47PB0019R0002_Solicitation_Exhibit_17_Equipment_List.xlsx

XLSX spreadsheet 98 KB Posted

Attached to
Operations and Facilities Maintenance Services at the John F. Kennedy Federal Building in Boston, MA
Solicitation number
47PB0019R0002
Issued by

About this file

47PB0019R0002 Solicitation Exhibit 17 Equipment List

View the file

Other files

File Type Posted
47PB0019R0002_Tab_10_Solicitation_Amend_04_SF-30_Amendment_Form_2019_08_13.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_04_Solicitation_Questions_and_Answers_2019_08_13.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_03_SF-30_Amendment_Form_2019_08_12.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_03_Attach_01_Solicitation_Exhibit_02_SF-1449_Solicitation_Form_2019_08_12.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_20_Service_Call_Log_May_2019_-_July_2019.xlsx XLSX spreadsheet
47PB0019R0002_Tab_10_Solicitation_Amend_02_Solicitation_Questions_and_Answers_2019_08_02.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_01_Proposal_Checklist_Cover_Sheet_2019_08_02.docx DOCX document
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_23_GSA-Approved_Devices.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_15_SCA_WD_Suffolk_2015_4047_Rev_11_2019_07_16.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_02_SF-30_Amendment_Form_2019_08_02.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_21_Repairs_2016_-_2019.xlsx XLSX spreadsheet
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_25_GSA_Region_1_NCMMS_Startup_Flowchart.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_10_QASP_2019_08_02.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_02_Solicitation_Changes_Summary_2019_08_02.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_03_Solicitation_Line_Item_Pricing_Table_2019_08_02.xlsx XLSX spreadsheet
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_22_Construction_Orders_2016_-_2018.xlsx XLSX spreadsheet
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_04_Building_Information_Sheet_2019_08_02.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_24_GSA_Region_1_NCMMS_Operations_Policy.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_06_Maintenance_Submittal_2019_08_02.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_11_Unit_Price_Agreement_2019_08_02.xlsx XLSX spreadsheet
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_18_Equipment_List_2019_08_02.xlsx XLSX spreadsheet
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_26_Child_Care_Equipment_Inventory.xlsx XLSX spreadsheet
47PB0019R0002_Tab_10_Solicitation_Amend_02_Solicitation_2019_08_02.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_01_Attach_07_Pre-Proposal_Conference_Presentation_2019_07_17.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_01_Attach_03_Solicitation_Exhibit_01_Proposal_Checklist_Cover_Sheet_2019_07_18.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_01_Attach_06_Solicitation_Exhibit_18_PBS_Maintenance_Standards_Guide_2018.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_01_Attach_08_Pre-Proposal_Conference_Sign-in_Sheet_2019_07_17.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_01_SF-30_Amendment_Form_2019_07_18.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_01_Attach_05_Solicitation_Exhibit_17_Equipment_List.xlsx XLSX spreadsheet
47PB0019R0002_Tab_10_Solicitation_Amend_01_Attach_01_Solicitation_2019_07_18.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_01_Attach_02_Solicitation_Changed_Pages_2019_07_18.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_01_Attach_04_Solicitation_Exhibit_02_SF-1449_Solicitation_Form_2019_07_18.pdf PDF
47PB0019R0002_Solicitation_Exhibit_18_GSA_Public_Building_Maintenance_Standards_Guide_2018_12_31.pdf PDF
47PB0019R0002_Solicitation_Exhibit_07_Construction_Services_Form.xlsx XLSX spreadsheet
47PB0019R0002_Solicitation_Exhibit_11_Unit_Price_Agreement.xlsx XLSX spreadsheet
47PB0019R0002_Solicitation_Exhibit_16_Past_Performance_Reference_Form.doc DOC document
47PB0019R0002_Solicitation_2019_07_12.pdf PDF
47PB0019R0002_Solicitation_Exhibit_06_Maintenance_Submittal.pdf PDF
47PB0019R0002_Solicitation_Exhibit_12_CBA_WD_1989-0460_Rev_16_2018_10_09.pdf PDF
47PB0019R0002_Solicitation_Exhibit_15_GSA_Form_527_Contractor_Qualifications_and_Financial_Information.pdf PDF
47PB0019R0002_Solicitation_Exhibit_09_Smart_Buildings.pdf PDF
47PB0019R0002_Solicitation_Exhibit_14_DB_WD_MA190001_Rev_04_2019_07_05.pdf PDF
47PB0019R0002_Solicitation_Exhibit_03_Solicitation_Line_Item_Pricing_Table.xlsx XLSX spreadsheet
47PB0019R0002_Solicitation_Exhibit_02_SF-1449_Solicitation_Form.pdf PDF
47PB0019R0002_Solicitation_Exhibit_05_Energy_Water_Monthly_Report.pdf PDF
47PB0019R0002_Solicitation_Exhibit_10_QASP.pdf PDF
47PB0019R0002_Solicitation_Exhibit_04_Building_Information_Sheet.pdf PDF
47PB0019R0002_Solicitation_Exhibit_13_CBA_SIGNED_2018_07_31.pdf PDF
47PB0019R0002_Solicitation_Exhibit_01_Proposal_Checklist_Cover_Sheet.pdf PDF
47PB0019R0002_Solicitation_Exhibit_08_Chart_of_Deliverables.pdf PDF
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Report

EXHIBIT 8
O&M EQUIPMENT LIST
AssetTypeAssetDescriptionQuantityLocationDescriptionManufacturerSerialNumberModelNumberStatus
ACCCONDENSER, AIR-COOLED1.00MA0131ZZ-High Rise-Mechanical Equipment RoomOPERATING
ACCCondensers,Packaged Air Cooled,Compressor Type,Screw1.00MA0131ZZ-RoofLEIBERT91010297DNT 940AOPERATING
ACCCondensers,Packaged Air Cooled,Compressor Type,Screw1.00MA0131ZZ-RoofLEIBERT91010295DNT 940AOPERATING
ACCCondensers,Packaged Air Cooled,Compressor Type,Screw1.00MA0131ZZ-RoofLEIBERT91010367DNT 940AOPERATING
ACCCondensers,Packaged Air Cooled,Compressor Type,Screw1.00MA0131ZZ-RoofLEIBERT91010296DNT 940AOPERATING
ACCCondensers,Packaged Air Cooled,Compressor Type,Screw1.00MA0131ZZ-RoofLEIBERT91010293DNT 940AOPERATING
ACCCondenser package unit H/R Roof1.00MA0131ZZ-RoofLIEBERTC15CT22972Liebert DDNT940AOPERATING
ACCCONDENSER, AIR-COOLED1.00MA0131ZZ-RoofLIEBERTC15CT22972LEIBERTDDNT940AOPERATING
ACCCondensers,Packaged Air Cooled,Compressor Type,Screw1.00MA0131ZZ-Basement-Air Handing RoomBRYANT3012E21232123ANA048-COPERATING
ACCCondensers,Packaged Air Cooled,Compressor Type,Screw1.00MA0131ZZ-Basement-Air Handing RoomCARRIER4194E0319238YKC036300OPERATING
ACCCondensers,Packaged Air Cooled,Compressor Type,Screw1.00MA0131ZZ-Low Rise Roof-East AreaLEIBERT0208C54779DDNT225A16OPERATING
ACCCondensers,Packaged Air Cooled,Compressor Type,Screw1.00MA0131ZZ-Low Rise Roof-West AreaLEIBERTC12AAT20217DDNT940AOPERATING
ACCCondensers,Packaged Air Cooled,Compressor Type,Screw1.00MA0131ZZ-Low Rise Roof-West AreaLEIBERTC12BT20220DDNT940AOPERATING
ACCCONDENSER, AIR-COOLED1.00MA0131ZZ-GarageMCQUAY5738509001McQuay ALPO120OPERATING
ACCCONDENSER, AIR-COOLED1.00MA0131ZZ-GarageCARRIER4194E03192Carrier 38YKC036-300OPERATING
ACCCompressor for AHU Ground Floor FPS1.00MA0131ZZ-GarageMCQUAY5738509001McQuay ALPO120OPERATING
ACCCompressor for AHU Ground Floor FPS1.00MA0131ZZ-GarageCARRIER4194E03192Carrier 38YKC036-300OPERATING
ACTAIR CURTAIN1.00MA0131ZZ-Exterior-Half CircleDAYTON 6E811A307070005DAYTON 6E811AOPERATING
ACTAIR CURTAIN1.00MA0131ZZ-Ground Floor-Entrance EastDAYTON307070005DAYTON 6E811AOPERATING
ACTAIR CURTAIN1.00MA0131ZZ-Ground Floor-Entrance WestDAYTON307070020DAYTON 6E811AOPERATING
ACTAIR CURTAIN1.00MA0131ZZ-Exterior-Half CircleDAYTON 6E811A307070020DAYTON 6E811AOPERATING
ACUPackaged Units,Air Conditioners,Dual Pack,Water Cooled1.00MA0131ZZ-Floor 10-Computer RoomLEIBERT305901-001FE240GUA00OPERATING
ACUPackaged Units,Air Conditioners,Dual Pack,Water Cooled1.00MA0131ZZ-Floor 10-Computer RoomLEIBERTMINIMATE / MME020G-XHOOPERATING
ACUPackaged Units,Air Conditioners,Dual Pack,Water Cooled1.00MA0131ZZ-Floor 10-Computer RoomLEIBERT305901-003FE240GUA00OPERATING
ACUPackaged Units,Air Conditioners,Dual Pack,Water Cooled1.00MA0131ZZ-Floor 10-Computer RoomLEIBERT305901-002FE240GUA00OPERATING
ACUPackaged Units,Air Conditioners,Dual Pack,Water Cooled1.00MA0131ZZ-Floor 13-Room-1325LEIBERT0722N148675MINIMATE / MMD24EX00DCOPERATING
ACUPackage A/C unit1.00MA0131ZZ-Floor 13-Room-1325LIEBERTY15DB10099LIEBERT MMD60K7AHELOPERATING
ACUPackaged Units,Air Conditioners,Dual Pack,Water Cooled1.00MA0131ZZ-Floor 16-Computer RoomLEIBERT307594-002FE110GUA00OPERATING
ACUPackaged Units,Air Conditioners,Dual Pack,Water Cooled1.00MA0131ZZ-Floor 16-Computer RoomLEIBERT307594-001FE110GUA00OPERATING
ACUPackaged Units,Air Conditioners,Dual Pack,Water Cooled1.00MA0131ZZ-Floor 19-Room-1925LEIBERTEVAP: 0237NE8530 COND: 0243N68930MINIMATE / EVAP: MMD36E YOODO COND: MCD38W3YH3OPERATING
ACUPackaged Units,Air Conditioners,Dual Pack,Water Cooled1.00MA0131ZZ-Floor 19-Room-1925EMERSON MOTORY11DB1289MMD60E7DHELDOPERATING
ACUPackaged Units,Air Conditioners,Dual Pack,Water Cooled1.00MA0131ZZ-Floor 20-Room-2050LEIBERTMINIMATE / MME060E-A01OPERATING
ACUPackaged Units,Air Conditioners,Dual Pack,Water Cooled1.00MA0131ZZ-Floor 21-Room-2155LEIBERT170597-001DELUXE SYSTEM 3 / FE240GUA00OPERATING
ACUPackaged Units,Air Conditioners,Dual Pack,Water Cooled1.00MA0131ZZ-Floor 21-Room-2155LEIBERT170597-002DELUXE SYSTEM 3 / FE240GUA00OPERATING
ACUPackaged Units,Air Conditioners,Dual Pack,Water Cooled1.00MA0131ZZ-Floor 23-Room-2335LEIBERTD059042DMC022WGP02OPERATING
ACUPackaged Units,Air Conditioners,Dual Pack,Water Cooled1.00MA0131ZZ-Floor 23-Room-2370LEIBERTD059134DMC022WGP02OPERATING
ACUPackaged Units,Air Conditioners,Dual Pack,Water Cooled1.00MA0131ZZ-Ground Floor-Phone RoomLEIBERT363191001UH116GUASMOPERATING
ACUAIR CONDITIONING MACHINE PACKAGE UNIT1.00MA0131ZZ-Floor 04-Room-DEALEIBERTY12AB16492MINIMATE / MMD96K7AHELDOPERATING
ACUAIR CONDITIONING MACHINE PACKAGE UNIT1.00MA0131ZZ-Floor 04-Room-DEALEIBERTY12AB16492MME060E-AOO/AHOOPERATING
ACUAIR CONDITIONER PACKAGE1.00MA0131ZZ-Floor 04-Room-DEALIEBERT85622LEIBERTMME024EXH1OPERATING
ACUPackage A/C unit1.00MA0131ZZ-Floor 04-Room-DEALIEBERT85622Liebert MME024EXH1OPERATING
ACUAIR CONDITIONER PACKAGE1.00MA0131ZZ-Floor 04-Room-DEALIEBERTY12CB18014LEIBERTMMD96K7AIEIBOPERATING
ACUPackage A/C unit1.00MA0131ZZ-Floor 04-Room-DEALIEBERTY12CB18014Liebert MMD96K7AIEIBOPERATING
ACUAIR CONDITIONER PACKAGE1.00MA0131ZZ-Floor 04-Room-DEALIEBERTY12CB18027LEIBERTMMD96K7AHEIBOPERATING
ACUPackage A/C unit1.00MA0131ZZ-Floor 04-Room-DEALIEBERTY12CB18027Liebert MMD96K7AHEIBOPERATING
ACUAIR CONDITIONING MACHINE PACKAGE UNIT1.00MA0131ZZ-Floor 04-Room-DEALEIBERTY12AB16441MINIMATE / MMD60K7AHELDOPERATING
ACUAIR CONDITIONING MACHINE PACKAGE UNIT1.00MA0131ZZ-Floor 04-Room-DEALEIBERTV12AB16492MINIMATE /MMD60K7AHELDOPERATING
ACUAIR CONDITIONING MACHINE PACKAGE UNIT1.00MA0131ZZ-Floor 04-Room-DEALEIBERTY12AB16420MINIMATE / MMD36K7AHELDOPERATING
ACUPackaged Units,Air Conditioners,Dual Pack,Water Cooled1.00MA0131ZZ-Floor 02-Clean RoomLEIBERT85597MINIMATE / MME036EPH1OPERATING
ACUPackaged Units,Air Conditioners,Dual Pack,Water Cooled1.00MA0131ZZ-Floor 03-North AreaLEIBERT86239MINIMATE / MME036EPH1OPERATING
ACUAIR CONDITIONING MACHINE PACKAGE UNIT COMFORT COOLING (AC27)1.00MA0131ZZ-Ground Floor-Room G38CARRIER0794A00417Carrier FB4ANF036000ABAAOPERATING
ACUAIR CONDITIONER PACKAGE1.00MA0131ZZ-Floor 12-Room-1205LIEBERT9.221E+11LEIBERTMMD20W2PHE00OPERATING
ACUPackage A/C unit1.00MA0131ZZ-Floor 12-Room-1205LIEBERT9.22E+11Liebert MMD20W2PHE00OPERATING
ACUAIR HANDLING UNIT, COMPUTER ROOM, H/R 1325 Cyber DOD1.00MA0131ZZ-Floor 13-Room-1325Y15DB10099MMD60K7AHELBOPERATING
ACUAIR CONDITIONER PACKAGE1.00MA0131ZZ-Floor 13-Room-1350LIEBERT0908N180771LEIBERTMMD14WTPH3OPERATING
ACUPackage A/C unit1.00MA0131ZZ-Floor 13-Room-1350LIEBERT0908N180771Liebert MMD14WTPH3OPERATING
ACUAIR CONDITIONER PACKAGE1.00MA0131ZZ-Floor 17-Room-1725LIEBERT0952N193331LEIBERTMMD24E7PHEDOOPERATING
ACUAIR CONDITIONER PACKAGE1.00MA0131ZZ-Floor 17-Room-1725LIEBERTY11DB19920LEIBERTMMD36E7HEDAOPERATING
ACUPackage A/C unit1.00MA0131ZZ-Floor 17-Room-1725LIEBERT0952N193331Liebert MMD24E7PHEDOOPERATING
ACUPackage A/C unit1.00MA0131ZZ-Floor 17-Room-1725LIEBERTY11DB19920Liebert MMD36E7HEDAOPERATING
ACUAIR HANDLING UNIT, COMPUTER ROOM, H/R 300 COURT ROOM 61.00MA0131ZZ-Floor 03-Room-300T12639304HBH024A8C30CRSOPERATING
ACUAIR HANDLING UNIT, COMPUTER ROOM, H/R 300 COURT ROOM 51.00MA0131ZZ-Floor 03-Room-300T11622678HBH015A8C30CLSOPERATING
ACUAIR HANDLING UNIT, COMPUTER ROOM, H/R 325 COURT ROOM 11.00MA0131ZZ-Floor 03-Room-325S13627730HBH015A8C30CLSOPERATING
ACUAIR HANDLING UNIT, COMPUTER ROOM ,H/R 325 COURT ROOM 41.00MA0131ZZ-Floor 03-Room-325S13627733HBH015A8C30CLSOPERATING
ACUAIR HANDLING UNIT, COMPUTER ROOM ,H/R 325 COURT ROOM 31.00MA0131ZZ-Floor 03-Room-325S13627731HBH015A8C30CLSOPERATING
ACUAIR HANDLING UNIT, COMPUTER ROOM, H/R 325 COURT ROOM 21.00MA0131ZZ-Floor 03-Room-325S13627732HBH015A8C30CLSOPERATING
ACUAIR CONDITIONER PACKAGE1.00MA0131ZZ-Floor 03-Room-375LIEBERT084N177498LEIBERTMMD36E-PHEDOOPERATING
ACUPackage A/C unit1.00MA0131ZZ-Floor 03-Room-375LIEBERT084N177498Liebert MMD36E-PHEDOOPERATING
ACUPackage A/C unit1.00MA0131ZZ-Floor 03-Room-375LIEBERTLiebert MMD36E-PHEDOOPERATING
ACUAIR CONDITIONER PACKAGE1.00MA0131ZZ-Floor 03-Room-375LIEBERTLEIBERTMMD36E-PHEDOOPERATING
ACUAIR CONDITIONER PACKAGE1.00MA0131ZZ-Floor 03-Room-375LIEBERT084N177520MMD20WTP00HDOPERATING
ACUPackage A/C unit1.00MA0131ZZ-Floor 03-Room-375LIEBERT084N177520MMD20WTP00HDOPERATING
ACUAIR CONDITIONER PACKAGE1.00MA0131ZZ-Floor 06-Room-625LIEBERTY13GB16903LEIBERTMMD20WTPHE70OPERATING
ACUPackage A/C unit1.00MA0131ZZ-Floor 06-Room-625LIEBERTY13GB16903Liebert MMD20WTPHE70OPERATING
ACUAIR HANDLING UNIT, COMPUTER ROOM, H/R 9251.00MA0131ZZ-Floor 09-Room-9252014-0383-BDAPG-2.532-E-POPERATING
ACUAIR CONDITIONER PACKAGE1.00MA0131ZZ-Ground Floor-Room-G-37-ABRYANT9122A85842Bryant FXDNB049T00ABAAOPERATING
ACUAIR HANDLING UNIT, COMPUTER ROOM, L/R E-130 CAC 51.00MA0131ZZ-Floor 01-Room-E-1302014-0281-BDAPG-0432-E-POPERATING
ACUAIR HANDLING UNIT, COMPUTER ROOM, L/RE-130 CAC 11.00MA0131ZZ-Floor 01-Room-E-1302014-0280-BDAPG-0432-E-POPERATING
ACUAIR HANDLING UNIT, COMPUTER ROOM, L/R E-1651.00MA0131ZZ-Floor 01-Room-E-1652014-0384-BDAPG-2.532-E-POPERATING
ACUAIR HANDLING UNIT, COMPUTER ROOM, L/R E-1901.00MA0131ZZ-Floor 03-Room-3002014-0382-BDAPG-2.532-E-POPERATING
ACUAIR CONDITIONING MACHINE PACKAGE UNIT1.00MA0131ZZ-Ground Floor-OfficeLEIBERTMNE060E-AH0OPERATING
ACUPackaged Units,Air Conditioners,Dual Pack,Water Cooled1.00MA0131ZZ-Basement-Air Handing RoomAMERICAN STANDARD542-13Order# I-76999-HOPERATING
ACUPackaged Units,Air Conditioners,Dual Pack,Water Cooled1.00MA0131ZZ-Floor 22-Room-2270LEIBERTD058648DME020EPC2OPERATING
ACUPackaged Units,Air Conditioners,Dual Pack,Water Cooled1.00MA0131ZZ-Floor 03-Room-320LEIBERTY12FBL10485MINIMATE /MMD20WDXHE7AOPERATING
ACUAIR HANDLING UNIT, COMPUTER ROOM1.00MA0131ZZ-Floor 03-Room-3002014-0280-BOPERATING
ACWAIR CONDITIONINGWINDOW UNIT(EAC-5)1.00MA0131ZZ-Floor 27CARRIERLJIY02415SL36L30A-EOPERATING
ADRDistribution Systems,Air Handling Units,Air Dryers,Refrigerated1.00MA0131ZZ-Basement-Air Handing RoomGARDNER DENVERGD75A1150306015RNC75A1C1OPERATING
ADRDistribution Systems,Air Handling Units,Air Dryers,Refrigerated1.00MA0131ZZ-Basement-Air Handing RoomAIRTEK1202-06578-D01SC80-A1OPERATING
AHU-01Distribution Systems,Air Handling Units,Modular Air Handling Units,Modular Indoor1.00MA0131ZZ-Floor 10-Room-1010SNYDER GENERAL3YG00432-04MSL 137D HOPERATING
AHU-01Distribution Systems,Air Handling Units,Modular Air Handling Units,Modular Indoor1.00MA0131ZZ-Floor 10-Room-1090SNYDER GENERAL3YG00829-04MSL 137D HOPERATING
AHU-01Distribution Systems,Air Handling Units,Modular Air Handling Units,Modular Indoor1.00MA0131ZZ-Floor 12-Room-1210SNYDER GENERAL3YG00433-04MSL 137D HOPERATING
AHU-01Distribution Systems,Air Handling Units,Modular Air Handling Units,Modular Indoor1.00MA0131ZZ-Floor 12-Room-1290SNYDER GENERAL3YG00830-04MSL 137D HOPERATING
AHU-01Distribution Systems,Air Handling Units,Modular Air Handling Units,Modular Indoor1.00MA0131ZZ-Floor 14-Room-1410SNYDER GENERAL3YG00824-04MSL 137D HOPERATING
AHU-01Distribution Systems,Air Handling Units,Modular Air Handling Units,Modular Indoor1.00MA0131ZZ-Floor 14-Room-1490SNYDER GENERAL3YG00435-04MSL 137D HOPERATING
AHU-01Distribution Systems,Air Handling Units,Modular Air Handling Units,Modular Indoor1.00MA0131ZZ-Floor 16-Room-1610SNYDER GENERAL3YG00825-04MSL 137D HOPERATING
AHU-01Distribution Systems,Air Handling Units,Modular Air Handling Units,Modular Indoor1.00MA0131ZZ-Floor 16-Room-1690SNYDER GENERAL3YG00434-04MSL 137D HOPERATING
AHU-01Distribution Systems,Air Handling Units,Modular Air Handling Units,Modular Indoor1.00MA0131ZZ-Floor 18-Room-1810SNYDER GENERAL9WA0507504MSL 137D HOPERATING
AHU-01Distribution Systems,Air Handling Units,Modular Air Handling Units,Modular Indoor1.00MA0131ZZ-Floor 18-Room-1890SNYDER GENERAL9VM0761304MSL 137D HOPERATING
AHU-01Distribution Systems,Air Handling Units,Modular Air Handling Units,Modular Indoor1.00MA0131ZZ-Floor 20-Room-2010SNYDER GENERAL9WA0507404MSL 137D HOPERATING
AHU-01Distribution Systems,Air Handling Units,Modular Air Handling Units,Modular Indoor1.00MA0131ZZ-Floor 20-Room-2090SNYDER GENERAL9WA0507204MSL 137D HOPERATING
AHU-01Distribution Systems,Air Handling Units,Modular Air Handling Units,Modular Indoor1.00MA0131ZZ-Floor 22-Room-2210SNYDER GENERAL9WA0507304MSL 137D HOPERATING
AHU-01Distribution Systems,Air Handling Units,Modular Air Handling Units,Modular Indoor1.00MA0131ZZ-Floor 22-Room-2290SNYDER GENERAL9WA0507104MSL 137D HOPERATING
AHU-01Distribution Systems,Air Handling Units,Modular Air Handling Units,Modular Indoor1.00MA0131ZZ-Floor 24-Room-2490SNYDER GENERAL9VM0761404MSL 137D HOPERATING
AHU-01Distribution Systems,Air Handling Units,Modular Air Handling Units,Modular Indoor1.00MA0131ZZ-Floor 06-Room-610SNYDER GENERAL3YG00430-04MSL 137D HOPERATING
AHU-01Distribution Systems,Air Handling Units,Modular Air Handling Units,Modular Indoor1.00MA0131ZZ-Floor 06-Room-690SNYDER GENERAL3YG00827-04MSL 137D HOPERATING
AHU-01Distribution Systems,Air Handling Units,Modular Air Handling Units,Modular Indoor1.00MA0131ZZ-Floor 08-Room-810SNYDER GENERAL3YG00431-04MSL 137D HOPERATING
AHU-01Distribution Systems,Air Handling Units,Modular Air Handling Units,Modular Indoor1.00MA0131ZZ-Floor 08-Room-890SNYDER GENERAL3YG00828-04MSL 137D HOPERATING
AHU-01Distribution Systems,Air Handling Units,Heating and Ventilating Units1.00MA0131ZZ-Low Rise Penthouse-East AreaMCQUAYMcQUAYOPERATING
AHU-01AIR HANDLER UNIT1.00MA0131ZZ-Low Rise Penthouse-East AreaMCQUAYMcQUAYOPERATING
AHU-01Distribution Systems,Air Handling Units,Heating and Ventilating Units1.00MA0131ZZ-Low Rise Penthouse-East AreaMCQUAYMcQUAYOPERATING
AHU-01AIR HANDLER UNIT1.00MA0131ZZ-Low Rise Penthouse-East AreaMCQUAYMcQUAYOPERATING
AHU-01Distribution Systems,Air Handling Units,Heating and Ventilating Units1.00MA0131ZZ-Low Rise Penthouse-West AreaMCQUAYMcQUAYOPERATING
AHU-01AIR HANDLER UNIT1.00MA0131ZZ-Low Rise Penthouse-West AreaMCQUAYMcQUAYOPERATING
AHU-01Distribution Systems,Air Handling Units,Heating and Ventilating Units1.00MA0131ZZ-Low Rise Penthouse-West AreaMCQUAYMcQUAYOPERATING
AHU-01AIR HANDLER UNIT1.00MA0131ZZ-Low Rise Penthouse-West AreaMCQUAYMcQUAYOPERATING
AHU-01Distribution Systems,Air Handling Units,Modular Air Handling Units,Modular Indoor1.00MA0131ZZ-Floor 26-PenthouseYORKORDER# 90-802031ACS113DEAC-4OPERATING
AHU-01AIR HANDLER UNIT1.00MA0131ZZ-Ground Floor-ChildcarePRICE BCVPRICE BCVOPERATING
AHU-01Distribution Systems,Air Handling Units,Heating and Ventilating Units1.00MA0131ZZ-Ground Floor-ChildcarePRICEPRICE BCVOPERATING
AHU-01Distribution Systems,Air Handling Units,Modular Air Handling Units,Modular Indoor1.00MA0131ZZ-Floor 24-Room-2410SNYDER GENERAL9WA0507604MSL 137D HOPERATING
AHU-01Distribution Systems,Air Handling Units,Modular Air Handling Units,Modular Indoor1.00MA0131ZZ-Floor 25YORKCS217SHLPDOPERATING
AHU-01Distribution Systems,Air Handling Units,Modular Air Handling Units,Modular Indoor1.00MA0131ZZ-Floor 26YORKORDER# 89-802963DCS1135VLPPEAC4BOPERATING
AHU-01Distribution Systems,Air Handling Units,Modular Air Handling Units,Modular Indoor1.00MA0131ZZ-Floor 26-PenthouseYORKORDER# 89-802963ECS113SVLPDEAC4BOPERATING
AHU-01Distribution Systems,Air Handling Units,Modular Air Handling Units,Modular Indoor1.00MA0131ZZ-Floor 26-PenthouseYORKORDER# 89-802963ECS113SVLPDEAC4BOPERATING
AHU-01AC-1 W/25 HP MOTOR, 24 FILTERS1.00MA0131ZZ-Floor 04-Room-410SNYDER GENERALMSL 137D HOPERATING
AHU-01A-2 W/25 HP MOTOR, 24 FILTERS1.00MA0131ZZ-Floor 04-Room-490SNYDER GENERALMSL 137D HOPERATING
AHU-01Distribution Systems,Air Handling Units,Modular Air Handling Units,Modular Indoor1.00MA0131ZZ-Basement-Air Handing Room2057PA-20OPERATING
AHU-01Distribution Systems,Air Handling Units,Modular Air Handling Units,Modular Indoor1.00MA0131ZZ-Basement-Air Handing RoomMCQUAYFBOU060900363CAH025GHACOPERATING
AHU-01Distribution Systems,Air Handling Units,Modular Air Handling Units,Modular Indoor1.00MA0131ZZ-Ground Floor-OfficeMCQUAY37000103-06LSL106CHOPERATING
AHU-01Packaged Units,Air Conditioners,Dual Pack,Water Cooled1.00MA0131ZZ-Basement-Central PlantMCQUAY3ZJ01285-04MSL 137 DVOPERATING
ALMPOWER SUPPLY FOR H/R FIRE ALARM SYSTEM44.00MA0131ZZ-Entire BuildingEDWARDSEDWARDS 24 VOLT POWER SUPPLYOPERATING
ALMPOWER SUPPLY FOR L/R FIRE ALARM SYSTEM12.00MA0131ZZ-Low RiseEDWARDSEDWARDS 24 VOLT POWER SUPPLYOPERATING
ALMAUTOMATIC FIRE DETECTORS2,526.00MA0131ZZ-Garage-PenthouseOPERATING
ALMFire Supervisory Signals, Testing1.00MA0131ZZ-Floor 02-Room-E-275EDWARDSEST 3EDWARDSOPERATING
ALMFire Supervisory Signals, Testing1.00MA0131ZZ-Floor 02-Room-E-275EDWARDSEST 3EDWARDSOPERATING
ALMremote fire alarm panel for L/R1.00MA0131ZZ-Floor 02-Room-E-275EDWARDSEST 3EDWARDSOPERATING
ALM(78) TAMPER SWITCHES107.00MA0131ZZ-Entire BuildingOPERATING
ALM-04(64) FLOW SWITCHES64.00MA0131ZZ-Entire BuildingOPERATING
ALM-05Automatic Fire Detection, Heat Detectors109.00MA0131ZZ-Entire BuildingOPERATING
ALM-07Fire Alarm Control Panel1.00MA0131ZZ-High Rise-Fire Sprinkler RoomEDWARDSEST 3Edwards EST 3OPERATING
ALM-07FIRE ALARM CONTROL PANEL SIGNET PANEL1.00MA0131ZZ-High Rise-OutsideEDWARDSEST 3Edwards EST 3OPERATING
ALM-07FIRE ALARM CONTROL PANEL1.00MA0131ZZ-Low Rise-Fire Sprinkler RoomEDWARDSEST 3Edwards EST 3OPERATING
ALM-07Remote fire alarm panel for H/R1.00MA0131ZZ-Floor 02-Room-E-275EDWARDSEST 3EDWARDSOPERATING
ALM-10(66) TELEPHONES,66.00MA0131ZZ-Entire BuildingOPERATING
ALM-16FIRE ALARM PULL STATION INCLUDING MASTER BOX OUTSIDE FCR H.R60.00MA0131ZZ-Entire BuildingOPERATING
ALM-16FIRE ALARM PULL STATION INCLUDING MASTER BOX205.00MA0131ZZ-Garage-PenthouseOPERATING
ALM-17(820) HORN AND LIGHT DEVICES820.00MA0131ZZ-Entire BuildingOPERATING
ATSElectrical Distribution,Switches, Controls and Devices,Automatic Transfer Switches,Normal Power Seeking Automatic3.00MA0131ZZ-Basement-Generator RoomZENITHOPERATING
ATSElectrical Distribution,Switches, Controls and Devices,Automatic Transfer Switches,Normal Power Seeking Automatic1.00MA0131ZZ-High Rise-Mechanical Equipment RoomOPERATING
ATSElectrical Distribution,Switches, Controls and Devices,Automatic Transfer Switches,Normal Power Seeking Automatic1.00MA0131ZZ-Low Rise-Garage AreaZENITHOPERATING
ATSElectrical Distribution,Switches, Controls and Devices,Automatic Transfer Switches,Normal Power Seeking Automatic1.00MA0131ZZ-Floor 25-Tank RoomZENITHOPERATING
ATSElectrical Distribution,Switches, Controls and Devices,Automatic Transfer Switches,Normal Power Seeking Automatic4.00MA0131ZZ-Floor 01ZENITHTYPE 1OPERATING
ATSAUTOMATIC TRANSFER SWITCH1.00MA0131ZZ-Floor 16ZENITH1570612-3GE ZENITH CONTROLS ZG2A00431-07S601XOPERATING
ATSAUTOMATIC TRANSFER SWITCH1.00MA0131ZZ-Floor 26-PenthouseZENITH1570612-2GE ZENITH CONTROLS ZG2A00431-07S601XOPERATING
ATSElectrical Distribution,Switches, Controls and Devices,Automatic Transfer Switches1.00MA0131ZZ-Floor 26ZENITHZENITHOPERATING
ATSAUTOMATIC TRANSFER SWITCH1.00MA0131ZZ-Floor 26ZENITHGE-9149-449-01ZENITH M300-60-460COPERATING
ATSElectrical Distribution,Switches, Controls and Devices,Automatic Transfer Switches,Normal Power Seeking Automatic2.00MA0131ZZ-Ground Floor-ClosetZENITHOPERATING
ATSElectrical Distribution,Switches, Controls and Devices,Automatic Transfer Switches,Normal Power Seeking Automatic1.00MA0131ZZ-Ground Floor-ClosetZENITHOPERATING
ATSElectrical Distribution,Switches, Controls and Devices,Automatic Transfer Switches1.00MA0131ZZ-Basement-Electrical Equipment RoomZENITH172571ZENITH 2BTSH40EOPERATING
ATSElectrical Distribution,Switches, Controls and Devices,Automatic Transfer Switches1.00MA0131ZZ-Basement-Electrical Equipment RoomZENITH197465ZENITH ZTSHU40EC-7-8AOPERATING
ATSElectrical Distribution,Switches, Controls and Devices,Automatic Transfer Switches1.00MA0131ZZ-Basement-Electrical Equipment RoomZENITHZENITH ZTSHU40EC-7-8AOPERATING
ATSElectrical Distribution,Switches, Controls and Devices,Automatic Transfer Switches1.00MA0131ZZ-Basement-Electrical Equipment RoomZENITH229256ZENITH ZTSHU40EC-76ALLOPERATING
ATSElectrical Distribution,Switches, Controls and Devices,Automatic Transfer Switches1.00MA0131ZZ-Basement-Electrical Equipment RoomZENITH229255ZENITH ZTSHU40EC-76ALLOPERATING
ATSAUTOMATIC TRANSFER SWITCH1.00MA0131ZZ-Basement-High Rise BasementZENITH229255ZENITH ZTSHU40EC-76ALLOPERATING
ATSAUTOMATIC TRANSFER SWITCH1.00MA0131ZZ-Basement-High Rise BasementZENITH172571ZENITH 2BTSH40EOPERATING
ATSAUTOMATIC TRANSFER SWITCH1.00MA0131ZZ-Basement-High Rise BasementZENITH197465ZENITH ZTSHU40EC-7-8AOPERATING
ATSAUTOMATIC TRANSFER SWITCH1.00MA0131ZZ-Basement-High Rise BasementZENITHZENITH ZTSHU40EC-7-8AOPERATING
ATSAUTOMATIC TRANSFER SWITCH1.00MA0131ZZ-Basement-High Rise BasementZENITH229256ZENITH ZTSHU40EC-76ALLOPERATING
ATSElectrical Distribution,Switches, Controls and Devices,Automatic Transfer Switches1.00MA0131ZZ-Low Rise-Fire Sprinkler RoomZENITHZENITHOPERATING
ATSAUTOMATIC TRANSFER SWITCH1.00MA0131ZZ-Garage-Pump RoomZENITH333/331ZENITH LX2800OPERATING
ATSElectrical Distribution,Switches, Controls and Devices,Automatic Transfer Switches1.00MA0131ZZ-BasementRUSS ELEC12141-1BRUSSELL ELECTRIC RTB-4003CEOPERATING
ATSAUTOMATIC TRANSFER SWITCH1.00MA0131ZZ-Basement-High Rise BasementZENITHA22819ZENITH ZMH403OPERATING
ATSAUTOMATIC TRANSFER SWITCH1.00MA0131ZZ-Basement-High Rise BasementRUSSELL ELECTRIC12141-1BRUSSELL ELECTRIC RTB-4003CEOPERATING
ATSElectrical Distribution,Switches, Controls and Devices,Automatic Transfer Switches1.00MA0131ZZ-Ground Floor-Electrical Equipment RoomZENITHA18209AZENITH ZTS10E-7AAAALLTWOPERATING
ATSElectrical Distribution,Switches, Controls and Devices,Automatic Transfer Switches1.00MA0131ZZ-Ground Floor-Electrical Equipment RoomZENITHA18209AZENITH ZTS10E-7AAAALLTWOPERATING
ATSAUTOMATIC TRANSFER SWITCH1.00MA0131ZZ-Ground FloorZENITHA18209AZENITH ZTS10E-7AAAALLTWOPERATING
ATSAUTOMATIC TRANSFER SWITCH1.00MA0131ZZ-Ground FloorZENITHA18209AZENITH ZTS10E-7AAAALLTWOPERATING
ATSElectrical Distribution,Switches, Controls and Devices,Automatic Transfer Switches1.00MA0131ZZ-Ground Floor-Electrical Equipment RoomZENITHA18209AZENITH ZTS10E-7AAAALLTWOPERATING
ATSElectrical Distribution,Switches, Controls and Devices,Automatic Transfer Switches1.00MA0131ZZ-Ground Floor-Electrical Equipment RoomZENITHA18209AZENITH ZTS10E-7AAAALLTWOPERATING
ATSAUTOMATIC TRANSFER SWITCH1.00MA0131ZZ-Ground FloorZENITHA18209AZENITH ZTS10E-7AAAALLTWOPERATING
ATSAUTOMATIC TRANSFER SWITCH1.00MA0131ZZ-Ground FloorZENITHA18209AZENITH ZTS10E-7AAAALLTWOPERATING
ATSAUTOMATIC TRANSFER SWITCH1.00MA0131ZZ-Low Rise Penthouse-East AreaZENITH1570612-1GE ZENITH CONTROLS ZG2A00431-07S601XOPERATING
ATSAUTOMATIC TRANSFER SWITCH1.00MA0131ZZ-Low Rise Penthouse-West AreaZENITH1570612-4GE ZENITH CONTROLS ZG2A00431-07S601XOPERATING
ATSAUTOMATIC TRANSFER SWITCH1.00MA0131ZZ-Basement-High Rise BasementZENITHA182093ZENITH ZTS15E-7AAELLPTOOPERATING
ATSElectrical Distribution,Switches, Controls and Devices,Automatic Transfer Switches1.00MA0131ZZ-Basement-Central PlantZENITHZENITHOPERATING
ATS-01AUTOMATIC TRANSFER SWITCH EMERGENCY POWER FOR ALL ELEVATORS,DOMESTIC WATER AND SUMP PUMPS1.00MA0131ZZ-BasementZENITHA22819ZENITH ZMH403OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACSENSORS ASSOCIATED WITH AH UNIT: SUPPLY AIR TEMP, RETURN AIR TEMP, RE1.00MA0131ZZ-Floor 10-Room-1010OPERATING
BAS-01CONTROL PANEL P-7 SERVING AC-7, 9 & 10TH FLOORS WEST1.00MA0131ZZ-Floor 10-Room-1010OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACTEMPERATURE SENSOR1.00MA0131ZZ-Floor 10-Room-1025OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACHUMIDITY SENSOR1.00MA0131ZZ-Floor 10-Room-1025OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACTEMPERATURE SENSOR1.00MA0131ZZ-Floor 10-Room-1075OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACHUMIDITY SENSOR1.00MA0131ZZ-Floor 10-Room-1075OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACSENSORS ASSOCIATED WITH AH UNIT: SUPPLY AIR TEMP, RETURN AIR TEMP, RE1.00MA0131ZZ-Floor 10-Room-1090OPERATING
BAS-01CONTROL PANEL P-8 SERVING AC-8, 9 & 10TH FLOORS EAST1.00MA0131ZZ-Floor 10-Room-1090OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACTEMPERATURE SENSOR1.00MA0131ZZ-Floor 11-Room-1125OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACTEMPERATURE SENSOR1.00MA0131ZZ-Floor 11-Room-1175OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACSENSORS ASSOCIATED WITH AH UNIT: SUPPLY AIR TEMP, RETURN AIR TEMP, RE1.00MA0131ZZ-Floor 12-Room-1210OPERATING
BAS-01CONTROL PANEL P-9 SERVING AC-9, 11 & 12TH & 12TH FLOORS WEST1.00MA0131ZZ-Floor 12-Room-1210OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACTEMPERATURE SENSOR1.00MA0131ZZ-Floor 12-Room-1225OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACHUMIDITY SENSOR1.00MA0131ZZ-Floor 12-Room-1226OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACTEMPERATURE SENSOR1.00MA0131ZZ-Floor 12-Room-1275OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACHUMIDITY SENSOR1.00MA0131ZZ-Floor 12-Room-1275OPERATING
BAS-01CONTROL PANEL P-10 SERVING AC-10, 11 & 12TH FLOORS EAST1.00MA0131ZZ-Floor 12-Room-1290OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACSENSORS ASSOCIATED WITH AH UNIT: SUPPLY AIR TEMP, RETURN AIR TEMP, RE1.00MA0131ZZ-Floor 12-Room-1290OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACTEMPERATURE SENSOR1.00MA0131ZZ-Floor 13-Room-1325OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACTEMPERATURE SENSOR1.00MA0131ZZ-Floor 13-Room-1375OPERATING
BAS-01CONTROL PANEL P-11 SERVING AC-11, 13 & 14TH FLOORS WEST1.00MA0131ZZ-Floor 14-Room-1410OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACSENSORS ASSOCIATED WITH AH UNIT: SUPPLY AIR TEMP, RETURN AIR TEMP, RE1.00MA0131ZZ-Floor 14-Room-1410OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACTEMPERATURE SENSOR1.00MA0131ZZ-Floor 14-Room-1425OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACHUMIDITY SENSOR1.00MA0131ZZ-Floor 14-Room-1425OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACTEMPERATURE SENSOR1.00MA0131ZZ-Floor 14-Room-1475OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACHUMIDITY SENSOR1.00MA0131ZZ-Floor 14-Room-1475OPERATING
BAS-01CONTROL PANEL P-12 RVING AC-12, 13 & 14TH FLOORS EAST1.00MA0131ZZ-Floor 14-Room-1490OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACSENSORS ASSOCIATED WITH AH UNIT: SUPPLY AIR TEMP, RETURN AIR TEMP, RE1.00MA0131ZZ-Floor 14-Room-1490OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACTEMPERATURE SENSOR1.00MA0131ZZ-Floor 15-Room-1525OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACTEMPERATURE SENSOR1.00MA0131ZZ-Floor 15-Room-1575OPERATING
BAS-01CONTROL PANEL P-13 SERVING AC-13, 15 & 16TH FLOORS WEST1.00MA0131ZZ-Floor 16-Room-1610OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACSENSORS ASSOCIATED WITH AH UNIT: SUPPLY AIR TEMP, RETURN AIR TEMP, RE1.00MA0131ZZ-Floor 16-Room-1610OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACTEMPERATURE SENSOR1.00MA0131ZZ-Floor 16-Room-1625OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACHUMIDITY SENSOR1.00MA0131ZZ-Floor 16-Room-1625OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACHUMIDITY SENSOR1.00MA0131ZZ-Floor 16-Room-1675OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACTEMPERATURE SENSOR1.00MA0131ZZ-Floor 16-Room-1675OPERATING
BAS-01CONTROL PANEL P-14 SERVING AC-14, 15 & 16TH FLOORS EAST1.00MA0131ZZ-Floor 16-Room-1690OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACSENSORS ASSOCIATED WITH AH UNIT: SUPPLY AIR TEMP, RETURN AIR TEMP, RE1.00MA0131ZZ-Floor 16-Room-1690OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACTEMPERATURE SENSOR1.00MA0131ZZ-Floor 17-Room-1725OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACTEMPERATURE SENSOR1.00MA0131ZZ-Floor 17-Room-1775OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACSENSORS ASSOCIATED WITH AH UNIT: SUPPLY AIR TEMP, RETURN AIR TEMP, RE1.00MA0131ZZ-Floor 18-Room-1810OPERATING
BAS-01CONTROL PANEL P-15 SERVING AC-15, 17 & 18TH FLOORS WEST1.00MA0131ZZ-Floor 18-Room-1810OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACTEMPERATURE SENSOR1.00MA0131ZZ-Floor 18-Room-1825OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACHUMIDITY SENSOR1.00MA0131ZZ-Floor 18-Room-1825OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACHUMIDITY SENSOR1.00MA0131ZZ-Floor 18-Room-1875OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACTEMPERATURE SENSOR1.00MA0131ZZ-Floor 18-Room-1875OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACSENSORS ASSOCIATED WITH AH UNIT: SUPPLY AIR TEMP, RETURN AIR TEMP, RE1.00MA0131ZZ-Floor 18-Room-1890OPERATING
BAS-01CONTROL PANEL P-16 SERVING AC-16, 17 & 18TH FLOORS EAST1.00MA0131ZZ-Floor 18-Room-1890OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACTEMPERATURE SENSOR1.00MA0131ZZ-Floor 19-Room-1925OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACTEMPERATURE SENSOR1.00MA0131ZZ-Floor 19-Room-1975OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACSENSORS ASSOCIATED WITH AH UNIT: SUPPLY AIR TEMP, RETURN AIR TEMP, RE1.00MA0131ZZ-Floor 20-Room-2010OPERATING
BAS-01CONTROL PANEL P-17 SERVING AC-17, 19 & 20TH FLOORS WEST1.00MA0131ZZ-Floor 20-Room-2010OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACTEMPERATURE SENSOR1.00MA0131ZZ-Floor 20-Room-2025OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACHUMIDITY SENSOR1.00MA0131ZZ-Floor 20-Room-2026OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACHUMIDITY SENSOR1.00MA0131ZZ-Floor 20-Room-2075OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACTEMPERATURE SENSOR1.00MA0131ZZ-Floor 20-Room-2075OPERATING
BAS-01CONTROL PANEL P-18 SERVING AC-18, 19 & 20TH FLOORS EAST1.00MA0131ZZ-Floor 20-Room-2090OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACSENSORS ASSOCIATED WITH AH UNIT: SUPPLY AIR TEMP, RETURN AIR TEMP, RE1.00MA0131ZZ-Floor 20-Room-2090OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACTEMPERATURE SENSOR1.00MA0131ZZ-Floor 21-Room-2125OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACSENSORS ASSOCIATED WITH AH UNIT: SUPPLY AIR TEMP, RETURN AIR TEMP, RE1.00MA0131ZZ-Floor 22-Room-2210OPERATING
BAS-01CONTROL PANEL P-19 SERVING AC-19, 21 & 22ND FLOORS WEST1.00MA0131ZZ-Floor 22-Room-2210OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACHUMIDITY SENSOR1.00MA0131ZZ-Floor 22-Room-2225OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACTEMPERATURE SENSOR1.00MA0131ZZ-Floor 22-Room-2275OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACHUMIDITY SENSOR1.00MA0131ZZ-Floor 22-Room-2275OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACSENSORS ASSOCIATED WITH AH UNIT: SUPPLY AIR TEMP, RETURN AIR TEMP, RE1.00MA0131ZZ-Floor 22-Room-2290OPERATING
BAS-01CONTROL PANEL P-20 SERVING AC-20, 21 & 22ND FLOORS EAST1.00MA0131ZZ-Floor 22-Room-2290OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACTEMPERATURE SENSOR2.00MA0131ZZ-Floor 23-Room-2325OPERATING
BAS-01CONTROL PANEL P-21 SERVING AC-21, 23 & 24TH FLOORS WEST1.00MA0131ZZ-Floor 24-Room-2410OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACSENSORS ASSOCIATED WITH AH UNIT: SUPPLY AIR TEMP, RETURN AIR TEMP, RE1.00MA0131ZZ-Floor 24-Room-2410OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACTEMPERATURE SENSOR1.00MA0131ZZ-Floor 24-Room-2425OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVAC HUMIDITY SENSOR1.00MA0131ZZ-Floor 24-Room-2425OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACHUMIDITY SENSOR1.00MA0131ZZ-Floor 24-Room-2475OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACTEMPERATURE SENSOR1.00MA0131ZZ-Floor 24-Room-2475OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACSENSORS ASSOCIATED WITH AH UNIT: SUPPLY AIR TEMP, RETURN AIR TEMP, RE1.00MA0131ZZ-Floor 24-Room-2490OPERATING
BAS-01CONTROL PANEL P-22 SERVING AC-22, 23 & 24TH FLOORS EAST1.00MA0131ZZ-Floor 24-Room-2490OPERATING
BAS-01CONTROL PANEL FOR DRY COOLERS, COOLING TOWER, & 21ST FLOOR COMPUTER ROOM1.00MA0131ZZ-Floor 25OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACTEMPERATURE SENSOR1.00MA0131ZZ-Floor 03-Room-325OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACTEMPERATURE SENSOR1.00MA0131ZZ-Floor 03-Room-375OPERATING
BAS-01CONTROL PANEL P-1 SERVING AC-1, 3 & 4TH FLOORS WEST1.00MA0131ZZ-Floor 04-Room-410OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACSENSORS ASSOCIATED WITH AH UNIT: SUPPLY AIR TEMP, RETURN AIR TEMP, RE1.00MA0131ZZ-Floor 04-Room-410OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACTEMPERATURE SENSOR1.00MA0131ZZ-Floor 04-Room-425OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACHUMIDITY SENSOR1.00MA0131ZZ-Floor 04-Room-425OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACTEMPERATURE SENSOR1.00MA0131ZZ-Floor 04-Room-475OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACHUMIDITY SENSOR1.00MA0131ZZ-Floor 04-Room-475OPERATING
BAS-01CONTROL PANEL P-2 SERVING AC-2, 3 & 4TH FLOORS EAST1.00MA0131ZZ-Floor 04-Room-490OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACSENSORS ASSOCIATED WITH AH UNIT: SUPPLY AIR TEMP, RETURN AIR TEMP, RE1.00MA0131ZZ-Floor 04-Room-490OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACTEMPERATURE SENSOR1.00MA0131ZZ-Floor 05-Room-525OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACTEMPERATURE SENSOR1.00MA0131ZZ-Floor 05-Room-575OPERATING
BAS-01CONTROL PANEL P-3 SERVING AC-3, 5 & 6TH FLOORS WEST1.00MA0131ZZ-Floor 06-Room-610OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACSENSORS ASSOCIATED WITH AH UNIT: SUPPLY AIR TEMP, RETURN AIR TEMP, RE1.00MA0131ZZ-Floor 06-Room-610OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACTEMPERATURE SENSOR1.00MA0131ZZ-Floor 06-Room-625OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACHUMIDITY SENSOR1.00MA0131ZZ-Floor 06-Room-625OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACHUMIDITY SENSOR1.00MA0131ZZ-Floor 06-Room-675OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACTEMPERATURE SENSOR1.00MA0131ZZ-Floor 06-Room-675OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACSENSORS ASSOCIATED WITH AH UNIT: SUPPLY AIR TEMP, RETURN AIR TEMP, RE1.00MA0131ZZ-Floor 06-Room-690OPERATING
BAS-01CONTROL PANEL P-4 SERVING AC-4, 5 & 6TH FLOORS EAST1.00MA0131ZZ-Floor 06-Room-690OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACTEMPERATURE SENSOR1.00MA0131ZZ-Floor 07-Room-725OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACTEMPERATURE SENSOR1.00MA0131ZZ-Floor 07-Room-775OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACSENSORS ASSOCIATED WITH AH UNIT: SUPPLY AIR TEMP, RETURN AIR TEMP, RE1.00MA0131ZZ-Floor 08-Room-810OPERATING
BAS-01CONTROL PANEL P-5 SERVING AC-5, 7 & 8TH FLOORS WEST1.00MA0131ZZ-Floor 08-Room-810OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACTEMPERATURE SENSOR1.00MA0131ZZ-Floor 08-Room-825OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACHUMIDITY SENSOR1.00MA0131ZZ-Floor 08-Room-825OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACHUMIDITY SENSOR1.00MA0131ZZ-Floor 08-Room-875OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACTEMPERATURE SENSOR1.00MA0131ZZ-Floor 08-Room-875OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACSENSORS ASSOCIATED WITH AH UNIT: SUPPLY AIR TEMP, RETURN AIR TEMP, RE1.00MA0131ZZ-Floor 08-Room-890OPERATING
BAS-01CONTROL PANEL P-6 SERVING AC-6, 7 & 8TH FLOORS EAST1.00MA0131ZZ-Floor 08-Room-890OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACTEMPERATURE SENSOR1.00MA0131ZZ-Floor 09-Room-925OPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACTEMPERATURE SENSOR1.00MA0131ZZ-Floor 09-Room-975OPERATING
BAS-01CONTROL PANELS SERVING CONDENSER PUMPS 1-32.00MA0131ZZ-BasementYASKAWAGPD506/P5 / NB 11250OPERATING
BAS-01CONTROL PANELS SERVING CHILL WATER PUMPS 1-32.00MA0131ZZ-BasementYASKAWAGPD506/P5 / NB 51125COPERATING
BAS-01CONTROL PANELS SERVING MULTIPLE LOCATIONS FOR EMS SYSTEM2.00MA0131ZZ-Low Rise-Entire BuildingOPERATING
BAS-01CONTROL PANELS SERVING COOLING TOWER FANS 1-65.00MA0131ZZ-High Rise-PenthouseYASKAWAGPD506/P5 / NB 51125BOPERATING
BAS-01NETWORK REMOTE TERMINAL MODEL ENBSF-201-01.00MA0131ZZ-Basement-OfficeOPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACBETWEEN ABSORBERS CONTROL SENSOR FOR WARM UP UNIT1.00MA0131ZZ-Basement-Central PlantOPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVAC STOCK CONDENSATE RETURN UNITS FOR MHV 1 & 2WITH MECHANICAL ALTERNATO1.00MA0131ZZ-Basement-Central PlantHOFFMANSCC2OPERATING
BAS-01COMPAQ WORKSTATION INCLUDING MONITOR & KEYBOARD1.00MA0131ZZ-Basement-OfficeOPERATING
BAS-01CONTROL PANELS SERVING A/C-23, 24, 25 & 26 EAST & WEST PENTHOUSES4.00MA0131ZZ-Low Rise-PenthouseOPERATING
BAS-01CONTROL PANELS SERVING RETURN FANS 1E, 2E, 3W & 4W4.00MA0131ZZ-Low Rise-PenthouseYASKAWAGPD506/P5 / NB 51125AOPERATING
BAS-01CONTROLS, CENTRAL SYSTEM, HVACTEMPERATURE SENSOR1.00MA0131ZZ-Floor 23-Room-2375OPERATING
BATLEAD ACID BATTERIES36.00MA0131ZZ-Basement-Room-B-15OPERATING
BFPDomestic Water Equipment,Back Flow Preventers,G301002.05.07.0412.00MA0131ZZ-Basement-Air Handing Room11926009M2OPERATING
BFPBACKFLOW PREVENTION DEVICE1.00MA0131ZZ-Floor 15-Janitor's ClosetWATTS29193"Watts 009M2 3/4"""OPERATING
BFPBack Flow Preventer1.00MA0131ZZ-Floor 15-Janitor's ClosetWATTS29193"Watts 009M2 3/4"""OPERATING
BFPBACKFLOW PREVENTION DEVICE1.00MA0131ZZ-Floor 02WATTS24369Watts TK99E 3 inchOPERATING
BFPBACKFLOW PREVENTION DEVICE1.00MA0131ZZ-Floor 02WATTSWatts 909 3 inchOPERATING
BFPBack Flow Preventer1.00MA0131ZZ-Floor 25WATTS24369Watts TK99E 3 inchOPERATING
BFPBack Flow Preventer1.00MA0131ZZ-Floor 25WATTSWatts 909 3 inchOPERATING
BFPBACKFLOW PREVENTION DEVICE1.00MA0131ZZ-Floor 26WATTS240461Watts 209 3 inchOPERATING
BFPBack Flow Preventer1.00MA0131ZZ-Floor 26WATTS240461Watts 209 3 inchOPERATING
BFPBACKFLOW PREVENTION DEVICE1.00MA0131ZZ-Floor 03-High Rise Janitor's ClosetWATTS34787"Watts009 3/4"""OPERATING
BFPBack Flow Preventer1.00MA0131ZZ-Floor 03-High Rise Janitor's ClosetWATTS34787"Watts009 3/4"""OPERATING
BFPBACKFLOW PREVENTION DEVICE1.00MA0131ZZ-Floor 09-Janitor's ClosetWATTS292225"Watts 009M2 3/4"""OPERATING
BFPBack Flow Preventer1.00MA0131ZZ-Floor 09-Janitor's ClosetWATTS292225"Watts 009M2 3/4"""OPERATING
BFPBACKFLOW PREVENTION DEVICE1.00MA0131ZZ-BasementWATTSA-76690"Watts 007M1QT 1"""OPERATING
BFPBACKFLOW PREVENTION DEVICE1.00MA0131ZZ-BasementWATTS203201"Watts 909 1 1/2"""OPERATING
BFPBack Flow Preventer1.00MA0131ZZ-Basement-High Rise BasementWATTSA-76690"Watts 007M1QT 1"""OPERATING
BFPBack Flow Preventer1.00MA0131ZZ-Basement-High Rise BasementWATTS203201"Watts 909 1 1/2"""OPERATING
BFPBACKFLOW PREVENTION DEVICE1.00MA0131ZZ-Floor 02-CafeteriaWATTS47693"Watts 009 1 1/4"""OPERATING
BFPBack Flow Preventer1.00MA0131ZZ-Floor 02-CafeteriaWATTS47693"Watts 009 1 1/4"""OPERATING
BFPBACKFLOW PREVENTION DEVICE1.00MA0131ZZ-Floor 03-Janitor's Closet EastWATTS406738"Watts 909 3/4"""OPERATING
BFPBack Flow Preventer1.00MA0131ZZ-Floor 03-Janitor's Closet EastWATTS406738"Watts 909 3/4"""OPERATING
BFPBack Flow Preventer1.00MA0131ZZ-Floor 03-Janitor's Closet WestWATTS406708"Watts 825Y 3/4"""OPERATING
BFPBACKFLOW PREVENTION DEVICE1.00MA0131ZZ-Floor 04-Janitor's Closet WestWATTS406708"Watts 825Y 3/4"""OPERATING
BFPBACKFLOW PREVENTION DEVICE1.00MA0131ZZ-Floor 04-Janitor's Closet EastWATTS215086"Watts 909WC 1"""OPERATING
BFPBack Flow Preventer1.00MA0131ZZ-Floor 04-Janitor's Closet EastWATTS215086"Watts 909WC 1"""OPERATING
BFPBACKFLOW PREVENTION DEVICE1.00MA0131ZZ-Floor 04-Janitor's Closet WestWATTS251066"Watts 909 1"""OPERATING
BFPBack Flow Preventer1.00MA0131ZZ-Floor 04-Janitor's Closet WestWATTS251066"Watts 909 1"""OPERATING
BFPBACKFLOW PREVENTION DEVICE1.00MA0131ZZ-Garage-Pump RoomFEBCOB18674" Febco 805 8"""OPERATING
BFPBack Flow Preventer1.00MA0131ZZ-Low Rise-Fire Sprinkler RoomFEBCOB18674" Febco 805 8"""OPERATING
BFPBACKFLOW PREVENTION DEVICE1.00MA0131ZZ-GarageFEBCOB1674"Febco 805 8"""OPERATING
BFPBACKFLOW PREVENTION DEVICE1.00MA0131ZZ-GarageFEBCO1488680"Febco 825Y 1"""OPERATING
BFPBACKFLOW PREVENTION DEVICE1.00MA0131ZZ-GarageWATTS188666"Watts 009-M3 3/4"""OPERATING
BFPBack Flow Preventer1.00MA0131ZZ-GarageFEBCOB1674"Febco 805 8"""OPERATING
BFPBack Flow Preventer1.00MA0131ZZ-GarageWATTS188666"Watts 009-M3 3/4"""OPERATING
BFPBack Flow Preventer1.00MA0131ZZ-Low Rise-Garage AreaFEBCO1488680"Febco 825Y 1"""OPERATING
BFPBACKFLOW PREVENTION DEVICE1.00MA0131ZZ-GarageWATTS11926"Watts 009 1 1/4"""OPERATING
BFPBack Flow Preventer1.00MA0131ZZ-Low Rise-Garage AreaWATTS11926"Watts 009 1 1/4"""OPERATING
BFPBACKFLOW PREVENTION DEVICE1.00MA0131ZZ-GarageFEBCOB18110"Febco 805 6"""OPERATING
BFPBack Flow Preventer1.00MA0131ZZ-Low Rise-Garage AreaFEBCOB18110"Febco 805 6"""OPERATING
BSDLINE II BUSWAY FEEDER TYPE INDOOR4.00MA0131ZZ-BasementOPERATING
BTCBATTERY CHARGER1.00MA0131ZZ-Basement-Room-B-15LAMARCHE8332A-20R-4-24V AOPERATING
BTCBATTERY CHARGER1.00MA0131ZZ-Basement-Room-B-15LAMARCHEB-85842A-46-6-24VOPERATING
BTCBATTERY CHARGER1.00MA0131ZZ-Basement-Room-B-152420EOPERATING
CHFChemical feed Chilled water1.00MA0131ZZ-Basement-High Rise Basement7 GALLONManual feeder 7 gallonOPERATING
CHFCHEMICAL FEEDER1.00MA0131ZZ-BasementManual feeder 7 gallonOPERATING
CHFCHEMICAL FEEDER1.00MA0131ZZ-BasementManual feeder 7 gallonOPERATING
CHFChemical feed Perimeter Heat1.00MA0131ZZ-Basement-High Rise Basement7 GALLONManual feeder 7 gallonOPERATING
CHFCHEMICAL FEEDER1.00MA0131ZZ-BasementManual feeder 7 gallonOPERATING
CHFChemical feed Warm -up1.00MA0131ZZ-Basement-High Rise Basement7 GALLONManual feeder 7 gallonOPERATING
CHL-A1Chilled Water Systems,Chillers,Direct Fired Absorption Water Chiller,Air Cooled,over 5 tons1.00MA0131ZZ-Basement-Air Handing RoomCARRIER9260016JT080-705OPERATING
CHL-A1Chilled Water Systems,Chillers,Direct Fired Absorption Water Chiller,Air Cooled,over 5 tons1.00MA0131ZZ-Basement-Air Handing RoomCARRIER9260116JT080-705OPERATING
CHL-CW1CHILLER, CENTRIFUGAL, WATER COOLED, UP TO 100 TONS1.00MA0131ZZ-Basement-Air Handing RoomYORKGNKM171667YTK3C4E2 - CRJSOPERATING
CHL-CW1CHILLER, CENTRIFUGAL, WATER COOLED, UP TO 100 TONS1.00MA0131ZZ-Basement-Air Handing RoomYORKGNKM011743YTK3C4E2 - CRJSOPERATING
CHL-CW1CHILLER, CENTRIFUGAL, WATER COOLED, UP TO 100 TONS1.00MA0131ZZ-Floor 25-Mechanical Equipment RoomFILTRINE5467 / 08ES-100-RFCAOPERATING
CHL-CW1CHILLER, CENTRIFUGAL, WATER COOLED, UP TO 100 TONS1.00MA0131ZZ-Garage-Air Handing RoomFILTRINE2117319ES-60-RFCAOPERATING
CMDCARBON-MONOXIDE DETECTION SENSORS1.00MA0131ZZ-Low Rise-Garage AreaGREYSTONECMD5B110GREYSTONE CMD5B4110OPERATING
CMDCARBON-MONOXIDE DETECTION SENSORS ( TOTAL OF 15)1.00MA0131ZZ-GarageGRAYSTONECMD5B110GREYSTONE CMD5B4110OPERATING
CMPRefrigerant Compressors,D303001.11.021.00MA0131ZZ-Basement-Air Handing RoomINGERSOLL-RAND508230517TS4N5OPERATING
CMPRefrigerant Compressors,D303001.11.021.00MA0131ZZ-Basement-Air Handing RoomQUINCY1170705EB399NOPERATING
CMPRefrigerant Compressors,D303001.11.021.00MA0131ZZ-Basement-Air Handing RoomQUINCY1170713EB399NOPERATING
CMPAIR COMPRESSOR1.00MA0131ZZ-BasementGARDNER DENVERS151356Gardner Denver EBBE99NOPERATING
CMPAIR COMPRESSOR1.00MA0131ZZ-BasementGARDNER DENVERS151357Gardner Denver EBBE99NOPERATING
CMPAir Compressor For House System1.00MA0131ZZ-Basement-High Rise BasementGARDNER DENVERS151357Gardner Denver EBBE99NOPERATING
CMPAir Compressor For House system1.00MA0131ZZ-Basement-High Rise BasementGARDNER DENVERS151356Gardner Denver EBBE99NOPERATING
CMPAir Compressor for bollards1.00MA0131ZZ-Basement-High Rise BasementINGERSOLL RAND508230517Ingersoll Rand TS4N5OPERATING
CMPAIR COMPRESSOR1.00MA0131ZZ-BasementINGERSOLL-RAND508230517Ingersoll Rand TS4N5OPERATING
CONCONTROL PANELS1.00MA0131ZZ-Entire BuildingJOHNSON CONTROLOPERATING
CONCONTROL PANEL1.00MA0131ZZ-Entire BuildingJOHNSON CONTROLSOPERATING
CTRChilled Water Systems,Cooling Towers,Mechanical Draft Cooling Towers,Forced Draft1.00MA0131ZZ-RoofMARLEY016824-001-91NS614736 A65761NOPERATING
CTRChilled Water Systems,Cooling Towers,Mechanical Draft Cooling Towers,Forced Draft1.00MA0131ZZ-RoofMARLEY016824-001-91NS614736 A65761NOPERATING
CTRChilled Water Systems,Cooling Towers,Mechanical Draft Cooling Towers,Forced Draft1.00MA0131ZZ-RoofMARLEY016824-001-91NS614736 A65761NOPERATING
CTRChilled Water Systems,Cooling Towers,Mechanical Draft Cooling Towers,Forced Draft1.00MA0131ZZ-RoofMARLEY016824-001-91NS614736 A65761NOPERATING
CTRChilled Water Systems,Cooling Towers,Mechanical Draft Cooling Towers,Forced Draft1.00MA0131ZZ-RoofMARLEY016824-001-91NS614736 A65761NOPERATING
CTRChilled Water Systems,Cooling Towers,Mechanical Draft Cooling Towers,Forced Draft1.00MA0131ZZ-RoofMARLEY016824-001-91NS614736 A65761NOPERATING
DAVDAVITS ROOF/ ANCHORS/ FALL PROTECTION60.00MA0131ZZ-High Rise-RoofOPERATING
DAVDAVITS ROOF/ ANCHORS/ FALL PROTECTION71.00MA0131ZZ-Low Rise RoofOPERATING
DETLEAK DETECTOR REFRIGERANT1.00MA0131ZZ-Basement-High Rise BasementCHILLGARD RTB02-831725-10CHILL GUARD RT A-RT-A411SF40D00000000OPERATING
DETDETECTOR, LEAK1.00MA0131ZZ-Basement-Central PlantCHILLGARDB02-831725-10CHILL GUARD RT A-RT-A411SF40D00000000OPERATING
DETDETECTOR, LEAK1.00MA0131ZZ-BasementOWENS CORNINGOC TANKS SB0011BOPERATING
DETLEAK DETECTOR FUEL1.00MA0131ZZ-Basement-High Rise BasementOC TANKSOC TANKS SB0011BOPERATING
DKLLoading Dock Leveler1.00MA0131ZZ-Ground Floor-Loading DockPIONEER60628Pioneer HP6835OPERATING
DKLDOCK LEVELER1.00MA0131ZZ-Ground Floor-Loading DockPIONEER60628Pioneer HP6835OPERATING
DKLDOCK LEVELER1.00MA0131ZZ-Ground Floor-Loading DockPIONEER60628Pioneer HP6835OPERATING
DKLLoading Dock Leveler1.00MA0131ZZ-Ground Floor-Loading DockPIONEER60628Pioneer HP6835OPERATING
DORENTRANCE DOORS18.00MA0131ZZ-Entire BuildingOPERATING
DOREXTERIOR DOOR H/C OPENER2.00MA0131ZZ-Ground Floor-EntranceOPERATING
DOREXTERIOR DOOR WITH KEY CARD1.00MA0131ZZ-Ground Floor-EntranceOPERATING
DOREXTERIOR DOOR REVOLVING1.00MA0131ZZ-Ground Floor-EntranceOPERATING
DOREXTERIOR DOOR1.00MA0131ZZ-GarageOPERATING
DOREXTERIOR DOOR WITH ALARM CONTACTS1.00MA0131ZZ-High Rise-LobbyOPERATING
DOREXTERIOR DOOR WITH H/C OPENER AND ALARM CONTACTS1.00MA0131ZZ-High Rise-LobbyOPERATING
DOREXTERIOR DOOR REVOLVING1.00MA0131ZZ-High Rise-LobbyOPERATING
DOREXTERIOR DOOR H/C OPENER WITH ALARM CONTACTS1.00MA0131ZZ-High Rise-LobbyOPERATING
DOREXTERIOR DOOR REVOLVING1.00MA0131ZZ-High Rise-LobbyOPERATING
DOREXTERIOR DOOR WITH DOOR ALARM AND ALARM CONTACTS1.00MA0131ZZ-High Rise-StairwellOPERATING
DOREXTERIOR DOOR WITH DOOR ALARM AND ALARM CONTACTS1.00MA0131ZZ-High Rise-StairwellOPERATING
DOREXTERIOR DOOR DOUBLE DOORS WITH MAGNET HOLDER ALARM CONTACTS1.00MA0131ZZ-High Rise-LobbyOPERATING
DOREXTERIOR DOOR 4 DOORS4.00MA0131ZZ-Floor 01-Lobby City HallOPERATING
DOREXTERIOR DOOR L/R GROUND FLOOR TO 1/2 CIRCLE1.00MA0131ZZ-Ground Floor-EntranceOPERATING
DOREXTERIOR DOOR DOUBLE DOORS TO THE LOADING DOCK FROM STAIRWELL 61.00MA0131ZZ-Ground Floor-Loading DockOPERATING
DOR-01OVERHEAD DOORS WITH ELECTRIC OPERATORS3.00MA0131ZZ-Exterior-Loading DockOPERATING
DPPREMOTE AIR INTAKE DAMPER STAIRWAY 21.00MA0131ZZ-Floor 15OPERATING
DPPREMOTE AIR INTAKE DAMPER STAIRWAY 11.00MA0131ZZ-Floor 15OPERATING
DPPREMOTE AIR INTAKE DAMPER STAIRWAY 11.00MA0131ZZ-Floor 24OPERATING
DPPREMOTE AIR INTAKE DAMPER STAIRWAY 21.00MA0131ZZ-Floor 24OPERATING
DPPRETURN, (44) TYPE #5150,44.00MA0131ZZ-Entire BuildingOPERATING
DPPOUTSIDE AIR MIX, (22) TYPE W/UNIT20.00MA0131ZZ-Entire BuildingOPERATING
DPPRETURN, (66) TYPE #5150,66.00MA0131ZZ-Entire BuildingOPERATING
DPPRETURN MIX, (22) TYPE W/UNIT,22.00MA0131ZZ-Entire BuildingOPERATING
DPPREMOTE AIR INTAKE DAMPER STAIRWAY 11.00MA0131ZZ-Floor 07OPERATING
DPPREMOTE AIR INTAKE DAMPER STAIRWAY 21.00MA0131ZZ-Floor 07OPERATING
DPPMULTIPLE DAMPER UNITS FROM A/C UNITS 23, 24, 25 & 26; RETURN FANS R-23, R-24, R-25 & R26. TO EACH FLOOR.109.00MA0131ZZ-Low Rise-Entire BuildingOPERATING
DPPRELIEF, (66) TYPE # COPBS,22.00MA0131ZZ-Entire BuildingOPERATING
DRNDRAIN1.00MA0131ZZ-Exterior-PlazaOPERATING
DRNDRAIN1.00MA0131ZZ-Exterior-PlazaOPERATING
DRNDRAIN1.00MA0131ZZ-High Rise-RoofOPERATING
DRNDRAIN1.00MA0131ZZ-RoofOPERATING
DRNDRAIN1.00MA0131ZZ-Low Rise RoofOPERATING
DRNDRAIN1.00MA0131ZZ-Low Rise RoofOPERATING
DTTElectrical Distribution,Transformers,Dry Type Utility Transformer,Below 15 000 V,Three-Phase1.00MA0131ZZ-Floor 10-Room-EE1090SQUARE DCAT # 30T3HOPERATING
DTTElectrical Distribution,Transformers,Dry Type Utility Transformer,Below 15 000 V,Three-Phase1.00MA0131ZZ-Floor 10-Room-EE1099SQUARE DCAT # 112T3HFISNLPOPERATING
DTTElectrical Distribution,Transformers,Dry Type Utility Transformer,Below 15 000 V,Three-Phase1.00MA0131ZZ-Floor 11-Room-EE1130SQUARE DCAT # 112T3HFOPERATING

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.