47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_11_Unit_Price_Agreement_2019_08_02.xlsx
XLSX spreadsheet 106 KB Posted
- Attached to
- Operations and Facilities Maintenance Services at the John F. Kennedy Federal Building in Boston, MA
- Solicitation number
- 47PB0019R0002
About this file
Exhibit 11 Unit Price Agreement 2019 08 02
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Solicitation 47PB0019R0002 | Note: Offerors should enter their company name after "Offeror:" in Line 5, and fill in the Price Differential percentages for each UPA Line Item for each Contract Period (except for the "6 Mo Ext" period) in the two green columns (i.e. Regular Hours Price Differentials and After Hours Price Differentials). This will automatically calculate a lump sum for yearly UPA Regular Hours work and UPA After Hours work for each contract period. These yearly amounts (two per contract period) will roll down to a table at the bottom of the spreadsheet on page 45. These lump sum Line Items (for Line Items 0017 - 10017 and 0018 - 10018) should then be entered into the main Solicitation Line Item Pricing Table (Exhibit 3). |
| JFK Operations and Maintenance | |
| Exhibit 11 | |
| Unit Price Agreement (UPA) * | |
| Offeror: |
| Contract Year | Line Item | Description | Est. Qty. | Unit | Estimated Unit Cost (Reg. Hrs) | Bare Cost (Reg. Hours) | Offeror Price Diff. (%) Reg. Hrs. | Offeror Price Diff. (%) Reg. Hrs. | Total Cost (Reg. Hours) | Estimated Unit Cost (Aftr Hrs) | Bare Cost (Aftr Hrs) | Offeror Price Diff. (%) (Aftr Hrs) | Total Cost (Aftr Hrs) |
| Base (12/1/19 - 9/30/20) | Ba.1 | Provide labor and materials to remove completely Gypsum Wall Board Partitions up to 8” thick and 13 feet high. | 1,000 | SF | $2.49 | $2,490.00 | $0.00 | $0.00 | $2.56 | $2,564.70 | $0.00 | ||
| Base (12/1/19 - 9/30/20) | Ba.2 | Provide labor and materials to remove door/frame from existing GWB Partition and close in opening, paint to match existing walls. | 10 | EA | $169.33 | $1,693.30 | $0.00 | $0.00 | $174.41 | $1,744.10 | $0.00 | ||
| Base (12/1/19 - 9/30/20) | Ba.3 | Construct a Gypsum Wall Board and Metal Stud Partition, consisting of 5/8” thick fire rated GWB and 20 GA metal studs, with a thin coat of plaster to include 4” cove base. | 1,000 | SF | $9.76 | $9,760.00 | $0.00 | $0.00 | $10.05 | $10,052.80 | $0.00 | ||
| Base (12/1/19 - 9/30/20) | Ba.4 | Premium for extending the height of Gypsum Wall Board Partitions to 13 feet high. SF | 1 | $403.17 | $403.17 | $0.00 | $0.00 | $415.27 | $415.27 | $0.00 | |||
| Base (12/1/19 - 9/30/20) | Ba.5 | Remove and replace existing 4” cove base. | 100 | LF | $3.18 | $318.00 | $0.00 | $0.00 | $3.28 | $327.54 | $0.00 | ||
| Base (12/1/19 - 9/30/20) | Ba.6 | Furnish and install a 3’0” X 7’0” wood door with 20 minute fire label and 16 GA welded steel knockdown frame in a new GWB Partition to include painting of the door and frame. | 10 | EA | $551.00 | $5,510.00 | $0.00 | $0.00 | $567.53 | $5,675.30 | $0.00 | ||
| Base (12/1/19 - 9/30/20) | Ba.7 | Furnish and install a 3’0” X 7’0” wood door with 20 minute fire label and 16 GA pressed steel knockdown frame in a existing GWB Partition to include painting of the door and frame. | 6 | EA | $544.29 | $3,265.74 | $0.00 | $0.00 | $560.62 | $3,363.71 | $0.00 | ||
| Base (12/1/19 - 9/30/20) | Ba.8 | Provide labor & materials to remove, replace and or modify existing Ceiling Grid and tiles. | 500 | SF | $2.69 | $1,345.00 | $0.00 | $0.00 | $2.77 | $1,385.35 | $0.00 | ||
| Base (12/1/19 - 9/30/20) | Ba.9 | Furnish materials and paint new or previously painted vertical surfaces, plaster and drywall with Eggshell paint (color to be selected by GSA). | $0.00 | ||||||||||
| First Coat: | 12,000 | SF | $0.40 | $4,800.00 | $0.00 | $0.00 | $0.41 | $4,944.00 | $0.00 | ||||
| Second Coat: | 12,000 | SF | $0.30 | $3,600.00 | $0.00 | $0.00 | $0.31 | $3,708.00 | $0.00 | ||||
| Base (12/1/19 - 9/30/20) | Ba.10 | Furnish materials and paint new or previously painted masonry surfaces. | $0.00 | ||||||||||
| First Coat: | 6,000 | SF | $0.40 | $2,400.00 | $0.00 | $0.00 | $0.41 | $2,472.00 | $0.00 | ||||
| Second Coat: | 6,000 | SF | $0.30 | $1,800.00 | $0.00 | $0.00 | $0.31 | $1,854.00 | $0.00 | ||||
| Base (12/1/19 - 9/30/20) | Ba.11 | Furnish materials and paint previously painted pressed metal door and window frames up to 10" width, 2 coats semi-gloss (Latex base). | 150 | LF | $2.78 | $417.00 | $0.00 | $0.00 | $2.86 | $429.51 | $0.00 | ||
| Base (12/1/19 - 9/30/20) | Ba.12 | Furnish materials and prepare surface, prime/paint (2) finishes coats wood door. | 50 | EA | $73.91 | $3,695.50 | $0.00 | $0.00 | $76.13 | $3,806.37 | $0.00 | ||
| Base (12/1/19 - 9/30/20) | Ba.13 | Furnish materials and patch vertical surfaces (GWB/Plaster) and restore to original condition. | 500 | SF | $0.62 | $310.00 | $0.00 | $0.00 | $0.64 | $319.30 | $0.00 | ||
| Base (12/1/19 - 9/30/20) | Ba.14 | Remove an existing quad, duplex outlet in an existing GWB partition, to include termination of wiring. | 20 | Outlet | $63.84 | $1,276.80 | $0.00 | $0.00 | $65.76 | $1,315.10 | $0.00 | ||
| Base (12/1/19 - 9/30/20) | Ba.15 | Remove existing floor outlet (elec./tele/data) includes termination of wiring and sealing hole with Flammadur and Steel Cap. | 35 | Outlet | $72.91 | $2,551.85 | $0.00 | $0.00 | $75.10 | $2,628.41 | $0.00 | ||
| Base (12/1/19 - 9/30/20) | Ba.16 | Locate cell in under floor duct system and bore through up to 8" of concrete, tap cell. | 75 | Cell | $67.20 | $5,040.00 | $0.00 | $0.00 | $69.22 | $5,191.20 | $0.00 | ||
| Base (12/1/19 - 9/30/20) | Ba.17 | Furnish and install duplex outlet in a new or existing GWB partition, wire to adjacent outlet Max Run 25 LF. | 30 | Outlet | $141.92 | $4,257.60 | $0.00 | $0.00 | $146.18 | $4,385.33 | $0.00 | ||
| Base (12/1/19 - 9/30/20) | Ba.18 | Furnish and install a quad outlet in a new or existing GWB partition, wire to adjacent outlet Max Run 25 LF. | 30 | Outlet | $162.34 | $4,870.20 | $0.00 | $0.00 | $167.21 | $5,016.31 | $0.00 | ||
| Base (12/1/19 - 9/30/20) | Ba.19 | Furnish and install flush mount, brushed aluminum, floor electrical duplex outlet in under floor duct system, includes all parts for a complete installation, Max Run 25 LF. | 50 | Outlet | $215.03 | $10,751.50 | $0.00 | $0.00 | $221.48 | $11,074.05 | $0.00 | ||
| Base (12/1/19 - 9/30/20) | Ba.20 | Furnish and install a surface metal raceway to include all required fittings for a complete installation. | 100 | LF | $8.45 | $845.00 | $0.00 | $0.00 | $8.70 | $870.35 | $0.00 | ||
| Base (12/1/19 - 9/30/20) | Ba.21 | Furnish and install a surface mounted duplex outlet in conjunction with #20. | 20 | Outlet | $67.20 | $1,344.00 | $0.00 | $0.00 | $69.22 | $1,384.32 | $0.00 | ||
| Base (12/1/19 - 9/30/20) | Ba.22 | Premium for furnish and install of an isolated ground duplex outlet in lieu of standard in #'s 17, 18, 19 & 21. | 30 | EA | $17.47 | $524.10 | $0.00 | $0.00 | $17.99 | $539.82 | $0.00 | ||
| Base (12/1/19 - 9/30/20) | Ba.23 | Furnish and install floor electrical outlet for systems furniture. Install in floor system, must be equal to existing used in building. | 15 | Outlet | $181.43 | $2,721.45 | $0.00 | $0.00 | $186.87 | $2,803.09 | $0.00 | ||
| Base (12/1/19 - 9/30/20) | Ba.24 | Furnish and install wiring and Honeywell switch (model EL7650) to control lights in new or existing GWB walls. | 20 | Switch | $212.34 | $4,246.80 | $0.00 | $0.00 | $218.71 | $4,374.20 | $0.00 | ||
| Base (12/1/19 - 9/30/20) | Ba.25 | Install a Government furnished lay-in type light fixture in an existing suspended ceiling system, furnish all materials including AFC connectors for a complete installation. | 30 | Fixture | $69.88 | $2,096.40 | $0.00 | $0.00 | $71.98 | $2,159.29 | $0.00 | ||
| Base (12/1/19 - 9/30/20) | Ba.26 | Relocate existing lay-in type light fixture within suspended ceiling, tie to adjacent fixture, furnish any additional materials for a complete installation. | 30 | Fixture | $60.48 | $1,814.40 | $0.00 | $0.00 | $62.29 | $1,868.83 | $0.00 | ||
| Base (12/1/19 - 9/30/20) | Ba.27 | Remove existing lay-in type light fixture to include termination of wiring. | 20 | Fixture | $47.04 | $940.80 | $0.00 | $0.00 | $48.45 | $969.02 | $0.00 | ||
| Base (12/1/19 - 9/30/20) | Ba.28 | Furnish and install and electrical door release in new or existing door. Work includes buzzer/plate/push button, electric strike and transformer with associated wiring. | 12 | EA | $470.37 | $5,644.44 | $0.00 | $0.00 | $484.48 | $5,813.77 | $0.00 | ||
| Base (12/1/19 - 9/30/20) | Ba.29 | Extra for home run above a new or existing suspended ceiling, to include circuit breaker, EMT, and support for a complete installation. | 2,000 | LF | $6.58 | $13,160.00 | $0.00 | $0.00 | $6.78 | $13,554.80 | $0.00 | ||
| Base (12/1/19 - 9/30/20) | Ba.30 | Extra for home run in under floor duct system to include circuit breaker. | 2,000 | LF | $6.05 | $12,100.00 | $0.00 | $0.00 | $6.23 | $12,463.00 | $0.00 | ||
| Base (12/1/19 - 9/30/20) | Ba.31 | Furnish and install data/telephone outlet in a new or existing GWB partition. | 30 | Outlet | $141.92 | $4,257.60 | $0.00 | $0.00 | $146.18 | $4,385.33 | $0.00 | ||
| Base (12/1/19 - 9/30/20) | Ba.32 | Furnish and install surface mounted data/telephone outlet. | 30 | Outlet | $128.55 | $3,856.50 | $0.00 | $0.00 | $132.41 | $3,972.20 | $0.00 | ||
| Base (12/1/19 - 9/30/20) | Ba.33 | Install Government furnished computer cable in under-floor raceway. | 1,500 | LF | $1.14 | $1,710.00 | $0.00 | $0.00 | $1.17 | $1,761.30 | $0.00 | ||
| Base (12/1/19 - 9/30/20) | Ba.34 | Install Government furnished computer cable above a new or existing ceiling. | 1,200 | LF | $1.48 | $1,776.00 | $0.00 | $0.00 | $1.52 | $1,829.28 | $0.00 | ||
| Base (12/1/19 - 9/30/20) | Ba.35 | Furnish and Install cable connectors to wiring under 33 & 34. | 75 | EA | $35.95 | $2,696.25 | $0.00 | $0.00 | $37.03 | $2,777.14 | $0.00 | ||
| Base (12/1/19 - 9/30/20) | Ba.36 | Furnish and install flush mount, brushed aluminum, floor Telephone/Data outlet in under floor system for a complete installation. | 50 | Outlet | $221.75 | $11,087.50 | $0.00 | $0.00 | $228.40 | $11,420.13 | $0.00 | ||
| Base (12/1/19 - 9/30/20) | Ba.37 | Provide labor and materials to demo existing carpet tiles from floor area. | 2,000 | SF | $1.28 | $2,560.00 | $0.00 | $0.00 | $1.32 | $2,636.80 | $0.00 | ||
| Base (12/1/19 - 9/30/20) | Ba.38 | Provide labor and materials to Install Government-furnished Carpet Tiles. | 1,000 | sq yd | $5.38 | $5,380.00 | $0.00 | $0.00 | $5.54 | $5,541.40 | $0.00 | ||
| Base (12/1/19 - 9/30/20) | Ba.39 | Remove existing sprinkler plate, head and pipe drop. Install new elbows and relocate existing sprinkler to include valving off branch and plugging out fire alarm system. | 20 | EA | $330.60 | $6,612.00 | $0.00 | $0.00 | $340.52 | $6,810.36 | $0.00 | ||
| Base (12/1/19 - 9/30/20) | Ba.40 | Provide labor and materials to remove/relocate hard duct VAD ceiling unit to a new location. (Max Run 20 feet) To include all pneumatic tubing and duct work as required for a complete installation and removal. | 10 | EA | $772.75 | $7,727.50 | $0.00 | $0.00 | $795.93 | $7,959.33 | $0.00 | ||
| Base (12/1/19 - 9/30/20) | Ba.41 | Provide labor and materials to install a government furnished VAD ceiling unit in a new location. To include contractor furnishing of all pneumatic tubing, duct work, and any other materials needed to install unit. | 10 | EA | $893.70 | $8,937.00 | $0.00 | $0.00 | $920.51 | $9,205.11 | $0.00 | ||
| Base (12/1/19 - 9/30/20) | Ba.42 | Furnish and install 2’ X 2' air diffuser in a new or existing ceiling grid system. To include contractor furnishing of all pneumatic tubing, duct work and any other materials needed to install unit. Maximum flex duct to be installed is 10 feet. All other to be hard duct. | 10 | EA | $335.98 | $3,359.80 | $0.00 | $0.00 | $346.06 | $3,460.59 | $0.00 | ||
| Base (12/1/19 - 9/30/20) | Ba.43 | Remove existing pneumatic T-Stat affected by the removal of GWB partitions. | 20 | T-Stat | $160.56 | $3,211.20 | $0.00 | $0.00 | $165.38 | $3,307.54 | $0.00 | ||
| Base (12/1/19 - 9/30/20) | Ba.44 | Furnish and install new pneumatic T-Stat affected by installation of new GWB partitions. | 20 | T-Stat | $302.38 | $6,047.60 | $0.00 | $0.00 | $311.45 | $6,229.03 | $0.00 | ||
| Base (12/1/19 - 9/30/20) | Ba.45 | Furnish and install DDC thermostat controls for VAV boxes. | 1 | T-Stat | $436.77 | $436.77 | $0.00 | $0.00 | $449.87 | $449.87 | $0.00 | ||
| Base (12/1/19 - 9/30/20) | Ba.46 | Furnish and install Unican cipher lock with removable core in metal/wood door to match existing ciphers, including wrap around plate and push plate. | 10 | EA | $759.31 | $7,593.10 | $0.00 | $0.00 | $782.09 | $7,820.89 | $0.00 | ||
| Base (12/1/19 - 9/30/20) | Ba.47 | Furnish and install lock-set with removable core in metal/wood door to match existing in building standard. | 30 | EA | $456.93 | $13,707.90 | $0.00 | $0.00 | $470.64 | $14,119.14 | $0.00 | ||
| Base (12/1/19 - 9/30/20) | Ba.48 | Furnish and install Sargent Board KP 60 – 28 – 10 G77 LL 26D 100 User Lock-set with removable core in new or existing door. | 10 | EA | $938.99 | $9,389.90 | $0.00 | $0.00 | $967.16 | $9,671.60 | $0.00 | ||
| Base (12/1/19 - 9/30/20) | Ba.49 | Furnish and install Sargent Mortise KP – 8278 – LNL – 26D RH 100 User Lock-set with removable core in new or existing door. | 10 | EA | $956.73 | $9,567.30 | $0.00 | $0.00 | $985.43 | $9,854.32 | $0.00 | ||
| Base (12/1/19 - 9/30/20) | Ba.50 | Furnish and install Sargent Board KP 60 – 28 – 10 G77 LUL 26D 500 User Lock-set with removable core in new or existing door. | 10 | EA | $1,350.30 | $13,503.00 | $0.00 | $0.00 | $1,390.81 | $13,908.09 | $0.00 | ||
| Base (12/1/19 - 9/30/20) | Ba.51 | Furnish and install Sargent Mortise KP – 8278 – LUL – 26D RH 500 User Lock-set with removable core in new or existing door. | 10 | EA | $1,368.04 | $13,680.40 | $0.00 | $0.00 | $1,409.08 | $14,090.81 | $0.00 | ||
| Base (12/1/19 - 9/30/20) | Ba.52 | Running Fiber Optic Cable | 100 | C.L.F. | $150.00 | $15,000.00 | $0.00 | $0.00 | $154.50 | $15,450.00 | $0.00 | ||
| $268,090.37 | $0.00 | $276,133.08 | $0.00 | ||||||||||
| Line Item 0017 | Line Item 0018 |
| Option 1 (10/1/20 - 9/30/21) | O1.1 | Provide labor and materials to remove completely Gypsum Wall Board Partitions up to 8” thick and 13 feet high. | 1,000 | SF | $2.49 | $2,490.00 | $0.00 | $0.00 | $2.56 | $2,564.70 | $0.00 |
| Option 1 (10/1/20 - 9/30/21) | O1.2 | Provide labor and materials to remove door/frame from existing GWB Partition and close in opening, paint to match existing walls. | 10 | EA | $169.33 | $1,693.30 | $0.00 | $0.00 | $174.41 | $1,744.10 | $0.00 |
| Option 1 (10/1/20 - 9/30/21) | O1.3 | Construct a Gypsum Wall Board and Metal Stud Partition, consisting of 5/8” thick fire rated GWB and 20 GA metal studs, with a thin coat of plaster to include 4” cove base. | 1,000 | SF | $9.76 | $9,760.00 | $0.00 | $0.00 | $10.05 | $10,052.80 | $0.00 |
| Option 1 (10/1/20 - 9/30/21) | O1.4 | Premium for extending the height of Gypsum Wall Board Partitions to 13 feet high. SF | 1 | $403.17 | $403.17 | $0.00 | $0.00 | $415.27 | $415.27 | $0.00 | |
| Option 1 (10/1/20 - 9/30/21) | O1.5 | Remove and replace existing 4” cove base. | 100 | LF | $3.18 | $318.00 | $0.00 | $0.00 | $3.28 | $327.54 | $0.00 |
| Option 1 (10/1/20 - 9/30/21) | O1.6 | Furnish and install a 3’0” X 7’0” wood door with 20 minute fire label and 16 GA welded steel knockdown frame in a new GWB Partition to include painting of the door and frame. | 10 | EA | $551.00 | $5,510.00 | $0.00 | $0.00 | $567.53 | $5,675.30 | $0.00 |
| Option 1 (10/1/20 - 9/30/21) | O1.7 | Furnish and install a 3’0” X 7’0” wood door with 20 minute fire label and 16 GA pressed steel knockdown frame in a existing GWB Partition to include painting of the door and frame. | 6 | EA | $544.29 | $3,265.74 | $0.00 | $0.00 | $560.62 | $3,363.71 | $0.00 |
| Option 1 (10/1/20 - 9/30/21) | O1.8 | Provide labor & materials to remove, replace and or modify existing Ceiling Grid and tiles. | 500 | SF | $2.69 | $1,345.00 | $0.00 | $0.00 | $2.77 | $1,385.35 | $0.00 |
| Option 1 (10/1/20 - 9/30/21) | O1.9 | Furnish materials and paint new or previously painted vertical surfaces, plaster and drywall with Eggshell paint (color to be selected by GSA). | $0.00 | ||||||||
| First Coat: | 12,000 | SF | $0.40 | $4,800.00 | $0.00 | $0.00 | $0.41 | $4,944.00 | $0.00 | ||
| Second Coat: | 12,000 | SF | $0.30 | $3,600.00 | $0.00 | $0.00 | $0.31 | $3,708.00 | $0.00 | ||
| Option 1 (10/1/20 - 9/30/21) | O1.10 | Furnish materials and paint new or previously painted masonry surfaces. | $0.00 | ||||||||
| First Coat: | 6,000 | SF | $0.40 | $2,400.00 | $0.00 | $0.00 | $0.41 | $2,472.00 | $0.00 | ||
| Second Coat: | 6,000 | SF | $0.30 | $1,800.00 | $0.00 | $0.00 | $0.31 | $1,854.00 | $0.00 | ||
| Option 1 (10/1/20 - 9/30/21) | O1.11 | Furnish materials and paint previously painted pressed metal door and window frames up to 10" width, 2 coats semi-gloss (Latex base). | 150 | LF | $2.78 | $417.00 | $0.00 | $0.00 | $2.86 | $429.51 | $0.00 |
| Option 1 (10/1/20 - 9/30/21) | O1.12 | Furnish materials and prepare surface, prime/paint (2) finishes coats wood door. | 50 | EA | $73.91 | $3,695.50 | $0.00 | $0.00 | $76.13 | $3,806.37 | $0.00 |
| Option 1 (10/1/20 - 9/30/21) | O1.13 | Furnish materials and patch vertical surfaces (GWB/Plaster) and restore to original condition. | 500 | SF | $0.62 | $310.00 | $0.00 | $0.00 | $0.64 | $319.30 | $0.00 |
| Option 1 (10/1/20 - 9/30/21) | O1.14 | Remove an existing quad, duplex outlet in an existing GWB partition, to include termination of wiring. | 20 | Outlet | $63.84 | $1,276.80 | $0.00 | $0.00 | $65.76 | $1,315.10 | $0.00 |
| Option 1 (10/1/20 - 9/30/21) | O1.15 | Remove existing floor outlet (elec./tele/data) includes termination of wiring and sealing hole with Flammadur and Steel Cap. | 35 | Outlet | $72.91 | $2,551.85 | $0.00 | $0.00 | $75.10 | $2,628.41 | $0.00 |
| Option 1 (10/1/20 - 9/30/21) | O1.16 | Locate cell in under floor duct system and bore through up to 8" of concrete, tap cell. | 75 | Cell | $67.20 | $5,040.00 | $0.00 | $0.00 | $69.22 | $5,191.20 | $0.00 |
| Option 1 (10/1/20 - 9/30/21) | O1.17 | Furnish and install duplex outlet in a new or existing GWB partition, wire to adjacent outlet Max Run 25 LF. | 30 | Outlet | $141.92 | $4,257.60 | $0.00 | $0.00 | $146.18 | $4,385.33 | $0.00 |
| Option 1 (10/1/20 - 9/30/21) | O1.18 | Furnish and install a quad outlet in a new or existing GWB partition, wire to adjacent outlet Max Run 25 LF. | 30 | Outlet | $162.34 | $4,870.20 | $0.00 | $0.00 | $167.21 | $5,016.31 | $0.00 |
| Option 1 (10/1/20 - 9/30/21) | O1.19 | Furnish and install flush mount, brushed aluminum, floor electrical duplex outlet in under floor duct system, includes all parts for a complete installation, Max Run 25 LF. | 50 | Outlet | $215.03 | $10,751.50 | $0.00 | $0.00 | $221.48 | $11,074.05 | $0.00 |
| Option 1 (10/1/20 - 9/30/21) | O1.20 | Furnish and install a surface metal raceway to include all required fittings for a complete installation. | 100 | LF | $8.45 | $845.00 | $0.00 | $0.00 | $8.70 | $870.35 | $0.00 |
| Option 1 (10/1/20 - 9/30/21) | O1.21 | Furnish and install a surface mounted duplex outlet in conjunction with #20. | 20 | Outlet | $67.20 | $1,344.00 | $0.00 | $0.00 | $69.22 | $1,384.32 | $0.00 |
| Option 1 (10/1/20 - 9/30/21) | O1.22 | Premium for furnish and install of an isolated ground duplex outlet in lieu of standard in #'s 17, 18, 19 & 21. | 30 | EA | $17.47 | $524.10 | $0.00 | $0.00 | $17.99 | $539.82 | $0.00 |
| Option 1 (10/1/20 - 9/30/21) | O1.23 | Furnish and install floor electrical outlet for systems furniture. Install in floor system, must be equal to existing used in building. | 15 | Outlet | $181.43 | $2,721.45 | $0.00 | $0.00 | $186.87 | $2,803.09 | $0.00 |
| Option 1 (10/1/20 - 9/30/21) | O1.24 | Furnish and install wiring and Honeywell switch (model EL7650) to control lights in new or existing GWB walls. | 20 | Switch | $212.34 | $4,246.80 | $0.00 | $0.00 | $218.71 | $4,374.20 | $0.00 |
| Option 1 (10/1/20 - 9/30/21) | O1.25 | Install a Government furnished lay-in type light fixture in an existing suspended ceiling system, furnish all materials including AFC connectors for a complete installation. | 30 | Fixture | $69.88 | $2,096.40 | $0.00 | $0.00 | $71.98 | $2,159.29 | $0.00 |
| Option 1 (10/1/20 - 9/30/21) | O1.26 | Relocate existing lay-in type light fixture within suspended ceiling, tie to adjacent fixture, furnish any additional materials for a complete installation. | 30 | Fixture | $60.48 | $1,814.40 | $0.00 | $0.00 | $62.29 | $1,868.83 | $0.00 |
| Option 1 (10/1/20 - 9/30/21) | O1.27 | Remove existing lay-in type light fixture to include termination of wiring. | 20 | Fixture | $47.04 | $940.80 | $0.00 | $0.00 | $48.45 | $969.02 | $0.00 |
| Option 1 (10/1/20 - 9/30/21) | O1.28 | Furnish and install and electrical door release in new or existing door. Work includes buzzer/plate/push button, electric strike and transformer with associated wiring. | 12 | EA | $470.37 | $5,644.44 | $0.00 | $0.00 | $484.48 | $5,813.77 | $0.00 |
| Option 1 (10/1/20 - 9/30/21) | O1.29 | Extra for home run above a new or existing suspended ceiling, to include circuit breaker, EMT, and support for a complete installation. | 2,000 | LF | $6.58 | $13,160.00 | $0.00 | $0.00 | $6.78 | $13,554.80 | $0.00 |
| Option 1 (10/1/20 - 9/30/21) | O1.30 | Extra for home run in under floor duct system to include circuit breaker. | 2,000 | LF | $6.05 | $12,100.00 | $0.00 | $0.00 | $6.23 | $12,463.00 | $0.00 |
| Option 1 (10/1/20 - 9/30/21) | O1.31 | Furnish and install data/telephone outlet in a new or existing GWB partition. | 30 | Outlet | $141.92 | $4,257.60 | $0.00 | $0.00 | $146.18 | $4,385.33 | $0.00 |
| Option 1 (10/1/20 - 9/30/21) | O1.32 | Furnish and install surface mounted data/telephone outlet. | 30 | Outlet | $128.55 | $3,856.50 | $0.00 | $0.00 | $132.41 | $3,972.20 | $0.00 |
| Option 1 (10/1/20 - 9/30/21) | O1.33 | Install Government furnished computer cable in under-floor raceway. | 1,500 | LF | $1.14 | $1,710.00 | $0.00 | $0.00 | $1.17 | $1,761.30 | $0.00 |
| Option 1 (10/1/20 - 9/30/21) | O1.34 | Install Government furnished computer cable above a new or existing ceiling. | 1,200 | LF | $1.48 | $1,776.00 | $0.00 | $0.00 | $1.52 | $1,829.28 | $0.00 |
| Option 1 (10/1/20 - 9/30/21) | O1.35 | Furnish and Install cable connectors to wiring under 33 & 34. | 75 | EA | $35.95 | $2,696.25 | $0.00 | $0.00 | $37.03 | $2,777.14 | $0.00 |
| Option 1 (10/1/20 - 9/30/21) | O1.36 | Furnish and install flush mount, brushed aluminum, floor Telephone/Data outlet in under floor system for a complete installation. | 50 | Outlet | $221.75 | $11,087.50 | $0.00 | $0.00 | $228.40 | $11,420.13 | $0.00 |
| Option 1 (10/1/20 - 9/30/21) | O1.37 | Provide labor and materials to demo existing carpet tiles from floor area. | 2,000 | SF | $1.28 | $2,560.00 | $0.00 | $0.00 | $1.32 | $2,636.80 | $0.00 |
| Option 1 (10/1/20 - 9/30/21) | O1.38 | Provide labor and materials to Install Government-furnished Carpet Tiles. | 1,000 | sq yd | $5.38 | $5,380.00 | $0.00 | $0.00 | $5.54 | $5,541.40 | $0.00 |
| Option 1 (10/1/20 - 9/30/21) | O1.39 | Remove existing sprinkler plate, head and pipe drop. Install new elbows and relocate existing sprinkler to include valving off branch and plugging out fire alarm system. | 20 | EA | $330.60 | $6,612.00 | $0.00 | $0.00 | $340.52 | $6,810.36 | $0.00 |
| Option 1 (10/1/20 - 9/30/21) | O1.40 | Provide labor and materials to remove/relocate hard duct VAD ceiling unit to a new location. (Max Run 20 feet) To include all pneumatic tubing and duct work as required for a complete installation and removal. | 10 | EA | $772.75 | $7,727.50 | $0.00 | $0.00 | $795.93 | $7,959.33 | $0.00 |
| Option 1 (10/1/20 - 9/30/21) | O1.41 | Provide labor and materials to install a government furnished VAD ceiling unit in a new location. To include contractor furnishing of all pneumatic tubing, duct work, and any other materials needed to install unit. | 10 | EA | $893.70 | $8,937.00 | $0.00 | $0.00 | $920.51 | $9,205.11 | $0.00 |
| Option 1 (10/1/20 - 9/30/21) | O1.42 | Furnish and install 2’ X 2' air diffuser in a new or existing ceiling grid system. To include contractor furnishing of all pneumatic tubing, duct work and any other materials needed to install unit. Maximum flex duct to be installed is 10 feet. All other to be hard duct. | 10 | EA | $335.98 | $3,359.80 | $0.00 | $0.00 | $346.06 | $3,460.59 | $0.00 |
| Option 1 (10/1/20 - 9/30/21) | O1.43 | Remove existing pneumatic T-Stat affected by the removal of GWB partitions. | 20 | T-Stat | $160.56 | $3,211.20 | $0.00 | $0.00 | $165.38 | $3,307.54 | $0.00 |
| Option 1 (10/1/20 - 9/30/21) | O1.44 | Furnish and install new pneumatic T-Stat affected by installation of new GWB partitions. | 20 | T-Stat | $302.38 | $6,047.60 | $0.00 | $0.00 | $311.45 | $6,229.03 | $0.00 |
| Option 1 (10/1/20 - 9/30/21) | O1.45 | Furnish and install DDC thermostat controls for VAV boxes. | 1 | T-Stat | $436.77 | $436.77 | $0.00 | $0.00 | $449.87 | $449.87 | $0.00 |
| Option 1 (10/1/20 - 9/30/21) | O1.46 | Furnish and install Unican cipher lock with removable core in metal/wood door to match existing ciphers, including wrap around plate and push plate. | 10 | EA | $759.31 | $7,593.10 | $0.00 | $0.00 | $782.09 | $7,820.89 | $0.00 |
| Option 1 (10/1/20 - 9/30/21) | O1.47 | Furnish and install lock-set with removable core in metal/wood door to match existing in building standard. | 30 | EA | $456.93 | $13,707.90 | $0.00 | $0.00 | $470.64 | $14,119.14 | $0.00 |
| Option 1 (10/1/20 - 9/30/21) | O1.48 | Furnish and install Sargent Board KP 60 – 28 – 10 G77 LL 26D 100 User Lock-set with removable core in new or existing door. | 10 | EA | $938.99 | $9,389.90 | $0.00 | $0.00 | $967.16 | $9,671.60 | $0.00 |
| Option 1 (10/1/20 - 9/30/21) | O1.49 | Furnish and install Sargent Mortise KP – 8278 – LNL – 26D RH 100 User Lock-set with removable core in new or existing door. | 10 | EA | $956.73 | $9,567.30 | $0.00 | $0.00 | $985.43 | $9,854.32 | $0.00 |
| Option 1 (10/1/20 - 9/30/21) | O1.50 | Furnish and install Sargent Board KP 60 – 28 – 10 G77 LUL 26D 500 User Lock-set with removable core in new or existing door. | 10 | EA | $1,350.30 | $13,503.00 | $0.00 | $0.00 | $1,390.81 | $13,908.09 | $0.00 |
| Option 1 (10/1/20 - 9/30/21) | O1.51 | Furnish and install Sargent Mortise KP – 8278 – LUL – 26D RH 500 User Lock-set with removable core in new or existing door. | 10 | EA | $1,368.04 | $13,680.40 | $0.00 | $0.00 | $1,409.08 | $14,090.81 | $0.00 |
| Option 1 (10/1/20 - 9/30/21) | O1.52 | Running Fiber Optic Cable | 100 | C.L.F. | $150.00 | $15,000.00 | $0.00 | $0.00 | $154.50 | $15,450.00 | $0.00 |
| $268,090.37 | $0.00 | $276,133.08 | $0.00 | ||||||||
| Line Item 1017 | Line Item 1018 |
| Option 2 (10/1/21 - 9/30/22) | O2.1 | Provide labor and materials to remove completely Gypsum Wall Board Partitions up to 8” thick and 13 feet high. | 1,000 | SF | $2.49 | $2,490.00 | $0.00 | $0.00 | $2.56 | $2,564.70 | $0.00 |
| Option 2 (10/1/21 - 9/30/22) | O2.2 | Provide labor and materials to remove door/frame from existing GWB Partition and close in opening, paint to match existing walls. | 10 | EA | $169.33 | $1,693.30 | $0.00 | $0.00 | $174.41 | $1,744.10 | $0.00 |
| Option 2 (10/1/21 - 9/30/22) | O2.3 | Construct a Gypsum Wall Board and Metal Stud Partition, consisting of 5/8” thick fire rated GWB and 20 GA metal studs, with a thin coat of plaster to include 4” cove base. | 1,000 | SF | $9.76 | $9,760.00 | $0.00 | $0.00 | $10.05 | $10,052.80 | $0.00 |
| Option 2 (10/1/21 - 9/30/22) | O2.4 | Premium for extending the height of Gypsum Wall Board Partitions to 13 feet high. SF | 1 | $403.17 | $403.17 | $0.00 | $0.00 | $415.27 | $415.27 | $0.00 | |
| Option 2 (10/1/21 - 9/30/22) | O2.5 | Remove and replace existing 4” cove base. | 100 | LF | $3.18 | $318.00 | $0.00 | $0.00 | $3.28 | $327.54 | $0.00 |
| Option 2 (10/1/21 - 9/30/22) | O2.6 | Furnish and install a 3’0” X 7’0” wood door with 20 minute fire label and 16 GA welded steel knockdown frame in a new GWB Partition to include painting of the door and frame. | 10 | EA | $551.00 | $5,510.00 | $0.00 | $0.00 | $567.53 | $5,675.30 | $0.00 |
| Option 2 (10/1/21 - 9/30/22) | O2.7 | Furnish and install a 3’0” X 7’0” wood door with 20 minute fire label and 16 GA pressed steel knockdown frame in a existing GWB Partition to include painting of the door and frame. | 6 | EA | $544.29 | $3,265.74 | $0.00 | $0.00 | $560.62 | $3,363.71 | $0.00 |
| Option 2 (10/1/21 - 9/30/22) | O2.8 | Provide labor & materials to remove, replace and or modify existing Ceiling Grid and tiles. | 500 | SF | $2.69 | $1,345.00 | $0.00 | $0.00 | $2.77 | $1,385.35 | $0.00 |
| Option 2 (10/1/21 - 9/30/22) | O2.9 | Furnish materials and paint new or previously painted vertical surfaces, plaster and drywall with Eggshell paint (color to be selected by GSA). | $0.00 | ||||||||
| First Coat: | 12,000 | SF | $0.40 | $4,800.00 | $0.00 | $0.00 | $0.41 | $4,944.00 | $0.00 | ||
| Second Coat: | 12,000 | SF | $0.30 | $3,600.00 | $0.00 | $0.00 | $0.31 | $3,708.00 | $0.00 | ||
| Option 2 (10/1/21 - 9/30/22) | O2.10 | Furnish materials and paint new or previously painted masonry surfaces. | $0.00 | ||||||||
| First Coat: | 6,000 | SF | $0.40 | $2,400.00 | $0.00 | $0.00 | $0.41 | $2,472.00 | $0.00 | ||
| Second Coat: | 6,000 | SF | $0.30 | $1,800.00 | $0.00 | $0.00 | $0.31 | $1,854.00 | $0.00 | ||
| Option 2 (10/1/21 - 9/30/22) | O2.11 | Furnish materials and paint previously painted pressed metal door and window frames up to 10" width, 2 coats semi-gloss (Latex base). | 150 | LF | $2.78 | $417.00 | $0.00 | $0.00 | $2.86 | $429.51 | $0.00 |
| Option 2 (10/1/21 - 9/30/22) | O2.12 | Furnish materials and prepare surface, prime/paint (2) finishes coats wood door. | 50 | EA | $73.91 | $3,695.50 | $0.00 | $0.00 | $76.13 | $3,806.37 | $0.00 |
| Option 2 (10/1/21 - 9/30/22) | O2.13 | Furnish materials and patch vertical surfaces (GWB/Plaster) and restore to original condition. | 500 | SF | $0.62 | $310.00 | $0.00 | $0.00 | $0.64 | $319.30 | $0.00 |
| Option 2 (10/1/21 - 9/30/22) | O2.14 | Remove an existing quad, duplex outlet in an existing GWB partition, to include termination of wiring. | 20 | Outlet | $63.84 | $1,276.80 | $0.00 | $0.00 | $65.76 | $1,315.10 | $0.00 |
| Option 2 (10/1/21 - 9/30/22) | O2.15 | Remove existing floor outlet (elec./tele/data) includes termination of wiring and sealing hole with Flammadur and Steel Cap. | 35 | Outlet | $72.91 | $2,551.85 | $0.00 | $0.00 | $75.10 | $2,628.41 | $0.00 |
| Option 2 (10/1/21 - 9/30/22) | O2.16 | Locate cell in under floor duct system and bore through up to 8" of concrete, tap cell. | 75 | Cell | $67.20 | $5,040.00 | $0.00 | $0.00 | $69.22 | $5,191.20 | $0.00 |
| Option 2 (10/1/21 - 9/30/22) | O2.17 | Furnish and install duplex outlet in a new or existing GWB partition, wire to adjacent outlet Max Run 25 LF. | 30 | Outlet | $141.92 | $4,257.60 | $0.00 | $0.00 | $146.18 | $4,385.33 | $0.00 |
| Option 2 (10/1/21 - 9/30/22) | O2.18 | Furnish and install a quad outlet in a new or existing GWB partition, wire to adjacent outlet Max Run 25 LF. | 30 | Outlet | $162.34 | $4,870.20 | $0.00 | $0.00 | $167.21 | $5,016.31 | $0.00 |
| Option 2 (10/1/21 - 9/30/22) | O2.19 | Furnish and install flush mount, brushed aluminum, floor electrical duplex outlet in under floor duct system, includes all parts for a complete installation, Max Run 25 LF. | 50 | Outlet | $215.03 | $10,751.50 | $0.00 | $0.00 | $221.48 | $11,074.05 | $0.00 |
| Option 2 (10/1/21 - 9/30/22) | O2.20 | Furnish and install a surface metal raceway to include all required fittings for a complete installation. | 100 | LF | $8.45 | $845.00 | $0.00 | $0.00 | $8.70 | $870.35 | $0.00 |
| Option 2 (10/1/21 - 9/30/22) | O2.21 | Furnish and install a surface mounted duplex outlet in conjunction with #20. | 20 | Outlet | $67.20 | $1,344.00 | $0.00 | $0.00 | $69.22 | $1,384.32 | $0.00 |
| Option 2 (10/1/21 - 9/30/22) | O2.22 | Premium for furnish and install of an isolated ground duplex outlet in lieu of standard in #'s 17, 18, 19 & 21. | 30 | EA | $17.47 | $524.10 | $0.00 | $0.00 | $17.99 | $539.82 | $0.00 |
| Option 2 (10/1/21 - 9/30/22) | O2.23 | Furnish and install floor electrical outlet for systems furniture. Install in floor system, must be equal to existing used in building. | 15 | Outlet | $181.43 | $2,721.45 | $0.00 | $0.00 | $186.87 | $2,803.09 | $0.00 |
| Option 2 (10/1/21 - 9/30/22) | O2.24 | Furnish and install wiring and Honeywell switch (model EL7650) to control lights in new or existing GWB walls. | 20 | Switch | $212.34 | $4,246.80 | $0.00 | $0.00 | $218.71 | $4,374.20 | $0.00 |
| Option 2 (10/1/21 - 9/30/22) | O2.25 | Install a Government furnished lay-in type light fixture in an existing suspended ceiling system, furnish all materials including AFC connectors for a complete installation. | 30 | Fixture | $69.88 | $2,096.40 | $0.00 | $0.00 | $71.98 | $2,159.29 | $0.00 |
| Option 2 (10/1/21 - 9/30/22) | O2.26 | Relocate existing lay-in type light fixture within suspended ceiling, tie to adjacent fixture, furnish any additional materials for a complete installation. | 30 | Fixture | $60.48 | $1,814.40 | $0.00 | $0.00 | $62.29 | $1,868.83 | $0.00 |
| Option 2 (10/1/21 - 9/30/22) | O2.27 | Remove existing lay-in type light fixture to include termination of wiring. | 20 | Fixture | $47.04 | $940.80 | $0.00 | $0.00 | $48.45 | $969.02 | $0.00 |
| Option 2 (10/1/21 - 9/30/22) | O2.28 | Furnish and install and electrical door release in new or existing door. Work includes buzzer/plate/push button, electric strike and transformer with associated wiring. | 12 | EA | $470.37 | $5,644.44 | $0.00 | $0.00 | $484.48 | $5,813.77 | $0.00 |
| Option 2 (10/1/21 - 9/30/22) | O2.29 | Extra for home run above a new or existing suspended ceiling, to include circuit breaker, EMT, and support for a complete installation. | 2,000 | LF | $6.58 | $13,160.00 | $0.00 | $0.00 | $6.78 | $13,554.80 | $0.00 |
| Option 2 (10/1/21 - 9/30/22) | O2.30 | Extra for home run in under floor duct system to include circuit breaker. | 2,000 | LF | $6.05 | $12,100.00 | $0.00 | $0.00 | $6.23 | $12,463.00 | $0.00 |
| Option 2 (10/1/21 - 9/30/22) | O2.31 | Furnish and install data/telephone outlet in a new or existing GWB partition. | 30 | Outlet | $141.92 | $4,257.60 | $0.00 | $0.00 | $146.18 | $4,385.33 | $0.00 |
| Option 2 (10/1/21 - 9/30/22) | O2.32 | Furnish and install surface mounted data/telephone outlet. | 30 | Outlet | $128.55 | $3,856.50 | $0.00 | $0.00 | $132.41 | $3,972.20 | $0.00 |
| Option 2 (10/1/21 - 9/30/22) | O2.33 | Install Government furnished computer cable in under-floor raceway. | 1,500 | LF | $1.14 | $1,710.00 | $0.00 | $0.00 | $1.17 | $1,761.30 | $0.00 |
| Option 2 (10/1/21 - 9/30/22) | O2.34 | Install Government furnished computer cable above a new or existing ceiling. | 1,200 | LF | $1.48 | $1,776.00 | $0.00 | $0.00 | $1.52 | $1,829.28 | $0.00 |
| Option 2 (10/1/21 - 9/30/22) | O2.35 | Furnish and Install cable connectors to wiring under 33 & 34. | 75 | EA | $35.95 | $2,696.25 | $0.00 | $0.00 | $37.03 | $2,777.14 | $0.00 |
| Option 2 (10/1/21 - 9/30/22) | O2.36 | Furnish and install flush mount, brushed aluminum, floor Telephone/Data outlet in under floor system for a complete installation. | 50 | Outlet | $221.75 | $11,087.50 | $0.00 | $0.00 | $228.40 | $11,420.13 | $0.00 |
| Option 2 (10/1/21 - 9/30/22) | O2.37 | Provide labor and materials to demo existing carpet tiles from floor area. | 2,000 | SF | $1.28 | $2,560.00 | $0.00 | $0.00 | $1.32 | $2,636.80 | $0.00 |
| Option 2 (10/1/21 - 9/30/22) | O2.38 | Provide labor and materials to Install Government-furnished Carpet Tiles. | 1,000 | sq yd | $5.38 | $5,380.00 | $0.00 | $0.00 | $5.54 | $5,541.40 | $0.00 |
| Option 2 (10/1/21 - 9/30/22) | O2.39 | Remove existing sprinkler plate, head and pipe drop. Install new elbows and relocate existing sprinkler to include valving off branch and plugging out fire alarm system. | 20 | EA | $330.60 | $6,612.00 | $0.00 | $0.00 | $340.52 | $6,810.36 | $0.00 |
| Option 2 (10/1/21 - 9/30/22) | O2.40 | Provide labor and materials to remove/relocate hard duct VAD ceiling unit to a new location. (Max Run 20 feet) To include all pneumatic tubing and duct work as required for a complete installation and removal. | 10 | EA | $772.75 | $7,727.50 | $0.00 | $0.00 | $795.93 | $7,959.33 | $0.00 |
| Option 2 (10/1/21 - 9/30/22) | O2.41 | Provide labor and materials to install a government furnished VAD ceiling unit in a new location. To include contractor furnishing of all pneumatic tubing, duct work, and any other materials needed to install unit. | 10 | EA | $893.70 | $8,937.00 | $0.00 | $0.00 | $920.51 | $9,205.11 | $0.00 |
| Option 2 (10/1/21 - 9/30/22) | O2.42 | Furnish and install 2’ X 2' air diffuser in a new or existing ceiling grid system. To include contractor furnishing of all pneumatic tubing, duct work and any other materials needed to install unit. Maximum flex duct to be installed is 10 feet. All other to be hard duct. | 10 | EA | $335.98 | $3,359.80 | $0.00 | $0.00 | $346.06 | $3,460.59 | $0.00 |
| Option 2 (10/1/21 - 9/30/22) | O2.43 | Remove existing pneumatic T-Stat affected by the removal of GWB partitions. | 20 | T-Stat | $160.56 | $3,211.20 | $0.00 | $0.00 | $165.38 | $3,307.54 | $0.00 |
| Option 2 (10/1/21 - 9/30/22) | O2.44 | Furnish and install new pneumatic T-Stat affected by installation of new GWB partitions. | 20 | T-Stat | $302.38 | $6,047.60 | $0.00 | $0.00 | $311.45 | $6,229.03 | $0.00 |
| Option 2 (10/1/21 - 9/30/22) | O2.45 | Furnish and install DDC thermostat controls for VAV boxes. | 1 | T-Stat | $436.77 | $436.77 | $0.00 | $0.00 | $449.87 | $449.87 | $0.00 |
| Option 2 (10/1/21 - 9/30/22) | O2.46 | Furnish and install Unican cipher lock with removable core in metal/wood door to match existing ciphers, including wrap around plate and push plate. | 10 | EA | $759.31 | $7,593.10 | $0.00 | $0.00 | $782.09 | $7,820.89 | $0.00 |
| Option 2 (10/1/21 - 9/30/22) | O2.47 | Furnish and install lock-set with removable core in metal/wood door to match existing in building standard. | 30 | EA | $456.93 | $13,707.90 | $0.00 | $0.00 | $470.64 | $14,119.14 | $0.00 |
| Option 2 (10/1/21 - 9/30/22) | O2.48 | Furnish and install Sargent Board KP 60 – 28 – 10 G77 LL 26D 100 User Lock-set with removable core in new or existing door. | 10 | EA | $938.99 | $9,389.90 | $0.00 | $0.00 | $967.16 | $9,671.60 | $0.00 |
| Option 2 (10/1/21 - 9/30/22) | O2.49 | Furnish and install Sargent Mortise KP – 8278 – LNL – 26D RH 100 User Lock-set with removable core in new or existing door. | 10 | EA | $956.73 | $9,567.30 | $0.00 | $0.00 | $985.43 | $9,854.32 | $0.00 |
| Option 2 (10/1/21 - 9/30/22) | O2.50 | Furnish and install Sargent Board KP 60 – 28 – 10 G77 LUL 26D 500 User Lock-set with removable core in new or existing door. | 10 | EA | $1,350.30 | $13,503.00 | $0.00 | $0.00 | $1,390.81 | $13,908.09 | $0.00 |
| Option 2 (10/1/21 - 9/30/22) | O2.51 | Furnish and install Sargent Mortise KP – 8278 – LUL – 26D RH 500 User Lock-set with removable core in new or existing door. | 10 | EA | $1,368.04 | $13,680.40 | $0.00 | $0.00 | $1,409.08 | $14,090.81 | $0.00 |
| Option 2 (10/1/21 - 9/30/22) | O2.52 | Running Fiber Optic Cable | 100 | C.L.F. | $150.00 | $15,000.00 | $0.00 | $0.00 | $154.50 | $15,450.00 | $0.00 |
| $268,090.37 | $0.00 | $276,133.08 | $0.00 | ||||||||
| Line Item 2017 | Line Item 2018 |
| Option 3 (10/1/22 - 9/30/23) | O3.1 | Provide labor and materials to remove completely Gypsum Wall Board Partitions up to 8” thick and 13 feet high. | 1,000 | SF | $2.49 | $2,490.00 | $0.00 | $0.00 | $2.56 | $2,564.70 | $0.00 |
| Option 3 (10/1/22 - 9/30/23) | O3.2 | Provide labor and materials to remove door/frame from existing GWB Partition and close in opening, paint to match existing walls. | 10 | EA | $169.33 | $1,693.30 | $0.00 | $0.00 | $174.41 | $1,744.10 | $0.00 |
| Option 3 (10/1/22 - 9/30/23) | O3.3 | Construct a Gypsum Wall Board and Metal Stud Partition, consisting of 5/8” thick fire rated GWB and 20 GA metal studs, with a thin coat of plaster to include 4” cove base. | 1,000 | SF | $9.76 | $9,760.00 | $0.00 | $0.00 | $10.05 | $10,052.80 | $0.00 |
| Option 3 (10/1/22 - 9/30/23) | O3.4 | Premium for extending the height of Gypsum Wall Board Partitions to 13 feet high. SF | 1 | $403.17 | $403.17 | $0.00 | $0.00 | $415.27 | $415.27 | $0.00 | |
| Option 3 (10/1/22 - 9/30/23) | O3.5 | Remove and replace existing 4” cove base. | 100 | LF | $3.18 | $318.00 | $0.00 | $0.00 | $3.28 | $327.54 | $0.00 |
| Option 3 (10/1/22 - 9/30/23) | O3.6 | Furnish and install a 3’0” X 7’0” wood door with 20 minute fire label and 16 GA welded steel knockdown frame in a new GWB Partition to include painting of the door and frame. | 10 | EA | $551.00 | $5,510.00 | $0.00 | $0.00 | $567.53 | $5,675.30 | $0.00 |
| Option 3 (10/1/22 - 9/30/23) | O3.7 | Furnish and install a 3’0” X 7’0” wood door with 20 minute fire label and 16 GA pressed steel knockdown frame in a existing GWB Partition to include painting of the door and frame. | 6 | EA | $544.29 | $3,265.74 | $0.00 | $0.00 | $560.62 | $3,363.71 | $0.00 |
| Option 3 (10/1/22 - 9/30/23) | O3.8 | Provide labor & materials to remove, replace and or modify existing Ceiling Grid and tiles. | 500 | SF | $2.69 | $1,345.00 | $0.00 | $0.00 | $2.77 | $1,385.35 | $0.00 |
| Option 3 (10/1/22 - 9/30/23) | O3.9 | Furnish materials and paint new or previously painted vertical surfaces, plaster and drywall with Eggshell paint (color to be selected by GSA). | $0.00 | ||||||||
| First Coat: | 12,000 | SF | $0.40 | $4,800.00 | $0.00 | $0.00 | $0.41 | $4,944.00 | $0.00 | ||
| Second Coat: | 12,000 | SF | $0.30 | $3,600.00 | $0.00 | $0.00 | $0.31 | $3,708.00 | $0.00 | ||
| Option 3 (10/1/22 - 9/30/23) | O3.10 | Furnish materials and paint new or previously painted masonry surfaces. | $0.00 | ||||||||
| First Coat: | 6,000 | SF | $0.40 | $2,400.00 | $0.00 | $0.00 | $0.41 | $2,472.00 | $0.00 | ||
| Second Coat: | 6,000 | SF | $0.30 | $1,800.00 | $0.00 | $0.00 | $0.31 | $1,854.00 | $0.00 | ||
| Option 3 (10/1/22 - 9/30/23) | O3.11 | Furnish materials and paint previously painted pressed metal door and window frames up to 10" width, 2 coats semi-gloss (Latex base). | 150 | LF | $2.78 | $417.00 | $0.00 | $0.00 | $2.86 | $429.51 | $0.00 |
| Option 3 (10/1/22 - 9/30/23) | O3.12 | Furnish materials and prepare surface, prime/paint (2) finishes coats wood door. | 50 | EA | $73.91 | $3,695.50 | $0.00 | $0.00 | $76.13 | $3,806.37 | $0.00 |
| Option 3 (10/1/22 - 9/30/23) | O3.13 | Furnish materials and patch vertical surfaces (GWB/Plaster) and restore to original condition. | 500 | SF | $0.62 | $310.00 | $0.00 | $0.00 | $0.64 | $319.30 | $0.00 |
| Option 3 (10/1/22 - 9/30/23) | O3.14 | Remove an existing quad, duplex outlet in an existing GWB partition, to include termination of wiring. | 20 | Outlet | $63.84 | $1,276.80 | $0.00 | $0.00 | $65.76 | $1,315.10 | $0.00 |
| Option 3 (10/1/22 - 9/30/23) | O3.15 | Remove existing floor outlet (elec./tele/data) includes termination of wiring and sealing hole with Flammadur and Steel Cap. | 35 | Outlet | $72.91 | $2,551.85 | $0.00 | $0.00 | $75.10 | $2,628.41 | $0.00 |
| Option 3 (10/1/22 - 9/30/23) | O3.16 | Locate cell in under floor duct system and bore through up to 8" of concrete, tap cell. | 75 | Cell | $67.20 | $5,040.00 | $0.00 | $0.00 | $69.22 | $5,191.20 | $0.00 |
| Option 3 (10/1/22 - 9/30/23) | O3.17 | Furnish and install duplex outlet in a new or existing GWB partition, wire to adjacent outlet Max Run 25 LF. | 30 | Outlet | $141.92 | $4,257.60 | $0.00 | $0.00 | $146.18 | $4,385.33 | $0.00 |
| Option 3 (10/1/22 - 9/30/23) | O3.18 | Furnish and install a quad outlet in a new or existing GWB partition, wire to adjacent outlet Max Run 25 LF. | 30 | Outlet | $162.34 | $4,870.20 | $0.00 | $0.00 | $167.21 | $5,016.31 | $0.00 |
| Option 3 (10/1/22 - 9/30/23) | O3.19 | Furnish and install flush mount, brushed aluminum, floor electrical duplex outlet in under floor duct system, includes all parts for a complete installation, Max Run 25 LF. | 50 | Outlet | $215.03 | $10,751.50 | $0.00 | $0.00 | $221.48 | $11,074.05 | $0.00 |
| Option 3 (10/1/22 - 9/30/23) | O3.20 | Furnish and install a surface metal raceway to include all required fittings for a complete installation. | 100 | LF | $8.45 | $845.00 | $0.00 | $0.00 | $8.70 | $870.35 | $0.00 |
| Option 3 (10/1/22 - 9/30/23) | O3.21 | Furnish and install a surface mounted duplex outlet in conjunction with #20. | 20 | Outlet | $67.20 | $1,344.00 | $0.00 | $0.00 | $69.22 | $1,384.32 | $0.00 |
| Option 3 (10/1/22 - 9/30/23) | O3.22 | Premium for furnish and install of an isolated ground duplex outlet in lieu of standard in #'s 17, 18, 19 & 21. | 30 | EA | $17.47 | $524.10 | $0.00 | $0.00 | $17.99 | $539.82 | $0.00 |
| Option 3 (10/1/22 - 9/30/23) | O3.23 | Furnish and install floor electrical outlet for systems furniture. Install in floor system, must be equal to existing used in building. | 15 | Outlet | $181.43 | $2,721.45 | $0.00 | $0.00 | $186.87 | $2,803.09 | $0.00 |
| Option 3 (10/1/22 - 9/30/23) | O3.24 | Furnish and install wiring and Honeywell switch (model EL7650) to control lights in new or existing GWB walls. | 20 | Switch | $212.34 | $4,246.80 | $0.00 | $0.00 | $218.71 | $4,374.20 | $0.00 |
| Option 3 (10/1/22 - 9/30/23) | O3.25 | Install a Government furnished lay-in type light fixture in an existing suspended ceiling system, furnish all materials including AFC connectors for a complete installation. | 30 | Fixture | $69.88 | $2,096.40 | $0.00 | $0.00 | $71.98 | $2,159.29 | $0.00 |
| Option 3 (10/1/22 - 9/30/23) | O3.26 | Relocate existing lay-in type light fixture within suspended ceiling, tie to adjacent fixture, furnish any additional materials for a complete installation. | 30 | Fixture | $60.48 | $1,814.40 | $0.00 | $0.00 | $62.29 | $1,868.83 | $0.00 |
| Option 3 (10/1/22 - 9/30/23) | O3.27 | Remove existing lay-in type light fixture to include termination of wiring. | 20 | Fixture | $47.04 | $940.80 | $0.00 | $0.00 | $48.45 | $969.02 | $0.00 |
| Option 3 (10/1/22 - 9/30/23) | O3.28 | Furnish and install and electrical door release in new or existing door. Work includes buzzer/plate/push button, electric strike and transformer with associated wiring. | 12 | EA | $470.37 | $5,644.44 | $0.00 | $0.00 | $484.48 | $5,813.77 | $0.00 |
| Option 3 (10/1/22 - 9/30/23) | O3.29 | Extra for home run above a new or existing suspended ceiling, to include circuit breaker, EMT, and support for a complete installation. | 2,000 | LF | $6.58 | $13,160.00 | $0.00 | $0.00 | $6.78 | $13,554.80 | $0.00 |
| Option 3 (10/1/22 - 9/30/23) | O3.30 | Extra for home run in under floor duct system to include circuit breaker. | 2,000 | LF | $6.05 | $12,100.00 | $0.00 | $0.00 | $6.23 | $12,463.00 | $0.00 |
| Option 3 (10/1/22 - 9/30/23) | O3.31 | Furnish and install data/telephone outlet in a new or existing GWB partition. | 30 | Outlet | $141.92 | $4,257.60 | $0.00 | $0.00 | $146.18 | $4,385.33 | $0.00 |
| Option 3 (10/1/22 - 9/30/23) | O3.32 | Furnish and install surface mounted data/telephone outlet. | 30 | Outlet | $128.55 | $3,856.50 | $0.00 | $0.00 | $132.41 | $3,972.20 | $0.00 |
| Option 3 (10/1/22 - 9/30/23) | O3.33 | Install Government furnished computer cable in under-floor raceway. | 1,500 | LF | $1.14 | $1,710.00 | $0.00 | $0.00 | $1.17 | $1,761.30 | $0.00 |
| Option 3 (10/1/22 - 9/30/23) | O3.34 | Install Government furnished computer cable above a new or existing ceiling. | 1,200 | LF | $1.48 | $1,776.00 | $0.00 | $0.00 | $1.52 | $1,829.28 | $0.00 |
| Option 3 (10/1/22 - 9/30/23) | O3.35 | Furnish and Install cable connectors to wiring under 33 & 34. | 75 | EA | $35.95 | $2,696.25 | $0.00 | $0.00 | $37.03 | $2,777.14 | $0.00 |
| Option 3 (10/1/22 - 9/30/23) | O3.36 | Furnish and install flush mount, brushed aluminum, floor Telephone/Data outlet in under floor system for a complete installation. | 50 | Outlet | $221.75 | $11,087.50 | $0.00 | $0.00 | $228.40 | $11,420.13 | $0.00 |
| Option 3 (10/1/22 - 9/30/23) | O3.37 | Provide labor and materials to demo existing carpet tiles from floor area. | 2,000 | SF | $1.28 | $2,560.00 | $0.00 | $0.00 | $1.32 | $2,636.80 | $0.00 |
| Option 3 (10/1/22 - 9/30/23) | O3.38 | Provide labor and materials to Install Government-furnished Carpet Tiles. | 1,000 | sq yd | $5.38 | $5,380.00 | $0.00 | $0.00 | $5.54 | $5,541.40 | $0.00 |
| Option 3 (10/1/22 - 9/30/23) | O3.39 | Remove existing sprinkler plate, head and pipe drop. Install new elbows and relocate existing sprinkler to include valving off branch and plugging out fire alarm system. | 20 | EA | $330.60 | $6,612.00 | $0.00 | $0.00 | $340.52 | $6,810.36 | $0.00 |
| Option 3 (10/1/22 - 9/30/23) | O3.40 | Provide labor and materials to remove/relocate hard duct VAD ceiling unit to a new location. (Max Run 20 feet) To include all pneumatic tubing and duct work as required for a complete installation and removal. | 10 | EA | $772.75 | $7,727.50 | $0.00 | $0.00 | $795.93 | $7,959.33 | $0.00 |
| Option 3 (10/1/22 - 9/30/23) | O3.41 | Provide labor and materials to install a government furnished VAD ceiling unit in a new location. To include contractor furnishing of all pneumatic tubing, duct work, and any other materials needed to install unit. | 10 | EA | $893.70 | $8,937.00 | $0.00 | $0.00 | $920.51 | $9,205.11 | $0.00 |
| Option 3 (10/1/22 - 9/30/23) | O3.42 | Furnish and install 2’ X 2' air diffuser in a new or existing ceiling grid system. To include contractor furnishing of all pneumatic tubing, duct work and any other materials needed to install unit. Maximum flex duct to be installed is 10 feet. All other to be hard duct. | 10 | EA | $335.98 | $3,359.80 | $0.00 | $0.00 | $346.06 | $3,460.59 | $0.00 |
| Option 3 (10/1/22 - 9/30/23) | O3.43 | Remove existing pneumatic T-Stat affected by the removal of GWB partitions. | 20 | T-Stat | $160.56 | $3,211.20 | $0.00 | $0.00 | $165.38 | $3,307.54 | $0.00 |
| Option 3 (10/1/22 - 9/30/23) | O3.44 | Furnish and install new pneumatic T-Stat affected by installation of new GWB partitions. | 20 | T-Stat | $302.38 | $6,047.60 | $0.00 | $0.00 | $311.45 | $6,229.03 | $0.00 |
| Option 3 (10/1/22 - 9/30/23) | O3.45 | Furnish and install DDC thermostat controls for VAV boxes. | 1 | T-Stat | $436.77 | $436.77 | $0.00 | $0.00 | $449.87 | $449.87 | $0.00 |
| Option 3 (10/1/22 - 9/30/23) | O3.46 | Furnish and install Unican cipher lock with removable core in metal/wood door to match existing ciphers, including wrap around plate and push plate. | 10 | EA | $759.31 | $7,593.10 | $0.00 | $0.00 | $782.09 | $7,820.89 | $0.00 |
| Option 3 (10/1/22 - 9/30/23) | O3.47 | Furnish and install lock-set with removable core in metal/wood door to match existing in building standard. | 30 | EA | $456.93 | $13,707.90 | $0.00 | $0.00 | $470.64 | $14,119.14 | $0.00 |
| Option 3 (10/1/22 - 9/30/23) | O3.48 | Furnish and install Sargent Board KP 60 – 28 – 10 G77 LL 26D 100 User Lock-set with removable core in new or existing door. | 10 | EA | $938.99 | $9,389.90 | $0.00 | $0.00 | $967.16 | $9,671.60 | $0.00 |
| Option 3 (10/1/22 - 9/30/23) | O3.49 | Furnish and install Sargent Mortise KP – 8278 – LNL – 26D RH 100 User Lock-set with removable core in new or existing door. | 10 | EA | $956.73 | $9,567.30 | $0.00 | $0.00 | $985.43 | $9,854.32 | $0.00 |
| Option 3 (10/1/22 - 9/30/23) | O3.50 | Furnish and install Sargent Board KP 60 – 28 – 10 G77 LUL 26D 500 User Lock-set with removable core in new or existing door. | 10 | EA | $1,350.30 | $13,503.00 | $0.00 | $0.00 | $1,390.81 | $13,908.09 | $0.00 |
| Option 3 (10/1/22 - 9/30/23) | O3.51 | Furnish and install Sargent Mortise KP – 8278 – LUL – 26D RH 500 User Lock-set with removable core in new or existing door. | 10 | EA | $1,368.04 | $13,680.40 | $0.00 | $0.00 | $1,409.08 | $14,090.81 | $0.00 |
| Option 3 (10/1/22 - 9/30/23) | O3.52 | Running Fiber Optic Cable | 100 | C.L.F. | $150.00 | $15,000.00 | $0.00 | $0.00 | $154.50 | $15,450.00 | $0.00 |
| $268,090.37 | $0.00 | $276,133.08 | $0.00 | ||||||||
| Line Item 3017 | Line Item 3018 |
| Option 4 (10/1/23 - 9/30/24) | O4.1 | Provide labor and materials to remove completely Gypsum Wall Board Partitions up to 8” thick and 13 feet high. | 1,000 | SF | $2.49 | $2,490.00 | $0.00 | $0.00 | $2.56 | $2,564.70 | $0.00 |
| Option 4 (10/1/23 - 9/30/24) | O4.2 | Provide labor and materials to remove door/frame from existing GWB Partition and close in opening, paint to match existing walls. | 10 | EA | $169.33 | $1,693.30 | $0.00 | $0.00 | $174.41 | $1,744.10 | $0.00 |
| Option 4 (10/1/23 - 9/30/24) | O4.3 | Construct a Gypsum Wall Board and Metal Stud Partition, consisting of 5/8” thick fire rated GWB and 20 GA metal studs, with a thin coat of plaster to include 4” cove base. | 1,000 | SF | $9.76 | $9,760.00 | $0.00 | $0.00 | $10.05 | $10,052.80 | $0.00 |
| Option 4 (10/1/23 - 9/30/24) | O4.4 | Premium for extending the height of Gypsum Wall Board Partitions to 13 feet high. SF | 1 | $403.17 | $403.17 | $0.00 | $0.00 | $415.27 | $415.27 | $0.00 | |
| Option 4 (10/1/23 - 9/30/24) | O4.5 | Remove and replace existing 4” cove base. | 100 | LF | $3.18 | $318.00 | $0.00 | $0.00 | $3.28 | $327.54 | $0.00 |
| Option 4 (10/1/23 - 9/30/24) | O4.6 | Furnish and install a 3’0” X 7’0” wood door with 20 minute fire label and 16 GA welded steel knockdown frame in a new GWB Partition to include painting of the door and frame. | 10 | EA | $551.00 | $5,510.00 | $0.00 | $0.00 | $567.53 | $5,675.30 | $0.00 |
| Option 4 (10/1/23 - 9/30/24) | O4.7 | Furnish and install a 3’0” X 7’0” wood door with 20 minute fire label and 16 GA pressed steel knockdown frame in a existing GWB Partition to include painting of the door and frame. | 6 | EA | $544.29 | $3,265.74 | $0.00 | $0.00 | $560.62 | $3,363.71 | $0.00 |
| Option 4 (10/1/23 - 9/30/24) | O4.8 | Provide labor & materials to remove, replace and or modify existing Ceiling Grid and tiles. | 500 | SF | $2.69 | $1,345.00 | $0.00 | $0.00 | $2.77 | $1,385.35 | $0.00 |
| Option 4 (10/1/23 - 9/30/24) | O4.9 | Furnish materials and paint new or previously painted vertical surfaces, plaster and drywall with Eggshell paint (color to be selected by GSA). | $0.00 | ||||||||
| First Coat: | 12,000 | SF | $0.40 | $4,800.00 | $0.00 | $0.00 | $0.41 | $4,944.00 | $0.00 | ||
| Second Coat: | 12,000 | SF | $0.30 | $3,600.00 | $0.00 | $0.00 | $0.31 | $3,708.00 | $0.00 | ||
| Option 4 (10/1/23 - 9/30/24) | O4.10 | Furnish materials and paint new or previously painted masonry surfaces. | $0.00 | ||||||||
| First Coat: | 6,000 | SF | $0.40 | $2,400.00 | $0.00 | $0.00 | $0.41 | $2,472.00 | $0.00 | ||
| Second Coat: | 6,000 | SF | $0.30 | $1,800.00 | $0.00 | $0.00 | $0.31 | $1,854.00 | $0.00 | ||
| Option 4 (10/1/23 - 9/30/24) | O4.11 | Furnish materials and paint previously painted pressed metal door and window frames up to 10" width, 2 coats semi-gloss (Latex base). | 150 | LF | $2.78 | $417.00 | $0.00 | $0.00 | $2.86 | $429.51 | $0.00 |
| Option 4 (10/1/23 - 9/30/24) | O4.12 | Furnish materials and prepare surface, prime/paint (2) finishes coats wood door. | 50 | EA | $73.91 | $3,695.50 | $0.00 | $0.00 | $76.13 | $3,806.37 | $0.00 |
| Option 4 (10/1/23 - 9/30/24) | O4.13 | Furnish materials and patch vertical surfaces (GWB/Plaster) and restore to original condition. | 500 | SF | $0.62 | $310.00 | $0.00 | $0.00 | $0.64 | $319.30 | $0.00 |
| Option 4 (10/1/23 - 9/30/24) | O4.14 | Remove an existing quad, duplex outlet in an existing GWB partition, to include termination of wiring. | 20 | Outlet | $63.84 | $1,276.80 | $0.00 | $0.00 | $65.76 | $1,315.10 | $0.00 |
| Option 4 (10/1/23 - 9/30/24) | O4.15 | Remove existing floor outlet (elec./tele/data) includes termination of wiring and sealing hole with Flammadur and Steel Cap. | 35 | Outlet | $72.91 | $2,551.85 | $0.00 | $0.00 | $75.10 | $2,628.41 | $0.00 |
| Option 4 (10/1/23 - 9/30/24) | O4.16 | Locate cell in under floor duct system and bore through up to 8" of concrete, tap cell. | 75 | Cell | $67.20 | $5,040.00 | $0.00 | $0.00 | $69.22 | $5,191.20 | $0.00 |
| Option 4 (10/1/23 - 9/30/24) | O4.17 | Furnish and install duplex outlet in a new or existing GWB partition, wire to adjacent outlet Max Run 25 LF. | 30 | Outlet | $141.92 | $4,257.60 | $0.00 | $0.00 | $146.18 | $4,385.33 | $0.00 |
| Option 4 (10/1/23 - 9/30/24) | O4.18 | Furnish and install a quad outlet in a new or existing GWB partition, wire to adjacent outlet Max Run 25 LF. | 30 | Outlet | $162.34 | $4,870.20 | $0.00 | $0.00 | $167.21 | $5,016.31 | $0.00 |