36E77619R0097-007.pdf

PDF 23 MB Posted

Attached to
Construct Clean Core (VA-19-00058573) Federal contract opportunity
Solicitation number
36E77619R0097
Issued by
Department of Veterans Affairs Headquarters

About this file

This solicitation package describes a federal construction contract opportunity for the Department of Veterans Affairs. The project consists of constructing a new clean core surgery suite space and renovating existing areas at the Providence VA Medical Center in Rhode Island. The work includes building an elevated second floor addition measuring approximately 3,900 gross square feet and renovating 2,900 gross square feet of existing first floor space. The solicitation will be a request for proposal evaluated using lowest price technically acceptable procedures. The NAICS code is 236220 and the size standard is $39.5 million. The solicitation period of performance is approximately 490 calendar days from notice to proceed with a magnitude of construction between $5 million to $10 million. The solicitation will be set aside as a total SDVOSB and issue on or around October 16, 2019. All questions must be submitted in writing by the specified date.

36E77619R0097 Attachment 4 - Fire Protection Plans.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Construct Clean Core (VA-19-00058573), newest first.
File Type Posted
36E77619R0097-0007000.docx DOCX document
36E77619R0097-0006000.docx DOCX document
36E77619R0097-0005000.docx DOCX document
36E77619R0097-0005001.pdf PDF
36E77619R0097-0004001.docx DOCX document
36E77619R0097-0004005.pdf PDF
36E77619R0097-0004004.pdf PDF
36E77619R0097-0004002.pdf PDF
36E77619R0097-0004000.docx DOCX document
36E77619R0097-0004003.pdf PDF
36E77619R0097-0003001.pdf PDF
36E77619R0097-0003000.docx DOCX document
36E77619R0097-0002001.pdf PDF
36E77619R0097-0002002.pdf PDF
36E77619R0097-0002000.docx DOCX document
36E77619R0097-0001030.docx DOCX document
36E77619R0097-0001031.pdf PDF
36E77619R0097-010.pdf PDF
36E77619R0097-006.pdf PDF
36E77619R0097-008.pdf PDF
36E77619R0097-014.pdf PDF
36E77619R0097-011.pdf PDF
36E77619R0097-003.docx DOCX document
36E77619R0097-015.docx DOCX document
36E77619R0097-013.pdf PDF
36E77619R0097-009.pdf PDF
36E77619R0097-007.pdf PDF
36E77619R0097-012.pdf PDF
36E77619R0097-004.pdf PDF
36E77619R0097-005.zip ZIP file
36E77619R0097-009.pdf PDF
36E77619R0097-008.pdf PDF
36E77619R0097-012.pdf PDF
36E77619R0097-004.pdf PDF
36E77619R0097-013.pdf PDF
36E77619R0097-005.zip ZIP file
36E77619R0097-006.pdf PDF
36E77619R0097-015.docx DOCX document
36E77619R0097-011.pdf PDF
36E77619R0097-014.pdf PDF
36E77619R0097-003.docx DOCX document
36E77619R0097-010.pdf PDF
36E77619R0097-000.docx DOCX document
36E77619R0097-000.docx DOCX document
Show all 44

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEMI-RECESSED SPRINKLER

SPRINKLER RISER

SPRINKLER PIPE, SIZE (INCHES) AND LENGTH (FEET-INCHES) AS INDICATED

FLOOR CONTROL VALVE ASSEMBLY

HYDRAULIC CALCULATION TAG

FIRE SPRINKLER LEGEND

FCVA

A

EXISTING PENDANT SPRINKLER

INSPECTOR'S TEST CONNECTION

ITC

GENERAL NOTES:

1. PROVIDE A WET PIPE FIRE PROTECTION SYSTEM THROUGHOUT INTERIOR PROJECT

WORK AREAS AND A DRY PIPE FIRE PROTECTION SYSTEM UNDER THE FLOOR

OVERHANG IN ACCORDANCE WITH VA FIRE PROTECTION DESIGN MANUAL (7TH

EDITION) AND NFPA 13 (2015 EDITION).

2. THESE DRAWINGS ILLUSTRATE THE CONFIGURATION OF MAJOR SYSTEM

COMPONENTS. THEY ARE DIAGRAMMATIC IN NATURE AND ARE NOT INTENDED TO

SHOW EXACT LOCATIONS. PIPE LENGTHS AND ELEVATIONS INDICATED ON THE

DRAWINGS (IF SHOWN) ARE APPROXIMATE. COORDINATE FINAL INSTALLATION WITH

ACTUAL FIELD CONDITIONS AND OTHER CONSTRUCTION TRADES. THE CONTRACTOR

SHALL DESIGN AND INSTALL THE SPRINKLER SYSTEM TO PROVIDE COMPLETE

PROTECTION THROUGHOUT THE PROJECT WORK AREAS IN ACCORDANCE WITH NFPA

13.

3. PROVIDE SHOP DRAWINGS WITH FINAL SPRINKLER SYSTEM LAYOUT, PIPE SIZING,

SPRINKLER HYDRAULIC CALCULATIONS, AND COORDINATION WITH ALL OTHER

TRADES.

4. PROVIDE QUICK RESPONSE SPRINKLERS IN ALL AREAS UNLESS OTHERWISE

NOTED. PENDANT SPRINKLERS SHALL BE INSTALLED IN FINISHED CEILING AREAS.

5. PROVIDE CUTTING AND PATCHING OF WALLS AND CEILING NECESSARY TO

PERFORM INSTALLATION OF FIRE SPRINKLER SYSTEM.

6. PROVIDE SLEEVES AND UL LISTED FIRESTOP ASSEMBLIES AT ALL PIPE

PENETRATIONS TO MAINTAIN FIRE-RESISTANCE RATINGS AS INDICATED ON LIFE

SAFETY PLANS. UL CLASSIFICAITONS AND MATERIAL PRODUCT DATA SHEET FOR ALL

FIRESTOP SYSTEMS SHALL BE SUBMITTED AND APPROVED BEFORE ANY

FIRESTOPPING SYSTEMS ARE INSTALLED.

7. THE DESIGN OF THE SPRINKLER SYSTEM IS BASED ON THE HYDRAULIC METHOD

DESCRIBED IN NFPA 13 USING THE AREA/DENSITY/HOSE REQUIREMENTS:

A. LIGHT HAZARD OCCUPANCIES: 0.10 GPM/SQFT FOR THE HYDRAULICALLY MOST

REMOTE 1,500 SQFT WITH 100 GPM HOSE ALLOWANCE INCLUDES: PATIENT CARE,

TREATMENT, OFFICE, AND CUSTOMARY ACCESS AREAS.

B. ORDINARY HAZARD GROUP 1 OCCUPANCIES: 0.15 GPM/SQFT FOR THE

HYDRAULICALLY MOST REMOTE 1,500 SQFT (OR ENTIRE AREA IF LESS THAN 1,500

SQFT) WITH 250 GPM HOSE ALLOWANCE INCLUDES: MECHANICAL EQUIPMENT

ROOMS, TRANSFORMER ROOMS, ELECTRICAL SWITCHGEAR ROOMS, AND

ELECTRIC CLOSETS.

C. ORDINARY HAZARD GROUP 2 OCCUPANCIES: 0.20 GPM/SQFT FOR THE

HYDRAULICALLY MOST REMOTE 1,500 SQFT (OR ENTIRE AREA IF LESS THAN 1,500

SQFT) WITH 250 GPM HOSE ALLOWANCE INCLUDES: STORAGE ROOMS, TRASH

ROOMS, CLEAN AND SOILED LINEN ROOMS, AND OTHER STORAGE AREAS.

SPRINKLER HAZARD CLASSIFICATION SCHEDULE:

LH = LIGHT HAZARD

OH1 = ORDINARY HAZARD GROUP 1

OH 2 = ORDINARY HAZARD GROUP 2

ETR = EXISTING TO REMAIN

WATER SUPPLY INFORMATION:

REFER TO THE WATER SUPPLY REPORT CONTAINED IN THE SPECIFICATIONS FOR

MORE DETAILED INFORMATION.

CODE RED CONSULTANTS, LLC

154 TURNPIKE ROAD, SUITE 200

SOUTHBOROUGH, MA 01772

FIRE PROTECTION ENGINEERING

EXISTING SPRINKLER PIPING

SPRINKLER PIPING TO BE DEMOLISHED

NEW SPRINKLER PIPING

EXISTING CONCEALED SPRINKLER

PENDANT SPRINKLER

CONCEALED SPRINKLER

EXISTING SEMI-RECESSED SPRINKLER

CAP OR END OF PIPING

PIPING INTERRUPTED OR TO BE CONTINUED

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

FINAL CONSTRUCTION

DOCUMENTS

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans

Affairs

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Auburn, ME 207.784.5100

Boston, MA 617.426.5050

Portland, ME 207.775.0053

Portsmouth, NH 603.626.1242 c HA PROJECT NUMBER: 13586

CONSTRUCT CLEAN CORE ADDITION TO

SURGICAL SUITE

PROVIDENCE, RHODE ISLAND

650-337

FIRE PROTECTION LEGEND AND

GENERAL NOTES

2-22-19

CN

CL

FP0.0

Revisions: Date:

EXISTING TO REMAIN

ETR

DRY SPRINKLER VALVE

DRY PIPE

DRY

10_FP0-0
10_FP10-1
10_FP10-2
10_FP10-3
FP00.0
Layout1
FP10.1
FP10.2
FP10.3
LS10.2

11_LS10-2

File details come from the government source that posted it. Updated .