47PB0019R0002_Solicitation_Exhibit_05_Energy_Water_Monthly_Report.pdf

PDF 185 KB Posted

Attached to
Operations and Facilities Maintenance Services at the John F. Kennedy Federal Building in Boston, MA
Solicitation number
47PB0019R0002
Issued by

About this file

47PB0019R0002 Solicitation Exhibit 05 Energy Water Monthly Report

View the file

Other files

File Type Posted
47PB0019R0002_Tab_10_Solicitation_Amend_04_SF-30_Amendment_Form_2019_08_13.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_04_Solicitation_Questions_and_Answers_2019_08_13.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_03_SF-30_Amendment_Form_2019_08_12.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_03_Attach_01_Solicitation_Exhibit_02_SF-1449_Solicitation_Form_2019_08_12.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_20_Service_Call_Log_May_2019_-_July_2019.xlsx XLSX spreadsheet
47PB0019R0002_Tab_10_Solicitation_Amend_02_Solicitation_Questions_and_Answers_2019_08_02.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_01_Proposal_Checklist_Cover_Sheet_2019_08_02.docx DOCX document
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_23_GSA-Approved_Devices.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_15_SCA_WD_Suffolk_2015_4047_Rev_11_2019_07_16.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_02_SF-30_Amendment_Form_2019_08_02.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_21_Repairs_2016_-_2019.xlsx XLSX spreadsheet
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_25_GSA_Region_1_NCMMS_Startup_Flowchart.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_10_QASP_2019_08_02.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_02_Solicitation_Changes_Summary_2019_08_02.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_03_Solicitation_Line_Item_Pricing_Table_2019_08_02.xlsx XLSX spreadsheet
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_22_Construction_Orders_2016_-_2018.xlsx XLSX spreadsheet
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_04_Building_Information_Sheet_2019_08_02.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_24_GSA_Region_1_NCMMS_Operations_Policy.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_06_Maintenance_Submittal_2019_08_02.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_11_Unit_Price_Agreement_2019_08_02.xlsx XLSX spreadsheet
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_18_Equipment_List_2019_08_02.xlsx XLSX spreadsheet
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_26_Child_Care_Equipment_Inventory.xlsx XLSX spreadsheet
47PB0019R0002_Tab_10_Solicitation_Amend_02_Solicitation_2019_08_02.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_01_Attach_07_Pre-Proposal_Conference_Presentation_2019_07_17.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_01_Attach_03_Solicitation_Exhibit_01_Proposal_Checklist_Cover_Sheet_2019_07_18.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_01_Attach_06_Solicitation_Exhibit_18_PBS_Maintenance_Standards_Guide_2018.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_01_Attach_08_Pre-Proposal_Conference_Sign-in_Sheet_2019_07_17.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_01_SF-30_Amendment_Form_2019_07_18.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_01_Attach_05_Solicitation_Exhibit_17_Equipment_List.xlsx XLSX spreadsheet
47PB0019R0002_Tab_10_Solicitation_Amend_01_Attach_01_Solicitation_2019_07_18.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_01_Attach_02_Solicitation_Changed_Pages_2019_07_18.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_01_Attach_04_Solicitation_Exhibit_02_SF-1449_Solicitation_Form_2019_07_18.pdf PDF
47PB0019R0002_Solicitation_Exhibit_18_GSA_Public_Building_Maintenance_Standards_Guide_2018_12_31.pdf PDF
47PB0019R0002_Solicitation_Exhibit_17_Equipment_List.xlsx XLSX spreadsheet
47PB0019R0002_Solicitation_Exhibit_07_Construction_Services_Form.xlsx XLSX spreadsheet
47PB0019R0002_Solicitation_Exhibit_11_Unit_Price_Agreement.xlsx XLSX spreadsheet
47PB0019R0002_Solicitation_Exhibit_16_Past_Performance_Reference_Form.doc DOC document
47PB0019R0002_Solicitation_2019_07_12.pdf PDF
47PB0019R0002_Solicitation_Exhibit_06_Maintenance_Submittal.pdf PDF
47PB0019R0002_Solicitation_Exhibit_12_CBA_WD_1989-0460_Rev_16_2018_10_09.pdf PDF
47PB0019R0002_Solicitation_Exhibit_15_GSA_Form_527_Contractor_Qualifications_and_Financial_Information.pdf PDF
47PB0019R0002_Solicitation_Exhibit_09_Smart_Buildings.pdf PDF
47PB0019R0002_Solicitation_Exhibit_14_DB_WD_MA190001_Rev_04_2019_07_05.pdf PDF
47PB0019R0002_Solicitation_Exhibit_03_Solicitation_Line_Item_Pricing_Table.xlsx XLSX spreadsheet
47PB0019R0002_Solicitation_Exhibit_02_SF-1449_Solicitation_Form.pdf PDF
47PB0019R0002_Solicitation_Exhibit_10_QASP.pdf PDF
47PB0019R0002_Solicitation_Exhibit_04_Building_Information_Sheet.pdf PDF
47PB0019R0002_Solicitation_Exhibit_13_CBA_SIGNED_2018_07_31.pdf PDF
47PB0019R0002_Solicitation_Exhibit_01_Proposal_Checklist_Cover_Sheet.pdf PDF
47PB0019R0002_Solicitation_Exhibit_08_Chart_of_Deliverables.pdf PDF
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit 2

Energy and Water Efficiency Monthly Report

1.0 General: This energy and water efficiency report is to be completed per the requirements of section 5.6, Energy & Water Efficiency, of the O&M services contract. The Contractor shall use this report template and submit completed reports as part of the monthly report to the Facility Manager.

2.0 Energy and Water Efficiency Reporting Template. The Contractor shall use this template to complete the energy and water efficiency report sections for “Contract Information” and “Contractor Reporting Elements.”

The GSA Property Manager shall complete the section “GSA Review and Response Elements.”

Contract Information

Contract Number:

Report Prepared by:

Building Information

Building Number: MA0131ZZ

Building Name: John F. Kennedy Federal Building

Building gross square foot: 1,045,574

Energy Technology & Analytic Tools Available at this Building:

Advanced Meters: yes/no

GSA Link: yes/no Yes

Renewable Energy Systems: yes/no (describe)

Most Recent Energy Audit: yes/no (date)

Annual Performance Target (To be filled out by in conjunction with the regional energy coordinator and the facility manager at the beginning of the Contractor’s performance period and 1 year thereafter until the end of contract)

Energy Water TARGET Annual Usage 57,609 BTU/GSF 7.46 Gal./GSF TARGET Annual Usage Variance + / - 5% of target BTU/GSF + / - 5% of target Gallon/GSF ACTUAL Annual Usage 57,899 BTU/GSF 7.496 Gal./GSF

Actual Usage is Within Target Variance (Yes/No)? Yes / No Yes / No

ACTUAL Annual Usage, Previous Year (FY18) 57,899 BTU/GSF 7.496 Gal./GSF

Actual Usage is Improving Relative to Previous Year (Yes/No)? Yes / No Yes / No

If actual energy or water usage is not within target variance, please provide narrative justification:

If actual energy or water usage is not improving relative to previous year, please provide justification:

Monthly Utility Bill Reporting (To be filled out monthly)

Actual Usage for

Difference Between This Year & Previous

Year

Purchased Utility

Recommended Reporting Unit

Current Billing Cycle Ending Month a

Current Billing Cycle

Same Month

Previous Year

Actual Units

Percentage Difference

Electricity kWh Electric Demand Peak kW

Other Energy c

Total Energy Usage mmBTU d

Domestic Water Gallons e

a. Current cycle ending month refers to the most recent month in which data is available. EUAS and utility invoices are typically not available until 45 days after the month’s end. E.g. June data is available around August 15th.

b. EUAS data is reported in cubic feet. 100 cubic feet = 1 CCF = 1 Therm

c. Other energy can refer to biomass or other purchased utilities that should add to show total building energy consumption

d. Total mmBTU = (3,413 X kWh + 1.031 X 100 Cubic Feet + 1,000,000 X MLB + 12,000 X Ton-Hours ) /

1,000,000

e. Water is sometimes billed on quarterly (3 month) intervals. If water is billed quarterly, use the total quarterly value from the most recent quarter available.

Discussion & Analysis (If applicable, to be filled out monthly)

Are there any significant (>15%) increases energy or water usage? No: Yes:

If yes, what is the cause?

Are there any significant decreases or improvements energy or water usage? No: Yes:

If yes, what is the cause? Is it something that can be replicated across additional GSA buildings?

Are there any significant changes in renewable energy production? No: Yes:

If yes, what is the cause?

Please describe any planned adjustments to operations or physical changes to the building (by the Contractor, a project, or at the request of tenants) since the last report that may result in improved energy or water efficiency.

Please describe any planned adjustments to operations or changes made to the building (by the Contractor, a project, or at the request of tenants) since the last report that may result in increased energy or water usage.

Were planned adjustments from the last report implemented?

Advanced Meter Analysis (To be filled out monthly. If advanced meters are not available for this building, skip to next section.)

Electric Demand Profile (example)

Electric Sub-Meter Demand Profile (example)

Steam Demand Profile Gas Demand Profile

Chilled Water Demand Profile Domestic Water Demand Profile (example)

System & Efficiency Checks (To be filled out monthly)

Are advanced meters functioning properly (i.e. are any meters not communicating or reporting data or reporting faulty data)?

Yes No Malfunctioning meters reported to regional metering point of contact?

Is GSA Link functioning and are Sparks being addressed?

Yes No Malfunctioning GSA Link reported to regional point of contact?

Are space temperatures set at 72 degrees F. +/- 2 degrees F. for heating mode?

Yes No If no, are there plans to adjust temperatures to the desired range?

Are space temperatures set at 75 degrees F. +/- 3 degrees F. for cooling mode?

Yes No If no, are there plans to adjust temperatures to the desired range?

Are the night and weekend set back temperatures set to no more than 550 in the winter and no less than 850 in the summer?

Yes No

If no, are the night/weekend setback temperatures at the level that promotes maximum energy savings without disrupting comfort?

Are holiday schedules verified for upcoming holidays?

Yes No If no, are there plans to verify or add holiday schedules?

Is the optimum start/stop sequence programmed into the building automation system?

Yes No If no, are there plans to implement optimum start/stop?

Is there a chilled water reset programmed into the chiller controls?

Yes No

If chilled water reset schedule is available, but not in use, is there a plan to implement it?

Is there a hot water reset programmed into the boiler controls?

Yes No If a hot water reset schedule is available, but not in use, is there a plan to implement it?

Are the AHU schedules correctly programmed into the BAS and for the shortest possible time to maintain temperatures for the spaces served?

Yes No Comments

Are AHUs currently allowed to cycle off near the end of the day so building temperatures can “coast”?

Yes No Comments

Are computer room temperature set points at 78 degrees or higher, and are overtime utilities being collected for these spaces?

Yes N o Comments

If applicable, have steam traps been inspected internally and, if needed, rebuilt prior to the heating season?

Yes No If no, are there plans to inspect and rebuild steam traps?

If applicable, have boiler efficiency tests been scheduled and performed in October - November?

Yes N o

If no, are there plans to schedule tests?

Have advanced meters and/or leak detection sensors been checked for signs of water leaks?

Yes N o Comments

If applicable, have cooling towers been checked for signs of leaks or excessive drift?

Yes N o

If no, are there plans inspect cooling towers?

GSA Review & Concurrence

GSA1. GSA Reviewing Official:

GSA2. Date Reviewed:

GSA3. Comments:

File details come from the government source that posted it.