Exhibit 11 Unit Price Agreement 2019 08 02

View the file

Other files

File Type Posted
47PB0019R0002_Tab_10_Solicitation_Amend_04_SF-30_Amendment_Form_2019_08_13.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_04_Solicitation_Questions_and_Answers_2019_08_13.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_03_SF-30_Amendment_Form_2019_08_12.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_03_Attach_01_Solicitation_Exhibit_02_SF-1449_Solicitation_Form_2019_08_12.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_20_Service_Call_Log_May_2019_-_July_2019.xlsx XLSX spreadsheet
47PB0019R0002_Tab_10_Solicitation_Amend_02_Solicitation_Questions_and_Answers_2019_08_02.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_01_Proposal_Checklist_Cover_Sheet_2019_08_02.docx DOCX document
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_23_GSA-Approved_Devices.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_15_SCA_WD_Suffolk_2015_4047_Rev_11_2019_07_16.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_02_SF-30_Amendment_Form_2019_08_02.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_21_Repairs_2016_-_2019.xlsx XLSX spreadsheet
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_25_GSA_Region_1_NCMMS_Startup_Flowchart.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_10_QASP_2019_08_02.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_02_Solicitation_Changes_Summary_2019_08_02.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_03_Solicitation_Line_Item_Pricing_Table_2019_08_02.xlsx XLSX spreadsheet
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_22_Construction_Orders_2016_-_2018.xlsx XLSX spreadsheet
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_04_Building_Information_Sheet_2019_08_02.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_24_GSA_Region_1_NCMMS_Operations_Policy.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_06_Maintenance_Submittal_2019_08_02.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_18_Equipment_List_2019_08_02.xlsx XLSX spreadsheet
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_26_Child_Care_Equipment_Inventory.xlsx XLSX spreadsheet
47PB0019R0002_Tab_10_Solicitation_Amend_02_Solicitation_2019_08_02.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_01_Attach_07_Pre-Proposal_Conference_Presentation_2019_07_17.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_01_Attach_03_Solicitation_Exhibit_01_Proposal_Checklist_Cover_Sheet_2019_07_18.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_01_Attach_06_Solicitation_Exhibit_18_PBS_Maintenance_Standards_Guide_2018.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_01_Attach_08_Pre-Proposal_Conference_Sign-in_Sheet_2019_07_17.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_01_SF-30_Amendment_Form_2019_07_18.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_01_Attach_05_Solicitation_Exhibit_17_Equipment_List.xlsx XLSX spreadsheet
47PB0019R0002_Tab_10_Solicitation_Amend_01_Attach_01_Solicitation_2019_07_18.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_01_Attach_02_Solicitation_Changed_Pages_2019_07_18.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_01_Attach_04_Solicitation_Exhibit_02_SF-1449_Solicitation_Form_2019_07_18.pdf PDF
47PB0019R0002_Solicitation_Exhibit_18_GSA_Public_Building_Maintenance_Standards_Guide_2018_12_31.pdf PDF
47PB0019R0002_Solicitation_Exhibit_17_Equipment_List.xlsx XLSX spreadsheet
47PB0019R0002_Solicitation_Exhibit_07_Construction_Services_Form.xlsx XLSX spreadsheet
47PB0019R0002_Solicitation_Exhibit_11_Unit_Price_Agreement.xlsx XLSX spreadsheet
47PB0019R0002_Solicitation_Exhibit_16_Past_Performance_Reference_Form.doc DOC document
47PB0019R0002_Solicitation_2019_07_12.pdf PDF
47PB0019R0002_Solicitation_Exhibit_06_Maintenance_Submittal.pdf PDF
47PB0019R0002_Solicitation_Exhibit_12_CBA_WD_1989-0460_Rev_16_2018_10_09.pdf PDF
47PB0019R0002_Solicitation_Exhibit_15_GSA_Form_527_Contractor_Qualifications_and_Financial_Information.pdf PDF
47PB0019R0002_Solicitation_Exhibit_09_Smart_Buildings.pdf PDF
47PB0019R0002_Solicitation_Exhibit_14_DB_WD_MA190001_Rev_04_2019_07_05.pdf PDF
47PB0019R0002_Solicitation_Exhibit_03_Solicitation_Line_Item_Pricing_Table.xlsx XLSX spreadsheet
47PB0019R0002_Solicitation_Exhibit_02_SF-1449_Solicitation_Form.pdf PDF
47PB0019R0002_Solicitation_Exhibit_05_Energy_Water_Monthly_Report.pdf PDF
47PB0019R0002_Solicitation_Exhibit_10_QASP.pdf PDF
47PB0019R0002_Solicitation_Exhibit_04_Building_Information_Sheet.pdf PDF
47PB0019R0002_Solicitation_Exhibit_13_CBA_SIGNED_2018_07_31.pdf PDF
47PB0019R0002_Solicitation_Exhibit_01_Proposal_Checklist_Cover_Sheet.pdf PDF
47PB0019R0002_Solicitation_Exhibit_08_Chart_of_Deliverables.pdf PDF
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Solicitation 47PB0019R0002Note: Offerors should enter their company name after "Offeror:" in Line 5, and fill in the Price Differential percentages for each UPA Line Item for each Contract Period (except for the "6 Mo Ext" period) in the two green columns (i.e. Regular Hours Price Differentials and After Hours Price Differentials). This will automatically calculate a lump sum for yearly UPA Regular Hours work and UPA After Hours work for each contract period. These yearly amounts (two per contract period) will roll down to a table at the bottom of the spreadsheet on page 45. These lump sum Line Items (for Line Items 0017 - 10017 and 0018 - 10018) should then be entered into the main Solicitation Line Item Pricing Table (Exhibit 3).
JFK Operations and Maintenance
Exhibit 11
Unit Price Agreement (UPA) *
Offeror:
Contract YearLine ItemDescriptionEst. Qty.UnitEstimated Unit Cost (Reg. Hrs)Bare Cost (Reg. Hours)Offeror Price Diff. (%) Reg. Hrs.Offeror Price Diff. (%) Reg. Hrs.Total Cost (Reg. Hours)Estimated Unit Cost (Aftr Hrs)Bare Cost (Aftr Hrs)Offeror Price Diff. (%) (Aftr Hrs)Total Cost (Aftr Hrs)
Base (12/1/19 - 9/30/20)Ba.1Provide labor and materials to remove completely Gypsum Wall Board Partitions up to 8” thick and 13 feet high.1,000SF$2.49$2,490.00$0.00$0.00$2.56$2,564.70$0.00
Base (12/1/19 - 9/30/20)Ba.2Provide labor and materials to remove door/frame from existing GWB Partition and close in opening, paint to match existing walls.10EA$169.33$1,693.30$0.00$0.00$174.41$1,744.10$0.00
Base (12/1/19 - 9/30/20)Ba.3Construct a Gypsum Wall Board and Metal Stud Partition, consisting of 5/8” thick fire rated GWB and 20 GA metal studs, with a thin coat of plaster to include 4” cove base.1,000SF$9.76$9,760.00$0.00$0.00$10.05$10,052.80$0.00
Base (12/1/19 - 9/30/20)Ba.4Premium for extending the height of Gypsum Wall Board Partitions to 13 feet high. SF1$403.17$403.17$0.00$0.00$415.27$415.27$0.00
Base (12/1/19 - 9/30/20)Ba.5Remove and replace existing 4” cove base.100LF$3.18$318.00$0.00$0.00$3.28$327.54$0.00
Base (12/1/19 - 9/30/20)Ba.6Furnish and install a 3’0” X 7’0” wood door with 20 minute fire label and 16 GA welded steel knockdown frame in a new GWB Partition to include painting of the door and frame.10EA$551.00$5,510.00$0.00$0.00$567.53$5,675.30$0.00
Base (12/1/19 - 9/30/20)Ba.7Furnish and install a 3’0” X 7’0” wood door with 20 minute fire label and 16 GA pressed steel knockdown frame in a existing GWB Partition to include painting of the door and frame.6EA$544.29$3,265.74$0.00$0.00$560.62$3,363.71$0.00
Base (12/1/19 - 9/30/20)Ba.8Provide labor & materials to remove, replace and or modify existing Ceiling Grid and tiles.500SF$2.69$1,345.00$0.00$0.00$2.77$1,385.35$0.00
Base (12/1/19 - 9/30/20)Ba.9Furnish materials and paint new or previously painted vertical surfaces, plaster and drywall with Eggshell paint (color to be selected by GSA).$0.00
First Coat:12,000SF$0.40$4,800.00$0.00$0.00$0.41$4,944.00$0.00
Second Coat:12,000SF$0.30$3,600.00$0.00$0.00$0.31$3,708.00$0.00
Base (12/1/19 - 9/30/20)Ba.10Furnish materials and paint new or previously painted masonry surfaces.$0.00
First Coat:6,000SF$0.40$2,400.00$0.00$0.00$0.41$2,472.00$0.00
Second Coat:6,000SF$0.30$1,800.00$0.00$0.00$0.31$1,854.00$0.00
Base (12/1/19 - 9/30/20)Ba.11Furnish materials and paint previously painted pressed metal door and window frames up to 10" width, 2 coats semi-gloss (Latex base).150LF$2.78$417.00$0.00$0.00$2.86$429.51$0.00
Base (12/1/19 - 9/30/20)Ba.12Furnish materials and prepare surface, prime/paint (2) finishes coats wood door.50EA$73.91$3,695.50$0.00$0.00$76.13$3,806.37$0.00
Base (12/1/19 - 9/30/20)Ba.13Furnish materials and patch vertical surfaces (GWB/Plaster) and restore to original condition.500SF$0.62$310.00$0.00$0.00$0.64$319.30$0.00
Base (12/1/19 - 9/30/20)Ba.14Remove an existing quad, duplex outlet in an existing GWB partition, to include termination of wiring.20Outlet$63.84$1,276.80$0.00$0.00$65.76$1,315.10$0.00
Base (12/1/19 - 9/30/20)Ba.15Remove existing floor outlet (elec./tele/data) includes termination of wiring and sealing hole with Flammadur and Steel Cap.35Outlet$72.91$2,551.85$0.00$0.00$75.10$2,628.41$0.00
Base (12/1/19 - 9/30/20)Ba.16Locate cell in under floor duct system and bore through up to 8" of concrete, tap cell.75Cell$67.20$5,040.00$0.00$0.00$69.22$5,191.20$0.00
Base (12/1/19 - 9/30/20)Ba.17Furnish and install duplex outlet in a new or existing GWB partition, wire to adjacent outlet Max Run 25 LF.30Outlet$141.92$4,257.60$0.00$0.00$146.18$4,385.33$0.00
Base (12/1/19 - 9/30/20)Ba.18Furnish and install a quad outlet in a new or existing GWB partition, wire to adjacent outlet Max Run 25 LF.30Outlet$162.34$4,870.20$0.00$0.00$167.21$5,016.31$0.00
Base (12/1/19 - 9/30/20)Ba.19Furnish and install flush mount, brushed aluminum, floor electrical duplex outlet in under floor duct system, includes all parts for a complete installation, Max Run 25 LF.50Outlet$215.03$10,751.50$0.00$0.00$221.48$11,074.05$0.00
Base (12/1/19 - 9/30/20)Ba.20Furnish and install a surface metal raceway to include all required fittings for a complete installation.100LF$8.45$845.00$0.00$0.00$8.70$870.35$0.00
Base (12/1/19 - 9/30/20)Ba.21Furnish and install a surface mounted duplex outlet in conjunction with #20.20Outlet$67.20$1,344.00$0.00$0.00$69.22$1,384.32$0.00
Base (12/1/19 - 9/30/20)Ba.22Premium for furnish and install of an isolated ground duplex outlet in lieu of standard in #'s 17, 18, 19 & 21.30EA$17.47$524.10$0.00$0.00$17.99$539.82$0.00
Base (12/1/19 - 9/30/20)Ba.23Furnish and install floor electrical outlet for systems furniture. Install in floor system, must be equal to existing used in building.15Outlet$181.43$2,721.45$0.00$0.00$186.87$2,803.09$0.00
Base (12/1/19 - 9/30/20)Ba.24Furnish and install wiring and Honeywell switch (model EL7650) to control lights in new or existing GWB walls.20Switch$212.34$4,246.80$0.00$0.00$218.71$4,374.20$0.00
Base (12/1/19 - 9/30/20)Ba.25Install a Government furnished lay-in type light fixture in an existing suspended ceiling system, furnish all materials including AFC connectors for a complete installation.30Fixture$69.88$2,096.40$0.00$0.00$71.98$2,159.29$0.00
Base (12/1/19 - 9/30/20)Ba.26Relocate existing lay-in type light fixture within suspended ceiling, tie to adjacent fixture, furnish any additional materials for a complete installation.30Fixture$60.48$1,814.40$0.00$0.00$62.29$1,868.83$0.00
Base (12/1/19 - 9/30/20)Ba.27Remove existing lay-in type light fixture to include termination of wiring.20Fixture$47.04$940.80$0.00$0.00$48.45$969.02$0.00
Base (12/1/19 - 9/30/20)Ba.28Furnish and install and electrical door release in new or existing door. Work includes buzzer/plate/push button, electric strike and transformer with associated wiring.12EA$470.37$5,644.44$0.00$0.00$484.48$5,813.77$0.00
Base (12/1/19 - 9/30/20)Ba.29Extra for home run above a new or existing suspended ceiling, to include circuit breaker, EMT, and support for a complete installation.2,000LF$6.58$13,160.00$0.00$0.00$6.78$13,554.80$0.00
Base (12/1/19 - 9/30/20)Ba.30Extra for home run in under floor duct system to include circuit breaker.2,000LF$6.05$12,100.00$0.00$0.00$6.23$12,463.00$0.00
Base (12/1/19 - 9/30/20)Ba.31Furnish and install data/telephone outlet in a new or existing GWB partition.30Outlet$141.92$4,257.60$0.00$0.00$146.18$4,385.33$0.00
Base (12/1/19 - 9/30/20)Ba.32Furnish and install surface mounted data/telephone outlet.30Outlet$128.55$3,856.50$0.00$0.00$132.41$3,972.20$0.00
Base (12/1/19 - 9/30/20)Ba.33Install Government furnished computer cable in under-floor raceway.1,500LF$1.14$1,710.00$0.00$0.00$1.17$1,761.30$0.00
Base (12/1/19 - 9/30/20)Ba.34Install Government furnished computer cable above a new or existing ceiling.1,200LF$1.48$1,776.00$0.00$0.00$1.52$1,829.28$0.00
Base (12/1/19 - 9/30/20)Ba.35Furnish and Install cable connectors to wiring under 33 & 34.75EA$35.95$2,696.25$0.00$0.00$37.03$2,777.14$0.00
Base (12/1/19 - 9/30/20)Ba.36Furnish and install flush mount, brushed aluminum, floor Telephone/Data outlet in under floor system for a complete installation.50Outlet$221.75$11,087.50$0.00$0.00$228.40$11,420.13$0.00
Base (12/1/19 - 9/30/20)Ba.37Provide labor and materials to demo existing carpet tiles from floor area.2,000SF$1.28$2,560.00$0.00$0.00$1.32$2,636.80$0.00
Base (12/1/19 - 9/30/20)Ba.38Provide labor and materials to Install Government-furnished Carpet Tiles.1,000sq yd$5.38$5,380.00$0.00$0.00$5.54$5,541.40$0.00
Base (12/1/19 - 9/30/20)Ba.39Remove existing sprinkler plate, head and pipe drop. Install new elbows and relocate existing sprinkler to include valving off branch and plugging out fire alarm system.20EA$330.60$6,612.00$0.00$0.00$340.52$6,810.36$0.00
Base (12/1/19 - 9/30/20)Ba.40Provide labor and materials to remove/relocate hard duct VAD ceiling unit to a new location. (Max Run 20 feet) To include all pneumatic tubing and duct work as required for a complete installation and removal.10EA$772.75$7,727.50$0.00$0.00$795.93$7,959.33$0.00
Base (12/1/19 - 9/30/20)Ba.41Provide labor and materials to install a government furnished VAD ceiling unit in a new location. To include contractor furnishing of all pneumatic tubing, duct work, and any other materials needed to install unit.10EA$893.70$8,937.00$0.00$0.00$920.51$9,205.11$0.00
Base (12/1/19 - 9/30/20)Ba.42Furnish and install 2’ X 2' air diffuser in a new or existing ceiling grid system. To include contractor furnishing of all pneumatic tubing, duct work and any other materials needed to install unit. Maximum flex duct to be installed is 10 feet. All other to be hard duct.10EA$335.98$3,359.80$0.00$0.00$346.06$3,460.59$0.00
Base (12/1/19 - 9/30/20)Ba.43Remove existing pneumatic T-Stat affected by the removal of GWB partitions.20T-Stat$160.56$3,211.20$0.00$0.00$165.38$3,307.54$0.00
Base (12/1/19 - 9/30/20)Ba.44Furnish and install new pneumatic T-Stat affected by installation of new GWB partitions.20T-Stat$302.38$6,047.60$0.00$0.00$311.45$6,229.03$0.00
Base (12/1/19 - 9/30/20)Ba.45Furnish and install DDC thermostat controls for VAV boxes.1T-Stat$436.77$436.77$0.00$0.00$449.87$449.87$0.00
Base (12/1/19 - 9/30/20)Ba.46Furnish and install Unican cipher lock with removable core in metal/wood door to match existing ciphers, including wrap around plate and push plate.10EA$759.31$7,593.10$0.00$0.00$782.09$7,820.89$0.00
Base (12/1/19 - 9/30/20)Ba.47Furnish and install lock-set with removable core in metal/wood door to match existing in building standard.30EA$456.93$13,707.90$0.00$0.00$470.64$14,119.14$0.00
Base (12/1/19 - 9/30/20)Ba.48Furnish and install Sargent Board KP 60 – 28 – 10 G77 LL 26D 100 User Lock-set with removable core in new or existing door.10EA$938.99$9,389.90$0.00$0.00$967.16$9,671.60$0.00
Base (12/1/19 - 9/30/20)Ba.49Furnish and install Sargent Mortise KP – 8278 – LNL – 26D RH 100 User Lock-set with removable core in new or existing door.10EA$956.73$9,567.30$0.00$0.00$985.43$9,854.32$0.00
Base (12/1/19 - 9/30/20)Ba.50Furnish and install Sargent Board KP 60 – 28 – 10 G77 LUL 26D 500 User Lock-set with removable core in new or existing door.10EA$1,350.30$13,503.00$0.00$0.00$1,390.81$13,908.09$0.00
Base (12/1/19 - 9/30/20)Ba.51Furnish and install Sargent Mortise KP – 8278 – LUL – 26D RH 500 User Lock-set with removable core in new or existing door.10EA$1,368.04$13,680.40$0.00$0.00$1,409.08$14,090.81$0.00
Base (12/1/19 - 9/30/20)Ba.52Running Fiber Optic Cable100C.L.F.$150.00$15,000.00$0.00$0.00$154.50$15,450.00$0.00
$268,090.37$0.00$276,133.08$0.00
Line Item 0017Line Item 0018
Option 1 (10/1/20 - 9/30/21)O1.1Provide labor and materials to remove completely Gypsum Wall Board Partitions up to 8” thick and 13 feet high.1,000SF$2.49$2,490.00$0.00$0.00$2.56$2,564.70$0.00
Option 1 (10/1/20 - 9/30/21)O1.2Provide labor and materials to remove door/frame from existing GWB Partition and close in opening, paint to match existing walls.10EA$169.33$1,693.30$0.00$0.00$174.41$1,744.10$0.00
Option 1 (10/1/20 - 9/30/21)O1.3Construct a Gypsum Wall Board and Metal Stud Partition, consisting of 5/8” thick fire rated GWB and 20 GA metal studs, with a thin coat of plaster to include 4” cove base.1,000SF$9.76$9,760.00$0.00$0.00$10.05$10,052.80$0.00
Option 1 (10/1/20 - 9/30/21)O1.4Premium for extending the height of Gypsum Wall Board Partitions to 13 feet high. SF1$403.17$403.17$0.00$0.00$415.27$415.27$0.00
Option 1 (10/1/20 - 9/30/21)O1.5Remove and replace existing 4” cove base.100LF$3.18$318.00$0.00$0.00$3.28$327.54$0.00
Option 1 (10/1/20 - 9/30/21)O1.6Furnish and install a 3’0” X 7’0” wood door with 20 minute fire label and 16 GA welded steel knockdown frame in a new GWB Partition to include painting of the door and frame.10EA$551.00$5,510.00$0.00$0.00$567.53$5,675.30$0.00
Option 1 (10/1/20 - 9/30/21)O1.7Furnish and install a 3’0” X 7’0” wood door with 20 minute fire label and 16 GA pressed steel knockdown frame in a existing GWB Partition to include painting of the door and frame.6EA$544.29$3,265.74$0.00$0.00$560.62$3,363.71$0.00
Option 1 (10/1/20 - 9/30/21)O1.8Provide labor & materials to remove, replace and or modify existing Ceiling Grid and tiles.500SF$2.69$1,345.00$0.00$0.00$2.77$1,385.35$0.00
Option 1 (10/1/20 - 9/30/21)O1.9Furnish materials and paint new or previously painted vertical surfaces, plaster and drywall with Eggshell paint (color to be selected by GSA).$0.00
First Coat:12,000SF$0.40$4,800.00$0.00$0.00$0.41$4,944.00$0.00
Second Coat:12,000SF$0.30$3,600.00$0.00$0.00$0.31$3,708.00$0.00
Option 1 (10/1/20 - 9/30/21)O1.10Furnish materials and paint new or previously painted masonry surfaces.$0.00
First Coat:6,000SF$0.40$2,400.00$0.00$0.00$0.41$2,472.00$0.00
Second Coat:6,000SF$0.30$1,800.00$0.00$0.00$0.31$1,854.00$0.00
Option 1 (10/1/20 - 9/30/21)O1.11Furnish materials and paint previously painted pressed metal door and window frames up to 10" width, 2 coats semi-gloss (Latex base).150LF$2.78$417.00$0.00$0.00$2.86$429.51$0.00
Option 1 (10/1/20 - 9/30/21)O1.12Furnish materials and prepare surface, prime/paint (2) finishes coats wood door.50EA$73.91$3,695.50$0.00$0.00$76.13$3,806.37$0.00
Option 1 (10/1/20 - 9/30/21)O1.13Furnish materials and patch vertical surfaces (GWB/Plaster) and restore to original condition.500SF$0.62$310.00$0.00$0.00$0.64$319.30$0.00
Option 1 (10/1/20 - 9/30/21)O1.14Remove an existing quad, duplex outlet in an existing GWB partition, to include termination of wiring.20Outlet$63.84$1,276.80$0.00$0.00$65.76$1,315.10$0.00
Option 1 (10/1/20 - 9/30/21)O1.15Remove existing floor outlet (elec./tele/data) includes termination of wiring and sealing hole with Flammadur and Steel Cap.35Outlet$72.91$2,551.85$0.00$0.00$75.10$2,628.41$0.00
Option 1 (10/1/20 - 9/30/21)O1.16Locate cell in under floor duct system and bore through up to 8" of concrete, tap cell.75Cell$67.20$5,040.00$0.00$0.00$69.22$5,191.20$0.00
Option 1 (10/1/20 - 9/30/21)O1.17Furnish and install duplex outlet in a new or existing GWB partition, wire to adjacent outlet Max Run 25 LF.30Outlet$141.92$4,257.60$0.00$0.00$146.18$4,385.33$0.00
Option 1 (10/1/20 - 9/30/21)O1.18Furnish and install a quad outlet in a new or existing GWB partition, wire to adjacent outlet Max Run 25 LF.30Outlet$162.34$4,870.20$0.00$0.00$167.21$5,016.31$0.00
Option 1 (10/1/20 - 9/30/21)O1.19Furnish and install flush mount, brushed aluminum, floor electrical duplex outlet in under floor duct system, includes all parts for a complete installation, Max Run 25 LF.50Outlet$215.03$10,751.50$0.00$0.00$221.48$11,074.05$0.00
Option 1 (10/1/20 - 9/30/21)O1.20Furnish and install a surface metal raceway to include all required fittings for a complete installation.100LF$8.45$845.00$0.00$0.00$8.70$870.35$0.00
Option 1 (10/1/20 - 9/30/21)O1.21Furnish and install a surface mounted duplex outlet in conjunction with #20.20Outlet$67.20$1,344.00$0.00$0.00$69.22$1,384.32$0.00
Option 1 (10/1/20 - 9/30/21)O1.22Premium for furnish and install of an isolated ground duplex outlet in lieu of standard in #'s 17, 18, 19 & 21.30EA$17.47$524.10$0.00$0.00$17.99$539.82$0.00
Option 1 (10/1/20 - 9/30/21)O1.23Furnish and install floor electrical outlet for systems furniture. Install in floor system, must be equal to existing used in building.15Outlet$181.43$2,721.45$0.00$0.00$186.87$2,803.09$0.00
Option 1 (10/1/20 - 9/30/21)O1.24Furnish and install wiring and Honeywell switch (model EL7650) to control lights in new or existing GWB walls.20Switch$212.34$4,246.80$0.00$0.00$218.71$4,374.20$0.00
Option 1 (10/1/20 - 9/30/21)O1.25Install a Government furnished lay-in type light fixture in an existing suspended ceiling system, furnish all materials including AFC connectors for a complete installation.30Fixture$69.88$2,096.40$0.00$0.00$71.98$2,159.29$0.00
Option 1 (10/1/20 - 9/30/21)O1.26Relocate existing lay-in type light fixture within suspended ceiling, tie to adjacent fixture, furnish any additional materials for a complete installation.30Fixture$60.48$1,814.40$0.00$0.00$62.29$1,868.83$0.00
Option 1 (10/1/20 - 9/30/21)O1.27Remove existing lay-in type light fixture to include termination of wiring.20Fixture$47.04$940.80$0.00$0.00$48.45$969.02$0.00
Option 1 (10/1/20 - 9/30/21)O1.28Furnish and install and electrical door release in new or existing door. Work includes buzzer/plate/push button, electric strike and transformer with associated wiring.12EA$470.37$5,644.44$0.00$0.00$484.48$5,813.77$0.00
Option 1 (10/1/20 - 9/30/21)O1.29Extra for home run above a new or existing suspended ceiling, to include circuit breaker, EMT, and support for a complete installation.2,000LF$6.58$13,160.00$0.00$0.00$6.78$13,554.80$0.00
Option 1 (10/1/20 - 9/30/21)O1.30Extra for home run in under floor duct system to include circuit breaker.2,000LF$6.05$12,100.00$0.00$0.00$6.23$12,463.00$0.00
Option 1 (10/1/20 - 9/30/21)O1.31Furnish and install data/telephone outlet in a new or existing GWB partition.30Outlet$141.92$4,257.60$0.00$0.00$146.18$4,385.33$0.00
Option 1 (10/1/20 - 9/30/21)O1.32Furnish and install surface mounted data/telephone outlet.30Outlet$128.55$3,856.50$0.00$0.00$132.41$3,972.20$0.00
Option 1 (10/1/20 - 9/30/21)O1.33Install Government furnished computer cable in under-floor raceway.1,500LF$1.14$1,710.00$0.00$0.00$1.17$1,761.30$0.00
Option 1 (10/1/20 - 9/30/21)O1.34Install Government furnished computer cable above a new or existing ceiling.1,200LF$1.48$1,776.00$0.00$0.00$1.52$1,829.28$0.00
Option 1 (10/1/20 - 9/30/21)O1.35Furnish and Install cable connectors to wiring under 33 & 34.75EA$35.95$2,696.25$0.00$0.00$37.03$2,777.14$0.00
Option 1 (10/1/20 - 9/30/21)O1.36Furnish and install flush mount, brushed aluminum, floor Telephone/Data outlet in under floor system for a complete installation.50Outlet$221.75$11,087.50$0.00$0.00$228.40$11,420.13$0.00
Option 1 (10/1/20 - 9/30/21)O1.37Provide labor and materials to demo existing carpet tiles from floor area.2,000SF$1.28$2,560.00$0.00$0.00$1.32$2,636.80$0.00
Option 1 (10/1/20 - 9/30/21)O1.38Provide labor and materials to Install Government-furnished Carpet Tiles.1,000sq yd$5.38$5,380.00$0.00$0.00$5.54$5,541.40$0.00
Option 1 (10/1/20 - 9/30/21)O1.39Remove existing sprinkler plate, head and pipe drop. Install new elbows and relocate existing sprinkler to include valving off branch and plugging out fire alarm system.20EA$330.60$6,612.00$0.00$0.00$340.52$6,810.36$0.00
Option 1 (10/1/20 - 9/30/21)O1.40Provide labor and materials to remove/relocate hard duct VAD ceiling unit to a new location. (Max Run 20 feet) To include all pneumatic tubing and duct work as required for a complete installation and removal.10EA$772.75$7,727.50$0.00$0.00$795.93$7,959.33$0.00
Option 1 (10/1/20 - 9/30/21)O1.41Provide labor and materials to install a government furnished VAD ceiling unit in a new location. To include contractor furnishing of all pneumatic tubing, duct work, and any other materials needed to install unit.10EA$893.70$8,937.00$0.00$0.00$920.51$9,205.11$0.00
Option 1 (10/1/20 - 9/30/21)O1.42Furnish and install 2’ X 2' air diffuser in a new or existing ceiling grid system. To include contractor furnishing of all pneumatic tubing, duct work and any other materials needed to install unit. Maximum flex duct to be installed is 10 feet. All other to be hard duct.10EA$335.98$3,359.80$0.00$0.00$346.06$3,460.59$0.00
Option 1 (10/1/20 - 9/30/21)O1.43Remove existing pneumatic T-Stat affected by the removal of GWB partitions.20T-Stat$160.56$3,211.20$0.00$0.00$165.38$3,307.54$0.00
Option 1 (10/1/20 - 9/30/21)O1.44Furnish and install new pneumatic T-Stat affected by installation of new GWB partitions.20T-Stat$302.38$6,047.60$0.00$0.00$311.45$6,229.03$0.00
Option 1 (10/1/20 - 9/30/21)O1.45Furnish and install DDC thermostat controls for VAV boxes.1T-Stat$436.77$436.77$0.00$0.00$449.87$449.87$0.00
Option 1 (10/1/20 - 9/30/21)O1.46Furnish and install Unican cipher lock with removable core in metal/wood door to match existing ciphers, including wrap around plate and push plate.10EA$759.31$7,593.10$0.00$0.00$782.09$7,820.89$0.00
Option 1 (10/1/20 - 9/30/21)O1.47Furnish and install lock-set with removable core in metal/wood door to match existing in building standard.30EA$456.93$13,707.90$0.00$0.00$470.64$14,119.14$0.00
Option 1 (10/1/20 - 9/30/21)O1.48Furnish and install Sargent Board KP 60 – 28 – 10 G77 LL 26D 100 User Lock-set with removable core in new or existing door.10EA$938.99$9,389.90$0.00$0.00$967.16$9,671.60$0.00
Option 1 (10/1/20 - 9/30/21)O1.49Furnish and install Sargent Mortise KP – 8278 – LNL – 26D RH 100 User Lock-set with removable core in new or existing door.10EA$956.73$9,567.30$0.00$0.00$985.43$9,854.32$0.00
Option 1 (10/1/20 - 9/30/21)O1.50Furnish and install Sargent Board KP 60 – 28 – 10 G77 LUL 26D 500 User Lock-set with removable core in new or existing door.10EA$1,350.30$13,503.00$0.00$0.00$1,390.81$13,908.09$0.00
Option 1 (10/1/20 - 9/30/21)O1.51Furnish and install Sargent Mortise KP – 8278 – LUL – 26D RH 500 User Lock-set with removable core in new or existing door.10EA$1,368.04$13,680.40$0.00$0.00$1,409.08$14,090.81$0.00
Option 1 (10/1/20 - 9/30/21)O1.52Running Fiber Optic Cable100C.L.F.$150.00$15,000.00$0.00$0.00$154.50$15,450.00$0.00
$268,090.37$0.00$276,133.08$0.00
Line Item 1017Line Item 1018
Option 2 (10/1/21 - 9/30/22)O2.1Provide labor and materials to remove completely Gypsum Wall Board Partitions up to 8” thick and 13 feet high.1,000SF$2.49$2,490.00$0.00$0.00$2.56$2,564.70$0.00
Option 2 (10/1/21 - 9/30/22)O2.2Provide labor and materials to remove door/frame from existing GWB Partition and close in opening, paint to match existing walls.10EA$169.33$1,693.30$0.00$0.00$174.41$1,744.10$0.00
Option 2 (10/1/21 - 9/30/22)O2.3Construct a Gypsum Wall Board and Metal Stud Partition, consisting of 5/8” thick fire rated GWB and 20 GA metal studs, with a thin coat of plaster to include 4” cove base.1,000SF$9.76$9,760.00$0.00$0.00$10.05$10,052.80$0.00
Option 2 (10/1/21 - 9/30/22)O2.4Premium for extending the height of Gypsum Wall Board Partitions to 13 feet high. SF1$403.17$403.17$0.00$0.00$415.27$415.27$0.00
Option 2 (10/1/21 - 9/30/22)O2.5Remove and replace existing 4” cove base.100LF$3.18$318.00$0.00$0.00$3.28$327.54$0.00
Option 2 (10/1/21 - 9/30/22)O2.6Furnish and install a 3’0” X 7’0” wood door with 20 minute fire label and 16 GA welded steel knockdown frame in a new GWB Partition to include painting of the door and frame.10EA$551.00$5,510.00$0.00$0.00$567.53$5,675.30$0.00
Option 2 (10/1/21 - 9/30/22)O2.7Furnish and install a 3’0” X 7’0” wood door with 20 minute fire label and 16 GA pressed steel knockdown frame in a existing GWB Partition to include painting of the door and frame.6EA$544.29$3,265.74$0.00$0.00$560.62$3,363.71$0.00
Option 2 (10/1/21 - 9/30/22)O2.8Provide labor & materials to remove, replace and or modify existing Ceiling Grid and tiles.500SF$2.69$1,345.00$0.00$0.00$2.77$1,385.35$0.00
Option 2 (10/1/21 - 9/30/22)O2.9Furnish materials and paint new or previously painted vertical surfaces, plaster and drywall with Eggshell paint (color to be selected by GSA).$0.00
First Coat:12,000SF$0.40$4,800.00$0.00$0.00$0.41$4,944.00$0.00
Second Coat:12,000SF$0.30$3,600.00$0.00$0.00$0.31$3,708.00$0.00
Option 2 (10/1/21 - 9/30/22)O2.10Furnish materials and paint new or previously painted masonry surfaces.$0.00
First Coat:6,000SF$0.40$2,400.00$0.00$0.00$0.41$2,472.00$0.00
Second Coat:6,000SF$0.30$1,800.00$0.00$0.00$0.31$1,854.00$0.00
Option 2 (10/1/21 - 9/30/22)O2.11Furnish materials and paint previously painted pressed metal door and window frames up to 10" width, 2 coats semi-gloss (Latex base).150LF$2.78$417.00$0.00$0.00$2.86$429.51$0.00
Option 2 (10/1/21 - 9/30/22)O2.12Furnish materials and prepare surface, prime/paint (2) finishes coats wood door.50EA$73.91$3,695.50$0.00$0.00$76.13$3,806.37$0.00
Option 2 (10/1/21 - 9/30/22)O2.13Furnish materials and patch vertical surfaces (GWB/Plaster) and restore to original condition.500SF$0.62$310.00$0.00$0.00$0.64$319.30$0.00
Option 2 (10/1/21 - 9/30/22)O2.14Remove an existing quad, duplex outlet in an existing GWB partition, to include termination of wiring.20Outlet$63.84$1,276.80$0.00$0.00$65.76$1,315.10$0.00
Option 2 (10/1/21 - 9/30/22)O2.15Remove existing floor outlet (elec./tele/data) includes termination of wiring and sealing hole with Flammadur and Steel Cap.35Outlet$72.91$2,551.85$0.00$0.00$75.10$2,628.41$0.00
Option 2 (10/1/21 - 9/30/22)O2.16Locate cell in under floor duct system and bore through up to 8" of concrete, tap cell.75Cell$67.20$5,040.00$0.00$0.00$69.22$5,191.20$0.00
Option 2 (10/1/21 - 9/30/22)O2.17Furnish and install duplex outlet in a new or existing GWB partition, wire to adjacent outlet Max Run 25 LF.30Outlet$141.92$4,257.60$0.00$0.00$146.18$4,385.33$0.00
Option 2 (10/1/21 - 9/30/22)O2.18Furnish and install a quad outlet in a new or existing GWB partition, wire to adjacent outlet Max Run 25 LF.30Outlet$162.34$4,870.20$0.00$0.00$167.21$5,016.31$0.00
Option 2 (10/1/21 - 9/30/22)O2.19Furnish and install flush mount, brushed aluminum, floor electrical duplex outlet in under floor duct system, includes all parts for a complete installation, Max Run 25 LF.50Outlet$215.03$10,751.50$0.00$0.00$221.48$11,074.05$0.00
Option 2 (10/1/21 - 9/30/22)O2.20Furnish and install a surface metal raceway to include all required fittings for a complete installation.100LF$8.45$845.00$0.00$0.00$8.70$870.35$0.00
Option 2 (10/1/21 - 9/30/22)O2.21Furnish and install a surface mounted duplex outlet in conjunction with #20.20Outlet$67.20$1,344.00$0.00$0.00$69.22$1,384.32$0.00
Option 2 (10/1/21 - 9/30/22)O2.22Premium for furnish and install of an isolated ground duplex outlet in lieu of standard in #'s 17, 18, 19 & 21.30EA$17.47$524.10$0.00$0.00$17.99$539.82$0.00
Option 2 (10/1/21 - 9/30/22)O2.23Furnish and install floor electrical outlet for systems furniture. Install in floor system, must be equal to existing used in building.15Outlet$181.43$2,721.45$0.00$0.00$186.87$2,803.09$0.00
Option 2 (10/1/21 - 9/30/22)O2.24Furnish and install wiring and Honeywell switch (model EL7650) to control lights in new or existing GWB walls.20Switch$212.34$4,246.80$0.00$0.00$218.71$4,374.20$0.00
Option 2 (10/1/21 - 9/30/22)O2.25Install a Government furnished lay-in type light fixture in an existing suspended ceiling system, furnish all materials including AFC connectors for a complete installation.30Fixture$69.88$2,096.40$0.00$0.00$71.98$2,159.29$0.00
Option 2 (10/1/21 - 9/30/22)O2.26Relocate existing lay-in type light fixture within suspended ceiling, tie to adjacent fixture, furnish any additional materials for a complete installation.30Fixture$60.48$1,814.40$0.00$0.00$62.29$1,868.83$0.00
Option 2 (10/1/21 - 9/30/22)O2.27Remove existing lay-in type light fixture to include termination of wiring.20Fixture$47.04$940.80$0.00$0.00$48.45$969.02$0.00
Option 2 (10/1/21 - 9/30/22)O2.28Furnish and install and electrical door release in new or existing door. Work includes buzzer/plate/push button, electric strike and transformer with associated wiring.12EA$470.37$5,644.44$0.00$0.00$484.48$5,813.77$0.00
Option 2 (10/1/21 - 9/30/22)O2.29Extra for home run above a new or existing suspended ceiling, to include circuit breaker, EMT, and support for a complete installation.2,000LF$6.58$13,160.00$0.00$0.00$6.78$13,554.80$0.00
Option 2 (10/1/21 - 9/30/22)O2.30Extra for home run in under floor duct system to include circuit breaker.2,000LF$6.05$12,100.00$0.00$0.00$6.23$12,463.00$0.00
Option 2 (10/1/21 - 9/30/22)O2.31Furnish and install data/telephone outlet in a new or existing GWB partition.30Outlet$141.92$4,257.60$0.00$0.00$146.18$4,385.33$0.00
Option 2 (10/1/21 - 9/30/22)O2.32Furnish and install surface mounted data/telephone outlet.30Outlet$128.55$3,856.50$0.00$0.00$132.41$3,972.20$0.00
Option 2 (10/1/21 - 9/30/22)O2.33Install Government furnished computer cable in under-floor raceway.1,500LF$1.14$1,710.00$0.00$0.00$1.17$1,761.30$0.00
Option 2 (10/1/21 - 9/30/22)O2.34Install Government furnished computer cable above a new or existing ceiling.1,200LF$1.48$1,776.00$0.00$0.00$1.52$1,829.28$0.00
Option 2 (10/1/21 - 9/30/22)O2.35Furnish and Install cable connectors to wiring under 33 & 34.75EA$35.95$2,696.25$0.00$0.00$37.03$2,777.14$0.00
Option 2 (10/1/21 - 9/30/22)O2.36Furnish and install flush mount, brushed aluminum, floor Telephone/Data outlet in under floor system for a complete installation.50Outlet$221.75$11,087.50$0.00$0.00$228.40$11,420.13$0.00
Option 2 (10/1/21 - 9/30/22)O2.37Provide labor and materials to demo existing carpet tiles from floor area.2,000SF$1.28$2,560.00$0.00$0.00$1.32$2,636.80$0.00
Option 2 (10/1/21 - 9/30/22)O2.38Provide labor and materials to Install Government-furnished Carpet Tiles.1,000sq yd$5.38$5,380.00$0.00$0.00$5.54$5,541.40$0.00
Option 2 (10/1/21 - 9/30/22)O2.39Remove existing sprinkler plate, head and pipe drop. Install new elbows and relocate existing sprinkler to include valving off branch and plugging out fire alarm system.20EA$330.60$6,612.00$0.00$0.00$340.52$6,810.36$0.00
Option 2 (10/1/21 - 9/30/22)O2.40Provide labor and materials to remove/relocate hard duct VAD ceiling unit to a new location. (Max Run 20 feet) To include all pneumatic tubing and duct work as required for a complete installation and removal.10EA$772.75$7,727.50$0.00$0.00$795.93$7,959.33$0.00
Option 2 (10/1/21 - 9/30/22)O2.41Provide labor and materials to install a government furnished VAD ceiling unit in a new location. To include contractor furnishing of all pneumatic tubing, duct work, and any other materials needed to install unit.10EA$893.70$8,937.00$0.00$0.00$920.51$9,205.11$0.00
Option 2 (10/1/21 - 9/30/22)O2.42Furnish and install 2’ X 2' air diffuser in a new or existing ceiling grid system. To include contractor furnishing of all pneumatic tubing, duct work and any other materials needed to install unit. Maximum flex duct to be installed is 10 feet. All other to be hard duct.10EA$335.98$3,359.80$0.00$0.00$346.06$3,460.59$0.00
Option 2 (10/1/21 - 9/30/22)O2.43Remove existing pneumatic T-Stat affected by the removal of GWB partitions.20T-Stat$160.56$3,211.20$0.00$0.00$165.38$3,307.54$0.00
Option 2 (10/1/21 - 9/30/22)O2.44Furnish and install new pneumatic T-Stat affected by installation of new GWB partitions.20T-Stat$302.38$6,047.60$0.00$0.00$311.45$6,229.03$0.00
Option 2 (10/1/21 - 9/30/22)O2.45Furnish and install DDC thermostat controls for VAV boxes.1T-Stat$436.77$436.77$0.00$0.00$449.87$449.87$0.00
Option 2 (10/1/21 - 9/30/22)O2.46Furnish and install Unican cipher lock with removable core in metal/wood door to match existing ciphers, including wrap around plate and push plate.10EA$759.31$7,593.10$0.00$0.00$782.09$7,820.89$0.00
Option 2 (10/1/21 - 9/30/22)O2.47Furnish and install lock-set with removable core in metal/wood door to match existing in building standard.30EA$456.93$13,707.90$0.00$0.00$470.64$14,119.14$0.00
Option 2 (10/1/21 - 9/30/22)O2.48Furnish and install Sargent Board KP 60 – 28 – 10 G77 LL 26D 100 User Lock-set with removable core in new or existing door.10EA$938.99$9,389.90$0.00$0.00$967.16$9,671.60$0.00
Option 2 (10/1/21 - 9/30/22)O2.49Furnish and install Sargent Mortise KP – 8278 – LNL – 26D RH 100 User Lock-set with removable core in new or existing door.10EA$956.73$9,567.30$0.00$0.00$985.43$9,854.32$0.00
Option 2 (10/1/21 - 9/30/22)O2.50Furnish and install Sargent Board KP 60 – 28 – 10 G77 LUL 26D 500 User Lock-set with removable core in new or existing door.10EA$1,350.30$13,503.00$0.00$0.00$1,390.81$13,908.09$0.00
Option 2 (10/1/21 - 9/30/22)O2.51Furnish and install Sargent Mortise KP – 8278 – LUL – 26D RH 500 User Lock-set with removable core in new or existing door.10EA$1,368.04$13,680.40$0.00$0.00$1,409.08$14,090.81$0.00
Option 2 (10/1/21 - 9/30/22)O2.52Running Fiber Optic Cable100C.L.F.$150.00$15,000.00$0.00$0.00$154.50$15,450.00$0.00
$268,090.37$0.00$276,133.08$0.00
Line Item 2017Line Item 2018
Option 3 (10/1/22 - 9/30/23)O3.1Provide labor and materials to remove completely Gypsum Wall Board Partitions up to 8” thick and 13 feet high.1,000SF$2.49$2,490.00$0.00$0.00$2.56$2,564.70$0.00
Option 3 (10/1/22 - 9/30/23)O3.2Provide labor and materials to remove door/frame from existing GWB Partition and close in opening, paint to match existing walls.10EA$169.33$1,693.30$0.00$0.00$174.41$1,744.10$0.00
Option 3 (10/1/22 - 9/30/23)O3.3Construct a Gypsum Wall Board and Metal Stud Partition, consisting of 5/8” thick fire rated GWB and 20 GA metal studs, with a thin coat of plaster to include 4” cove base.1,000SF$9.76$9,760.00$0.00$0.00$10.05$10,052.80$0.00
Option 3 (10/1/22 - 9/30/23)O3.4Premium for extending the height of Gypsum Wall Board Partitions to 13 feet high. SF1$403.17$403.17$0.00$0.00$415.27$415.27$0.00
Option 3 (10/1/22 - 9/30/23)O3.5Remove and replace existing 4” cove base.100LF$3.18$318.00$0.00$0.00$3.28$327.54$0.00
Option 3 (10/1/22 - 9/30/23)O3.6Furnish and install a 3’0” X 7’0” wood door with 20 minute fire label and 16 GA welded steel knockdown frame in a new GWB Partition to include painting of the door and frame.10EA$551.00$5,510.00$0.00$0.00$567.53$5,675.30$0.00
Option 3 (10/1/22 - 9/30/23)O3.7Furnish and install a 3’0” X 7’0” wood door with 20 minute fire label and 16 GA pressed steel knockdown frame in a existing GWB Partition to include painting of the door and frame.6EA$544.29$3,265.74$0.00$0.00$560.62$3,363.71$0.00
Option 3 (10/1/22 - 9/30/23)O3.8Provide labor & materials to remove, replace and or modify existing Ceiling Grid and tiles.500SF$2.69$1,345.00$0.00$0.00$2.77$1,385.35$0.00
Option 3 (10/1/22 - 9/30/23)O3.9Furnish materials and paint new or previously painted vertical surfaces, plaster and drywall with Eggshell paint (color to be selected by GSA).$0.00
First Coat:12,000SF$0.40$4,800.00$0.00$0.00$0.41$4,944.00$0.00
Second Coat:12,000SF$0.30$3,600.00$0.00$0.00$0.31$3,708.00$0.00
Option 3 (10/1/22 - 9/30/23)O3.10Furnish materials and paint new or previously painted masonry surfaces.$0.00
First Coat:6,000SF$0.40$2,400.00$0.00$0.00$0.41$2,472.00$0.00
Second Coat:6,000SF$0.30$1,800.00$0.00$0.00$0.31$1,854.00$0.00
Option 3 (10/1/22 - 9/30/23)O3.11Furnish materials and paint previously painted pressed metal door and window frames up to 10" width, 2 coats semi-gloss (Latex base).150LF$2.78$417.00$0.00$0.00$2.86$429.51$0.00
Option 3 (10/1/22 - 9/30/23)O3.12Furnish materials and prepare surface, prime/paint (2) finishes coats wood door.50EA$73.91$3,695.50$0.00$0.00$76.13$3,806.37$0.00
Option 3 (10/1/22 - 9/30/23)O3.13Furnish materials and patch vertical surfaces (GWB/Plaster) and restore to original condition.500SF$0.62$310.00$0.00$0.00$0.64$319.30$0.00
Option 3 (10/1/22 - 9/30/23)O3.14Remove an existing quad, duplex outlet in an existing GWB partition, to include termination of wiring.20Outlet$63.84$1,276.80$0.00$0.00$65.76$1,315.10$0.00
Option 3 (10/1/22 - 9/30/23)O3.15Remove existing floor outlet (elec./tele/data) includes termination of wiring and sealing hole with Flammadur and Steel Cap.35Outlet$72.91$2,551.85$0.00$0.00$75.10$2,628.41$0.00
Option 3 (10/1/22 - 9/30/23)O3.16Locate cell in under floor duct system and bore through up to 8" of concrete, tap cell.75Cell$67.20$5,040.00$0.00$0.00$69.22$5,191.20$0.00
Option 3 (10/1/22 - 9/30/23)O3.17Furnish and install duplex outlet in a new or existing GWB partition, wire to adjacent outlet Max Run 25 LF.30Outlet$141.92$4,257.60$0.00$0.00$146.18$4,385.33$0.00
Option 3 (10/1/22 - 9/30/23)O3.18Furnish and install a quad outlet in a new or existing GWB partition, wire to adjacent outlet Max Run 25 LF.30Outlet$162.34$4,870.20$0.00$0.00$167.21$5,016.31$0.00
Option 3 (10/1/22 - 9/30/23)O3.19Furnish and install flush mount, brushed aluminum, floor electrical duplex outlet in under floor duct system, includes all parts for a complete installation, Max Run 25 LF.50Outlet$215.03$10,751.50$0.00$0.00$221.48$11,074.05$0.00
Option 3 (10/1/22 - 9/30/23)O3.20Furnish and install a surface metal raceway to include all required fittings for a complete installation.100LF$8.45$845.00$0.00$0.00$8.70$870.35$0.00
Option 3 (10/1/22 - 9/30/23)O3.21Furnish and install a surface mounted duplex outlet in conjunction with #20.20Outlet$67.20$1,344.00$0.00$0.00$69.22$1,384.32$0.00
Option 3 (10/1/22 - 9/30/23)O3.22Premium for furnish and install of an isolated ground duplex outlet in lieu of standard in #'s 17, 18, 19 & 21.30EA$17.47$524.10$0.00$0.00$17.99$539.82$0.00
Option 3 (10/1/22 - 9/30/23)O3.23Furnish and install floor electrical outlet for systems furniture. Install in floor system, must be equal to existing used in building.15Outlet$181.43$2,721.45$0.00$0.00$186.87$2,803.09$0.00
Option 3 (10/1/22 - 9/30/23)O3.24Furnish and install wiring and Honeywell switch (model EL7650) to control lights in new or existing GWB walls.20Switch$212.34$4,246.80$0.00$0.00$218.71$4,374.20$0.00
Option 3 (10/1/22 - 9/30/23)O3.25Install a Government furnished lay-in type light fixture in an existing suspended ceiling system, furnish all materials including AFC connectors for a complete installation.30Fixture$69.88$2,096.40$0.00$0.00$71.98$2,159.29$0.00
Option 3 (10/1/22 - 9/30/23)O3.26Relocate existing lay-in type light fixture within suspended ceiling, tie to adjacent fixture, furnish any additional materials for a complete installation.30Fixture$60.48$1,814.40$0.00$0.00$62.29$1,868.83$0.00
Option 3 (10/1/22 - 9/30/23)O3.27Remove existing lay-in type light fixture to include termination of wiring.20Fixture$47.04$940.80$0.00$0.00$48.45$969.02$0.00
Option 3 (10/1/22 - 9/30/23)O3.28Furnish and install and electrical door release in new or existing door. Work includes buzzer/plate/push button, electric strike and transformer with associated wiring.12EA$470.37$5,644.44$0.00$0.00$484.48$5,813.77$0.00
Option 3 (10/1/22 - 9/30/23)O3.29Extra for home run above a new or existing suspended ceiling, to include circuit breaker, EMT, and support for a complete installation.2,000LF$6.58$13,160.00$0.00$0.00$6.78$13,554.80$0.00
Option 3 (10/1/22 - 9/30/23)O3.30Extra for home run in under floor duct system to include circuit breaker.2,000LF$6.05$12,100.00$0.00$0.00$6.23$12,463.00$0.00
Option 3 (10/1/22 - 9/30/23)O3.31Furnish and install data/telephone outlet in a new or existing GWB partition.30Outlet$141.92$4,257.60$0.00$0.00$146.18$4,385.33$0.00
Option 3 (10/1/22 - 9/30/23)O3.32Furnish and install surface mounted data/telephone outlet.30Outlet$128.55$3,856.50$0.00$0.00$132.41$3,972.20$0.00
Option 3 (10/1/22 - 9/30/23)O3.33Install Government furnished computer cable in under-floor raceway.1,500LF$1.14$1,710.00$0.00$0.00$1.17$1,761.30$0.00
Option 3 (10/1/22 - 9/30/23)O3.34Install Government furnished computer cable above a new or existing ceiling.1,200LF$1.48$1,776.00$0.00$0.00$1.52$1,829.28$0.00
Option 3 (10/1/22 - 9/30/23)O3.35Furnish and Install cable connectors to wiring under 33 & 34.75EA$35.95$2,696.25$0.00$0.00$37.03$2,777.14$0.00
Option 3 (10/1/22 - 9/30/23)O3.36Furnish and install flush mount, brushed aluminum, floor Telephone/Data outlet in under floor system for a complete installation.50Outlet$221.75$11,087.50$0.00$0.00$228.40$11,420.13$0.00
Option 3 (10/1/22 - 9/30/23)O3.37Provide labor and materials to demo existing carpet tiles from floor area.2,000SF$1.28$2,560.00$0.00$0.00$1.32$2,636.80$0.00
Option 3 (10/1/22 - 9/30/23)O3.38Provide labor and materials to Install Government-furnished Carpet Tiles.1,000sq yd$5.38$5,380.00$0.00$0.00$5.54$5,541.40$0.00
Option 3 (10/1/22 - 9/30/23)O3.39Remove existing sprinkler plate, head and pipe drop. Install new elbows and relocate existing sprinkler to include valving off branch and plugging out fire alarm system.20EA$330.60$6,612.00$0.00$0.00$340.52$6,810.36$0.00
Option 3 (10/1/22 - 9/30/23)O3.40Provide labor and materials to remove/relocate hard duct VAD ceiling unit to a new location. (Max Run 20 feet) To include all pneumatic tubing and duct work as required for a complete installation and removal.10EA$772.75$7,727.50$0.00$0.00$795.93$7,959.33$0.00
Option 3 (10/1/22 - 9/30/23)O3.41Provide labor and materials to install a government furnished VAD ceiling unit in a new location. To include contractor furnishing of all pneumatic tubing, duct work, and any other materials needed to install unit.10EA$893.70$8,937.00$0.00$0.00$920.51$9,205.11$0.00
Option 3 (10/1/22 - 9/30/23)O3.42Furnish and install 2’ X 2' air diffuser in a new or existing ceiling grid system. To include contractor furnishing of all pneumatic tubing, duct work and any other materials needed to install unit. Maximum flex duct to be installed is 10 feet. All other to be hard duct.10EA$335.98$3,359.80$0.00$0.00$346.06$3,460.59$0.00
Option 3 (10/1/22 - 9/30/23)O3.43Remove existing pneumatic T-Stat affected by the removal of GWB partitions.20T-Stat$160.56$3,211.20$0.00$0.00$165.38$3,307.54$0.00
Option 3 (10/1/22 - 9/30/23)O3.44Furnish and install new pneumatic T-Stat affected by installation of new GWB partitions.20T-Stat$302.38$6,047.60$0.00$0.00$311.45$6,229.03$0.00
Option 3 (10/1/22 - 9/30/23)O3.45Furnish and install DDC thermostat controls for VAV boxes.1T-Stat$436.77$436.77$0.00$0.00$449.87$449.87$0.00
Option 3 (10/1/22 - 9/30/23)O3.46Furnish and install Unican cipher lock with removable core in metal/wood door to match existing ciphers, including wrap around plate and push plate.10EA$759.31$7,593.10$0.00$0.00$782.09$7,820.89$0.00
Option 3 (10/1/22 - 9/30/23)O3.47Furnish and install lock-set with removable core in metal/wood door to match existing in building standard.30EA$456.93$13,707.90$0.00$0.00$470.64$14,119.14$0.00
Option 3 (10/1/22 - 9/30/23)O3.48Furnish and install Sargent Board KP 60 – 28 – 10 G77 LL 26D 100 User Lock-set with removable core in new or existing door.10EA$938.99$9,389.90$0.00$0.00$967.16$9,671.60$0.00
Option 3 (10/1/22 - 9/30/23)O3.49Furnish and install Sargent Mortise KP – 8278 – LNL – 26D RH 100 User Lock-set with removable core in new or existing door.10EA$956.73$9,567.30$0.00$0.00$985.43$9,854.32$0.00
Option 3 (10/1/22 - 9/30/23)O3.50Furnish and install Sargent Board KP 60 – 28 – 10 G77 LUL 26D 500 User Lock-set with removable core in new or existing door.10EA$1,350.30$13,503.00$0.00$0.00$1,390.81$13,908.09$0.00
Option 3 (10/1/22 - 9/30/23)O3.51Furnish and install Sargent Mortise KP – 8278 – LUL – 26D RH 500 User Lock-set with removable core in new or existing door.10EA$1,368.04$13,680.40$0.00$0.00$1,409.08$14,090.81$0.00
Option 3 (10/1/22 - 9/30/23)O3.52Running Fiber Optic Cable100C.L.F.$150.00$15,000.00$0.00$0.00$154.50$15,450.00$0.00
$268,090.37$0.00$276,133.08$0.00
Line Item 3017Line Item 3018
Option 4 (10/1/23 - 9/30/24)O4.1Provide labor and materials to remove completely Gypsum Wall Board Partitions up to 8” thick and 13 feet high.1,000SF$2.49$2,490.00$0.00$0.00$2.56$2,564.70$0.00
Option 4 (10/1/23 - 9/30/24)O4.2Provide labor and materials to remove door/frame from existing GWB Partition and close in opening, paint to match existing walls.10EA$169.33$1,693.30$0.00$0.00$174.41$1,744.10$0.00
Option 4 (10/1/23 - 9/30/24)O4.3Construct a Gypsum Wall Board and Metal Stud Partition, consisting of 5/8” thick fire rated GWB and 20 GA metal studs, with a thin coat of plaster to include 4” cove base.1,000SF$9.76$9,760.00$0.00$0.00$10.05$10,052.80$0.00
Option 4 (10/1/23 - 9/30/24)O4.4Premium for extending the height of Gypsum Wall Board Partitions to 13 feet high. SF1$403.17$403.17$0.00$0.00$415.27$415.27$0.00
Option 4 (10/1/23 - 9/30/24)O4.5Remove and replace existing 4” cove base.100LF$3.18$318.00$0.00$0.00$3.28$327.54$0.00
Option 4 (10/1/23 - 9/30/24)O4.6Furnish and install a 3’0” X 7’0” wood door with 20 minute fire label and 16 GA welded steel knockdown frame in a new GWB Partition to include painting of the door and frame.10EA$551.00$5,510.00$0.00$0.00$567.53$5,675.30$0.00
Option 4 (10/1/23 - 9/30/24)O4.7Furnish and install a 3’0” X 7’0” wood door with 20 minute fire label and 16 GA pressed steel knockdown frame in a existing GWB Partition to include painting of the door and frame.6EA$544.29$3,265.74$0.00$0.00$560.62$3,363.71$0.00
Option 4 (10/1/23 - 9/30/24)O4.8Provide labor & materials to remove, replace and or modify existing Ceiling Grid and tiles.500SF$2.69$1,345.00$0.00$0.00$2.77$1,385.35$0.00
Option 4 (10/1/23 - 9/30/24)O4.9Furnish materials and paint new or previously painted vertical surfaces, plaster and drywall with Eggshell paint (color to be selected by GSA).$0.00
First Coat:12,000SF$0.40$4,800.00$0.00$0.00$0.41$4,944.00$0.00
Second Coat:12,000SF$0.30$3,600.00$0.00$0.00$0.31$3,708.00$0.00
Option 4 (10/1/23 - 9/30/24)O4.10Furnish materials and paint new or previously painted masonry surfaces.$0.00
First Coat:6,000SF$0.40$2,400.00$0.00$0.00$0.41$2,472.00$0.00
Second Coat:6,000SF$0.30$1,800.00$0.00$0.00$0.31$1,854.00$0.00
Option 4 (10/1/23 - 9/30/24)O4.11Furnish materials and paint previously painted pressed metal door and window frames up to 10" width, 2 coats semi-gloss (Latex base).150LF$2.78$417.00$0.00$0.00$2.86$429.51$0.00
Option 4 (10/1/23 - 9/30/24)O4.12Furnish materials and prepare surface, prime/paint (2) finishes coats wood door.50EA$73.91$3,695.50$0.00$0.00$76.13$3,806.37$0.00
Option 4 (10/1/23 - 9/30/24)O4.13Furnish materials and patch vertical surfaces (GWB/Plaster) and restore to original condition.500SF$0.62$310.00$0.00$0.00$0.64$319.30$0.00
Option 4 (10/1/23 - 9/30/24)O4.14Remove an existing quad, duplex outlet in an existing GWB partition, to include termination of wiring.20Outlet$63.84$1,276.80$0.00$0.00$65.76$1,315.10$0.00
Option 4 (10/1/23 - 9/30/24)O4.15Remove existing floor outlet (elec./tele/data) includes termination of wiring and sealing hole with Flammadur and Steel Cap.35Outlet$72.91$2,551.85$0.00$0.00$75.10$2,628.41$0.00
Option 4 (10/1/23 - 9/30/24)O4.16Locate cell in under floor duct system and bore through up to 8" of concrete, tap cell.75Cell$67.20$5,040.00$0.00$0.00$69.22$5,191.20$0.00
Option 4 (10/1/23 - 9/30/24)O4.17Furnish and install duplex outlet in a new or existing GWB partition, wire to adjacent outlet Max Run 25 LF.30Outlet$141.92$4,257.60$0.00$0.00$146.18$4,385.33$0.00
Option 4 (10/1/23 - 9/30/24)O4.18Furnish and install a quad outlet in a new or existing GWB partition, wire to adjacent outlet Max Run 25 LF.30Outlet$162.34$4,870.20$0.00$0.00$167.21$5,016.31$0.00