36E77619R0097-011.pdf
PDF 2 MB Posted
- Attached to
- Construct Clean Core (VA-19-00058573) Federal contract opportunity
- Solicitation number
- 36E77619R0097
About this file
This document provides details for a federal construction contract opportunity with the Department of Veterans Affairs. The solicitation will be for constructing a clean core addition to the surgical suite at the Providence, Rhode Island VA Medical Center, including approximately 2,900 gross square feet of renovations to existing space and 3,900 gross square feet of new construction. Work will include relocating cystoscopy and minor surgery suites, adding an elevated clean core for sterile supplies access, and relocating surgery locker rooms. The solicitation will be a request for proposal conducted under FAR Parts 15, 19, and 36 and evaluated using lowest price technically acceptable procedures. It will be set aside for service-disabled veteran-owned small businesses and issued on October 16, 2019, with a performance period of approximately 490 calendar days. The magnitude of construction is estimated between $5 million to $10 million. Questions must be submitted in writing by the specified date.
36E77619R0097 Attachment 8 - Plumbing Plans.pdf
View the file
Other files for this federal contract opportunity
Show all 44
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VENT PIPING ABOVE FINISHED FLOORV
MA
EXISTING SANITARY PIPING ABOVE FINISHED FLOOR
LEGEND
CHECK VALVE
SA "X"
VTR
SHOCK ARRESTOR (P.D.I RATING)
VENT THROUGH ROOF
SHUT-OFF VALVE
CAP
DN DOWN
AFF ABOVE FINISHED FLOOR
BFF BELOW FINISHED FLOOR
TYP. TYPICAL
THERMOMETER
P-XXX PLUMBING FIXTURE REFER TO (PLUMBING FIXTURE INSTALLATION SCHEDULE)
TP-X TRAP PRIMER
FCO FLOOR CLEANOUT
EXISTING PIPING ABOVE FINISHED FLOOR TO BE REMOVED
SANITARY PIPING ABOVE FINISHED FLOORSAN
XSAN
EXISTING VENT PIPING ABOVE FINISHED FLOORXV
EXISTING STORM WATER PIPING ABOVE FINISHED FLOORXSW
STORM WATER PIPING ABOVE FINISHED FLOORSW
COLD WATER SUPPLY PIPING ABOVE FINISHED FLOORDCWS
EXISTING COLD WATER SUPPLY PIPING ABOVE FINISHED FLOORXDCWS
EXISTING HOT WATER SUPPLY PIPING ABOVE FINISHED FLOORXDHWS
HOT WATER SUPPLY PIPING ABOVE FINISHED FLOORDHWS
AIR PIPING ABOVE FINISHED FLOOR
EXISTING AIR PIPING ABOVE FINISHED FLOORXMA
EXISTING HOT WATER RETURN PIPING ABOVE FINISHED FLOORXDHWR
HOT WATER RETURN PIPING ABOVE FINISHED FLOORDHWR
NITROGEN PIPING ABOVE FINISHED FLOOR
EXISTING NITROGEN ABOVE FINISHED FLOOR
MN
XMN
HOT WATER HOSE BIBB
FLOOR CLEANOUT
FLOOR DRAIN
PIPE DROP
PIPE RISE
ROOF DRAIN
WCO WALL CLEANOUT
CO CLEANOUT
CLEAOUT
UNION
SINGLE HORIZONTAL ADJUSTABLE CARRIER
BACK TO BACK HORIZONTAL ADJUSTABLE CARRIER
OXYGEN PIPING ABOVE FINISHED FLOOR (PER THE FACILITY DUDE)
EXISTING OXYGEN PIPING ABOVE FINISHED FLOOR (PER THE FACILITY DUDE)
MO
XMO
EXISTING OVERFLOW STORM DRAIN PIPING ABOVE FINISHED FLOORXOFD
OVERFLOW STORM DRAIN PIPING ABOVE FINISHED FLOOROFD
EXISTING VACUUM PIPING ABOVE FINISHED FLOOR (PER THE FACILITY DUDE)XMV
VACUUM PIPING ABOVE FINISHED FLOOR (PER THE FACILITY DUDE)MV
NITROUS OXIDE PIPING ABOVE FINISHED FLOOR
EXISTING NITROUS OXIDE ABOVE FINISHED FLOOR
MN02
XMN02
EXISTING WASTE ANESTHESIA GAS DISPOSAL PIPING ABOVE FINISHED FLOORXWAGD
WASTE ANESTHESIA GAS DISPOSAL PIPING ABOVE FINISHED FLOORWAGD
HEAT TRACED CAST IRON NO HUB SANITARY PIPING ABOVE FINISHED FLOORSAN
COLD WATER RETURN PIPING ABOVE FINISHED FLOORDCWR
TMV-X THERMOSTATIC MIXING VALVE
BFP-X BACKFLOW PREVENTER
BALANCING VALVE
Graphic Scale
Graphic Scale
Graphic Scale
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL CONSTRUCTION
DOCUMENTS
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Auburn, ME 207.784.5100
Boston, MA 617.426.5050
Portland, ME 207.775.0053
Portsmouth, NH 603.626.1242 c HA PROJECT NUMBER: 13586
SCALE:
C :\U se rs
\m am or \D oc um en ts
R ev it
L oc al s\
6-pl um -c en tra l_ m am or
.rv t
2/
/2
7:
:0
AM
P00.1
LEGEND, SCHEDULES, GENERAL
NOTES & DETAILS
CONSTRUCT CLEAN CORE ADDITION TO
SURGICAL SUITE
PROVIDENCE, RHODE ISLAND
650-337
02-22-19 CG MAM
PLUMBING FIXTURE INSTALLATION SCHEDULE
FURNISHED & INSTALLED BY PLUMBING CONTRACTOR
TAG DESCRIPTION
BRANCH SIZE BASIS OF DESIGN FIXTURE SPECIFICATIONS
REFER TO THE SPECIFICATIONS FOR APPROVED
EQUALS AND DETAILED DESCRIPTIONS
BASIS OF DESIGN SUPPLY FITTING FIXTURE SPECIFICATIONS
REFER TO THE SPECIFICATIONS FOR APPROVED
EQUALS AND DETAILED DESCRIPTIONS MOUNTING HEIGHTW V CW HW TW
P-103 WATER CLOSET WALL
MOUNTED
4" 2" 1" - - AMERICAN STANDARD AFWALL FLOWISE MODEL 3351.101, PROVIDE
CHURCH MODEL 9500CT TOILET SEAT
SLOAN ROYAL MODEL 111-1.6 16 1/2"
P-418 ADA COMPLIANT LAVATORY 2" 1 1/2" 1/2" 1/2" - AMERICAN STANDARD MURRO MODEL 0955.001EC, PROVIDE
AMERICAN STANDARD ARCYLIC SHROUD MODEL 006.00EC
CHICAGO FAUCET MODEL 116.595.AB.1-E63VPJKABCP-12 VOLT TRANSFORMER 1.5 GPM,
PROVIDE CHICAGO FAUCET MIXING VALVE MODEL 131-FM-ABRCF & CHICAGO FAUCET
ANGLE STOPS MODEL 1017-CSTABCP BELOW LAVATORY
34"
P-528 SINGLE BOWL COUNTER
MOUNTED SINK
2" 1 1/2" 1/2" 1/2" - ELKAY LUSTERSTONE MODEL LRADQ211950-3, PROVIDE LKAD35
OFFSET TAILPIECE WITH GRID STRAINER
CHICAGO FAUCET MODEL 116.595.AB.1-E29VPJKABCP 2.2 GPM, PROVIDE CHICAGO FAUCET
MIXING VALVE MODEL 131-FM-ABRCF & CHICAGO FAUCET ANGLE STOPS MODEL
1017-CSTABCP BELOW LAVATORY
34"
P-519 ADA COMPLIANT SCRUB SINK 2" 1 1/2" 1/2" 1/2" - SLOAN SCRUB SINK MODEL ESS-220-C PROVIDED WITH SCRUB SINK, PROVIDE CHICAGO FAUCET MIXING VALVE MODEL
131-FM-ABRCF & CHICAGO FAUCET ANGLE STOPS MODEL 1017-CSTABCP BELOW
LAVATORY
34"
P-710 RECESSED EMERGENCY
EYEWASH
2" 1 1/2" - - 1" GUARDIAN EQUIPMENT RECESSED LABORATORY UNIT MODEL
GBF1735DP-TMV
TV-1 20"
GENERAL NOTES
1 DRAWINGS ARE DIAGRAMMATIC ONLY AND REPRESENT THE GENERAL SCOPE OF THE WORK. REVIEW THE GENERAL NOTES, SPECIFICATIONS AND PLANS FOR ADDITIONAL REQUIREMENTS THAT MAY NOT BE SPECIFICALLY CALLED OUT IN THIS PORTION OF THE CONSTRUCTION DOCUMENTS. NOTIFY THE
ARCHITECT OF ANY CONFLICTS OR
DISCREPANCIES PRIOR TO SUBMISSION OF BID.
2 VERIFY LOCATION AND DEPTH OF UTILITIES AT ALL POINTS OF CONNECTION INDICATED ON
DRAWINGS BEFORE START OF PROJECT.
3 COORDINATE ALL WORK WITH OTHER TRADES AND CONTRACTORS. COORDINATE PIPING
INSTALLATION WITH STRUCTURAL GRADE BEAMS, FOOTINGS, COLUMN PIERS, ETC. SLEEVE PIPING
THROUGH GRADE BEAMS, FOOTING, ETC. WHERE REQUIRED AND AS NOTED ON PLANS.
COORDINATE SLEEVE INSTALLATIONS WITH THE ARCHITECT, STRUCTURAL ENGINEER, STRUCTURAL CONTRACTOR AND GENERAL CONTRACTOR BEFORE CONCRETE IS INSTALLED. PIPING INVERTS AND SLOPE SHALL BE CLOSELY COORDINATED TO AVOID CONFLICTS WITH ALL OTHER TRADES BELOW
SLAB WORK.
4 COORDINATE PIPE ROUTING AWAY FROM ELECTRICAL PANELS. DO NOT ROUTE PIPING OVER
ELECTRICAL PANELS.
5 PIPING IN FINISHED AREAS SHALL BE ROUTED CONCEALED; EXPOSED PIPING, WHERE NECESSARY, SHALL BE ROUTED AS HIGH AS POSSIBLE AND TIGHT TO WALLS.
6 REFER TO INSTALLATION SCHEDULE DATA FOR THE SIZE OF PIPING CONNECTIONS AND MOUNTING
HEIGHTS OF EACH FIXTURE.
7 ALL PLUMBING FIXTURE SHUT-OFF AND/OR BALANCING VALVES INSTALLED IN PIPE CHASES SHALL BE ACCESSIBLE FROM JUST ABOVE THE CEILING LINE OR ACCESS DOORS PROVIDED LOW IN CHASE
WALL.
8 SANITARY WASTE PIPING 4" & LARGER SHALL BE INSTALLED WITH A PITCH OF 1/8" PER 1'-0".
9 ALL UNDERSLAB PIPING SHALL BE INSTALLED TO PROVIDE NO LESS THAN 2" OF COVER BETWEEN
THE PIPING AND THE FLOOR SLAB.
10 VENT AND WATER PIPING SHALL PITCH TO DRAIN.
11 PROVIDE FIXTURE STOPS ON ANY WATER SUPPLY IMMEDIATELY ADJACENT TO PLUMBING FIXTURES.
12 CLEAN FAUCET AERATORS AND PIPE STRAINERS PRIOR TO TURNING BUILDING OVER TO THE
OWNER.
13 PROVIDE TRAP PRIMERS WHERE REQUIRED BY LOCAL AUTHORITIES.
14 PROVIDE ISOLATION VALVES FOR ALL SUPPLY FIXTURES.VALVES SHALL BE LINE SIZE UNLESS
OTHERWISE NOTED.
15 THE TERM "PROVIDE" SHALL MEAN "TO FURNISH, INSTALL AND CONNECT COMPLETELY".
16 ENTIRE PLUMBING INSTALLATION SHALL BE IN COMPLIANCE WITH ALL CURRENT LOCAL, STATE AND
FEDERAL
CODES AND STANDARDS.
17 OSHA RULES, REGULATIONS AND REQUIREMENTS, AND ANY STATE AND LOCAL REQUIREMENTS FOR
SAFETY SHALL BE FOLLOWED BY THE CONTRACTOR
18 DOMESTIC HOT, COLD & HOT WATER RETURN PIPING SHALL HAVE NO DEAD LEGS. IF EXISTING DEAD LEGS ARE FOUND WITHIN THE WORK AREAS, PIPING SHALL BE DEMOLISHED BACK TO THE MAINS
19 SUPPLY DROPS FOR FUTURE USE SHALL HAVE ISOLATION VALVES AS CLOSE TO MAINS AS POSSIBLE
TO PREVENT DEAD LEG PIPES.
20 ALL PENETRATIONS THROUGH FLOORS & WALLS SHALL BE FIRESTOPPED.
21 ALL WORK PREFORMED WITHIN THE O.R SUITE SHALL TAKE PLACE ON SATURDAY, SUNDAY OR WEEK
NIGHTS BETWEEN THE HOURS OF 7 P.M & 6A.M MODAY THROUGH FRIDAY. WORK THAT CANNOT BE
CONDUCTED DURRING THESE TIMES MUST BE SCHEDULED WITH PVAMC 28 DAYS IN ADVANCE
22 PHASING: ALL WORK SHALL BE PREFORMED WITHIN THE ASSOCIATED PHASE. REFER TO DRAWINGS
A01.1,A01.2 AND PLUMBING DRAWINGS FOR IDENTIFICATION OF PHASING
DRAIN SCHEDULE
BASIS OF DESIGN DRAIN SPECIFICATIONS REFER TO THE SPECIFICATIONS FOR APPROVED EQUALS
AND DETAILED DESCRIPTIONS
TAG DESCRIPTION
CONNECTION SIZE SPECIFICATIONS
BASIS OF DESIGNWASTE V
FD-1 FLOOR DRAIN 3" 2" WATTS ROUND HEAVY DUTY MODEL
FD-1100-3-A8-6-7
FS-1 FLOOR SINK 4" 2" WATTS FLOOR SINK MODEL
FS-790-4-6-150-HD
OD-1 DOWNSPOUT
COVER
8" - WATTS DOWNSPOUT COVER MODEL
RD-950
RD-1 ROOF DRAIN 3" - WATTS MODEL RD-700-F-3-K80
MEDICAL GAS PIPING GENERAL NOTES
1. ALL WORK PREFORMED WITHIN THE O.R SUITE SHALL TAKE PLACE ON SATURDAY, SUNDAY OR
WEEK NIGHTS BETWEEN THE HOURS OF 7 P.M & 6A.M MODAY THROUGH FRIDAY. WORK THAT
CANNOT BE CONDUCTED DURRING THESE TIMES MUST BE SCHEDULED WITH PVAMC 28 DAYS IN
ADVANCE
2. PHASING: ALL WORK SHALL BE PREFORMED WITHIN THE ASSOCIATED PHASE. REFER TO
DRAWINGS A01.1,A01.2 AND PLUMBING DRAWINGS FOR IDENTIFICATION OF PHASING
TEMPERING VALVE SCHEDULE
BASIS OF DESIGN TEMPERING VALVE SPECIFICATIONS REFER TO THE SPECIFICATIONS FOR APPROVED EQUALS AND DETAILED DESCRIPTIONS
TAG MANUFACTURER MODEL CW HW TW
MAX. OPERATING
PRESSURE
MAX.
OPERATING
TEMPERATURE MAX. GPM MIN. GPM
TEMPERATURE
SETTING NOTES
TMV-1 LEONARD VALVE
COMPANY
TA-300-LF-STSTL-REC-TOP-VIEW 1/2" 1/2" 1/2" 125.00 140 °F 4 2.00 85°F
TV-2 LEONARD VALVE
COMPANY
XL-186-32A-REC-RHH-TOP-VIEW-LF 3/4" 3/4" 3/4" 125.00 140 °F 20 2.00 110°F
PIPING ACCESSORY SCHEDULE
BASIS OF DESIGN PIPE ACCESSORIES SPECIFICATIONS REFER TO THE SPECIFICATIONS FOR APPROVED EQUALS AND
DETAILED DESCRIPTIONS
TAG DESCRIPTION MANUFACTURER MODEL PIPE CONNECTION SIZE
BFP-1 BACKFLOW PREVENTOR WATTS LF909M1-QT-S 3/4"
FC THERMOSTATIC FLOW CONTROL
VALVE
THERMOMEGATE
CH
CSU-3/4-120
Revisions: Date:
V- 2"
SW- 4"
SW- 8"
V- 4"
SAN- 2"
Graphic Scale
Graphic Scale
0 4' 8' 12'
1/8" = 1'-0"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL CONSTRUCTION
DOCUMENTS
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Auburn, ME 207.784.5100
Boston, MA 617.426.5050
Portland, ME 207.775.0053
Portsmouth, NH 603.626.1242 c HA PROJECT NUMBER: 13586
SCALE:
C :\U se rs
\m am or \D oc um en ts
R ev it
L oc al s\
6-pl um -c en tra l_ m am or
.rv t
2/
/2
7:
:1
AM
P05.1
BASEMENT FLOOR DRAINAGE
DEMOLITION
CONSTRUCT CLEAN CORE ADDITION TO
SURGICAL SUITE
PROVIDENCE, RHODE ISLAND
650-337
02-22-19 CG MAM
SCALE: 1/8" = 1'-0"1 BASEMENT FLOOR DRAINAGE DEMOLITION
D01
D02
DEMO KEY NOTES
CODE DESCRIPTION
D01 DEMOLISH EXISTING 8" OD UP & PREPARE FOR RECONNECTION
D02 DEMOLISH EXISTING 8" OVERFLOW DRAIN OUTLET PATCH EXTERIOR
WALL TO MATCH EXISTING
D03 DEMOLISH EXISTING 4" S BACK TO THIS POINT & PREPARE FOR
RECONNECTION
D04 DEMOLISH EXISTING 2" W UP
D05 DEMOLISH EXISTING 2" V DN
D06 DEMOLISH EXISTING 2" V BACK TO THIS POINT & CAP
D07 DEMOLISH EXISTING SUPPLY PIPING & ASSOCIATED ACCESSORIES
BACK TO THIS POINT & CAP
D08 DEMOLISH EXISTING N2, N02 & ASSOCIATED ACCESSORIES BACK TO
THIS POINT & CAP
D09 DEMOLISH EXISTING SUPPLY, GAS PIPING & ASSOCIATED
ACCESSORIES
D10 DEMOLISH EXISTING SUPPLY PIPING & ASSOCIATED ACCESSORIES
DN
D11 DEMOLISH EXISTING 2-1/2" CW BACK TO THIS PIONT & PREPARE FOR
RECONNECTION
PH2B
XV- 2"
XS
W
-4
XSAN- 4"XSAN- 4"
XV
-2
XSAN- 4"
XS
AN
-4
XS
AN
-4
XS
AN
-2
XSAN- 4"XSAN- 2"
XS
AN
-2
XS
AN
-4
XSAN- 4"
XS
AN
-4
XSAN- 4"
XV- 2"
XS
AN
-4
XSAN- 4"
XV- 2"
XV
-2
XSAN- 4"
XS
AN
-4
XSW- 6"
XS
AN
-4
XSAN- 4"
XV- 2"
D01
XSAN- 4"
XSAN- 2"
D03
D04
D04
D04
XSAN- 2"
D03
O
FD
-8
SAN- 2"
OFD- 6"
OFD- 8"
V- 2"
SW- 6"
V- 2"
SW- 6"
OFD- 6"
PH7
PH2B
Graphic Scale
Graphic Scale
0 4' 8' 12'
1/8" = 1'-0"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL CONSTRUCTION
DOCUMENTS
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Auburn, ME 207.784.5100
Boston, MA 617.426.5050
Portland, ME 207.775.0053
Portsmouth, NH 603.626.1242 c HA PROJECT NUMBER: 13586
SCALE:
C :\U se rs
\m am or \D oc um en ts
R ev it
L oc al s\
6-pl um -c en tra l_ m am or
.rv t
2/
/2
7:
:2
AM
P05.2
FIRST FLOOR DRAINAGE
DEMOLITION
CONSTRUCT CLEAN CORE ADDITION TO
SURGICAL SUITE
PROVIDENCE, RHODE ISLAND
650-337
02-22-19 CG MAM
SCALE: 1/8" = 1'-0"1 FIRST FLOOR DRAINAGE DEMOLITION
DEMO KEY NOTES
CODE DESCRIPTION
D01 DEMOLISH EXISTING 8" OD UP & PREPARE FOR RECONNECTION
D02 DEMOLISH EXISTING 8" OVERFLOW DRAIN OUTLET PATCH EXTERIOR
WALL TO MATCH EXISTING
D03 DEMOLISH EXISTING 4" S BACK TO THIS POINT & PREPARE FOR
RECONNECTION
D04 DEMOLISH EXISTING 2" W UP
D05 DEMOLISH EXISTING 2" V DN
D06 DEMOLISH EXISTING 2" V BACK TO THIS POINT & CAP
D07 DEMOLISH EXISTING SUPPLY PIPING & ASSOCIATED ACCESSORIES
BACK TO THIS POINT & CAP
D08 DEMOLISH EXISTING N2, N02 & ASSOCIATED ACCESSORIES BACK TO
THIS POINT & CAP
D09 DEMOLISH EXISTING SUPPLY, GAS PIPING & ASSOCIATED
ACCESSORIES
D10 DEMOLISH EXISTING SUPPLY PIPING & ASSOCIATED ACCESSORIES
DN
D11 DEMOLISH EXISTING 2-1/2" CW BACK TO THIS PIONT & PREPARE FOR
RECONNECTION
XV
-2
XSW- 4"
XOFD- 6"
XV
-2
XOFD- 4"
XSW- 4" XSW- 4"
XOFD- 4"
XV- 3"
XV- 2"
XV- 2"
XV
-2
XV
-2
XV- 2"
XV- 2"
XV- 1"
XV
-2
XV- 2" XV- 2"
XV
-2
XV- 2"
XV- 2"
XOFD- 4"
XV
-2
XV
-2
XO
FD
-4
XV- 2"
XV- 2"
D05
D06
D06
D05
PH2B
PH2B
PH7
Graphic Scale
Graphic Scale
0 4' 8' 12'
1/8" = 1'-0"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL CONSTRUCTION
DOCUMENTS
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Auburn, ME 207.784.5100
Boston, MA 617.426.5050
Portland, ME 207.775.0053
Portsmouth, NH 603.626.1242 c HA PROJECT NUMBER: 13586
SCALE:
C :\U se rs
\m am or \D oc um en ts
R ev it
L oc al s\
6-pl um -c en tra l_ m am or
.rv t
2/
/2
7:
:3
AM
P05.3
SECOND FLOOR DRAINAGE
DEMOLITION
CONSTRUCT CLEAN CORE ADDITION TO
SURGICAL SUITE
PROVIDENCE, RHODE ISLAND
650-337
02-22-19 CG MAM
SCALE: 1/8" = 1'-0"1 SECOND FLOOR DRAINAGE DEMOLITION
DEMO KEY NOTES
CODE DESCRIPTION
D01 DEMOLISH EXISTING 8" OD UP & PREPARE FOR RECONNECTION
D02 DEMOLISH EXISTING 8" OVERFLOW DRAIN OUTLET PATCH EXTERIOR
WALL TO MATCH EXISTING
D03 DEMOLISH EXISTING 4" S BACK TO THIS POINT & PREPARE FOR
RECONNECTION
D04 DEMOLISH EXISTING 2" W UP
D05 DEMOLISH EXISTING 2" V DN
D06 DEMOLISH EXISTING 2" V BACK TO THIS POINT & CAP
D07 DEMOLISH EXISTING SUPPLY PIPING & ASSOCIATED ACCESSORIES
BACK TO THIS POINT & CAP
D08 DEMOLISH EXISTING N2, N02 & ASSOCIATED ACCESSORIES BACK TO
THIS POINT & CAP
D09 DEMOLISH EXISTING SUPPLY, GAS PIPING & ASSOCIATED
ACCESSORIES
D10 DEMOLISH EXISTING SUPPLY PIPING & ASSOCIATED ACCESSORIES
DN
D11 DEMOLISH EXISTING 2-1/2" CW BACK TO THIS PIONT & PREPARE FOR
RECONNECTION
D05
D05
D06
XMN02- 3/4"
XMN- 3/4"
XMV- 3/4"
XMC02- 3/4"
XMO- 3/4"
XMA- 3/4"
XWAGD- 3/4"
XDHWS- 1 1/2"
XDCWS- 2 1/2"
XMN02- 3/4"
XMN- 3/4"
XMV- 3/4"
XMC02- 3/4"
XMO- 3/4"
XMA- 3/4"
XWAGD- 3/4"
XDHWS- 1 1/2"
XDCWS- 2 1/2"
XMV- 3/4"
XMO- 3/4"
XMA- 3/4"
XWAGD- 3/4"
XDHWS- 1 1/2"
XDCWS- 2 1/2"
XMV- 2"
XMV- 3/4"
XMA- 3/4"
XMO- 3/4"
XDCW
S- 2 1/2"
XDHW
S- 1 1/2"
XMV- 1 1/2"
XMV- 3/4"
XMO- 3/4"
XMA- 3/4"
XMO- 3/4"
XDCWS- 2 1/2"
XDHWS- 1 1/2"
XMO- 1/2"
XMV- 1"
XMA- 1/2"
XMO- 1/2"
XMV- 1"
XMA- 1/2"
XMO- 1/2"
XMV- 3/4"
XMA- 1/2"
XDCWS- 2 1/2"
XDHWS- 1 1/2"
XDCWS- 2 1/2"
XDHWS- 1 1/2"
XD
C
W S-
1/
2"
XM
O
-1 /2
XM
A-
1/ 2"
XM
V-
1"
XM
N
-3 /4
XM
N
-3 /4
XM
O -3
/4
XM
A-
1/ 2"
XM
V-
3/ 4"
XW
AG
D -3
/4
XM
N
-3 /4
XM
N
-3 /4
XM
N
-3 /4
XM
N
-3
/4
XM
O
-3 /4
XM
A- 1/
2"
XM
V- 3/
4"
XW
AG
D
-3 /4
XM
N
-3 /4
XM
N
-3 /4
XM
O -3
/4
XM
A-
1/ 2"
XM
V-
3/ 4"
XW
AG
D -3
/4
XD
H
W S-
1/ 2"
XD
C
W S-
1/
4"
XD
H W
S- 3/
4"
XD
C W
S-
1/
4" XMN02- 3/4"
XMN- 3/4"
XMN02- 3/4"
XMN- 3/4"
XMV- 3/4"
XMO- 3/4"
XMA- 3/4"
XW
AGD- 3/4"
XDHW
S- 1 1/2"
XDCW
S- 2 1/2"
XDHW
S- 1/2
XDCW
S- 1/2
XD
C
W S-
1/
4"
XD
H W
S- 3/
4"
PH4
PH4
PH7
PH2B
D07
D07
D08 D09
D09
D10
D10
D10
D10
D10
D10
D07
D11
Graphic Scale
Graphic Scale
0 4' 8' 12'
1/8" = 1'-0"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL CONSTRUCTION
DOCUMENTS
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Auburn, ME 207.784.5100
Boston, MA 617.426.5050
Portland, ME 207.775.0053
Portsmouth, NH 603.626.1242 c HA PROJECT NUMBER: 13586
SCALE:
C :\U se rs
\m am or \D oc um en ts
R ev it
L oc al s\
6-pl um -c en tra l_ m am or
.rv t
2/
/2
7:
:0
AM
P06.1
SECOND FLOOR SUPPLY
DEMOLITION
CONSTRUCT CLEAN CORE ADDITION TO
SURGICAL SUITE
PROVIDENCE, RHODE ISLAND
650-337
02-22-19 CG MAM
SCALE: 1/8" = 1'-0"1 SECOND FLOOR SUPPLY DEMOLITION
DEMO KEY NOTES
CODE DESCRIPTION
D01 DEMOLISH EXISTING 8" OD UP & PREPARE FOR RECONNECTION
D02 DEMOLISH EXISTING 8" OVERFLOW DRAIN OUTLET PATCH EXTERIOR
WALL TO MATCH EXISTING
D03 DEMOLISH EXISTING 4" S BACK TO THIS POINT & PREPARE FOR
RECONNECTION
D04 DEMOLISH EXISTING 2" W UP
D05 DEMOLISH EXISTING 2" V DN
D06 DEMOLISH EXISTING 2" V BACK TO THIS POINT & CAP
D07 DEMOLISH EXISTING SUPPLY PIPING & ASSOCIATED ACCESSORIES
BACK TO THIS POINT & CAP
D08 DEMOLISH EXISTING N2, N02 & ASSOCIATED ACCESSORIES BACK TO
THIS POINT & CAP
D09 DEMOLISH EXISTING SUPPLY, GAS PIPING & ASSOCIATED
ACCESSORIES
D10 DEMOLISH EXISTING SUPPLY PIPING & ASSOCIATED ACCESSORIES
DN
D11 DEMOLISH EXISTING 2-1/2" CW BACK TO THIS PIONT & PREPARE FOR
RECONNECTION
D07
D09
OD-1
P04
XV- 2" XSW- 4" XV- 4"
E
E.1
D
765432.52.221.81.5
10.5
B
A.5
A
OFD- 8"
OFD- 8"
SW- 6"
P15 P16
P17
C
O
FD
-8
SW
-6
Room
Room
A-EL
PH2B
Graphic Scale
Graphic Scale
0 4' 8' 12'
1/8" = 1'-0"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL CONSTRUCTION
DOCUMENTS
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Auburn, ME 207.784.5100
Boston, MA 617.426.5050
Portland, ME 207.775.0053
Portsmouth, NH 603.626.1242 c HA PROJECT NUMBER: 13586
SCALE:
C :\U se rs
\m am or \D oc um en ts
R ev it
L oc al s\
6-pl um -c en tra l_ m am or
.rv t
2/
/2
7:
:2
AM
P10.1
GROUND FLOOR DRAINAGE CONSTRUCT CLEAN CORE ADDITION TO
SURGICAL SUITE
PROVIDENCE, RHODE ISLAND
650-337
02-22-19 CG MAM
SCALE: 1/8" = 1'-0"1 GROUND FLOOR DRAINAGE
KEY NOTES
CODE DESCRIPTION
P01 2" W UP
P02 2" V UP
P03 4" S UP
P04 8" OD UP
P05 2" W & 1-1/2" V DN
P06 2" W IN WALL & 1-1/2" V DN
P07 4" S DN
P08 2" V DN
P09 2" V UP 3" VTR
P10 3" V UP 4" VTR
P11 2" W DN
P12 3" VTR
P13 4" VTR
P14 6" OD & 6" SD DN
P15 6" OD & 6" SD UP
P16 CONNECT 8" OD TO EXISTING 8" OD
P17 CONNECT 6" SD TO EXISTING
P18 3" SD UP TO 3" RD
P19 3" OD UP TO 3" RD
P20 3" W UP
P21 EXISTING ROOF DRAIN TO REMAIN
P22 PROVIDE MEDICAL GAS VALVE BOX & ALARM PANEL REFER TO
SPECIFICATIONS FOR MANUFACTURERS & MODELS.
COORDINATE EXACT LOCATION OF ALARM PANEL WITH
ELECTRICAL CONTRACTOR
P23 1/2" A, OX. VA, WAGD,NO2 & N2 DN TO BOOM
P24 1/2" HW & CW DN
P25 1/2" HW & CW DN
P26 1/2" CO2,NO2, WAGD, A, OX, VA, N2 DN TO RETRACTABLE
CEILING COLUMN
P27 PROVIDE ISOLATION VALVE, MAKE FINAL CONNECTIONS TO
TWO EVAC UNITS REFER TO MANUFACTURERS INSTALLATION
MANUAL
P28 3/4" TEMPERED WATER FROM MIXING VALVE DN. RUN PIPE IN
WALL TO BACKFLOW PREVENTER LOCATION
P29 1" DCWR DN
P30 CONNECT TO EXISTING 1" CHWR RISER
P31 1" DCWR UP
XSAN- 4"
XSAN- 4" XSAN- 4"
XS
AN
-4
XS
AN
-4
XSAN- 2"
XV- 2"
XS
W
-4
XV
-2
XS
AN
-4
XSAN- 4"
XSAN- 4"
XV
-2
XS
AN
-4
XSAN- 2" XSAN- 4"
XS
AN
-2
XSAN- 4"
P03
SAN- 4"
SAN- 4"
CO
P01
XSW- 6"
XS
AN
-2
XS
AN
-4
XV- 2"
SAN- 2"
SA
N
-2
COP01
SA
N
-3
SA
N
-3
P30.1
P01
P01
SAN- 2"
SAN- 4"
E
E.1
D
765432.52.221.81.5
10.5
B
A.5
A
O
FD
-6
SW
-6
C
XSW- 6"
XOFD- 8"
XV
-2
XO
FD
-8
XOFD- 6"
P15
P14
P20
SAN- 3"
SA
N
-3
P02
V- 3"
P01
CO
P01
SAN- 4"MECHANICAL ROOM
STAFF LOCKER
FEMALE
TOILET MALE
TOILET FEMALE
STAFF LOCKER MALE
113A
OFFICE
115A
OFFICE
OFFICE
OFFICE
CONFERENCE ROOM
110 BREAK / KITCHEN
STAFF WASHROOM
109A
CONSULT
WAITING
STAIR TOWER-2
DROP OFFICE
119C
PICK UP
119B
PU/DO
119A
OFFICE
ANESTHESIA
CONFERENCE ROOM
118A
ANESTHESIA OFFICE
NURSE MANAGER
OFFICE
STAFF LOUNGE AND
CONFERENCE
STAIR K
K-1
CORRIDOR
CORRIDOR
101B
MENS RESTROOM
WOMENS REST ROOM
MENS REST ROOM
COMP AND PENSION
COMP AND PENSION
COMP AND PENSION
RECEPTION
160A
COMP AND PENSION
COMP AND PENSION
Room
ELEVATOR LOBBY
L11
PH2B
PH7
P03
P02
Graphic Scale
Graphic Scale
0 4' 8' 12'
1/8" = 1'-0"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL CONSTRUCTION
DOCUMENTS
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Auburn, ME 207.784.5100
Boston, MA 617.426.5050
Portland, ME 207.775.0053
Portsmouth, NH 603.626.1242 c HA PROJECT NUMBER: 13586
SCALE:
C :\U se rs
\m am or \D oc um en ts
R ev it
L oc al s\
6-pl um -c en tra l_ m am or
.rv t
2/
/2
7:
:2
AM
P10.2
FIRST FLOOR DRAINAGE CONSTRUCT CLEAN CORE ADDITION TO
SURGICAL SUITE
PROVIDENCE, RHODE ISLAND
650-337
02-22-19 CG MAM
SCALE: 1/8" = 1'-0"1 FIRST FLOOR DRAINAGE
KEY NOTES
CODE DESCRIPTION
P01 2" W UP
P02 2" V UP
P03 4" S UP
P04 8" OD UP
P05 2" W & 1-1/2" V DN
P06 2" W IN WALL & 1-1/2" V DN
P07 4" S DN
P08 2" V DN
P09 2" V UP 3" VTR
P10 3" V UP 4" VTR
P11 2" W DN
P12 3" VTR
P13 4" VTR
P14 6" OD & 6" SD DN
P15 6" OD & 6" SD UP
P16 CONNECT 8" OD TO EXISTING 8" OD
P17 CONNECT 6" SD TO EXISTING
P18 3" SD UP TO 3" RD
P19 3" OD UP TO 3" RD
P20 3" W UP
P21 EXISTING ROOF DRAIN TO REMAIN
P22 PROVIDE MEDICAL GAS VALVE BOX & ALARM PANEL REFER TO
SPECIFICATIONS FOR MANUFACTURERS & MODELS.
COORDINATE EXACT LOCATION OF ALARM PANEL WITH
ELECTRICAL CONTRACTOR
P23 1/2" A, OX. VA, WAGD,NO2 & N2 DN TO BOOM
P24 1/2" HW & CW DN
P25 1/2" HW & CW DN
P26 1/2" CO2,NO2, WAGD, A, OX, VA, N2 DN TO RETRACTABLE
CEILING COLUMN
P27 PROVIDE ISOLATION VALVE, MAKE FINAL CONNECTIONS TO
TWO EVAC UNITS REFER TO MANUFACTURERS INSTALLATION
MANUAL
P28 3/4" TEMPERED WATER FROM MIXING VALVE DN. RUN PIPE IN
WALL TO BACKFLOW PREVENTER LOCATION
P29 1" DCWR DN
P30 CONNECT TO EXISTING 1" CHWR RISER
P-103
XV
-2
XV- 1"
XV- 3"
XOFD- 4" XSW- 4"
XSW- 4"
XOFD- 6"XSW- 4"
XV
-2
XSW- 4"
XOFD- 4"
XV- 2"
XV
-2
XV- 2"
XV
-2
P-519
XV- 2"
XV- 2"
XV- 2"
XV
-2
XV- 2"
XV
-2
P05
P05
P05
P06
P05
P07P08P09
P10
P-528 P-528
P-418
P-528
P05
P05
V- 2"
V- 2"
V- 2"V- 3"
XV- 2"
XV- 2"
XV
-2
XV- 2"XV- 2"
XO
FD
-4
XOFD- 4"
CLEAN AND STERILE
SUPPLY
EQUIPMENT STORAGE
MECHANICAL
CYSTOSCOPY
SEMI RESTRICTED
CORRIDOR
A-EL-3
FUTURE
CLEAN
EL.
A-EL-2
FUTURE
CLEAN
EL.
CLEAN AND STERILE
SUPPLY
CC STORAGE
255A
NURSE MANAGER
OFFICE
SOILED
UTILITY
IUSS
ANESTHESIA
WORKROOM
EQUIPMENT STORAGE
WORK AREA
219218
CONTROL
STATION
MALE LOCKERS
ANGIOPLASTY
OR-1
OR-2
OR-3
215G
HOUSE
KEEPING
FEMALE
LOCKERS
CONSULT ROOM
MINOR PROCEDURE
OR STORAGE
PATIENT TOILET
215F
215E
PATIENT
LOCKERS
VESTIBULE
215D
CLEAN UTILITIES
215C
215B
SOILED
UTILITIES
SEMI RESTRICTED
CORRIDOR
STAIR WELL
A-2
ELECTRICAL
CLOSET
232A
HOUSE
KEEPING
ELEC
232C
ELEC
232D
ELECTRICAL ROOM
201C
EMERGENCY
ELECTRICAL ROOM
201B
ELEVATOR LOBBY
L23
LINEN CHUTE
IT CLOSET
229A
ELECTRICAL
CLOSET
CORRIDOR
2-DC-1A
SEMI RESTRICTED
CORRIDOR
EXAM-1
E205
EXAM-2
E206
OFFICE
CORRIDOR
BRONCHOSCOPY
SCRUB
210A SCRUB
210B
OR ACCESS VESTIBULE
OR ACCESS VESTIBULE
OBSERVATION
ROOM
PACU
NURSE STATION
215A
PATIENT
TOILET
CORRIDOR
C223
STAIR-K
K-2
STAFF TOILET/SHOWER
SEMI RESTRICTED
CORRIDOR
LINK CORRIDOR
L24
MICROSCOPE
E207
EXAM-3
E208
CAST ROOM
E204
CORRIDOR
C22
CORRIDOR
C21
ELEVATOR
E-EL-1
FUTURE SOILED
ELEVATOR
A-EL-1
P11
SAN- 2"
E
E.1
D
765432.52.221.81.5
10.5
B
A.5
A
OFD- 3"
SW- 3"
O
FD
-3
SW
-3
SW- 4"
OFD- 4"
SW
-3
O
FD
-3
SW- 3"
OFD- 3"
SW
-3
SW
- 3"OFD- 3"
SW
- 3"
OFD- 3"OFD- 4"
SW- 4"
P14
C
P18
P19
P18
P19
P18
P19
P18
P19
P18
P19
P18
P19
P18
P19
OFD- 3"
SW- 3"
P18
P19
P18
P19
FD-1 P11
P08
V- 3"
TOILET
202A
NURSE MANAGER
OFFICE
P-418
P05
P-710
P05
P-418
OFD- 4"
SW- 4"
PH2B
PH7
O
FD
-3
TMV-1
FS-1
P07
P08
TRANSPOSAL
ULTRA EVAC UNIT
(TYP OF 2)
Graphic Scale
Graphic Scale
0 4' 8' 12'
1/8" = 1'-0"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL CONSTRUCTION
DOCUMENTS
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Auburn, ME 207.784.5100
Boston, MA 617.426.5050
Portland, ME 207.775.0053
Portsmouth, NH 603.626.1242 c HA PROJECT NUMBER: 13586
SCALE:
C :\U se rs
\m am or \D oc um en ts
R ev it
L oc al s\
6-pl um -c en tra l_ m am or
.rv t
2/
/2
7:
:4
AM
P10.3
SECOND FLOOR DRAINAGE CONSTRUCT CLEAN CORE ADDITION TO
SURGICAL SUITE
PROVIDENCE, RHODE ISLAND
650-337
02-22-19 CG MAM
SCALE: 1/8" = 1'-0"1 SECOND FLOOR DRAINAGE
KEY NOTES
CODE DESCRIPTION
P01 2" W UP
P02 2" V UP
P03 4" S UP
P04 8" OD UP
P05 2" W & 1-1/2" V DN
P06 2" W IN WALL & 1-1/2" V DN
P07 4" S DN
P08 2" V DN
P09 2" V UP 3" VTR
P10 3" V UP 4" VTR
P11 2" W DN
P12 3" VTR
P13 4" VTR
P14 6" OD & 6" SD DN
P15 6" OD & 6" SD UP
P16 CONNECT 8" OD TO EXISTING 8" OD
P17 CONNECT 6" SD TO EXISTING
P18 3" SD UP TO 3" RD
P19 3" OD UP TO 3" RD
P20 3" W UP
P21 EXISTING ROOF DRAIN TO REMAIN
P22 PROVIDE MEDICAL GAS VALVE BOX & ALARM PANEL REFER TO
SPECIFICATIONS FOR MANUFACTURERS & MODELS.
COORDINATE EXACT LOCATION OF ALARM PANEL WITH
ELECTRICAL CONTRACTOR
P23 1/2" A, OX. VA, WAGD,NO2 & N2 DN TO BOOM
P24 1/2" HW & CW DN
P25 1/2" HW & CW DN
P26 1/2" CO2,NO2, WAGD, A, OX, VA, N2 DN TO RETRACTABLE
CEILING COLUMN
P27 PROVIDE ISOLATION VALVE, MAKE FINAL CONNECTIONS TO
TWO EVAC UNITS REFER TO MANUFACTURERS INSTALLATION
MANUAL
P28 3/4" TEMPERED WATER FROM MIXING VALVE DN. RUN PIPE IN
WALL TO BACKFLOW PREVENTER LOCATION
P29 1" DCWR DN
P30 CONNECT TO EXISTING 1" CHWR RISER
P12
P13
E
E.1
D
765432.52.221.81.5
10.5
B
A.5
A
C
P21
P21
P21
P21 P21 P21 P21
P21
P21PH2B
RD-1
285 SFRD-1
475 SF
RD-1
765 SF
RD-1
839 SF
RD-1
931 SF
RD-1
433 SF
RD-1
144 SF
RD-1
737 SF
RD-1
737 SF
Graphic Scale
Graphic Scale
0 4' 8' 12'
1/8" = 1'-0"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL CONSTRUCTION
DOCUMENTS
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Auburn, ME 207.784.5100
Boston, MA 617.426.5050
Portland, ME 207.775.0053
Portsmouth, NH 603.626.1242 c HA PROJECT NUMBER: 13586
SCALE:
C :\U se rs
\m am or \D oc um en ts
R ev it
L oc al s\
6-pl um -c en tra l_ m am or
.rv t
2/
/2
7:
:0
AM
P10.4
ROOF PLAN CONSTRUCT CLEAN CORE ADDITION TO
SURGICAL SUITE
PROVIDENCE, RHODE ISLAND
650-337
02-22-19 CG MAM
KEY NOTES
CODE DESCRIPTION
P01 2" W UP
P02 2" V UP
P03 4" S UP
P04 8" OD UP
P05 2" W & 1-1/2" V DN
P06 2" W IN WALL & 1-1/2" V DN
P07 4" S DN
P08 2" V DN
P09 2" V UP 3" VTR
P10 3" V UP 4" VTR
P11 2" W DN
P12 3" VTR
P13 4" VTR
P14 6" OD & 6" SD DN
P15 6" OD & 6" SD UP
P16 CONNECT 8" OD TO EXISTING 8" OD
P17 CONNECT 6" SD TO EXISTING
P18 3" SD UP TO 3" RD
P19 3" OD UP TO 3" RD
P20 3" W UP
P21 EXISTING ROOF DRAIN TO REMAIN
P22 PROVIDE MEDICAL GAS VALVE BOX & ALARM PANEL REFER TO
SPECIFICATIONS FOR MANUFACTURERS & MODELS.
COORDINATE EXACT LOCATION OF ALARM PANEL WITH
ELECTRICAL CONTRACTOR
P23 1/2" A, OX. VA, WAGD,NO2 & N2 DN TO BOOM
P24 1/2" HW & CW DN
P25 1/2" HW & CW DN
P26 1/2" CO2,NO2, WAGD, A, OX, VA, N2 DN TO RETRACTABLE
CEILING COLUMN
P27 PROVIDE ISOLATION VALVE, MAKE FINAL CONNECTIONS TO
TWO EVAC UNITS REFER TO MANUFACTURERS INSTALLATION
MANUAL
P28 3/4" TEMPERED WATER FROM MIXING VALVE DN. RUN PIPE IN
WALL TO BACKFLOW PREVENTER LOCATION
P29 1" DCWR DN
P30 CONNECT TO EXISTING 1" CHWR RISER
P31 1" DCWR UP
SCALE: 1/8" = 1'-0"1 ROOF PLAN
P30.1
EE.1
D
765432.52.221.81.5
10.5
B
A.5
A
C
DCWR- 1"
XMN02- 3/4"
XMN- 3/4"
XMC02- 3/4"
XDHWR- 3/4"
XDHWS- 1 1/2"
XDCWS- 2 1/2"
XM
N
-3 /4
XM
C
-3
/4
"XD
C W
S- 1/
2"
XDCWS- 1/2"
XDCWS- 1 1/2"
XDHWS- 1"
XDHWR- 3/4"
XDHWR- 1/2"
P30
Graphic Scale
Graphic Scale
0 4' 8' 12'
1/8" = 1'-0"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL CONSTRUCTION
DOCUMENTS
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Auburn, ME 207.784.5100
Boston, MA 617.426.5050
Portland, ME 207.775.0053
Portsmouth, NH 603.626.1242 c HA PROJECT NUMBER: 13586
SCALE:
C :\U se rs
\m am or \D oc um en ts
R ev it
L oc al s\
6-pl um -c en tra l_ m am or
.rv t
2/
/2
7:
:1
AM
P20.1
FIRST FLOOR SUPPLY CONSTRUCT CLEAN CORE ADDITION TO
SURGICAL SUITE
PROVIDENCE, RHODE ISLAND
650-337
02-22-19 CG MAM
SCALE: 1/8" = 1'-0"1 FIRST FLOOR SUPPLY
P31
KEY NOTES
CODE DESCRIPTION
P01 2" W UP
P02 2" V UP
P03 4" S UP
P04 8" OD UP
P05 2" W & 1-1/2" V DN
P06 2" W IN WALL & 1-1/2" V DN
P07 4" S DN
P08 2" V DN
P09 2" V UP 3" VTR
P10 3" V UP 4" VTR
P11 2" W DN
P12 3" VTR
P13 4" VTR
P14 6" OD & 6" SD DN
P15 6" OD & 6" SD UP
P16 CONNECT 8" OD TO EXISTING 8" OD
P17 CONNECT 6" SD TO EXISTING
P18 3" SD UP TO 3" RD
P19 3" OD UP TO 3" RD
P20 3" W UP
P21 EXISTING ROOF DRAIN TO REMAIN
P22 PROVIDE MEDICAL GAS VALVE BOX & ALARM PANEL REFER TO
SPECIFICATIONS FOR MANUFACTURERS & MODELS.
COORDINATE EXACT LOCATION OF ALARM PANEL WITH
ELECTRICAL CONTRACTOR
P23 1/2" A, OX. VA, WAGD,NO2 & N2 DN TO BOOM
P24 1/2" HW & CW DN
P25 1/2" HW & CW DN
P26 1/2" CO2,NO2, WAGD, A, OX, VA, N2 DN TO RETRACTABLE
CEILING COLUMN
P27 PROVIDE ISOLATION VALVE, MAKE FINAL CONNECTIONS TO
TWO EVAC UNITS REFER TO MANUFACTURERS INSTALLATION
MANUAL
P28 3/4" TEMPERED WATER FROM MIXING VALVE DN. RUN PIPE IN
WALL TO BACKFLOW PREVENTER LOCATION
P29 1" DCWR DN
P30 CONNECT TO EXISTING 1" CHWR RISER
FC
XMN02- 3/4"
XMN- 3/4"
XMV- 3/4"
XMC02- 3/4"
XMO- 3/4"
XMA- 3/4"
XWAGD- 3/4"
XDHWS- 1 1/2"
XDCWS- 2 1/2"
XMV- 3/4"
XMO- 3/4"
XMA- 3/4"
XWAGD- 3/4"
XDHWS- 1 1/2"
XDCWS- 2 1/2"
XMV- 2"
XMV- 3/4"
XMA- 3/4"
XMO- 3/4"
XDCW
S- 2 1/2"
XDHW
S- 1 1/2"
XMV- 1 1/2"
XMV- 3/4"
XMO- 3/4"
XMA- 3/4"
XMO- 3/4"
XDCWS- 2 1/2"
XDHWS- 1 1/2"
XMO- 1/2"
XMV- 1"
XMA- 1/2"
XMO- 1/2"
XMV- 1"
XMA- 1/2"
XMO- 1/2"
XMV- 3/4"
XMA- 1/2"
XDCWS- 2 1/2"
XDHWS- 1 1/2"
XDCWS- 2 1/2"
XDHWS- 1 1/2"
XD
C
W S-
1/
2"
XM
O
-1 /2
XM
A-
1/ 2"
XM
V-
1"
XM
N
-3 /4
XM
N
-3 /4
XM
O -3
/4
XM
A-
1/ 2"
XM
V-
3/ 4"
XW
AG
D -3
/4
XM
N
-3 /4
XM
N
-3 /4
XM
N
-3 /4
XM
N
-3
/4
XM
O
-3 /4
XM
A- 1/
2"
XM
V- 3/
4"
XW
AG
D
-3 /4
XM
N
-3 /4
XM
N
-3 /4
XM
O -3
/4
XM
A-
1/ 2"
XM
V-
3/ 4"
XW
AG
D -3
/4
XM
N
-3 /4
XMV- 3/4
DHWR- 3/4"
DCWS- 1"
DHWS- 1"
P-519
DCWS- 1"
DHWS- 1"
DHWR- 3/4"
P-528 P-528
P-418
P25
P25
P25
P25
P25
P-528
CLEAN AND STERILE
SUPPLY
EQUIPMENT STORAGE
MECHANICAL
CYSTOSCOPY
SEMI
RESTRICTED
CORRIDOR
CLEAN AND STERILE
SUPPLY
CC STORAGE
255A
NURSE MANAGER
OFFICE
253IUSS
ANESTHESIA
WORKROOM
EQUIPMENT STORAGE
WORK AREA
MALE LOCKERS
ANGIOPLASTY
OR-1
OR-2
OR-3
CONSULT ROOM
TOILET
202A
MINOR PROCEDURE
OR STORAGE
PATIENT TOILET
215F
VESTIBULE
215D
CLEAN UTILITIES
215C
SEMI RESTRICTED
CORRIDOR
STAIR WELL
A-2
ELEC
232C
ELEC
232D
ELECTRICAL ROOM
201C
ELEVATOR LOBBY
L23
LINEN CHUTE
IT CLOSET
229A
CORRIDOR
2-DC-1A
SEMI RESTRICTED
CORRIDOR
EXAM-1
E205
EXAM-2
E206
OFFICE
CORRIDOR
BRONCHOSCOPY
SCRUB
210A
SCRUB
210B
OR ACCESS VESTIBULE
260OR ACCESS VESTIBULE
PACU
NURSE STATION
CORRIDOR
C223
STAIR-K
K-2
STAFF
TOILET/SHOWER
SEMI RESTRICTED
CORRIDOR
LINK CORRIDOR
L24
MICROSCOPE
E207
EXAM-3
E208
CAST ROOM
E204
CORRIDOR
C22
CORRIDOR
C21
ELEVATOR
E-EL-2
ELEVATOR
E-EL-1
FUTURE SOILED
ELEVATOR
A-EL-1
E
E.1
D
765432.52.221.81.5
10.5
B
A.5
A
C
MN- 1/2"
MV- 1/2"
MO- 1/2"
MA- 1/2"
WAGD- 1/2"
MN02- 1/2"
MC02- 1/2"
P22
M N
-1 /2
M
V- 1/
2" M
O -1
/2
M A-
1/ 2"
W
AG
D -1
/2
M N
-1
/2
M C
-1
/2
P22
P-418
P-103
P24
SA-"A"
P23
P-418
P26
MA- 1/2"
MO- 1/2"
MV- 1/2"
MA- 1/2"
MO- 1/2"
MV- 1/2"
DHWR- 3/4"
DHWS- 1"
DCWS- 1"
MO- 1/2"
MV- 1/2"
DHWR- 3/4"
DHWS- 3/4"
DCWS- 1"
PH2B
PH7PH4PH4
TV-2
P-710
TMV-1
BFP-1
SA-"A"
P27
P28
MA- 1/2"
WAGD- 1/2"
MN02- 1/2"WAGD- 1/2"
MN02- 1/2"
MN- 1/2"
WAGD- 1/2"
MN02- 1/2"
P29P30
DCWR- 3/4"
DCWR- 3/4"
DCWR- 3/4"
DCWR- 3/4"
P30
XD
H
W S-
1/
2"
THE CONTRACTOR SHALL MAKE
PROVISIONS TO PROVIDE TEMPORARY
SERVICES TO ALL SPACES WITHIN THE
FACILITY PRIOR TO SHUT-DOWN OF MED
GAS UTILITIES. COORDINATE WITH PVAMC
28 DAYS IN ADVANCE OF ANY SHUT-DOWNS
ALL WORK PREFORMED WITHIN THE O.R
SUITE SHALL TAKE PLACE ON SATURDAY,
SUNDAY OR WEEK NIGHTS BETWEEN THE
HOURS OF 7 P.M & 6A.M MODAY THROUGH
FRIDAY. WORK THAT CANNOT BE
CONDUCTED DURRING THESE TIMES MUST
BE SCHEDULED WITH PVAMC 28 DAYS IN
ADVANCE
Graphic Scale
Graphic Scale
0 4' 8' 12'
1/8" = 1'-0"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL CONSTRUCTION
DOCUMENTS
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Auburn, ME 207.784.5100
Boston, MA 617.426.5050
Portland, ME 207.775.0053
Portsmouth, NH 603.626.1242 c HA PROJECT NUMBER: 13586
SCALE:
C :\U se rs
\m am or \D oc um en ts
R ev it
L oc al s\
6-pl um -c en tra l_ m am or
.rv t
2/
/2
7:
:3
AM
P20.2
SECOND FLOOR SUPPLY CONSTRUCT CLEAN CORE ADDITION TO
SURGICAL SUITE
PROVIDENCE, RHODE ISLAND
650-337
02-22-19 CG MAM
SCALE: 1/8" = 1'-0"1 SECOND FLOOR SUPPLY
KEY NOTES
CODE DESCRIPTION
P01 2" W UP
P02 2" V UP
P03 4" S UP
P04 8" OD UP
P05 2" W & 1-1/2" V DN
P06 2" W IN WALL & 1-1/2" V DN
P07 4" S DN
P08 2" V DN
P09 2" V UP 3" VTR
P10 3" V UP 4" VTR
P11 2" W DN
P12 3" VTR
P13 4" VTR
P14 6" OD & 6" SD DN
P15 6" OD & 6" SD UP
P16 CONNECT 8" OD TO EXISTING 8" OD
P17 CONNECT 6" SD TO EXISTING
P18 3" SD UP TO 3" RD
P19 3" OD UP TO 3" RD
P20 3" W UP
P21 EXISTING ROOF DRAIN TO REMAIN
P22 PROVIDE MEDICAL GAS VALVE BOX & ALARM PANEL REFER TO
SPECIFICATIONS FOR MANUFACTURERS & MODELS.
COORDINATE EXACT LOCATION OF ALARM PANEL WITH
ELECTRICAL CONTRACTOR
P23 1/2" A, OX. VA, WAGD,NO2 & N2 DN TO BOOM
P24 1/2" HW & CW DN
P25 1/2" HW & CW DN
P26 1/2" CO2,NO2, WAGD, A, OX, VA, N2 DN TO RETRACTABLE
CEILING COLUMN
P27 PROVIDE ISOLATION VALVE, MAKE FINAL CONNECTIONS TO
TWO EVAC UNITS REFER TO MANUFACTURERS INSTALLATION
MANUAL
P28 3/4" TEMPERED WATER FROM MIXING VALVE DN. RUN PIPE IN
WALL TO BACKFLOW PREVENTER LOCATION
P29 1" DCWR DN
P30 CONNECT TO EXISTING 1" CHWR RISER
HEAT TRACE CABLE SHALL
BE ONE CONTINUOUS WIRE
WITH NO JUNCTIONS.
WRAP HEAT TRACE CABLE
AROUND PIPE AND EXTEND
UP AS CLOSE TO SLAB AS
POSSIBLE TO PREVENT FREEZING
HEAT TRACE CABLE SHALL
CONTINUE TO FARTHEST MOST FIXTURE.
REFER TO SHEET PL102 FOR CONTINUATIONHEAT TRACE CABLE SHALL
START AT THIS POINT. REFER
TO PL102 FOR CONTINUATION
CONNECT 2" W TO
EXISTING 4" S
4" VTR
NEW DRAINAGE PIPING SHALL BE LOCATED
WITHIN PROVIDED CEILING CAVITY AS SHOWN
DBA.5 C
V- 3"V- 1 1/2"
SAN- 3"
Graphic Scale
Graphic Scale
Graphic Scale
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL CONSTRUCTION
DOCUMENTS
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Auburn, ME 207.784.5100
Boston, MA 617.426.5050
Portland, ME 207.775.0053
Portsmouth, NH 603.626.1242 c HA PROJECT NUMBER: 13586
SCALE:
C :\U se rs
\m am or \D oc um en ts
R ev it
L oc al s\
6-pl um -c en tra l_ m am or
.rv t
2/
/2
7:
:4
AM
P30.1
SECTIONS & DETAILS CONSTRUCT CLEAN CORE ADDITION TO
SURGICAL SUITE
PROVIDENCE, RHODE ISLAND
650-337
02-22-19 CG MAM
NO SCALE1 DRAINAGE HEAT TRACE DETAIL REFER TO SHEET P10.2
SCALE:2 VIEW 1 OVERFLOW DRAIN PIPING IN MECHANICAL ROOM
SCALE:3 VIEW 2 OVERFLOW DRAIN PIPING IN MECHANICAL ROOM
SCALE:4 VIEW 3 OVERFLOW DRAIN PIPING IN MECHANICAL ROOM
SCALE:5 VIEW 4 OVERFLOW DRAIN PIPING IN MECHANICAL ROOM
BOTTOM OF OVERFLOW
DRAIN AT 9'-8" AFF AT
THIS POINT
COORDINATE EXACT PENETRATION
THROUGH WALL WITH EXISTING
MECHANICAL PIPING & ELECTRICAL
CONDUITS
BOTTOM OF OVERFLOW
DRAIN AT 10'-0" AFF AT
THIS POINT
BOTTOM OF OVERFLOW
DRAIN AT 10'-3" AFF AT
THIS POINT
BOTTOM OF OVERFLOW
DRAIN AT 10'-3" AFF AT
THIS POINT
BOTTOM OF OVERFLOW
DRAIN AT 10'-0" AFF AT
THIS POINT
BOTTOM OF STORM
DRAIN AT 10'-7" AFF AT
THIS POINT
STORM DRAIN
ABOVE OVERFLOW
BOTTOM OF OVERFLOW
DRAIN AT 10'-4" AFF AT
THIS POINT
CONNECT TO EXISTING
STORM DRAIN AT
THIS POINT
OVERFLOW DRAIN ABOVE
EXISTING EXHAUST DUCT
| 52_P00-1 |
| Sheets |
| P00.1 - LEGEND, SCHEDULES, GENERAL NOTES & DETAILS |
| P05.1 - BASEMENT FLOOR DRAINAGE DEMOLITION |
| P05.2 - FIRST FLOOR DRAINAGE DEMOLITION |
| P05.3 - SECOND FLOOR DRAINAGE DEMOLITION |
| P06.1 - SECOND FLOOR SUPPLY DEMOLITION |
| P10.1 - GROUND FLOOR DRAINAGE |
| P10.2 - FIRST FLOOR DRAINAGE |
| P10.3 - SECOND FLOOR DRAINAGE |
| P10.4 - ROOF PLAN |
| P20.1 - FIRST FLOOR SUPPLY |
| P20.2 - SECOND FLOOR SUPPLY |
| P30.1 - SECTIONS & DETAILS |
| 52_P05-1 |
| Sheets |
| P00.1 - LEGEND, SCHEDULES, GENERAL NOTES & DETAILS |
| P05.1 - BASEMENT FLOOR DRAINAGE DEMOLITION |
| P05.2 - FIRST FLOOR DRAINAGE DEMOLITION |
| P05.3 - SECOND FLOOR DRAINAGE DEMOLITION |
| P06.1 - SECOND FLOOR SUPPLY DEMOLITION |
| P10.1 - GROUND FLOOR DRAINAGE |
| P10.2 - FIRST FLOOR DRAINAGE |
| P10.3 - SECOND FLOOR DRAINAGE |
| P10.4 - ROOF PLAN |
| P20.1 - FIRST FLOOR SUPPLY |
| P20.2 - SECOND FLOOR SUPPLY |
| P30.1 - SECTIONS & DETAILS |
| 52_P05-2 |
| Sheets |
| P00.1 - LEGEND, SCHEDULES, GENERAL NOTES & DETAILS |
| P05.1 - BASEMENT FLOOR DRAINAGE DEMOLITION |
| P05.2 - FIRST FLOOR DRAINAGE DEMOLITION |
| P05.3 - SECOND FLOOR DRAINAGE DEMOLITION |
| P06.1 - SECOND FLOOR SUPPLY DEMOLITION |
| P10.1 - GROUND FLOOR DRAINAGE |
| P10.2 - FIRST FLOOR DRAINAGE |
| P10.3 - SECOND FLOOR DRAINAGE |
| P10.4 - ROOF PLAN |
| P20.1 - FIRST FLOOR SUPPLY |
| P20.2 - SECOND FLOOR SUPPLY |
| P30.1 - SECTIONS & DETAILS |
| 52_P05-3 |
| Sheets |
| P00.1 - LEGEND, SCHEDULES, GENERAL NOTES & DETAILS |
| P05.1 - BASEMENT FLOOR DRAINAGE DEMOLITION |
| P05.2 - FIRST FLOOR DRAINAGE DEMOLITION |
| P05.3 - SECOND FLOOR DRAINAGE DEMOLITION |
| P06.1 - SECOND FLOOR SUPPLY DEMOLITION |
| P10.1 - GROUND FLOOR DRAINAGE |
| P10.2 - FIRST FLOOR DRAINAGE |
| P10.3 - SECOND FLOOR DRAINAGE |
| P10.4 - ROOF PLAN |
| P20.1 - FIRST FLOOR SUPPLY |
| P20.2 - SECOND FLOOR SUPPLY |
| P30.1 - SECTIONS & DETAILS |
| 52_P06-1 |
| Sheets |
| P00.1 - LEGEND, SCHEDULES, GENERAL NOTES & DETAILS |
| P05.1 - BASEMENT FLOOR DRAINAGE DEMOLITION |
| P05.2 - FIRST FLOOR DRAINAGE DEMOLITION |
| P05.3 - SECOND FLOOR DRAINAGE DEMOLITION |
| P06.1 - SECOND FLOOR SUPPLY DEMOLITION |
| P10.1 - GROUND FLOOR DRAINAGE |
| P10.2 - FIRST FLOOR DRAINAGE |
| P10.3 - SECOND FLOOR DRAINAGE |
| P10.4 - ROOF PLAN |
| P20.1 - FIRST FLOOR SUPPLY |
| P20.2 - SECOND FLOOR SUPPLY |
| P30.1 - SECTIONS & DETAILS |
| 52_P10-1 |
| Sheets |
| P00.1 - LEGEND, SCHEDULES, GENERAL NOTES & DETAILS |
| P05.1 - BASEMENT FLOOR DRAINAGE DEMOLITION |
| P05.2 - FIRST FLOOR DRAINAGE DEMOLITION |
| P05.3 - SECOND FLOOR DRAINAGE DEMOLITION |
| P06.1 - SECOND FLOOR SUPPLY DEMOLITION |
| P10.1 - GROUND FLOOR DRAINAGE |
| P10.2 - FIRST FLOOR DRAINAGE |
| P10.3 - SECOND FLOOR DRAINAGE |
| P10.4 - ROOF PLAN |
| P20.1 - FIRST FLOOR SUPPLY |
| P20.2 - SECOND FLOOR SUPPLY |
| P30.1 - SECTIONS & DETAILS |
| 52_P10-2 |
| Sheets |
| P00.1 - LEGEND, SCHEDULES, GENERAL NOTES & DETAILS |
| P05.1 - BASEMENT FLOOR DRAINAGE DEMOLITION |
| P05.2 - FIRST FLOOR DRAINAGE DEMOLITION |
| P05.3 - SECOND FLOOR DRAINAGE DEMOLITION |
| P06.1 - SECOND FLOOR SUPPLY DEMOLITION |
| P10.1 - GROUND FLOOR DRAINAGE |
| P10.2 - FIRST FLOOR DRAINAGE |
| P10.3 - SECOND FLOOR DRAINAGE |
| P10.4 - ROOF PLAN |
| P20.1 - FIRST FLOOR SUPPLY |
| P20.2 - SECOND FLOOR SUPPLY |
| P30.1 - SECTIONS & DETAILS |
| 52_P10-3 |
| Sheets |
| P00.1 - LEGEND, SCHEDULES, GENERAL NOTES & DETAILS |
| P05.1 - BASEMENT FLOOR DRAINAGE DEMOLITION |
| P05.2 - FIRST FLOOR DRAINAGE DEMOLITION |
| P05.3 - SECOND FLOOR DRAINAGE DEMOLITION |
| P06.1 - SECOND FLOOR SUPPLY DEMOLITION |
| P10.1 - GROUND FLOOR DRAINAGE |
| P10.2 - FIRST FLOOR DRAINAGE |
| P10.3 - SECOND FLOOR DRAINAGE |
| P10.4 - ROOF PLAN |
| P20.1 - FIRST FLOOR SUPPLY |
| P20.2 - SECOND FLOOR SUPPLY |
| P30.1 - SECTIONS & DETAILS |
| 52_P10-4 |
| Sheets |
| P00.1 - LEGEND, SCHEDULES, GENERAL NOTES & DETAILS |
| P05.1 - BASEMENT FLOOR DRAINAGE DEMOLITION |
| P05.2 - FIRST FLOOR DRAINAGE DEMOLITION |
| P05.3 - SECOND FLOOR DRAINAGE DEMOLITION |
| P06.1 - SECOND FLOOR SUPPLY DEMOLITION |
| P10.1 - GROUND FLOOR DRAINAGE |
| P10.2 - FIRST FLOOR DRAINAGE |
| P10.3 - SECOND FLOOR DRAINAGE |
| P10.4 - ROOF PLAN |
| P20.1 - FIRST FLOOR SUPPLY |
| P20.2 - SECOND FLOOR SUPPLY |
| P30.1 - SECTIONS & DETAILS |
| 52_P20-1 |
| Sheets |
| P00.1 - LEGEND, SCHEDULES, GENERAL NOTES & DETAILS |
| P05.1 - BASEMENT FLOOR DRAINAGE DEMOLITION |
| P05.2 - FIRST FLOOR DRAINAGE DEMOLITION |
| P05.3 - SECOND FLOOR DRAINAGE DEMOLITION |
| P06.1 - SECOND FLOOR SUPPLY DEMOLITION |
| P10.1 - GROUND FLOOR DRAINAGE |
| P10.2 - FIRST FLOOR DRAINAGE |
| P10.3 - SECOND FLOOR DRAINAGE |
| P10.4 - ROOF PLAN |
| P20.1 - FIRST FLOOR SUPPLY |
| P20.2 - SECOND FLOOR SUPPLY |
| P30.1 - SECTIONS & DETAILS |
| 52_P20-2 |
| Sheets |
| P00.1 - LEGEND, SCHEDULES, GENERAL NOTES & DETAILS |
| P05.1 - BASEMENT FLOOR DRAINAGE DEMOLITION |
| P05.2 - FIRST FLOOR DRAINAGE DEMOLITION |
| P05.3 - SECOND FLOOR DRAINAGE DEMOLITION |
| P06.1 - SECOND FLOOR SUPPLY DEMOLITION |
| P10.1 - GROUND FLOOR DRAINAGE |
| P10.2 - FIRST FLOOR DRAINAGE |
| P10.3 - SECOND FLOOR DRAINAGE |
| P10.4 - ROOF PLAN |
| P20.1 - FIRST FLOOR SUPPLY |
| P20.2 - SECOND FLOOR SUPPLY |
| P30.1 - SECTIONS & DETAILS |
| 52_P30-1 |
| Sheets |
| P00.1 - LEGEND, SCHEDULES, GENERAL NOTES & DETAILS |
| P05.1 - BASEMENT FLOOR DRAINAGE DEMOLITION |
| P05.2 - FIRST FLOOR DRAINAGE DEMOLITION |
| P05.3 - SECOND FLOOR DRAINAGE DEMOLITION |
| P06.1 - SECOND FLOOR SUPPLY DEMOLITION |
| P10.1 - GROUND FLOOR DRAINAGE |
| P10.2 - FIRST FLOOR DRAINAGE |
| P10.3 - SECOND FLOOR DRAINAGE |
| P10.4 - ROOF PLAN |
| P20.1 - FIRST FLOOR SUPPLY |
| P20.2 - SECOND FLOOR SUPPLY |
| P30.1 - SECTIONS & DETAILS |
File details come from the government source that posted it. Updated .