47PB0019R0002 Solicitation Exhibit 08 Chart of Deliverables
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. General Services Administration Public Buildings Service New England Region
Solicitation 47PB0019R0002 JFK Operations and Maintenance
Exhibit 5 Contractor Chart of Deliverables for COR
Deliverable Reference Due Standard
Contract Project Manager 1.2.1 Prior to Contract start date Chief Engineer 1.2.1 Prior to Contract start date Communication Equipment 1.2.3 Contract Commencement Administrative Station 1.2.3 Contract Commencement Certifications
1.2.7 Contract Commencement
Employee Training
1.2.8 Contract Commencement
Asbestos Awareness Training 1.2.8.1 Within 60 calendar days of Contract start date
Re-Tuning Training 1.2.8.2 Within 60 calendar days of
NCMMS Training 1.2.8.4 During the inbound transition period
Lead Awareness Training 1.2.8.5 Within 60 calendar days of
Recording Presence
1.2.11 Weekly
Quality Control Plan 1.3.2 Within 30 calendar days of
Key Control 1.5.1 Part of Quality Control Plan Ordinances, Taxes, Permits, and Licenses
1.11 As required
Tenant Environment
5.1 As required ASHRAE Standard
55-2004, ASHRAE
62.1-2016
Equipment Inventory 5.3.3.b Annual Certification and as required.
Equipment condition assessment
5.3.3.c Annually
Safety and Health Program 5.4.2.1 Within 30 calendar days of
Lock Out/Tag Out Procedure 5.4.6 Within 30 calendar days of
Confined Space Entry Permit System
5.4.7 Within 60 calendar days of
Hazard Communication Plan 5.4.11.2 As part of Health and Safety Program
Labeling and signage 5.4.12 As required
Electrical Safety
5.4.14 As required
Labeling Electrical Circuits and Panels
5.4.15 As Required
Refrigerants 5.5.2.1 As required 40 CFR Part 82 under Section 608 of the Clean Air Act
Stationary Engines 5.5.4 As Required Fuel Storage Tank Management
5.5.5 As required GSA Order 1095.2
PBS Fuel Storage Tank Management
Solid Waste 5.5.6 As required Resource Conservation and Recovery Act
Polychlorinated Biphenyl (PCB) Control
5.5.7 As required
Asbestos Management
5.5.8 As required 29 CFR 1926.1101
Disposition of Hazardous Waste 5.5.9 As required 40 CFR Part 273 Backflow Prevention Devices 5.5.10 As required NFPA 25 Potable Water Systems 5.5.11 As required The Safe Drinking
Water Act, PL 99- 339 and 40 CFR 141.43, Sections A and D
Waste Reports 5.5.12 (a) Monthly Environmental Compliance 5.5.12 (b) As required Sustainable Purchasing Practices
5.5.12 (c) Monthly Resource Conservation and Recovery Act
(RCRA), USDA,
and EO 13834
Energy and Water Efficiency Reporting
5.6.3 Monthly Energy and Water
Efficiency Monthly Report format (See Exhibit 2
Advanced Metering Program Operations
5.7.2 Daily
Advanced Metering Program Reporting
5.7.4 Monthly
Building Automated Systems and IT Controls Operations
5.8.2 As required
BAS Alarms 5.8.3.2 As required BAS Testing/Inspecting
5.8.4 As required
BAS Reporting 5.8.5 As required Fire Protection and Life Safety 5.9.1.e Within 24 hours of incident
Equipment and Systems
Fire Alarm System Services
5.9.2 As required NFPA 72 National
Fire Alarm and Signaling Code
Water-Based Fire Protection Systems
5.9.3 As Required NFPA 25
Fire-rated Door Assemblies 5.9.4 As required NFPA 80, Standard for Fire Doors and Other Opening Protectives and NFPA 101, Life Safety Code
Fire Damper and Combination Fire/Smoke Dampers
5.9.5 As required NFPA 80, Standard
for Fire Doors and Other Opening Protectives and
NFPA 105,
Standard for the Installation of Smoke Door Assemblies and Other Opening Protectives.
Smoke Doors Assemblies 5.9.6 As required NFPA 105, Standard for the Installation of Smoke Door Assemblies and Other Opening Protectives
Smoke Dampers 5.9.7 As required the NFPA 105, Standard for the Installation of Smoke Door Assemblies and Other Opening Protectives
Portable Fire Extinguishers
5.9.8 As required NFPA 10, Standard
for Portable Fire Extinguishers
Non-Water-Based Fire Extinguishing Systems
5.9.9 As required NFPA 12, Standard
on Carbon Dioxide Extinguishing Systems; NFPA 12A, Standard on Halon 1301 Fire Extinguishing
Systems; NFPA 17, Standard for Dry Chemical Extinguishing Systems; NFPA 17A, Standard for Wet Chemical Extinguishing Systems; NFPA 96, Standard for Ventilation Control and Fire Protection of Commercial Cooking Operations; NFPA 2001, Standard for Clean Agent Fire Extinguishing Systems.
Smoke Control Systems 5.9.10 As required NFPA 92, Standard for Smoke Control Systems
Emergency and Standby Power Systems
5.9.11 As required NFPA 110, Standard for Emergency and Standby Power Systems; NFPA 111, Standard on Stored Electrical Energy Emergency and Standby Power Systems
Emergency Lighting Systems and Exit Signage
5.9.12 As required NFPA 101, Life
Safety Code
Lightning Protection Systems 5.9.14 As Required NFPA 780, Standard for the Installation of Lightning Protection Systems.
Chemical sensors 5.9.15 As required Per Manufacturer's recommendations.
Proactive Facility Tours 5.10.2 As required Minimum Tour Frequencies
5.10.3 As required
Monitoring of Central Plant Equipment
5.10.4 As required
Escorting and Miscellaneous Utility
5.14.1 & 2 Monthly
Flag Procedures 5.14.5 As required Monthly Progress Reports 5.15 Monthly Reference Library 5.16. As required Preventive Maintenance Plan 6.0 As part of the Contractor Proposal Boiler Systems 6.2 As required Air Distribution Equipment: Air Handling Units (AHU), Exhaust Fans (EF), Ductwork, Variable Air Volume (VAV), Actuators, Intakes
6.3 As required
Chiller Systems
6.4 As Required
Cooling Towers
6.5 As Required
HVAC Water Management
6.6 As Required
Comprehensive initial water treatment analysis
6.6.5.a Within 30 days of Contract start date
HVAC Water Management
Reporting
6.6.6 Monthly
Plumbing and Restrooms 6.7 As Required
Recycling program for fluorescent lamps and other light bulbs
6.8.3 As Required 40 CFR 260
Electrical Switchgear and Switchboards
6.9 As Required
Emergency Power Equipment
- Maintenance
6.10.3 As required NFPA 110, Standard for Emergency and Standby Power Systems and NFPA 111, Standard on Stored Electrical Energy Emergency and Standby Power Systems
Emergency Generator and Transfer Switch
6.10.4 Monthly
Emergency Power Equipment – Testing Generator Oil
6.10.4.a As required (minimally once per year)
American Society for Testing and Materials (ASTM) D6595 (Wear Metals in Used Oils) and ASTM D445 or ASTM D72799 (Viscosity).
Emergency Power Equipment
– Testing Diesel Fuel
6.10.4.b As required (minimally once per year)
ASTM D396-12
“STANDARD
SPECIFICATION
FOR FUEL OILS
Emergency Power Equipment - Reporting
6.10.5 Monthly
Oil Analysis and Oil Changes 6.11 As Required
Replacement Items and Painting
6.13.2 As Required
Directories. 6.13.6 As Required
Roof anchorages 6.13.8 Annually ANSI/IWCA I-14
Initial Inspection 7.0 Conclusion of Startup or Transition Phase
Existing Deficiency Inspection/Initial Deficiency Report
7.1 Not later than 30 days prior the
start of the Contract
Startup Phase or Transition Phase Services
7.2 Within 60 days of transition
services prior to the Contract start date
Startup or Transition Phase Schedule
7.2.1 Within the 15 of the startup or
transition phase commencement
Contract Closeout Examination
7.4 90 calendar days prior to contract completion.