About this file

This notice describes a forthcoming solicitation for construction services. The Department of Veterans Affairs intends to award a firm-fixed-price contract to construct a clean core addition to the surgical suite at the Providence, Rhode Island VA Medical Center. The project scope includes building new operating room space adjacent to existing areas, relocating suites, and renovating locker rooms to provide pass-through access. The construction value is estimated between $5-10 million. The solicitation will be a Request for Proposal issued on or around October 16, 2019, as a total set-aside for Service-Disabled Veteran-Owned Small Businesses. Offers will be evaluated using the Lowest Price Technically Acceptable procedure. The period of performance is approximately 490 calendar days from notice to proceed. All questions must be submitted in writing by the specified date.

36E77619R0097 Attachment 3 - Cover Sheet (Drawing List).pdf

View the file

Other files for this federal contract opportunity

Other files attached to Construct Clean Core (VA-19-00058573), newest first.
File Type Posted
36E77619R0097-0007000.docx DOCX document
36E77619R0097-0006000.docx DOCX document
36E77619R0097-0005000.docx DOCX document
36E77619R0097-0005001.pdf PDF
36E77619R0097-0004001.docx DOCX document
36E77619R0097-0004005.pdf PDF
36E77619R0097-0004004.pdf PDF
36E77619R0097-0004002.pdf PDF
36E77619R0097-0004000.docx DOCX document
36E77619R0097-0004003.pdf PDF
36E77619R0097-0003000.docx DOCX document
36E77619R0097-0003001.pdf PDF
36E77619R0097-0002001.pdf PDF
36E77619R0097-0002002.pdf PDF
36E77619R0097-0002000.docx DOCX document
36E77619R0097-0001031.pdf PDF
36E77619R0097-0001030.docx DOCX document
36E77619R0097-013.pdf PDF
36E77619R0097-009.pdf PDF
36E77619R0097-010.pdf PDF
36E77619R0097-008.pdf PDF
36E77619R0097-014.pdf PDF
36E77619R0097-011.pdf PDF
36E77619R0097-003.docx DOCX document
36E77619R0097-015.docx DOCX document
36E77619R0097-007.pdf PDF
36E77619R0097-012.pdf PDF
36E77619R0097-004.pdf PDF
36E77619R0097-005.zip ZIP file
36E77619R0097-015.docx DOCX document
36E77619R0097-011.pdf PDF
36E77619R0097-014.pdf PDF
36E77619R0097-007.pdf PDF
36E77619R0097-009.pdf PDF
36E77619R0097-008.pdf PDF
36E77619R0097-012.pdf PDF
36E77619R0097-004.pdf PDF
36E77619R0097-013.pdf PDF
36E77619R0097-005.zip ZIP file
36E77619R0097-006.pdf PDF
36E77619R0097-003.docx DOCX document
36E77619R0097-010.pdf PDF
36E77619R0097-000.docx DOCX document
36E77619R0097-000.docx DOCX document
Show all 44

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B35

T35

T36

T18

B9

B10

B6 B14

B8B7

T38 T33 T39 T32

B32

BUILDING 1

B1 - C

B1 - A B1 - B B4

B26 B2 T7/8

B3 B5

T37T34

B22B23

T9

PROJECT LOCATION

N

B1 - E

B1 - D

PROJECT LOCATION

COVER SHEET

G00.1 COVER SHEET

FIRE PROTECTION

FP0.0 FIRE PROTECTION LEGEND AND GENERAL NOTES

FP10.1 FIRST FLOOR FIRE PROTECTION NEW CONSTRUCTION PLAN

FP10.2 SECOND FLOOR FIRE PROTECTION DEMILITION PLAN

FP10.3 SECOND FLOOR FIRE PROTECTION NEW CONSTRUCTION PLAN

LS10.2 SECOND FLOOR LIFE SAFETY PLAN

CIVIL DRAWINGS

C00.1 SITE PLAN

C00.2 GENERAL NOTES PLAN

C10.1 EXISTING CONDITIONS PLAN

C10.2 DEMOLITION PLAN

C10.3 DEMOLITION PLAN

C30.1 GRADING PLAN

C40.1 UTILITY PLAN

C40.2 UTILITY PLAN

C50.1 DETAIL SHEET

C50.2 DETAIL SHEET

ARCHITECTURAL DRAWINGS

A00.1 ABBREVIATIONS AND LEGENDS

A01.1 GROUND FLOOR PHASING PLAN

A01.2 SECOND FLOOR PHASING PLAN

A05.1 SECOND FLOOR DEMOLITION PLAN

A05.2 DEMOLITION ELEVATIONS

A10.0 GROUND FLOOR PLAN

A10.1 FIRST FLOOR PLAN

A10.2 SECOND FLOOR PLAN

A10.3 ROOF PLAN

A10.4 ENLARGED PLANS

A10.5 ENLARGED PLANS

A10.6 ENLARGED PLANS

A20.1 EXTERIOR ELEVATIONS

A25.1 BUILDING SECTIONS

A25.2 BUILDING SECTIONS

A25.3 BUILDING SECTIONS

A25.4 BUILDING SECTIONS

A30.1 WALL SECTIONS

A30.2 WALL SECTIONS

A35.1 ELEVATOR PLANS AND DETAILS

A35.2 ELEVATOR SECTIONS

A35.3 DEDUCT ALTERNATE ELEVATOR SECTIONS

A35.4 ELEVATOR DETIALS

A40.1 PARTITION TYPES AND CONSTRUCTION SYSTEMS

A40.2 CONSTRUCTION SYSTEMS

A40.3 CONSTRUCTION SYSTEMS

A40.4 CONSTRUCTION SYSTEMS

A50.1 EXTERIOR DETAILS

A50.2 EXTERIOR DETAILS

A50.3 PLAN DETAILS

A50.4 PLAN DETAILS

A50.5 PLAN DETAILS

A50.6 MISCELLANEOUS DETAILS

A55.1 WINDOW DETAILS

A60.1 DOOR, WINDOW & LOUVER SCHEDULE

A61.1 ROOM FINISH SCHEDULE

A70.1 FIRST FLOOR CEILING PLAN

A70.2 SECOND FLOOR CEILING PLAN

A71.1 SECOND FLOOR MATERIALS PLAN

A72.1 ENLARGED EQUIPMENT PLANS

A72.2 ENLARGED EQUIPMENT PLANS

A72.3 ENLARGED EQUIPMENT PLANS

A72.4 EQUIPMENT SCHEDULE

A73.1 SIGNAGE PLAN

A81.1 INTERIOR ELEVATIONS

A81.2 INTERIOR ELEVATIONS

A81.3 INTERIOR ELEVATIONS

A82.1 INTERIOR DETAILS

A83.1 MILLWORK DETAILS

STRUCTURAL DRAWINGS

S10.1 FOUNDATION PLAN, NOTES AND DETAILS

S20.1 FIRST FLOOR FRAMING PLAN

S20.2 SECOND FLOOR FRAMING

S30.1 ROOF FRAMING

S31.1 DEDUCT ALTERNATE PLANS AND DETAILS

S40.1 SCHEDULES

S40.2 BRACING ELEVATIONS AND DETAILS

S40.3 FRAMING ELEVATIONS AND DETAILS

S50.1 TYPICAL FOUNDATION NOTES AND DETAILS

S50.2 FOUNDATION DETAILS

S60.1 TYPICAL FRAMING NOTES AND DETAILS

S60.2 FRAMING DETAILS

S60.3 FRAMING DETAILS

S60.4 FRAMING DETAILS

PLUMBING DRAWINGS

P00.1 LEGEND, SCHEDULES, GENERAL NOTES & DETAILS

P05.1 BASEMENT FLOOR DRAINAGE DEMOLITION

P05.2 FIRST FLOOR DRAINAGE DEMOLITION

P05.3 SECOND FLOOR DRAINAGE DEMOLITION

P06.1 SECOND FLOOR SUPPLY DEMOLITION

P10.1 GROUND FLOOR DRAINAGE

P10.2 FIRST FLOOR DRAINAGE

P10.3 SECOND FLOOR DRAINAGE

P10.4 ROOF PLAN

P20.1 FIRST FLOOR SUPPLY

P20.2 SECOND FLOOR SUPPLY

P30.1 SECTIONS & DETAILS

MECHANICAL DRAWINGS

M00.1 LEGEND & GENERAL NOTES

M05.0 GROUND FLOOR DEMOLITION DUCTWORK

M05.1 FIRST FLOOR DEMOLITION DUCTWORK

M05.2 SECOND FLOOR DEMOLITION DUCTWORK

M06.0 GROUND FLOOR DEMOLITION PIPING

M06.1 ENLARGED MECHANICAL ROOM PIPING DEMOLITION

M10.0 GROUND FLOOR DUCTWORK

M10.1 FIRST FLOOR DUCTWORK

M10.2 SECOND FLOOR DUCTWORK

M20.0 GROUND FLOOR PIPING

M20.1 FIRST FLOOR PIPING

M20.2 SECOND FLOOR PIPING

M30.1 FLOW AND RISER DIAGRAMS & DETAILS

M30.2 CONTROL DIAGRAMS

M30.3 DETAILS

M31.1 SECTIONS

M40.1 SCHEDULES

ELECTRICAL DRAWINGS

E00.1 ELECTRICAL LEGEND AND NOTES

E00.2 ELECTRICAL LIGHTING FIXTURE SCHEDULE AND DETAILS

E05.1 SECOND FLOOR PART PLAN EXISTING CONDITIONS

E10.1 SECOND FLOOR PART PLAN LIGHTING

E20.1 SECOND FLOOR PART PLAN POWER

E20.2 ROOF PART PLAN POWER

E30.1 SECOND FLOOR PART PLAN SYSTEMS

E40.1 CYSTOSCOPY 263 ENLARGED PART PLANS

E50.1 ELECTRICAL RISER DIAGRAM

E60.1 PANELBOARD SCHEDULES

E70.1 ELECTRICAL DETAILS

E70.2 ELECTRICAL DETAILS

ES05.1 BASEMENT LEVEL SITE PLAN EXISTING CONDITIONS

ES10.0 SUB BASEMENT LEVEL SITE PLAN POWER AND SYSTEMS

ES10.1 BASEMENT LEVEL SITE PLAN POWER AND SYSTEMS

CONSTRUCT CLEAN CORE ADDITION TO SURGICAL SUITE

DEPARTMENT OF VETERANS AFFAIRS MEDICAL CENTER

830 CHALKSTONE AVENUE

PROVIDENCE, RHODE ISLAND 02908-4799

NO SCALE

CAMPUS KEY PLAN

NO SCALE

VICINITY MAP

VA PROJECT NUMBER - 650-337

DRAWING LIST

D4

F4

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Auburn, ME

207.784.5100

Boston, MA

617.426.5050

Portland, ME

207.775.0053

Portsmouth, NH

603.626.1242 c HA PROJECT NUMBER: 13586

CONSTRUCT CLEAN CORE ADDITION TO

SURGICAL SUITE

PROVIDENCE, RHODE ISLAND

650-337

C U s e rs

\m m o u e \D o c u m e n ts

R e v it

L o c a ls \1

-a rc h -c e n tr a l_ m m o u e

.r v t

/2

/2

:0

:3

P

M

G00.1

COVER SHEET

02-22-19 MMO MMO

FINAL CONSTRUCTION

DOCUMENTS

Revisions: Date:

Sheets
G00.1 - COVER SHEET