47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_21_Repairs_2016_-_2019.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
Operations and Facilities Maintenance Services at the John F. Kennedy Federal Building in Boston, MA
Solicitation number
47PB0019R0002
Issued by

About this file

Exhibit 21 Repairs 2016 - 2019

View the file

Other files

File Type Posted
47PB0019R0002_Tab_10_Solicitation_Amend_04_SF-30_Amendment_Form_2019_08_13.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_04_Solicitation_Questions_and_Answers_2019_08_13.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_03_SF-30_Amendment_Form_2019_08_12.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_03_Attach_01_Solicitation_Exhibit_02_SF-1449_Solicitation_Form_2019_08_12.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_20_Service_Call_Log_May_2019_-_July_2019.xlsx XLSX spreadsheet
47PB0019R0002_Tab_10_Solicitation_Amend_02_Solicitation_Questions_and_Answers_2019_08_02.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_01_Proposal_Checklist_Cover_Sheet_2019_08_02.docx DOCX document
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_23_GSA-Approved_Devices.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_15_SCA_WD_Suffolk_2015_4047_Rev_11_2019_07_16.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_02_SF-30_Amendment_Form_2019_08_02.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_25_GSA_Region_1_NCMMS_Startup_Flowchart.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_10_QASP_2019_08_02.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_02_Solicitation_Changes_Summary_2019_08_02.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_03_Solicitation_Line_Item_Pricing_Table_2019_08_02.xlsx XLSX spreadsheet
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_22_Construction_Orders_2016_-_2018.xlsx XLSX spreadsheet
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_04_Building_Information_Sheet_2019_08_02.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_24_GSA_Region_1_NCMMS_Operations_Policy.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_06_Maintenance_Submittal_2019_08_02.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_11_Unit_Price_Agreement_2019_08_02.xlsx XLSX spreadsheet
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_18_Equipment_List_2019_08_02.xlsx XLSX spreadsheet
47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_26_Child_Care_Equipment_Inventory.xlsx XLSX spreadsheet
47PB0019R0002_Tab_10_Solicitation_Amend_02_Solicitation_2019_08_02.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_01_Attach_07_Pre-Proposal_Conference_Presentation_2019_07_17.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_01_Attach_03_Solicitation_Exhibit_01_Proposal_Checklist_Cover_Sheet_2019_07_18.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_01_Attach_06_Solicitation_Exhibit_18_PBS_Maintenance_Standards_Guide_2018.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_01_Attach_08_Pre-Proposal_Conference_Sign-in_Sheet_2019_07_17.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_01_SF-30_Amendment_Form_2019_07_18.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_01_Attach_05_Solicitation_Exhibit_17_Equipment_List.xlsx XLSX spreadsheet
47PB0019R0002_Tab_10_Solicitation_Amend_01_Attach_01_Solicitation_2019_07_18.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_01_Attach_02_Solicitation_Changed_Pages_2019_07_18.pdf PDF
47PB0019R0002_Tab_10_Solicitation_Amend_01_Attach_04_Solicitation_Exhibit_02_SF-1449_Solicitation_Form_2019_07_18.pdf PDF
47PB0019R0002_Solicitation_Exhibit_18_GSA_Public_Building_Maintenance_Standards_Guide_2018_12_31.pdf PDF
47PB0019R0002_Solicitation_Exhibit_17_Equipment_List.xlsx XLSX spreadsheet
47PB0019R0002_Solicitation_Exhibit_07_Construction_Services_Form.xlsx XLSX spreadsheet
47PB0019R0002_Solicitation_Exhibit_11_Unit_Price_Agreement.xlsx XLSX spreadsheet
47PB0019R0002_Solicitation_Exhibit_16_Past_Performance_Reference_Form.doc DOC document
47PB0019R0002_Solicitation_2019_07_12.pdf PDF
47PB0019R0002_Solicitation_Exhibit_06_Maintenance_Submittal.pdf PDF
47PB0019R0002_Solicitation_Exhibit_12_CBA_WD_1989-0460_Rev_16_2018_10_09.pdf PDF
47PB0019R0002_Solicitation_Exhibit_15_GSA_Form_527_Contractor_Qualifications_and_Financial_Information.pdf PDF
47PB0019R0002_Solicitation_Exhibit_09_Smart_Buildings.pdf PDF
47PB0019R0002_Solicitation_Exhibit_14_DB_WD_MA190001_Rev_04_2019_07_05.pdf PDF
47PB0019R0002_Solicitation_Exhibit_03_Solicitation_Line_Item_Pricing_Table.xlsx XLSX spreadsheet
47PB0019R0002_Solicitation_Exhibit_02_SF-1449_Solicitation_Form.pdf PDF
47PB0019R0002_Solicitation_Exhibit_05_Energy_Water_Monthly_Report.pdf PDF
47PB0019R0002_Solicitation_Exhibit_10_QASP.pdf PDF
47PB0019R0002_Solicitation_Exhibit_04_Building_Information_Sheet.pdf PDF
47PB0019R0002_Solicitation_Exhibit_13_CBA_SIGNED_2018_07_31.pdf PDF
47PB0019R0002_Solicitation_Exhibit_01_Proposal_Checklist_Cover_Sheet.pdf PDF
47PB0019R0002_Solicitation_Exhibit_08_Chart_of_Deliverables.pdf PDF
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

JFK Operations and Maintenance
Solicitation 47PB0019R0002
Exhibit 20 (Repairs: 2016 - 2019)
ASR #Repair, Alt or MiscCategorySub CategoryLocationDescriptionCostOrderedCompleted
873RepairRepairPlumbingGarageCall-in, repair leak / 1" condensate line / Low-Rise Garage East$501.451/8/161/8/16
874RepairRepairElectricalBasementReplace Kato Generator radiator.$50,161.701/15/161/15/16
875RepairRepairHVACMech. RoomReplace Controal Damper, East Tower, High-Rise Mechanical Rm. 15th floor$2,929.771/19/166/29/16
878RepairRepairPlumbingMech. RoomReplace Leonard Mixing valve Low-Rise Basement$5,232.941/27/163/25/16
879RepairRepairCafeteriaCafeteriaReplace Walk-in Cooler$16,248.681/29/162/4/16
881RepairRepairHVACLoading DockReplace Modinesteam heater$2,879.972/4/163/25/16
883RepairRepairGeneralGarageEmergency call to repair Gate Arm and Garage Door-Outgoing Garage. 1/28/16$376.452/4/164/29/16
886RepairRepairLightingGSAASR to purchase replacement projector light-bulbs for Rm. 2075 Conference Room$252.322/11/164/29/16
887RepairRepairPlumbingChildcareRepair rense arm assambly of the Dishwasher in the Daycare Kitchen$746.802/17/164/29/16
889RepairRepairPlumbingMech. RoomReplace Gate-Valve feeding 27th floor holding tank.$5,448.182/23/166/29/16
914RepairRepairElectricalGSAReplace damaged cable inside control panel for the loading dock Light signal at the guard shack low-rise bldg.$1,010.117/11/1612/8/16
917RepairMechanicalMechanicalMech. RoomRebuild Fire Pump on the 26th floor$6,521.207/20/1610/28/16
928RepairRepairPlumbingBasementReplace 2 Hot Water Tanks located in the High-Rise Basement$21,190.808/30/1612/7/16
929RepairRepairPlumbingMechanicalReplace Steam/Electric Heaters in the high-Rise Lobby overhang$92,961.609/2/163/10/17
930RepairRepairCaulkingMechanicalRepalce caulking in High-Rise overhang Soffit Joints$64,477.699/13/161/13/17
948RepairRepairPlumbingBasementReplace 2 heat exchangers in the High-Rise Basement$14,175.0011/21/165/19/17
957RepairRepairHVACVARpalce damaged Tcmp/Comtrol sensor in 14th floor HVAC unit.$1,636.4112/14/165/25/17
958RepairRepairLocksGround FloorReplace Lock-Set in Rm. G-37A Ground Floor$597.3712/16/1612/16/16
959RepairRepairMisc.ChildcareReplace Electric Range and Dryer in childcare$1,744.1412/16/162/24/17
971RepairMisc.Misc.Loading DockRepair Guard Shack at the Loading Dock$6,843.232/24/178/14/17
979RepairRepairElectricalHHSChange 250v 20amp outlet with 125v 20amp outlet for HHS rm 2375$416.043/30/174/14/17
981RepairRepairGeneralDockReplace loading dock sliding gate$17,223.644/6/179/27/17
982RepairRepairConstructionDEARepair/Patches to approx 9200 SF of LR roof. Also includes repairs within DEA space.$88,638.094/11/1710/2/17
990RepairMechanicalHVACMachine RoomReplace fluid coils in the 4th floor west AHU$30,823.594/25/176/26/17
995RepairConstructionPlumbingGSAReplace 40' of 3" Lead-Oakum Pipe in rm. 2475$2,620.815/23/178/14/17
997RepairConstructionPlumbingGSA100' of 5" Drain pipe replace in G-37$7,280.045/30/178/14/17
999RepairMechanicalPlumbingBasementEmergency replacement of a 10' section of 10" condensate main pipe in the basement plant.$9,989.696/6/178/14/17
1000RepairRepairBldg SupportGarageReplace fequency drive for the out-going garage door gate arm.$2,310.196/7/1710/13/17
1004RepairRepairLocksICEInstall (2) 100 series locks in room 1775 for ICE$1,172.056/13/1712/1/17
1017RepairRepairGeneralGSACall-in 6/8/17 - Repair pedestrian door leading to the Low-Rise garage.$367.648/24/1711/30/17
1018RepairRepairHVACGSACall-in - 7/2/17 - Repair glycol pump in 3rd floor high rise mchine rm.$367.648/24/1710/13/17
1019RepairRepairMisc.GSACall-in - 7/16/17 - Repair gate-arm incomming garage door$338.448/24/1710/13/17
1020RepairRepairHVACGSACall-in 8/12/17 - Repair HVAC unit in E-310$367.648/24/1710/13/17
1021RepairRepairMisc.DaycareRepairs to Hobart Dishwasher$1,418.418/25/1711/26/17
1027RepairRepairPaintingSSAPatch, Sand, and repaint door in rm. 1880$412.709/14/172/12/18
1028RepairRepairMisc.GSAReplace loop detector located at the Low-Rise loading dock Sudbury Street side of the bldg.$1,895.599/14/172/12/18
1030RepairRepairHVACSSAL&M to replace the broken compressor on the AC unit in the SSA server room 1925.$5,016.869/15/1712/20/17
1046RepairRepairFlooringHHSRemove Approx. 2 raised floor tiles computer HHS rms. 2150/2160$892.1910/17/173/15/18
1071RepairMechanicalEquipmentGSAReplace T-Stat on the consolidated generator.$6,231.201/23/185/29/18
1074RepairRepairMisc.Loading DockReplace the Overhead Roll-up door in the Loading-Dock bays (1) and (2)$13,287.361/29/185/29/18
1075RepairMechanicalPlumbingMech. RoomRepair the energency fire-pump tank on the 26th floor high-rise.$7,285.202/1/185/29/18
1080RepairRepairPlumbingMech. RoomReplace 5-inch Steam valve in the High-Rise Basemtn.$4,230.203/14/188/2/18
1082RepairRepairFire Life/SafetyGarageRepair Fire Pump Control Panel in the Low-Rise Garage.$3,492.563/30/188/2/18
1083RepairRepairMechanicalLoading DockCall-in 1-8-18 - Make repairs to the Loading Dock Garage doors.$1,638.484/17/189/26/18
1084RepairRepairMechanicalLoading DockCall-in 1-16-18 - Tuesday evening the overhead door buckled and needed repairs in-order to close and secure-it.$2,500.004/17/189/26/18
1085RepairRepairFire Life/SafetyGarageCall-in 3-20-18 1100hrs - Low pressure switch for the Low-Rise fire pump was activated and set-off the Low-Rise bldg. Fire-Alarm$1,386.004/17/189/26/18
1086RepairRepairPlumbingGarageCall-in 3-26-18 - Mega center called 1030hrs about a water leak in the parking garage above space #115$373.444/17/189/26/18
1087RepairRepairElectricalGarageReplacement of the water pump on the Katolite emergency generator$4,997.944/23/188/2/18
1088RepairRepairMechanicalMech. RoomHVAC repairs - Work topics include Chiller 1 diaphragms, motor for chilled water pump 1, purge units for York Chillers 3&4, cooling tower backflow & piping, chilled water pump for chiller #3 and hot water perimeter pump$74,553.684/23/182/4/19
1089RepairConstructionPlumbingMech. RoomReplac 10ft of 2.5in copper pipe and 2.5 inch iron pipe in the 6th floor Mech Rm. Of the High-Rise$4,333.984/30/1810/25/18
1090RepairRepairHVACGarageReplace damaged compressor and motor in the McQuay AC Unit that supplies G80 in the low-rise at the JFK$3,382.165/14/188/2/18
1091RepairConstructionHVACBoiler RoomReplace 50 feet of 12 inch Condenser pipe and (10) 90 degree, 12 inch elbows$77,658.945/21/18
1095RepairRepairCafeteriaCafeteriaReplace the compressor for the frig unit for the deli table in the Cafe$1,305.247/3/189/13/18
1099RepairRepairMisc.MechanicalRepair (2) pieces of broken glass located over the city-hall side entrance to the bldg.$1,269.487/24/1811/5/18
1101RepairRepairCafeteriaCafeteriaInstall new compressor in the salad bar.$4,412.087/25/182/4/19
1115RepairRepairPlumbingMechanicalReplace (13) 2 1/2" Butterfly valaves in the High-Rise stairwells and (4) 14" butterfly in the High-Rise basement$75,028.9411/6/18
1138RepairConstructionConstructionGSARepair concrete pad for the outgoing card reader at the half circle$1,191.814/19/19
1139RepairConstructionHVACBoiler RoomReplace Thrust bearing seal chiller #3$19,938.314/19/19
1140RepairConstructionConstructionDOLRe-Carpet Rm. E-135 "Quarter turning the carpet tiles"$1,015.874/24/19
1148RepairRepairPlumbingCISReplace 5 broken drain pipes located above the ceiling in the 1st floor CIS file rm. E-190.$2,379.626/14/19
1150RepairRepairPlumbingBoiler RoomReplace suction elbow and PRV valve in Chiller #3$14,220.116/25/19
1152RepairRepairMisc.ChildcareReplace monitor in Child care center$532.177/3/19
1153RepairRepairPlumbingCISReplace water foutain in 1st floor Low-Rise CIS space.$4,155.497/3/19
56Repairs (2016 - 2018)Total Repairs (2016 - 2018)$754,853.94
63Repairs (To-Date)Total Repairs (To-Date)$798,287.32
2016$289,092.58
2017$178,394.48
2018$287,366.88
3-Year Average$251,617.98