36E77619R0097-011.pdf

PDF 2 MB Posted

Attached to
Construct Clean Core (VA-19-00058573) Federal contract opportunity
Solicitation number
36E77619R0097
Issued by
Department of Veterans Affairs Headquarters

About this file

This document provides details for a federal construction contract opportunity with the Department of Veterans Affairs. The solicitation will be for constructing a clean core addition to the surgical suite at the Providence, Rhode Island VA Medical Center, including approximately 2,900 gross square feet of renovations to existing space and 3,900 gross square feet of new construction. Work will include relocating cystoscopy and minor surgery suites, adding an elevated clean core for sterile supplies access, and relocating surgery locker rooms. The solicitation will be a request for proposal conducted under FAR Parts 15, 19, and 36 and evaluated using lowest price technically acceptable procedures. It will be set aside for service-disabled veteran-owned small businesses and issued on October 16, 2019, with a performance period of approximately 490 calendar days. The magnitude of construction is estimated between $5 million to $10 million. Questions must be submitted in writing by the specified date.

36E77619R0097 Attachment 8 - Plumbing Plans.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Construct Clean Core (VA-19-00058573), newest first.
File Type Posted
36E77619R0097-0007000.docx DOCX document
36E77619R0097-0006000.docx DOCX document
36E77619R0097-0005000.docx DOCX document
36E77619R0097-0005001.pdf PDF
36E77619R0097-0004001.docx DOCX document
36E77619R0097-0004005.pdf PDF
36E77619R0097-0004004.pdf PDF
36E77619R0097-0004002.pdf PDF
36E77619R0097-0004000.docx DOCX document
36E77619R0097-0004003.pdf PDF
36E77619R0097-0003000.docx DOCX document
36E77619R0097-0003001.pdf PDF
36E77619R0097-0002001.pdf PDF
36E77619R0097-0002002.pdf PDF
36E77619R0097-0002000.docx DOCX document
36E77619R0097-0001031.pdf PDF
36E77619R0097-0001030.docx DOCX document
36E77619R0097-013.pdf PDF
36E77619R0097-009.pdf PDF
36E77619R0097-014.pdf PDF
36E77619R0097-011.pdf PDF
36E77619R0097-003.docx DOCX document
36E77619R0097-015.docx DOCX document
36E77619R0097-010.pdf PDF
36E77619R0097-006.pdf PDF
36E77619R0097-008.pdf PDF
36E77619R0097-007.pdf PDF
36E77619R0097-012.pdf PDF
36E77619R0097-004.pdf PDF
36E77619R0097-005.zip ZIP file
36E77619R0097-015.docx DOCX document
36E77619R0097-014.pdf PDF
36E77619R0097-013.pdf PDF
36E77619R0097-005.zip ZIP file
36E77619R0097-006.pdf PDF
36E77619R0097-007.pdf PDF
36E77619R0097-009.pdf PDF
36E77619R0097-008.pdf PDF
36E77619R0097-012.pdf PDF
36E77619R0097-004.pdf PDF
36E77619R0097-003.docx DOCX document
36E77619R0097-010.pdf PDF
36E77619R0097-000.docx DOCX document
36E77619R0097-000.docx DOCX document
Show all 44

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VENT PIPING ABOVE FINISHED FLOORV

MA

EXISTING SANITARY PIPING ABOVE FINISHED FLOOR

LEGEND

CHECK VALVE

SA "X"

VTR

SHOCK ARRESTOR (P.D.I RATING)

VENT THROUGH ROOF

SHUT-OFF VALVE

CAP

DN DOWN

AFF ABOVE FINISHED FLOOR

BFF BELOW FINISHED FLOOR

TYP. TYPICAL

THERMOMETER

P-XXX PLUMBING FIXTURE REFER TO (PLUMBING FIXTURE INSTALLATION SCHEDULE)

TP-X TRAP PRIMER

FCO FLOOR CLEANOUT

EXISTING PIPING ABOVE FINISHED FLOOR TO BE REMOVED

SANITARY PIPING ABOVE FINISHED FLOORSAN

XSAN

EXISTING VENT PIPING ABOVE FINISHED FLOORXV

EXISTING STORM WATER PIPING ABOVE FINISHED FLOORXSW

STORM WATER PIPING ABOVE FINISHED FLOORSW

COLD WATER SUPPLY PIPING ABOVE FINISHED FLOORDCWS

EXISTING COLD WATER SUPPLY PIPING ABOVE FINISHED FLOORXDCWS

EXISTING HOT WATER SUPPLY PIPING ABOVE FINISHED FLOORXDHWS

HOT WATER SUPPLY PIPING ABOVE FINISHED FLOORDHWS

AIR PIPING ABOVE FINISHED FLOOR

EXISTING AIR PIPING ABOVE FINISHED FLOORXMA

EXISTING HOT WATER RETURN PIPING ABOVE FINISHED FLOORXDHWR

HOT WATER RETURN PIPING ABOVE FINISHED FLOORDHWR

NITROGEN PIPING ABOVE FINISHED FLOOR

EXISTING NITROGEN ABOVE FINISHED FLOOR

MN

XMN

HOT WATER HOSE BIBB

FLOOR CLEANOUT

FLOOR DRAIN

PIPE DROP

PIPE RISE

ROOF DRAIN

WCO WALL CLEANOUT

CO CLEANOUT

CLEAOUT

UNION

SINGLE HORIZONTAL ADJUSTABLE CARRIER

BACK TO BACK HORIZONTAL ADJUSTABLE CARRIER

OXYGEN PIPING ABOVE FINISHED FLOOR (PER THE FACILITY DUDE)

EXISTING OXYGEN PIPING ABOVE FINISHED FLOOR (PER THE FACILITY DUDE)

MO

XMO

EXISTING OVERFLOW STORM DRAIN PIPING ABOVE FINISHED FLOORXOFD

OVERFLOW STORM DRAIN PIPING ABOVE FINISHED FLOOROFD

EXISTING VACUUM PIPING ABOVE FINISHED FLOOR (PER THE FACILITY DUDE)XMV

VACUUM PIPING ABOVE FINISHED FLOOR (PER THE FACILITY DUDE)MV

NITROUS OXIDE PIPING ABOVE FINISHED FLOOR

EXISTING NITROUS OXIDE ABOVE FINISHED FLOOR

MN02

XMN02

EXISTING WASTE ANESTHESIA GAS DISPOSAL PIPING ABOVE FINISHED FLOORXWAGD

WASTE ANESTHESIA GAS DISPOSAL PIPING ABOVE FINISHED FLOORWAGD

HEAT TRACED CAST IRON NO HUB SANITARY PIPING ABOVE FINISHED FLOORSAN

COLD WATER RETURN PIPING ABOVE FINISHED FLOORDCWR

TMV-X THERMOSTATIC MIXING VALVE

BFP-X BACKFLOW PREVENTER

BALANCING VALVE

Graphic Scale

Graphic Scale

Graphic Scale

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL CONSTRUCTION

DOCUMENTS

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Auburn, ME 207.784.5100

Boston, MA 617.426.5050

Portland, ME 207.775.0053

Portsmouth, NH 603.626.1242 c HA PROJECT NUMBER: 13586

SCALE:

C :\U se rs

\m am or \D oc um en ts

R ev it

L oc al s\

6-pl um -c en tra l_ m am or

.rv t

2/

/2

7:

:0

AM

P00.1

LEGEND, SCHEDULES, GENERAL

NOTES & DETAILS

CONSTRUCT CLEAN CORE ADDITION TO

SURGICAL SUITE

PROVIDENCE, RHODE ISLAND

650-337

02-22-19 CG MAM

PLUMBING FIXTURE INSTALLATION SCHEDULE

FURNISHED & INSTALLED BY PLUMBING CONTRACTOR

TAG DESCRIPTION

BRANCH SIZE BASIS OF DESIGN FIXTURE SPECIFICATIONS

REFER TO THE SPECIFICATIONS FOR APPROVED

EQUALS AND DETAILED DESCRIPTIONS

BASIS OF DESIGN SUPPLY FITTING FIXTURE SPECIFICATIONS

REFER TO THE SPECIFICATIONS FOR APPROVED

EQUALS AND DETAILED DESCRIPTIONS MOUNTING HEIGHTW V CW HW TW

P-103 WATER CLOSET WALL

MOUNTED

4" 2" 1" - - AMERICAN STANDARD AFWALL FLOWISE MODEL 3351.101, PROVIDE

CHURCH MODEL 9500CT TOILET SEAT

SLOAN ROYAL MODEL 111-1.6 16 1/2"

P-418 ADA COMPLIANT LAVATORY 2" 1 1/2" 1/2" 1/2" - AMERICAN STANDARD MURRO MODEL 0955.001EC, PROVIDE

AMERICAN STANDARD ARCYLIC SHROUD MODEL 006.00EC

CHICAGO FAUCET MODEL 116.595.AB.1-E63VPJKABCP-12 VOLT TRANSFORMER 1.5 GPM,

PROVIDE CHICAGO FAUCET MIXING VALVE MODEL 131-FM-ABRCF & CHICAGO FAUCET

ANGLE STOPS MODEL 1017-CSTABCP BELOW LAVATORY

34"

P-528 SINGLE BOWL COUNTER

MOUNTED SINK

2" 1 1/2" 1/2" 1/2" - ELKAY LUSTERSTONE MODEL LRADQ211950-3, PROVIDE LKAD35

OFFSET TAILPIECE WITH GRID STRAINER

CHICAGO FAUCET MODEL 116.595.AB.1-E29VPJKABCP 2.2 GPM, PROVIDE CHICAGO FAUCET

MIXING VALVE MODEL 131-FM-ABRCF & CHICAGO FAUCET ANGLE STOPS MODEL

1017-CSTABCP BELOW LAVATORY

34"

P-519 ADA COMPLIANT SCRUB SINK 2" 1 1/2" 1/2" 1/2" - SLOAN SCRUB SINK MODEL ESS-220-C PROVIDED WITH SCRUB SINK, PROVIDE CHICAGO FAUCET MIXING VALVE MODEL

131-FM-ABRCF & CHICAGO FAUCET ANGLE STOPS MODEL 1017-CSTABCP BELOW

LAVATORY

34"

P-710 RECESSED EMERGENCY

EYEWASH

2" 1 1/2" - - 1" GUARDIAN EQUIPMENT RECESSED LABORATORY UNIT MODEL

GBF1735DP-TMV

TV-1 20"

GENERAL NOTES

1 DRAWINGS ARE DIAGRAMMATIC ONLY AND REPRESENT THE GENERAL SCOPE OF THE WORK. REVIEW THE GENERAL NOTES, SPECIFICATIONS AND PLANS FOR ADDITIONAL REQUIREMENTS THAT MAY NOT BE SPECIFICALLY CALLED OUT IN THIS PORTION OF THE CONSTRUCTION DOCUMENTS. NOTIFY THE

ARCHITECT OF ANY CONFLICTS OR

DISCREPANCIES PRIOR TO SUBMISSION OF BID.

2 VERIFY LOCATION AND DEPTH OF UTILITIES AT ALL POINTS OF CONNECTION INDICATED ON

DRAWINGS BEFORE START OF PROJECT.

3 COORDINATE ALL WORK WITH OTHER TRADES AND CONTRACTORS. COORDINATE PIPING

INSTALLATION WITH STRUCTURAL GRADE BEAMS, FOOTINGS, COLUMN PIERS, ETC. SLEEVE PIPING

THROUGH GRADE BEAMS, FOOTING, ETC. WHERE REQUIRED AND AS NOTED ON PLANS.

COORDINATE SLEEVE INSTALLATIONS WITH THE ARCHITECT, STRUCTURAL ENGINEER, STRUCTURAL CONTRACTOR AND GENERAL CONTRACTOR BEFORE CONCRETE IS INSTALLED. PIPING INVERTS AND SLOPE SHALL BE CLOSELY COORDINATED TO AVOID CONFLICTS WITH ALL OTHER TRADES BELOW

SLAB WORK.

4 COORDINATE PIPE ROUTING AWAY FROM ELECTRICAL PANELS. DO NOT ROUTE PIPING OVER

ELECTRICAL PANELS.

5 PIPING IN FINISHED AREAS SHALL BE ROUTED CONCEALED; EXPOSED PIPING, WHERE NECESSARY, SHALL BE ROUTED AS HIGH AS POSSIBLE AND TIGHT TO WALLS.

6 REFER TO INSTALLATION SCHEDULE DATA FOR THE SIZE OF PIPING CONNECTIONS AND MOUNTING

HEIGHTS OF EACH FIXTURE.

7 ALL PLUMBING FIXTURE SHUT-OFF AND/OR BALANCING VALVES INSTALLED IN PIPE CHASES SHALL BE ACCESSIBLE FROM JUST ABOVE THE CEILING LINE OR ACCESS DOORS PROVIDED LOW IN CHASE

WALL.

8 SANITARY WASTE PIPING 4" & LARGER SHALL BE INSTALLED WITH A PITCH OF 1/8" PER 1'-0".

9 ALL UNDERSLAB PIPING SHALL BE INSTALLED TO PROVIDE NO LESS THAN 2" OF COVER BETWEEN

THE PIPING AND THE FLOOR SLAB.

10 VENT AND WATER PIPING SHALL PITCH TO DRAIN.

11 PROVIDE FIXTURE STOPS ON ANY WATER SUPPLY IMMEDIATELY ADJACENT TO PLUMBING FIXTURES.

12 CLEAN FAUCET AERATORS AND PIPE STRAINERS PRIOR TO TURNING BUILDING OVER TO THE

OWNER.

13 PROVIDE TRAP PRIMERS WHERE REQUIRED BY LOCAL AUTHORITIES.

14 PROVIDE ISOLATION VALVES FOR ALL SUPPLY FIXTURES.VALVES SHALL BE LINE SIZE UNLESS

OTHERWISE NOTED.

15 THE TERM "PROVIDE" SHALL MEAN "TO FURNISH, INSTALL AND CONNECT COMPLETELY".

16 ENTIRE PLUMBING INSTALLATION SHALL BE IN COMPLIANCE WITH ALL CURRENT LOCAL, STATE AND

FEDERAL

CODES AND STANDARDS.

17 OSHA RULES, REGULATIONS AND REQUIREMENTS, AND ANY STATE AND LOCAL REQUIREMENTS FOR

SAFETY SHALL BE FOLLOWED BY THE CONTRACTOR

18 DOMESTIC HOT, COLD & HOT WATER RETURN PIPING SHALL HAVE NO DEAD LEGS. IF EXISTING DEAD LEGS ARE FOUND WITHIN THE WORK AREAS, PIPING SHALL BE DEMOLISHED BACK TO THE MAINS

19 SUPPLY DROPS FOR FUTURE USE SHALL HAVE ISOLATION VALVES AS CLOSE TO MAINS AS POSSIBLE

TO PREVENT DEAD LEG PIPES.

20 ALL PENETRATIONS THROUGH FLOORS & WALLS SHALL BE FIRESTOPPED.

21 ALL WORK PREFORMED WITHIN THE O.R SUITE SHALL TAKE PLACE ON SATURDAY, SUNDAY OR WEEK

NIGHTS BETWEEN THE HOURS OF 7 P.M & 6A.M MODAY THROUGH FRIDAY. WORK THAT CANNOT BE

CONDUCTED DURRING THESE TIMES MUST BE SCHEDULED WITH PVAMC 28 DAYS IN ADVANCE

22 PHASING: ALL WORK SHALL BE PREFORMED WITHIN THE ASSOCIATED PHASE. REFER TO DRAWINGS

A01.1,A01.2 AND PLUMBING DRAWINGS FOR IDENTIFICATION OF PHASING

DRAIN SCHEDULE

BASIS OF DESIGN DRAIN SPECIFICATIONS REFER TO THE SPECIFICATIONS FOR APPROVED EQUALS

AND DETAILED DESCRIPTIONS

TAG DESCRIPTION

CONNECTION SIZE SPECIFICATIONS

BASIS OF DESIGNWASTE V

FD-1 FLOOR DRAIN 3" 2" WATTS ROUND HEAVY DUTY MODEL

FD-1100-3-A8-6-7

FS-1 FLOOR SINK 4" 2" WATTS FLOOR SINK MODEL

FS-790-4-6-150-HD

OD-1 DOWNSPOUT

COVER

8" - WATTS DOWNSPOUT COVER MODEL

RD-950

RD-1 ROOF DRAIN 3" - WATTS MODEL RD-700-F-3-K80

MEDICAL GAS PIPING GENERAL NOTES

1. ALL WORK PREFORMED WITHIN THE O.R SUITE SHALL TAKE PLACE ON SATURDAY, SUNDAY OR

WEEK NIGHTS BETWEEN THE HOURS OF 7 P.M & 6A.M MODAY THROUGH FRIDAY. WORK THAT

CANNOT BE CONDUCTED DURRING THESE TIMES MUST BE SCHEDULED WITH PVAMC 28 DAYS IN

ADVANCE

2. PHASING: ALL WORK SHALL BE PREFORMED WITHIN THE ASSOCIATED PHASE. REFER TO

DRAWINGS A01.1,A01.2 AND PLUMBING DRAWINGS FOR IDENTIFICATION OF PHASING

TEMPERING VALVE SCHEDULE

BASIS OF DESIGN TEMPERING VALVE SPECIFICATIONS REFER TO THE SPECIFICATIONS FOR APPROVED EQUALS AND DETAILED DESCRIPTIONS

TAG MANUFACTURER MODEL CW HW TW

MAX. OPERATING

PRESSURE

MAX.

OPERATING

TEMPERATURE MAX. GPM MIN. GPM

TEMPERATURE

SETTING NOTES

TMV-1 LEONARD VALVE

COMPANY

TA-300-LF-STSTL-REC-TOP-VIEW 1/2" 1/2" 1/2" 125.00 140 °F 4 2.00 85°F

TV-2 LEONARD VALVE

COMPANY

XL-186-32A-REC-RHH-TOP-VIEW-LF 3/4" 3/4" 3/4" 125.00 140 °F 20 2.00 110°F

PIPING ACCESSORY SCHEDULE

BASIS OF DESIGN PIPE ACCESSORIES SPECIFICATIONS REFER TO THE SPECIFICATIONS FOR APPROVED EQUALS AND

DETAILED DESCRIPTIONS

TAG DESCRIPTION MANUFACTURER MODEL PIPE CONNECTION SIZE

BFP-1 BACKFLOW PREVENTOR WATTS LF909M1-QT-S 3/4"

FC THERMOSTATIC FLOW CONTROL

VALVE

THERMOMEGATE

CH

CSU-3/4-120

Revisions: Date:

V- 2"

SW- 4"

SW- 8"

V- 4"

SAN- 2"

Graphic Scale

Graphic Scale

0 4' 8' 12'

1/8" = 1'-0"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL CONSTRUCTION

DOCUMENTS

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Auburn, ME 207.784.5100

Boston, MA 617.426.5050

Portland, ME 207.775.0053

Portsmouth, NH 603.626.1242 c HA PROJECT NUMBER: 13586

SCALE:

C :\U se rs

\m am or \D oc um en ts

R ev it

L oc al s\

6-pl um -c en tra l_ m am or

.rv t

2/

/2

7:

:1

AM

P05.1

BASEMENT FLOOR DRAINAGE

DEMOLITION

CONSTRUCT CLEAN CORE ADDITION TO

SURGICAL SUITE

PROVIDENCE, RHODE ISLAND

650-337

02-22-19 CG MAM

SCALE: 1/8" = 1'-0"1 BASEMENT FLOOR DRAINAGE DEMOLITION

D01

D02

DEMO KEY NOTES

CODE DESCRIPTION

D01 DEMOLISH EXISTING 8" OD UP & PREPARE FOR RECONNECTION

D02 DEMOLISH EXISTING 8" OVERFLOW DRAIN OUTLET PATCH EXTERIOR

WALL TO MATCH EXISTING

D03 DEMOLISH EXISTING 4" S BACK TO THIS POINT & PREPARE FOR

RECONNECTION

D04 DEMOLISH EXISTING 2" W UP

D05 DEMOLISH EXISTING 2" V DN

D06 DEMOLISH EXISTING 2" V BACK TO THIS POINT & CAP

D07 DEMOLISH EXISTING SUPPLY PIPING & ASSOCIATED ACCESSORIES

BACK TO THIS POINT & CAP

D08 DEMOLISH EXISTING N2, N02 & ASSOCIATED ACCESSORIES BACK TO

THIS POINT & CAP

D09 DEMOLISH EXISTING SUPPLY, GAS PIPING & ASSOCIATED

ACCESSORIES

D10 DEMOLISH EXISTING SUPPLY PIPING & ASSOCIATED ACCESSORIES

DN

D11 DEMOLISH EXISTING 2-1/2" CW BACK TO THIS PIONT & PREPARE FOR

RECONNECTION

PH2B

XV- 2"

XS

W

-4

XSAN- 4"XSAN- 4"

XV

-2

XSAN- 4"

XS

AN

-4

XS

AN

-4

XS

AN

-2

XSAN- 4"XSAN- 2"

XS

AN

-2

XS

AN

-4

XSAN- 4"

XS

AN

-4

XSAN- 4"

XV- 2"

XS

AN

-4

XSAN- 4"

XV- 2"

XV

-2

XSAN- 4"

XS

AN

-4

XSW- 6"

XS

AN

-4

XSAN- 4"

XV- 2"

D01

XSAN- 4"

XSAN- 2"

D03

D04

D04

D04

XSAN- 2"

D03

O

FD

-8

SAN- 2"

OFD- 6"

OFD- 8"

V- 2"

SW- 6"

V- 2"

SW- 6"

OFD- 6"

PH7

PH2B

Graphic Scale

Graphic Scale

0 4' 8' 12'

1/8" = 1'-0"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL CONSTRUCTION

DOCUMENTS

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Auburn, ME 207.784.5100

Boston, MA 617.426.5050

Portland, ME 207.775.0053

Portsmouth, NH 603.626.1242 c HA PROJECT NUMBER: 13586

SCALE:

C :\U se rs

\m am or \D oc um en ts

R ev it

L oc al s\

6-pl um -c en tra l_ m am or

.rv t

2/

/2

7:

:2

AM

P05.2

FIRST FLOOR DRAINAGE

DEMOLITION

CONSTRUCT CLEAN CORE ADDITION TO

SURGICAL SUITE

PROVIDENCE, RHODE ISLAND

650-337

02-22-19 CG MAM

SCALE: 1/8" = 1'-0"1 FIRST FLOOR DRAINAGE DEMOLITION

DEMO KEY NOTES

CODE DESCRIPTION

D01 DEMOLISH EXISTING 8" OD UP & PREPARE FOR RECONNECTION

D02 DEMOLISH EXISTING 8" OVERFLOW DRAIN OUTLET PATCH EXTERIOR

WALL TO MATCH EXISTING

D03 DEMOLISH EXISTING 4" S BACK TO THIS POINT & PREPARE FOR

RECONNECTION

D04 DEMOLISH EXISTING 2" W UP

D05 DEMOLISH EXISTING 2" V DN

D06 DEMOLISH EXISTING 2" V BACK TO THIS POINT & CAP

D07 DEMOLISH EXISTING SUPPLY PIPING & ASSOCIATED ACCESSORIES

BACK TO THIS POINT & CAP

D08 DEMOLISH EXISTING N2, N02 & ASSOCIATED ACCESSORIES BACK TO

THIS POINT & CAP

D09 DEMOLISH EXISTING SUPPLY, GAS PIPING & ASSOCIATED

ACCESSORIES

D10 DEMOLISH EXISTING SUPPLY PIPING & ASSOCIATED ACCESSORIES

DN

D11 DEMOLISH EXISTING 2-1/2" CW BACK TO THIS PIONT & PREPARE FOR

RECONNECTION

XV

-2

XSW- 4"

XOFD- 6"

XV

-2

XOFD- 4"

XSW- 4" XSW- 4"

XOFD- 4"

XV- 3"

XV- 2"

XV- 2"

XV

-2

XV

-2

XV- 2"

XV- 2"

XV- 1"

XV

-2

XV- 2" XV- 2"

XV

-2

XV- 2"

XV- 2"

XOFD- 4"

XV

-2

XV

-2

XO

FD

-4

XV- 2"

XV- 2"

D05

D06

D06

D05

PH2B

PH2B

PH7

Graphic Scale

Graphic Scale

0 4' 8' 12'

1/8" = 1'-0"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL CONSTRUCTION

DOCUMENTS

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Auburn, ME 207.784.5100

Boston, MA 617.426.5050

Portland, ME 207.775.0053

Portsmouth, NH 603.626.1242 c HA PROJECT NUMBER: 13586

SCALE:

C :\U se rs

\m am or \D oc um en ts

R ev it

L oc al s\

6-pl um -c en tra l_ m am or

.rv t

2/

/2

7:

:3

AM

P05.3

SECOND FLOOR DRAINAGE

DEMOLITION

CONSTRUCT CLEAN CORE ADDITION TO

SURGICAL SUITE

PROVIDENCE, RHODE ISLAND

650-337

02-22-19 CG MAM

SCALE: 1/8" = 1'-0"1 SECOND FLOOR DRAINAGE DEMOLITION

DEMO KEY NOTES

CODE DESCRIPTION

D01 DEMOLISH EXISTING 8" OD UP & PREPARE FOR RECONNECTION

D02 DEMOLISH EXISTING 8" OVERFLOW DRAIN OUTLET PATCH EXTERIOR

WALL TO MATCH EXISTING

D03 DEMOLISH EXISTING 4" S BACK TO THIS POINT & PREPARE FOR

RECONNECTION

D04 DEMOLISH EXISTING 2" W UP

D05 DEMOLISH EXISTING 2" V DN

D06 DEMOLISH EXISTING 2" V BACK TO THIS POINT & CAP

D07 DEMOLISH EXISTING SUPPLY PIPING & ASSOCIATED ACCESSORIES

BACK TO THIS POINT & CAP

D08 DEMOLISH EXISTING N2, N02 & ASSOCIATED ACCESSORIES BACK TO

THIS POINT & CAP

D09 DEMOLISH EXISTING SUPPLY, GAS PIPING & ASSOCIATED

ACCESSORIES

D10 DEMOLISH EXISTING SUPPLY PIPING & ASSOCIATED ACCESSORIES

DN

D11 DEMOLISH EXISTING 2-1/2" CW BACK TO THIS PIONT & PREPARE FOR

RECONNECTION

D05

D05

D06

XMN02- 3/4"

XMN- 3/4"

XMV- 3/4"

XMC02- 3/4"

XMO- 3/4"

XMA- 3/4"

XWAGD- 3/4"

XDHWS- 1 1/2"

XDCWS- 2 1/2"

XMN02- 3/4"

XMN- 3/4"

XMV- 3/4"

XMC02- 3/4"

XMO- 3/4"

XMA- 3/4"

XWAGD- 3/4"

XDHWS- 1 1/2"

XDCWS- 2 1/2"

XMV- 3/4"

XMO- 3/4"

XMA- 3/4"

XWAGD- 3/4"

XDHWS- 1 1/2"

XDCWS- 2 1/2"

XMV- 2"

XMV- 3/4"

XMA- 3/4"

XMO- 3/4"

XDCW

S- 2 1/2"

XDHW

S- 1 1/2"

XMV- 1 1/2"

XMV- 3/4"

XMO- 3/4"

XMA- 3/4"

XMO- 3/4"

XDCWS- 2 1/2"

XDHWS- 1 1/2"

XMO- 1/2"

XMV- 1"

XMA- 1/2"

XMO- 1/2"

XMV- 1"

XMA- 1/2"

XMO- 1/2"

XMV- 3/4"

XMA- 1/2"

XDCWS- 2 1/2"

XDHWS- 1 1/2"

XDCWS- 2 1/2"

XDHWS- 1 1/2"

XD

C

W S-

1/

2"

XM

O

-1 /2

XM

A-

1/ 2"

XM

V-

1"

XM

N

-3 /4

XM

N

-3 /4

XM

O -3

/4

XM

A-

1/ 2"

XM

V-

3/ 4"

XW

AG

D -3

/4

XM

N

-3 /4

XM

N

-3 /4

XM

N

-3 /4

XM

N

-3

/4

XM

O

-3 /4

XM

A- 1/

2"

XM

V- 3/

4"

XW

AG

D

-3 /4

XM

N

-3 /4

XM

N

-3 /4

XM

O -3

/4

XM

A-

1/ 2"

XM

V-

3/ 4"

XW

AG

D -3

/4

XD

H

W S-

1/ 2"

XD

C

W S-

1/

4"

XD

H W

S- 3/

4"

XD

C W

S-

1/

4" XMN02- 3/4"

XMN- 3/4"

XMN02- 3/4"

XMN- 3/4"

XMV- 3/4"

XMO- 3/4"

XMA- 3/4"

XW

AGD- 3/4"

XDHW

S- 1 1/2"

XDCW

S- 2 1/2"

XDHW

S- 1/2

XDCW

S- 1/2

XD

C

W S-

1/

4"

XD

H W

S- 3/

4"

PH4

PH4

PH7

PH2B

D07

D07

D08 D09

D09

D10

D10

D10

D10

D10

D10

D07

D11

Graphic Scale

Graphic Scale

0 4' 8' 12'

1/8" = 1'-0"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL CONSTRUCTION

DOCUMENTS

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Auburn, ME 207.784.5100

Boston, MA 617.426.5050

Portland, ME 207.775.0053

Portsmouth, NH 603.626.1242 c HA PROJECT NUMBER: 13586

SCALE:

C :\U se rs

\m am or \D oc um en ts

R ev it

L oc al s\

6-pl um -c en tra l_ m am or

.rv t

2/

/2

7:

:0

AM

P06.1

SECOND FLOOR SUPPLY

DEMOLITION

CONSTRUCT CLEAN CORE ADDITION TO

SURGICAL SUITE

PROVIDENCE, RHODE ISLAND

650-337

02-22-19 CG MAM

SCALE: 1/8" = 1'-0"1 SECOND FLOOR SUPPLY DEMOLITION

DEMO KEY NOTES

CODE DESCRIPTION

D01 DEMOLISH EXISTING 8" OD UP & PREPARE FOR RECONNECTION

D02 DEMOLISH EXISTING 8" OVERFLOW DRAIN OUTLET PATCH EXTERIOR

WALL TO MATCH EXISTING

D03 DEMOLISH EXISTING 4" S BACK TO THIS POINT & PREPARE FOR

RECONNECTION

D04 DEMOLISH EXISTING 2" W UP

D05 DEMOLISH EXISTING 2" V DN

D06 DEMOLISH EXISTING 2" V BACK TO THIS POINT & CAP

D07 DEMOLISH EXISTING SUPPLY PIPING & ASSOCIATED ACCESSORIES

BACK TO THIS POINT & CAP

D08 DEMOLISH EXISTING N2, N02 & ASSOCIATED ACCESSORIES BACK TO

THIS POINT & CAP

D09 DEMOLISH EXISTING SUPPLY, GAS PIPING & ASSOCIATED

ACCESSORIES

D10 DEMOLISH EXISTING SUPPLY PIPING & ASSOCIATED ACCESSORIES

DN

D11 DEMOLISH EXISTING 2-1/2" CW BACK TO THIS PIONT & PREPARE FOR

RECONNECTION

D07

D09

OD-1

P04

XV- 2" XSW- 4" XV- 4"

E

E.1

D

765432.52.221.81.5

10.5

B

A.5

A

OFD- 8"

OFD- 8"

SW- 6"

P15 P16

P17

C

O

FD

-8

SW

-6

Room

Room

A-EL

PH2B

Graphic Scale

Graphic Scale

0 4' 8' 12'

1/8" = 1'-0"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL CONSTRUCTION

DOCUMENTS

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Auburn, ME 207.784.5100

Boston, MA 617.426.5050

Portland, ME 207.775.0053

Portsmouth, NH 603.626.1242 c HA PROJECT NUMBER: 13586

SCALE:

C :\U se rs

\m am or \D oc um en ts

R ev it

L oc al s\

6-pl um -c en tra l_ m am or

.rv t

2/

/2

7:

:2

AM

P10.1

GROUND FLOOR DRAINAGE CONSTRUCT CLEAN CORE ADDITION TO

SURGICAL SUITE

PROVIDENCE, RHODE ISLAND

650-337

02-22-19 CG MAM

SCALE: 1/8" = 1'-0"1 GROUND FLOOR DRAINAGE

KEY NOTES

CODE DESCRIPTION

P01 2" W UP

P02 2" V UP

P03 4" S UP

P04 8" OD UP

P05 2" W & 1-1/2" V DN

P06 2" W IN WALL & 1-1/2" V DN

P07 4" S DN

P08 2" V DN

P09 2" V UP 3" VTR

P10 3" V UP 4" VTR

P11 2" W DN

P12 3" VTR

P13 4" VTR

P14 6" OD & 6" SD DN

P15 6" OD & 6" SD UP

P16 CONNECT 8" OD TO EXISTING 8" OD

P17 CONNECT 6" SD TO EXISTING

P18 3" SD UP TO 3" RD

P19 3" OD UP TO 3" RD

P20 3" W UP

P21 EXISTING ROOF DRAIN TO REMAIN

P22 PROVIDE MEDICAL GAS VALVE BOX & ALARM PANEL REFER TO

SPECIFICATIONS FOR MANUFACTURERS & MODELS.

COORDINATE EXACT LOCATION OF ALARM PANEL WITH

ELECTRICAL CONTRACTOR

P23 1/2" A, OX. VA, WAGD,NO2 & N2 DN TO BOOM

P24 1/2" HW & CW DN

P25 1/2" HW & CW DN

P26 1/2" CO2,NO2, WAGD, A, OX, VA, N2 DN TO RETRACTABLE

CEILING COLUMN

P27 PROVIDE ISOLATION VALVE, MAKE FINAL CONNECTIONS TO

TWO EVAC UNITS REFER TO MANUFACTURERS INSTALLATION

MANUAL

P28 3/4" TEMPERED WATER FROM MIXING VALVE DN. RUN PIPE IN

WALL TO BACKFLOW PREVENTER LOCATION

P29 1" DCWR DN

P30 CONNECT TO EXISTING 1" CHWR RISER

P31 1" DCWR UP

XSAN- 4"

XSAN- 4" XSAN- 4"

XS

AN

-4

XS

AN

-4

XSAN- 2"

XV- 2"

XS

W

-4

XV

-2

XS

AN

-4

XSAN- 4"

XSAN- 4"

XV

-2

XS

AN

-4

XSAN- 2" XSAN- 4"

XS

AN

-2

XSAN- 4"

P03

SAN- 4"

SAN- 4"

CO

P01

XSW- 6"

XS

AN

-2

XS

AN

-4

XV- 2"

SAN- 2"

SA

N

-2

COP01

SA

N

-3

SA

N

-3

P30.1

P01

P01

SAN- 2"

SAN- 4"

E

E.1

D

765432.52.221.81.5

10.5

B

A.5

A

O

FD

-6

SW

-6

C

XSW- 6"

XOFD- 8"

XV

-2

XO

FD

-8

XOFD- 6"

P15

P14

P20

SAN- 3"

SA

N

-3

P02

V- 3"

P01

CO

P01

SAN- 4"MECHANICAL ROOM

STAFF LOCKER

FEMALE

TOILET MALE

TOILET FEMALE

STAFF LOCKER MALE

113A

OFFICE

115A

OFFICE

OFFICE

OFFICE

CONFERENCE ROOM

110 BREAK / KITCHEN

STAFF WASHROOM

109A

CONSULT

WAITING

STAIR TOWER-2

DROP OFFICE

119C

PICK UP

119B

PU/DO

119A

OFFICE

ANESTHESIA

CONFERENCE ROOM

118A

ANESTHESIA OFFICE

NURSE MANAGER

OFFICE

STAFF LOUNGE AND

CONFERENCE

STAIR K

K-1

CORRIDOR

CORRIDOR

101B

MENS RESTROOM

WOMENS REST ROOM

MENS REST ROOM

COMP AND PENSION

COMP AND PENSION

COMP AND PENSION

RECEPTION

160A

COMP AND PENSION

COMP AND PENSION

Room

ELEVATOR LOBBY

L11

PH2B

PH7

P03

P02

Graphic Scale

Graphic Scale

0 4' 8' 12'

1/8" = 1'-0"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL CONSTRUCTION

DOCUMENTS

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Auburn, ME 207.784.5100

Boston, MA 617.426.5050

Portland, ME 207.775.0053

Portsmouth, NH 603.626.1242 c HA PROJECT NUMBER: 13586

SCALE:

C :\U se rs

\m am or \D oc um en ts

R ev it

L oc al s\

6-pl um -c en tra l_ m am or

.rv t

2/

/2

7:

:2

AM

P10.2

FIRST FLOOR DRAINAGE CONSTRUCT CLEAN CORE ADDITION TO

SURGICAL SUITE

PROVIDENCE, RHODE ISLAND

650-337

02-22-19 CG MAM

SCALE: 1/8" = 1'-0"1 FIRST FLOOR DRAINAGE

KEY NOTES

CODE DESCRIPTION

P01 2" W UP

P02 2" V UP

P03 4" S UP

P04 8" OD UP

P05 2" W & 1-1/2" V DN

P06 2" W IN WALL & 1-1/2" V DN

P07 4" S DN

P08 2" V DN

P09 2" V UP 3" VTR

P10 3" V UP 4" VTR

P11 2" W DN

P12 3" VTR

P13 4" VTR

P14 6" OD & 6" SD DN

P15 6" OD & 6" SD UP

P16 CONNECT 8" OD TO EXISTING 8" OD

P17 CONNECT 6" SD TO EXISTING

P18 3" SD UP TO 3" RD

P19 3" OD UP TO 3" RD

P20 3" W UP

P21 EXISTING ROOF DRAIN TO REMAIN

P22 PROVIDE MEDICAL GAS VALVE BOX & ALARM PANEL REFER TO

SPECIFICATIONS FOR MANUFACTURERS & MODELS.

COORDINATE EXACT LOCATION OF ALARM PANEL WITH

ELECTRICAL CONTRACTOR

P23 1/2" A, OX. VA, WAGD,NO2 & N2 DN TO BOOM

P24 1/2" HW & CW DN

P25 1/2" HW & CW DN

P26 1/2" CO2,NO2, WAGD, A, OX, VA, N2 DN TO RETRACTABLE

CEILING COLUMN

P27 PROVIDE ISOLATION VALVE, MAKE FINAL CONNECTIONS TO

TWO EVAC UNITS REFER TO MANUFACTURERS INSTALLATION

MANUAL

P28 3/4" TEMPERED WATER FROM MIXING VALVE DN. RUN PIPE IN

WALL TO BACKFLOW PREVENTER LOCATION

P29 1" DCWR DN

P30 CONNECT TO EXISTING 1" CHWR RISER

P-103

XV

-2

XV- 1"

XV- 3"

XOFD- 4" XSW- 4"

XSW- 4"

XOFD- 6"XSW- 4"

XV

-2

XSW- 4"

XOFD- 4"

XV- 2"

XV

-2

XV- 2"

XV

-2

P-519

XV- 2"

XV- 2"

XV- 2"

XV

-2

XV- 2"

XV

-2

P05

P05

P05

P06

P05

P07P08P09

P10

P-528 P-528

P-418

P-528

P05

P05

V- 2"

V- 2"

V- 2"V- 3"

XV- 2"

XV- 2"

XV

-2

XV- 2"XV- 2"

XO

FD

-4

XOFD- 4"

CLEAN AND STERILE

SUPPLY

EQUIPMENT STORAGE

MECHANICAL

CYSTOSCOPY

SEMI RESTRICTED

CORRIDOR

A-EL-3

FUTURE

CLEAN

EL.

A-EL-2

FUTURE

CLEAN

EL.

CLEAN AND STERILE

SUPPLY

CC STORAGE

255A

NURSE MANAGER

OFFICE

SOILED

UTILITY

IUSS

ANESTHESIA

WORKROOM

EQUIPMENT STORAGE

WORK AREA

219218

CONTROL

STATION

MALE LOCKERS

ANGIOPLASTY

OR-1

OR-2

OR-3

215G

HOUSE

KEEPING

FEMALE

LOCKERS

CONSULT ROOM

MINOR PROCEDURE

OR STORAGE

PATIENT TOILET

215F

215E

PATIENT

LOCKERS

VESTIBULE

215D

CLEAN UTILITIES

215C

215B

SOILED

UTILITIES

SEMI RESTRICTED

CORRIDOR

STAIR WELL

A-2

ELECTRICAL

CLOSET

232A

HOUSE

KEEPING

ELEC

232C

ELEC

232D

ELECTRICAL ROOM

201C

EMERGENCY

ELECTRICAL ROOM

201B

ELEVATOR LOBBY

L23

LINEN CHUTE

IT CLOSET

229A

ELECTRICAL

CLOSET

CORRIDOR

2-DC-1A

SEMI RESTRICTED

CORRIDOR

EXAM-1

E205

EXAM-2

E206

OFFICE

CORRIDOR

BRONCHOSCOPY

SCRUB

210A SCRUB

210B

OR ACCESS VESTIBULE

OR ACCESS VESTIBULE

OBSERVATION

ROOM

PACU

NURSE STATION

215A

PATIENT

TOILET

CORRIDOR

C223

STAIR-K

K-2

STAFF TOILET/SHOWER

SEMI RESTRICTED

CORRIDOR

LINK CORRIDOR

L24

MICROSCOPE

E207

EXAM-3

E208

CAST ROOM

E204

CORRIDOR

C22

CORRIDOR

C21

ELEVATOR

E-EL-1

FUTURE SOILED

ELEVATOR

A-EL-1

P11

SAN- 2"

E

E.1

D

765432.52.221.81.5

10.5

B

A.5

A

OFD- 3"

SW- 3"

O

FD

-3

SW

-3

SW- 4"

OFD- 4"

SW

-3

O

FD

-3

SW- 3"

OFD- 3"

SW

-3

SW

- 3"OFD- 3"

SW

- 3"

OFD- 3"OFD- 4"

SW- 4"

P14

C

P18

P19

P18

P19

P18

P19

P18

P19

P18

P19

P18

P19

P18

P19

OFD- 3"

SW- 3"

P18

P19

P18

P19

FD-1 P11

P08

V- 3"

TOILET

202A

NURSE MANAGER

OFFICE

P-418

P05

P-710

P05

P-418

OFD- 4"

SW- 4"

PH2B

PH7

O

FD

-3

TMV-1

FS-1

P07

P08

TRANSPOSAL

ULTRA EVAC UNIT

(TYP OF 2)

Graphic Scale

Graphic Scale

0 4' 8' 12'

1/8" = 1'-0"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL CONSTRUCTION

DOCUMENTS

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Auburn, ME 207.784.5100

Boston, MA 617.426.5050

Portland, ME 207.775.0053

Portsmouth, NH 603.626.1242 c HA PROJECT NUMBER: 13586

SCALE:

C :\U se rs

\m am or \D oc um en ts

R ev it

L oc al s\

6-pl um -c en tra l_ m am or

.rv t

2/

/2

7:

:4

AM

P10.3

SECOND FLOOR DRAINAGE CONSTRUCT CLEAN CORE ADDITION TO

SURGICAL SUITE

PROVIDENCE, RHODE ISLAND

650-337

02-22-19 CG MAM

SCALE: 1/8" = 1'-0"1 SECOND FLOOR DRAINAGE

KEY NOTES

CODE DESCRIPTION

P01 2" W UP

P02 2" V UP

P03 4" S UP

P04 8" OD UP

P05 2" W & 1-1/2" V DN

P06 2" W IN WALL & 1-1/2" V DN

P07 4" S DN

P08 2" V DN

P09 2" V UP 3" VTR

P10 3" V UP 4" VTR

P11 2" W DN

P12 3" VTR

P13 4" VTR

P14 6" OD & 6" SD DN

P15 6" OD & 6" SD UP

P16 CONNECT 8" OD TO EXISTING 8" OD

P17 CONNECT 6" SD TO EXISTING

P18 3" SD UP TO 3" RD

P19 3" OD UP TO 3" RD

P20 3" W UP

P21 EXISTING ROOF DRAIN TO REMAIN

P22 PROVIDE MEDICAL GAS VALVE BOX & ALARM PANEL REFER TO

SPECIFICATIONS FOR MANUFACTURERS & MODELS.

COORDINATE EXACT LOCATION OF ALARM PANEL WITH

ELECTRICAL CONTRACTOR

P23 1/2" A, OX. VA, WAGD,NO2 & N2 DN TO BOOM

P24 1/2" HW & CW DN

P25 1/2" HW & CW DN

P26 1/2" CO2,NO2, WAGD, A, OX, VA, N2 DN TO RETRACTABLE

CEILING COLUMN

P27 PROVIDE ISOLATION VALVE, MAKE FINAL CONNECTIONS TO

TWO EVAC UNITS REFER TO MANUFACTURERS INSTALLATION

MANUAL

P28 3/4" TEMPERED WATER FROM MIXING VALVE DN. RUN PIPE IN

WALL TO BACKFLOW PREVENTER LOCATION

P29 1" DCWR DN

P30 CONNECT TO EXISTING 1" CHWR RISER

P12

P13

E

E.1

D

765432.52.221.81.5

10.5

B

A.5

A

C

P21

P21

P21

P21 P21 P21 P21

P21

P21PH2B

RD-1

285 SFRD-1

475 SF

RD-1

765 SF

RD-1

839 SF

RD-1

931 SF

RD-1

433 SF

RD-1

144 SF

RD-1

737 SF

RD-1

737 SF

Graphic Scale

Graphic Scale

0 4' 8' 12'

1/8" = 1'-0"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL CONSTRUCTION

DOCUMENTS

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Auburn, ME 207.784.5100

Boston, MA 617.426.5050

Portland, ME 207.775.0053

Portsmouth, NH 603.626.1242 c HA PROJECT NUMBER: 13586

SCALE:

C :\U se rs

\m am or \D oc um en ts

R ev it

L oc al s\

6-pl um -c en tra l_ m am or

.rv t

2/

/2

7:

:0

AM

P10.4

ROOF PLAN CONSTRUCT CLEAN CORE ADDITION TO

SURGICAL SUITE

PROVIDENCE, RHODE ISLAND

650-337

02-22-19 CG MAM

KEY NOTES

CODE DESCRIPTION

P01 2" W UP

P02 2" V UP

P03 4" S UP

P04 8" OD UP

P05 2" W & 1-1/2" V DN

P06 2" W IN WALL & 1-1/2" V DN

P07 4" S DN

P08 2" V DN

P09 2" V UP 3" VTR

P10 3" V UP 4" VTR

P11 2" W DN

P12 3" VTR

P13 4" VTR

P14 6" OD & 6" SD DN

P15 6" OD & 6" SD UP

P16 CONNECT 8" OD TO EXISTING 8" OD

P17 CONNECT 6" SD TO EXISTING

P18 3" SD UP TO 3" RD

P19 3" OD UP TO 3" RD

P20 3" W UP

P21 EXISTING ROOF DRAIN TO REMAIN

P22 PROVIDE MEDICAL GAS VALVE BOX & ALARM PANEL REFER TO

SPECIFICATIONS FOR MANUFACTURERS & MODELS.

COORDINATE EXACT LOCATION OF ALARM PANEL WITH

ELECTRICAL CONTRACTOR

P23 1/2" A, OX. VA, WAGD,NO2 & N2 DN TO BOOM

P24 1/2" HW & CW DN

P25 1/2" HW & CW DN

P26 1/2" CO2,NO2, WAGD, A, OX, VA, N2 DN TO RETRACTABLE

CEILING COLUMN

P27 PROVIDE ISOLATION VALVE, MAKE FINAL CONNECTIONS TO

TWO EVAC UNITS REFER TO MANUFACTURERS INSTALLATION

MANUAL

P28 3/4" TEMPERED WATER FROM MIXING VALVE DN. RUN PIPE IN

WALL TO BACKFLOW PREVENTER LOCATION

P29 1" DCWR DN

P30 CONNECT TO EXISTING 1" CHWR RISER

P31 1" DCWR UP

SCALE: 1/8" = 1'-0"1 ROOF PLAN

P30.1

EE.1

D

765432.52.221.81.5

10.5

B

A.5

A

C

DCWR- 1"

XMN02- 3/4"

XMN- 3/4"

XMC02- 3/4"

XDHWR- 3/4"

XDHWS- 1 1/2"

XDCWS- 2 1/2"

XM

N

-3 /4

XM

C

-3

/4

"XD

C W

S- 1/

2"

XDCWS- 1/2"

XDCWS- 1 1/2"

XDHWS- 1"

XDHWR- 3/4"

XDHWR- 1/2"

P30

Graphic Scale

Graphic Scale

0 4' 8' 12'

1/8" = 1'-0"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL CONSTRUCTION

DOCUMENTS

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Auburn, ME 207.784.5100

Boston, MA 617.426.5050

Portland, ME 207.775.0053

Portsmouth, NH 603.626.1242 c HA PROJECT NUMBER: 13586

SCALE:

C :\U se rs

\m am or \D oc um en ts

R ev it

L oc al s\

6-pl um -c en tra l_ m am or

.rv t

2/

/2

7:

:1

AM

P20.1

FIRST FLOOR SUPPLY CONSTRUCT CLEAN CORE ADDITION TO

SURGICAL SUITE

PROVIDENCE, RHODE ISLAND

650-337

02-22-19 CG MAM

SCALE: 1/8" = 1'-0"1 FIRST FLOOR SUPPLY

P31

KEY NOTES

CODE DESCRIPTION

P01 2" W UP

P02 2" V UP

P03 4" S UP

P04 8" OD UP

P05 2" W & 1-1/2" V DN

P06 2" W IN WALL & 1-1/2" V DN

P07 4" S DN

P08 2" V DN

P09 2" V UP 3" VTR

P10 3" V UP 4" VTR

P11 2" W DN

P12 3" VTR

P13 4" VTR

P14 6" OD & 6" SD DN

P15 6" OD & 6" SD UP

P16 CONNECT 8" OD TO EXISTING 8" OD

P17 CONNECT 6" SD TO EXISTING

P18 3" SD UP TO 3" RD

P19 3" OD UP TO 3" RD

P20 3" W UP

P21 EXISTING ROOF DRAIN TO REMAIN

P22 PROVIDE MEDICAL GAS VALVE BOX & ALARM PANEL REFER TO

SPECIFICATIONS FOR MANUFACTURERS & MODELS.

COORDINATE EXACT LOCATION OF ALARM PANEL WITH

ELECTRICAL CONTRACTOR

P23 1/2" A, OX. VA, WAGD,NO2 & N2 DN TO BOOM

P24 1/2" HW & CW DN

P25 1/2" HW & CW DN

P26 1/2" CO2,NO2, WAGD, A, OX, VA, N2 DN TO RETRACTABLE

CEILING COLUMN

P27 PROVIDE ISOLATION VALVE, MAKE FINAL CONNECTIONS TO

TWO EVAC UNITS REFER TO MANUFACTURERS INSTALLATION

MANUAL

P28 3/4" TEMPERED WATER FROM MIXING VALVE DN. RUN PIPE IN

WALL TO BACKFLOW PREVENTER LOCATION

P29 1" DCWR DN

P30 CONNECT TO EXISTING 1" CHWR RISER

FC

XMN02- 3/4"

XMN- 3/4"

XMV- 3/4"

XMC02- 3/4"

XMO- 3/4"

XMA- 3/4"

XWAGD- 3/4"

XDHWS- 1 1/2"

XDCWS- 2 1/2"

XMV- 3/4"

XMO- 3/4"

XMA- 3/4"

XWAGD- 3/4"

XDHWS- 1 1/2"

XDCWS- 2 1/2"

XMV- 2"

XMV- 3/4"

XMA- 3/4"

XMO- 3/4"

XDCW

S- 2 1/2"

XDHW

S- 1 1/2"

XMV- 1 1/2"

XMV- 3/4"

XMO- 3/4"

XMA- 3/4"

XMO- 3/4"

XDCWS- 2 1/2"

XDHWS- 1 1/2"

XMO- 1/2"

XMV- 1"

XMA- 1/2"

XMO- 1/2"

XMV- 1"

XMA- 1/2"

XMO- 1/2"

XMV- 3/4"

XMA- 1/2"

XDCWS- 2 1/2"

XDHWS- 1 1/2"

XDCWS- 2 1/2"

XDHWS- 1 1/2"

XD

C

W S-

1/

2"

XM

O

-1 /2

XM

A-

1/ 2"

XM

V-

1"

XM

N

-3 /4

XM

N

-3 /4

XM

O -3

/4

XM

A-

1/ 2"

XM

V-

3/ 4"

XW

AG

D -3

/4

XM

N

-3 /4

XM

N

-3 /4

XM

N

-3 /4

XM

N

-3

/4

XM

O

-3 /4

XM

A- 1/

2"

XM

V- 3/

4"

XW

AG

D

-3 /4

XM

N

-3 /4

XM

N

-3 /4

XM

O -3

/4

XM

A-

1/ 2"

XM

V-

3/ 4"

XW

AG

D -3

/4

XM

N

-3 /4

XMV- 3/4

DHWR- 3/4"

DCWS- 1"

DHWS- 1"

P-519

DCWS- 1"

DHWS- 1"

DHWR- 3/4"

P-528 P-528

P-418

P25

P25

P25

P25

P25

P-528

CLEAN AND STERILE

SUPPLY

EQUIPMENT STORAGE

MECHANICAL

CYSTOSCOPY

SEMI

RESTRICTED

CORRIDOR

CLEAN AND STERILE

SUPPLY

CC STORAGE

255A

NURSE MANAGER

OFFICE

253IUSS

ANESTHESIA

WORKROOM

EQUIPMENT STORAGE

WORK AREA

MALE LOCKERS

ANGIOPLASTY

OR-1

OR-2

OR-3

CONSULT ROOM

TOILET

202A

MINOR PROCEDURE

OR STORAGE

PATIENT TOILET

215F

VESTIBULE

215D

CLEAN UTILITIES

215C

SEMI RESTRICTED

CORRIDOR

STAIR WELL

A-2

ELEC

232C

ELEC

232D

ELECTRICAL ROOM

201C

ELEVATOR LOBBY

L23

LINEN CHUTE

IT CLOSET

229A

CORRIDOR

2-DC-1A

SEMI RESTRICTED

CORRIDOR

EXAM-1

E205

EXAM-2

E206

OFFICE

CORRIDOR

BRONCHOSCOPY

SCRUB

210A

SCRUB

210B

OR ACCESS VESTIBULE

260OR ACCESS VESTIBULE

PACU

NURSE STATION

CORRIDOR

C223

STAIR-K

K-2

STAFF

TOILET/SHOWER

SEMI RESTRICTED

CORRIDOR

LINK CORRIDOR

L24

MICROSCOPE

E207

EXAM-3

E208

CAST ROOM

E204

CORRIDOR

C22

CORRIDOR

C21

ELEVATOR

E-EL-2

ELEVATOR

E-EL-1

FUTURE SOILED

ELEVATOR

A-EL-1

E

E.1

D

765432.52.221.81.5

10.5

B

A.5

A

C

MN- 1/2"

MV- 1/2"

MO- 1/2"

MA- 1/2"

WAGD- 1/2"

MN02- 1/2"

MC02- 1/2"

P22

M N

-1 /2

M

V- 1/

2" M

O -1

/2

M A-

1/ 2"

W

AG

D -1

/2

M N

-1

/2

M C

-1

/2

P22

P-418

P-103

P24

SA-"A"

P23

P-418

P26

MA- 1/2"

MO- 1/2"

MV- 1/2"

MA- 1/2"

MO- 1/2"

MV- 1/2"

DHWR- 3/4"

DHWS- 1"

DCWS- 1"

MO- 1/2"

MV- 1/2"

DHWR- 3/4"

DHWS- 3/4"

DCWS- 1"

PH2B

PH7PH4PH4

TV-2

P-710

TMV-1

BFP-1

SA-"A"

P27

P28

MA- 1/2"

WAGD- 1/2"

MN02- 1/2"WAGD- 1/2"

MN02- 1/2"

MN- 1/2"

WAGD- 1/2"

MN02- 1/2"

P29P30

DCWR- 3/4"

DCWR- 3/4"

DCWR- 3/4"

DCWR- 3/4"

P30

XD

H

W S-

1/

2"

THE CONTRACTOR SHALL MAKE

PROVISIONS TO PROVIDE TEMPORARY

SERVICES TO ALL SPACES WITHIN THE

FACILITY PRIOR TO SHUT-DOWN OF MED

GAS UTILITIES. COORDINATE WITH PVAMC

28 DAYS IN ADVANCE OF ANY SHUT-DOWNS

ALL WORK PREFORMED WITHIN THE O.R

SUITE SHALL TAKE PLACE ON SATURDAY,

SUNDAY OR WEEK NIGHTS BETWEEN THE

HOURS OF 7 P.M & 6A.M MODAY THROUGH

FRIDAY. WORK THAT CANNOT BE

CONDUCTED DURRING THESE TIMES MUST

BE SCHEDULED WITH PVAMC 28 DAYS IN

ADVANCE

Graphic Scale

Graphic Scale

0 4' 8' 12'

1/8" = 1'-0"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL CONSTRUCTION

DOCUMENTS

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Auburn, ME 207.784.5100

Boston, MA 617.426.5050

Portland, ME 207.775.0053

Portsmouth, NH 603.626.1242 c HA PROJECT NUMBER: 13586

SCALE:

C :\U se rs

\m am or \D oc um en ts

R ev it

L oc al s\

6-pl um -c en tra l_ m am or

.rv t

2/

/2

7:

:3

AM

P20.2

SECOND FLOOR SUPPLY CONSTRUCT CLEAN CORE ADDITION TO

SURGICAL SUITE

PROVIDENCE, RHODE ISLAND

650-337

02-22-19 CG MAM

SCALE: 1/8" = 1'-0"1 SECOND FLOOR SUPPLY

KEY NOTES

CODE DESCRIPTION

P01 2" W UP

P02 2" V UP

P03 4" S UP

P04 8" OD UP

P05 2" W & 1-1/2" V DN

P06 2" W IN WALL & 1-1/2" V DN

P07 4" S DN

P08 2" V DN

P09 2" V UP 3" VTR

P10 3" V UP 4" VTR

P11 2" W DN

P12 3" VTR

P13 4" VTR

P14 6" OD & 6" SD DN

P15 6" OD & 6" SD UP

P16 CONNECT 8" OD TO EXISTING 8" OD

P17 CONNECT 6" SD TO EXISTING

P18 3" SD UP TO 3" RD

P19 3" OD UP TO 3" RD

P20 3" W UP

P21 EXISTING ROOF DRAIN TO REMAIN

P22 PROVIDE MEDICAL GAS VALVE BOX & ALARM PANEL REFER TO

SPECIFICATIONS FOR MANUFACTURERS & MODELS.

COORDINATE EXACT LOCATION OF ALARM PANEL WITH

ELECTRICAL CONTRACTOR

P23 1/2" A, OX. VA, WAGD,NO2 & N2 DN TO BOOM

P24 1/2" HW & CW DN

P25 1/2" HW & CW DN

P26 1/2" CO2,NO2, WAGD, A, OX, VA, N2 DN TO RETRACTABLE

CEILING COLUMN

P27 PROVIDE ISOLATION VALVE, MAKE FINAL CONNECTIONS TO

TWO EVAC UNITS REFER TO MANUFACTURERS INSTALLATION

MANUAL

P28 3/4" TEMPERED WATER FROM MIXING VALVE DN. RUN PIPE IN

WALL TO BACKFLOW PREVENTER LOCATION

P29 1" DCWR DN

P30 CONNECT TO EXISTING 1" CHWR RISER

HEAT TRACE CABLE SHALL

BE ONE CONTINUOUS WIRE

WITH NO JUNCTIONS.

WRAP HEAT TRACE CABLE

AROUND PIPE AND EXTEND

UP AS CLOSE TO SLAB AS

POSSIBLE TO PREVENT FREEZING

HEAT TRACE CABLE SHALL

CONTINUE TO FARTHEST MOST FIXTURE.

REFER TO SHEET PL102 FOR CONTINUATIONHEAT TRACE CABLE SHALL

START AT THIS POINT. REFER

TO PL102 FOR CONTINUATION

CONNECT 2" W TO

EXISTING 4" S

4" VTR

NEW DRAINAGE PIPING SHALL BE LOCATED

WITHIN PROVIDED CEILING CAVITY AS SHOWN

DBA.5 C

V- 3"V- 1 1/2"

SAN- 3"

Graphic Scale

Graphic Scale

Graphic Scale

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL CONSTRUCTION

DOCUMENTS

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Auburn, ME 207.784.5100

Boston, MA 617.426.5050

Portland, ME 207.775.0053

Portsmouth, NH 603.626.1242 c HA PROJECT NUMBER: 13586

SCALE:

C :\U se rs

\m am or \D oc um en ts

R ev it

L oc al s\

6-pl um -c en tra l_ m am or

.rv t

2/

/2

7:

:4

AM

P30.1

SECTIONS & DETAILS CONSTRUCT CLEAN CORE ADDITION TO

SURGICAL SUITE

PROVIDENCE, RHODE ISLAND

650-337

02-22-19 CG MAM

NO SCALE1 DRAINAGE HEAT TRACE DETAIL REFER TO SHEET P10.2

SCALE:2 VIEW 1 OVERFLOW DRAIN PIPING IN MECHANICAL ROOM

SCALE:3 VIEW 2 OVERFLOW DRAIN PIPING IN MECHANICAL ROOM

SCALE:4 VIEW 3 OVERFLOW DRAIN PIPING IN MECHANICAL ROOM

SCALE:5 VIEW 4 OVERFLOW DRAIN PIPING IN MECHANICAL ROOM

BOTTOM OF OVERFLOW

DRAIN AT 9'-8" AFF AT

THIS POINT

COORDINATE EXACT PENETRATION

THROUGH WALL WITH EXISTING

MECHANICAL PIPING & ELECTRICAL

CONDUITS

BOTTOM OF OVERFLOW

DRAIN AT 10'-0" AFF AT

THIS POINT

BOTTOM OF OVERFLOW

DRAIN AT 10'-3" AFF AT

THIS POINT

BOTTOM OF OVERFLOW

DRAIN AT 10'-3" AFF AT

THIS POINT

BOTTOM OF OVERFLOW

DRAIN AT 10'-0" AFF AT

THIS POINT

BOTTOM OF STORM

DRAIN AT 10'-7" AFF AT

THIS POINT

STORM DRAIN

ABOVE OVERFLOW

BOTTOM OF OVERFLOW

DRAIN AT 10'-4" AFF AT

THIS POINT

CONNECT TO EXISTING

STORM DRAIN AT

THIS POINT

OVERFLOW DRAIN ABOVE

EXISTING EXHAUST DUCT

52_P00-1
Sheets
P00.1 - LEGEND, SCHEDULES, GENERAL NOTES & DETAILS
P05.1 - BASEMENT FLOOR DRAINAGE DEMOLITION
P05.2 - FIRST FLOOR DRAINAGE DEMOLITION
P05.3 - SECOND FLOOR DRAINAGE DEMOLITION
P06.1 - SECOND FLOOR SUPPLY DEMOLITION
P10.1 - GROUND FLOOR DRAINAGE
P10.2 - FIRST FLOOR DRAINAGE
P10.3 - SECOND FLOOR DRAINAGE
P10.4 - ROOF PLAN
P20.1 - FIRST FLOOR SUPPLY
P20.2 - SECOND FLOOR SUPPLY
P30.1 - SECTIONS & DETAILS
52_P05-1
Sheets
P00.1 - LEGEND, SCHEDULES, GENERAL NOTES & DETAILS
P05.1 - BASEMENT FLOOR DRAINAGE DEMOLITION
P05.2 - FIRST FLOOR DRAINAGE DEMOLITION
P05.3 - SECOND FLOOR DRAINAGE DEMOLITION
P06.1 - SECOND FLOOR SUPPLY DEMOLITION
P10.1 - GROUND FLOOR DRAINAGE
P10.2 - FIRST FLOOR DRAINAGE
P10.3 - SECOND FLOOR DRAINAGE
P10.4 - ROOF PLAN
P20.1 - FIRST FLOOR SUPPLY
P20.2 - SECOND FLOOR SUPPLY
P30.1 - SECTIONS & DETAILS
52_P05-2
Sheets
P00.1 - LEGEND, SCHEDULES, GENERAL NOTES & DETAILS
P05.1 - BASEMENT FLOOR DRAINAGE DEMOLITION
P05.2 - FIRST FLOOR DRAINAGE DEMOLITION
P05.3 - SECOND FLOOR DRAINAGE DEMOLITION
P06.1 - SECOND FLOOR SUPPLY DEMOLITION
P10.1 - GROUND FLOOR DRAINAGE
P10.2 - FIRST FLOOR DRAINAGE
P10.3 - SECOND FLOOR DRAINAGE
P10.4 - ROOF PLAN
P20.1 - FIRST FLOOR SUPPLY
P20.2 - SECOND FLOOR SUPPLY
P30.1 - SECTIONS & DETAILS
52_P05-3
Sheets
P00.1 - LEGEND, SCHEDULES, GENERAL NOTES & DETAILS
P05.1 - BASEMENT FLOOR DRAINAGE DEMOLITION
P05.2 - FIRST FLOOR DRAINAGE DEMOLITION
P05.3 - SECOND FLOOR DRAINAGE DEMOLITION
P06.1 - SECOND FLOOR SUPPLY DEMOLITION
P10.1 - GROUND FLOOR DRAINAGE
P10.2 - FIRST FLOOR DRAINAGE
P10.3 - SECOND FLOOR DRAINAGE
P10.4 - ROOF PLAN
P20.1 - FIRST FLOOR SUPPLY
P20.2 - SECOND FLOOR SUPPLY
P30.1 - SECTIONS & DETAILS
52_P06-1
Sheets
P00.1 - LEGEND, SCHEDULES, GENERAL NOTES & DETAILS
P05.1 - BASEMENT FLOOR DRAINAGE DEMOLITION
P05.2 - FIRST FLOOR DRAINAGE DEMOLITION
P05.3 - SECOND FLOOR DRAINAGE DEMOLITION
P06.1 - SECOND FLOOR SUPPLY DEMOLITION
P10.1 - GROUND FLOOR DRAINAGE
P10.2 - FIRST FLOOR DRAINAGE
P10.3 - SECOND FLOOR DRAINAGE
P10.4 - ROOF PLAN
P20.1 - FIRST FLOOR SUPPLY
P20.2 - SECOND FLOOR SUPPLY
P30.1 - SECTIONS & DETAILS
52_P10-1
Sheets
P00.1 - LEGEND, SCHEDULES, GENERAL NOTES & DETAILS
P05.1 - BASEMENT FLOOR DRAINAGE DEMOLITION
P05.2 - FIRST FLOOR DRAINAGE DEMOLITION
P05.3 - SECOND FLOOR DRAINAGE DEMOLITION
P06.1 - SECOND FLOOR SUPPLY DEMOLITION
P10.1 - GROUND FLOOR DRAINAGE
P10.2 - FIRST FLOOR DRAINAGE
P10.3 - SECOND FLOOR DRAINAGE
P10.4 - ROOF PLAN
P20.1 - FIRST FLOOR SUPPLY
P20.2 - SECOND FLOOR SUPPLY
P30.1 - SECTIONS & DETAILS
52_P10-2
Sheets
P00.1 - LEGEND, SCHEDULES, GENERAL NOTES & DETAILS
P05.1 - BASEMENT FLOOR DRAINAGE DEMOLITION
P05.2 - FIRST FLOOR DRAINAGE DEMOLITION
P05.3 - SECOND FLOOR DRAINAGE DEMOLITION
P06.1 - SECOND FLOOR SUPPLY DEMOLITION
P10.1 - GROUND FLOOR DRAINAGE
P10.2 - FIRST FLOOR DRAINAGE
P10.3 - SECOND FLOOR DRAINAGE
P10.4 - ROOF PLAN
P20.1 - FIRST FLOOR SUPPLY
P20.2 - SECOND FLOOR SUPPLY
P30.1 - SECTIONS & DETAILS
52_P10-3
Sheets
P00.1 - LEGEND, SCHEDULES, GENERAL NOTES & DETAILS
P05.1 - BASEMENT FLOOR DRAINAGE DEMOLITION
P05.2 - FIRST FLOOR DRAINAGE DEMOLITION
P05.3 - SECOND FLOOR DRAINAGE DEMOLITION
P06.1 - SECOND FLOOR SUPPLY DEMOLITION
P10.1 - GROUND FLOOR DRAINAGE
P10.2 - FIRST FLOOR DRAINAGE
P10.3 - SECOND FLOOR DRAINAGE
P10.4 - ROOF PLAN
P20.1 - FIRST FLOOR SUPPLY
P20.2 - SECOND FLOOR SUPPLY
P30.1 - SECTIONS & DETAILS
52_P10-4
Sheets
P00.1 - LEGEND, SCHEDULES, GENERAL NOTES & DETAILS
P05.1 - BASEMENT FLOOR DRAINAGE DEMOLITION
P05.2 - FIRST FLOOR DRAINAGE DEMOLITION
P05.3 - SECOND FLOOR DRAINAGE DEMOLITION
P06.1 - SECOND FLOOR SUPPLY DEMOLITION
P10.1 - GROUND FLOOR DRAINAGE
P10.2 - FIRST FLOOR DRAINAGE
P10.3 - SECOND FLOOR DRAINAGE
P10.4 - ROOF PLAN
P20.1 - FIRST FLOOR SUPPLY
P20.2 - SECOND FLOOR SUPPLY
P30.1 - SECTIONS & DETAILS
52_P20-1
Sheets
P00.1 - LEGEND, SCHEDULES, GENERAL NOTES & DETAILS
P05.1 - BASEMENT FLOOR DRAINAGE DEMOLITION
P05.2 - FIRST FLOOR DRAINAGE DEMOLITION
P05.3 - SECOND FLOOR DRAINAGE DEMOLITION
P06.1 - SECOND FLOOR SUPPLY DEMOLITION
P10.1 - GROUND FLOOR DRAINAGE
P10.2 - FIRST FLOOR DRAINAGE
P10.3 - SECOND FLOOR DRAINAGE
P10.4 - ROOF PLAN
P20.1 - FIRST FLOOR SUPPLY
P20.2 - SECOND FLOOR SUPPLY
P30.1 - SECTIONS & DETAILS
52_P20-2
Sheets
P00.1 - LEGEND, SCHEDULES, GENERAL NOTES & DETAILS
P05.1 - BASEMENT FLOOR DRAINAGE DEMOLITION
P05.2 - FIRST FLOOR DRAINAGE DEMOLITION
P05.3 - SECOND FLOOR DRAINAGE DEMOLITION
P06.1 - SECOND FLOOR SUPPLY DEMOLITION
P10.1 - GROUND FLOOR DRAINAGE
P10.2 - FIRST FLOOR DRAINAGE
P10.3 - SECOND FLOOR DRAINAGE
P10.4 - ROOF PLAN
P20.1 - FIRST FLOOR SUPPLY
P20.2 - SECOND FLOOR SUPPLY
P30.1 - SECTIONS & DETAILS
52_P30-1
Sheets
P00.1 - LEGEND, SCHEDULES, GENERAL NOTES & DETAILS
P05.1 - BASEMENT FLOOR DRAINAGE DEMOLITION
P05.2 - FIRST FLOOR DRAINAGE DEMOLITION
P05.3 - SECOND FLOOR DRAINAGE DEMOLITION
P06.1 - SECOND FLOOR SUPPLY DEMOLITION
P10.1 - GROUND FLOOR DRAINAGE
P10.2 - FIRST FLOOR DRAINAGE
P10.3 - SECOND FLOOR DRAINAGE
P10.4 - ROOF PLAN
P20.1 - FIRST FLOOR SUPPLY
P20.2 - SECOND FLOOR SUPPLY
P30.1 - SECTIONS & DETAILS

File details come from the government source that posted it. Updated .