This solicitation notice provides information about an upcoming construction project opportunity with the Department of Veterans Affairs. The VA plans to solicit bids and award a firm-fixed-price contract to construct a new surgery suite space known as a Clean Core addition at the Providence, Rhode Island VA Medical Center. The project scope involves constructing approximately 2,900 square feet of new space in an elevated second floor addition and renovating around 3,900 square feet of existing space adjacent to the existing operating room suite. The construction services are detailed in drawings and specifications for Project Number 650-337. The period of performance is expected to be approximately 490 calendar days from the notice to proceed. The anticipated magnitude of construction is between $5 million and $10 million. The solicitation will be issued as a request for proposal conducted according to FAR Parts 15, 19, and 36 and evaluated using the lowest price technically acceptable process. The opportunity is set aside solely for service-disabled veteran-owned small businesses.

36E77619R0097 Attachment 9 - Mechanical Plans.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Construct Clean Core (VA-19-00058573), newest first.
File Type Posted
36E77619R0097-0007000.docx DOCX document
36E77619R0097-0006000.docx DOCX document
36E77619R0097-0005000.docx DOCX document
36E77619R0097-0005001.pdf PDF
36E77619R0097-0004001.docx DOCX document
36E77619R0097-0004005.pdf PDF
36E77619R0097-0004004.pdf PDF
36E77619R0097-0004002.pdf PDF
36E77619R0097-0004000.docx DOCX document
36E77619R0097-0004003.pdf PDF
36E77619R0097-0003000.docx DOCX document
36E77619R0097-0003001.pdf PDF
36E77619R0097-0002001.pdf PDF
36E77619R0097-0002002.pdf PDF
36E77619R0097-0002000.docx DOCX document
36E77619R0097-0001031.pdf PDF
36E77619R0097-0001030.docx DOCX document
36E77619R0097-010.pdf PDF
36E77619R0097-006.pdf PDF
36E77619R0097-008.pdf PDF
36E77619R0097-013.pdf PDF
36E77619R0097-009.pdf PDF
36E77619R0097-014.pdf PDF
36E77619R0097-011.pdf PDF
36E77619R0097-003.docx DOCX document
36E77619R0097-015.docx DOCX document
36E77619R0097-007.pdf PDF
36E77619R0097-004.pdf PDF
36E77619R0097-005.zip ZIP file
36E77619R0097-007.pdf PDF
36E77619R0097-009.pdf PDF
36E77619R0097-008.pdf PDF
36E77619R0097-012.pdf PDF
36E77619R0097-004.pdf PDF
36E77619R0097-015.docx DOCX document
36E77619R0097-011.pdf PDF
36E77619R0097-014.pdf PDF
36E77619R0097-013.pdf PDF
36E77619R0097-005.zip ZIP file
36E77619R0097-006.pdf PDF
36E77619R0097-003.docx DOCX document
36E77619R0097-010.pdf PDF
36E77619R0097-000.docx DOCX document
36E77619R0097-000.docx DOCX document
Show all 44

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMS

TIGHT SHUT-OFF VALVE

FD (3 HR) FIRE DAMPER (3 HOUR RATED)

S2 4

SUPPLY DIFFUSER ( TYPE 2 )

400 CFM EA

DIFFUSER DESCRIPTION

QUANTITY

FIRE DAMPER (1 1/2 HOUR RATED)

( SEE REG., GRILLES & DIFF SCHEDULE )

BD

H

HS

V

DN

10'-0" FL

10.0 gpm

T

V

ACOUSTICALLY LINED DUCT

LENGTH, 10,000 BTU/HR) WITHOUT DAMPER

RADIATION I.D. ( TYPE A, 10'-0" FINNED1

10'-0" FL/D

10.0 GPM LENGTH, 10,000 BTU/HR) WITH DAMPER

A M10.1

ACV 2 - WAY

ACV 3 - WAY

BALANCE VALVE

BACKDRAFT DAMPER

CAP - PIPE

CHECK VALVE

COMBINATION BALANCING, FLOW MEASURING &

DUCT SECTION - SUPPLY/OUTDOOR AIR

DUCT SECTION - RETURN AIR

DUCT TURNING VANES

FLEXIBLE DUCT

FLOAT & THERMOSTATIC TRAP

ISOLATION VALVE

GLOBE VALVE

HUMIDISTAT

HUMIDITY SENSOR

LOCKSHIELD GATE VALVE

LOUVER

MANUAL AIR VENT

MOTORIZED DAMPER

OS&Y GATE VALVE

PETCOCK FOR GAUGE CONNECTION

PIPE ANCHOR

PIPE GUIDE

PITCH DOWN

PLUG VALVE

PRESSURE GAUGE

PRESSURE REDUCING VALVE

PRESSURE RELIEF VALVE

PRESSURE RELIEF DAMPER

RADIATION I.D. ( TYPE A, 10'-0" FINNED

REDUCER - CONCENTRIC

REDUCER - ECCENTRIC

RETURN AIR

SECTION I.D. ( SECTION A SHOWN ON DWG. M10.1)

SMOKE DAMPER

STRAINER

SUPPLY AIR

TAKE - OFF FROM BOTTOM OF PIPE

TAKE - OFF FROM TOP OF PIPE

TEMPERATURE SENSOR

THERMOMETER

THERMOMETER WELL

THERMOSTAT

THERMOSTAT COOLING

THERMOSTAT HEATING

THERMOSTAT - NIGHT

THERMOSTAT - HEATING/COOLING

THERMOSTATIC TRAP

UNION

VOLUME DAMPER

DUCT DIAMETER

CB COUNTERBALANCED DAMPER

S (SUPPLY) R (RETURN)

E (EXHAUST) T (TRANSFER)

DESCRIPTIONSYMBOL

S

PRD

M

F

AIRFLOW MEASURING STATION

DUCT MOUNTED SMOKE DETECTOR

T

TS

TC

H

N

H/C

T

T

T

DESCRIPTIONSYMBOL

EXISTING EQUIPMENT TO REMAIN

NEW EQUIPMENT

SD

EXISTING SUPPLY PIPING TO REMAIN

EXISTING RETURN PIPING TO REMAIN

NEW SUPPLY PIPING

NEW RETURN PIPING

EXISTING DUCTWORK TO REMAIN

NEW DUCTWORK

PIPE DOWN

PIPE UP

DUCT SECTION - EXHAUST AIR

DIFFERENTIAL PRESSURE SENSORDPS

INVERTED BUCKET TRAPIB

STATIC PRESSURE SENSORSPS

Graphic Scale

Graphic Scale

Graphic Scale

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL CONSTRUCTION

DOCUMENTS

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Auburn, ME 207.784.5100

Boston, MA 617.426.5050

Portland, ME 207.775.0053

Portsmouth, NH 603.626.1242 c HA PROJECT NUMBER: 13586

CONSTRUCT CLEAN CORE ADDITION TO

SURGICAL SUITE

PROVIDENCE, RHODE ISLAND

650-337SCALE:

C :\U se rs

\js la p\ D oc um en ts

R ev it

L oc al s\

6-m ec h-ce nt ra l_ js la p.

rv t 2/

/2

2:

:0

PM

M00.1

LEGEND & GENERAL NOTES

02-22-19 CG JSL

ABBREV DESCRIPTION

LAT LEAVING AIR TEMPERATURE

LPCR LOW PRESSURE CONDENSATE

RETURN (LESS THAN 15 PSI)

LPS LOW PRESSURE STEAM(LESS THAN

15 PSI)

LRA LOCKED ROTOR AMPS

LSGV LOCK & SHIELD GATE VALVE

LWT LEAVING WATER TEMPERATURE

M MOTORIZED DAMPER

MAX MAXIMUM

MBH 1000 BRITISH THERMAL UNITS

MCA MINIMUM CIRCUIT AMPS

MIN MINIMUM

MOPD MAXIMUM OVERCURRENT

PROTECTIVE DEVICE

MPCR MEDIUM PRESSURE CONDENSATE

RETURN(16-30 PSIG)

MPS MEDIUM PRESSURE STEAM (16-30

PSIG)

NA NOT APPLICABLE

NC NOISE CRITERIA

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NTS NOT TO SCALE

OA OUTSIDE AIR

OC ON CENTER

OED OPEN END DUCT

OS&Y OUTSIDE SCREW & YOKE GATE

VALVE

PD PRESSURE DROP

PRD PRESSURE RELIEF DAMPER

PRV PRESSURE REDUCING VALVE

PSI POUNDS PER SQUARE INCH

RET RETURN

RET RETURN

RL RIFRIGERANT LIQUID

RLA RATED LOAD AMPERES

RPM REVOLUTIONS PER MINUTE

RS REFRIGERANT SUCTION

S SMOKE DAMPER

S/F SMOKE AND FIRE COMBINATION

DAMPER

SP STATIC PRESSURE

SS STAINLESS STEEL

SUP SUPPLY

TEMP TEMPERATURE

TT THERMOSTATIC TRAP

TYP TYPICAL

V VOLUME DAMPER

VFD VARIABLE FREQUENCY DRIVE

W/ WITH

W/O WITHOUT

WC WATER COLUMN

WG WATER GAUGE

WPD WATER PRESSURE DROP

WWMS WELDED WIRE MESH SCREEN

Z ZONE DAMPER

PREFIX OF X EXISTING

ABBREV DESCRIPTION

ACV AUTOMATIC CONTROL VALVE

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

ALD ACOUSTICAL LINED DUCT

AMS AIRFLOW MEASURING STATION

APD AIR PRESSURE DROP

ATC AUTOMATIC TEMPERATURE

CONTROL

B BAROMETRIC DAMPER

BD BACKDRAFT DAMPER

BHP BRAKE HORSEPOWER

BPD BYPASS DAMPER

BTU BRITISH THERMAL UNITS

CBD COUNTERBALANCED BACKDRAFT

DAMPER

CFM CUBIC FEET PER MINUTE

CHWR CHILLED WATER RETURN

CHWS CHILLED WATER SUPPLY

CO CLEANOUT

CTE CONNECT TO EXISTING

CWR CONDENSER WATER RETURN

CWS CONDENSER WATER SUPPLY

DCW DOMESTIC COLD WATER

DEG.F DEGREES FAHRENHEIT

DHW DOMESTIC HOT WATER

DIA DIAMETER

DN DOWN

EAT ENTERING AIR TEMPERATURE

ESP EXTERNAL STATIC PRESSURE

EWT ENTERING WATER TEMPERATURE

EXG EXISTING

EXH EXHAUST

F&T FLOAT & THERMOSTATIC TRAP

FD FIRE DAMPER

FL FINNED LENGTH OF RADIATION

FM FLOW METER

FOR FUEL OIL RETURN

FOS FUEL OIL SUPPLY

FPF FINS PER FOOT

FPI FINS PER/INCH

FPM FEET PER MINUTE

FT FEET

FT-HD FEET OF HEAD

FT-WG FEET WATER GAUGE

FTR FIN TUBE RADIATOR

GAL GALLONS

GPM GALLONS PER MINUTE

HP HORSEPOWER

HPCR HIGH PRESSURE CONDENSATE

RETURN (OVER 30 PSIG)

HPS HIGH PRESSURE STEAM (OVER

30PSIG)

HRR HEAT RECOVERY RETURN

HRS HEAT RECOVERY SUPPLY

HWR HOT WATER RETURN

HWS HOT WATER SUPPLY

IN INCHES

GENERAL NOTES

1 VISIT THE BUILDING SITE PRIOR TO BIDDING TO BECOME FAMILIAR WITH EXISTING CONDITIONS, AND TO

TAKE MEASUREMENTS AS NECESSARY FOR COMPLETION OF THE WORK ASSOCIATED WITH THE DESIGN

INTENT OF THE CONTRACT DOCUMENTS.

2 COORDINATE WORK OF MECHANICAL SUBCONTRACTOR WITH WORK OF OTHER TRADES.

3 DUCTWORK, PIPING AND EQUIPMENT ARE INDICATED DIAGRAMMATICALLY. FIELD-VERIFY LOCATIONS.

4 PRIOR TO FABRICATING DUCTWORK, COORDINATE WITH OTHER TRADES TO ENSURE THAT THE DUCTWORK

CAN BE INSTALLED WITH THE INDICATED SIZES AND LOCATIONS.FIELD-VERIFY EXISTING DUCT SIZES AND

CONDITIONS.SUBMIT ANY DISCREPANCIES OR PROPOSED CHANGES.

5 REFER TO ARCHITECTURAL REFLECTED CEILING PLAN FOR LOCATIONS OF CEILING DIFFUSERS AND REGISTERS.PROVIDE VOLUME DAMPERS SO THAT EVERY REGISTER, GRILLE AND DIFFUSER (SUPPLY, RETURN, AND EXHAUST) CAN BE INDIVIDUALLY BALANCED.

6 VERIFY INSTALLATION OF EXISTING VOLUME DAMPERS AT EACH BRANCH IN EXISTING SUPPLY DUCT.

PROVIDE ADDITIONAL VOLUME DAMPERS WHERE REQUIRED.

7 LOCATE VOLUME DAMPERS AS FAR AWAY FROM REGISTERS, GRILLES AND DIFFUSERS AS POSSIBLE TO MINIMIZE NOISE. LOCATE TO BE UNOBSTRUCTED AND EASILY ACCESSIBLE FOR TESTING AND BALANCING.

LOCATE POSSIBLE. WHERE VOLUME DAMPERS MUST BE LOCATED ABOVE HARD CEILINGS SUCH AS GYPSUM WALLBOARD, PROVIDE ACCESS PANELS AS SPECIFIED, AND NOTIFY THE ARCHITECT OF SUCH LOCATIONS VERBALLY AND IN WRITING. OBTAIN PERMISSION FROM THE ARCHITECT BEFORE INSTALLING

ACCESS PANELS.

8 DUCT ELBOWS SHALL BE LONG-RADIUS TYPE (THROAT RADIUS EQUAL TO OR GREATER THAN DUCT WIDTH IN THE PLANE OF THE TURN) WHEREVER SPACE ALLOWS. IF SPACE IS NOT ADEQUATE, PROVIDE MITERED

ELBOWS WITH TURNING VANES.

9 PROVIDE 16 GAUGE SINGLE-THICKNESS TURNING VANES AT MITERED DUCT ELBOWS. VANE EDGES

(LEADING AND TRAILING) SHALL BE TANGENTIAL TO AIRFLOW.

10 FLEXIBLE DUCT LENGTHS SHALL NOT EXCEED 5'-0"

11 PAINT DUCTWORK VISIBLE THRU CEILING OPENINGS, DUCT OPENINGS, AND REGISTERS, GRILLES, AND

DIFFUSERS WITH BLACK PAINT IN ACCORDANCE WITH DIVISION 09 SECTION "PAINTING."

12 MOUNT THERMOSTATS AND TEMPERATURE AND HUMIDITY SENSORS AT 48 INCHES AFF TO TOP OF ITEM.

PROVIDE ELECTRICAL WALL BOX ATTACHED TO FRAMING.

13 WHERE THERMOSTATS/TEMPERATURE SENSORS ARE LOCATED NEAR LIGHT SWITCHES, INSTALL SO THAT

LIGHT SWITCHES ARE NEARER TO THE DOOR JAMBS. THE INTENT IS TO LOCATE THERMOSTATS/ TEMPERATURE SENSORS SO THEY WILL NOT INTERFERE WITH ACCESSIBILITY OF LIGHT SWITCHES.

14 PIPING INDICATED IN OUTSIDE WALLS SHALL BE RUN ON THE WARM SIDE OF BUILDING INSULATION AND VAPOR BARRIER. BUILDING INSULATION BEHIND SUCH PIPING SHALL BE CONTINUOUS, WITHOUT JOINTS OR

GAPS.

15 PIPING SHALL BE CONCEALED EXCEPT IN MECHANICAL ROOMS AND AS INDICATED. WHERE PIPES DROP IN

BLOCK WALLS, PROVIDE 1/2" THICK INSULATION MINIMUM.

16 SEAL DUCTWORK AND PIPING THRU MECHANICAL ROOM FLOORS AND PARTITIONS, AND THRU FIRE-RATED

ASSEMBLIES, WITH FIRESTOP MATERIAL AS SPECIFIED.

17 CONTRACTOR SHALL ROUGH-IN AS MUCH PIPING AS POSSIBLE AHEAD OF TIME TO SERVE NEW CLEAN STEAM GENERATOR AND RELOCATED CHILLER PLANT. IN ORDER TO MINIMIZE DOWNTIME TO THE FACILITY, CONTRACTOR SHALL SCHEDULE CUT-OVER OF NEW CLEAN STEAM GENERATOR AT THE SAME TIME AS

CUT-OVER FOR RELOCATED CHILLER PLANT.

Revisions: Date:

0.5 1 1.5 2

1.8 2.2 2.5 3 4 5 6 7

G.4'

9 10

E4.8

E5

E3E2 EC.2ECEB.3EBEA.8EA

A.5 A.5'

A 3'

B

A' A.2'

C.3

D.3

C.5

B' C' D' E' F'

F

F.7' G'

H

D

EE.1

E4

G.3'

4.8'

C G.5'

4.75'

4.7'

4.5'

4'

4.3'

L

EA.1

K

J

EBB

GF.9

2'

A.6'

1'

5'

EXISTING SURGICAL SUITE

AIR HANDLER TO REMAIN EXISTING SURGICAL SUITE

AIR HANDLER TO REMAIN

M001

M001

M001

M001

M001

EXISTING DUCTWORK

TO REMAIN (TYP.)

EXISTING DIFFUSER, REGISTER

OR GRILLE TO REMAIN (TYP.)

Graphic Scale

Graphic Scale

Graphic Scale

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL CONSTRUCTION

DOCUMENTS

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Auburn, ME 207.784.5100

Boston, MA 617.426.5050

Portland, ME 207.775.0053

Portsmouth, NH 603.626.1242 c HA PROJECT NUMBER: 13586

CONSTRUCT CLEAN CORE ADDITION TO

SURGICAL SUITE

PROVIDENCE, RHODE ISLAND

650-337SCALE:

C :\U se rs

\js la p\ D oc um en ts

R ev it

L oc al s\

6-m ec h-ce nt ra l_ js la p.

rv t 2/

/2

2:

:2

PM

M05.0

GROUND FLOOR DEMOLITION

DUCTWORK

02-22-19 CG JSL

SCALE: 1/8" = 1'-0"1 GROUND FLOOR DUCT DEMO PLAN

KEY NOTES

CODE DESCRIPTION

M001 TAB CONTRACTOR TO PERFORM PRELIMINARY AIRFLOW MEASUREMENT PRIOR TO

DEMOLITION AND SUBMIT RESULTS TO ENGINEER FOR REVIEW. ONCE DEMOLITION IS

COMPLETE, TAB CONTRACTOR SHALL RE-BALANCE TO PRELIMINARY CONDITIONS (OR NEW

FLOW IF CHANGED BY SUBMITTAL REVIEW). INTERMEDIATE TAB REPORT SHALL BE

SUBMITTED TO ENGINEER FOR REVIEW. AT CONCLUSION OF PROJECT, TAB CONTRACTOR

SHALL REBALANCE TO PRELIMINARY CONDITIONS (OR NEW FLOW IF CHANGED BY

SUBMITTAL REVIEW). FINAL TAB REPORT SHALL BE SUBMITTED TO ENGINEER FOR REVIEW.

M002 TAB CONTRACTOR TO PERFORM PRELIMINARY AIRFLOW MEASUREMENT PRIOR TO

DEMOLITION AND SUBMIT RESULTS TO ENGINEER FOR REVIEW.

G.4'

9 10

E4.8

E5

E3 EBEA.8EA

A.5 A.5'

A 3'

B

A' A.2'

C.3

D.3

C.5

B' C' D' E' F'

F

F.7' G'

H

D

EE.1

E4

G.3'

4.8'

C G.5'

4.75'

4.7'

4.5'

4'

4.3'

L

EA.1

K

J

EBB

G F.92'

A.6'

1'

5'

M31.1

M31.1

M001

M001

M001

M001

M001

M001

M001

M001

M001

M001 M001

M001

EXISTING DUCT TO

REMAIN (TYP.)

EXISTING DIFFUSER, REGISTER

OR GRILLE TO REMAIN (TYP.)

STAIR K

K-1

CORRIDOR

STAFF LOUNGE AND

CONFERENCE

NURSE MANAGER

OFFICE

ANESTHESIA OFFICE

118 ANESTHESIA

CONFERENCE ROOM

118A OFFICE

PU/DO

119A

PICK UP

119B

DROP OFFICE

119C

WAITING

STAFF LOCKER

FEMALE

115 TOILET MALE

TOILET FEMALE

STAFF LOCKER MALE

113A

STAFF LOCKER MALE

113A

OFFICE

115A

OFFICE

OFFICE

OFFICE

CONFERENCE ROOM

110 BREAK / KITCHEN

STAFF WASHROOM

109A

CONSULT

STAIR TOWER-2

MENS RESTROOM

WOMENS REST ROOM

RECEPTION

160A

COMP AND PENSION

COMP AND PENSION

MECHANICAL ROOM

Graphic Scale

Graphic Scale

Graphic Scale

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL CONSTRUCTION

DOCUMENTS

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Auburn, ME 207.784.5100

Boston, MA 617.426.5050

Portland, ME 207.775.0053

Portsmouth, NH 603.626.1242 c HA PROJECT NUMBER: 13586

SCALE:

C :\U se rs

\js la p\ D oc um en ts

R ev it

L oc al s\

6-m ec h-ce nt ra l_ js la p.

rv t 2/

/2

2:

:4

PM

M05.1

FIRST FLOOR DEMOLITION

DUCTWORK

CONSTRUCT CLEAN CORE ADDITION TO

SURGICAL SUITE

PROVIDENCE, RHODE ISLAND

650-337

02-22-19 CG JSL

SCALE: 1/8" = 1'-0"1 FIRST FLOOR DUCT DEMO PLAN

KEY NOTES

CODE DESCRIPTION

M001 TAB CONTRACTOR TO PERFORM PRELIMINARY AIRFLOW MEASUREMENT PRIOR TO

DEMOLITION AND SUBMIT RESULTS TO ENGINEER FOR REVIEW. ONCE DEMOLITION IS

COMPLETE, TAB CONTRACTOR SHALL RE-BALANCE TO PRELIMINARY CONDITIONS (OR NEW

FLOW IF CHANGED BY SUBMITTAL REVIEW). INTERMEDIATE TAB REPORT SHALL BE

SUBMITTED TO ENGINEER FOR REVIEW. AT CONCLUSION OF PROJECT, TAB CONTRACTOR

SHALL REBALANCE TO PRELIMINARY CONDITIONS (OR NEW FLOW IF CHANGED BY

SUBMITTAL REVIEW). FINAL TAB REPORT SHALL BE SUBMITTED TO ENGINEER FOR REVIEW.

M002 TAB CONTRACTOR TO PERFORM PRELIMINARY AIRFLOW MEASUREMENT PRIOR TO

G.4'

9 10

E4.8

E5

E3E2 EC.2ECEB.3EBEA.8EA

A.5 A.5'

A 3'

B

A' A.2'

C.3

D.3

C.5

B' C' D' E' F'

F

F.7' G'

H

D

EE.1

E4

G.3'

4.8'

C G.5'

4.75'

4.7'

4.5'

4'

4.3'

L

EA.1

K

J

EBB

GF.9

2'

A.6'

1'

5'

EXISTING DUCTWORK

TO REMAIN (TYP.)

EXISTING DUCTWORK TO

BE REMOVED (TYP.)

EXISTING REGISTER, GRILLE

OR DIFFUSER TO BE REMOVED (TYP.)

M31.1

M31.1

EXISTING REGISTER, GRILLE

OR DIFFUSER TO REMAIN (TYP.)

M001

M001

M001

TYP. OF 16 M001 TYP. OF 10

M001

M001

M001

M001

M001 TYP. OF 10

M001 TYP. OF 10

M001

M001

M001

M001

M001

M001

M001

M001

M001

M001

M001 M001

M001

M001

M001

M001

M001 M001

M001 M001

M001M001

M001

M001 M001

M001

M001

M001

M001 M001 M001 M001 M001 M001

M001

M001

M001 M001

M001

M002

TYP. OF 8

M002

M002

M002

M002

M002

M002

STAIR-K

K-2

STAFF TOILET/SHOWER

CORRIDOR

C223

PACU

NURSE STATION

EQUIPMENT STORAGE

PATIENT TOILET

215A

OBSERVATION ROOM

CORRIDOR

C223

MALE LOCKERS

MALE LOCKERS

ANGIOPLASTY

SCRUB

210A

SEMI RESTRICTED

CORRIDOR

OR-1

208 OR-2

OR-3

SCRUB

210B

HOUSE KEEPING

215G

MINOR PROCEDURE

CORRIDOR

STAIR WELL

A-2

IT CLOSET

229A

LINEN CHUTE

OFFICE

228CORRIDOR

2-DC-1APATIENT TOILET

215F

PATIENT LOCKERS

215E

VESTIBULE

215D

CLEAN UTILITIES

215C

ANESTHESIA

WORKROOM

ELECTRICAL CLOSET

ELECTRICAL CLOSET

HOUSE KEEPING

232A

HOUSE KEEPING

232A OR STORAGE

ELEC

232C

ELEC

232D

OR STORAGE

INTERVENTIONAL PAIN

MANAGEMENT

233A

OR RECEPTION

WAITING ROOM

CORRIDOR

OFFICE

201A

OFFICE

201A

ELECTRICAL ROOM

201C

EMERGENCY

ELECTRICAL ROOM

201B

CONSULT ROOM

FEMALE LOCKERS

FEMALE LOCKERS

TOILET

202A

ELEVATOR LOBBY

L23

ELEVATOR

E-EL-2

ELEVATOR

E-EL-1

ELEVATOR LOBBY

L21

LOBBY

L22

EXAM-1

E205

EXAM-2

E206

MICROSCOPE

E207

EXAM-3

E208

CORRIDOR

C22

CAST ROOM

E204

CORRIDOR

C21

Graphic Scale

Graphic Scale

Graphic Scale

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL CONSTRUCTION

DOCUMENTS

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Auburn, ME 207.784.5100

Boston, MA 617.426.5050

Portland, ME 207.775.0053

Portsmouth, NH 603.626.1242 c HA PROJECT NUMBER: 13586

SCALE:

C :\U se rs

\js la p\ D oc um en ts

R ev it

L oc al s\

6-m ec h-ce nt ra l_ js la p.

rv t 2/

/2

2:

:0

PM

M05.2

SECOND FLOOR DEMOLITION

DUCTWORK

CONSTRUCT CLEAN CORE ADDITION TO

SURGICAL SUITE

PROVIDENCE, RHODE ISLAND

650-337

02-22-19 CG JSL

SCALE: 1/8" = 1'-0"1 SECOND FLOOR DUCT DEMO PLAN

KEY NOTES

CODE DESCRIPTION

M001 TAB CONTRACTOR TO PERFORM PRELIMINARY AIRFLOW MEASUREMENT PRIOR TO

DEMOLITION AND SUBMIT RESULTS TO ENGINEER FOR REVIEW. ONCE DEMOLITION IS

COMPLETE, TAB CONTRACTOR SHALL RE-BALANCE TO PRELIMINARY CONDITIONS (OR NEW

FLOW IF CHANGED BY SUBMITTAL REVIEW). INTERMEDIATE TAB REPORT SHALL BE

SUBMITTED TO ENGINEER FOR REVIEW. AT CONCLUSION OF PROJECT, TAB CONTRACTOR

SHALL REBALANCE TO PRELIMINARY CONDITIONS (OR NEW FLOW IF CHANGED BY

SUBMITTAL REVIEW). FINAL TAB REPORT SHALL BE SUBMITTED TO ENGINEER FOR REVIEW.

M002 TAB CONTRACTOR TO PERFORM PRELIMINARY AIRFLOW MEASUREMENT PRIOR TO

EXISTING SURGICAL SUITE

AIR HANDLER TO REMAIN

EXISTING SURGICAL SUITE

AIR HANDLER TO REMAIN

EXISTING CLEAN STEAM

GENERATOR TO BE

REMOVED

EXISTING SURGICAL SUITE

CHILLER TO BE REMOVED

EXISTING OUTPATIENT PHARMACY

CHILLER TO BE RELOCATED

EXISTING CHILLED WATER PUMPS

TO REMAIN

LPS- 6"

HWR- 3"

LPC- 2"

HPC- 3/4"

CHWS- 4"

HWS- 3"

HPS- 1"

CHWR- 6"

M06.1

EXISTING STEAM TO HOT WATER

HEAT EXCHANGERS AND PUMPS

TO REMAIN AND SERVE PROJECT

EXISTING ABOVE GROUND

EXTERIOR PIPING TO

BE REMOVED (TYP.)

PIPING TO BE

REMOVED (TYP.)

EXISTING WING E CONDENSING

UNIT TO BE RELOCATED. CUT

BACK REFRIGERANT PIPING TO

OUTSIDE WALL AND CAP FOR

RE-CONNECTION. SEE DRAWING

ES05.1 FOR MORE INFORMATION.

Graphic Scale

Graphic Scale

Graphic Scale

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL CONSTRUCTION

DOCUMENTS

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Auburn, ME 207.784.5100

Boston, MA 617.426.5050

Portland, ME 207.775.0053

Portsmouth, NH 603.626.1242 c HA PROJECT NUMBER: 13586

CONSTRUCT CLEAN CORE ADDITION TO

SURGICAL SUITE

PROVIDENCE, RHODE ISLAND

650-337SCALE:

C :\U se rs

\js la p\ D oc um en ts

R ev it

L oc al s\

6-m ec h-ce nt ra l_ js la p.

rv t 2/

/2

2:

:4

PM

M06.0

GROUND FLOOR DEMOLITION

PIPING

02-22-19 CG JSL

SCALE: 1/8" = 1'-0"1 GROUND FLOOR PIPING DEMO PLAN

HWR- 3"

HWS- 3"

LPC- 2"

HPS- 1"

HPC- 3/4"

CHWR- 6"

CHWS- 4"

LP

S

- 3

C H

W S

- 4

C H

W S

- 6

CHWS- 6"

C H

W R

- 6

H W

R

- 3

H W

S

- 3

H W

S

- 3

LPC- 1 1/4"

LPC- 2"

LPC- 2"

LPC- 1 1/4"

H W

S

- 3

/4

H W

R

- 3

/4

H W

S

- 3

H

W R

- 3

CHWS- 6"

CHWR- 6"

HPC- 3/4"

HPS- 1"

LPC- 2"

HWS- 3"

HWR- 3"

H P

S

- 1

H P

C

- 3

/4

LP

S

- 2

LP

C

- 1

H W

R

- 3

C H

W S

- 6

CHWS- 6"

CHWS- 4"

CHWS- 4"

LP

C

- 2

C H

W S

- 4

C H

W S

- 4

LP

C

- 2

C H

W S

- 4

C H

W S

- 4

LPC- 2"LPC- 2"

H P

S

- 1

H P

C

- 3

/4

HPC- 1"

HPS- 1 1/4"

LPC- 2"

HPS- 4"

LP

S

- 6

LPS- 6"

LPC- 1 1/4"

H P

S

- 1

/4

HPC- 1

LP

C- 2

C H

W R

- 4

LPS- 3"

LPC- 3"

LPS- 3"

LPC- 3"

LP

S

- 3

TEMPORARY

CHILLER BYPASS

PIPING TO BE REMOVED

Graphic Scale

Graphic Scale

Graphic Scale

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL CONSTRUCTION

DOCUMENTS

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Auburn, ME 207.784.5100

Boston, MA 617.426.5050

Portland, ME 207.775.0053

Portsmouth, NH 603.626.1242 c HA PROJECT NUMBER: 13586

SCALE:

C :\U se rs

\js la p\ D oc um en ts

R ev it

L oc al s\

6-m ec h-ce nt ra l_ js la p.

rv t 2/

/2

3:

:0

PM

M06.1

ENLARGED MECHANICAL ROOM

PIPING DEMOLITION

CONSTRUCT CLEAN CORE ADDITION TO

SURGICAL SUITE

PROVIDENCE, RHODE ISLAND

650-337

02-22-19 CG JSL

SCALE: 1/4" = 1'-0"1 ENLARGED MECHANICAL ROOM PIPING DEMOLITION

G.4'

E4.8

E5

ED

E3E2E1 EC.2ECEB.3EBEA.8EA

A.5 A.5'

A 3'

B

A' A.2'

C.3

D.3

C.5

B' C' D' E' F'

F

F.7' G'

H

D

EE.1

E4

G.3'

4.8'

C G.5'

4.75'

4.7'

4.5'

4'

4.3'

L

EA.1

K

J

EBB

GF.9

2'

A.6'

1'

5'

EXISTING AIR HANDLING

UNITS TO BE RE-BALANCED

TO ORIGINAL DESIGN FLOWS

M001

M001

M001

M001

M001

EXISTING RETURN FANS TO BE

RE-BALANCED TO ORIGINAL

DESIGN FLOWS

Graphic Scale

Graphic Scale

Graphic Scale

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL CONSTRUCTION

DOCUMENTS

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Auburn, ME 207.784.5100

Boston, MA 617.426.5050

Portland, ME 207.775.0053

Portsmouth, NH 603.626.1242 c HA PROJECT NUMBER: 13586

CONSTRUCT CLEAN CORE ADDITION TO

SURGICAL SUITE

PROVIDENCE, RHODE ISLAND

650-337SCALE:

C :\U se rs

\js la p\ D oc um en ts

R ev it

L oc al s\

6-m ec h-ce nt ra l_ js la p.

rv t 2/

/2

3:

:2

PM

M10.0

GROUND FLOOR DUCTWORK

02-22-19 CG JSL

SCALE: 1/8" = 1'-0"1 GROUND FLOOR DUCT PLAN

KEY NOTES

CODE DESCRIPTION

M001 TAB CONTRACTOR TO PERFORM PRELIMINARY AIRFLOW MEASUREMENT PRIOR TO

DEMOLITION AND SUBMIT RESULTS TO ENGINEER FOR REVIEW. ONCE DEMOLITION IS

COMPLETE, TAB CONTRACTOR SHALL RE-BALANCE TO PRELIMINARY CONDITIONS (OR NEW

FLOW IF CHANGED BY SUBMITTAL REVIEW). INTERMEDIATE TAB REPORT SHALL BE

SUBMITTED TO ENGINEER FOR REVIEW. AT CONCLUSION OF PROJECT, TAB CONTRACTOR

SHALL REBALANCE TO PRELIMINARY CONDITIONS (OR NEW FLOW IF CHANGED BY

SUBMITTAL REVIEW). FINAL TAB REPORT SHALL BE SUBMITTED TO ENGINEER FOR REVIEW.

M002 TAB CONTRACTOR TO PERFORM PRELIMINARY AIRFLOW MEASUREMENT PRIOR TO

G.4'

E4.8

E5

ED

E3E2E1 EC.2ECEB.3EBEA.8EA

A.5 A.5'

A 3'

B

A' A.2'

C.3

D.3

C.5

B' C' D' E' F'

F

F.7' G'

H

D

EE.1

E4

G.3'

4.8'

C G.5'

4.75'

4.7'

4.5'

4'

4.3'

L

EA.1

K

J

EBB

GF.9

2'

A.6'

1'

5'

M31.1

M31.1

M001

M001

M001

M001

M001

M001

M001

M001

M001

M001 M001

M001

STAIR K

K-1

STAFF LOUNGE AND

CONFERENCE

NURSE MANAGER

OFFICE

ANESTHESIA OFFICE

ANESTHESIA

CONFERENCE ROOM

118A OFFICE

PU/DO

119A

PICK UP

119B

DROP OFFICE

119C

WAITING

CORRIDOR

STAFF LOCKER

FEMALE

TOILET MALE

TOILET FEMALE

STAFF LOCKER MALE

113A

OFFICE

115A

OFFICE

OFFICE

OFFICE

CONFERENCE ROOM

110 BREAK / KITCHEN

STAFF WASHROOM

109A

CONSULT

MECHANICAL ROOM

STAIR TOWER-2

MENS RESTROOM

WOMENS REST ROOM

MENS REST ROOM

COMP AND PENSION

COMP AND PEN

PSYCHOLOGIST

COMP AND PENSION

COMP AND PENSION

COMP AND PENSION

RECEPTION

160A

COMP AND PENSION

Graphic Scale

Graphic Scale

Graphic Scale

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL CONSTRUCTION

DOCUMENTS

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Auburn, ME 207.784.5100

Boston, MA 617.426.5050

Portland, ME 207.775.0053

Portsmouth, NH 603.626.1242 c HA PROJECT NUMBER: 13586

CONSTRUCT CLEAN CORE ADDITION TO

SURGICAL SUITE

PROVIDENCE, RHODE ISLAND

650-337SCALE:

C :\U se rs

\js la p\ D oc um en ts

R ev it

L oc al s\

6-m ec h-ce nt ra l_ js la p.

rv t 2/

/2

3:

:3

PM

M10.1

FIRST FLOOR DUCTWORK

02-22-19 CG JSL

SCALE: 1/8" = 1'-0"1 FIRST FLOOR DUCT PLAN

KEY NOTES

CODE DESCRIPTION

M001 TAB CONTRACTOR TO PERFORM PRELIMINARY AIRFLOW MEASUREMENT PRIOR TO

DEMOLITION AND SUBMIT RESULTS TO ENGINEER FOR REVIEW. ONCE DEMOLITION IS

COMPLETE, TAB CONTRACTOR SHALL RE-BALANCE TO PRELIMINARY CONDITIONS (OR NEW

FLOW IF CHANGED BY SUBMITTAL REVIEW). INTERMEDIATE TAB REPORT SHALL BE

SUBMITTED TO ENGINEER FOR REVIEW. AT CONCLUSION OF PROJECT, TAB CONTRACTOR

SHALL REBALANCE TO PRELIMINARY CONDITIONS (OR NEW FLOW IF CHANGED BY

SUBMITTAL REVIEW). FINAL TAB REPORT SHALL BE SUBMITTED TO ENGINEER FOR REVIEW.

M002 TAB CONTRACTOR TO PERFORM PRELIMINARY AIRFLOW MEASUREMENT PRIOR TO

V

V

V

VV

V

VVVVVV

V

V

V

V V

V V

V V

V V VV V

V V

V

V V

V V

V

V V V

V

V V

V V

V

V

V

V

V

V

V V

V

V V

V

V

V

V

V

V

M M

V V

V V

S

V

TT

T

T

T

T

T

T

T

T T

T

T

V

V

F

F

F

F

F

0.5 1 1.5 2

1.8 2.2 2.5 3 4 5 6 7

G.4'

9 10

E4.8

E5

E3E2 EC.2ECEB.3EBEA.8EA

A.5 A.5'

A 3'

B

A' A.2'

C.3

D.3

C.5

B' C' D' E' F'

F

F.7' G'

H

D

EE.1

E4

G.3'

4.8'

C G.5'

4.75'

4.7'

4.5'

4'

4.3'

L

EA.1

K

J

EBB

GF.9

2'

A.6'

1'

5'

CONTINUOUS WALL LOUVER

OUTSIDE AIR AND RELIEF

AIR SHALL BE SEPARATED

FROM EACH OTHER BY 25'-0"

USING DUCT PLENUMS

PROVIDE VOLUME DAMPERS

AT THESE BRANCHES

8"ø

8"ø

"x

8" 6" ø

42"x14"

8"ø 12"x10" 12"x10"

"x

8" ø

8"ø

5" ø

8" ø

8"ø

8"ø 6"ø 10"x8"

6"ø

8"ø

12"x10"

8"ø

8"ø

6"ø

10"ø

10"ø

16"x16"12"x12"

"ø

10"ø

10"ø

10"ø

5"ø

"x

28"x14"

28"x14"

14"ø

8"ø

24"x12"10"ø

12"ø

14"x14" 10"ø

"x

"ø

20"x18"

"x

14"x14"

"ø

"ø

"x

10"x10"

"x

8" x1

4"

10"ø

10"ø

"ø

8" ø

"x

10"x10"10"ø 6"ø 10"ø

12"ø 8"ø

CAP

12"x12" UP THROUGH

ROOF TO HEPA FILTER MODULE

EQUAL TO AAF/FLANDERS MODEL

BG1-1H1W-2GGF-304-D4 WITH

FLANDERS MEGAPLEAT M8 PRE

FILTER AND ASTROCEL 1 HEPA

FILTER. PROVIDE OPTIONAL

WEATHER COVER FOR OUTDOOR

INSTALLATION. FILTER MODULE

IS SERVED BY EF-13B001 UTILITY

SET EXHAUST FAN.

8"ø

8"ø

8"ø

8"ø

8"ø

10"x10"

10"x10"

12"x10"

"x1

0"

8"ø 8"x

6"

"x6

12"x6"

12"x8"

14"x10"

18"x8"

"x

6"

"x

20"x12"

"x

24"x16"

36"x14"

"x

24"x10"

DUCT SMOKE DETECTOR

IN RISER

DUCT SMOKE DETECTOR

IN RISER

M31.1

M31.1

HUM-1

SEMI RESTRICTED

CORRIDOR

CYSTOSCOPY

CLEAN AND STERILE

SUPPLY

CLEAN CORE

CC STORAGE

255A

MECHANICAL

CLEAN AND STERILE

SUPPLY

EQUIPMENT STORAGE

IUSS

SEMI RESTRICTED

CORRIDOR

NURSE MANAGER

OFFICE

SOILED UTILITY

BRONCHOSCOPY

NOTE: WITHIN CYSTOSCOPY 263,

ALL LOW RETURN GRILLES SHALL

BE LOCATED 7" AFF.

M001

M001

M001

TYP. OF 16 M001 TYP. OF 10

M001 TYP. OF 10

M001 TYP. OF 10

M001

M001

M001

M001

M001

M001

CAP

"x

6"

M001

M001

RE-BALANCE TO 150 CFM

WHEN USED AS LOCKER ROOM

RE-BALANCE TO 350 CFM

WHEN USED AS LOCKER ROOM

RE-BALANCE TO 100 CFM

(TYP. OF 4) WHEN USED AS

ANESTHESIA WORKROOM

RE-BALANCE TO 400 CFM

WHEN USED AS

ANESTHESIA WORKROOM

"x8

"x8

6"ø 8"ø

8"ø

10"x8" 6"ø

"x8

8"ø

M001

M001

M001

M001 M001

M001

M001

M001

M001

M001 M001

M001

M001 M001 M001 M001 M001 M001

M001M001 M001M001

M001

M001

M001 M001

M001

M001

M001

M001

M001

M001

M001

M001

M001

S6

S6

S3 1

S2 1

S2 2

R9

R2

S3 4

S2 2

S2 3

S2 1

S5

R5

S5

S7

S7

S3 2

R8

R7

S3 1

S2 1 R3

R5

E2

S1 1

E8

S2 5

S2 1

R3

S2 2

E1

E6

8"ø

VAV-11

VAV-10

VAV-9

VAV-8

VAV-7

VAV-5

VAV-6

VAV-4

VAV-3

VAV-2

VAV-1

VAV-12

VAV-13

S8

R8

STAIR-K

K-2

PACU

EQUIPMENT STORAGE

STAFF TOILET/SHOWER

CORRIDOR

C223

MALE LOCKERS

SEMI RESTRICTED

CORRIDOR

SCRUB

210A

ANGIOPLASTY

OR-1

OR-2

OR-3

NURSE STATION

OBSERVATION ROOM

ANESTHESIA

WORKROOM

PATIENT TOILET

215F

CORRIDOR

2-DC-1A

OFFICE

CORRIDOR

IT CLOSET

229A

LINEN CHUTE

STAIR WELL

A-2

ELECTRICAL CLOSET

CORRIDOR

ELECTRICAL CLOSET

HOUSE KEEPING

232A

HOUSE KEEPING

232A

ELEC

232D

ELEC

232C

OR STORAGE

MINOR PROCEDURE

SOILED UTILITIES

215BVESTIBULE

215D

CLEAN UTILITIES

215C

SEMI RESTRICTED

CORRIDOR

LINK CORRIDOR

L24

CONSULT ROOM

ELECTRICAL ROOM

201C

EMERGENCY

ELECTRICAL ROOM

201B

OFFICE

201A

WAITING ROOM

OR RECEPTION

INTERVENTIONAL PAIN

MANAGEMENT

233A

FEMALE LOCKERS

TOILET

202A

56"x16" 72"x36"

"x

"x

18"x8"

AHU-12B001 ELEVATOR LOBBY

L23

EXAM-1

E205

EXAM-2

E206

MICROSCOPE

E207

EXAM-3

E208

CORRIDOR

C22 CAST ROOM

E204

CORRIDOR

C21

ELEVATOR LOBBY

L21

LOBBY

L22

ELEVATOR

E-EL-1

ELEVATOR

E-EL-2

NOTE: BALANCING CONTRACTOR SHALL WORK WITH

CONTROLS CONTRACTOR TO SET SUPPLY DUCT

STATIC PRESSURE SETPOINT AND RETURN DUCT

STATIC PRESSURE SETPOINT.

Graphic Scale

Graphic Scale

Graphic Scale

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL CONSTRUCTION

DOCUMENTS

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Auburn, ME 207.784.5100

Boston, MA 617.426.5050

Portland, ME 207.775.0053

Portsmouth, NH 603.626.1242 c HA PROJECT NUMBER: 13586

SCALE:

C :\U se rs

\js la p\ D oc um en ts

R ev it

L oc al s\

6-m ec h-ce nt ra l_ js la p.

rv t 2/

/2

3:

:0

PM

M10.2

SECOND FLOOR DUCTWORK CONSTRUCT CLEAN CORE ADDITION TO

SURGICAL SUITE

PROVIDENCE, RHODE ISLAND

650-337

02-22-19 CG JSL

SCALE: 1/8" = 1'-0"1 SECOND FLOOR DUCT PLAN

KEY NOTES

CODE DESCRIPTION

M001 TAB CONTRACTOR TO PERFORM PRELIMINARY AIRFLOW MEASUREMENT PRIOR TO

DEMOLITION AND SUBMIT RESULTS TO ENGINEER FOR REVIEW. ONCE DEMOLITION IS

COMPLETE, TAB CONTRACTOR SHALL RE-BALANCE TO PRELIMINARY CONDITIONS (OR NEW

FLOW IF CHANGED BY SUBMITTAL REVIEW). INTERMEDIATE TAB REPORT SHALL BE

SUBMITTED TO ENGINEER FOR REVIEW. AT CONCLUSION OF PROJECT, TAB CONTRACTOR

SHALL REBALANCE TO PRELIMINARY CONDITIONS (OR NEW FLOW IF CHANGED BY

SUBMITTAL REVIEW). FINAL TAB REPORT SHALL BE SUBMITTED TO ENGINEER FOR REVIEW.

M002 TAB CONTRACTOR TO PERFORM PRELIMINARY AIRFLOW MEASUREMENT PRIOR TO

G.4'

E4.8

E5

ED

E3E2E1 EC.2ECEB.3EBEA.8

EA

A.5 A.5'

A 3'

B

A' A.2'

C.3

D.3

C.5

B' C' D' E' F'

F

F.7' G'

H

D

EE.1

E4

G.3'

4.8'

C G.5'

4.75'

4.7'

4.5'

4'

4.3'

L

EA.1

K

J

EBB

GF.9

2'

A.6'

1'

5'

RELOCATED

OUTPATIENT

PHARMACY

CHILLER

FUTURE LOCATION OF

STERILE PROCESSING

AND DISTRIBUTION CHILLER

NEW CLEAN STEAM

GENERATOR PURCHASED

BY OWNER UNDER A SEPARATE

PROJECT. CONTRACTOR TO

CONFIRM WITH OWNER THAT

EQUIPMENT IS AVAILABLE PRIOR

TO SUBMITTING ON NEW EQUIPMENT.

CLEAN STEAM GENERATOR SHALL BE

EQUAL TO CEMLINE #V510USG2454.

EXISTING AIR HANDLING

UNITS TO BE RE-BALANCED

TO ORIGINAL DESIGN FLOWS

EXISTING PUMPS TO BE

RE-BALANCED AS NECESSARY

CH-1GB001

CH-1GB002

3" 3"

6" 6"

6" 6"

3" 3"

6" 6"

UNDERGROUND CHILLED WATER

SUPPLY AND RETURN PIPING.

REFER TO SITE/CIVIL PLANS

FOR ADDITIONAL INFORMATION.

PIPING TO PASS UNDER FROST

WALL AT ELEVATION 76'-0"

RE-INSTALL EXISTING WING E CONDENSING

UNIT AT THIS LOCATION AND CONNECT NEW

REFRIGERANT PIPING TO EXISTING REFRIGERANT

LINES. RE-CHARGE WITH REFRIGERANT AND

PROVIDE SYSTEM STARTUP. NEW REFRIGERANT

LINES SHALL MATCH SIZE OF EXISTING LINES.

RACK REFRIGERANT PIPING AGAINST OUTSIDE

WALL. REFER TO DRAWING ES10.1 FOR MORE

INFORMATION.

NOTE: REFER TO PIPE BEDDING DETAIL #2

ON DRAWING M30.1 FOR MORE INFORMATION.

CONNECT 2 1/2" STEAM INLET TO

EXISTING STEAM MAIN ROUGHED

IN ABOVE EXISTING EQUIPMENT.

CONNECT 2" CONDENSATE DRAIN

TO EXISTNG CONDENSATE PUMP.

PIPE 1 1/2" MANUAL BLOWDOWN

TO EXISTING FLOOR DRAIN ON

OPPOSITE SIDE OF EXISTING AIR

HANDLER. CONNECT 3/4" FEEDWATER

INLET TO EXISTING COLD WATER

FEED. 3" STEAM OUTLET TO EXISTING

STEAM OUTLET PIPING. PIPE RELIEF

VALVE THROUGH OUTSIDE WALL TO

VENT OUTSIDE OF BUILDING.

2-1/2" HWS &

HWR UP

CONNECT NEW HWS & HWR

PIPING TO EXISTING HEAT

EXCHANGERS & PUMPS

CONNECT 1-1/4" LPC

INTO EXISTING 3" LPC

Graphic Scale

Graphic Scale

Graphic Scale

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL CONSTRUCTION

DOCUMENTS

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Auburn, ME 207.784.5100

Boston, MA 617.426.5050

Portland, ME 207.775.0053

Portsmouth, NH 603.626.1242 c HA PROJECT NUMBER: 13586

CONSTRUCT CLEAN CORE ADDITION TO

SURGICAL SUITE

PROVIDENCE, RHODE ISLAND

650-337SCALE:

C :\U se rs

\js la p\ D oc um en ts

R ev it

L oc al s\

6-m ec h-ce nt ra l_ js la p.

rv t 2/

/2

3:

:2

PM

M20.0

GROUND FLOOR PIPING

02-22-19 CG JSL

SCALE: 1/8" = 1'-0"1 GROUND FLOOR PIPING PLAN

CONNECT NEW HEATING

HOT WATER PIPING TO

EXISTING PIPING AT

HEAT EXCHANGERS AND PUMPS

NOTE: UNDERGROUND PIPING SHALL BE

PRE-INSULATED STEEL PIPING EQUAL TO

THERMACORE FERRO THERM OR APPROVED

EQUAL. CONTRACTOR SHALL SAW CUT OPENING

THROUGH EXISTING FLOOR SLAB IN

MECHANICAL ROOM TO ALLOW FOR PIPING TO

RUN UNDER GROUND. PIPING SHALL RUN

UNDER FROST WALL AND OPENINGS SHALL BE

SEALED WATER TIGHT WITH SLEEVE SEALS.

G.4'

E4.8

E5

ED

E3E2E1 EC.2ECEB.3EBEA.8EA

A.5 A.5'

A 3'

B

A' A.2'

C.3

D.3

C.5

B' C' D' E' F'

F

F.7' G'

H

D

EE.1

E4

G.3'

4.8'

C G.5'

4.75'

4.7'

4.5'

4'

4.3'

L

EA.1

K

J

EBB

GF.9

2'

A.6'

1'

5'

M31.1

M31.1

3"

3"

TO CHILLERS

FROM CHILLERS

6"

6"

CHILLED WATER PIPING

TO AHU-12B001

STAIR K

K-1

CORRIDOR

STAFF LOUNGE AND

CONFERENCE

NURSE MANAGER

OFFICE

ANESTHESIA OFFICE

ANESTHESIA

CONFERENCE ROOM

118A OFFICE

PU/DO

119A

PICK UP

119B DROP OFFICE

119C

WAITING

STAFF LOCKER

FEMALE

TOILET MALE

TOILET FEMALE

STAFF LOCKER MALE

113A

OFFICE

115A

OFFICE

OFFICE

OFFICE

CONFERENCE ROOM

BREAK / KITCHEN

STAFF WASHROOM

109A

CONSULT

STAIR TOWER-2

MENS RESTROOM

WOMENS REST ROOM

MENS REST ROOM

COMP AND PENSION

COMP AND PEN

PSYCHOLOGIST

RECEPTION

160A

COMP AND PENSION

COMP AND PENSION

COMP AND PENSION

COMP AND PENSION

CLINICAL MANAGER

100C

VISN

100D

Room

ELEVATOR LOBBY

L11

CAP CHILLED WATER

PIPING WITHIN BUILDING

WITH 4" PIPING TO MATCH

SIZE OF EXISTING PIPING.

4" PIPING

3"

3"

4" PIPING

6" PIPING

6" PIPING

NOTE: CONNECT NEW 6" CHILLED WATER

PIPING TO EXISTING 6" CHILLED WATER

PIPING. DRAIN SYSTEM AS NECESSARY

TO PERFORM CONNECTIONS. RE-FILL

PIPING SYSTEM AND PROVIDE FACTORY

STARTUP OF CHILLERS.

2-1/2" HWS &

HWR UP AND

DOWN

1-1/4" LPC

UP 3" CHWS &

CHWR UP

1/

4" 1-1/4" LPC

DOWN

Graphic Scale

Graphic Scale

Graphic Scale

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL CONSTRUCTION

DOCUMENTS

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Auburn, ME 207.784.5100

Boston, MA 617.426.5050

Portland, ME 207.775.0053

Portsmouth, NH 603.626.1242 c HA PROJECT NUMBER: 13586

SCALE:

C :\U se rs

\js la p\ D oc um en ts

R ev it

L oc al s\

6-m ec h-ce nt ra l_ js la p.

rv t 2/

/2

3:

:4

PM

M20.1

FIRST FLOOR PIPING CONSTRUCT CLEAN CORE ADDITION TO

SURGICAL SUITE

PROVIDENCE, RHODE ISLAND

650-337

02-22-19 CG JSL

SCALE: 1/8" = 1'-0"1 FIRST FLOOR PIPING PLAN

TT

T

T

T

T

T

T

T

T T

T

T

0.5 1 1.5 2

1.8 2.2 2.5 3 4 5 6 7

G.4'

E4.8

E5

ED

E3E2E1 EC.2ECEB.3EBEA.8EA

A.5 A.5'

A 3'

B

A' A.2'

C.3

D.3

C.5

B' C' D' E' F'

F

F.7' G'

H

D

EE.1

E4

G.3'

4.8'

C G.5'

4.75'

4.7'

4.5'

4'

4.3'

L

EA.1

K

J

EBB

GF.9

2'

A.6'

1'

5'

VAV-1

VAV-2

VAV-3VAV-4

VAV-5

VAV-6

VAV-7VAV-8

VAV-9

VAV-10

VAV-11

M31.1

M31.1

SEMI RESTRICTED

CORRIDOR

CYSTOSCOPY

CLEAN CORE

CC STORAGE

255A

CLEAN AND STERILE

SUPPLY

CLEAN AND STERILE

SUPPLY

MECHANICAL

EQUIPMENT STORAGE

SEMI RESTRICTED

CORRIDOR

NURSE MANAGER

OFFICE

SOILED UTILITY

BRONCHOSCOPY

IUSS

VAV-12

VAV-13

AHU-12B001

HUM-1

STAIR-K

K-2

STAFF TOILET/SHOWER

CORRIDOR

C223

MALE LOCKERS

SEMI RESTRICTED

CORRIDOR

ANGIOPLASTY

OR-1

SCRUB

210A

SEMI RESTRICTED

CORRIDOR

OR-2

SCRUB

210B

OR-3

HOUSE KEEPING

215G

ANESTHESIA

WORKROOM

NURSE STATION

WORK AREA

CONTROL STATION

OBSERVATION ROOM

EQUIPMENT STORAGE

PACU

PATIENT LOCKERS

215E

PATIENT TOILET

215F

CORRIDOR

2-DC-1A

OFFICE

IT CLOSET

229A

LINEN CHUTE

CORRIDOR

VESTIBULE

215D

CLEAN UTILITIES

215C

SOILED UTILITIES

215B

MINOR PROCEDURE

CORRIDOR

STAIR WELL

A-2

ELECTRICAL CLOSET

ELECTRICAL CLOSET

HOUSE KEEPING

232A

ELEC

232D

ELEC

232C

OR STORAGE

INTERVENTIONAL PAIN

MANAGEMENT

233A

OR RECEPTION

WAITING ROOM

CORRIDOR

OFFICE

201A

ELECTRICAL ROOM

201C

EMERGENCY

ELECTRICAL ROOM

201B

CONSULT ROOM

FEMALE LOCKERS

ELEVATOR LOBBY

L23

EXAM-1

E205

EXAM-2

E206

MICROSCOPE

E207

EXAM-3

E208

CORRIDOR

C22

CAST ROOM

E204

CORRIDOR

C21

ELEVATOR

E-EL-1

ELEVATOR

E-EL-2

ELEVATOR LOBBY

L21

LOBBY

L22

NOTE: ALL WALL MOUNTED TEMPERATURE SENSORS SHALL

BE TEMPERATURE AND HUMIDITY SENSORS. DUCT MOUNTED

HUMIDIFIER HUM-1 SHALL BE CONTROLLED BY ROOM SENSOR

IN CYSTOSCOPY 263. HUMIDIFIER WITHIN AIR HANDLER

AHU-12B001 SHALL BE ENABLED IF ANY OF THE SPACES SERVED

BY AHU-12B001 DROP BELOW 30% RH.

1-1/4" LPS

1" LPC PITCHED

@ 1/4" PER FOOT

TO VERTICAL RISER

1" LPS

3" CHWS

& CHWR

DOWN

3/4" LPS

1" LPC

2-1/2" HWS &

HWR DOWN

1/

2"

1/

2"

1"

1"

3/ 4" 3/

4"

3/ 4"

3/4"

3/ 4"

3/ 4"

3/4

3/4

3/4"

3/4"

3/4

3/4

3/4"

3/4"

2 1/2"

2 1/2"

3/ 4"

3/ 4"

3/4"

3/4"

3/ 4"

3/ 4"

3/ 4"3/ 4"

2 1/2"

2 1/2"

2" 2"

1 1/4"

1 1/4"

3/ 4"

3/ 4"

1 1/4"

1 1/4"

3/ 4"

3/ 4"

1 1/4"

1 1/4"

1"1"

1" 1"

3/ 4"

3/ 4"

3/4" 3/4"

3/ 4"

3/ 4"

Graphic Scale

Graphic Scale

Graphic Scale

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL CONSTRUCTION

DOCUMENTS

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Auburn, ME 207.784.5100

Boston, MA 617.426.5050

Portland, ME 207.775.0053

Portsmouth, NH 603.626.1242 c HA PROJECT NUMBER: 13586

CONSTRUCT CLEAN CORE ADDITION TO

SURGICAL SUITE

PROVIDENCE, RHODE ISLAND

650-337SCALE:

C :\U se rs

\js la p\ D oc um en ts

R ev it

L oc al s\

6-m ec h-ce nt ra l_ js la p.

rv t 2/

/2

3:

:5

PM

M20.2

SECOND FLOOR PIPING

02-22-19 CG JSL

SCALE: 1/8" = 1'-0"1 SECOND FLOOR PIPING PLAN

AHU-12B001

LEVEL 2

VAV-1 VAV-2 VAV-3 VAV-4 VAV-5 VAV-6 VAV-7 VAV-8 VAV-9 VAV-10 VAV-11

LEVEL 1

GROUND LEVEL

HX HX

HWPHWP

VAV-12 VAV-13

EXISTING PUMPS EXISTING HEAT EXCHANGERSCLEAN STEAM GENERATOR

HUM-2

HUM-1

CHWPCHWP

EXISTING PUMPS

CH-1GB001 CH-1GB002

D

V A

R

IE

S

BACKFILL WITH APPROVED

EXCAVATED MATERIAL

COMPACTED AS SPECIFIED

GRANULAR PIPE

BEDDING MATERIAL

COMPACTED TO

95% MAX. DENSITY

MARKER TAPE

12" ABOVE PIPE

GRAVEL BASE/

SUBBASE IN

ROADWAYS

D +2'-6'' MAX

SAW CUT EXISTING

PAVEMENT PRIOR

TO EXCAVATION

NEW PAVED AREA

1 _ 2

PL

U

S

" M

IN

PI

PE

D

IA

1 _ 2

P

LU

S 4"

M

IN

PI

PE

D

IA

PIPE BEDDING

ZONE

ADDITIONAL 4"

BEDDING IF LEDGE

ENCOUNTERED

SEEDED AREA

CHILLED WATER COIL

PERFORMANCE FROM

75/67 TO 48.2/48.0

HOT WATER COIL

PERFORMANCE FROM

1.4 TO 60.0

DRAW

THRU

BLOW

THRU

2" [50mm]

PLUS X

1" [25mm]

MINIMUM

X

2X

UNIT TYPE A B

WHERE X = STATIC PRESSURE IN PAN

DRAIN LINE SHALL BE AT LEAST THE

SAME SIZE AS THE NIPPLE ON THE DRAIN PAN

PIPING SHALL BE RIGID COPPER TYPE L

OR TYPE M UNLESS NOTE BELOW IS MET

PITCH DOWN

TOWARD DRAIN

CLEAN

OUT

FLOOR

SINK

DRAIN

PAN

NOTE: 1. CPVC PIPE MAY BE USED ONLY IF APPROVED BY

LOCAL VA AND IS INDOORS AND DOES NOT PASS THROUGH

RATED BARRIERS.

2. DIELECTRIC FITTING TO BE USED WHEN TWO DISSIMILAR

METALS ARE TO BE

CONNECTED.

[2 5m m

DIELECTRIC

FITTING

A B

1"

COIL

TEST PLUG

(TYP.)

REDUCER, IF

REQUIRED

WATER

RETURN

MANUAL AIR

VENT

UNION CONNECTIONS

(TYP.)

WATER

SUPPLY

SHUT OFF

VALVE

DRAIN WITH HOSE

CONNECTION

MV

MODULATION CONTROL

VALVE

NOTE:

1.

2.

3.

4.

ALL VANE ELBOWS SHALL BE CONSTRUCTED AND INSTALLED AS DETAILED BY

SMACNA.

WHEN W1 DOES NOT EQUAL W2, VANE SHALL BE SINGLE THICKNESS VANE

TYPE REGARDLESS OF W

DIMENSION.

ALL SINGLE THICKNESS VANES SHALL HAVE A 2" [50mm] RADIUS, 1 1/2"

[40mm] MAXIMUM SPACE BETWEEN VANES AND A 3/4" [20mm] TRAILING

EDGE.

WHEN W EQUALS W2 AND W1 IS GREATER THAN 20" [500mm] VANES SHALL

BE DOUBLE VANE

TYPE.

W

W1

2500 [1133]

1320 [598]

420 [190]ONE 1 [25] x 18 GA STRAP36 [900]

TWO 1/2 [13]∅ RODS

TWO 3/8 [10]∅. RODS

ONE 1 [25] x 16 GA STRAP

84 [2100] 60 [1500]

50 [1250] 700 [317]

ONE 1 [25] x 22 GA STRAP

QUANTITY/SIZEMAX. DUCT ∅

26 [650]

HANGER STRAPS OR RODS

MAX. LOAD

LBS. [kg]

260 [119]

MAX.

144 [3600]

IN. [mm]

SPACING

IN. [mm] IN. [mm]

144 [3600] 144 [3600]

144 [3600]

144 [3600]

NOTE:

TABULATED DATA FROM SMACNA

ALLOWS FOR DUCT REINFORCING

AND INSULATION, BUT NO

EXTERNAL

LOAD.

BAND

OVER 50"

[1250mm]∅

HANGER RODS

BAND OF

SAME SIZE AS

HANGER STRAP

LOAD RATED

FASTENERS

50" [1250mm]∅

& UNDER

MAIN EXHAUST OR RETURN

PLAN VIEW

AIR

FLOW AIR

FLOW

PROVIDE VOLUME

DAMPER

AT EACH BRANCH DUCT

1/4W OR 4"

[100mm] MIN.

BRANCH

DUCT

VD

W

Graphic Scale

Graphic Scale

Graphic Scale

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL CONSTRUCTION

DOCUMENTS

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Auburn, ME 207.784.5100

Boston, MA 617.426.5050

Portland, ME 207.775.0053

Portsmouth, NH 603.626.1242 c HA PROJECT NUMBER: 13586

SCALE:

C :\U se rs

\js la p\ D oc um en ts

R ev it

L oc al s\

6-m ec h-ce nt ra l_ js la p.

rv t 2/

/2

3:

:1

PM

M30.1

FLOW AND RISER DIAGRAMS &

DETAILS

CONSTRUCT CLEAN CORE ADDITION TO

SURGICAL SUITE

PROVIDENCE, RHODE ISLAND

650-337

02-22-19 CG JSL

NO SCALE1 FLOW AND RISER DIAGRAM

NO SCALE2 PIPE BEDDING DETAIL

NO SCALE4 PSYCHROMETRIC CHART

NO SCALE3 232113-08 AIR HANDLING UNIT DRAIN TRAP DETAIL

NO SCALE5 232113-12 TERMINAL UNIT WATER COILS- PIPING CONNECTIONS

NO SCALE6 233100-01 DUCTWORK SQUARE VANE ELBOWS

NO SCALE7 233100-26 ROUND DUCT HANGERS

NO SCALE8 233100-07 EXHAUST OR RETURN BRANCH DUCTWORK

ALARM

PROCESSING

DU

TY

C

YC

LE

FU

NC

TI

O

N

SC

HE

DU

LE

S

TA

RT

/S

TO

P

HUMIDITY HIGH LIMIT

RETURN FAN VFD ALARM (2 TOTAL)

SUPPLY FAN VFD ALARM (2 TOTAL)

RETURN FAN STATUS (2 TOTAL)

STATIC PRESSURE HIGH LIMIT

SUPPLY AIR FLOW (CFM)

ST

AT

US

SYSTEM

AL

AR

M

EL

EC

TR

IC

D

EV

IC

E

SP

EE

D

CO

M M

AN

D

PO

IN

T

ID

DISCHARGE STATIC PRESSURE

AFTER HUMIDIFIER TEMPERATURE

DISCHARGE AIR TEMPERATURE

PRE-HEAT TEMPERATURE

MIXED AIR TEMPERATURE

COOLING COIL TEMPERATURE

SYSTEM COMPONENT:

RETURN AIR FLOW (CFM)

RETURN AIR TEMPERATURE

O

PE

N/

CL

O

SE

ST

AR

T/

ST

O P

VA

LV

E

PO

SI

TI

O N

DA

M

PE

R

PO

SI

TI

O

N

JOB: 13586

VAV AIR

HANDLER

BUILDING 1

SYSTEM:

BUILDING: LEGEND

POINT

BINARY

TE

M

PE

RA

TU

RE

(T I)

LO

CA

L

AL

AR

M

P

AN

EL

M

ET

AS

YS

A

LA

RM

P

AN

EL

HI

G

H

ST

AT

IC

P

RE

SS

UR

E

HI

G

H

HU

M

ID

IT

Y

PR

ES

SU

RE

LO

W

T

EM

PE

RA

TU

RE

PE

RC

EN

T

PR

ES

SU

RE

PO

SI

TI

O

N

FL

O W

HI

G

H

LI

M

IT

LO

W

L

IM

IT

SYSTEM

INPUTS

ANALOG BINARY ANALOG

SP

AC

E

TE

M P.

C O

NT

RO

L

ST

AT

IC

P

RE

SS

UR

E

RE

SE

T

DE

M

AN

D

LI

M

IT

IN

G

TE

M

PE

RA

TU

RE

R

ES

ET

TE

M

PE

RA

TU

RE

O

VE

RR

ID

E

TE

M

P.

E

CO

NO

M

IZ

ER

FA

IL

UR

E

M O

DE

PR

ES

SU

RE

/V O

LU

M

E

CN

TR

L

REMARKSFU

LL

C O

M M

UN

IC

AT

IO

N

SYSTEM

SOFTWARE/CONTROL

APPLICATION/FUNCTION

PAGE:

RETURN AIR HUMIDITY

SUPPLY FAN STATUS (2 TOTAL)

RETURN AIR DAMPER (2 TOTAL)

RETURN FAN START/STOP

STEAM HUMIDIFIER VALVE V-2

COILING VALVE V-4

PRE-HEAT VALVE V-1

RETURN AIR BYPASS DAMPER

SUPPLY FAN VFD (2 TOTAL)

OUTSIDE AIR DAMPER

RETURN FAN VFD (2 TOTAL)

ST

AT

IC

P

RE

SS

UR

E

HU

M

ID

IT

Y

STEAM ISOLATION VALVE V-3

SUPPLY FAN START/STOP

AI-3

AI-4

AI-5

AI-6

AI-7

AI-8

AI-9

AI-10

TR

EN

DI

NG

OUTSIDE AIR TEMPERATURE AI-11

BI-1, 2

BI-3, 4

BI-5

BI-6

BI-7, 8

BI-9, 10

AO-3, 4

AO-5, 6

AO-7

AO-8, 9

AO-10

AO-11

AO-12

AO-13

BO-1

BO-2

BO-3

AB

BR

EV

IA

TI

O

N

RHT-1

FT-1

TT-3

TT-4

TT-6

TT-7

SPS-2

TT-5

FT-3

TT-2

RF-STS

SF-STS

PSH-1

RHT-2

SF-ALA

RF-ALA

RF-SPD

SF-SPD

D-3 D-1, D-2 D-4

VLV-1

VLV-4

VLV-2

RF-SST

SF-SST

VLV-3

OUTPUTS

AI-1 TT-1

AI-2

RETURN STATIC PRESSURE AI-12 SPS-1

OUTSIDE AIR FLOW (CFM) AI-13 FT-2

SUPPLY AIR DAMPER (2 TOTAL) AO-1, 2 D-5, D-6

FILTER STATUS

FILTER STATUS

FILTER STATUS

FILTER STATUS

FILTER STATUS

AI-14

AI-15

AI-16

PDS-1

PDS-2

PDS-3

AI-17 PDS-4

AI-18 PDS-5

SUPPLY SMOKE DETECTOR

RETURN SMOKE DETECTOR

BI-11

BI-12

SD

SD

X X X X X X X X X X X X X X

FI

RE

A

LA

RM

P

AN

EL

X X X X

X X

X X

X X X X

X X X

X X

X X X X X X X X X

X X

FI

LT

ER

M

AI

NT

EN

AN

CE

X X X X X X X X X X X X X

X X

X X X X X X

X X

X X

X X

X X

X X X X

X X

X X X X X X

X X X

X X

X X

X X

X X X X X X X X X X X

X X X X X X

X

X

X X

X

X X

X X X X X X X X X

X X X

EXHAUST AIR TEMPERATURE AI-19 TT-8 X X X

FACE-AND-BYPASS DAMPER AO-14 D-7 X X X

1. UNIT OPERATION

1.1 UNIT IS NORMALLY STARTED AND STOPPED REMOTELY THROUGH THE BAS. H-O-A

SWITCH SHALL BE KEPT IN THE "AUTO" POSITION. "HAND" AND "OFF" POSITIONS SHALL

BE USED ONLY FOR MAINTENANCE. WHEN THE UNIT IS "OFF" D-3, SHALL BE FULLY

CLOSED. WHEN THE UNIT IS "ON" D-1, D-2, D-5, D-6 SHALL BE FULLY OPEN.

D-3 AND D-4 SHALL MODULATE IN ACCORDANCE WITH THE DAMPER CONTROL

SEQUENCE.

2. FAN CONTROL

SEQUENCE

2.1

2.2

2.3

6. COOLING COIL/HEATING

COIL

6.1

6.2

8. ALARMS

8.1

UPON A CALL FOR THE SUPPLY FAN(S) TO OPERATE, BAS SHALL OPEN THEIR

RESPECTIVE DAMPER 30 SECONDS BEFORE STARTING THE FAN. BOTH SUPPLY

FANS SHALL OPERATE AND RAMP UP/DOWN IN SEQUENCE TO MAINTAIN DUCT

IF ANY OF THE TEMPERATURE AND/OR PRESSURE ANALOG INPUTS INDICATE THEY ARE OUTSIDE

OF THE OPERATING SETPOINTS, INITIATE AN ALARM. SEE POINTS LIST.

DURING OCCUPIED MODE, MODULATE THE CONTROL VALVES IN SEQUENCE TO MAINTAIN

THE AHU DISCHARGE AIR TEMPERATURE AT THE OCCUPIED MODE SETPOINT OF 54 DEG. F (ADJ.).

SEQUENCE OF OPERATION FOR VARIABLE AIR VOLUME AIR HANDLING UNIT WITH MINIMUM

OUTSIDE AIR

STATIC PRESSURE SETPOINT.

UPON A CALL FOR THE RETURN FAN(S) TO OPERATE, BAS SHALL OPEN THEIR

RESPECTIVE DAMPER 30 SECONDS BEFORE STARTING THE FAN. BOTH RETURN

FANS SHALL OPERATE AND RAMP UP/DOWN IN SEQUENCE TO MAINTAIN DUCT

STATIC PRESSURE SETPOINT.

IN THE EVENT THAT EITHER ONE OF THE SUPPLY OR RETURN FANS FAIL, BAS

SHALL SEND AN ALARM AND RAMP-UP THE REMAINING FAN IN THE ARRAY TO

MAINTAIN THE DUCT STATIC PRESSURE SETPOINT.

3. DAMPER CONTROL

SEQUENCE

3.1 MODULATE OUTSIDE AIR DAMPER D-3 AND RETURN AIR BYPASS DAMPER D-4

IN SEQUENCE. THERE IS NO DAMPER PRESENT IN THE RETURN AIRSTREAM.

WHEN THE OUTSIDE AIR TEMPERATURE IS ABOVE 70 DEG. F (ADJ.), POSITION

POSITION DAMPERS D-3 & D-4 TO PROVIDE MINIMUM OA FLOW OF 1510 CFM.

WHEN THE OUTSIDE AIR TEMPERATURE IS 70 DEG. F (ADJ.) OR BELOW AND

OUTSIDE AIR RELATIVE HUMIDITY IS 50% (ADJ.) OR BELOW, MODULATE DAMPERS

D-3 & D-4 TO MAINTAIN THE MIXED AIR TEMPERATURE 2 DEG. F BELOW THE

UNIT DISCHARGE AIR TEMPERATURE. IN ORDER TO AVOID TRIPPING THE FREEZE

4. FILTER MAINTENANCE

4.1 INITIATE A FILTER MAINTENANCE ALERT IF ANY OF THE DIFFERENTIAL PRESSURE

SWITCHES ACROSS ANY OF THE FILTER BANKS REACHES SETPOINT.

5. HUMIDITY CONTROL

5.1

5.2

WHEN THE DIGITAL CONTROL PANEL IS NOT CALLING FOR HUMIDITY, SENSED BY

RETURN AIR HUMIDITY RHT-1, 2-WAY "ON-OFF" CONTROL VALVE VLV-3 SHALL REMAIN

CLOSED. WHEN THE DIGITAL CONTROL PANEL IS CALLING FOR HUMIDITY, VLV-3 SHALL

REMAIN OPEN.

RETURN AIR HUMIDITY SHALL BE MAINTAINED AT SETPOINT OF 30% RH (ADJ.) VIA

DIGITAL CONTROL PANEL BY MODULATING CONTROL VALVE VLV-2 TO MAINTAIN THE

DESIRED HUMIDITY. THE DCP SHALL OVERRIDE THIS CONTROL TO MAINTAIN HUMIDITY

OF 80% AS SENSED BY RHT-2. DCP SHALL CLOSE VALVE VLV-3 WHENEVER THE SUPPLY

FAN IS OFF. VALVE VLV-2 SHALL BE INTERLOCKED WITH A TEMPERATURE SWITCH TO

KEEP THE HUMIDIFIER OFF UNTIL CONDENSATE TEMPERATURE APPROACHES STEAM

TEMPERATURE.

DURING UNOCCUPIED MODE, MODULATE THE CONTROL VALVES IN SEQUENCE TO MAINTAIN

THE AHU DISCHARGE AIR TEMPERATURE AT THE UNOCCUPIED MODE SETPOINT OF 58 DEG. F (ADJ.).

7. SMOKE CONTROL

7.1 IF THE SUPPLY DUCT SMOKE DETECTOR SENSES SMOKE, SHUT DOWN THE UNIT, CLOSE DAMPER

D-3 AND INITIATE A SMOKE ALARM AT THE FIRE ALARM CONTROL PANEL. IF THE RETURN DUCT SMOKE DETECTOR SENSES SMOKE, INITIATE A SMOKE ALARM AT THE FIRE ALARM CONTROL PANEL ALLOW THE AIR HANDLER TO CONTINUE OPERATION WITH THE D-3 & D-4 DAMPERS POSITIONED FOR

100% OUTSIDE AIR.

9. CHILLED WATER

CONTROL

9.1 EXISTING CHILLED WATER PUMPS CHWP-01BA15 & CHWP-01BA16 CONTINUE TO OPERATE INDEPENDENTLY

WITH ONE PUMP AS STAND-BY. THE TWO NEW AIR COOLED CHILLERS ARE 100% REDUNDANT AND OPERATE

INDEPENDENTLY WITH ONE CHILLER AS STAND-BY. AT NO TIME SHALL BOTH CHILLERS OPERATE SIMULTANEOUSLY.

USE FACTORY INTEGRATED CONTROLS TO ALTERNATE CHILLERS AND CONTROL CHILLED WATER TEMPERATURE

TO DELIVER 44 DEG. F (ADJ.). ON A CALL FOR COOLING FROM THE BAS, LEAD CHILLED WATER PUMP STARTS, FLOW IS PROVEN AND LEAD CHILLER IS ENABLED. BAS CONTROLS LEAD/LAG OF CHILLERS ON WEEKLY (ADJ.) BASIS.

10. GENERAL CONTROL NOTES

10.1 CONTRACTOR SHALL REFER TO SPECIFICATION SECTIONS 23 09 23 & HVAC SYSTEM CONTROLS FOR MORE INFO.

STAT, MANIPULATION OF THE OUTSIDE AIR DAMPER SHALL BE EXTREMELY SLOW.

10.2 LOCATE CONTROL PANELS IN MECHANICAL 257.

10.3 USE PLENUM RATED CABLE. INSTALL WIRING LOCATED WITHIN MECHANICAL 257, IN EXPOSED AREAS, OR WITHIN

WALLS IN CONDUIT.

10.4 CONTRACTOR SHALL PROVIDE A COMPLETE DDC AUTOMATIC TEMPERATURE CONTROL SYSTEM COMPATIBLE

WITH THE EXISTING METASYS BUILDING MANAGEMENT SYSTEM BY JOHNSON CONTROLS INC. ALL HVAC SYSTEM AND ANCILLIARY COMPONENTS SHALL BE CONTROLLED BY THE EXISTING METASYS BUILDING MANAGEMENT

SYSTEM. FINAL CONNECTION OF NEW EQUIPMENT TO THE EXISTING METASYS BUILDING MANAGEMENT SYSTEM SHALL BE MADE BY A COMPANY AND TECHNICIANS FULLY QUALIFIED AND CERTIFIED BY JOHNSON CONTROLS, INC. TO PROGRAM, INSTALL, ADJUST, REPAIR, MAINTAIN, MODIFY, OR OTHERWISE MANIPULATE THE METASYS BUILDING MANAGEMENT SYSTEM BY JOHNSON CONTROLS INC. CURRENT COMPANY AND TECHNICIAN QUALIFICATIONS AND CERTIFICATIONS TO PROGRAM, INSTALL, ADJUST, REPAIR, MAINTAIN, MODIFY, OR OTHERWISE MANIPULATE THE JOHNSON CONTROLS METASYS SYSTEM MUST BE MAINTAINED THROUGHOUT THE CONSTRUCTION OF THE PROJECT INCLUDING ANY EXTENSIONS OF THE CONSTRUCTION PERFORMANCE PERIOD. IF THE CONTRACTOR

UTILIZES THE SERVICES OF A SUBCONTRACTOR OTHER THAN JOHNSON CONTROLS TO PERFORM THIS WORK, THE CONTRACTOR SHALL PROVIDE THE VA, VIA SUBMITTAL, COPIES OF FACTORY TRAINING CERTIFICATES FOR EACH TECHNICIAN WORKING ON THE PROVIDENCE VAMC METASYS SYSTEM PRIOR TO COMMENCEMENT OF ANY CONTROLS WORK. THE PROVIDENCE VAMC WILL REVIEW THE CERTIFICATIONS AS PART OF THE SUBMITTAL

PROCESS. CONTRACTOR SHALL CARRY THE COST OF THIS WORK IN THEIR BID.

10.5 CONTRACTOR PROVIDING SMOKE DETECTOR INSTALLATION MUST BE FULLY NICET CERTIFIED. PROGRAMMING AND TESTING MUST BE PROVIDED BY THE COMPANY PRESENTLY RESPONSIBLE FOR FIRE ALARM INTEGRATION INTO THE PROVIDENCE VAMC NOTIFIER FIRE ALARM SYSTEM. CONTACT INFORMATION WILL BE PROVIDED UPON REQUEST. MODIFY THE EXISTING FIRE ALARM SYSTEM AS-BUILTS AS REQUIRED AND PROVIDE UPDATED FIRE ALARM AS-BUILTS UPON COMPLETION. FIELD VERIFY POINTS OF CONNECTIONS TO EXISTING NOTIFIER PANEL.

3.2 FACE-AND-BYPASS DAMPERS D-7 SHALL BYPASS AIR AROUND THE HEAT RECOVERY

CORE ANY TIME THAT EXHAUST AIR SENSED AT TT-8 IS 35 DEG. F (ADJ.) OR BELOW.

DAMPERS SHALL ALLOW OUTSIDE AIR THROUGH THE CORE ANY TIME THAT EXHAUST

AIR SENSED AT TT-8 IS 40 DEG. F (ADJ.) OR ABOVE.

11. UNOCCUPIED MODE FAN OPERATION

10.1 DURING UNOCCUPIED HOURS, FAN OPERATION IS ALLOWED TO RAMP BACK TO 50% OF OCCUPIED MODE FAN SPEED IN ORDER TO SAVE ENERGY. HOWEVER, PRESSURE RELATIONSHIPS SHALL BE MAINTAINED AT ALL TIMES REGARDLESS OF MODE OF OPERATION. EACH WALL SENSOR SHALL HAVE CAPABILITY TO RESET THAT PARTICULAR

ZONE TO OCCUPIED MODE FOR 3 HOURS (ADJ.).

PLATE AND FRAME

HEAT EXCHANGER

SUPPLY FAN

PRESSURE SWITCH HIGH

TO DISABLE FAN WHEN

HIGH PRESSURE LIMIT

SETPOINT IS REACHED

D-2

D-1

P R

E

- F

IL

TE

R

A

FT

E R

FI

LT

E

R

PDS PDS

D-3

D-4

C O

IL

P

R E

H E

A T

TT TT

3 4

C O

IL

C

O O

LI

N

G

TT TT

5 6

STEAM HUMIDIFIER

VLV

D-6

D-5

H E

P A

- F

IL

TE

R

PDS

A

FM

D

FT

OUTSIDE AIR

(1510 CFM MIN.)

RETURN AIR

(6677 CFM)

EXHAUST AIR

(637 CFM)

SUPPLY AIR TO

TERMINAL UNITS

(7550 CFM)

TT

A

FM

D

FT

SPS

PSH

SD

VFD

VFD

VFD

VFD

VLV VLV

3 4

TT

SUPPLY FAN

RETURN FAN

RETURN FAN

RETURN AIR

BYPASS SECTION

(6040 CFM)

PLACE SENSOR

OUTSIDE UNDER SHIELD

RHT

VLV

P R

E

- F

IL

TE

R

A

FT

E R

FI

LT

E

R

PDS PDS

TT

2 1

A

FM

D

FT

SMOKE

DETECTOR

SD

RHT

SPS

TT

D-7

FACE-AND-

BYPASS DAMPERS

THERMOMETER

UNDER CANOPY

FLOW

SWITCH

FLEXIBLE

CONNECTORS

IF REQUIRED

TEST

PLUGS

GCSGCR

DDC TEMP.

SENSOR TO

ECC

PRESSURE

GAUGE

FS

TT TT

AIR

COOLED

CHILLER

Graphic Scale

Graphic Scale

Graphic Scale

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL CONSTRUCTION

DOCUMENTS

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Auburn, ME 207.784.5100

Boston, MA 617.426.5050

Portland, ME 207.775.0053

Portsmouth, NH 603.626.1242 c HA PROJECT NUMBER: 13586

SCALE:

C :\U se rs

\js la p\ D oc um en ts

R ev it

L oc al s\

6-m ec h-ce nt ra l_ js la p.

rv t 2/

/2

3:

:3

PM

M30.2

CONTROL DIAGRAMS CONSTRUCT CLEAN CORE ADDITION TO

SURGICAL SUITE

PROVIDENCE, RHODE ISLAND

650-337

02-22-19 CG JSL

SCALE: 3/8" = 1'-0"1 VARIABLE AIR VOLUME AIR HANDLING UNIT WITH MINIMUM OUTSIDE AIR CONTROL DIAGRAM

NO SCALE4 CHILLER PIPING DETAIL

VANE VANE

NOTE:

1.

2.

THE INTERIOR SURFACE OF ALL RADIUS ELBOWS SHALL BE MADE

ROUND.

ALL STANDARD RADIUS ELBOWS CAN BE SUBSTITUTED WITH SHORT RADIUS

ELBOWS. ALL SHORT RADIUS ELBOWS SHALL HAVE VANES. VANES SHALL BE

CONSTRUCTED, SUPPORTED AND FASTENED AS RECOMMENDED BY

SMACNA.

R

SHALL

EQUAL

OR BE

GREATER

THAN W.

R

SHALL

EQUAL

OR BE

GREATER

THAN

1/3W.

R

SHALL

EQUAL

OR BE

GREATER

THAN

1/6W.

STANDARD RADIUS OR

LONG RADIUS ELBOW

SHORT RADIUS ELBOW

WITH TWO VANES

W

R

R

2/3W

1/ 3W

W W

1/2W 1/ 3W

1/6W R

SHORT RADIUS ELBOW

WITH ONE VANE

NOTE:

UNLESS OTHERWISE INDICATED ON PLANS, MAXIMUM ANGLES SHOWN SHALL

APPLY.

MAX.

M

AX.

E Q

U

IP

M E

N T

AIR

FLOW

AIR

FLOW

TYPICAL DUCTWORK TRANSITION

PLAN OR SIDE VIEW

TYPICAL DUCTWORK TRANSITION WITH

EQUIPMENT MOUNTED IN DUCT

PLAN OR SIDE VIEW

MAX.

M

AX.

M A

X.

M

AX

30°

15°

15°

DESIGNER'S

NOTES:

1. THE SUPPLY REGISTER TAKE-OFF MAY BE USED FOR UP UP TO 25% OF THE

MAIN DUCT CFM. THE BRANCH DUCT TAKE-OFF MAY BE USED FOR UP TO 15%

OF THE MAIN DUCT CFM ANYTIME AND UP TO 40% WHEN THE MAIN DUCT

VELOCITY IS 1000 FPM [5.1 M/S] OR LESS. THE AIR SPLIT DUCT TAKE-OFF

SHALL BE USED IN ALL OTHER CASES AND MAY BE USED AT

ANYTIME.

2. SHOW ALL VOLUME DAMPERS ON FLOOR

PLANS.

AIR SPLIT DUCT TAKE-OFF

PLAN VIEW

BRANCH DUCT TAKE-OFF PLAN

VIEW

SUPPLY REGISTER

TAKE-OFF PLAN VIEW

AIR

FLOW

AIR

FLOW

A

IR

FL

O

W

SUPPLY REGISTER

OR BRANCH DUCT

TURNING

VANES

MAIN

SUPPLY

DUCT

SEE FLOOR PLAN

FOR SPLIT DIMENSION

PROVIDE VOLUME

DAMPER

PROVIDE

VOLUME

DAMPER

ADJUSTABLE

METAL ROD

OR LINKAGE

TOP

REGISTER

MAIN

SUPPLY

DUCT

VOLUME EXTRACTOR; ADJUSTABLE

FROM FULLY CLOSED POSITION TO

CFM NOTED ON FLOOR PLANS

AIR

FLOW

AIR

FLOW

1/4 W OR 4"

[100mm] MIN.

AIR

FLOW

MAIN SUPPLY

DUCT

A

IR

FL

O

W

W

NTS

RIGID DUCT TO AIR

TERMINAL UNIT.

ROUND SHEET METAL

DUCT.

MAIN

SUPPLY

PLAN VIEW

"D"

45°M

AX.

A

ROUND FLEXIBLE CONNECTION

RECTANGULAR FLEXIBLE CONNECTION

FLANGED

CONNECTION ON

FAN SIDE

WASHER 1-1/2" [40mm] MIN. TO 3" [75mm] MAX. INSTALLED. 6" [150mm] NOMINAL WITH MATERIAL

TAUT

FLEXIBLE

MATERIAL AS

SPECIFIED

1"x1/8" [25x3mm] DRAW BAND 1"x1/8" [25x3mm] BAND IRON BOLT ON 4" [100mm] CENTERS 5/16" [8mm] FLANGE

DUCT

SHEET METAL SCREWS

ON 12" [300mm]

CENTERS

RIVET ON 4"

[100mm]

CENTERS

SHEET METAL

AS

SPECIFIED

FOR

DUCTWORK.

1"x1/8" [25x3mm] BAND IRON BOLT ON 4" [100mm] CENTERS 1" [25mm] FLANGE & HEMALTERNATE

POSITION OF

BOLT

1 1/2" [40mm]

POCKET SLIP

DUCT

SHEET METAL AS

SPECIFIED FOR

DUCTWORK.

[15mm] [15mm] [40mm]

1 1/2" [40mm] MIN. TO 3" [75mm] MAX. INSTALLED. 6" [150mm] NOMINAL WITH

MATERIAL

TAUT

FLANGED

CONNECTION

ON FAN SIDE

WASHER

FLEXIBLE MATERIAL

AS SPECIFIED

1/2" 1/2" 1 1/2"

HWS

HWR

V-2ROOM THERMOSTAT/SENSOR

WALL MOUNTED

48" [1200mm] AFF. ROOM THERMOSTAT/SENSOR

WALL MOUNTED

48" [1200mm] AFF.NO SUPPLEMENTAL HEATING

WITH SUPPLEMENTAL HEATING

A

IR

FL

O

W (C

FM

ROOM TEMPERATURE(°F)

HEATING

MINIMUM

VAV BOX CONTROL SEQUENCE

SP

TU

RHCHWS

HWR

V-1

REHEAT

COIL

AIR

TERMINAL

UNIT

AIR

FLOW

TE

ATU

CONTROLLER

PC

TE

TU

RHC

HWS

HWR

V-1

REHE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .