36E77619R0097-012.pdf
PDF 2 MB Posted
- Attached to
- Construct Clean Core (VA-19-00058573) Federal contract opportunity
- Solicitation number
- 36E77619R0097
About this file
This solicitation notice provides details for the Construct Clean Core Addition to Surgical Suite project at the Providence VA Medical Center. The Department of Veterans Affairs intends to solicit bids and award a single firm-fixed-price construction contract valued between $5-10 million. Work includes constructing a new surgery suite space, relocating the Cystoscopy suite and minor surgery, adding an elevated Clean Core to access operating rooms and Cystoscopy with sterile supplies, and locating support spaces within the Clean Core. Renovations will update approximately 2,900 square feet of existing space and 3,900 square feet in a new second floor addition. The solicitation will be issued as a Request for Proposal on October 16, 2019, with a period of performance of approximately 490 calendar days from notice to proceed. The opportunity is set aside for Service-Disabled Veteran-Owned Small Businesses. Questions must be submitted in writing by the specified date.
36E77619R0097 Attachment 9 - Mechanical Plans.pdf
View the file
Other files for this federal contract opportunity
Show all 44
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMS
TIGHT SHUT-OFF VALVE
FD (3 HR) FIRE DAMPER (3 HOUR RATED)
S2 4
SUPPLY DIFFUSER ( TYPE 2 )
400 CFM EA
DIFFUSER DESCRIPTION
QUANTITY
FIRE DAMPER (1 1/2 HOUR RATED)
( SEE REG., GRILLES & DIFF SCHEDULE )
BD
H
HS
V
DN
10'-0" FL
10.0 gpm
T
V
ACOUSTICALLY LINED DUCT
LENGTH, 10,000 BTU/HR) WITHOUT DAMPER
RADIATION I.D. ( TYPE A, 10'-0" FINNED1
10'-0" FL/D
10.0 GPM LENGTH, 10,000 BTU/HR) WITH DAMPER
A M10.1
ACV 2 - WAY
ACV 3 - WAY
BALANCE VALVE
BACKDRAFT DAMPER
CAP - PIPE
CHECK VALVE
COMBINATION BALANCING, FLOW MEASURING &
DUCT SECTION - SUPPLY/OUTDOOR AIR
DUCT SECTION - RETURN AIR
DUCT TURNING VANES
FLEXIBLE DUCT
FLOAT & THERMOSTATIC TRAP
ISOLATION VALVE
GLOBE VALVE
HUMIDISTAT
HUMIDITY SENSOR
LOCKSHIELD GATE VALVE
LOUVER
MANUAL AIR VENT
MOTORIZED DAMPER
OS&Y GATE VALVE
PETCOCK FOR GAUGE CONNECTION
PIPE ANCHOR
PIPE GUIDE
PITCH DOWN
PLUG VALVE
PRESSURE GAUGE
PRESSURE REDUCING VALVE
PRESSURE RELIEF VALVE
PRESSURE RELIEF DAMPER
RADIATION I.D. ( TYPE A, 10'-0" FINNED
REDUCER - CONCENTRIC
REDUCER - ECCENTRIC
RETURN AIR
SECTION I.D. ( SECTION A SHOWN ON DWG. M10.1)
SMOKE DAMPER
STRAINER
SUPPLY AIR
TAKE - OFF FROM BOTTOM OF PIPE
TAKE - OFF FROM TOP OF PIPE
TEMPERATURE SENSOR
THERMOMETER
THERMOMETER WELL
THERMOSTAT
THERMOSTAT COOLING
THERMOSTAT HEATING
THERMOSTAT - NIGHT
THERMOSTAT - HEATING/COOLING
THERMOSTATIC TRAP
UNION
VOLUME DAMPER
DUCT DIAMETER
CB COUNTERBALANCED DAMPER
S (SUPPLY) R (RETURN)
E (EXHAUST) T (TRANSFER)
DESCRIPTIONSYMBOL
S
PRD
M
F
AIRFLOW MEASURING STATION
DUCT MOUNTED SMOKE DETECTOR
T
TS
TC
H
N
H/C
T
T
T
DESCRIPTIONSYMBOL
EXISTING EQUIPMENT TO REMAIN
NEW EQUIPMENT
SD
EXISTING SUPPLY PIPING TO REMAIN
EXISTING RETURN PIPING TO REMAIN
NEW SUPPLY PIPING
NEW RETURN PIPING
EXISTING DUCTWORK TO REMAIN
NEW DUCTWORK
PIPE DOWN
PIPE UP
DUCT SECTION - EXHAUST AIR
DIFFERENTIAL PRESSURE SENSORDPS
INVERTED BUCKET TRAPIB
STATIC PRESSURE SENSORSPS
Graphic Scale
Graphic Scale
Graphic Scale
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL CONSTRUCTION
DOCUMENTS
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Auburn, ME 207.784.5100
Boston, MA 617.426.5050
Portland, ME 207.775.0053
Portsmouth, NH 603.626.1242 c HA PROJECT NUMBER: 13586
CONSTRUCT CLEAN CORE ADDITION TO
SURGICAL SUITE
PROVIDENCE, RHODE ISLAND
650-337SCALE:
C :\U se rs
\js la p\ D oc um en ts
R ev it
L oc al s\
6-m ec h-ce nt ra l_ js la p.
rv t 2/
/2
2:
:0
PM
M00.1
LEGEND & GENERAL NOTES
02-22-19 CG JSL
ABBREV DESCRIPTION
LAT LEAVING AIR TEMPERATURE
LPCR LOW PRESSURE CONDENSATE
RETURN (LESS THAN 15 PSI)
LPS LOW PRESSURE STEAM(LESS THAN
15 PSI)
LRA LOCKED ROTOR AMPS
LSGV LOCK & SHIELD GATE VALVE
LWT LEAVING WATER TEMPERATURE
M MOTORIZED DAMPER
MAX MAXIMUM
MBH 1000 BRITISH THERMAL UNITS
MCA MINIMUM CIRCUIT AMPS
MIN MINIMUM
MOPD MAXIMUM OVERCURRENT
PROTECTIVE DEVICE
MPCR MEDIUM PRESSURE CONDENSATE
RETURN(16-30 PSIG)
MPS MEDIUM PRESSURE STEAM (16-30
PSIG)
NA NOT APPLICABLE
NC NOISE CRITERIA
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NTS NOT TO SCALE
OA OUTSIDE AIR
OC ON CENTER
OED OPEN END DUCT
OS&Y OUTSIDE SCREW & YOKE GATE
VALVE
PD PRESSURE DROP
PRD PRESSURE RELIEF DAMPER
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
RET RETURN
RET RETURN
RL RIFRIGERANT LIQUID
RLA RATED LOAD AMPERES
RPM REVOLUTIONS PER MINUTE
RS REFRIGERANT SUCTION
S SMOKE DAMPER
S/F SMOKE AND FIRE COMBINATION
DAMPER
SP STATIC PRESSURE
SS STAINLESS STEEL
SUP SUPPLY
TEMP TEMPERATURE
TT THERMOSTATIC TRAP
TYP TYPICAL
V VOLUME DAMPER
VFD VARIABLE FREQUENCY DRIVE
W/ WITH
W/O WITHOUT
WC WATER COLUMN
WG WATER GAUGE
WPD WATER PRESSURE DROP
WWMS WELDED WIRE MESH SCREEN
Z ZONE DAMPER
PREFIX OF X EXISTING
ABBREV DESCRIPTION
ACV AUTOMATIC CONTROL VALVE
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
ALD ACOUSTICAL LINED DUCT
AMS AIRFLOW MEASURING STATION
APD AIR PRESSURE DROP
ATC AUTOMATIC TEMPERATURE
CONTROL
B BAROMETRIC DAMPER
BD BACKDRAFT DAMPER
BHP BRAKE HORSEPOWER
BPD BYPASS DAMPER
BTU BRITISH THERMAL UNITS
CBD COUNTERBALANCED BACKDRAFT
DAMPER
CFM CUBIC FEET PER MINUTE
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CO CLEANOUT
CTE CONNECT TO EXISTING
CWR CONDENSER WATER RETURN
CWS CONDENSER WATER SUPPLY
DCW DOMESTIC COLD WATER
DEG.F DEGREES FAHRENHEIT
DHW DOMESTIC HOT WATER
DIA DIAMETER
DN DOWN
EAT ENTERING AIR TEMPERATURE
ESP EXTERNAL STATIC PRESSURE
EWT ENTERING WATER TEMPERATURE
EXG EXISTING
EXH EXHAUST
F&T FLOAT & THERMOSTATIC TRAP
FD FIRE DAMPER
FL FINNED LENGTH OF RADIATION
FM FLOW METER
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FPF FINS PER FOOT
FPI FINS PER/INCH
FPM FEET PER MINUTE
FT FEET
FT-HD FEET OF HEAD
FT-WG FEET WATER GAUGE
FTR FIN TUBE RADIATOR
GAL GALLONS
GPM GALLONS PER MINUTE
HP HORSEPOWER
HPCR HIGH PRESSURE CONDENSATE
RETURN (OVER 30 PSIG)
HPS HIGH PRESSURE STEAM (OVER
30PSIG)
HRR HEAT RECOVERY RETURN
HRS HEAT RECOVERY SUPPLY
HWR HOT WATER RETURN
HWS HOT WATER SUPPLY
IN INCHES
GENERAL NOTES
1 VISIT THE BUILDING SITE PRIOR TO BIDDING TO BECOME FAMILIAR WITH EXISTING CONDITIONS, AND TO
TAKE MEASUREMENTS AS NECESSARY FOR COMPLETION OF THE WORK ASSOCIATED WITH THE DESIGN
INTENT OF THE CONTRACT DOCUMENTS.
2 COORDINATE WORK OF MECHANICAL SUBCONTRACTOR WITH WORK OF OTHER TRADES.
3 DUCTWORK, PIPING AND EQUIPMENT ARE INDICATED DIAGRAMMATICALLY. FIELD-VERIFY LOCATIONS.
4 PRIOR TO FABRICATING DUCTWORK, COORDINATE WITH OTHER TRADES TO ENSURE THAT THE DUCTWORK
CAN BE INSTALLED WITH THE INDICATED SIZES AND LOCATIONS.FIELD-VERIFY EXISTING DUCT SIZES AND
CONDITIONS.SUBMIT ANY DISCREPANCIES OR PROPOSED CHANGES.
5 REFER TO ARCHITECTURAL REFLECTED CEILING PLAN FOR LOCATIONS OF CEILING DIFFUSERS AND REGISTERS.PROVIDE VOLUME DAMPERS SO THAT EVERY REGISTER, GRILLE AND DIFFUSER (SUPPLY, RETURN, AND EXHAUST) CAN BE INDIVIDUALLY BALANCED.
6 VERIFY INSTALLATION OF EXISTING VOLUME DAMPERS AT EACH BRANCH IN EXISTING SUPPLY DUCT.
PROVIDE ADDITIONAL VOLUME DAMPERS WHERE REQUIRED.
7 LOCATE VOLUME DAMPERS AS FAR AWAY FROM REGISTERS, GRILLES AND DIFFUSERS AS POSSIBLE TO MINIMIZE NOISE. LOCATE TO BE UNOBSTRUCTED AND EASILY ACCESSIBLE FOR TESTING AND BALANCING.
LOCATE POSSIBLE. WHERE VOLUME DAMPERS MUST BE LOCATED ABOVE HARD CEILINGS SUCH AS GYPSUM WALLBOARD, PROVIDE ACCESS PANELS AS SPECIFIED, AND NOTIFY THE ARCHITECT OF SUCH LOCATIONS VERBALLY AND IN WRITING. OBTAIN PERMISSION FROM THE ARCHITECT BEFORE INSTALLING
ACCESS PANELS.
8 DUCT ELBOWS SHALL BE LONG-RADIUS TYPE (THROAT RADIUS EQUAL TO OR GREATER THAN DUCT WIDTH IN THE PLANE OF THE TURN) WHEREVER SPACE ALLOWS. IF SPACE IS NOT ADEQUATE, PROVIDE MITERED
ELBOWS WITH TURNING VANES.
9 PROVIDE 16 GAUGE SINGLE-THICKNESS TURNING VANES AT MITERED DUCT ELBOWS. VANE EDGES
(LEADING AND TRAILING) SHALL BE TANGENTIAL TO AIRFLOW.
10 FLEXIBLE DUCT LENGTHS SHALL NOT EXCEED 5'-0"
11 PAINT DUCTWORK VISIBLE THRU CEILING OPENINGS, DUCT OPENINGS, AND REGISTERS, GRILLES, AND
DIFFUSERS WITH BLACK PAINT IN ACCORDANCE WITH DIVISION 09 SECTION "PAINTING."
12 MOUNT THERMOSTATS AND TEMPERATURE AND HUMIDITY SENSORS AT 48 INCHES AFF TO TOP OF ITEM.
PROVIDE ELECTRICAL WALL BOX ATTACHED TO FRAMING.
13 WHERE THERMOSTATS/TEMPERATURE SENSORS ARE LOCATED NEAR LIGHT SWITCHES, INSTALL SO THAT
LIGHT SWITCHES ARE NEARER TO THE DOOR JAMBS. THE INTENT IS TO LOCATE THERMOSTATS/ TEMPERATURE SENSORS SO THEY WILL NOT INTERFERE WITH ACCESSIBILITY OF LIGHT SWITCHES.
14 PIPING INDICATED IN OUTSIDE WALLS SHALL BE RUN ON THE WARM SIDE OF BUILDING INSULATION AND VAPOR BARRIER. BUILDING INSULATION BEHIND SUCH PIPING SHALL BE CONTINUOUS, WITHOUT JOINTS OR
GAPS.
15 PIPING SHALL BE CONCEALED EXCEPT IN MECHANICAL ROOMS AND AS INDICATED. WHERE PIPES DROP IN
BLOCK WALLS, PROVIDE 1/2" THICK INSULATION MINIMUM.
16 SEAL DUCTWORK AND PIPING THRU MECHANICAL ROOM FLOORS AND PARTITIONS, AND THRU FIRE-RATED
ASSEMBLIES, WITH FIRESTOP MATERIAL AS SPECIFIED.
17 CONTRACTOR SHALL ROUGH-IN AS MUCH PIPING AS POSSIBLE AHEAD OF TIME TO SERVE NEW CLEAN STEAM GENERATOR AND RELOCATED CHILLER PLANT. IN ORDER TO MINIMIZE DOWNTIME TO THE FACILITY, CONTRACTOR SHALL SCHEDULE CUT-OVER OF NEW CLEAN STEAM GENERATOR AT THE SAME TIME AS
CUT-OVER FOR RELOCATED CHILLER PLANT.
Revisions: Date:
0.5 1 1.5 2
1.8 2.2 2.5 3 4 5 6 7
G.4'
9 10
E4.8
E5
E3E2 EC.2ECEB.3EBEA.8EA
A.5 A.5'
A 3'
B
A' A.2'
C.3
D.3
C.5
B' C' D' E' F'
F
F.7' G'
H
D
EE.1
E4
G.3'
4.8'
C G.5'
4.75'
4.7'
4.5'
4'
4.3'
L
EA.1
K
J
EBB
GF.9
2'
A.6'
1'
5'
EXISTING SURGICAL SUITE
AIR HANDLER TO REMAIN EXISTING SURGICAL SUITE
AIR HANDLER TO REMAIN
M001
M001
M001
M001
M001
EXISTING DUCTWORK
TO REMAIN (TYP.)
EXISTING DIFFUSER, REGISTER
OR GRILLE TO REMAIN (TYP.)
Graphic Scale
Graphic Scale
Graphic Scale
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL CONSTRUCTION
DOCUMENTS
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Auburn, ME 207.784.5100
Boston, MA 617.426.5050
Portland, ME 207.775.0053
Portsmouth, NH 603.626.1242 c HA PROJECT NUMBER: 13586
CONSTRUCT CLEAN CORE ADDITION TO
SURGICAL SUITE
PROVIDENCE, RHODE ISLAND
650-337SCALE:
C :\U se rs
\js la p\ D oc um en ts
R ev it
L oc al s\
6-m ec h-ce nt ra l_ js la p.
rv t 2/
/2
2:
:2
PM
M05.0
GROUND FLOOR DEMOLITION
DUCTWORK
02-22-19 CG JSL
SCALE: 1/8" = 1'-0"1 GROUND FLOOR DUCT DEMO PLAN
KEY NOTES
CODE DESCRIPTION
M001 TAB CONTRACTOR TO PERFORM PRELIMINARY AIRFLOW MEASUREMENT PRIOR TO
DEMOLITION AND SUBMIT RESULTS TO ENGINEER FOR REVIEW. ONCE DEMOLITION IS
COMPLETE, TAB CONTRACTOR SHALL RE-BALANCE TO PRELIMINARY CONDITIONS (OR NEW
FLOW IF CHANGED BY SUBMITTAL REVIEW). INTERMEDIATE TAB REPORT SHALL BE
SUBMITTED TO ENGINEER FOR REVIEW. AT CONCLUSION OF PROJECT, TAB CONTRACTOR
SHALL REBALANCE TO PRELIMINARY CONDITIONS (OR NEW FLOW IF CHANGED BY
SUBMITTAL REVIEW). FINAL TAB REPORT SHALL BE SUBMITTED TO ENGINEER FOR REVIEW.
M002 TAB CONTRACTOR TO PERFORM PRELIMINARY AIRFLOW MEASUREMENT PRIOR TO
DEMOLITION AND SUBMIT RESULTS TO ENGINEER FOR REVIEW.
G.4'
9 10
E4.8
E5
E3 EBEA.8EA
A.5 A.5'
A 3'
B
A' A.2'
C.3
D.3
C.5
B' C' D' E' F'
F
F.7' G'
H
D
EE.1
E4
G.3'
4.8'
C G.5'
4.75'
4.7'
4.5'
4'
4.3'
L
EA.1
K
J
EBB
G F.92'
A.6'
1'
5'
M31.1
M31.1
M001
M001
M001
M001
M001
M001
M001
M001
M001
M001 M001
M001
EXISTING DUCT TO
REMAIN (TYP.)
EXISTING DIFFUSER, REGISTER
OR GRILLE TO REMAIN (TYP.)
STAIR K
K-1
CORRIDOR
STAFF LOUNGE AND
CONFERENCE
NURSE MANAGER
OFFICE
ANESTHESIA OFFICE
118 ANESTHESIA
CONFERENCE ROOM
118A OFFICE
PU/DO
119A
PICK UP
119B
DROP OFFICE
119C
WAITING
STAFF LOCKER
FEMALE
115 TOILET MALE
TOILET FEMALE
STAFF LOCKER MALE
113A
STAFF LOCKER MALE
113A
OFFICE
115A
OFFICE
OFFICE
OFFICE
CONFERENCE ROOM
110 BREAK / KITCHEN
STAFF WASHROOM
109A
CONSULT
STAIR TOWER-2
MENS RESTROOM
WOMENS REST ROOM
RECEPTION
160A
COMP AND PENSION
COMP AND PENSION
MECHANICAL ROOM
Graphic Scale
Graphic Scale
Graphic Scale
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL CONSTRUCTION
DOCUMENTS
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Auburn, ME 207.784.5100
Boston, MA 617.426.5050
Portland, ME 207.775.0053
Portsmouth, NH 603.626.1242 c HA PROJECT NUMBER: 13586
SCALE:
C :\U se rs
\js la p\ D oc um en ts
R ev it
L oc al s\
6-m ec h-ce nt ra l_ js la p.
rv t 2/
/2
2:
:4
PM
M05.1
FIRST FLOOR DEMOLITION
DUCTWORK
CONSTRUCT CLEAN CORE ADDITION TO
SURGICAL SUITE
PROVIDENCE, RHODE ISLAND
650-337
02-22-19 CG JSL
SCALE: 1/8" = 1'-0"1 FIRST FLOOR DUCT DEMO PLAN
KEY NOTES
CODE DESCRIPTION
M001 TAB CONTRACTOR TO PERFORM PRELIMINARY AIRFLOW MEASUREMENT PRIOR TO
DEMOLITION AND SUBMIT RESULTS TO ENGINEER FOR REVIEW. ONCE DEMOLITION IS
COMPLETE, TAB CONTRACTOR SHALL RE-BALANCE TO PRELIMINARY CONDITIONS (OR NEW
FLOW IF CHANGED BY SUBMITTAL REVIEW). INTERMEDIATE TAB REPORT SHALL BE
SUBMITTED TO ENGINEER FOR REVIEW. AT CONCLUSION OF PROJECT, TAB CONTRACTOR
SHALL REBALANCE TO PRELIMINARY CONDITIONS (OR NEW FLOW IF CHANGED BY
SUBMITTAL REVIEW). FINAL TAB REPORT SHALL BE SUBMITTED TO ENGINEER FOR REVIEW.
M002 TAB CONTRACTOR TO PERFORM PRELIMINARY AIRFLOW MEASUREMENT PRIOR TO
G.4'
9 10
E4.8
E5
E3E2 EC.2ECEB.3EBEA.8EA
A.5 A.5'
A 3'
B
A' A.2'
C.3
D.3
C.5
B' C' D' E' F'
F
F.7' G'
H
D
EE.1
E4
G.3'
4.8'
C G.5'
4.75'
4.7'
4.5'
4'
4.3'
L
EA.1
K
J
EBB
GF.9
2'
A.6'
1'
5'
EXISTING DUCTWORK
TO REMAIN (TYP.)
EXISTING DUCTWORK TO
BE REMOVED (TYP.)
EXISTING REGISTER, GRILLE
OR DIFFUSER TO BE REMOVED (TYP.)
M31.1
M31.1
EXISTING REGISTER, GRILLE
OR DIFFUSER TO REMAIN (TYP.)
M001
M001
M001
TYP. OF 16 M001 TYP. OF 10
M001
M001
M001
M001
M001 TYP. OF 10
M001 TYP. OF 10
M001
M001
M001
M001
M001
M001
M001
M001
M001
M001
M001 M001
M001
M001
M001
M001
M001 M001
M001 M001
M001M001
M001
M001 M001
M001
M001
M001
M001 M001 M001 M001 M001 M001
M001
M001
M001 M001
M001
M002
TYP. OF 8
M002
M002
M002
M002
M002
M002
STAIR-K
K-2
STAFF TOILET/SHOWER
CORRIDOR
C223
PACU
NURSE STATION
EQUIPMENT STORAGE
PATIENT TOILET
215A
OBSERVATION ROOM
CORRIDOR
C223
MALE LOCKERS
MALE LOCKERS
ANGIOPLASTY
SCRUB
210A
SEMI RESTRICTED
CORRIDOR
OR-1
208 OR-2
OR-3
SCRUB
210B
HOUSE KEEPING
215G
MINOR PROCEDURE
CORRIDOR
STAIR WELL
A-2
IT CLOSET
229A
LINEN CHUTE
OFFICE
228CORRIDOR
2-DC-1APATIENT TOILET
215F
PATIENT LOCKERS
215E
VESTIBULE
215D
CLEAN UTILITIES
215C
ANESTHESIA
WORKROOM
ELECTRICAL CLOSET
ELECTRICAL CLOSET
HOUSE KEEPING
232A
HOUSE KEEPING
232A OR STORAGE
ELEC
232C
ELEC
232D
OR STORAGE
INTERVENTIONAL PAIN
MANAGEMENT
233A
OR RECEPTION
WAITING ROOM
CORRIDOR
OFFICE
201A
OFFICE
201A
ELECTRICAL ROOM
201C
EMERGENCY
ELECTRICAL ROOM
201B
CONSULT ROOM
FEMALE LOCKERS
FEMALE LOCKERS
TOILET
202A
ELEVATOR LOBBY
L23
ELEVATOR
E-EL-2
ELEVATOR
E-EL-1
ELEVATOR LOBBY
L21
LOBBY
L22
EXAM-1
E205
EXAM-2
E206
MICROSCOPE
E207
EXAM-3
E208
CORRIDOR
C22
CAST ROOM
E204
CORRIDOR
C21
Graphic Scale
Graphic Scale
Graphic Scale
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL CONSTRUCTION
DOCUMENTS
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Auburn, ME 207.784.5100
Boston, MA 617.426.5050
Portland, ME 207.775.0053
Portsmouth, NH 603.626.1242 c HA PROJECT NUMBER: 13586
SCALE:
C :\U se rs
\js la p\ D oc um en ts
R ev it
L oc al s\
6-m ec h-ce nt ra l_ js la p.
rv t 2/
/2
2:
:0
PM
M05.2
SECOND FLOOR DEMOLITION
DUCTWORK
CONSTRUCT CLEAN CORE ADDITION TO
SURGICAL SUITE
PROVIDENCE, RHODE ISLAND
650-337
02-22-19 CG JSL
SCALE: 1/8" = 1'-0"1 SECOND FLOOR DUCT DEMO PLAN
KEY NOTES
CODE DESCRIPTION
M001 TAB CONTRACTOR TO PERFORM PRELIMINARY AIRFLOW MEASUREMENT PRIOR TO
DEMOLITION AND SUBMIT RESULTS TO ENGINEER FOR REVIEW. ONCE DEMOLITION IS
COMPLETE, TAB CONTRACTOR SHALL RE-BALANCE TO PRELIMINARY CONDITIONS (OR NEW
FLOW IF CHANGED BY SUBMITTAL REVIEW). INTERMEDIATE TAB REPORT SHALL BE
SUBMITTED TO ENGINEER FOR REVIEW. AT CONCLUSION OF PROJECT, TAB CONTRACTOR
SHALL REBALANCE TO PRELIMINARY CONDITIONS (OR NEW FLOW IF CHANGED BY
SUBMITTAL REVIEW). FINAL TAB REPORT SHALL BE SUBMITTED TO ENGINEER FOR REVIEW.
M002 TAB CONTRACTOR TO PERFORM PRELIMINARY AIRFLOW MEASUREMENT PRIOR TO
EXISTING SURGICAL SUITE
AIR HANDLER TO REMAIN
EXISTING SURGICAL SUITE
AIR HANDLER TO REMAIN
EXISTING CLEAN STEAM
GENERATOR TO BE
REMOVED
EXISTING SURGICAL SUITE
CHILLER TO BE REMOVED
EXISTING OUTPATIENT PHARMACY
CHILLER TO BE RELOCATED
EXISTING CHILLED WATER PUMPS
TO REMAIN
LPS- 6"
HWR- 3"
LPC- 2"
HPC- 3/4"
CHWS- 4"
HWS- 3"
HPS- 1"
CHWR- 6"
M06.1
EXISTING STEAM TO HOT WATER
HEAT EXCHANGERS AND PUMPS
TO REMAIN AND SERVE PROJECT
EXISTING ABOVE GROUND
EXTERIOR PIPING TO
BE REMOVED (TYP.)
PIPING TO BE
REMOVED (TYP.)
EXISTING WING E CONDENSING
UNIT TO BE RELOCATED. CUT
BACK REFRIGERANT PIPING TO
OUTSIDE WALL AND CAP FOR
RE-CONNECTION. SEE DRAWING
ES05.1 FOR MORE INFORMATION.
Graphic Scale
Graphic Scale
Graphic Scale
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL CONSTRUCTION
DOCUMENTS
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Auburn, ME 207.784.5100
Boston, MA 617.426.5050
Portland, ME 207.775.0053
Portsmouth, NH 603.626.1242 c HA PROJECT NUMBER: 13586
CONSTRUCT CLEAN CORE ADDITION TO
SURGICAL SUITE
PROVIDENCE, RHODE ISLAND
650-337SCALE:
C :\U se rs
\js la p\ D oc um en ts
R ev it
L oc al s\
6-m ec h-ce nt ra l_ js la p.
rv t 2/
/2
2:
:4
PM
M06.0
GROUND FLOOR DEMOLITION
PIPING
02-22-19 CG JSL
SCALE: 1/8" = 1'-0"1 GROUND FLOOR PIPING DEMO PLAN
HWR- 3"
HWS- 3"
LPC- 2"
HPS- 1"
HPC- 3/4"
CHWR- 6"
CHWS- 4"
LP
S
- 3
C H
W S
- 4
C H
W S
- 6
CHWS- 6"
C H
W R
- 6
H W
R
- 3
H W
S
- 3
H W
S
- 3
LPC- 1 1/4"
LPC- 2"
LPC- 2"
LPC- 1 1/4"
H W
S
- 3
/4
H W
R
- 3
/4
H W
S
- 3
H
W R
- 3
CHWS- 6"
CHWR- 6"
HPC- 3/4"
HPS- 1"
LPC- 2"
HWS- 3"
HWR- 3"
H P
S
- 1
H P
C
- 3
/4
LP
S
- 2
LP
C
- 1
H W
R
- 3
C H
W S
- 6
CHWS- 6"
CHWS- 4"
CHWS- 4"
LP
C
- 2
C H
W S
- 4
C H
W S
- 4
LP
C
- 2
C H
W S
- 4
C H
W S
- 4
LPC- 2"LPC- 2"
H P
S
- 1
H P
C
- 3
/4
HPC- 1"
HPS- 1 1/4"
LPC- 2"
HPS- 4"
LP
S
- 6
LPS- 6"
LPC- 1 1/4"
H P
S
- 1
/4
HPC- 1
LP
C- 2
C H
W R
- 4
LPS- 3"
LPC- 3"
LPS- 3"
LPC- 3"
LP
S
- 3
TEMPORARY
CHILLER BYPASS
PIPING TO BE REMOVED
Graphic Scale
Graphic Scale
Graphic Scale
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL CONSTRUCTION
DOCUMENTS
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Auburn, ME 207.784.5100
Boston, MA 617.426.5050
Portland, ME 207.775.0053
Portsmouth, NH 603.626.1242 c HA PROJECT NUMBER: 13586
SCALE:
C :\U se rs
\js la p\ D oc um en ts
R ev it
L oc al s\
6-m ec h-ce nt ra l_ js la p.
rv t 2/
/2
3:
:0
PM
M06.1
ENLARGED MECHANICAL ROOM
PIPING DEMOLITION
CONSTRUCT CLEAN CORE ADDITION TO
SURGICAL SUITE
PROVIDENCE, RHODE ISLAND
650-337
02-22-19 CG JSL
SCALE: 1/4" = 1'-0"1 ENLARGED MECHANICAL ROOM PIPING DEMOLITION
G.4'
E4.8
E5
ED
E3E2E1 EC.2ECEB.3EBEA.8EA
A.5 A.5'
A 3'
B
A' A.2'
C.3
D.3
C.5
B' C' D' E' F'
F
F.7' G'
H
D
EE.1
E4
G.3'
4.8'
C G.5'
4.75'
4.7'
4.5'
4'
4.3'
L
EA.1
K
J
EBB
GF.9
2'
A.6'
1'
5'
EXISTING AIR HANDLING
UNITS TO BE RE-BALANCED
TO ORIGINAL DESIGN FLOWS
M001
M001
M001
M001
M001
EXISTING RETURN FANS TO BE
RE-BALANCED TO ORIGINAL
DESIGN FLOWS
Graphic Scale
Graphic Scale
Graphic Scale
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL CONSTRUCTION
DOCUMENTS
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Auburn, ME 207.784.5100
Boston, MA 617.426.5050
Portland, ME 207.775.0053
Portsmouth, NH 603.626.1242 c HA PROJECT NUMBER: 13586
CONSTRUCT CLEAN CORE ADDITION TO
SURGICAL SUITE
PROVIDENCE, RHODE ISLAND
650-337SCALE:
C :\U se rs
\js la p\ D oc um en ts
R ev it
L oc al s\
6-m ec h-ce nt ra l_ js la p.
rv t 2/
/2
3:
:2
PM
M10.0
GROUND FLOOR DUCTWORK
02-22-19 CG JSL
SCALE: 1/8" = 1'-0"1 GROUND FLOOR DUCT PLAN
KEY NOTES
CODE DESCRIPTION
M001 TAB CONTRACTOR TO PERFORM PRELIMINARY AIRFLOW MEASUREMENT PRIOR TO
DEMOLITION AND SUBMIT RESULTS TO ENGINEER FOR REVIEW. ONCE DEMOLITION IS
COMPLETE, TAB CONTRACTOR SHALL RE-BALANCE TO PRELIMINARY CONDITIONS (OR NEW
FLOW IF CHANGED BY SUBMITTAL REVIEW). INTERMEDIATE TAB REPORT SHALL BE
SUBMITTED TO ENGINEER FOR REVIEW. AT CONCLUSION OF PROJECT, TAB CONTRACTOR
SHALL REBALANCE TO PRELIMINARY CONDITIONS (OR NEW FLOW IF CHANGED BY
SUBMITTAL REVIEW). FINAL TAB REPORT SHALL BE SUBMITTED TO ENGINEER FOR REVIEW.
M002 TAB CONTRACTOR TO PERFORM PRELIMINARY AIRFLOW MEASUREMENT PRIOR TO
G.4'
E4.8
E5
ED
E3E2E1 EC.2ECEB.3EBEA.8EA
A.5 A.5'
A 3'
B
A' A.2'
C.3
D.3
C.5
B' C' D' E' F'
F
F.7' G'
H
D
EE.1
E4
G.3'
4.8'
C G.5'
4.75'
4.7'
4.5'
4'
4.3'
L
EA.1
K
J
EBB
GF.9
2'
A.6'
1'
5'
M31.1
M31.1
M001
M001
M001
M001
M001
M001
M001
M001
M001
M001 M001
M001
STAIR K
K-1
STAFF LOUNGE AND
CONFERENCE
NURSE MANAGER
OFFICE
ANESTHESIA OFFICE
ANESTHESIA
CONFERENCE ROOM
118A OFFICE
PU/DO
119A
PICK UP
119B
DROP OFFICE
119C
WAITING
CORRIDOR
STAFF LOCKER
FEMALE
TOILET MALE
TOILET FEMALE
STAFF LOCKER MALE
113A
OFFICE
115A
OFFICE
OFFICE
OFFICE
CONFERENCE ROOM
110 BREAK / KITCHEN
STAFF WASHROOM
109A
CONSULT
MECHANICAL ROOM
STAIR TOWER-2
MENS RESTROOM
WOMENS REST ROOM
MENS REST ROOM
COMP AND PENSION
COMP AND PEN
PSYCHOLOGIST
COMP AND PENSION
COMP AND PENSION
COMP AND PENSION
RECEPTION
160A
COMP AND PENSION
Graphic Scale
Graphic Scale
Graphic Scale
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL CONSTRUCTION
DOCUMENTS
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Auburn, ME 207.784.5100
Boston, MA 617.426.5050
Portland, ME 207.775.0053
Portsmouth, NH 603.626.1242 c HA PROJECT NUMBER: 13586
CONSTRUCT CLEAN CORE ADDITION TO
SURGICAL SUITE
PROVIDENCE, RHODE ISLAND
650-337SCALE:
C :\U se rs
\js la p\ D oc um en ts
R ev it
L oc al s\
6-m ec h-ce nt ra l_ js la p.
rv t 2/
/2
3:
:3
PM
M10.1
FIRST FLOOR DUCTWORK
02-22-19 CG JSL
SCALE: 1/8" = 1'-0"1 FIRST FLOOR DUCT PLAN
KEY NOTES
CODE DESCRIPTION
M001 TAB CONTRACTOR TO PERFORM PRELIMINARY AIRFLOW MEASUREMENT PRIOR TO
DEMOLITION AND SUBMIT RESULTS TO ENGINEER FOR REVIEW. ONCE DEMOLITION IS
COMPLETE, TAB CONTRACTOR SHALL RE-BALANCE TO PRELIMINARY CONDITIONS (OR NEW
FLOW IF CHANGED BY SUBMITTAL REVIEW). INTERMEDIATE TAB REPORT SHALL BE
SUBMITTED TO ENGINEER FOR REVIEW. AT CONCLUSION OF PROJECT, TAB CONTRACTOR
SHALL REBALANCE TO PRELIMINARY CONDITIONS (OR NEW FLOW IF CHANGED BY
SUBMITTAL REVIEW). FINAL TAB REPORT SHALL BE SUBMITTED TO ENGINEER FOR REVIEW.
M002 TAB CONTRACTOR TO PERFORM PRELIMINARY AIRFLOW MEASUREMENT PRIOR TO
V
V
V
VV
V
VVVVVV
V
V
V
V V
V V
V V
V V VV V
V V
V
V V
V V
V
V V V
V
V V
V V
V
V
V
V
V
V
V V
V
V V
V
V
V
V
V
V
M M
V V
V V
S
V
TT
T
T
T
T
T
T
T
T T
T
T
V
V
F
F
F
F
F
0.5 1 1.5 2
1.8 2.2 2.5 3 4 5 6 7
G.4'
9 10
E4.8
E5
E3E2 EC.2ECEB.3EBEA.8EA
A.5 A.5'
A 3'
B
A' A.2'
C.3
D.3
C.5
B' C' D' E' F'
F
F.7' G'
H
D
EE.1
E4
G.3'
4.8'
C G.5'
4.75'
4.7'
4.5'
4'
4.3'
L
EA.1
K
J
EBB
GF.9
2'
A.6'
1'
5'
CONTINUOUS WALL LOUVER
OUTSIDE AIR AND RELIEF
AIR SHALL BE SEPARATED
FROM EACH OTHER BY 25'-0"
USING DUCT PLENUMS
PROVIDE VOLUME DAMPERS
AT THESE BRANCHES
8"ø
8"ø
"x
8" 6" ø
42"x14"
8"ø 12"x10" 12"x10"
"x
8" ø
8"ø
5" ø
8" ø
8"ø
8"ø 6"ø 10"x8"
6"ø
8"ø
12"x10"
8"ø
8"ø
6"ø
10"ø
10"ø
16"x16"12"x12"
"ø
10"ø
10"ø
10"ø
5"ø
"x
28"x14"
28"x14"
14"ø
8"ø
24"x12"10"ø
12"ø
14"x14" 10"ø
"x
"ø
20"x18"
"x
14"x14"
"ø
"ø
"x
10"x10"
"x
8" x1
4"
10"ø
10"ø
"ø
8" ø
"x
10"x10"10"ø 6"ø 10"ø
12"ø 8"ø
CAP
12"x12" UP THROUGH
ROOF TO HEPA FILTER MODULE
EQUAL TO AAF/FLANDERS MODEL
BG1-1H1W-2GGF-304-D4 WITH
FLANDERS MEGAPLEAT M8 PRE
FILTER AND ASTROCEL 1 HEPA
FILTER. PROVIDE OPTIONAL
WEATHER COVER FOR OUTDOOR
INSTALLATION. FILTER MODULE
IS SERVED BY EF-13B001 UTILITY
SET EXHAUST FAN.
8"ø
8"ø
8"ø
8"ø
8"ø
10"x10"
10"x10"
12"x10"
"x1
0"
8"ø 8"x
6"
"x6
12"x6"
12"x8"
14"x10"
18"x8"
"x
6"
"x
20"x12"
"x
24"x16"
36"x14"
"x
24"x10"
DUCT SMOKE DETECTOR
IN RISER
DUCT SMOKE DETECTOR
IN RISER
M31.1
M31.1
HUM-1
SEMI RESTRICTED
CORRIDOR
CYSTOSCOPY
CLEAN AND STERILE
SUPPLY
CLEAN CORE
CC STORAGE
255A
MECHANICAL
CLEAN AND STERILE
SUPPLY
EQUIPMENT STORAGE
IUSS
SEMI RESTRICTED
CORRIDOR
NURSE MANAGER
OFFICE
SOILED UTILITY
BRONCHOSCOPY
NOTE: WITHIN CYSTOSCOPY 263,
ALL LOW RETURN GRILLES SHALL
BE LOCATED 7" AFF.
M001
M001
M001
TYP. OF 16 M001 TYP. OF 10
M001 TYP. OF 10
M001 TYP. OF 10
M001
M001
M001
M001
M001
M001
CAP
"x
6"
M001
M001
RE-BALANCE TO 150 CFM
WHEN USED AS LOCKER ROOM
RE-BALANCE TO 350 CFM
WHEN USED AS LOCKER ROOM
RE-BALANCE TO 100 CFM
(TYP. OF 4) WHEN USED AS
ANESTHESIA WORKROOM
RE-BALANCE TO 400 CFM
WHEN USED AS
ANESTHESIA WORKROOM
"x8
"x8
6"ø 8"ø
8"ø
10"x8" 6"ø
"x8
8"ø
M001
M001
M001
M001 M001
M001
M001
M001
M001
M001 M001
M001
M001 M001 M001 M001 M001 M001
M001M001 M001M001
M001
M001
M001 M001
M001
M001
M001
M001
M001
M001
M001
M001
M001
S6
S6
S3 1
S2 1
S2 2
R9
R2
S3 4
S2 2
S2 3
S2 1
S5
R5
S5
S7
S7
S3 2
R8
R7
S3 1
S2 1 R3
R5
E2
S1 1
E8
S2 5
S2 1
R3
S2 2
E1
E6
8"ø
VAV-11
VAV-10
VAV-9
VAV-8
VAV-7
VAV-5
VAV-6
VAV-4
VAV-3
VAV-2
VAV-1
VAV-12
VAV-13
S8
R8
STAIR-K
K-2
PACU
EQUIPMENT STORAGE
STAFF TOILET/SHOWER
CORRIDOR
C223
MALE LOCKERS
SEMI RESTRICTED
CORRIDOR
SCRUB
210A
ANGIOPLASTY
OR-1
OR-2
OR-3
NURSE STATION
OBSERVATION ROOM
ANESTHESIA
WORKROOM
PATIENT TOILET
215F
CORRIDOR
2-DC-1A
OFFICE
CORRIDOR
IT CLOSET
229A
LINEN CHUTE
STAIR WELL
A-2
ELECTRICAL CLOSET
CORRIDOR
ELECTRICAL CLOSET
HOUSE KEEPING
232A
HOUSE KEEPING
232A
ELEC
232D
ELEC
232C
OR STORAGE
MINOR PROCEDURE
SOILED UTILITIES
215BVESTIBULE
215D
CLEAN UTILITIES
215C
SEMI RESTRICTED
CORRIDOR
LINK CORRIDOR
L24
CONSULT ROOM
ELECTRICAL ROOM
201C
EMERGENCY
ELECTRICAL ROOM
201B
OFFICE
201A
WAITING ROOM
OR RECEPTION
INTERVENTIONAL PAIN
MANAGEMENT
233A
FEMALE LOCKERS
TOILET
202A
56"x16" 72"x36"
"x
"x
18"x8"
AHU-12B001 ELEVATOR LOBBY
L23
EXAM-1
E205
EXAM-2
E206
MICROSCOPE
E207
EXAM-3
E208
CORRIDOR
C22 CAST ROOM
E204
CORRIDOR
C21
ELEVATOR LOBBY
L21
LOBBY
L22
ELEVATOR
E-EL-1
ELEVATOR
E-EL-2
NOTE: BALANCING CONTRACTOR SHALL WORK WITH
CONTROLS CONTRACTOR TO SET SUPPLY DUCT
STATIC PRESSURE SETPOINT AND RETURN DUCT
STATIC PRESSURE SETPOINT.
Graphic Scale
Graphic Scale
Graphic Scale
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL CONSTRUCTION
DOCUMENTS
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Auburn, ME 207.784.5100
Boston, MA 617.426.5050
Portland, ME 207.775.0053
Portsmouth, NH 603.626.1242 c HA PROJECT NUMBER: 13586
SCALE:
C :\U se rs
\js la p\ D oc um en ts
R ev it
L oc al s\
6-m ec h-ce nt ra l_ js la p.
rv t 2/
/2
3:
:0
PM
M10.2
SECOND FLOOR DUCTWORK CONSTRUCT CLEAN CORE ADDITION TO
SURGICAL SUITE
PROVIDENCE, RHODE ISLAND
650-337
02-22-19 CG JSL
SCALE: 1/8" = 1'-0"1 SECOND FLOOR DUCT PLAN
KEY NOTES
CODE DESCRIPTION
M001 TAB CONTRACTOR TO PERFORM PRELIMINARY AIRFLOW MEASUREMENT PRIOR TO
DEMOLITION AND SUBMIT RESULTS TO ENGINEER FOR REVIEW. ONCE DEMOLITION IS
COMPLETE, TAB CONTRACTOR SHALL RE-BALANCE TO PRELIMINARY CONDITIONS (OR NEW
FLOW IF CHANGED BY SUBMITTAL REVIEW). INTERMEDIATE TAB REPORT SHALL BE
SUBMITTED TO ENGINEER FOR REVIEW. AT CONCLUSION OF PROJECT, TAB CONTRACTOR
SHALL REBALANCE TO PRELIMINARY CONDITIONS (OR NEW FLOW IF CHANGED BY
SUBMITTAL REVIEW). FINAL TAB REPORT SHALL BE SUBMITTED TO ENGINEER FOR REVIEW.
M002 TAB CONTRACTOR TO PERFORM PRELIMINARY AIRFLOW MEASUREMENT PRIOR TO
G.4'
E4.8
E5
ED
E3E2E1 EC.2ECEB.3EBEA.8
EA
A.5 A.5'
A 3'
B
A' A.2'
C.3
D.3
C.5
B' C' D' E' F'
F
F.7' G'
H
D
EE.1
E4
G.3'
4.8'
C G.5'
4.75'
4.7'
4.5'
4'
4.3'
L
EA.1
K
J
EBB
GF.9
2'
A.6'
1'
5'
RELOCATED
OUTPATIENT
PHARMACY
CHILLER
FUTURE LOCATION OF
STERILE PROCESSING
AND DISTRIBUTION CHILLER
NEW CLEAN STEAM
GENERATOR PURCHASED
BY OWNER UNDER A SEPARATE
PROJECT. CONTRACTOR TO
CONFIRM WITH OWNER THAT
EQUIPMENT IS AVAILABLE PRIOR
TO SUBMITTING ON NEW EQUIPMENT.
CLEAN STEAM GENERATOR SHALL BE
EQUAL TO CEMLINE #V510USG2454.
EXISTING AIR HANDLING
UNITS TO BE RE-BALANCED
TO ORIGINAL DESIGN FLOWS
EXISTING PUMPS TO BE
RE-BALANCED AS NECESSARY
CH-1GB001
CH-1GB002
3" 3"
6" 6"
6" 6"
3" 3"
6" 6"
UNDERGROUND CHILLED WATER
SUPPLY AND RETURN PIPING.
REFER TO SITE/CIVIL PLANS
FOR ADDITIONAL INFORMATION.
PIPING TO PASS UNDER FROST
WALL AT ELEVATION 76'-0"
RE-INSTALL EXISTING WING E CONDENSING
UNIT AT THIS LOCATION AND CONNECT NEW
REFRIGERANT PIPING TO EXISTING REFRIGERANT
LINES. RE-CHARGE WITH REFRIGERANT AND
PROVIDE SYSTEM STARTUP. NEW REFRIGERANT
LINES SHALL MATCH SIZE OF EXISTING LINES.
RACK REFRIGERANT PIPING AGAINST OUTSIDE
WALL. REFER TO DRAWING ES10.1 FOR MORE
INFORMATION.
NOTE: REFER TO PIPE BEDDING DETAIL #2
ON DRAWING M30.1 FOR MORE INFORMATION.
CONNECT 2 1/2" STEAM INLET TO
EXISTING STEAM MAIN ROUGHED
IN ABOVE EXISTING EQUIPMENT.
CONNECT 2" CONDENSATE DRAIN
TO EXISTNG CONDENSATE PUMP.
PIPE 1 1/2" MANUAL BLOWDOWN
TO EXISTING FLOOR DRAIN ON
OPPOSITE SIDE OF EXISTING AIR
HANDLER. CONNECT 3/4" FEEDWATER
INLET TO EXISTING COLD WATER
FEED. 3" STEAM OUTLET TO EXISTING
STEAM OUTLET PIPING. PIPE RELIEF
VALVE THROUGH OUTSIDE WALL TO
VENT OUTSIDE OF BUILDING.
2-1/2" HWS &
HWR UP
CONNECT NEW HWS & HWR
PIPING TO EXISTING HEAT
EXCHANGERS & PUMPS
CONNECT 1-1/4" LPC
INTO EXISTING 3" LPC
Graphic Scale
Graphic Scale
Graphic Scale
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL CONSTRUCTION
DOCUMENTS
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Auburn, ME 207.784.5100
Boston, MA 617.426.5050
Portland, ME 207.775.0053
Portsmouth, NH 603.626.1242 c HA PROJECT NUMBER: 13586
CONSTRUCT CLEAN CORE ADDITION TO
SURGICAL SUITE
PROVIDENCE, RHODE ISLAND
650-337SCALE:
C :\U se rs
\js la p\ D oc um en ts
R ev it
L oc al s\
6-m ec h-ce nt ra l_ js la p.
rv t 2/
/2
3:
:2
PM
M20.0
GROUND FLOOR PIPING
02-22-19 CG JSL
SCALE: 1/8" = 1'-0"1 GROUND FLOOR PIPING PLAN
CONNECT NEW HEATING
HOT WATER PIPING TO
EXISTING PIPING AT
HEAT EXCHANGERS AND PUMPS
NOTE: UNDERGROUND PIPING SHALL BE
PRE-INSULATED STEEL PIPING EQUAL TO
THERMACORE FERRO THERM OR APPROVED
EQUAL. CONTRACTOR SHALL SAW CUT OPENING
THROUGH EXISTING FLOOR SLAB IN
MECHANICAL ROOM TO ALLOW FOR PIPING TO
RUN UNDER GROUND. PIPING SHALL RUN
UNDER FROST WALL AND OPENINGS SHALL BE
SEALED WATER TIGHT WITH SLEEVE SEALS.
G.4'
E4.8
E5
ED
E3E2E1 EC.2ECEB.3EBEA.8EA
A.5 A.5'
A 3'
B
A' A.2'
C.3
D.3
C.5
B' C' D' E' F'
F
F.7' G'
H
D
EE.1
E4
G.3'
4.8'
C G.5'
4.75'
4.7'
4.5'
4'
4.3'
L
EA.1
K
J
EBB
GF.9
2'
A.6'
1'
5'
M31.1
M31.1
3"
3"
TO CHILLERS
FROM CHILLERS
6"
6"
CHILLED WATER PIPING
TO AHU-12B001
STAIR K
K-1
CORRIDOR
STAFF LOUNGE AND
CONFERENCE
NURSE MANAGER
OFFICE
ANESTHESIA OFFICE
ANESTHESIA
CONFERENCE ROOM
118A OFFICE
PU/DO
119A
PICK UP
119B DROP OFFICE
119C
WAITING
STAFF LOCKER
FEMALE
TOILET MALE
TOILET FEMALE
STAFF LOCKER MALE
113A
OFFICE
115A
OFFICE
OFFICE
OFFICE
CONFERENCE ROOM
BREAK / KITCHEN
STAFF WASHROOM
109A
CONSULT
STAIR TOWER-2
MENS RESTROOM
WOMENS REST ROOM
MENS REST ROOM
COMP AND PENSION
COMP AND PEN
PSYCHOLOGIST
RECEPTION
160A
COMP AND PENSION
COMP AND PENSION
COMP AND PENSION
COMP AND PENSION
CLINICAL MANAGER
100C
VISN
100D
Room
ELEVATOR LOBBY
L11
CAP CHILLED WATER
PIPING WITHIN BUILDING
WITH 4" PIPING TO MATCH
SIZE OF EXISTING PIPING.
4" PIPING
3"
3"
4" PIPING
6" PIPING
6" PIPING
NOTE: CONNECT NEW 6" CHILLED WATER
PIPING TO EXISTING 6" CHILLED WATER
PIPING. DRAIN SYSTEM AS NECESSARY
TO PERFORM CONNECTIONS. RE-FILL
PIPING SYSTEM AND PROVIDE FACTORY
STARTUP OF CHILLERS.
2-1/2" HWS &
HWR UP AND
DOWN
1-1/4" LPC
UP 3" CHWS &
CHWR UP
1/
4" 1-1/4" LPC
DOWN
Graphic Scale
Graphic Scale
Graphic Scale
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL CONSTRUCTION
DOCUMENTS
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Auburn, ME 207.784.5100
Boston, MA 617.426.5050
Portland, ME 207.775.0053
Portsmouth, NH 603.626.1242 c HA PROJECT NUMBER: 13586
SCALE:
C :\U se rs
\js la p\ D oc um en ts
R ev it
L oc al s\
6-m ec h-ce nt ra l_ js la p.
rv t 2/
/2
3:
:4
PM
M20.1
FIRST FLOOR PIPING CONSTRUCT CLEAN CORE ADDITION TO
SURGICAL SUITE
PROVIDENCE, RHODE ISLAND
650-337
02-22-19 CG JSL
SCALE: 1/8" = 1'-0"1 FIRST FLOOR PIPING PLAN
TT
T
T
T
T
T
T
T
T T
T
T
0.5 1 1.5 2
1.8 2.2 2.5 3 4 5 6 7
G.4'
E4.8
E5
ED
E3E2E1 EC.2ECEB.3EBEA.8EA
A.5 A.5'
A 3'
B
A' A.2'
C.3
D.3
C.5
B' C' D' E' F'
F
F.7' G'
H
D
EE.1
E4
G.3'
4.8'
C G.5'
4.75'
4.7'
4.5'
4'
4.3'
L
EA.1
K
J
EBB
GF.9
2'
A.6'
1'
5'
VAV-1
VAV-2
VAV-3VAV-4
VAV-5
VAV-6
VAV-7VAV-8
VAV-9
VAV-10
VAV-11
M31.1
M31.1
SEMI RESTRICTED
CORRIDOR
CYSTOSCOPY
CLEAN CORE
CC STORAGE
255A
CLEAN AND STERILE
SUPPLY
CLEAN AND STERILE
SUPPLY
MECHANICAL
EQUIPMENT STORAGE
SEMI RESTRICTED
CORRIDOR
NURSE MANAGER
OFFICE
SOILED UTILITY
BRONCHOSCOPY
IUSS
VAV-12
VAV-13
AHU-12B001
HUM-1
STAIR-K
K-2
STAFF TOILET/SHOWER
CORRIDOR
C223
MALE LOCKERS
SEMI RESTRICTED
CORRIDOR
ANGIOPLASTY
OR-1
SCRUB
210A
SEMI RESTRICTED
CORRIDOR
OR-2
SCRUB
210B
OR-3
HOUSE KEEPING
215G
ANESTHESIA
WORKROOM
NURSE STATION
WORK AREA
CONTROL STATION
OBSERVATION ROOM
EQUIPMENT STORAGE
PACU
PATIENT LOCKERS
215E
PATIENT TOILET
215F
CORRIDOR
2-DC-1A
OFFICE
IT CLOSET
229A
LINEN CHUTE
CORRIDOR
VESTIBULE
215D
CLEAN UTILITIES
215C
SOILED UTILITIES
215B
MINOR PROCEDURE
CORRIDOR
STAIR WELL
A-2
ELECTRICAL CLOSET
ELECTRICAL CLOSET
HOUSE KEEPING
232A
ELEC
232D
ELEC
232C
OR STORAGE
INTERVENTIONAL PAIN
MANAGEMENT
233A
OR RECEPTION
WAITING ROOM
CORRIDOR
OFFICE
201A
ELECTRICAL ROOM
201C
EMERGENCY
ELECTRICAL ROOM
201B
CONSULT ROOM
FEMALE LOCKERS
ELEVATOR LOBBY
L23
EXAM-1
E205
EXAM-2
E206
MICROSCOPE
E207
EXAM-3
E208
CORRIDOR
C22
CAST ROOM
E204
CORRIDOR
C21
ELEVATOR
E-EL-1
ELEVATOR
E-EL-2
ELEVATOR LOBBY
L21
LOBBY
L22
NOTE: ALL WALL MOUNTED TEMPERATURE SENSORS SHALL
BE TEMPERATURE AND HUMIDITY SENSORS. DUCT MOUNTED
HUMIDIFIER HUM-1 SHALL BE CONTROLLED BY ROOM SENSOR
IN CYSTOSCOPY 263. HUMIDIFIER WITHIN AIR HANDLER
AHU-12B001 SHALL BE ENABLED IF ANY OF THE SPACES SERVED
BY AHU-12B001 DROP BELOW 30% RH.
1-1/4" LPS
1" LPC PITCHED
@ 1/4" PER FOOT
TO VERTICAL RISER
1" LPS
3" CHWS
& CHWR
DOWN
3/4" LPS
1" LPC
2-1/2" HWS &
HWR DOWN
1/
2"
1/
2"
1"
1"
3/ 4" 3/
4"
3/ 4"
3/4"
3/ 4"
3/ 4"
3/4
3/4
3/4"
3/4"
3/4
3/4
3/4"
3/4"
2 1/2"
2 1/2"
3/ 4"
3/ 4"
3/4"
3/4"
3/ 4"
3/ 4"
3/ 4"3/ 4"
2 1/2"
2 1/2"
2" 2"
1 1/4"
1 1/4"
3/ 4"
3/ 4"
1 1/4"
1 1/4"
3/ 4"
3/ 4"
1 1/4"
1 1/4"
1"1"
1" 1"
3/ 4"
3/ 4"
3/4" 3/4"
3/ 4"
3/ 4"
Graphic Scale
Graphic Scale
Graphic Scale
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL CONSTRUCTION
DOCUMENTS
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Auburn, ME 207.784.5100
Boston, MA 617.426.5050
Portland, ME 207.775.0053
Portsmouth, NH 603.626.1242 c HA PROJECT NUMBER: 13586
CONSTRUCT CLEAN CORE ADDITION TO
SURGICAL SUITE
PROVIDENCE, RHODE ISLAND
650-337SCALE:
C :\U se rs
\js la p\ D oc um en ts
R ev it
L oc al s\
6-m ec h-ce nt ra l_ js la p.
rv t 2/
/2
3:
:5
PM
M20.2
SECOND FLOOR PIPING
02-22-19 CG JSL
SCALE: 1/8" = 1'-0"1 SECOND FLOOR PIPING PLAN
AHU-12B001
LEVEL 2
VAV-1 VAV-2 VAV-3 VAV-4 VAV-5 VAV-6 VAV-7 VAV-8 VAV-9 VAV-10 VAV-11
LEVEL 1
GROUND LEVEL
HX HX
HWPHWP
VAV-12 VAV-13
EXISTING PUMPS EXISTING HEAT EXCHANGERSCLEAN STEAM GENERATOR
HUM-2
HUM-1
CHWPCHWP
EXISTING PUMPS
CH-1GB001 CH-1GB002
D
V A
R
IE
S
BACKFILL WITH APPROVED
EXCAVATED MATERIAL
COMPACTED AS SPECIFIED
GRANULAR PIPE
BEDDING MATERIAL
COMPACTED TO
95% MAX. DENSITY
MARKER TAPE
12" ABOVE PIPE
GRAVEL BASE/
SUBBASE IN
ROADWAYS
D +2'-6'' MAX
SAW CUT EXISTING
PAVEMENT PRIOR
TO EXCAVATION
NEW PAVED AREA
1 _ 2
PL
U
S
" M
IN
PI
PE
D
IA
1 _ 2
P
LU
S 4"
M
IN
PI
PE
D
IA
PIPE BEDDING
ZONE
ADDITIONAL 4"
BEDDING IF LEDGE
ENCOUNTERED
SEEDED AREA
CHILLED WATER COIL
PERFORMANCE FROM
75/67 TO 48.2/48.0
HOT WATER COIL
PERFORMANCE FROM
1.4 TO 60.0
DRAW
THRU
BLOW
THRU
2" [50mm]
PLUS X
1" [25mm]
MINIMUM
X
2X
UNIT TYPE A B
WHERE X = STATIC PRESSURE IN PAN
DRAIN LINE SHALL BE AT LEAST THE
SAME SIZE AS THE NIPPLE ON THE DRAIN PAN
PIPING SHALL BE RIGID COPPER TYPE L
OR TYPE M UNLESS NOTE BELOW IS MET
PITCH DOWN
TOWARD DRAIN
CLEAN
OUT
FLOOR
SINK
DRAIN
PAN
NOTE: 1. CPVC PIPE MAY BE USED ONLY IF APPROVED BY
LOCAL VA AND IS INDOORS AND DOES NOT PASS THROUGH
RATED BARRIERS.
2. DIELECTRIC FITTING TO BE USED WHEN TWO DISSIMILAR
METALS ARE TO BE
CONNECTED.
[2 5m m
DIELECTRIC
FITTING
A B
1"
COIL
TEST PLUG
(TYP.)
REDUCER, IF
REQUIRED
WATER
RETURN
MANUAL AIR
VENT
UNION CONNECTIONS
(TYP.)
WATER
SUPPLY
SHUT OFF
VALVE
DRAIN WITH HOSE
CONNECTION
MV
MODULATION CONTROL
VALVE
NOTE:
1.
2.
3.
4.
ALL VANE ELBOWS SHALL BE CONSTRUCTED AND INSTALLED AS DETAILED BY
SMACNA.
WHEN W1 DOES NOT EQUAL W2, VANE SHALL BE SINGLE THICKNESS VANE
TYPE REGARDLESS OF W
DIMENSION.
ALL SINGLE THICKNESS VANES SHALL HAVE A 2" [50mm] RADIUS, 1 1/2"
[40mm] MAXIMUM SPACE BETWEEN VANES AND A 3/4" [20mm] TRAILING
EDGE.
WHEN W EQUALS W2 AND W1 IS GREATER THAN 20" [500mm] VANES SHALL
BE DOUBLE VANE
TYPE.
W
W1
2500 [1133]
1320 [598]
420 [190]ONE 1 [25] x 18 GA STRAP36 [900]
TWO 1/2 [13]∅ RODS
TWO 3/8 [10]∅. RODS
ONE 1 [25] x 16 GA STRAP
84 [2100] 60 [1500]
50 [1250] 700 [317]
ONE 1 [25] x 22 GA STRAP
QUANTITY/SIZEMAX. DUCT ∅
26 [650]
HANGER STRAPS OR RODS
MAX. LOAD
LBS. [kg]
260 [119]
MAX.
144 [3600]
IN. [mm]
SPACING
IN. [mm] IN. [mm]
144 [3600] 144 [3600]
144 [3600]
144 [3600]
NOTE:
TABULATED DATA FROM SMACNA
ALLOWS FOR DUCT REINFORCING
AND INSULATION, BUT NO
EXTERNAL
LOAD.
BAND
OVER 50"
[1250mm]∅
HANGER RODS
BAND OF
SAME SIZE AS
HANGER STRAP
LOAD RATED
FASTENERS
50" [1250mm]∅
& UNDER
MAIN EXHAUST OR RETURN
PLAN VIEW
AIR
FLOW AIR
FLOW
PROVIDE VOLUME
DAMPER
AT EACH BRANCH DUCT
1/4W OR 4"
[100mm] MIN.
BRANCH
DUCT
VD
W
Graphic Scale
Graphic Scale
Graphic Scale
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL CONSTRUCTION
DOCUMENTS
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Auburn, ME 207.784.5100
Boston, MA 617.426.5050
Portland, ME 207.775.0053
Portsmouth, NH 603.626.1242 c HA PROJECT NUMBER: 13586
SCALE:
C :\U se rs
\js la p\ D oc um en ts
R ev it
L oc al s\
6-m ec h-ce nt ra l_ js la p.
rv t 2/
/2
3:
:1
PM
M30.1
FLOW AND RISER DIAGRAMS &
DETAILS
CONSTRUCT CLEAN CORE ADDITION TO
SURGICAL SUITE
PROVIDENCE, RHODE ISLAND
650-337
02-22-19 CG JSL
NO SCALE1 FLOW AND RISER DIAGRAM
NO SCALE2 PIPE BEDDING DETAIL
NO SCALE4 PSYCHROMETRIC CHART
NO SCALE3 232113-08 AIR HANDLING UNIT DRAIN TRAP DETAIL
NO SCALE5 232113-12 TERMINAL UNIT WATER COILS- PIPING CONNECTIONS
NO SCALE6 233100-01 DUCTWORK SQUARE VANE ELBOWS
NO SCALE7 233100-26 ROUND DUCT HANGERS
NO SCALE8 233100-07 EXHAUST OR RETURN BRANCH DUCTWORK
ALARM
PROCESSING
DU
TY
C
YC
LE
FU
NC
TI
O
N
SC
HE
DU
LE
S
TA
RT
/S
TO
P
HUMIDITY HIGH LIMIT
RETURN FAN VFD ALARM (2 TOTAL)
SUPPLY FAN VFD ALARM (2 TOTAL)
RETURN FAN STATUS (2 TOTAL)
STATIC PRESSURE HIGH LIMIT
SUPPLY AIR FLOW (CFM)
ST
AT
US
SYSTEM
AL
AR
M
EL
EC
TR
IC
D
EV
IC
E
SP
EE
D
CO
M M
AN
D
PO
IN
T
ID
DISCHARGE STATIC PRESSURE
AFTER HUMIDIFIER TEMPERATURE
DISCHARGE AIR TEMPERATURE
PRE-HEAT TEMPERATURE
MIXED AIR TEMPERATURE
COOLING COIL TEMPERATURE
SYSTEM COMPONENT:
RETURN AIR FLOW (CFM)
RETURN AIR TEMPERATURE
O
PE
N/
CL
O
SE
ST
AR
T/
ST
O P
VA
LV
E
PO
SI
TI
O N
DA
M
PE
R
PO
SI
TI
O
N
JOB: 13586
VAV AIR
HANDLER
BUILDING 1
SYSTEM:
BUILDING: LEGEND
POINT
BINARY
TE
M
PE
RA
TU
RE
(T I)
LO
CA
L
AL
AR
M
P
AN
EL
M
ET
AS
YS
A
LA
RM
P
AN
EL
HI
G
H
ST
AT
IC
P
RE
SS
UR
E
HI
G
H
HU
M
ID
IT
Y
PR
ES
SU
RE
LO
W
T
EM
PE
RA
TU
RE
PE
RC
EN
T
PR
ES
SU
RE
PO
SI
TI
O
N
FL
O W
HI
G
H
LI
M
IT
LO
W
L
IM
IT
SYSTEM
INPUTS
ANALOG BINARY ANALOG
SP
AC
E
TE
M P.
C O
NT
RO
L
ST
AT
IC
P
RE
SS
UR
E
RE
SE
T
DE
M
AN
D
LI
M
IT
IN
G
TE
M
PE
RA
TU
RE
R
ES
ET
TE
M
PE
RA
TU
RE
O
VE
RR
ID
E
TE
M
P.
E
CO
NO
M
IZ
ER
FA
IL
UR
E
M O
DE
PR
ES
SU
RE
/V O
LU
M
E
CN
TR
L
REMARKSFU
LL
C O
M M
UN
IC
AT
IO
N
SYSTEM
SOFTWARE/CONTROL
APPLICATION/FUNCTION
PAGE:
RETURN AIR HUMIDITY
SUPPLY FAN STATUS (2 TOTAL)
RETURN AIR DAMPER (2 TOTAL)
RETURN FAN START/STOP
STEAM HUMIDIFIER VALVE V-2
COILING VALVE V-4
PRE-HEAT VALVE V-1
RETURN AIR BYPASS DAMPER
SUPPLY FAN VFD (2 TOTAL)
OUTSIDE AIR DAMPER
RETURN FAN VFD (2 TOTAL)
ST
AT
IC
P
RE
SS
UR
E
HU
M
ID
IT
Y
STEAM ISOLATION VALVE V-3
SUPPLY FAN START/STOP
AI-3
AI-4
AI-5
AI-6
AI-7
AI-8
AI-9
AI-10
TR
EN
DI
NG
OUTSIDE AIR TEMPERATURE AI-11
BI-1, 2
BI-3, 4
BI-5
BI-6
BI-7, 8
BI-9, 10
AO-3, 4
AO-5, 6
AO-7
AO-8, 9
AO-10
AO-11
AO-12
AO-13
BO-1
BO-2
BO-3
AB
BR
EV
IA
TI
O
N
RHT-1
FT-1
TT-3
TT-4
TT-6
TT-7
SPS-2
TT-5
FT-3
TT-2
RF-STS
SF-STS
PSH-1
RHT-2
SF-ALA
RF-ALA
RF-SPD
SF-SPD
D-3 D-1, D-2 D-4
VLV-1
VLV-4
VLV-2
RF-SST
SF-SST
VLV-3
OUTPUTS
AI-1 TT-1
AI-2
RETURN STATIC PRESSURE AI-12 SPS-1
OUTSIDE AIR FLOW (CFM) AI-13 FT-2
SUPPLY AIR DAMPER (2 TOTAL) AO-1, 2 D-5, D-6
FILTER STATUS
FILTER STATUS
FILTER STATUS
FILTER STATUS
FILTER STATUS
AI-14
AI-15
AI-16
PDS-1
PDS-2
PDS-3
AI-17 PDS-4
AI-18 PDS-5
SUPPLY SMOKE DETECTOR
RETURN SMOKE DETECTOR
BI-11
BI-12
SD
SD
X X X X X X X X X X X X X X
FI
RE
A
LA
RM
P
AN
EL
X X X X
X X
X X
X X X X
X X X
X X
X X X X X X X X X
X X
FI
LT
ER
M
AI
NT
EN
AN
CE
X X X X X X X X X X X X X
X X
X X X X X X
X X
X X
X X
X X
X X X X
X X
X X X X X X
X X X
X X
X X
X X
X X X X X X X X X X X
X X X X X X
X
X
X X
X
X X
X X X X X X X X X
X X X
EXHAUST AIR TEMPERATURE AI-19 TT-8 X X X
FACE-AND-BYPASS DAMPER AO-14 D-7 X X X
1. UNIT OPERATION
1.1 UNIT IS NORMALLY STARTED AND STOPPED REMOTELY THROUGH THE BAS. H-O-A
SWITCH SHALL BE KEPT IN THE "AUTO" POSITION. "HAND" AND "OFF" POSITIONS SHALL
BE USED ONLY FOR MAINTENANCE. WHEN THE UNIT IS "OFF" D-3, SHALL BE FULLY
CLOSED. WHEN THE UNIT IS "ON" D-1, D-2, D-5, D-6 SHALL BE FULLY OPEN.
D-3 AND D-4 SHALL MODULATE IN ACCORDANCE WITH THE DAMPER CONTROL
SEQUENCE.
2. FAN CONTROL
SEQUENCE
2.1
2.2
2.3
6. COOLING COIL/HEATING
COIL
6.1
6.2
8. ALARMS
8.1
UPON A CALL FOR THE SUPPLY FAN(S) TO OPERATE, BAS SHALL OPEN THEIR
RESPECTIVE DAMPER 30 SECONDS BEFORE STARTING THE FAN. BOTH SUPPLY
FANS SHALL OPERATE AND RAMP UP/DOWN IN SEQUENCE TO MAINTAIN DUCT
IF ANY OF THE TEMPERATURE AND/OR PRESSURE ANALOG INPUTS INDICATE THEY ARE OUTSIDE
OF THE OPERATING SETPOINTS, INITIATE AN ALARM. SEE POINTS LIST.
DURING OCCUPIED MODE, MODULATE THE CONTROL VALVES IN SEQUENCE TO MAINTAIN
THE AHU DISCHARGE AIR TEMPERATURE AT THE OCCUPIED MODE SETPOINT OF 54 DEG. F (ADJ.).
SEQUENCE OF OPERATION FOR VARIABLE AIR VOLUME AIR HANDLING UNIT WITH MINIMUM
OUTSIDE AIR
STATIC PRESSURE SETPOINT.
UPON A CALL FOR THE RETURN FAN(S) TO OPERATE, BAS SHALL OPEN THEIR
RESPECTIVE DAMPER 30 SECONDS BEFORE STARTING THE FAN. BOTH RETURN
FANS SHALL OPERATE AND RAMP UP/DOWN IN SEQUENCE TO MAINTAIN DUCT
STATIC PRESSURE SETPOINT.
IN THE EVENT THAT EITHER ONE OF THE SUPPLY OR RETURN FANS FAIL, BAS
SHALL SEND AN ALARM AND RAMP-UP THE REMAINING FAN IN THE ARRAY TO
MAINTAIN THE DUCT STATIC PRESSURE SETPOINT.
3. DAMPER CONTROL
SEQUENCE
3.1 MODULATE OUTSIDE AIR DAMPER D-3 AND RETURN AIR BYPASS DAMPER D-4
IN SEQUENCE. THERE IS NO DAMPER PRESENT IN THE RETURN AIRSTREAM.
WHEN THE OUTSIDE AIR TEMPERATURE IS ABOVE 70 DEG. F (ADJ.), POSITION
POSITION DAMPERS D-3 & D-4 TO PROVIDE MINIMUM OA FLOW OF 1510 CFM.
WHEN THE OUTSIDE AIR TEMPERATURE IS 70 DEG. F (ADJ.) OR BELOW AND
OUTSIDE AIR RELATIVE HUMIDITY IS 50% (ADJ.) OR BELOW, MODULATE DAMPERS
D-3 & D-4 TO MAINTAIN THE MIXED AIR TEMPERATURE 2 DEG. F BELOW THE
UNIT DISCHARGE AIR TEMPERATURE. IN ORDER TO AVOID TRIPPING THE FREEZE
4. FILTER MAINTENANCE
4.1 INITIATE A FILTER MAINTENANCE ALERT IF ANY OF THE DIFFERENTIAL PRESSURE
SWITCHES ACROSS ANY OF THE FILTER BANKS REACHES SETPOINT.
5. HUMIDITY CONTROL
5.1
5.2
WHEN THE DIGITAL CONTROL PANEL IS NOT CALLING FOR HUMIDITY, SENSED BY
RETURN AIR HUMIDITY RHT-1, 2-WAY "ON-OFF" CONTROL VALVE VLV-3 SHALL REMAIN
CLOSED. WHEN THE DIGITAL CONTROL PANEL IS CALLING FOR HUMIDITY, VLV-3 SHALL
REMAIN OPEN.
RETURN AIR HUMIDITY SHALL BE MAINTAINED AT SETPOINT OF 30% RH (ADJ.) VIA
DIGITAL CONTROL PANEL BY MODULATING CONTROL VALVE VLV-2 TO MAINTAIN THE
DESIRED HUMIDITY. THE DCP SHALL OVERRIDE THIS CONTROL TO MAINTAIN HUMIDITY
OF 80% AS SENSED BY RHT-2. DCP SHALL CLOSE VALVE VLV-3 WHENEVER THE SUPPLY
FAN IS OFF. VALVE VLV-2 SHALL BE INTERLOCKED WITH A TEMPERATURE SWITCH TO
KEEP THE HUMIDIFIER OFF UNTIL CONDENSATE TEMPERATURE APPROACHES STEAM
TEMPERATURE.
DURING UNOCCUPIED MODE, MODULATE THE CONTROL VALVES IN SEQUENCE TO MAINTAIN
THE AHU DISCHARGE AIR TEMPERATURE AT THE UNOCCUPIED MODE SETPOINT OF 58 DEG. F (ADJ.).
7. SMOKE CONTROL
7.1 IF THE SUPPLY DUCT SMOKE DETECTOR SENSES SMOKE, SHUT DOWN THE UNIT, CLOSE DAMPER
D-3 AND INITIATE A SMOKE ALARM AT THE FIRE ALARM CONTROL PANEL. IF THE RETURN DUCT SMOKE DETECTOR SENSES SMOKE, INITIATE A SMOKE ALARM AT THE FIRE ALARM CONTROL PANEL ALLOW THE AIR HANDLER TO CONTINUE OPERATION WITH THE D-3 & D-4 DAMPERS POSITIONED FOR
100% OUTSIDE AIR.
9. CHILLED WATER
CONTROL
9.1 EXISTING CHILLED WATER PUMPS CHWP-01BA15 & CHWP-01BA16 CONTINUE TO OPERATE INDEPENDENTLY
WITH ONE PUMP AS STAND-BY. THE TWO NEW AIR COOLED CHILLERS ARE 100% REDUNDANT AND OPERATE
INDEPENDENTLY WITH ONE CHILLER AS STAND-BY. AT NO TIME SHALL BOTH CHILLERS OPERATE SIMULTANEOUSLY.
USE FACTORY INTEGRATED CONTROLS TO ALTERNATE CHILLERS AND CONTROL CHILLED WATER TEMPERATURE
TO DELIVER 44 DEG. F (ADJ.). ON A CALL FOR COOLING FROM THE BAS, LEAD CHILLED WATER PUMP STARTS, FLOW IS PROVEN AND LEAD CHILLER IS ENABLED. BAS CONTROLS LEAD/LAG OF CHILLERS ON WEEKLY (ADJ.) BASIS.
10. GENERAL CONTROL NOTES
10.1 CONTRACTOR SHALL REFER TO SPECIFICATION SECTIONS 23 09 23 & HVAC SYSTEM CONTROLS FOR MORE INFO.
STAT, MANIPULATION OF THE OUTSIDE AIR DAMPER SHALL BE EXTREMELY SLOW.
10.2 LOCATE CONTROL PANELS IN MECHANICAL 257.
10.3 USE PLENUM RATED CABLE. INSTALL WIRING LOCATED WITHIN MECHANICAL 257, IN EXPOSED AREAS, OR WITHIN
WALLS IN CONDUIT.
10.4 CONTRACTOR SHALL PROVIDE A COMPLETE DDC AUTOMATIC TEMPERATURE CONTROL SYSTEM COMPATIBLE
WITH THE EXISTING METASYS BUILDING MANAGEMENT SYSTEM BY JOHNSON CONTROLS INC. ALL HVAC SYSTEM AND ANCILLIARY COMPONENTS SHALL BE CONTROLLED BY THE EXISTING METASYS BUILDING MANAGEMENT
SYSTEM. FINAL CONNECTION OF NEW EQUIPMENT TO THE EXISTING METASYS BUILDING MANAGEMENT SYSTEM SHALL BE MADE BY A COMPANY AND TECHNICIANS FULLY QUALIFIED AND CERTIFIED BY JOHNSON CONTROLS, INC. TO PROGRAM, INSTALL, ADJUST, REPAIR, MAINTAIN, MODIFY, OR OTHERWISE MANIPULATE THE METASYS BUILDING MANAGEMENT SYSTEM BY JOHNSON CONTROLS INC. CURRENT COMPANY AND TECHNICIAN QUALIFICATIONS AND CERTIFICATIONS TO PROGRAM, INSTALL, ADJUST, REPAIR, MAINTAIN, MODIFY, OR OTHERWISE MANIPULATE THE JOHNSON CONTROLS METASYS SYSTEM MUST BE MAINTAINED THROUGHOUT THE CONSTRUCTION OF THE PROJECT INCLUDING ANY EXTENSIONS OF THE CONSTRUCTION PERFORMANCE PERIOD. IF THE CONTRACTOR
UTILIZES THE SERVICES OF A SUBCONTRACTOR OTHER THAN JOHNSON CONTROLS TO PERFORM THIS WORK, THE CONTRACTOR SHALL PROVIDE THE VA, VIA SUBMITTAL, COPIES OF FACTORY TRAINING CERTIFICATES FOR EACH TECHNICIAN WORKING ON THE PROVIDENCE VAMC METASYS SYSTEM PRIOR TO COMMENCEMENT OF ANY CONTROLS WORK. THE PROVIDENCE VAMC WILL REVIEW THE CERTIFICATIONS AS PART OF THE SUBMITTAL
PROCESS. CONTRACTOR SHALL CARRY THE COST OF THIS WORK IN THEIR BID.
10.5 CONTRACTOR PROVIDING SMOKE DETECTOR INSTALLATION MUST BE FULLY NICET CERTIFIED. PROGRAMMING AND TESTING MUST BE PROVIDED BY THE COMPANY PRESENTLY RESPONSIBLE FOR FIRE ALARM INTEGRATION INTO THE PROVIDENCE VAMC NOTIFIER FIRE ALARM SYSTEM. CONTACT INFORMATION WILL BE PROVIDED UPON REQUEST. MODIFY THE EXISTING FIRE ALARM SYSTEM AS-BUILTS AS REQUIRED AND PROVIDE UPDATED FIRE ALARM AS-BUILTS UPON COMPLETION. FIELD VERIFY POINTS OF CONNECTIONS TO EXISTING NOTIFIER PANEL.
3.2 FACE-AND-BYPASS DAMPERS D-7 SHALL BYPASS AIR AROUND THE HEAT RECOVERY
CORE ANY TIME THAT EXHAUST AIR SENSED AT TT-8 IS 35 DEG. F (ADJ.) OR BELOW.
DAMPERS SHALL ALLOW OUTSIDE AIR THROUGH THE CORE ANY TIME THAT EXHAUST
AIR SENSED AT TT-8 IS 40 DEG. F (ADJ.) OR ABOVE.
11. UNOCCUPIED MODE FAN OPERATION
10.1 DURING UNOCCUPIED HOURS, FAN OPERATION IS ALLOWED TO RAMP BACK TO 50% OF OCCUPIED MODE FAN SPEED IN ORDER TO SAVE ENERGY. HOWEVER, PRESSURE RELATIONSHIPS SHALL BE MAINTAINED AT ALL TIMES REGARDLESS OF MODE OF OPERATION. EACH WALL SENSOR SHALL HAVE CAPABILITY TO RESET THAT PARTICULAR
ZONE TO OCCUPIED MODE FOR 3 HOURS (ADJ.).
PLATE AND FRAME
HEAT EXCHANGER
SUPPLY FAN
PRESSURE SWITCH HIGH
TO DISABLE FAN WHEN
HIGH PRESSURE LIMIT
SETPOINT IS REACHED
D-2
D-1
P R
E
- F
IL
TE
R
A
FT
E R
FI
LT
E
R
PDS PDS
D-3
D-4
C O
IL
P
R E
H E
A T
TT TT
3 4
C O
IL
C
O O
LI
N
G
TT TT
5 6
STEAM HUMIDIFIER
VLV
D-6
D-5
H E
P A
- F
IL
TE
R
PDS
A
FM
D
FT
OUTSIDE AIR
(1510 CFM MIN.)
RETURN AIR
(6677 CFM)
EXHAUST AIR
(637 CFM)
SUPPLY AIR TO
TERMINAL UNITS
(7550 CFM)
TT
A
FM
D
FT
SPS
PSH
SD
VFD
VFD
VFD
VFD
VLV VLV
3 4
TT
SUPPLY FAN
RETURN FAN
RETURN FAN
RETURN AIR
BYPASS SECTION
(6040 CFM)
PLACE SENSOR
OUTSIDE UNDER SHIELD
RHT
VLV
P R
E
- F
IL
TE
R
A
FT
E R
FI
LT
E
R
PDS PDS
TT
2 1
A
FM
D
FT
SMOKE
DETECTOR
SD
RHT
SPS
TT
D-7
FACE-AND-
BYPASS DAMPERS
THERMOMETER
UNDER CANOPY
FLOW
SWITCH
FLEXIBLE
CONNECTORS
IF REQUIRED
TEST
PLUGS
GCSGCR
DDC TEMP.
SENSOR TO
ECC
PRESSURE
GAUGE
FS
TT TT
AIR
COOLED
CHILLER
Graphic Scale
Graphic Scale
Graphic Scale
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL CONSTRUCTION
DOCUMENTS
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Auburn, ME 207.784.5100
Boston, MA 617.426.5050
Portland, ME 207.775.0053
Portsmouth, NH 603.626.1242 c HA PROJECT NUMBER: 13586
SCALE:
C :\U se rs
\js la p\ D oc um en ts
R ev it
L oc al s\
6-m ec h-ce nt ra l_ js la p.
rv t 2/
/2
3:
:3
PM
M30.2
CONTROL DIAGRAMS CONSTRUCT CLEAN CORE ADDITION TO
SURGICAL SUITE
PROVIDENCE, RHODE ISLAND
650-337
02-22-19 CG JSL
SCALE: 3/8" = 1'-0"1 VARIABLE AIR VOLUME AIR HANDLING UNIT WITH MINIMUM OUTSIDE AIR CONTROL DIAGRAM
NO SCALE4 CHILLER PIPING DETAIL
VANE VANE
NOTE:
1.
2.
THE INTERIOR SURFACE OF ALL RADIUS ELBOWS SHALL BE MADE
ROUND.
ALL STANDARD RADIUS ELBOWS CAN BE SUBSTITUTED WITH SHORT RADIUS
ELBOWS. ALL SHORT RADIUS ELBOWS SHALL HAVE VANES. VANES SHALL BE
CONSTRUCTED, SUPPORTED AND FASTENED AS RECOMMENDED BY
SMACNA.
R
SHALL
EQUAL
OR BE
GREATER
THAN W.
R
SHALL
EQUAL
OR BE
GREATER
THAN
1/3W.
R
SHALL
EQUAL
OR BE
GREATER
THAN
1/6W.
STANDARD RADIUS OR
LONG RADIUS ELBOW
SHORT RADIUS ELBOW
WITH TWO VANES
W
R
R
2/3W
1/ 3W
W W
1/2W 1/ 3W
1/6W R
SHORT RADIUS ELBOW
WITH ONE VANE
NOTE:
UNLESS OTHERWISE INDICATED ON PLANS, MAXIMUM ANGLES SHOWN SHALL
APPLY.
MAX.
M
AX.
E Q
U
IP
M E
N T
AIR
FLOW
AIR
FLOW
TYPICAL DUCTWORK TRANSITION
PLAN OR SIDE VIEW
TYPICAL DUCTWORK TRANSITION WITH
EQUIPMENT MOUNTED IN DUCT
PLAN OR SIDE VIEW
MAX.
M
AX.
M A
X.
M
AX
30°
15°
15°
DESIGNER'S
NOTES:
1. THE SUPPLY REGISTER TAKE-OFF MAY BE USED FOR UP UP TO 25% OF THE
MAIN DUCT CFM. THE BRANCH DUCT TAKE-OFF MAY BE USED FOR UP TO 15%
OF THE MAIN DUCT CFM ANYTIME AND UP TO 40% WHEN THE MAIN DUCT
VELOCITY IS 1000 FPM [5.1 M/S] OR LESS. THE AIR SPLIT DUCT TAKE-OFF
SHALL BE USED IN ALL OTHER CASES AND MAY BE USED AT
ANYTIME.
2. SHOW ALL VOLUME DAMPERS ON FLOOR
PLANS.
AIR SPLIT DUCT TAKE-OFF
PLAN VIEW
BRANCH DUCT TAKE-OFF PLAN
VIEW
SUPPLY REGISTER
TAKE-OFF PLAN VIEW
AIR
FLOW
AIR
FLOW
A
IR
FL
O
W
SUPPLY REGISTER
OR BRANCH DUCT
TURNING
VANES
MAIN
SUPPLY
DUCT
SEE FLOOR PLAN
FOR SPLIT DIMENSION
PROVIDE VOLUME
DAMPER
PROVIDE
VOLUME
DAMPER
ADJUSTABLE
METAL ROD
OR LINKAGE
TOP
REGISTER
MAIN
SUPPLY
DUCT
VOLUME EXTRACTOR; ADJUSTABLE
FROM FULLY CLOSED POSITION TO
CFM NOTED ON FLOOR PLANS
AIR
FLOW
AIR
FLOW
1/4 W OR 4"
[100mm] MIN.
AIR
FLOW
MAIN SUPPLY
DUCT
A
IR
FL
O
W
W
NTS
RIGID DUCT TO AIR
TERMINAL UNIT.
ROUND SHEET METAL
DUCT.
MAIN
SUPPLY
PLAN VIEW
"D"
45°M
AX.
A
ROUND FLEXIBLE CONNECTION
RECTANGULAR FLEXIBLE CONNECTION
FLANGED
CONNECTION ON
FAN SIDE
WASHER 1-1/2" [40mm] MIN. TO 3" [75mm] MAX. INSTALLED. 6" [150mm] NOMINAL WITH MATERIAL
TAUT
FLEXIBLE
MATERIAL AS
SPECIFIED
1"x1/8" [25x3mm] DRAW BAND 1"x1/8" [25x3mm] BAND IRON BOLT ON 4" [100mm] CENTERS 5/16" [8mm] FLANGE
DUCT
SHEET METAL SCREWS
ON 12" [300mm]
CENTERS
RIVET ON 4"
[100mm]
CENTERS
SHEET METAL
AS
SPECIFIED
FOR
DUCTWORK.
1"x1/8" [25x3mm] BAND IRON BOLT ON 4" [100mm] CENTERS 1" [25mm] FLANGE & HEMALTERNATE
POSITION OF
BOLT
1 1/2" [40mm]
POCKET SLIP
DUCT
SHEET METAL AS
SPECIFIED FOR
DUCTWORK.
[15mm] [15mm] [40mm]
1 1/2" [40mm] MIN. TO 3" [75mm] MAX. INSTALLED. 6" [150mm] NOMINAL WITH
MATERIAL
TAUT
FLANGED
CONNECTION
ON FAN SIDE
WASHER
FLEXIBLE MATERIAL
AS SPECIFIED
1/2" 1/2" 1 1/2"
HWS
HWR
V-2ROOM THERMOSTAT/SENSOR
WALL MOUNTED
48" [1200mm] AFF. ROOM THERMOSTAT/SENSOR
WALL MOUNTED
48" [1200mm] AFF.NO SUPPLEMENTAL HEATING
WITH SUPPLEMENTAL HEATING
A
IR
FL
O
W (C
FM
ROOM TEMPERATURE(°F)
HEATING
MINIMUM
VAV BOX CONTROL SEQUENCE
SP
TU
RHCHWS
HWR
V-1
REHEAT
COIL
AIR
TERMINAL
UNIT
AIR
FLOW
TE
ATU
CONTROLLER
PC
TE
TU
RHC
HWS
HWR
V-1
REHE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .