3.- Exhibit C3 - Pest Control Work and Inspection Report.pdf

PDF 239 KB Posted

Attached to
Laredo Texas Full Maintenance; Operations and Maintenance; Custodial, Grounds, and Related Services
Solicitation number
47PH0225R0006
Issued by

About this file

This document is a GSA Form 3638 Pest Control Work and Inspection Report template designed for documenting pest control services. The form is divided into three sections: Section A for reporting the type of pest and location, Section B for reporting pest infestation status and service quality, and Section C for documenting pesticides, traps, and materials used during treatment. The form is intended to be completed collaboratively by the Field Office, GSA Inspector, and Contractor, with spaces for recording details such as the reporting person's contact information, pest type, location, infestation status, service satisfaction, and treatment materials. Signature lines and time/date fields are provided for the pest controller and GSA inspector to validate the inspection and treatment process.

View the file

Other files

File Type Posted
47PH0225R0006 Amendment 0005 SF30.pdf PDF
CBA IUOE 351 2025 06 01-2028 05 31 Final .pdf PDF
47PH0225R0006 Amendment 0003 Word Doc FIGURE L-3 Experience Worksheet 6 of 12.docx DOCX document
47PH0225R0006 Amendment 0003 Laredo Texas Full Maintenance Questions and Answers 11 of 12.pdf PDF
47PH0225R0006 Amendment 0003 SF30 0 OF 12.pdf PDF
47PH0225R0006 Amendment 0003 Specification Laredo Texas Full Maintenance Operations and Maintenance1 of 12.pdf PDF
47PH0225R0006 Amendment 0003 BL-1 Fire Extinguisher Report 9 of 12.xlsx XLSX spreadsheet
47PH0225R0006 Amendment 0003 - Notes by Gemini Pre-Proposal Meeting Laredo - 10 of 12.pdf PDF
47PH0225R0006 Amendment 0002 SF30 PDF Form 12 of 12.pdf PDF
47PH0225R0006 Pre-Proposal Conference Presentation Laredo Texas Full Maintenance 4 of 7.pdf PDF
47PH0225R0006 Pre-Proposal Walk Thru Schedule Laredo Texas Full Maintenance 6 of 7.pdf PDF
47PH0225R0006 Attachment 2_ Wage Determination Laredo Texas 3 of 7.pdf PDF
47PH0225R0006 Amendment 0001 Specification Laredo Texas Full Maintenance Operations and Maintenance.pdf PDF
7. Exhibit C5 - Building Information Sheet - Juarez Lincoln Land Port of Entry (1).pdf PDF
10. Exhibit C5 - Building Information Sheet - George P. Kazen Federal Courthouse (1).pdf PDF
13.- Exhibit M3_ Sustainable Products and GSA Attribute Preferences (1).pdf PDF
14.- Exhibit M4 B Operating Plan Template.pdf PDF
15.- Exhibit M5 - Smart Bldgs.pdf PDF
21.- Exhibit M11_ Flag Policy.pdf PDF
47PH0225R0006 Amendment 0001 SF30 1 of 4.pdf PDF
4.- Exhibit C4 - Solid Waste Audit Reports (1).pdf PDF
5. Exhibit C5 - Building Information Sheet - Columbia Land Port Of Entry (1).pdf PDF
6. Exhibit C5 - Building Information Sheet - Covent Land Port Of Entry (1).pdf PDF
11.- Exhibit M1 - O_M QASP Template (2).pdf PDF
18.- Exhibit M8_ Miscellaneous Best Practices Shave Energy.pdf PDF
1.- Exhibit C1- Custodial R7 Recycling & Solid Waste Trash Report - APR24.pdf PDF
4.- Exhibit C4 - Solid Waste Audit Reports.pdf PDF
6. Exhibit C5 - Building Information Sheet - Covent Land Port Of Entry.pdf PDF
13.- Exhibit M3_ Environmentally Sustainable Products and GSA Attribute Preferences.pdf PDF
15.- Exhibit M5 - Smart Buildings.pdf PDF
16.- Exhibit M6 - Water Treatment.pdf PDF
17.- Exhibit M7 - Qualification of Electrical Testing Technicians.pdf PDF
18.- Exhibit M8_ Miscellaneous Best Practices Shave Energy (1).pdf PDF
26.- Exhibit M16_ Equipment Condition Critical Assessment Report.pdf PDF
27.- Exhibit M17_ AHU MERV.pdf PDF
30.- BL4 Elevator Information - List of Assets.pdf PDF
35.- FIGURE B-2 FM Union and Non Union Contracts REVISED 6.5.25.xlsx XLSX spreadsheet
7. Exhibit C5 - Building Information Sheet - Juarez Lincoln Land Port of Entry.pdf PDF
11.- Exhibit M1 - O_M QASP Template (1).pdf PDF
19.- Exhibit M9 2022 GSA PBS PM Guide (1).pdf PDF
28.- BL1_ Extinguisher Report - List of Assets.pdf PDF
32.- BL6 Work Order History - List of Work Orders.pdf PDF
33.- BL7 Energy_&_Water_Monthly_Report_template.docx.pdf PDF
37.- Figure L-1 Combined Management Plan 7.18.24.xlsx XLSX spreadsheet
5. Exhibit C5 - Building Information Sheet - Columbia Land Port Of Entry.pdf PDF
9. Exhibit C5 - Building Information Sheet - Border Patrol Sector Headquarters.pdf PDF
10. Exhibit C5 - Building Information Sheet - George P. Kazen Federal Courthouse.pdf PDF
14.- Exhibit M4 Building Operating Plan Template.pdf PDF
21.- Exhibit M11_ Flag Policy.pdf PDF
22.- Exhibit M12_ Flushing Stagnant Plumbing.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIELD OFFICE

BUILDING DATE

INSTRUCTIONS: The Field Office, GSA Inspector, and Contractor should use Section A for reporting type of pest and location.

The GSA Inspector should use Section B for reporting presence or absence of pests and adequacy of service. The Contractor should use Section C for reporting material used for treatment.

SECTION A SECTION B SECTION C

TYPE OF PEST LOCATION

REPORTED BY INFESTATION SERVICE PESTICIDES, TRAPS, AND

OTHER MATERIAL USED PERSON TELEPHONE NO. ACTIVE NONE SAT. UNSAT.

REMARKS

SIGNATURE OF PEST CONTROLLER TIME IN DATE SIGNATURE OF GSA INSPECTOR TIME INSPECTION

COMPLETED

DATE

TIME OUT

GSA FORM 3638

EXHIBIT C3

PEST CONTROL WORK AND INSPECTION REPORT

File details come from the government source that posted it. Updated .