36E77619R0097-0005000.docx
DOCX document Posted
- Attached to
- Construct Clean Core (VA-19-00058573) Federal contract opportunity
- Solicitation number
- 36E77619R0097
About this file
This document provides information regarding a federal solicitation for construction services. The Department of Veterans Affairs intends to solicit bids and award a firm-fixed-price contract for construction of a clean core addition to the surgical suite at the Providence, Rhode Island VA Medical Center. The project scope involves constructing new surgery suite space and relocating existing suites within approximately 6,800 gross square feet of renovated and new construction. The solicitation will be set aside for Service-Disabled Veteran-Owned Small Businesses and issued as a Request for Proposal evaluated using Lowest Price Technically Acceptable procedures. The applicable NAICS code is 236220 with a size standard of $39.5 million. The period of performance is approximately 490 calendar days with an expected contract value between $5 million to $10 million.
36E77619R0097 0005 36E77619R0097 0005.docx
View the file
Other files for this federal contract opportunity
Show all 44
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 12-11-2019 650-337
PCAC
Department of Veterans Affairs Program Contracting Activity Central 6150 Oak Tree Blvd, Suite 300 Independence
OH
44131
PCAC
Department of Veterans Affairs Program Contracting Activity Central 6150 Oak Tree Blvd, Suite 300 Independence
OH
44131 To all Offerors/Bidders
36E77619R0097 10-25-2019
X X X
12/13/2019 2:00 PM ET.
X The purpose of this amendment is as follows:
1. To answer all technical questions (attached). Answers to questions 40-48 are added in this amendment.
2. To add Geotechnical Engineering Report
Additionally, please not that the Contracting Opportunities website incorrectly states the submission due date time.
Please ensure that proposals are submitted prior to 2:00 PM ET. on 12/13/2019 All other terms and conditions remain the same.
Andrew Neiss Contracting Officer
CONTINUATION PAGE
ITEM
NO.
| QUESTION |
| GOVERNMENT RESPONSE |
| 1. |
| There is a Vapor Barrier called out on D1/A40.1. I do not see this specified anywhere? |
| The detail calls for a Vapor Retarder, refer to Specification Section 07 27 27: Fluid Applied Membrane Air Barriers, Vapor Retarding |
| 1. |
| The is confusion on how the substrate board, vapor barrier, insulation, cover board is to be fastened. Normally we would fasten the coverboard thru all layers (see Section 07 22 00-7, paragraph 3.6c. Please advise. |
| In reviewing the specification, it states to follow the mechanically fastened requirements which allows you to fasten thru all layers. |
| 1. |
| The mention an alternate for EPDM roofing, Detail D1/A40.1. I do not see any specifications for this. |
See attached Specification Section 07 53 23
ETHYLENE – PROPYLENE – DIENE MONOMER ROOFING (EPDM)
| 1. |
| Are there any FM requirements for this project? |
Yes. FM (Factory Mutual) is listed as a requirement (or equivalence) in numerous VA construction requirements, including adopted Building Codes, VA Design Guides and VA Specifications. All VA requirements (including those adopted by reference) for a contract should be carefully reviewed to determine the extent of FM (or UL) applicability.
| 1. |
| Section 07 60 00 calls out many different types of metal for the roof edge, what would they prefer? |
Prefinished Aluminum to match the siding.
| 1. |
| Can access be provided at the site visit to open Manhole 1A which shows on Dwg ES05.1? |
| Yes |
| 1. |
| Can access be provided at the site visit for the Main Electrical Room in Wing E on Dwg ES10.1? |
| Yes |
| 1. |
| The plans do not have Room 219 outlined in bold grid to indicate part of scope of work but on the Finished schedule it does indicate new AT in this room. |
| Disregard reference to new AT at this location. Existing AT to remain |
| 1. |
| The plans have Room 220 (Corridor) outlined in bold to indicate new AT in this area but this room is not listed at all on the finished schedule. |
| The Bold outlines referenced are for spaces directly adjacent to, but not including Corridor 220 |
| 1. |
| The tile specified is Armstrong HealthZone which can be installed as a flush lay-in tile or a revealed edge tile. On the spec sheet, if we are reading correctly, says to have the tile to be revealed edge? But in other parts of the spec sheets it says for the tile to lay flush against the grid. Please clarify whether the VA wants square lay-in (flush) or revealed edge tile. (please clarify for both the SP area and all other areas). |
| Utilize Square Lay in (Flush against the grid) in all areas. |
| 1. |
| For spray fireproofing what is the rating, do we carry all columns, beams and how much roof decking. Some roof details show fireproofing and some not? Please clarify. |
All spray fireproofing to be 2-hour rated. This includes all metal decks, steel columns and steel beams.
| 1. |
| Will the Site Superintendent, if duly qualified, be permitted to also serve in the roles of CQC and SSHO or will a separate individual be required for either of those two roles? |
Yes, if the site superintendent is duly qualified he or she can also serve as CQC and SSHO
| 1. |
| Is this project Tax Exempt? If the project is sales tax exempt, will the government provide a sales tax exemption certificate to the awardee; with an applicable Government contract number? Please advise. |
Reference FAR clause 52.229-3 included in the solicitation. Offerors shall include all applicable federal, state and local taxes in their proposal submission.
| 1. |
| Are other manufacturers acceptable for the epoxy in the above mentioned project, or VA set on Tnemec? |
Other manufacturers that meet the performance criteria is acceptable. Please provide product data for approval
| 1. |
| We were invited to bid the above named project and was wondering if there is a plans holders list – or additional documents? |
| There is no plan holders list, a list of attendees of the site visit will be included as an amendment |
| 1. | |
| Specification SECTION 11 76 00 OPERATING ROOM EQUIPMENT AND MANAGEMENT SYSTEMS includes the following items | |
| a. | Surgical Booms |
| b. | Video cameras |
| c. | Monitor holders |
We did not find these items on the equipment schedule on drawing A72.1. Are these items provided and installed by the VA or by the Contractor? If they are provided and installed by the contractor please provide product / manufacturer information as this was not provided in the specifications. What manufacture is the basis of design?
These items are to be provided and installed by the Contractor.
A - Surgical Boom (A1122) is a Triple Arm Equipment Boom (located in Bronchoscopy) and indicated on the ceiling A70.2. The Basis of Design is: Ergon 3 as manufactured by Skytron
The Ceiling Mounted Equipment Arm (A1121) is also indicated on Drawing A70.2 in Bronchoscopy. The Basis of Design is: Spectra V Series Ceiling Pendant as manufactured by Amico
B – Video Cameras are described generically in the specifications Section 11 76 00
C – Monitor Holders location and number are described generically in Specification Section 11 76 00.
| 1. | |
| Drawing A72.1 Equipment schedule calls for the following items to be provided and installed by the contractor. | |
| • | Mark A1130 Cabinet, Control, Nitrogen |
| • | Mark A4015 Clock, Elapsed Time, Electric |
Please provide BOD and specification information for these items Elapsed time digital electric clock. Single display time that can be used either as a clock or elapsed time indicator. Clock consists of buttons to set minutes, and hours for the time. For use in operating and delivery room, and medical service columns. Analog or digital displays may be provided as specified by the user.
Nitrogen control cabinet. Unit consists of supply cut-off valve, supply pressure gauge, pressure regulator (adjustable 0 to 200 PSI), outlet pressure gauge, nitrogen outlet and connection to surgical gas column. Specify recessed or surface mounting. Designed for powering surgical pneumatic tools.
| 1. |
| What is the anticipated start date for this project? Will winter conditions cost be needed during foundation work? |
Due to the duration of the project, winter conditions are required
| 1. |
| Reference Drawing E50.1: The contractor is to replace a breaker rating plug in Switchboard #1 and to add a new breaker in Switchboard #4. Can these items of work be done with the switchboards “live” providing PPE is worn or must these switchboards be de-energized when performing this work? If they must be de-energized is this work to take place during “off” hours and will there be any loads which must be provided with temporary power during the outages? |
All “live” electrical work shall be authorized by VA Safety Department. VA Safety Dept. to verify if live work is acceptable for work breaker work described.
| 1. |
| Reference Drawing ES10.1: Key Note P02 indicates to extend the power and control feeders to the new location of the Pharmacy Chiller. Neither the size of the existing power feeder nor the existing control cabling is indicated. This information is required to properly size the conduit and conductors. Can this information be provided via an amendment? |
| 3#2/0+1#6G in 2”C main power feed. 2#10+1#10G control power feed. Two category 6 in 1”C for ATC connections. |
| 1. |
| Reference Drawing E50.1: Via an amendment, can the Key Notes P07 and P09 for the four (4) new Panels IPU-N-CYSTO, IPU-E-CYSTO1, IPU-E-CYSTO2 and CB-2-CC be verified for correctness in size of conductors and can the Key Note P12 be verified for the proper size and quantity of circuit breakers to be added in the existing Panel DP-CB-OR? |
| Panel IPU-N-CYSTO – Fed by new 45A circuit breaker in DP-N-OR via a new 2#6+1#10G in ¾”C. |
Panel IPU-E-CYSTO1 – Fed by new 45A circuit breaker in DP-CB-OR via a new 2#6+1#10G in ¾”C.
Panel IPU-E-CYSTO2 – Fed by new 45A circuit breaker in DP-CB-OR via a new 2#6+1#10G in ¾”C.
Panel CB-2-CC – Fed by new 100A circuit breaker in DP-CB-OR via a new 4#1+1#8G in 1 1/2”C.
| 1. |
| Reference Drawing ES10.1: On the drawing it is indicated to reutilize the existing circuit to feed the New Steam Generator. The size of the existing feeder is not indicated. Can this information be provided via an amendment? |
| 2#10+1#10G in ¾”C for control. Two category 6 in 1”C for ATC connections. |
| 1. |
| This is no specification for the movable shelves in room 258 clean & sterile supply shown on drawings A10.5 & A72.2 or are these shelves to be furnished & installed by the VA. Please advise. |
| The shelves are to be provided and installed by the VA. The rail installation will need to be coordinated with the VA |
| 1. |
| Room finish schedule on drawing A61.1 room 250 bronchoscopy call for res-w wall finish there is in res-w on the finish legend please provide finish required. |
| Harriman Response: The res-w tag is incorrect and should be changes to read GWB (SC)-1 |
| 1. |
| Is there any finish required for the exterior gyp. Ceilings, beams & columns? |
| Harriman Response: The exterior gyp ceilings, beams and columns are to be painted per specification section 090600. Paint to be exterior with one coat of primer and 2 coats of finish paint. Color to be selected by Architect from manufacturer’s standard colors. |
| 1. |
| On Page a71.1 room 211 shows epoxy floor in locker room, the finish schedule on a61.1 calls for WSF ? Please advise which flooring is correct? |
| The flooring in Room 211 is epoxy and is shown correctly on the A71.1. |
| 1. |
| On page a71.1 room 256 the finish plan shows sheet vinyl, and the finish schedule calls for Epoxy floors? |
| Room 256 is to have Epoxy flooring, per the finish schedule. |
| 1. |
| There are numerous hardware sets in section 087100, but the door schedule does not list any hardware sets. |
| The doors were embedded inside the specification, however, during the course of our review we noticed that one door was missing, so for clarity we have updated and attached the following: |
08 71 00 Door Hardware Specification SKA01 – Revised Enlarges Second Floor Plan SKA02 – Revised Door Schedule SKA03 – Revised Floor Plan
| 1. |
| Is the use of MC allowed above ceilings and in partitions? |
| No, provide conductors in conduit per the specification. |
| 1. |
| David Wyman Jr. stated that Wyman & Sons does not currently have the contract to maintain the fire alarm system. Can the subcontractor bidding electrical furnish and install the fire alarm system rather than sub-contract through Wyman & Sons? If they have done fire alarm work at the VA before without having to contract through Wyman & Sons. |
| The GC is free to hire an electrical subcontractor who does the wiring per the wiring/color coding conventions outlined in the system functional description. Fire Systems Inc (FSI) is required to do programing, etc. FSI Contact: |
Fire Systems Inc.
955 Reed Road Dartmouth, MA 02747 O: 508-999-4444 F: 508-996-2828
| 1. |
| Plan E30.1 in Room #250 & E40.1 Detail #3 shows an "N" symbol. What does the symbol "N" stand for? |
| Nurse call station connected to existing nurse call system serving the area. |
| 1. |
| Who is relocating the pad mount transformer as noted on plan ES10.1 Note #P06? |
| Transformer relocation is part of division 26 scope of work. |
| 1. |
| Who is furnishing and installing the video monitors as noted on plan E20.1 keyed note #P08? |
| VA to furnish and install video monitors Power and data cabling to monitors is part of division 26 scope of work. |
| 1. |
| Who is furnishing and installing the baseplate as shown on plan E40.1 Detail #3? |
| The VA will furnish the baseplate the Contractor is to install |
| 1. |
| Plan E00.2 Detail #1 ductbank section "B" shows (4)-4"C, but one-line only shows (2)-4" & (2)-1/2" being run underground. Please advise. |
| Provide 4” conduits for ductbank section of circuit routing. One-line conduit sizes to be followed for circuit routing other than the ductbank portion. |
| 1. |
| Plan ES10.1 Key Note # P09 notes feeder sizes and quantity of conductors for temporary service. Should this be (16)350's in (4)-4" and not (3)-4"? |
| Yes. |
| 1. |
| Demolition schedule code D06 on drawing A05.2 calls for demolition of existing window, frame, or louver, refer to hazardous materials report but a hazardous materials report was not provided with the solicitation. Please advise. |
| See attached |
Hazardous Materials Report prepared by Bock and Clark
| 1. |
| The solicitation does not call for the bidder to provide a project schedule with the submission. Please confirm a project schedule is not required with the bid submission. |
| A project schedule is not required with a bid submission. |
| 1. |
| Please provide tie-in location for nitrogen piping. Where does the new piping tie into the existing? How do we tie in the new N2 panel? |
| Refer to sketch SKA4 for the nitrogen control panel and associated piping. |
| 1. |
| According to paragraph 3.1.1 & 3.1.2 of the geotechnical report the topsoil and fill is not suitable for supporting the proposed structure in its current condition. Please confirm that bidders are to carry cost to remove and export all fill to below bottom of footing elevation and place new structural fill meeting proper compaction requirements. |
| Please disregard the Pare Geotech Report included in the Bid Documents is incorrect and was submitted in April 2008 for the OR addition and replace with the Terracon GeoTechnical Report which was included with Harriman’s final report dated February 22, 2019 and is attached here for reference. |
| 1. |
| Excavation for footings along the building are at or above the existing bottom of footing elevations and will not undermine the existing building. Shoring is not required. Please confirm this is a correct statement. Shoring is only required for the existing W12x40 column per foundation note 11 on drawing S10.1. |
| Referencing the updated geotechnical report and supplemental letter provided in Question 40, the statement as written is correct. |
| 1. |
| Notes on P20.0 state the contractor shall make provisions to provide temporary services to all spaces in the facility prior to shutdown of med gas utilities. Utilities include med air, oxygen, C02, Vacuum, nitrogen and N02. WE do not believe the contractor could make reasonable provisions for temporary services for all of these services and without full understanding of the points of shutoff or the needs of the patients, and typically would be something the VA would need to provide. Shutdowns may be able to be coordinated or limited to times that the services are not being used. |
| The bid documents indicate the existing system and valves on the systems. The documents were created with survey information as well as VA documents created in 2012 labeled “BUILDING 1 MEDICAL GAS SURVEY PROJECTNO. 650-11-032. |
Shut-downs must be coordinated with the VA as indicated by the notes on drawing P20.2.
| 1. |
| Drawing P06.1 shows demolition of existing services from zone valve which appear to be capped at main which would require shutdown of med air systems. Alternately the services could be capped following zone valve except for the nitrogen piping being capped. |
| Remove the zone valves since they would not serve a purpose. |
| 1. |
| Drawing P20.0 shows the tie in of new services to existing and extension of the piping into the new addition. Shutdown would also be needed for these, unless VA would consider use of SmartTap technology to make live tie ins (not allowed in specification). |
| The specification allows the use of memory metal couplings. SmartTap is not stated by name. |
Live shut-downs will be required to perform with scope of work.
| 1. | |
| Amendment 3 question 28 references the following documents but thy have not been provided with the addendum | |
| a. | 08 71 00 Door Hardware Specification |
| b. | SKA01 – Revised Enlarges Second Floor Plan |
| c. | SKA02 – Revised Door Schedule |
| d. | SKA03 – Revised Floor Plan |
| Sketch and Specification was included in Amendment 0004 |
| 1. |
| Amendment 3 question 39 references sketch SKA4 but no sketch was provided |
| Sketch was included in Amendment 0004 |
| 1. |
| The door schedule on drawing A60.1 lists 28 openings but the floor plans A10.2, A10.4 & A10.5 only show 19 openings. Please advise how many door openings are we to include in the bid? Do we go by the floor plans or the door schedule. |
| There are 28 openings. Sheet A10.2 calls out 27 openings. One tag (Door 210) is shown on A10.6. Please refer to the response for Question 28. |
| 1. |
| Drawing A20.1 calls out the metal panel as aluminum but the wall types n A40.1 call the panel material copper. Specification 07 40 00 call for aluminum. Please advise on if the panels are copper or aluminum. |
| The intent of the design is for the base bid to be Copper Panels. Aluminum panels should have been identified as a deduct alternate. However, the VA is not requesting pricing for deduct alternates at this time, so the offeror’s bid should reflect Copper Panels. |
SOLICITATION 36E77619R0097 Construct Clean Core Addition Surgical Suite Construction – Providence, RI- TECHNICAL QUESTIONS AND VA RESPONSE TRACKING SHEET
See attached document: Question 40 - Providence VAMC.geotech report.