENTERLINE OF EXISTING 25,000
GALLON FUEL OIL STORAGE TANK
BELOW CONCRETE DECK.
FOS & FOR PIPING
BELOW CONCRETE
DECK
FOS & FOR PIPING
BELOW CONCRETE DECK
FOS & FOR PIPING BELOW
CONCRETE DECK FROM
NEW FUEL FILTRATION
SYSTEM
10" HPS UP TO
PIPE BRIDGE.
10"HPS DN TO
TUNNEL
SAW CUT EXISTING CONCRETE DECK
AS REQUIRED TO INSTALL NEW FOS &
FOR PIPING. PATCH AND SEAL TO
MATCH EXISTING. REFER TO
STRUCTURAL DRAWINGS.
COAL STORAGE AREA BELOW
1"LPG RISE
COORDINATE LOCATION OF MAXON SHUT OFF VALVE
WITH VA FACILITY. VALVE SHALL BE VISIBLE AND EASILY
ACCESSIBLE IN CASE OF EMERGENCY
SEE DRAWING
MP111.3E
FOR CONTINUATION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANTS
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
PLAN
NORTH
KEYPLAN
ACTUAL
NORTHAREA E
MR PROJECT NO:
Hazardous Materials:
MABBETT & ASSOCIATES
Architect & Civil Engineering:
WBRC
Fire & Life Safety:
KOFFEL ASSOCIATES
Electronic Security:
GRW
Tunnel Structural & Civil Engineering:
PEC
Physical Security:
FORCE PROTECT
EXISTING
BOILER
PLANT
NEW
EMERGENCY
GENERATOR
BLDG.
NEW BOILER
PLANT
TUNNEL
BLDG 1
/1 /2
:5
:0
A M
MP111.3E
MECHANICAL
PIPING PLAN
MAIN LEVEL - PHASE 3, AREA E
REPLACE BOILERS AND
UPGRADE CONTROLS
WEST ROXBURY VA MEDICAL CENTER
WEST ROXBURY, MA
11/14/2025 JJM AHTM
BID DOCUMENTS
ISSUED FOR CONSTRUCTION
0506-0012
SCALE: 1/4" = 1'-0"1
PIPING PLAN MAIN LEVEL - PHASE 3
GENERAL SHEET NOTES:
1. REFER TO DRAWING M-001 FOR MECHANICAL GENERAL NOTES, ABBREVIATIONS AND
SYMBOLS.
2. REFER TO DRAWINGS MP500 SERIES FOR MECHANICAL DETAILS.
3. REFER TO DRAWING MP600 SERIES FOR MECHANICAL FLOW DIAGRAMS.
4. REFER TO DRAWING M-700 SERIES FOR MECHANICAL SCHEDULES.
5. REFER TO OTHER DISCIPLINE DRAWINGS OF THIS PACKAGE FOR COORDINATION.
6. DO NOT SCALE THIS DRAWING FOR EXACT DIMENSIONS. VERIFY ALL DIMENSIONS,
CLEARANCES, AS-BUILT CONDITIONS, ETC. IN FIELD.
1 PROVIDE NEW FILTRATION SKID ON ROOF. PROVIDE CONTROL VALVES TO ALLOW FOR ONLY
ONE TANK TO BE FILTERED AT A TIME. BASIS OF DESIGN PREFERRED UTILITIES MODEL
PF-505.
2 CONTRACTOR TO FIELD VERIFY PIPE TIE-IN LOCATIONS TO EXISTING FUEL OIL TANKS. TANK
ROOM WAS INACCESSIBLE.
3 PROVIDE NEW 2-1/2" ANTI-SIPHON VALVE. BASIS OF DESIGN PREFERRED UTILITIES MODEL
A-295.
4 PROVIDE 1-1/2" CONTROL VALVES TO ALLOW FOR STAGING OF THE FUEL OIL FILTRATION
OPERATION.
5 PROVIDE NEW 2" FOS & FOR PIPING FROM STORAGE TANKS TO EXISTING 1-1/2" FOS & FOR
RISERS. INSTALL 2" BRANCH PIPING TO NEW 2" FOS & FOR RISERS. PROVIDE ISOLATION
VALVES ON ALL BRANCH PIPING.
MP304
MP304
A
9 8 7 6 5 4
C
D
B.3
B
8-FHX-1 8-FHX-2
8-FHX-3
8-FHX-4
8-DA-1
10"HPS
10"HPS
8-STS-1
2 1/2"FWPD
2 1/2"FWPD
2 1/2"FWPD
2 1/2"FWPD
2 1/2"FWPD
2 1/2"FWPD
2 1/2"FWPD
2 1/2"FWPD
F O
R C
O N
T
IN
U A
T
E D
R A
W
IN
G M
P
1.
3B
2"HPR
2"R
4"PC
8.7 8.4 7.6
A.7
A.6
A.4
C.7
E
F
STAIR
STORAGE
CORRIDOR
LOCKERS
TLT/SHOWER
SHOWER
LOUNGE
TLT
BEDROOM
JAN.
ELEC
I.T.
8-PRV-1
2"HPR
2 1/2"FWPD 2 1/2"FWPD 2 1/2"FWPD 2 1/2"FWPD
1-1/2"PC
UP&DN
8"LPS UP
8"HPS DROP TO
8-B-1
4"SV
UP&DN
4"SV
UP&DN 4"SV
UP&DN
4"SV
UP&DN
2 1/2" DN
2 1/2" DN 2 1/2" DN 2 1/2" DN
8"HPS DROP TO
8-B-2
8"HPS DROP TO
8-B-3
8"HPS DROP TO
8-B-4
2 1/2"
DN
2"MPS RISE
2 1/2"
DN
2 1/2"
DN
2 1/2"
DN
8"HPS
8"HPS
8"HPS
8"HPS
4" PC UP
FOR CONTINUATION
SEE DWG PP121.2A
6"SV
UP&DN
3"SW
UP&DN
4" PC DN
2" OFL DN
2" OFL DN
2" R DN
4"OFL
2 1/2"SW DN
2"HPR DN
2"R DN
8-PRV-2
4"SV UP
3"MPS RISE
TO BLDG 8
UNIT HEATERS
BOILER ROOM
3"HPS UP
8" HPS UP
FOR FUTURE
EMERGENCY RENTAL
BOILER
3"SV UP
2"R DROP
FROM DA
2 1/2"SV
DROP TO DA
2"D DROP
FROM DA
6"SV UP&DN TO
STEAM HEADER
10"HPS
DROP
MP305
(T O
B L G
U
N
IT
H E
A T
E R
S
H P
(S
A R
E
H
(F R
O M
-B
-1
H
A R
E
H
A R
E
H
(T
D /A
H
O M
-B
-2
H
(T
S T
E A
M S
IL
E
N C
E R
H
O M
-B
-3
H
(B U
IL
D
IN
G
H
O M
-B
-4
H
(E M
E R
G E
N C
Y S
T E
A M
H
R M
A S
T E
R S
T E
A M
P R
E S
S U
T
A
N S
M
IT
T E
R
(S P
A R
E
(P R
E S
S R
E I N
D
IC
A T
O R
(S P
A R
E
(T O
B L D
G
H
10"HPS10"HPS
4" 150#
BLIND
FLANGE
10" 300#
BLIND FLANGE
8" RISE TO
SILENCER
12" UP THRU ROOF
8"HPS UP 8"HPS UP3"HPS UP3"HPS UP
2-1/2"FDC UP&DN
24" BOILER
STACK UP
24" BOILER
STACK UP
24" BOILER
STACK UP
6" PC DN
1"PC UP
4"OFL DN
TO DRAIN
MP305
4"HPS UP
1-1/2"PC UP
2"HPR UP
10"HPS DRIPLEG & STEAM TRAP.
(SEE DETAIL 3 ON MP503)
8-UH-4
8-UH-3
MOUNT 15'AFF
MOUNT 15'AFF
MOUNT 15'-0"
ABV MEZZ
2"PC
2"MPS 1 1/2"MPS
2 1/2"MPR
M P S
3"HPS 10"HPS
2"PC
2 1/2"MPR
3/4"MPR UP
3/4"MPS UP
2"PC DN
8"HPS UP/DN.
SEE DRIP LEG
DETAIL
2"MPS
3"CTPD
UP&DN
10"HPS
4"MPR
4"MPR
2 1/2"MPR
4"MPR DN
8-EH-1
2 1/2"FWPD
DROP. ROUTED
BELOW CATWALK
2 1/2"FWPD
DROP. ROUTED
BELOW CATWALK
2 1/2"FWPD
DROP. ROUTED
BELOW CATWALK
2 1/2"FWPD
DROP. ROUTED
BELOW CATWALK
8"HPS UP
8-CS-01
(BELOW CATWALK)
2"MPS
2"MPS
(S P
A R
E
H
A R
E
H
MP305
1 1/2"MPS
UP
CAPPED FOR
PHASE 5
EXTENTION
2"PC
1/4" RL
1/2" RS
1/4" RL
1/2" RS
FOR CONTINUATION UP
SEE DRAWING MP131.3A
8-ACU-28-ACU-1
6"NG
6"NG DN
REFER TO
MP111.3A FOR
CONTINUATION
1 1/2"MPS
1 1/2"MPS
6"PC
4"PC
4"PC
2"PC
PIPE HANGER
(TYP)
SPRING PIPE
HANGER
(TYP)
4"PC
1-1/2" MPS
DOWN
1-1/2" SV
UP THROUGH ROOF
4"VT
WATER
HEATER
1" NG DN.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANTS
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR
ANY PURPOSE WHATSOEVER WITHOUT THE SEAL AND
SIGNATURE OF THE PROFESSIONAL ENGINEER
o n e e ig h th in c h o n e fo o t o n e q u a rt e r…