47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_22_Construction_Orders_2016_-_2018.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
Operations and Facilities Maintenance Services at the John F. Kennedy Federal Building in Boston, MA
Solicitation number
47PB0019R0002
Issued by

About this file

Exhibit 22 Construction Orders 2016 - 2018

View the file

Other files

File Type Posted
47PB0019R0002_Tab_10_Solicitation_Amend_04_SF-30_Amendment_Form_2019_08_13.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_04_Solicitation_Questions_and_Answers_2019_08_13.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_03_SF-30_Amendment_Form_2019_08_12.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_03_Attach_01_Solicitation_Exhibit_02_SF-1449_Solicitation_Form_2019_08_12.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_20_Service_Call_Log_May_2019_-_July_2019.xlsx XLSX spreadsheet
47PB0019R0002_Tab_10_Solicitation_Amend_02_Solicitation_Questions_and_Answers_2019_08_02.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_01_Proposal_Checklist_Cover_Sheet_2019_08_02.docx DOCX document
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_23_GSA-Approved_Devices.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_15_SCA_WD_Suffolk_2015_4047_Rev_11_2019_07_16.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_02_SF-30_Amendment_Form_2019_08_02.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_21_Repairs_2016_-_2019.xlsx XLSX spreadsheet
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_25_GSA_Region_1_NCMMS_Startup_Flowchart.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_10_QASP_2019_08_02.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_02_Solicitation_Changes_Summary_2019_08_02.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_03_Solicitation_Line_Item_Pricing_Table_2019_08_02.xlsx XLSX spreadsheet
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_04_Building_Information_Sheet_2019_08_02.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_24_GSA_Region_1_NCMMS_Operations_Policy.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_06_Maintenance_Submittal_2019_08_02.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_11_Unit_Price_Agreement_2019_08_02.xlsx XLSX spreadsheet
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_18_Equipment_List_2019_08_02.xlsx XLSX spreadsheet
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_26_Child_Care_Equipment_Inventory.xlsx XLSX spreadsheet
47PB0019R0002_Tab_10_Solicitation_Amend_02_Solicitation_2019_08_02.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_01_Attach_07_Pre-Proposal_Conference_Presentation_2019_07_17.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_01_Attach_03_Solicitation_Exhibit_01_Proposal_Checklist_Cover_Sheet_2019_07_18.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_01_Attach_06_Solicitation_Exhibit_18_PBS_Maintenance_Standards_Guide_2018.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_01_Attach_08_Pre-Proposal_Conference_Sign-in_Sheet_2019_07_17.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_01_SF-30_Amendment_Form_2019_07_18.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_01_Attach_05_Solicitation_Exhibit_17_Equipment_List.xlsx XLSX spreadsheet
47PB0019R0002_Tab_10_Solicitation_Amend_01_Attach_01_Solicitation_2019_07_18.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_01_Attach_02_Solicitation_Changed_Pages_2019_07_18.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_01_Attach_04_Solicitation_Exhibit_02_SF-1449_Solicitation_Form_2019_07_18.pdf PDF
47PB0019R0002_Solicitation_Exhibit_18_GSA_Public_Building_Maintenance_Standards_Guide_2018_12_31.pdf PDF
47PB0019R0002_Solicitation_Exhibit_17_Equipment_List.xlsx XLSX spreadsheet
47PB0019R0002_Solicitation_Exhibit_07_Construction_Services_Form.xlsx XLSX spreadsheet
47PB0019R0002_Solicitation_Exhibit_11_Unit_Price_Agreement.xlsx XLSX spreadsheet
47PB0019R0002_Solicitation_Exhibit_16_Past_Performance_Reference_Form.doc DOC document
47PB0019R0002_Solicitation_2019_07_12.pdf PDF
47PB0019R0002_Solicitation_Exhibit_06_Maintenance_Submittal.pdf PDF
47PB0019R0002_Solicitation_Exhibit_12_CBA_WD_1989-0460_Rev_16_2018_10_09.pdf PDF
47PB0019R0002_Solicitation_Exhibit_15_GSA_Form_527_Contractor_Qualifications_and_Financial_Information.pdf PDF
47PB0019R0002_Solicitation_Exhibit_09_Smart_Buildings.pdf PDF
47PB0019R0002_Solicitation_Exhibit_14_DB_WD_MA190001_Rev_04_2019_07_05.pdf PDF
47PB0019R0002_Solicitation_Exhibit_03_Solicitation_Line_Item_Pricing_Table.xlsx XLSX spreadsheet
47PB0019R0002_Solicitation_Exhibit_02_SF-1449_Solicitation_Form.pdf PDF
47PB0019R0002_Solicitation_Exhibit_05_Energy_Water_Monthly_Report.pdf PDF
47PB0019R0002_Solicitation_Exhibit_10_QASP.pdf PDF
47PB0019R0002_Solicitation_Exhibit_04_Building_Information_Sheet.pdf PDF
47PB0019R0002_Solicitation_Exhibit_13_CBA_SIGNED_2018_07_31.pdf PDF
47PB0019R0002_Solicitation_Exhibit_01_Proposal_Checklist_Cover_Sheet.pdf PDF
47PB0019R0002_Solicitation_Exhibit_08_Chart_of_Deliverables.pdf PDF
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

JFK Operations and Maintenance
Solicitation 47PB0019R0002
Exhibit 21 (Construction Orders: 2016 - 2018)
ASR #? Repair, Alt or MiscCategorySub CategoryLocationDescriptionCostApprovedCredit Log or ACT #Signed OffWork Status?
877AlterationConstructionElectricalDOLInstall A-Phone/monitor station/duress system-DOL-OASAM-E-215$8,704.301/27/16EP-GS-P-01-16-NA-70666/29/16COMPLETE
885AlterationConstructionHVACCISInstall 3 electric heaters 1st floor Low-Rise CIS$9,215.992/8/16EP-GS-P-01-16-NA-70743/25/16COMPLETE
899AlterationConstructionConstructionChildcareMove the playground shed, pour concrete pad and move shed back, install Azek for edges.$7,656.535/6/16EP-GS-P-01-16-NA-71108/8/16COMPLETE
901AlterationConstructionConstructionSSASSA (OGC) Build 3 new offices in room 625$14,734.465/19/16EP-GS-P-01-16-NA-71179/6/16COMPLETE
903AlterationConstructionPlumbingBasementEmergencay drain snake and replace 4/29/16$7,129.215/23/16EP-GS-P-01-16-NA-71188/9/16COMPLETE
905AlterationConstructionConstructionDOLL&M to install 1 Birch door with glass & signage; 1 aiphone system. E-310$8,391.195/27/16EP-GS-P-01-16-NA-71203/6/17COMPLETE
906AlterationConstructionConstructionGSADry Cooler Tie-In JFK Low-Rise Roof$76,583.956/7/16EP-GS-P-01-16-NA-71261/13/17COMPLETE
911AlterationConstructionElectricalHHSInstall new HP electric door opener HHS(CMS) Rm 2375$4,044.506/29/16EP-GS-P-01-16-NA-71349/6/16COMPLETE
912AlterationConstructionElectricalHHSInstall CAT6 Jacks, patch panel and floor boxes in rm. 2225, 2425, and 2475 HHS (OIG)$6,371.656/29/16EP-GS-P-01-16-NA-713510/28/16COMPLETE
926AlterationConstructionFire AlarmMech. RoomBring tel & Elec closets up to fire code by sealing perimeter & adding a sprinkler head. HR Floors 11 to 24.$96,872.968/29/16EP-GS-P-01-16-NA-71708/29/16COMPLETE
936AlterationConstructionMisc.CafeteriaRemove old damaged wallpaper from Stairwell in the Cafeteria$15,413.949/28/16EP-GS-P-01-17-NA-00273/31/17COMPLETE
945AlterationConstructionFire AlarmMech. RoomBring tel & Elec closets up to fire code by sealing perimeter & adding a sprinkler head. HR Floors 11 to 24.$95,842.8010/24/16EP-GS-P-01-17-NA-001610/26/17COMPLETE
946AlterationConstructionConstructionGSARemove/replace carpet/cove base in E-235$20,289.6610/25/16EP-GS-P-01-17-NA-00182/24/17COMPLETE
947AlterationConstructionElectricalGSAAdd 5 outlets in E-275 GSA office$962.9111/1/16CL21062872/8/17COMPLETE
949AlterationConstructionPlumbingBasementReplace 125 feet of 1in condensate line$64,675.4011/30/16EP-GS-P-01-17-NA-00322/23/17COMPLETE
950AlterationConstructionPlumbingBasementRepalce 100 feet of 3in drainage pipe$52,691.1211/30/16EP-GS-P-01-17-NA-00334/7/17COMPLETE
960AlterationConstructionConstructionMechanicalReplace outside entrance doors on the city-Hall side of the JFK Low-Rise Bldg.$41,180.2612/20/16EP-GS-P-01-17-NA-00435/19/17COMPLETE
962AlterationConstructionElectricalDOL(2) 120v panels for DOL Rm. E-365$538.361/11/17CL21156475/25/17COMPLETE
963AlterationConstructionElectricalDOL20 amp outlet for rm. 2000$600.721/11/17CL21156585/18/17COMPLETE
965AlterationConstructionPlumbingGSA OfficeInstall instant hot in E-275$1,675.412/2/17CL21191005/25/17COMPLETE
967AlterationConstructionMisc.GSA OfficeHang TV in J. Kelliher's office$628.422/2/17CL21190795/25/17COMPLETE
968AlterationConstructionElectricalMechanicalDisconnect fiber optic and copper cables and reconnect to new rack$4,485.362/15/17EP-GS-P-01-17-NA-00685/15/17COMPLETE
973AlterationConstructionHVACDOLInstall VAD for DOL rm E-215$1,137.282/27/17CL21228815/25/17COMPLETE
978AlterationConstructionBldg SupportEOIRBldg. Support for EOIR 8th floor project.$10,000.003/28/17EP-GS-P-01-17-NA-008510/26/17COMPLETE
980AlterationConstructionElectricalSSAInstall (7) wireless routers for SSA rm. 650$2,487.044/4/17EP-GS-P-01-17-NA-01248/28/17COMPLETE
988AlterationConstructionElectricalCommerceInstall coax cable rm. 1826-A Dep. Of Commerce$310.564/19/17CL21325764/19/17COMPLETE
989AlterationConstructionHVACCISInstall 2 booster pumnps to increase pressure on glycol system.$36,559.624/21/17EP-GS-P-01-17-NA-01063/5/18COMPLETE
991AlterationConstructionLaborDOLProvide project support for the OWCP consolidation project.$55,000.005/2/17EP-GS-P-01-17-NA-010310/26/17COMPLETE
992AlterationConstructionConstructionDOLInstall demountable wall wth egress door in the computer rmof E-250, DOL, OWCP$12,679.345/16/17EP-GS-P-01-17-NA-010812/19/17COMPLETE
993AlterationConstructionFlooringHHSLabor to remove T-strips, remove part of metal track and carpet over the floor troff in rooms 2275 and 2375.$11,567.915/18/17EP-GS-P-01-17-NA-011210/16/17COMPLETE
995RepairConstructionPlumbingGSAReplace 40' of 3" Lead-Oakum Pipe in rm. 2475$2,620.815/23/17EP-GS-P-01-17-NA-01138/14/17COMPLETE
997RepairConstructionPlumbingGSA100' of 5" Drain pipe replace in G-37$7,280.045/30/17EP-GS-P-01-17-NA-01218/14/17COMPLETE
998AlterationConstructionFlooringGeneralRemove wallpaper skim & paint corridors on 8 floors (17 through 24)$45,400.346/8/17EP-GS-P-01-17-NA-01286/6/18COMPLETE
1002AlterationConstructionElectricalSenatorInstall 1-RG-6 cable TV in Senator Markey's office$334.336/8/17CL214199812/6/17COMPLETE
1003AlterationConstructionFire Life/SafetyMechanicalResolution of FPLS findings (See Note). Includes. Sealing top of HR elevator shafts. Install fire doors separating garage & the plant. Seal penetrations in the plant. Installation of new & relocation of existing sprinkler heads in the garage.$66,058.336/12/17EP-GS-P-01-17-NA-01265/29/18COMPLETE
1005AlterationConstructionLocksVARelocate existing telephone/fax line in rm. 1575.$441.106/20/17CL216816212/6/17COMPLETE
1006AlterationConstructionLocksCISInstall single handed push bar on the E-185 Breakroom door.$444.146/20/17CL216565510/13/17COMPLETE
1007AlterationConstructionSecurityFOHF&I 4 wireless panic button in Nurses office.$2,637.237/21/17EP-47PB0717F0000212/19/17COMPLETE
1008AlterationConstructionLocksIRSEliminate IRS Green Buttons.$25,377.197/28/17EP-47PB0717F000089/14/18COMPLETE
1010AlterationConstructionElectricalCMSInstall (2) Data jacks in rm. 2275 for CMS$401.818/14/17CL21528818/31/17COMPLETE
1011AlterationConstructionElectricalDOLInstall 8 x 23 sidelight on e-321 corridor door.$628.758/14/17CL215293011/29/17COMPLETE
1012AlterationConstructionMisc.IRSInstall (1)RG-6 cable, Bracket, and TV in rm. 1000 for IRS$967.228/17/17CL215372812/18/17COMPLETE
1013AlterationConstructionElectricalSSAInstall (2) cat-6 data jacks in rm 650$759.338/18/17CL215406011/29/17COMPLETE
1014AlterationConstructionPaintingDOLPaint 5 sections of wall (1071 Sq.Ft.) Rm. E-310$845.008/21/17CL215429412/18/17COMPLETE
1015AlterationConstructionPaintingDOLInstall (1) Sit/Stand desk rm. E-310$428.758/21/17CL215429611/19/17COMPLETE
1024AlterationConstructionMisc.DOLInstall window in E-375$7,565.029/6/17EP-47PB0717F00195/22/18COMPLETE
1025AlterationConstructionMisc.DOLDisconnect power to HSPD-12 rm. E-370$319.149/14/17CL215962512/18/17COMPLETE
1026AlterationConstructionElectricalGSAInstall Cat-6 Cable for the JFK Lighting Project$1,979.759/14/17CL215963012/18/17COMPLETE
1029AlterationConstructionElectricalSSAL&M to install 2 sub-meter aiphone monitors in room 1900.$3,255.079/15/17EP-47PB0717F00222/28/18COMPLETE
1031AlterationConstructionConstructionDOD OIGL&M to for alteration of DOD OIG space on floor 13.$48,166.099/15/17EP-47PB0717F002510/25/18COMPLETE
1032AlterationConstructionMisc.DOLInstall TV & Bracket in OSHEA rm. E-340$706.619/18/17CL216048812/18/17COMPLETE
1033AlterationConstructionElectricalDOLDisconnect (2) systems furnture cubicles in rm. 675 A, (2) banks of furniture n rm. 550, and (1) quad outlet rm. E-370.$792.199/21/17CL21615512/12/18COMPLETE
1034AlterationConstructionElectricalDOLInstall (1) Quad outlet in rm. E-250$665.789/21/17CL216156312/18/17COMPLETE
1038AlterationConstructionElectricalDOLDisconnect Electrical/Tel/Data/Systems Furniture/Reconnect (2) banks of furniture/Install new Dog House$3,289.949/22/17EP-47PB0717F00272/15/18COMPLETE
1040AlterationConstructionElectricalCISInstall (1) general purpose and (1) iolated round 20 amp circuit, (1) quad outlet, (4) 3-port phone/data jack consisting of (3) cat-six cables in training rm. 960$5,174.329/25/17EP-47PB0717F00312/15/18COMPLETE
1041AlterationConstructionElectricalDOLInstall AiPhone system rm. E-235$3,247.609/26/17EP-47PB0717F00332/15/18COMPLETE
1042AlterationConstructionLocksHHSPurchase/Install (2) 100 series Cypher Locks on the 21st. Floor.$1,227.059/26/17CL21626392/12/18COMPLETE
1043AlterationConstructionElectricalGSAReplace lights in Low-Rise Stairwell/Basement Hallway$28,231.069/29/17EP-47PB0718F0000511/26/18COMPLETE
1044AlterationConstructionCarpet/PaintDEACartpet and Paint both the Diversion area nd the training room.$31,575.0410/10/17EP-47PB0718F00146/18/18COMPLETE
1047AlterationConstructionElectricalDOLInstall Cat-6 cable from E-275 to high-rise control rooms.$2,360.2110/23/17EP-47PB0718F00175/4/18COMPLETE
1049AlterationConstructionElectricalVAInstall (1) 55" TV in rm 1400. Install (1) 20 Amp outlet and install (1) HDMI cable$867.4511/2/17CL21680462/12/18COMPLETE
1050AlterationConstructionElectricalVAInstall (1) 20amp 120V dedicated outlet in the kitchen area of rm1675/disconnect electrical to systems furniture in rm1550.$1,008.3711/3/17CL21681512/12/18COMPLETE
1051AlterationConstructionLocksVAReplace damaged lock in rm1675$668.6811/3/17CL21681603/15/18COMPLETE
1052AlterationConstructionElectricalHHSAdd on floor outlet rm/ 2325 HHS/CMS$1,084.3711/29/17CL21714526/13/18COMPLETE
1061AlterationConstructionAlterationsDOLE-370 DOL/OCM Patch, paint, and carpet.$5,754.7812/7/17EP-47PB0718F00307/24/18COMPLETE
1064AlterationConstructionConstructionChildcareReplace shelving inside Daycare Center$780.2412/18/17CL21743483/15/18COMPLETE
1065AlterationConstructionConstructionDOLRemove card readers, door contacts, card reader panel, and 3 boxes mounted in the back room of E-370$497.0612/18/17CL21744146/26/18COMPLETE
1066AlterationConstructionConstructionDOLInstall VAD in computer lab rm. 500 DOL$879.9112/18/17CL21744163/15/18COMPLETE
1067AlterationConstructionElectricalIRSSupply 120v power to both the 7th & 12th floor telephone closets for IRS$622.0612/21/17CL21750439/13/18COMPLETE
1068AlterationConstructionElectricalDOLRun tele/data cables from E-250 to E-350 for DOL$18,431.5712/21/17EP-47PB0718F00434/24/18COMPLETE
1072AlterationConstructionDoorDOLinstall delayed egress hardware device DOL EBSA rm.525$5,173.501/23/18EP-47PB0718F00518/2/18COMPLETE
1073AlterationConstructionElectricalICEInstall 6-Strand fiber cable ICE/OPLA$2,484.461/25/18EP-47PB0718F00556/18/18COMPLETE
1077AlterationConstructionElectricalDOLTie-in Tele-Data for tennant occupancy. E-370$797.872/20/18CL21839129/13/18COMPLETE
1078Misc.ConstructionElectricalDOLTie-in Tele-Data for tennant occupancy. E-365$1,124.002/26/18CL21849199/13/18COMPLETE
1089RepairConstructionPlumbingMech. RoomReplac 10ft of 2.5in copper pipe and 2.5in iron pipe in the 6th floor Mech Rm. Of the High-Rise$4,333.984/30/18EP-47PB0718F008910/25/18COMPLETE
1091RepairConstructionHVACBoiler roomReplace 50 feet of 12 inch Condenser pipe and (10) 90 degree, 12 inch elbows$77,658.945/21/18EP-47PB0718F0104Outstanding
1092AlterationConstructionElectricalIRSRun fiber cable from main tel room to DEA Diversion area.$7,153.286/19/18EP-47PB0718F01159/27/18COMPLETE
1094AlterationConstructionCarpet/PaintDOLRoom E365- L&M to replace the carpet & cove base, paint walls, doors and frames. Carpet sf govt furnished.$9,827.496/22/18EP-47PB0718F011710/25/18COMPLETE
1096AlterationConstructionElectricalInstall cat 6 cable in rm. 650$660.457/9/18CL220717211/5/18COMPLETE
1097AlterationConstructionPaintingDOLPaint 2 walls in E-215, swap key cores in E-205$296.227/9/18CL22071789/13/18COMPLETE
1098AlterationConstructionElectricalSSAL&M for 19 data drops and surface mounted outlets in room 1975 systems furniture.$8,088.827/13/18EP-47PB0718F01292/22/19COMPLETE
1102AlterationConstructionElectricalIRSIRS-Dedicated outlets in data closets.$1,983.368/7/18CL221321611/5/18COMPLETE
1103AlterationConstructionLocksICEInstall (100) series cypher lock Rm. 425$660.138/8/18CL22133769/13/18COMPLETE
1104AlterationConstructionElectricalICEInstall 50' of cable wth connectors in rm. 425$211.348/8/18CL22133819/13/18COMPLETE
1110AlterationConstructionElectricalDOLInstall (12) 12-Strand fiber cables in E-215 for DOL$87,000.649/14/18EP-47PB0718F0147Outstanding
1111AlterationConstructionCarpet/PaintDOD OIGDOD-rm.1325 carpet and paint$16,983.849/26/18EP-47PB0718F01527/30/19COMPLETE
1113AlterationConstructionPaintingDOLPaint 4 offices in rm. E-375 DOL$1,967.7410/11/18CL2219719Outstanding
1121AlterationConstructionConstructionDOLbuild a wall in the DOL computer room in E-350$15,481.3611/23/18INSERT ACT #Outstanding
1123AlterationConstructionElectricalICEInstall (2) dedicated isolated 120v 20amp outlets for HIS/ICE in room 1700$1,992.1911/29/18CL2244258Outstanding
1124Misc.ConstructionMisc.DOLInstall Bracket and TV for DOL rm. E-215 OLMS$376.7511/30/18CL2233093Outstanding
60Repairs (2016 - 2018)Total Construction Orders (2016 - 2018)$1,236,460.94
2016$530,760.83
2017$461,443.75
2018$244,256.36
3-Year Average$412,153.65