47PB0019R0002_Tab_10_Solicitation_Amend_02_Exhibit_21_Repairs_2016_-_2019.xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- Operations and Facilities Maintenance Services at the John F. Kennedy Federal Building in Boston, MA
- Solicitation number
- 47PB0019R0002
About this file
Exhibit 21 Repairs 2016 - 2019
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| JFK Operations and Maintenance | ||||||||
| Solicitation 47PB0019R0002 | ||||||||
| Exhibit 20 (Repairs: 2016 - 2019) | ||||||||
| ASR # | Repair, Alt or Misc | Category | Sub Category | Location | Description | Cost | Ordered | Completed |
| 873 | Repair | Repair | Plumbing | Garage | Call-in, repair leak / 1" condensate line / Low-Rise Garage East | $501.45 | 1/8/16 | 1/8/16 |
| 874 | Repair | Repair | Electrical | Basement | Replace Kato Generator radiator. | $50,161.70 | 1/15/16 | 1/15/16 |
| 875 | Repair | Repair | HVAC | Mech. Room | Replace Controal Damper, East Tower, High-Rise Mechanical Rm. 15th floor | $2,929.77 | 1/19/16 | 6/29/16 |
| 878 | Repair | Repair | Plumbing | Mech. Room | Replace Leonard Mixing valve Low-Rise Basement | $5,232.94 | 1/27/16 | 3/25/16 |
| 879 | Repair | Repair | Cafeteria | Cafeteria | Replace Walk-in Cooler | $16,248.68 | 1/29/16 | 2/4/16 |
| 881 | Repair | Repair | HVAC | Loading Dock | Replace Modinesteam heater | $2,879.97 | 2/4/16 | 3/25/16 |
| 883 | Repair | Repair | General | Garage | Emergency call to repair Gate Arm and Garage Door-Outgoing Garage. 1/28/16 | $376.45 | 2/4/16 | 4/29/16 |
| 886 | Repair | Repair | Lighting | GSA | ASR to purchase replacement projector light-bulbs for Rm. 2075 Conference Room | $252.32 | 2/11/16 | 4/29/16 |
| 887 | Repair | Repair | Plumbing | Childcare | Repair rense arm assambly of the Dishwasher in the Daycare Kitchen | $746.80 | 2/17/16 | 4/29/16 |
| 889 | Repair | Repair | Plumbing | Mech. Room | Replace Gate-Valve feeding 27th floor holding tank. | $5,448.18 | 2/23/16 | 6/29/16 |
| 914 | Repair | Repair | Electrical | GSA | Replace damaged cable inside control panel for the loading dock Light signal at the guard shack low-rise bldg. | $1,010.11 | 7/11/16 | 12/8/16 |
| 917 | Repair | Mechanical | Mechanical | Mech. Room | Rebuild Fire Pump on the 26th floor | $6,521.20 | 7/20/16 | 10/28/16 |
| 928 | Repair | Repair | Plumbing | Basement | Replace 2 Hot Water Tanks located in the High-Rise Basement | $21,190.80 | 8/30/16 | 12/7/16 |
| 929 | Repair | Repair | Plumbing | Mechanical | Replace Steam/Electric Heaters in the high-Rise Lobby overhang | $92,961.60 | 9/2/16 | 3/10/17 |
| 930 | Repair | Repair | Caulking | Mechanical | Repalce caulking in High-Rise overhang Soffit Joints | $64,477.69 | 9/13/16 | 1/13/17 |
| 948 | Repair | Repair | Plumbing | Basement | Replace 2 heat exchangers in the High-Rise Basement | $14,175.00 | 11/21/16 | 5/19/17 |
| 957 | Repair | Repair | HVAC | VA | Rpalce damaged Tcmp/Comtrol sensor in 14th floor HVAC unit. | $1,636.41 | 12/14/16 | 5/25/17 |
| 958 | Repair | Repair | Locks | Ground Floor | Replace Lock-Set in Rm. G-37A Ground Floor | $597.37 | 12/16/16 | 12/16/16 |
| 959 | Repair | Repair | Misc. | Childcare | Replace Electric Range and Dryer in childcare | $1,744.14 | 12/16/16 | 2/24/17 |
| 971 | Repair | Misc. | Misc. | Loading Dock | Repair Guard Shack at the Loading Dock | $6,843.23 | 2/24/17 | 8/14/17 |
| 979 | Repair | Repair | Electrical | HHS | Change 250v 20amp outlet with 125v 20amp outlet for HHS rm 2375 | $416.04 | 3/30/17 | 4/14/17 |
| 981 | Repair | Repair | General | Dock | Replace loading dock sliding gate | $17,223.64 | 4/6/17 | 9/27/17 |
| 982 | Repair | Repair | Construction | DEA | Repair/Patches to approx 9200 SF of LR roof. Also includes repairs within DEA space. | $88,638.09 | 4/11/17 | 10/2/17 |
| 990 | Repair | Mechanical | HVAC | Machine Room | Replace fluid coils in the 4th floor west AHU | $30,823.59 | 4/25/17 | 6/26/17 |
| 995 | Repair | Construction | Plumbing | GSA | Replace 40' of 3" Lead-Oakum Pipe in rm. 2475 | $2,620.81 | 5/23/17 | 8/14/17 |
| 997 | Repair | Construction | Plumbing | GSA | 100' of 5" Drain pipe replace in G-37 | $7,280.04 | 5/30/17 | 8/14/17 |
| 999 | Repair | Mechanical | Plumbing | Basement | Emergency replacement of a 10' section of 10" condensate main pipe in the basement plant. | $9,989.69 | 6/6/17 | 8/14/17 |
| 1000 | Repair | Repair | Bldg Support | Garage | Replace fequency drive for the out-going garage door gate arm. | $2,310.19 | 6/7/17 | 10/13/17 |
| 1004 | Repair | Repair | Locks | ICE | Install (2) 100 series locks in room 1775 for ICE | $1,172.05 | 6/13/17 | 12/1/17 |
| 1017 | Repair | Repair | General | GSA | Call-in 6/8/17 - Repair pedestrian door leading to the Low-Rise garage. | $367.64 | 8/24/17 | 11/30/17 |
| 1018 | Repair | Repair | HVAC | GSA | Call-in - 7/2/17 - Repair glycol pump in 3rd floor high rise mchine rm. | $367.64 | 8/24/17 | 10/13/17 |
| 1019 | Repair | Repair | Misc. | GSA | Call-in - 7/16/17 - Repair gate-arm incomming garage door | $338.44 | 8/24/17 | 10/13/17 |
| 1020 | Repair | Repair | HVAC | GSA | Call-in 8/12/17 - Repair HVAC unit in E-310 | $367.64 | 8/24/17 | 10/13/17 |
| 1021 | Repair | Repair | Misc. | Daycare | Repairs to Hobart Dishwasher | $1,418.41 | 8/25/17 | 11/26/17 |
| 1027 | Repair | Repair | Painting | SSA | Patch, Sand, and repaint door in rm. 1880 | $412.70 | 9/14/17 | 2/12/18 |
| 1028 | Repair | Repair | Misc. | GSA | Replace loop detector located at the Low-Rise loading dock Sudbury Street side of the bldg. | $1,895.59 | 9/14/17 | 2/12/18 |
| 1030 | Repair | Repair | HVAC | SSA | L&M to replace the broken compressor on the AC unit in the SSA server room 1925. | $5,016.86 | 9/15/17 | 12/20/17 |
| 1046 | Repair | Repair | Flooring | HHS | Remove Approx. 2 raised floor tiles computer HHS rms. 2150/2160 | $892.19 | 10/17/17 | 3/15/18 |
| 1071 | Repair | Mechanical | Equipment | GSA | Replace T-Stat on the consolidated generator. | $6,231.20 | 1/23/18 | 5/29/18 |
| 1074 | Repair | Repair | Misc. | Loading Dock | Replace the Overhead Roll-up door in the Loading-Dock bays (1) and (2) | $13,287.36 | 1/29/18 | 5/29/18 |
| 1075 | Repair | Mechanical | Plumbing | Mech. Room | Repair the energency fire-pump tank on the 26th floor high-rise. | $7,285.20 | 2/1/18 | 5/29/18 |
| 1080 | Repair | Repair | Plumbing | Mech. Room | Replace 5-inch Steam valve in the High-Rise Basemtn. | $4,230.20 | 3/14/18 | 8/2/18 |
| 1082 | Repair | Repair | Fire Life/Safety | Garage | Repair Fire Pump Control Panel in the Low-Rise Garage. | $3,492.56 | 3/30/18 | 8/2/18 |
| 1083 | Repair | Repair | Mechanical | Loading Dock | Call-in 1-8-18 - Make repairs to the Loading Dock Garage doors. | $1,638.48 | 4/17/18 | 9/26/18 |
| 1084 | Repair | Repair | Mechanical | Loading Dock | Call-in 1-16-18 - Tuesday evening the overhead door buckled and needed repairs in-order to close and secure-it. | $2,500.00 | 4/17/18 | 9/26/18 |
| 1085 | Repair | Repair | Fire Life/Safety | Garage | Call-in 3-20-18 1100hrs - Low pressure switch for the Low-Rise fire pump was activated and set-off the Low-Rise bldg. Fire-Alarm | $1,386.00 | 4/17/18 | 9/26/18 |
| 1086 | Repair | Repair | Plumbing | Garage | Call-in 3-26-18 - Mega center called 1030hrs about a water leak in the parking garage above space #115 | $373.44 | 4/17/18 | 9/26/18 |
| 1087 | Repair | Repair | Electrical | Garage | Replacement of the water pump on the Katolite emergency generator | $4,997.94 | 4/23/18 | 8/2/18 |
| 1088 | Repair | Repair | Mechanical | Mech. Room | HVAC repairs - Work topics include Chiller 1 diaphragms, motor for chilled water pump 1, purge units for York Chillers 3&4, cooling tower backflow & piping, chilled water pump for chiller #3 and hot water perimeter pump | $74,553.68 | 4/23/18 | 2/4/19 |
| 1089 | Repair | Construction | Plumbing | Mech. Room | Replac 10ft of 2.5in copper pipe and 2.5 inch iron pipe in the 6th floor Mech Rm. Of the High-Rise | $4,333.98 | 4/30/18 | 10/25/18 |
| 1090 | Repair | Repair | HVAC | Garage | Replace damaged compressor and motor in the McQuay AC Unit that supplies G80 in the low-rise at the JFK | $3,382.16 | 5/14/18 | 8/2/18 |
| 1091 | Repair | Construction | HVAC | Boiler Room | Replace 50 feet of 12 inch Condenser pipe and (10) 90 degree, 12 inch elbows | $77,658.94 | 5/21/18 | |
| 1095 | Repair | Repair | Cafeteria | Cafeteria | Replace the compressor for the frig unit for the deli table in the Cafe | $1,305.24 | 7/3/18 | 9/13/18 |
| 1099 | Repair | Repair | Misc. | Mechanical | Repair (2) pieces of broken glass located over the city-hall side entrance to the bldg. | $1,269.48 | 7/24/18 | 11/5/18 |
| 1101 | Repair | Repair | Cafeteria | Cafeteria | Install new compressor in the salad bar. | $4,412.08 | 7/25/18 | 2/4/19 |
| 1115 | Repair | Repair | Plumbing | Mechanical | Replace (13) 2 1/2" Butterfly valaves in the High-Rise stairwells and (4) 14" butterfly in the High-Rise basement | $75,028.94 | 11/6/18 | |
| 1138 | Repair | Construction | Construction | GSA | Repair concrete pad for the outgoing card reader at the half circle | $1,191.81 | 4/19/19 | |
| 1139 | Repair | Construction | HVAC | Boiler Room | Replace Thrust bearing seal chiller #3 | $19,938.31 | 4/19/19 | |
| 1140 | Repair | Construction | Construction | DOL | Re-Carpet Rm. E-135 "Quarter turning the carpet tiles" | $1,015.87 | 4/24/19 | |
| 1148 | Repair | Repair | Plumbing | CIS | Replace 5 broken drain pipes located above the ceiling in the 1st floor CIS file rm. E-190. | $2,379.62 | 6/14/19 | |
| 1150 | Repair | Repair | Plumbing | Boiler Room | Replace suction elbow and PRV valve in Chiller #3 | $14,220.11 | 6/25/19 | |
| 1152 | Repair | Repair | Misc. | Childcare | Replace monitor in Child care center | $532.17 | 7/3/19 | |
| 1153 | Repair | Repair | Plumbing | CIS | Replace water foutain in 1st floor Low-Rise CIS space. | $4,155.49 | 7/3/19 |
| 56 | Repairs (2016 - 2018) | Total Repairs (2016 - 2018) | $754,853.94 |
| 63 | Repairs (To-Date) | Total Repairs (To-Date) | $798,287.32 |
| 2016 | $289,092.58 | ||
| 2017 | $178,394.48 | ||
| 2018 | $287,366.88 | ||
| 3-Year Average | $251,617.98 |
File details come from the government source that posted it.