47PB0019R0002_Tab_10_Solicitation_Amend_02_Solicitation_2019_08_02.pdf
PDF 755 KB Posted
- Attached to
- Operations and Facilities Maintenance Services at the John F. Kennedy Federal Building in Boston, MA
- Solicitation number
- 47PB0019R0002
About this file
Solicitation 2019 08 02
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. General Services Administration Public Buildings Service New England Region
SOLICITATION NUMBER: 47PB0019R0002
SERVICE: OPERATIONAL & MAINTENANCE AND RELATED SERVICES
LOCATION(S): JOHN F. KENNEDY FEDERAL OFFICE BUILDING (MA0131ZZ)
15 NEW SUDBURY STREET
BOSTON, MA 02203-0002
PERIOD OF PERFORMANCE: Base Period: December 1, 2019 – September 30, 2020 And Nine (9) Option Years
SOLICITATION ISSUE DATE: Friday, July 12, 2019
OFFER RECEIPT DATE/TIME: Tuesday, August 13, 2019
This procurement is 100% set-aside for Total Small Business
NOTE: ALL PROPOSALS MUST INCLUDE A SIGNED, DATED, AND FILLED-OUT VERSION OF EXHIBIT 1
(“PROPOSAL CHECKLIST COVER SHEET”) AS A COVER SHEET.
THE INFORMATION COLLECTION REQUIREMENTS CONTAINED IN THIS SOLICITATION/ CONTRACT THAT ARE NOT REQUIRED BY REGULATION HAVE BEEN APPROVED BY THE OFFICE OF MANAGEMENT AND BUDGET PURSUANT
TO THE PAPERWORK REDUCTION ACT AND ASSIGNED OMB CONTROL NO. 3990-0163
SOLICITATION TABLE OF CONTENTS
SECTION 0: CONTRACT FORMS AND SERVICES 15
0.1 CONTRACT FORMS 15
0.2 SERVICES ORDERING 16
SECTION 1: SCOPE OF WORK 17
1.0 GENERAL CONTRACT REQUIREMENTS 17
1.0.0 GENERAL 17
1.1 SCOPE OF WORK 18
1.1.1 Scope of Work 18
1.1.1.1 Discrepancy in the Specifications 19
1.1.2 Personnel 19
1.1.2.1 Contractor Key Personnel 19
1.1.2.2 Authority 20
1.1.2.3 Communication Equipment 20
1.1.2.3.1 CIO 2100 IT Security Policy 21
1.1.2.4 Language 21
1.1.2.5 Employee Suitability 21
1.1.2.6 Employee Technical Qualifications 22
1.1.2.7 Certifications 23
1.1.2.7.1 Qualifications of Fire Alarm System Technicians 23
1.1.2.7.2 Qualifications of Water-Based Fire Suppression System Technicians 23
1.1.2.7.3 Qualifications of Dry Chemical Extinguishing System, Wet Chemical Extinguishing System; Clean Agent Fire Extinguishing System; Halogenated Extinguishing System;
Carbon Dioxide Extinguishing System; Ventilation System Fire Extinguishing System;
Smoke Control; Fire Damper; Smoke Damper; Combination Fire/Smoke Damper; Fire-rated Door Assemblies; Smoke Door Assemblies; Portable Fire Extinguisher; Emergency and Standby Power; Emergency Lighting Equipment; Exit Signage Technicians 24
1.1.2.7.4 Qualifications for Electrical Technician 24
1.1.2.8 Employee Training 25
1.1.2.8.1 Asbestos Awareness Training 25
1.1.2.8.2 Re-Tuning Training 25
1.1.2.8.3 HVAC Continuing Education Requirements and Certifications 25
1.1.2.8.4 NCMMS Training 26
1.1.2.8.5 Lead Awareness Training 26
1.1.2.9 Appearance 26
1.1.2.10 Standards of Conduct 26
1.1.2.11 Recording Presence 27
1.1.2.12 Personal Identity Verification Requirements 27
1.1.2.13 Credentials and Identification 27
1.1.2.14 Escorting 27
1.1.3 Quality Control Program 28
1.1.3.1 Quality Control Plan 28
1.1.3.2.1 Quality Control Plan Contents 28
1.1.3.2.1 Inspection Program 29
1.1.3.2.2 Methods 29
1.1.4 Quality Assurance 29
1.1.4.1 Contracting Officer's Representative (COR) 30
1.1.4.2 Government Monitoring 30
1.1.4.3 Performance Evaluations 30
1.1.5 Physical Security 30
1.1.5.1 Key Control 31
1.1.5.2 Lock Combinations 31
1.1.6 Safeguarding Sensitive Data and Information Technology Resources 31
1.1.6.1 General 31
1.1.6.2 Safeguarding and Dissemination of Controlled Unclassified (CUI) Building information 32
1.1.6.2.1 General 32
1.1.6.2.2 Marking CUI 32
1.1.6.2.3 Authorized Recipients 32
1.1.6.2.4 Dissemination of CUI Building Information 33
1.1.6.2.4.1 By Electronic Transmission 33
1.1.6.2.4.2 By Non-electronic Form or on Portable Electronic Data Storage Devices 33
1.1.6.2.4.2.1 By Mail 33
1.1.6.2.4.2.2 In Person 33
1.1.6.2.5 Record Keeping 34
1.1.6.2.6 Safeguarding CUI Documents 34
1.1.6.2.7 Destroying CUI Building Information 34
1.1.6.2.8 Notice of Disposal 34
1.1.6.2.9 Incidents 34
1.1.6.2.10 Subcontracts 35
1.1.7 Hours of Operation 35
1.1.7.1 Normal Working Hours 35
1.1.7.2 Core Coverage Hours 35
1.1.7.3 Recognized Holidays 35
1.1.7.4 Extended Operating Hours 36
1.1.7.5 Building Access 36
1.1.8 Conservation of Utilities 36
1.1.9 Use of NCMMS 36
1.1.9.1 General 37
1.1.9.2 Operations 37
1.1.9.3 Reporting 38
1.1.10 Documentation and Records 38
1.1.11 Ordinances, Taxes, Permits, and Licenses 38
1.1.12 Other Contractors 38
1.1.13 Government Forms 38
1.1.14 Contractor Maintenance Performance Plans 39
1.2 DEFINITIONS 39
1.2.0 General 39
1.2.1 Above-Standard Services 39
1.2.2 Acceptance 39
1.2.3 Additional Services 40
1.2.4 Advanced Meters 40
1.2.5 Advanced Metering Systems 40
1.2.6 Annual Child Care Facility Survey 40
1.2.7 Architectural and Structural 40
1.2.8 Basic Services 40
1.2.9 Building Automation System (BAS) 41
1.2.10 Building Operating Plan 41
1.2.11 National Computerized Maintenance Management System (NCMMS) 41
1.2.12 Consumable Parts 41
1.2.13 Contracting Officer (CO) 41
1.2.14 Contracting Officer's Representative (COR) 42
1.2.15 Contractor 42
1.2.16 Core Coverage Hours 42
1.2.17 Corrective Maintenance 42
1.2.18 Demand Response Program 42
1.2.19 Emergency Callback 42
1.2.20 Environmentally Sustainable Products and Services 43
1.2.21 Exterior 43
1.2.22 Fire Protection and Life Safety Systems 43
1.2.23 GSAlink 43
1.2.24 Green Procurement Compilation (GPC) 43
1.2.25 Indefinite Quantity 43
1.2.26 Initial Deficiency Report 44
1.2.27 Miscellaneous Work 44
1.2.28 Modification of Contract 44
1.2.29 Non-Reimbursable Repairs 44
1.2.30 Normal Working Hours 44
1.2.31 Occupant Emergency Plan (OEP) 45
1.2.32 Ongoing Commissioning 45
1.2.33 Open Protocol Systems 45
1.2.34 Operations 45
1.2.35 Overtime Utilities 45
1.2.36 Partnering 46
1.2.37 Performance Work Statement (PWS) 46
1.2.38 Predictive Maintenance 46
1.2.39 Preventive Maintenance 46
1.2.40 Quality Assurance Surveillance Plan (QASP) 46
1.2.41 Quality Control Plan 46
1.2.42 Rapid Building Assessment Program 46
1.2.43 Repair 47
1.2.44 Reimbursable Repair 47
1.2.45 Tour 47
1.2.46 Vertical Transportation Systems 47
1.2.47 Watch 47
1.2.48 Work Order 47
1.3 GOVERNMENT-FURNISHED PROPERTY 48
1.3.0 General 48
1.3.1 Electric Power 48
1.3.2 Water Source 48
1.3.3 Contractor Office Space and Furnishings 48
1.3.4 Storage Space 49
1.3.5 Network Equipment and Computer Hardware 49
1.4 CONTRACTOR- FURNISHED PROPERTY SUPPLIES/MATERIAL/EQUIPMENT 49
1.4.0 General 49
1.4.1 Specific Requirements 50
1.5 OPERATIONS-SPECIFIC REQUIREMENTS 50
1.5.0 General 50
1.5.1 Tenant Environment 50
1.5.1.1 Tenant Furniture 50
1.5.2. Building Operating Plan 51
1.5.2.1 Components of the Building Operating Plan 51
1.5.3 Equipment Inventory 54
1.5.3.1 General: 54
1.5.3.2 Operations 54
1.5.3.3 Reporting 55
1.5.4 Safety Management 56
1.5.4.2 Workplace Safety and Health Program 56
1.5.4.2.1 Reporting. 56
1.5.4.3 Scheduling and Record Keeping 56
1.5.4.3.1 Reporting. 56
1.5.4.4 Fall Protection 57
1.5.4.5 Powered Platforms 57
1.5.4.6 Lock Out/Tag Out 57
1.5.4.7 Confined Spaces 57
1.5.4.8 Facility Hazards and Accidents 57
1.5.4.8.1 Hazards 57
1.5.4.8.2 Accidents 57
1.5.4.9 Disruptive or Hazardous Equipment 58
1.5.4.9.2 Hooks, Cranes, Hoists Chains and Slings 58
1.5.4.10 Scheduled Disruption to Utilities, Lighting, Fire Protection & Life Safety Systems, or Space Conditioning 58
1.5.4.11 Safety Data Sheets and Hazard Communication Plan 58
1.5.4.11.1 Safety Data Sheets 58
1.5.4.11.2 Hazard Communication Plan 58
1.5.4.12 Labeling and signage 59
1.5.4.13. Emergency Shutdown Instructions 59
1.5.4.14 Electrical Safety 59
1.5.4.15 Labeling of Electrical Circuits and Panels 59
1.5.5 Environmental Management 59
1.5.5.1 General 59
1.5.5.2 Refrigerants 60
1.5.5.2.1 Operations 60
1.5.5.2.2 Maintenance (Refrigerant Recycling, Reclamation, and Disposal) 60
1.5.5.2.3 Testing/Inspections 60
1.5.5.2.4 Reporting 61
1.5.5.3 Local Air Quality Management Operating Permits 61
1.5.5.4 Stationary Engines 61
1.5.5.5 Fuel Storage Tank Management 61
1.5.5.6 Solid Waste 61
1.5.5.7 Polychlorinated Biphenyl (PCB) Control 62
1.5.5.8 Asbestos Management 62
1.5.5.9 Disposition of Hazardous Waste 63
1.5.5.10 Backflow Prevention Devices 63
1.5.5.11 Potable Water Systems 63
1.5.5.12 Reporting 64
1.5.6 Energy and Water Efficiency 65
1.5.6.1 General 65
1.5.6.2 Operations 65
1.5.6.3 Reporting 65
1.5.7 Advanced Metering Systems 65
5.7.1 General 65
1.5.7.2 Operations 66
1.5.7.3 Maintenance 66
1.5.7.4 Reporting 66
1.5.8 Building Automation Systems and IT Controls 67
1.5.8.1 General 67
1.5.8.2 Operations 67
1.5.8.2.1 GSA-hosted Systems Requirements 68
1.5.8.2.2 Excepted Systems Requirements (not hosted on GSA’s system infrastructure) 69
1.5.8.3 Maintenance 70
1.5.8.3.1 BAS Control Systems and upgrades 70
1.5.8.3.2 BAS Alarms 71
1.5.8.4 Testing/Inspecting 71
1.5.8.5 Reporting 71
1.5.8.6 Smart Building Technology 71
1.5.9 Fire Protection and Life Safety Equipment and Systems 72
1.5.9.1 General 72
1.5.9.2 Fire Alarm System Services and Emergency Communication Systems 73
1.5.9.3 Water-Based Fire Protection Systems 74
1.5.9.4 Fire-rated Door Assemblies 75
1.5.9.5 Fire Damper and Combination Fire/Smoke Dampers 75
1.5.9.6 Smoke Doors Assemblies 75
1.5.9.7 Smoke Dampers 75
1.5.9.8 Portable Fire Extinguishers 75
1.5.9.9 Non-Water-Based Fire Extinguishing Systems 75
1.5.9.10 Smoke Control Systems 76
1.5.9.11 Emergency and Standby Power Systems 76
1.5.9.12 Emergency Lighting Systems and Exit Signage 76
1.5.9.13 Fire Resistance Rated Construction 76
1.5.9.14 Lightning Protection Systems 77
1.5.9.15 Chemical Sensors 77
1.5.10 Tours 77
1.5.10.1 General 77
1.5.10.2 Proactive Facility Tours 77
1.5.10.3 Minimum Tour Frequencies 78
1.5.10.4. Monitoring of Central Plant Equipment 78
1.5.10.5 Operating Logs and Tour Check Sheets 78
1.5.10.6 Reporting 79
1.5.11 Repairs 79
1.5.11.1 General 79
1.5.11.2 Operations 80
1.5.11.2.1 Non Reimbursable Repair 80
1.5.11.2.2 Partially Reimbursable Repairs (Shared Liability) 81
1.5.11.2.3 Fully Reimbursable Repairs 82
1.5.11.3 Warranties 82
1.5.11.4 Third-Party Contractors 82
1.5.12. Work Orders 82
1.5.12.1 General 82
1.5.12.2 Operations 83
1.5.12.2.1 Emergency Work Order 84
1.5.12.2.2 Emergency Call Back (Beyond Core Coverage Hours) 84
1.5.12.2.3 Urgent Work Order Response 85
1.5.12.2.4 Routine Work Order Response 85
1.5.12.3 Data Maintenance 85
1.5.12.4 Reporting 86
1.5.13 Additional Services Indefinite Quantity Provisions 86
1.5.13.1 General 86
1.5.13.2 Price Proposal for Additional Services Work Request 86
1.5.13.2.1 Parts and Materials 86
1.5.13.2.2 Labor 86
1.5.13.3 Additional (Non-Pricing Schedule) Subcontracts 87
1.5.13.4 Indirect Costs (Markup) 87
1.5.13.5 Proposal Review 87
1.5.13.6 Additional Services Work Request Ordering and Invoicing 87
1.5.13.7 Cost Documentation 87
1.5.13.8 Construction Services 88
1.5.14 Building Management and Support Services 88
1.5.14.1 General 88
1.5.14.2 Miscellaneous Work 89
1.5.14.3 Review of Design Documents 90
1.5.14.3.1 Reporting 90
1.5.14.4 Inspections Assistance for Space Build Outs 90
1.5.14.5 Flag Procedures 90
1.5.14.6 Overtime Utilities (OTU) 90
1.5.15 Monthly Progress Report 91
1.5.16 Reference Library 92
1.5.16.1 General 92
1.5.17 COMMUNICATION REQUIREMENTS: 93
1.6 MAINTENANCE-SPECIFIC REQUIREMENTS 93
1.6.1 Maintenance Standard 94
1.6.2 Boiler Systems 95
1.6.2.1 General 95
1.6.2.2 Operation 95
1.6.2.3 Boiler Maintenance 95
1.6.2.4 Testing and Inspecting 95
1.6.2.5 Reporting 96
1.6.3 Air Distribution Equipment 96
1.6.3.1 General 96
1.6.3.2 Operation 96
1.6.3.3 Maintenance 97
1.6.3.4 Replacement of Air Filters 97
1.6.3.5 Testing and Inspecting 97
1.6.3.6 Reporting 98
1.6.4 Chiller Systems 98
1.6.4.1 General 98
1.6.4.2 Operation 98
1.6.4.3 Maintenance 98
1.6.4.4 Testing/Inspecting 98
1.6.4.5 Reporting 99
1.6.5 Cooling Towers & Dry Coolers 99
1.6.5.1 General 99
1.6.5.2 Operations 99
1.6.5.3 Maintenance 99
1.6.5.4 Testing 100
1.6.5.5 Reporting 100
1.6.6 HVAC Water Management 100
1.6.6.1 General 100
1.6.6.2 HVAC Water Management Plan 100
1.6.6.3 Operation 101
1.6.6.4 Maintenance 101
1.6.6.5 Testing and Inspecting 101
1.6.6.6 Reporting 102
1.6.6.7 Chemical Free Water Treatment System 106
1.6.7. Domestic Plumbing Systems 106
1.6.7.1 General 106
1.6.8 Lighting Systems 107
1.6.8.1 General 107
1.6.8.2 Operation 107
1.6.8.3 Maintenance 108
1.6.8.4 Testing and Inspecting 110
1.6.9 Electrical Switchgear and Switchboards 110
1.6.10 Emergency Power Equipment 110
1.6.10.1 General 110
1.6.10.2 Operation 110
1.6.10.3 Maintenance 111
1.6.10.4 Testing and Inspecting 111
1.6.10.5 Reporting 112
1.6.11 Oil Analysis and Oil Changes 112
1.6.11.1 General 112
1.6.11.2 Operations 112
1.6.11.3 Testing and Inspecting 112
1.6.11.4 Reporting 113
1.6.12 Vertical Transportation Systems 113
1.6.12.1 Elevator Associated Equipment Maintenance 113
1.6.13 Architectural and Structural Systems 113
1.6.13.1 General 113
1.6.13.2 Replacement Items and Painting 114
1.6.13.3 Machinery Rooms 114
1.6.13.4 Historic Buildings 115
1.6.13.5 Architectural Woodwork 115
1.6.13.6 Directories 115
1.6.13.7 Roofs 115
1.6.13.8 Roof Anchorages 115
1.6.14 Perimeter Access Control Systems (Security fixtures) 116
1.6.14.1 General 116
1.6.15 Child Care Center 116
1.6.16 Cafeteria 116
1.6.17 Unit Price Agreement or Structural Alterations Services 117
1.6.17.1 Alterations 117
1.6.17.2 Off-Hours Service 117
1.6.17.3 Unit Price Agreement 117
1.7 ADMINISTRATIVE INSTRUCTIONS 119
1.7.0 Initial Inspection 119
1.7.1 Existing Deficiency Inspection/Initial Deficiency Report 119
1.7.2 Transition Phase 120
1.7.2.1 Transition Phase Schedule 121
1.7.3 Phase-out Transition Period 121
1.7.4 Contract Closeout Examination and Withholding of Final Payment 122
1.8 PUBLICATIONS AND CITED STANDARDS 124
1.8.0 Publications 124
SECTION 2: MISCELLANEOUS CONTRACT TERMS 127
2.1 PAYMENT OF POSTAGE AND FEES 127
2.2 MARKING 127
2.3 TERM OF CONTRACT 127
2.4 EXTENSION OF SERVICES 127
SECTION 3: SPECIAL CONTRACT REQUIREMENTS 128
3.1 PERSONAL PROTECTIVE EQUIPMENT (PPE) 128
3.2 QUALIFICATIONS OF CONTRACTOR PERSONNEL 128
3.3 SECURITY REQUIREMENTS AND PERSONAL IDENTITY VERIFICATION
PROCEDURES (NON-CLASSIFIED CONTRACT) 128
3.3.1 FAR 52.204-9 Personal Identity Verification of Contractor Personnel (Jan 2011) 128
3.3.2. Compliance with Security Requirements 128
3.3.3 Removal from Contract Work 129
3.4 SUBMISSION OF RESUMES FOR NEW EMPLOYEES 130
3.5 STATE LICENSING 130
3.6 COMPLIANCE WITH FEDERAL, STATE, AND LOCAL CODES 130
3.7 MISCELLANEOUS REQUIREMENTS 131
SECTION 4: CONTRACT CLAUSES 132
4.1 CLAUSES INCORPORATED BY FULL TEXT 132
4.1.1 GSAR 552.204-9 Personal Identity Verification Requirements (Oct 2012) 132
4.1.2 FAR 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders – Commercial Items (May 2019) 132
4.1.3 FAR 52.216-18 Ordering (Oct 1995) 141
4.1.4 FAR 52.216-22 Indefinite Quantity (Oct 1995) 142
4.1.5 FAR 52.217-8 Option to Extend Services (Nov 1999) 142
4.1.6 FAR 52.217-9 Option to Extend the Term of the Contract (Mar 2000) 142
4.1.7 FAR 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction (Feb 1999) 143
4.1.8 FAR 52.216-19 Order Limitations (Oct 1995) 144
4.2 CLAUSES INCORPORATED BY REFERENCE 144
4.2.1 FAR 52.204-19 Incorporation by Reference of Representations and Certification 144
4.2.2 FAR 52.212-4 Contract Terms and Conditions—Commercial Items (Oct 2018) 144
4.2.3 GSAR 52.212-4 Contract Terms and Conditions—Commercial Items FAR Deviation 144
4.2.4 GSAM 552.212-71 Contract Terms and Conditions Applicable to GSA Acquisition of Commercial Items (Jun 2016) 144
4.2.5 FAR 52.252-2 Clauses Incorporated by Reference (Feb 1998) 145
SECTION 5: LIST OF ATTACHMENTS (DOCUMENTS, EXHIBITS, AND OTHER
ATTACHMENTS) 148
EXHIBIT 1: Proposal Checklist Cover Sheet 148
EXHIBIT 2: Standard Form 1449 (Solicitation/Contract/Order for Commercial Items) 148
EXHIBIT 3: Solicitation Line Item Pricing Table 148
EXHIBIT 4: Building Information Sheet 148
EXHIBIT 5: Energy and Water Efficiency Monthly Report 148
EXHIBIT 6: Maintenance Submittal 148
EXHIBIT 7: Construction Services Form 148
EXHIBIT 8: Chart of Deliverables 148
EXHIBIT 9: Smart Building 148
EXHIBIT 10: QASP 148
EXHIBIT 11: Unit Price Agreement 148
EXHIBIT 12: Wage Determination CBA WD 1989-0460 Rev 16 2018-10-09 148
EXHIBIT 13: Wage Determination CBA (IUOC) 2018-07-31 148
EXHIBIT 14: Wage Determination DB WD MA190001 Rev 04 2019-07-05 148
EXHIBIT 16: Contractor’s Qualifications and Financial Form (GSA-527) 148
EXHIBIT 17: Past Performance Reference Form CPARS 148
EXHIBIT 18: Equipment List 148
EXHIBIT 19: Public Building Maintenance Standards Guide 2018 148
EXHIBIT 20 Service Call Log May 2019 - July 2019 148
EXHIBIT 21 Repairs 2016 - 2019 148
EXHIBIT 22 Construction Orders 2016 - 2018 148
EXHIBIT 23 GSA-Approved Devices 148
EXHIBIT 24 GSA Region 1 NCMMS Operations Policy 148
EXHIBIT 25 GSA Region 1 NCMMS Startup Flowchart 148
EXHIBIT 26 Child Care Equipment Inventory 148
SECTION 6: REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF
BIDDERS/OFFERORS 149
6.1 PROVISIONS 149
6.1.1 FAR 52.212-3 Offeror Representations and Certifications Commercial Items (Oct 2018)
6.1.2 FAR 52.223-1 Biobased Product Certification (May 2012) 166
6.1.3 FAR 52.223-2 Affirmative Procurement of Biobased Products under Service and Construction Contracts (Sep 2013) 166
SECTION 7: INSTRUCTIONS, CONDITIONS, AND NOTICES TO BIDDERS/OFFERORS 167
7.1 PROVISIONS INCORPORATED BY REFERENCE: 167
7.1.1 FAR 52.212-1 Instructions to Offerors—Commercial Items (Oct 2018) Tailored 167
7.1.2 FAR 52.223-1 Biobased Product Certification (May 2012) 171
7.1.3 FAR 52.223-4 Recovered Material Certification (May 2008) 171
7.2 SUBMISSION REQUIREMENTS: 171
7.2.1 Price and Business Proposal 171
7.2.1.1 Price Proposal 171
7.2.1.2 Pricing Spreadsheet 171
7.2.1.3 Contractor Team Arrangement 171
7.2.1.4 Small Business Standing 172
7.2.1.5 Current Certified Financial Statement(s) 172
7.2.1.6 Representations and Certifications of Offerors 173
7.2.1.7 Proposal Format and Page Count Limitation 173
7.3 PREPROPOSAL CONFERENCE & SITE VISIT: 173
7.4 SUBMISSION OF QUESTIONS: 174
7.5 SUBMISSION OF PROPOSALS: 174
7.6 NOTE TO OFFERORS REGARDING PRICE 173
SECTION 8: EVALUATION FACTORS FOR AWARD 175
8.1 EVALUATION 175
8.1.1 FAR 52.212-2 Evaluation—Commercial Items (Oct 2014) Tailored 175
8.1.2 Price Evaluation 176
8.1.2.1 Price Reasonableness 176
8.1.2.2 Unbalanced Prices 176
8.1.2.3 Evaluation of Options 176
8.1.2.4 Total Evaluated Price 177
8.1.3 Review of Joint Ventures, Mentor-Protégé Agreements, and Partnerships 177
SECTION 0: CONTRACT FORMS AND SERVICES
0.1 CONTRACT FORMS
See attached Standard Form 1449.
0.2 SERVICES ORDERING
See attached Solicitation Line Item Pricing Table.
SECTION 1: SCOPE OF WORK
1.0 GENERAL CONTRACT REQUIREMENTS
1.0.0 GENERAL
This is a Performance Work Statement (PWS) for Facilities Engineering: Operations, Maintenance, and Related Services defined under the scope of this contract. This PWS describes the minimum requirements of the U.S. General Services Administration (GSA) and acceptable outcomes to be performed by the Operations and Maintenance Contractor (known from here on as Contractor). All, or part of, the successful offeror’s Management Plan shall be incorporated into the contract.
GSA seeks to establish a partnering relationship with the Contractor to accomplish the program objectives in this contract. The objective of the partnering process is to provide an effective problem-finding/problem-solving management team composed of personnel from both parties, thus creating a single culture with one set of goals and objectives. Partnering requires that both parties recognize and address those opportunities and challenges that shall be confronted to help maintain the health of the Contractor/GSA relationship. The relationship is based on trust, dedication to common goals, and an understanding of each other's individual expectations and values. The team shall consider utilizing a facilities engineering and systems thinking approach to provide solutions from a global perspective.
The outcome of this initiative is for GSA to leverage Contractor expertise to assist GSA in accomplishing these goals and objectives.
GSA intends to purchase Contractor provided technical and managerial expertise to assist in the holistic management of assets over the long term. This program strategy has taken the name “facilities engineering” and has proven to be a successful model resulting in efficient and effective management of assets while maintaining a lower overall cost of operations. The facilities engineering model is dependent upon an effective partnership with a highly skilled Contractor whose objectives are based on mutual understanding of the stated requirements and objectives. A higher level of effective communication between the Government and Contractor is essential for partnering and for this performance based service contract to succeed, whereas the success of this contract is shared between the Government and the Contractor. More emphasis is placed on the Contractor’s self-management of quality, not the usual inspection by Government inspectors, although that is a part of this contract as well. All parties shall act proactively to reduce service cost.
To establish a standard of facilities engineering practices, thought processes and problem solving throughout the model, GSA established a program philosophy rooted in “systems thinking” whereby the means and methods for providing building operations and maintenance are established through investigations, metrics, and feedback loops, and by establishing a partnership between the Government and Contractor to achieve joint performance objectives. The goal of applying systems thinking to facility management is to see that every action or decision in operating, maintaining, and retrofitting a building shall result in an impact (financial, environmental or, human resource, or any combination thereof), and to evaluate the “full circle” implications. Long term application of systems thinking throughout GSA has resulted in both Contractor and Government joint command of short-term and long-term cohesive management of real property assets.
GSA is committed to Federal leadership in the design, construction, and operation of high-performance and sustainable buildings. A major element of this strategy is the implementation of common strategies for operating and maintaining buildings. As a result, this contract requires the Contractor to participate and partner with the Government in the initiative of obtaining high performance and sustainable operations, inclusive of initiatives to conserve energy and water consumption, recycling programs, meeting or exceeding specific environmental, regulatory, or performance standards, and the utilization of green products and services. The following sections detail the GSA minimum requirements and acceptable outcomes. The Contractor shall closely monitor all aspects of the work, identify deficiencies and implement corrective action, without reliance on Government oversight.
To the extent possible and consistent with EO 13788, the Contractor shall maximize the use of goods, products and materials that are produced in the United States.
1.1 SCOPE OF WORK
1.1.1 Scope of Work
The Contractor shall provide management, supervision, labor, materials, equipment, and supplies (shipping & handling) and shall be responsible for the efficient, effective, economical, and satisfactory operation, scheduled and unscheduled maintenance, repair of equipment and systems, and all related services located within the property line of the following locations:
John F. Kennedy Federal Building (MA0131ZZ) 15 New Sudbury Street Boston, Massachusetts 02203-0002
Additional services may be ordered at the discretion of GSA for work relating to the operations, maintenance and repair or upgrade of the facilities listed above, but not covered in the basic services of the contract. Government furnished items are specifically excluded in this contract, except as specified in Section 3.
1.1.1.1 Discrepancy in the Specifications
In any cases of discrepancy in the specifications, the matter shall be immediately submitted to the Contracting Officer (CO). The decision of the CO as to the proper interpretation of the specifications shall be final in accordance with the Disputes Clause of this Contract.
1.1.2 Personnel
The Contractor shall adhere to the submitted staffing plan and subcontracting plan that was submitted prior to award as part of the Bid proposal. Contractor shall submit staffing/subcontractor plan that provides sufficient numbers of staff at the various levels of expertise to ensure all scheduled and unscheduled services are performed and conditions are maintained to avoid any disruption to the tenant. Any changes to the proposed staffing levels, qualifications of proposed staff or key personnel, or the areas of expertise or disciplines of the proposed staff shall be submitted for review and approval from the CO or their designee.
1.1.2.1 Contractor Key Personnel
The Contractor shall designate a Contract Project Manager in writing and provide the name and contact information to the CO. The Contract Project Manager is considered essential to the work being performed under this Contract. Before removing, replacing, or diverting the Contract Project Manager, the Contractor shall (1) notify the CO four weeks in advance and
(2) submit justification (including proposed substitutions) in sufficient detail to permit evaluation of the impact on this Contract.
The Contract Project Manager shall possess at least five years of recent (within the past seven years) experience in the management and supervision of building mechanical operations and maintenance for buildings of the approximate size, complexity and characteristics of the buildings to be covered by this Contract. A detailed resume shall be submitted to the CO or their designee for approval prior to the assignment of the project manager to the Contract. Both new and replacement project manager’s shall meet these qualification standards. Minimally, the resume shall contain:
a. The full name of the proposed project manager.
b. A detailed description of the proposed project manager’s employment history for the previous five years. The names and addresses of the companies for whom the proposed project manager worked for the past five years, along with the names and telephone numbers of the immediate supervisors.
c. While submission of contact information for the immediate supervisors of proposed personnel is preferred, Offerors who are unwilling or unable to provide this contact information may provide alternate reference contact information. Be aware, however, that those references should be able to speak substantively to the proposed person’s recent and relevant performance, capabilities, and background.
The Chief Engineer shall possess at least five of recent (within the past 7 years) experience in directing operation and maintenance of equipment in a supervisory capacity for equipment of the approximate size, complexity, and other characteristics of the equipment to be operated and maintained under this Contract. A detailed resume containing the information specified in this document shall be submitted to the CO or their designee for approval prior to the assignment of any supervisor to the Contract. Both new and replacement onsite supervisors shall meet these qualification standards. Minimally the resume shall contain:
1. The full name of the proposed Chief Engineer.
2. A detailed description of the previous 7 years’ employment history of the proposed Chief Engineer.
3. The names and addresses of the companies for whom the proposed Chief
Engineer worked for the past 7 years, along with the names and telephone numbers of the immediate supervisors.
1.1.2.2 Authority
The Contract Project Manager shall have complete authority to act for the Contractor in every detail during the term of the Contract, and shall have the authority to exercise financial expenditures and controls, accept notices of deductions, inspection reports and all other correspondence on behalf of the Contractor. This Contract requires onsite managerial supervision. The Contractor can fulfill this requirement by having the Contract Project Manager located onsite or having an additional onsite Supervisor. If the Contractor decides that the requirement is to be filled with an onsite supervisor, the above requirements for Contract Project Manager shall be the same.
1.1.2.3 Communication Equipment
The Contractor shall provide key operational personnel (Managers, Supervisors, and Mechanical Engineers, Mechanical Supervisors, Operating Engineers, Heating, Ventilation and Air Conditioning (HVAC) Mechanics) with portable electronic means to communicate with GSA for all work covered under this Contract (Work Orders, emergencies, status of projects). Outside of normal working hours, the Contractor shall maintain some designated form of communication with on-call staff to allow the CO or their designee to contact such on-call staff at any time for emergency response. Electronic communication methods are the following:
● Phone/Emails/Text messaging smartphone or tablet devices, and two-way radios. All contract staff should be equipped with two-way radios. The frequency is to match existing systems already in use. It is the contractor responsibility to maintain licenses. The Contractor is responsible for all initial and monthly costs associated with the device(s). In areas where cellular service is unavailable, or unreliable, special exceptions shall be made by the CO or designee on a case-by-case basis. Such devices shall be on the list of GSA- approved devices and are to be processed through GSA’s procedures for remote mobile management. This shall allow for mobile access to GSA email, the National Computerized Maintenance Management System (NCMMS) mobile environment and Building Automation Systems (BAS) alarms. The process for this and the list of currently approved devices is available upon request. Contractor personnel under this Contract must obtain and maintain an official GSA ENT account (this is your enterprise account for signing into systems administered by GSA) and monitor their GSA email account for all notifications.
● Administrative Station – Contractor shall provide at least one Desktop/Laptop device per each contract group of buildings for NCMMS. Contractor shall maintain the device per GSA IT requirements, including patching and security software. Contractor shall provide and maintain core Operating Systems, updates, revisions and Microsoft Office (MS Office) tools.
1.1.2.3.1 CIO 2100 IT Security Policy
The Contractor shall ensure compliance with GSA Order CIO 2100.1L. Contractor core personnel under this Contract must obtain an official GSA email account. Employees must have clearance before they shall access GSA email, NCMMS, or other Government systems. The GSA Order CIO 2100 prohibits an employee or Contractor supporting GSA from creating or sending information using a non-official GSA electronic messaging account (i.e., company or personal email account). The Contractor shall ensure compliance with the Department of Homeland Security ICS-CERT cyber security guidance and recommendations. Guidance can be found at the web site in document titled “Web Links” at: Operations and Maintenance Specification
1.1.2.4 Language
On-site personnel and the Contractor’s Point of Contact (POC) for GSA need to be proficient in English, and must be able to read, write, speak, and understand English.
1.1.2.5 Employee Suitability
The GSAR 552.237-71 Qualifications of Employees (1989) clause shall be followed at all times during the performance of this Contract.
a. All Contract employees requiring routine unescorted access to federally controlled facilities or information systems, or both, for more than six months (Regular Employees) shall be required to undergo a suitability determination before a personal identification verification (PIV) card is issued. Prior to the time that an identification card is issued, such Regular Employees shall be required to comply with normal facility access control procedures, including recording presence, temporary badging, and escorted entry, as applicable.
b. Failure of a Regular Employee to receive a favorable suitability determination shall be cause for removal of the employee from the work site and from other work in connection with the Contract.
c. Contract employees working less than six months (Temporary Employees) shall, at the Government's option, be required to undergo a lesser form of suitability determination. Prior to the time that an identification card is issued, if at all, such Temporary Employees shall be required to comply with normal facility access control procedures, including recording presence, temporary badge, and escorted entry, as applicable.
d. The Government, at its sole discretion, may grant temporary suitability determinations to Regular or Temporary Employees. However, the granting of a temporary suitability determination to any such employee shall not be considered as assurance that a favorable suitability determination shall follow.
e. The CO or designee shall provide the Contractor with the required clearance procedures for obtaining necessary clearances. The Contractor shall comply with these clearance procedures.
f. The Contractor shall be responsible for planning and scheduling its work in such a manner as to account for facility access issues. Difficulties encountered by the Contractor in gaining access to facilities by its employees and subcontractors shall not be an excuse for any lack of Contractor performance under the Contract.
g. If the Government receives an unsuitable report on any Contractor employee, or if the Government finds a Contractor employee to be otherwise unsuitable or unfit for his assigned duties, the Contractor shall be advised immediately by the CO or designee that such employee is not allowed to work under this contract. The Contractor must then take action immediately to relieve the employee of all duties and responsibilities related to this contract and return any government issued Identification credentials. The contractor will not be compensated for such actions. Unsuitable contract employees may be escorted off Federal property by DHS/FPS or other law enforcement entities depending on the reason for the unsuitable determination.
1.1.2.6 Employee Technical Qualifications
Employees or subcontractors performing Contract work involving the operation, maintenance or repair, inspection, or testing of any piece of equipment or system shall be trained and possess the knowledge, experience and skills pertinent to the equipment or system as demonstrated by a current training certificate from an equipment manufacturer or a certificate by an organization acceptable to the CO. Contractor personnel shall have
NCMMS skills sufficient for “Use of NCMMS” as described in this subsection. All personnel or sub-contractor personnel shall possess all certifications and licenses required by Federal, state and local jurisdictions and National Fire Protection Association (NFPA) 72, National Fire Alarm Code, section 10.5, for equipment that they shall be operating, maintaining, repairing, inspecting or testing. At a minimum, a mechanic in each trade (e.g., electric, HVAC, plumbing) shall be a licensed journeyman grade in the local municipality in which they are working. All personnel under the team leader or sub-contractor personnel shall have the experience and skill set knowledge as described in the Service Contract Act (SCA) Directory of Occupations, Fifth Edition or later. For example, HVAC mechanics need to be as proficient as dictated by the 23410 and 23411 series and general maintenance mechanic shall be as proficient as dictated by the 23370 series.
1.1.2.7 Certifications
Copies of all certifications for Contractor employees shall be kept on-site and provided to the Government upon request. The Contractor shall provide to the CO or their designee documentation of the certificates of training, licenses, and permits for all new employees not later than seven calendar days prior to that person beginning work under the terms of this Contract. The Contractor shall ensure that all certificates of training, licenses, permits, and bonds are current and valid and are loaded in NCMMS.
1.1.2.7.1 Qualifications of Fire Alarm System Technicians
a. Technicians performing contract work involving the inspection, testing, and preventive maintenance or repair of fire alarm systems shall be certified by the National Institute for Certification in Engineering Technologies (NICET) and possess at least a NICET Level 2 (Associate Engineering Technician) in Fire Protection Engineering Technology, Fire Alarm Systems. The Contractor shall submit to the CO or designee the NICET level certification number and expiration date for each field technician and inspector responsible for performing fire alarm system preventive maintenance and repair services required under the terms of this Contract.
b. Technicians modifying the programming software of the fire alarm system shall also be factory trained and certified by the system manufacturer for the specific type and brand of fire alarm system being serviced. The Contractor shall submit to the CO or designee the factory trained certification number and expiration date for each specific manufacturer’s equipment for each technician responsible for performing programming of the fire alarm system.
1.1.2.7.2 Qualifications of Water-Based Fire Suppression System Technicians
Technicians performing contract work involving the inspection, testing, and preventive maintenance or repair of water-based fire suppression systems shall be certified by the National Institute for Certification in Engineering Technologies (NICET) and possess at least a NICET Level 2 (Associate Engineering Technician) in Fire Protection Engineering Technology, Inspection, and Testing of Water-Based Systems. The Contractor shall submit to the CO or designee the NICET level certification number and expiration date for each field technician and inspector responsible for performing water-based fire suppression system PM and repair services required under the terms of this Contract.
1.1.2.7.3 Qualifications of Dry Chemical Extinguishing System, Wet Chemical Extinguishing System; Clean Agent Fire Extinguishing System; Halogenated Extinguishing System; Carbon Dioxide Extinguishing System; Ventilation System Fire Extinguishing System; Smoke Control; Fire Damper; Smoke Damper; Combination Fire/Smoke Damper; Fire-rated Door Assemblies; Smoke Door Assemblies; Portable Fire Extinguisher; Emergency and Standby Power; Emergency Lighting Equipment;
Exit Signage Technicians
Technicians shall be trained and possess a current training certificate for inspecting, testing, and maintaining these components from an equipment manufacturer or a certificate by an organization acceptable to the CO. The Contractor shall submit to the CO or designee the certification document and expiration date, issued by the equipment manufacture or organization confirming the technician has been trained, for each field technician and inspector responsible for performing the inspection, testing, and maintenance of such systems/equipment under the terms of this Contract.
1.1.2.7.4 Qualifications for Electrical Technician
Technicians performing Contract work involving inspections, testing, and maintenance for the electrical switchgear shall meet the qualifications by the American National Standards Institute/International Electrical Testing Association ETT-2015, Standard for Certification of Electrical Testing Technicians or qualifications by the National Institute for Certification in Engineering Technologies (NICET) and hold at least a Level 3 certification.
The Contractor shall provide documentation to the CO or designee on qualifications identified in this standard. Certification can be obtained through; the ANSI/NETA Certification program or Electrical Testing Technician Certification Institute. Guidance can be found at the web site in document titled “Web Links” at: Operations and Maintenance Specification.
Alternate certifications presenting evidence of equal or greater skills and qualification may be substituted; however, the burden to evidence the quality of such certification falls fully upon the vendor.
1.1.2.8 Employee Training
The Contractor shall submit a training program to ensure employees working in a Federal building have the experience, knowledge, skills and abilities to perform the work required by this Contract. The Contractor shall document training and provide documentation to the CO or designee.
1.1.2.8.1 Asbestos Awareness Training
The Contractor shall ensure that all employees, including replacement workers, receive asbestos training and refresher training in accordance with 40 C.F.R part 763 and 29 C.F.R.
part 1910. The Contractor shall follow all instructions for each asbestos class job as outlined in 29 C.F.R. part 1910. The training shall be conducted, at no additional expense to the Government, within 60 calendar days of Contract start date. The Contractor shall submit written certification to the CO or designee within five calendar days of the completion of training.
1.1.2.8.2 Re-Tuning Training
The Contractor shall ensure that all Mechanical Engineers, Mechanical Supervisors, Operating Engineers, HVAC Mechanics, and Control Technician employees, including replacement workers, receive Building Re-Tuning Training, (guidance can be found at the web site in document titled “Web Links” at: Operations and Maintenance Specification a five
(5) to six (6) hour online course) and refresher training every two years. The training shall be conducted, at no additional expense to the Government, within 60 calendar days of the Contract start date. The Contractor shall submit written certification to the CO or designee within five (5) calendar days of the completion of training for each employee identified above.
1.1.2.8.3 HVAC Continuing Education Requirements and Certifications
All HVAC personnel designated to operate, maintain, or repair any combination of HVAC equipment or systems shall possess one or more of the following certifications:
a. North American Technician Excellence (NATE) HVAC Service Technician Certification
b. HVAC Excellence Professional Level Certification
c. UA Star HVAC Mastery Certification
d. Journeymen Certifications
All HVAC personnel designated, to operate, maintain, and repair any combination of HVAC equipment or systems shall maintain a minimum of 16 hours of continuing education per year from either NATE, HVAC Excellence, or UA Star recognized provider program.
The Contractor shall submit written certification to the CO or designee.
1.1.2.8.4 NCMMS Training
The Contractor shall ensure that all staff and replacement staff using the NCMMS receives virtual NCMMS Training, which takes approximately 12 hours to complete and can be found at the website in document titled “Web Links” at: Operations and Maintenance Specification.
The training shall be completed at no additional expense to the Government, during Contractor’s inbound transition period. The Contractor shall submit written certification to the CO or designee within five (5) calendar days of the completion of training for each employee who uses the NCMMS. The NCMMS regional trainers will take attendance and administer quizzes during the course. Trainees who pass the quizzes will receive credit for completing class.
1.1.2.8.5 Lead Awareness Training
The Contractor shall ensure that all employees, including replacement workers, receive lead awareness training and refresher training in accordance with 29 CFR 1910.1025(l) (1) (i).
The training shall be conducted, at no additional expense to the Government, within 60 calendar days of Contract start date. The Contractor shall submit written certification to the CO or designee within five (5) calendar days of the completion of training.
No lead in John F. Kennedy Federal Office Building.
1.1.2.9 Appearance
Contractor personnel shall present a neat appearance and be easily recognized. This shall be accomplished by wearing uniforms bearing the name of the company. Uniforms shall be regularly laundered, consistent among personnel classifications, and maintained presentable to tenant personnel during all working hours.
1.1.2.10 Standards of Conduct
The Contractor shall be responsible for maintaining satisfactory standards of employee competency, conduct, appearance, and integrity and shall be responsible for taking disciplinary action with respect to its employees, as necessary. The Contractor is responsible for ensuring that its employees do not disturb papers on desks, open desk drawers or cabinets, or use Government telephones, except as authorized. Each employee must adhere to standards of behavior that reflect favorably on his or her employer and the
Federal Government. Smoking is only allowed in designated areas on the property and no smoking is allowed within the Facility.
1.1.2.11 Recording Presence
Each Contract employee shall sign in when arriving and departing the facility daily and follow card access requirements as directed by the CO or designee. The Contractor shall accumulate GSA Form 139 (Record of Time of Arrival and Departure from Building) or other designated form for use in recording presence each calendar week, and certifies in writing on each form that the information shown is true and correct within 5 calendar days of the end of the work week. The Contractor shall provide copies of these records to the CO or designee upon request.
1.1.2.12 Personal Identity Verification Requirements
Contractor employees that require access to GSA-controlled facilities or information systems to perform Contract requirements shall comply with GSA personal identity verification requirements, guidance can be found at the web site in document titled “Web Links” at:
Operations and Maintenance Specification. The Contractor shall insert this clause in all subcontracts when the subcontractor is required to have access to a GSA-controlled facility or access to a GSA-controlled information system.
1.1.2.13 Credentials and Identification
Contractor personnel with credentials shall be required to comply with all access security screening procedures applicable to Government or other personnel possessing similar credentials, or as determined by the building practices as defined by the Facility Security Committee. All Contractor personnel possessing credentials (PIV or otherwise) shall visibly display their credentials at all times while in the building(s) where work is being performed.
The Contractor shall be responsible for ensuring that all identification credentials are returned to the CO or designee whenever its employees leave the Contract (i.e., when the Contract has been completed, employees leave the company, employees are dismissed or terminated or the Government determines that the employee is to be removed from the contract). The Contractor shall notify the CO or designee whenever employee badges are lost.
The Contractor shall be responsible for paying the Government for replacement credentials at the current cost per badge.
1.1.2.14 Escorting
Temporary contract employees who do not have favorable preliminary or final suitability determinations and need to work in non-public federally-controlled space must be escorted.
In those cases, the Contractor shall comply with the security clearance procedures for Escort Only Contractors. All uncleared contract employees shall be escorted in non-public space by a Government employee or another responsible cleared contract employee who is approved by the CO or designee. Other Government agencies shall have specific agency security requirements for their own space that shall only allow escort by Government employees or those designated by their agency. Government employees or approved cleared contract employees who provide escorts for uncleared contract employees shall always be within eyesight of the uncleared contract employees. The Contract Government escort shall watch uncleared employees and remain with uncleared contract employees for the entire time they are in non-public federally controlled space. Any security violation of escort requirements by a cleared and approved contract employee shall result in the immediate removal from the Contract of all contract employees involved, i.e., escorts and uncleared escorted contract employees. Also, violations of escort requirements by subcontract employees in accordance with security requirements shall be grounds for loss of facility access for those individuals or grounds for termination of Contract, or both.
1.1.3 Quality Control Program
A Quality Control Program (QCP) shall be developed and implemented by the Contractor.
The Contractor’s QCP shall ensure Contract compliance, and act to ensure that potential problems with building services, equipment and systems are identified, documented, and resolved prior to failure. In the event the Government Quality Assurance Program identifies deficiencies the Contractor shall implement progressively responsive quality control measures commensurate with the severity of the Government's deficiencies. Deficiencies identified by the QCP or QASP shall be recorded in the NCMMS and corrected.
1.1.3.1 Quality Control Plan
The “Quality Control Plan” (QC plan) is the Contractor’s complete written system for identifying and correcting deficiencies in the quality of services. Preparation of the QC Plan is the responsibility of the Contractor, and a QC Plan Outline is due with the Contractor’s proposal. The complete QC Plan is due within 30 days of Contract Award.
The QC plan, revisions or updates shall be submitted for approval by the CO or designee.
A review of the QC Plan can be initiated by direction of the CO or designee.
1.1.3.2.1 Quality Control Plan Contents
The QC plan shall detail the Contractor’s methods, frequencies, documentation, and remedies for ensuring that work performed is of the highest quality. It shall describe procedures for correcting problems and addressing quality assurance findings by the Government. The Contractor shall further customize the QC plan to meet facility specific conditions, describing the Contractor’s overall approach, service calls and preventive maintenance/inspection schedules, roles and responsibilities as it relates to quality control.
The QC plan is to be submitted for review and approval to the CO or designee within 30 calendar days of Contract start date.
1.1.3.2.1 Inspection…
This is the start of the file's text. The full file is on GovTribe.