36E77619R0097-009.pdf
PDF 21 MB Posted
- Attached to
- Construct Clean Core (VA-19-00058573) Federal contract opportunity
- Solicitation number
- 36E77619R0097
About this file
This document provides details of a forthcoming solicitation for construction services. The Department of Veterans Affairs intends to solicit fixed-price bids to construct a clean core addition and surgical suite renovations at its Providence, Rhode Island medical center. The project scope involves building approximately 3,900 gross square feet of new space in a second floor addition and renovating 2,900 gross square feet of existing areas adjacent to the operating rooms. Work must be completed according to the drawings and specifications for project number 650-337 while keeping the existing operating rooms and post-anesthesia care unit accessible at all times. The solicitation will be a service-disabled veteran-owned small business set-aside issued as a request for proposal in accordance with FAR Parts 15, 19, and 36 and evaluated using lowest price technically acceptable procedures. The North American Industry Classification System code is 236220 with a size standard of $39.5 million. The period of performance is expected to be approximately 490 calendar days. The anticipated value of construction is between $5 million and $10 million.
36E77619R0097 Attachment 6 - Architectural Plans.pdf
View the file
Other files for this federal contract opportunity
Show all 44
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
PLAN - SECTION
A1
VIEW TITLE
VIEW SCALE
VIEW TITLE
BUILDING SECTION
WALL SECTION
EXTERIOR ELEVATION
INTERIOR ELEVATION
DETAIL
THE FOLLOWING APPLIES TO THE
MARKERS ABOVE:
A1
A25.1
A1
A30.1
A1
A20.1
A3A1
A2
A4
A81.1
A1
A50.1
A1
A25.1
A1
A50.1
INDICATES ELEVATION, SECTION
OR DETAIL NUMBER
SEE TITLE BLOCK FOR GRAPHIC SCALE
INDICATES ELEVATION, SECTION
OR DETAIL NUMBER
INDICATES DRAWING SHEET ON
WHICH ELEVATION, SECTION OR
DETAIL IS SHOWN
COLUMN REFERENCE GRID
LEVEL LINE
WALL OR PARTITION TYPE
ROOM NAME AND NUMBER
EQUIPMENT OR FURNITURE NUMBER
DOOR OR BORROW LIGHT NUMBER
WINDOW TYPE
REVISION CLOUD
CEILING TYPE AND HEIGHT AFF
ROOM NAME
FLOOR FINISH
PROJECT NORTH
10'-0"
ACT1
VCT3
# KEYNOTE OR MATERIAL TAG
PLAN - SECTION
ELEVATIONS
SPECIAL INDICATIONS
PARTITION CONSTRUCTION - PLAN
EARTH
POROUS FILL
(STONE OR GRAVEL, ETC)
ROCK
LIGHTWEIGHT CONCRETE
(OR CONCRETE FILL)
BRICK (COMMON OR FACE)
CONCRETE MASONRY UNITS
METAL (LARGE SCALE)
PLYWOOD (LARGE SCALE)
WOOD, FINISHED
WOOD, ROUGH
INSULATION (LOOSE OR BATT)
INSULATION (RIGID)
GLASS (LARGE SCALE)
CERAMIC TILE
GYPSUM WALL BOARD
(FIBERBOARD, ETC)
PLASTER, SAND, CEMENT, GROUT
STRUCTURAL CONCRETE
(CAST-IN-PLACE, PRECAST, ETC)
ACOUSTICAL TILE
RESILIENT FLOORING
METAL (SMALL SCALE)
CONCRETE, PLASTER
SHEET METAL
GLAZING
BRICK
STEEL STUD
EXISTING TO REMAIN
WOOD STUD
EXISTING TO BE REMOVED
CMU
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Auburn, ME
207.784.5100
Boston, MA
617.426.5050
Portland, ME
207.775.0053
Portsmouth, NH
603.626.1242 c HA PROJECT NUMBER: 13586
CONSTRUCT CLEAN CORE ADDITION TO
SURGICAL SUITE
PROVIDENCE, RHODE ISLAND
650-337
C U s e rs
\m m o u e \D o c u m e n ts
R e v it
L o c a ls \1
-a rc h -c e n tr a l_ m m o u e
.r v t
/2
/2
:1
:5
A
M
A00.1
ABBREVIATIONS AND LEGENDS
02-22-19 MMO CMP
FINAL CONSTRUCTION
DOCUMENTS
A2
CONTRACT DRAWING ABBREVIATIONS
NO SCALE
A5
GRAPHIC SYMBOLS LEGEND
NO SCALE
A6
MATERIALS LEGEND
NO SCALE
RL ROOF LEADER
RM ROOM
RO ROUGH OPENING
ROW RIGHT OF WAY
RR RETURN REGISTER
S SANITARY
S SOIL
S SOUTH
S STEAM
SA SUPPLY AIR
SD SMOKE DAMPER
SD STORM DRAIN
SDMH STORM DRAIN MANHOLE
SEC SECTION
SF SUPPLY FAN
SG SUPPLY GRILLE
SHT SHEET
SIM SIMILAR
SK SINK
SMU SOLID MASONRY UNIT
SPEC SPECIFICATION (S)
SPF SPRUCE PINE FIR
SQ SQUARE
SR SUPPLY REGISTER
SS STAINLESS STEEL
SSK SERVICE SINK
STD STANDARD
STL STEEL
STOR STORAGE
SYM SYMMETRY (ICAL)
SYS SYSTEM
T TREAD
T&G TONGUE & GROOVE
T'STAT THERMOSTAT
TB TEST BORING
TD TRANSFER DUCT
TD TRENCH DRAIN
TEL TELEPHONE
TG TRANSFER GRILLE
THK THICK (NESS)
TKBD TACKBOARD
TL TOTAL LOAD
TOC TOP OF CONCRETE
TOF TOP OF FOOTING
TOS TOP OF STEEL
TP TEST PIT
TPTN TOILET PARTITION
TV TELEVISION
TYP TYPICAL
UD UNDERDRAIN
UGD
UNDERGROUND
DUCTWORK
UH UNIT HEATER
UNO
UNLESS NOTED
OTHERWISE
UR URINAL
UV UNIT VENTILATOR
V VENT
VAV VARIABLE AIR VOLUME
VB VINYL BASE
VCT VINYL COMPOSITION TILE
VD VOLUME DAMPER
VERT VERTICAL
VF VINYL FABRIC
VTR VENT THRU ROOF
W WEST, WIDTH, WIDE
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WCH WATER CLOSET HANDICAP
WCO WALL CLEANOUT
WD WOOD
WG WALL GRILLE
WH WALL HUNG
WIN WINDOW
WP WORKING POINT
WR WALL REGISTER
WWF WELDED WIRE FABRIC
LB (S) POUNDS
LD LINEAR DIFFUSER
LD LINED DUCT
LF LAWN FAUCET
LF LINEAL FEET
LG LONG
LL LIVE LOAD
LPS LOW PRESSURE STEAM
LTG LIGHTING
LTL LINTEL
LTW LOW TEMPERATURE STEAM
LW LIMIT OF WORK
M METER (S)
MAS MASONRY
MAX MAXIMUM
MBH
1000 BRITISH THERMAL
UNIT
MD MANUAL DAMPER
MD MOTORIZED DAMPER
MECH MECHANICAL
MED MEDIUM
MET METAL
MFR MANUFACTURE (R)
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MM MILLIMETER (S)
MO MASONRY OPENING
MR MOP RECEPTOR
MT METAL THRESHOLD
MTD MOUNTED
N NORTH
NA NOT APPLICABLE
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NORMALLY OPEN
No NUMBER
NS NEAR SIDE
NTS NOT TO SCALE
OC ON CENTER (S)
OD OUTSIDE DIAMETER
OED OPEN END DUCT
OFF OFFICE
OH OVERHEAD
OPG OPENING
OPH OPPOSITE HAND
OPP OPPOSITE
P PLATE
P PLUMBING
P PUMP
PAR PARALLEL
PFN PREFINISHED
PL PROPERTY LINE
PLAM PLASTIC LAMINATE
PNL PANEL
PNT PAINT (ED)
PP POINT TO POINT
PSF
POUNDS PER SQUARE
FOOT
PSI POUNDS PER SQUARE INCH
PT POINT
PTN PARTITION
PVC POLYVINYL CHLORIDE
PWD PLYWOOD
PWG POLISHED WIRE GLASS
QT QUARRY TILE
R RISER
RA RETURN AIR
RAD RADIATION
RAD RADIUS
RB RUBBER BASE
RD ROOF DRAIN
REF REFERENCE
REFR REFRIGERATOR
REV REVISION (S)
RG RETURN GRILLE
DWG DRAWING
E EAST
EB EXPANSION BOLT
EF EXHAUST FAN
EIFS
EXTERIOR INSULATED
FINISH SYSTEM
EJ EXPANSION JOINT
EL ELEVATION (S)
ELEC ELECTRIC (AL)
EM ELECTRIC MANHOLE
EP ELECTRIC PANEL
EQ EQUAL
ER EXHAUST REGISTER
ES EACH SIDE
EST ESTIMATE
EWC ELECTRIC WATER COOLER
EXG EXISTING
EXP EXPANSION
EXT EXTERIOR
FA FIRE ALARM
FAI FRESH AIR INTAKE
FC FLEXIBLE CONNECTION
FCO FLOOR CLEANOUT
FD FIRE DAMPER
FD FLOOR DRAIN
FD FOUNDATION DRAIN
FE FIRE EXTINGUISHER
FHS FIRE HOSE STATION
FIN FINISH (ED)
FL FINISH LENGTH
FLG FLASHING
FLR FLOOR (ING)
FOC FACE OF CONCRETE
FOS FACE OF STUD
FRR FLOOR RETURN REGISTER
FS FAR SIDE
FTG FOOTING
FY
MINIMUM YIELD STRESS
(KSI)
GA GAGE, GAUGE
GALV GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACT (OR)
GL GLASS
GPDW GYPSUM DRY WALL
GPM GALLONS PER MINUTE
GV GATE VALVE
H HARDENER
HB HOSE BIB
HD HUB DRAIN
HM HOLLOW METAL
HORIZ HORIZONTAL
HPS HIGH PRESSURE STEAM
HT HEIGHT
HTG HEATING
HTW HOT TEMPERATURE WATER
HVAC
HEATING - VENTILATING -
AIR CONDITIONING
HW HOT WATER
HYD HYDRANT
ID INSIDE DIAMETER
INS INSULATE (D) (ION)
INT INTERIOR
INV INVERT
IPS IRON PIPE SIZE
JC JANITOR'S CLOSET
JT JOINT
K KIPS
KIT KITCHEN
KSI KIPS PER SQUARE INCH
LAB LABORATORY
LAM LAMINATE (D)
LAV (L) LAVATORY
A/C AIR CONDITIONING
AB ANCHOR BOLT
ABT ABOUT
AC ACOUSTICAL
ACB ABOVE CEILING BELOW
ACT ACOUSTICAL TILE
AD ACCESS DOOR
ADJ ADJUSTABLE
AFF ABOVE FINISH FLOOR
AFG ABOVE FINISH GRADE
AL ACOUSTICAL LINING
AL ALUMINUM
ALT ALTERNATE
AP ACCESS PANEL
APX APPROXIMATE
ARCH ARCHITECT (URAL)
B/W BOTTOM OF WALL
BD BOARD
BDD BACKDRAFT DAMPER
BIT BITUMINOUS
BJ BAR JOIST
BLDG BUILDING
BLKG BLOCKING
BM BENCH MARK
BOF BOTTOM OF FOOTING
BOT BOTTOM
BP BEARING PLATE
BSMT BASEMENT
BSP BASE PLATE
BTU BRITISH THERMAL UNIT
CAB CABINET
CB CATCHBASIN
CD CEILING DIFFUSER
CEM CEMENT (ITIOUS)
CER CERAMIC
CF CUBIC FEET
CFM CUBIC FEET PER MINUTE
CG CEILING GRILLE
CHBD CHALKBOARD
CHT CEILING HEIGHT
CHWS CHILLED WATER SUPPLY
CI CAST IRON
CJT CONTROL JOINT
CL CLOSET
CLG CEILING
CM CENTIMETER (S)
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY UNIT
CO CLEANOUT
COL COLUMN
CONC CONCRETE
CONN CONNECT
CONST CONSTRUCTION
CONT CONTINUE (OUS)
CONTR CONTRACT (OR)
CORR CORRUGATED
CPT CARPET (ED)
CR CONDENSATE RETURN
CT CERAMIC TILE
CUH CABINET UNIT HEATER
CULV CULVERT
CV CONVECTOR
CW COLD WATER
CY CUBIC YARD
DF DOUGLAS FIR
DF DRINKING FOUNTAIN
DG DOOR GRILLE
DH DOUBLE HUNG
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DIV DIVISION
DL DEAD LOAD
DMT DEMOUNTABLE
DN DOWN
DTL DETAIL
DW DUCT WRAP
ANGLE
CENTERLINE
CHANNEL
DIAMETER
PLATE
SQUARE
SYMBOLS USED AS ABBREVIATIONS
L
O
PL
Revisions: Date:
DN
PHASING / CONSTRUCTION:
1A. MOBILIZE SITE, REFER TO SITE DRAWINGS.
CONSTRUCT NEW CHILLER PADS, INSTALL NEW
O.R. & PHARMACY CHILLER PIPING, MAKE
OPERATIONAL, SWITCH ONLINE. REFER TO
MECHANICAL DRAWINGS.
1B. (B) REMOVE EXISTING CHILLERS. RELOCATE
EXISTING PHARMACY CHILLER, TURN OVER
PHARMACY CHILLER AND SWITCH ONLINE.
REMOVE EXISTING ELECTRICAL MECHANICAL
UNDERGROUND UTILITIES ASSOCIATED WITH
EXISTING CHILLERS. REFER TO ELECTRICAL AND
MECHANICAL DRAWINGS
2A. INSTALL TEMPORARY PARTITION TO
AREA SHOWN IN EXISTING O.R. STORAGE TO
CREATE STERILE ENVIRONMENT FOR ACCESS TO
EXISTING DORNACH VACUUM MACHINE
DRAINAGE AND STERILIZATION DOCKING STATION.
WORK TO BE PERFORMED ON OFF HOURS AND
WEEKENDS ONLY. DEMOLISH EXISTING DOOR,
WALL AND TEMPORARY WALL AFTER PHASE 2B IS
COMPLETE.
2B PERFORM SITE EXCAVATION, DEMOLISH
UNDERGROUND UTILITIES, INSTALL NEW
UTILITIES. REFER TO SITE, MECHANICAL,
ELECTRICAL, AND PLUMBING DRAWINGS.
CONSTRUCT CLEAN CORE FOOTING &
FOUNDATIONS. REFER TO STRUCTURAL
DRAWINGS. COMMENCE WITH CLEAN CORE STEEL
ERECTION, FLOOR FRAMING/SLABS, AND
ELEVATOR SHAFTS. REFER TO STRUCTURAL AND
ARCHITECTURAL DRAWINGS. CLEAN CORE ROOF
CONSTRUCTION: INSULATE, INSTALL NEW
MEMBRANE, TIE-INTO EXISTING O.R. REFER TO
ARCHITECTURAL DRAWINGS
CLEAN CORE EXTERIOR WALLS, WEATHER
PROOFING. REFER TO ARCHITECTURAL
DRAWINGS. COMMENCE WITH INTERIOR
PARTITIONING/FRAMING & GYPSUM DRYWALLING.
COMMENCE WITH INTERIOR UTILITIES:
ELECTRICAL, PLUMBING, HVAC, FIRE PROTECTION.
REFER TO ELECTRICAL, PLUMBING, MECHANICAL
AND FIRE PROTECTION DRAWINGS. PHASE TWO
MUST BE COMPLETE PRIOR TO OTHER PHASES
COMMENCING.
3. MAKE CONNECTION FROM NEW CLEAN CORE TO
EXISTING PACU. REFER TO ARCHITECTURAL
DRAWINGS. WORK SHALL BE PERFORMED OFF
HOURS AND WEEKENDS ONLY.
4. PERFORM WORK AT FLASH STERILE
VESTIBULES. A, B, C, D, ONLY ONE O.R. DOWN AT
A TIME. REFER TO ARCHITECTURAL DRAWINGS.
WORK SHALL BE PERFORMED OFF HOURS AND
WEEKENDS ONLY.
5A. INSTALL NEW DOOR AS SHOWN. REFER TO
ARCHITECTURAL PLAN. FILL IN EXISTING DOOR
OPENING TO O.R. SEMI RESRICTED CORRIDOR
AREA. RENOVATE TEMPORARY ANESTHESIA
WORK AREA. WORK SHALL BE
PERFORMED OFF HOURS AND WEEKENDS ONLY.
5. TAKE AREA OF EXISTING ANESTHESIA
WORKROOM & SUPPLIES AND REVISE TO MALE
LOCKERS. REFER TO ARCHITECTURAL
DRAWINGS.
6. REVISE EXISTING O.R. STERILE STORAGE AND
CONVERT TO NEW ANESTHESIA WORKROOM.
REFER TO ARCHITECTURAL DRAWINGS.
WORK SHALL BE PERFORMED OFF
HOURS AND WEEKENDS ONLY.
7. RENOVATE EXISTING CYSTOSCOPY AND
REVISE TO FEMALE LOCKERS. REFER TO
ARCHITECTURAL DRAWINGS. PLUMBING WORK
SHALL BE PERFORMED ON OFF HOURS AND
WEEKENDS ONLY.
GENERAL NOTE:
1. OPERATING ROOM (O.R.) AND POST-ANESTHESIA
CARE UNIT (P.A.C.U.) SHALL REMAIN OPEN AND
ACCESSIBLE AT ALL TIMES DURING CONSTRUCTION.
ANY WORK DONE IN THESE AREAS SHALL BE
PERFORMED ON OFF HOURS AND WEEKENDS ONLY.
COORDINATE ALL PHASING & CONSTRUCTION WITH VA
CONTRACTING OFFICER'S REPRESENTATIVE (C.O.R.)
AND ARCHITECT, IF WORK REQUIRES AN SHUTDOWN
AND CANNOT BE PERFORMED OFF HOURS, WEEKENDS,
OR FEDERAL HOLIDAYS, A 28 DAY NOTICE IN ADVANCE
MUST BE SUBMITTED TO THE PROVIDENCE VA MEDICAL
CENTER (P.V.A.M.C.), COR, AND ARCHITECT.
2. NORMAL HOURS OF OPERATION OF THE O.R. AND
P.A.C.U. ARE MONDAY THROUGH FRIDAY, 6AM TO 7 PM.
3. DURING CONSTRUCTION, IF EXISTING CEILINGS ARE
BEING REMOVED, GENERAL CONTRACTOR SHALL
INSTALL TEMPORARY UPRIGHT SPRINKLER HEADS TO
MAINTAIN COVERAGE.
LEGEND:
DUST PARTITION: 1 HOUR RATED WALL
SIMILAR TO 123 PARTITION TYPE AS SHOWN
ON A40.1.
PHASE
2"
PHASE 1(B)
PHASE 1(A)
PHASE 2B
PHASE 2B
PHASE 2B
PHASE 2B
5'
NEW O.R. CHILLER
NEW O.R. CHILLERFUTURE
NEW
PHARMACY
CHILLER
EXISTING
PHARMACY
CHILLER
EXISTING O.R.
CHILLER
EXISTING O.R.
CHILLER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Auburn, ME
207.784.5100
Boston, MA
617.426.5050
Portland, ME
207.775.0053
Portsmouth, NH
603.626.1242 c HA PROJECT NUMBER: 13586
CONSTRUCT CLEAN CORE ADDITION TO
SURGICAL SUITE
PROVIDENCE, RHODE ISLAND
650-337
C U s e rs
\m m o u e \D o c u m e n ts
R e v it
L o c a ls \1
-a rc h -c e n tr a l_ m m o u e
.r v t
/2
/2
:1
:0
A
M
A01.1
GROUND FLOOR PHASING PLAN
02-22-19 MMO CMP
FINAL CONSTRUCTION
DOCUMENTS
PHASING / CONSTRUCTION:
1A. MOBILIZE SITE, REFER TO SITE DRAWINGS.
CONSTRUCT NEW CHILLER PADS, INSTALL NEW
O.R. & PHARMACY CHILLER PIPING, MAKE
OPERATIONAL, SWITCH ONLINE. REFER TO
MECHANICAL DRAWINGS.
1B. (B) REMOVE EXISTING CHILLERS. RELOCATE
EXISTING PHARMACY CHILLER, TURN OVER
PHARMACY CHILLER AND SWITCH ONLINE.
REMOVE EXISTING ELECTRICAL MECHANICAL
UNDERGROUND UTILITIES ASSOCIATED WITH
EXISTING CHILLERS. REFER TO ELECTRICAL AND
MECHANICAL DRAWINGS
2A. INSTALL TEMPORARY PARTITION TO
AREA SHOWN IN EXISTING O.R. STORAGE TO
CREATE STERILE ENVIRONMENT FOR ACCESS TO
EXISTING DORNACH VACUUM MACHINE
DRAINAGE AND STERILIZATION DOCKING STATION.
WORK TO BE PERFORMED ON OFF HOURS AND
WEEKENDS ONLY. DEMOLISH EXISTING DOOR,
WALL AND TEMPORARY WALL AFTER PHASE 2B IS
COMPLETE.
2B PERFORM SITE EXCAVATION, DEMOLISH
UNDERGROUND UTILITIES, INSTALL NEW
UTILITIES. REFER TO SITE, MECHANICAL,
ELECTRICAL, AND PLUMBING DRAWINGS.
CONSTRUCT CLEAN CORE FOOTING &
FOUNDATIONS. REFER TO STRUCTURAL
DRAWINGS. COMMENCE WITH CLEAN CORE STEEL
ERECTION, FLOOR FRAMING/SLABS, AND
ELEVATOR SHAFTS. REFER TO STRUCTURAL AND
ARCHITECTURAL DRAWINGS. CLEAN CORE ROOF
CONSTRUCTION: INSULATE, INSTALL NEW
MEMBRANE, TIE-INTO EXISTING O.R. REFER TO
ARCHITECTURAL DRAWINGS
CLEAN CORE EXTERIOR WALLS, WEATHER
PROOFING. REFER TO ARCHITECTURAL
DRAWINGS. COMMENCE WITH INTERIOR
PARTITIONING/FRAMING & GYPSUM DRYWALLING.
COMMENCE WITH INTERIOR UTILITIES:
ELECTRICAL, PLUMBING, HVAC, FIRE PROTECTION.
REFER TO ELECTRICAL, PLUMBING, MECHANICAL
AND FIRE PROTECTION DRAWINGS. PHASE TWO
MUST BE COMPLETE PRIOR TO OTHER PHASES
COMMENCING.
3. MAKE CONNECTION FROM NEW CLEAN CORE TO
EXISTING PACU. REFER TO ARCHITECTURAL
DRAWINGS. WORK SHALL BE PERFORMED OFF
HOURS AND WEEKENDS ONLY.
4. PERFORM WORK AT FLASH STERILE
VESTIBULES. A, B, C, D, ONLY ONE O.R. DOWN AT
A TIME. REFER TO ARCHITECTURAL DRAWINGS.
WORK SHALL BE PERFORMED OFF HOURS AND
WEEKENDS ONLY.
5A. INSTALL NEW DOOR AS SHOWN. REFER TO
ARCHITECTURAL PLAN. FILL IN EXISTING DOOR
OPENING TO O.R. SEMI RESRICTED CORRIDOR
AREA. RENOVATE TEMPORARY ANESTHESIA
WORK AREA. WORK SHALL BE
PERFORMED OFF HOURS AND WEEKENDS ONLY.
5. TAKE AREA OF EXISTING ANESTHESIA
WORKROOM & SUPPLIES AND REVISE TO MALE
LOCKERS. REFER TO ARCHITECTURAL
DRAWINGS.
6. REVISE EXISTING O.R. STERILE STORAGE AND
CONVERT TO NEW ANESTHESIA WORKROOM.
REFER TO ARCHITECTURAL DRAWINGS.
WORK SHALL BE PERFORMED OFF
HOURS AND WEEKENDS ONLY.
7. RENOVATE EXISTING CYSTOSCOPY AND
REVISE TO FEMALE LOCKERS. REFER TO
ARCHITECTURAL DRAWINGS. PLUMBING WORK
SHALL BE PERFORMED ON OFF HOURS AND
WEEKENDS ONLY.
GENERAL NOTE:
1. OPERATING ROOM (O.R.) AND POST-ANESTHESIA
CARE UNIT (P.A.C.U.) SHALL REMAIN OPEN AND
ACCESSIBLE AT ALL TIMES DURING CONSTRUCTION.
ANY WORK DONE IN THESE AREAS SHALL BE
PERFORMED ON OFF HOURS AND WEEKENDS ONLY.
COORDINATE ALL PHASING & CONSTRUCTION WITH VA
CONTRACTING OFFICER'S REPRESENTATIVE (C.O.R.)
AND ARCHITECT, IF WORK REQUIRES AN SHUTDOWN
AND CANNOT BE PERFORMED OFF HOURS, WEEKENDS,
OR FEDERAL HOLIDAYS, A 28 DAY NOTICE IN ADVANCE
MUST BE SUBMITTED TO THE PROVIDENCE VA MEDICAL
CENTER (P.V.A.M.C.), COR, AND ARCHITECT.
2. NORMAL HOURS OF OPERATION OF THE O.R. AND
P.A.C.U. ARE MONDAY THROUGH FRIDAY, 6AM TO 7 PM.
3. DURING CONSTRUCTION, IF EXISTING CEILINGS ARE
BEING REMOVED, GENERAL CONTRACTOR SHALL
INSTALL TEMPORARY UPRIGHT SPRINKLER HEADS TO
MAINTAIN COVERAGE.
LEGEND:
DUST PARTITION: 1 HOUR RATED WALL
SIMILAR TO 123 PARTITION TYPE AS SHOWN
ON A40.1.
PHASE
CLEAN AND STERILE
SUPPLY
EQUIPMENT STORAGE
MECHANICAL
CYSTOSCOPY
SEMI RESTRICTED
CORRIDOR
A-EL-3
FUTURE
CLEAN
EL.
A-EL-2
FUTURE
CLEAN
EL.
CLEAN AND STERILE
SUPPLY
CC STORAGE
255A
NURSE
MANAGER
OFFICE
SOILED UTILITY
IUSS
EQUIPMENT
STORAGE
WORK AREA
CONTROL STATION
MALE LOCKERS
ANGIOPLASTY
OR-1
OR-2
OR-3
HOUSE KEEPING
215G
SCRUB
210A
SCRUB
210B
OR ACCESS VESTIBULE
OR ACCESS VESTIBULE
OBSERVATION
ROOM
PACU
NURSE STATION
215A
PATIENT
TOILET
CORRIDOR
C223
STAIR-K
K-2
STAFF
TOILET/SHOWER
1ST STAGE
RECOVERY
PRE-OP
HOLDING
215F
PATIENT
TOILET
215E
PATIENT
LOCKERS
215D
VESTIBULE
215C
CLEAN
UTILITIES
MINOR
PROCEDURE
215B
SOILED
UTILITIES
229A
IT
CLOSET
OFFICE
2-DC-1A
CORRIDOR
LINEN
CHUTE
A-2
STAIR
WELL
ELECTRICAL
CLOSET
ELECTRICAL
CLOSET
232A
HOUSE
KEEPING
232D
ELEC
232C
ELEC
OR
STORAGE
233A
INTERVENTIONAL
PAIN
MANAGEMENT
CONSULT
ROOM
CORRIDOR
FEMALE
LOCKERS
202A
TOILET
201B
EMERGENCY
ELECTRICAL
ROOM
201C
ELECTRICAL
ROOM
CORRIDOR
BRONCHOSCOPY
L23
ELEVATOR
LOBBY
SEMI
RESTRICTED
CORRIDOR
L24
LINK
CORRIDOR
E205
EXAM-1
E206
EXAM-2
E207
MICROSCOPE
E208
EXAM-3 E204
CAST
ROOM
C22
CORRIDOR
L21
ELEVATOR
LOBBY
C21
CORRIDOR
L22
LOBBY
E-EL-2
ELEVATOR
E-EL-1
ELEVATOR
OR
RECEPTION
WAITING
ROOM
201A
OFFICE
A-EL-1
FUTURE
SOILED
ELEVATOR
37 37 37 37 37 37 37 37 37 37 37
55565731
37373737
252632
52 53
DUST
PARTITION
DUST
PARTITION
PHASE 2B
PHASE 2B
DUST
PARTITION
DUST
PARTITION
DUST
PARTITION
DUST
PARTITION
DUST
PARTITION
DUST
PARTITION
DUST
PARTITION
DUST
PARTITION
PHASE 2B
PHASE 7
PHASE 6
PHASE 3
PHASE 4
PHASE 4(A) PHASE 4(B)
PHASE 4
PHASE 4(C) PHASE 4(D)
13 29
PHASE 2B
PHASE 5/7
DUST
PARTITION
DUST
PARTITION
PHASE 2A
PHASE 5 -
TEMPORARY
ANESTHESIA WORK
ROOM, REFER TO
B8/A72.2
STAFF TOILET
DURING PHASE 5
& 7
PHASE 7 - FINAL MALE
LOCKER ROOM
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Auburn, ME
207.784.5100
Boston, MA
617.426.5050
Portland, ME
207.775.0053
Portsmouth, NH
603.626.1242 c HA PROJECT NUMBER: 13586
CONSTRUCT CLEAN CORE ADDITION TO
SURGICAL SUITE
PROVIDENCE, RHODE ISLAND
650-337
C U s e rs
\m m o u e \D o c u m e n ts
R e v it
L o c a ls \1
-a rc h -c e n tr a l_ m m o u e
.r v t
/2
/2
:1
:0
A
M
A01.2
SECOND FLOOR PHASING PLAN
02-22-19 MMO CMP
FINAL CONSTRUCTION
DOCUMENTS
D06
D06
D01D01
D02 D02 D02 D02
D02
D01
D01
D01
D02
D02
D02
D01
A05.2
D4
A05.2 B4
A05.2
F4
A05.2
F9
A05.2
F6
D01
D01
9' - 8 5/8"
12' - 11 1/8"
D06
SEE
HAZARDOUS
MATERIAL
NOTE 1.
HAZARDOUS MATERIAL NOTE
1. EXISTING WINDOW THAT IS ENCASED BETWEEN THE EXISTING WALLS TO BE DEMOLISHED IS
SUSPECTED TO HAVE LEAD PAINT. TEST WINDOW FOR LEAD PAINT AND/OR PCB CONTAINING
SEALANT.
OR
ACCESS
VESTIBULE
OR
ACCESS
VESTIBULE
ANGIOPLASTY
OR-1
OR-2
OR-3
MINOR
PROCEDURE
OR
STORAGE
NURSE
STATION
OBSERVATION
ROOM
CONTROL
STATION
210A
SCRUB
210B
SCRUB
215A
PATIENT
TOILET
215F
PATIENT
TOILET
215E
PATIENT
LOCKERS
215D
VESTIBULE
215C
CLEAN
UTILITIES
215B
SOILED
UTILITIES
215G
HOUSE
KEEPING
K-2
STAIR-K
CORRIDOR
A-2
STAIR
WELL
ELECTRICAL
CLOSET
232A
HOUSE
KEEPING
232C
ELEC
232D
ELEC
233A
INTERVENTIONAL
PAIN
MANAGEMENT
OR
RECEPTION
WAITING
ROOM
201C
ELECTRICAL
ROOM
201B
EMERGENCY
ELECTRICAL
ROOM
201A
OFFICE
LINEN
CHUTE
229A
IT
CLOSET
ELECTRICAL
CLOSET
STAFF
TOILET/SHOWER
L23
ELEVATOR
LOBBY
L24
LINK
CORRIDOR
E-EL-1
ELEVATOR
E-EL-2
ELEVATORE205
EXAM-1
C22
CORRIDOR
E206
EXAM-2
E207
MICROSCOPE
E204
CAST
ROOM
C21
CORRIDOR
OFFICE
INSTRUMENT
STORAGE
ANESTHESIA
WORK ROOM
SUPPLIES
STERILE
SUPPLY CORE
STORAGE
ALCOVE
CYSTOSCOPY
PROCEDURE
C203
CORRIDOR
C203
CORRIDOR
OR WAITING
L21
ELEVATOR
LOBBY
C22
CORRIDOR
E208
EXAM-3
E209
EXAM-4
E203
JC
L22
LOBBY
OR STORAGE
D04 D04
D05
D07
D04
D03
D04
D03
D05
D01
D05
D06
D01
D01
D01
D06
8' - 6 1/8"
D01
D05
D07
D01
D05
D07
D01
D05
D07
D01
A 83.1
F1
2' - 8"
RELOCATE
DEEP
FREEZER,
COORDINATE
WITH COR.
D04
D03
CUTTING AND PATCHING NOTES:
DO NOT CUT AND PATCH STRUCTURAL ELEMENTS IN A MANNER THAT COULD CHANGE THEIR LOAD-CARRYING CAPACITY OR
LOAD-DEFLECTION RATIO.
OPERATIONAL ELEMENTS: DO NOT CUT AND PATCH OPERATING ELEMENTS AND RELATED COMPONENTS IN A MANNER THAT RESULTS IN REDUCING THEIR CAPACITY TO PERFORM AS INTENDED OR THAT RESULTS IN INCREASED MAINTENANCE OR
DECREASED OPERATIONAL LIFE OR SAFETY. OPERATING ELEMENTS INCLUDE THE FOLLOWING:
• FIRE OR SMOKE BARRIERS.
• FIRE-SUPPRESSION SYSTEMS.
• MECHANICAL SYSTEMS PIPING AND DUCTS.
• CONTROL SYSTEMS.
• COMMUNICATION SYSTEMS.
• ELECTRICAL WIRING SYSTEMS.
MISCELLANEOUS ELEMENTS: DO NOT CUT AND PATCH MISCELLANEOUS ELEMENTS OR RELATED COMPONENTS IN A MANNER THAT COULD CHANGE THEIR LOAD-CARRYING CAPACITY, THAT RESULTS IN REDUCING THEIR CAPACITY TO PERFORM AS INTENDED, OR RESULT IN INCREASED MAINTENANCE OR DECREASED OPERATIONAL LIFE OR SAFETY.
MISCELLANEOUS ELEMENTS INCLUDE THE FOLLOWING:
• WATER, MOISTURE, OR VAPOR BARRIERS.
• MEMBRANE AND FLASHING.
• EQUIPMENT SUPPORTS.
• PIPING, DUCTWORK, VESSELS, AND EQUIPMENT.
• NOISE- AND VIBRATION-CONTROL ELEMENTS AND SYSTEMS.
VISUAL REQUIREMENTS: DO NOT CUT AND PATCH CONSTRUCTION IN A MANNER THAT RESULTS IN VISUAL EVIDENCE OF CUTTING AND PATCHING. DO NOT CUT AND PATCH CONSTRUCTION EXPOSED ON THE EXTERIOR OR IN OCCUPIED SPACES IN A MANNER THAT WOULD, IN ARCHITECT'S OPINION, REDUCE THE BUILDING'S AESTHETIC QUALITIES. DEMOLISH AND REPLACE CONSTRUCTION THAT HAS BEEN CUT AND PATCHED IN A VISUALLY UNSATISFACTORY MANNER.
TEMPORARY SUPPORT: PROVIDE TEMPORARY SUPPORT OF WORK TO BE CUT.
PROTECTION: PROTECT IN-PLACE CONSTRUCTION DURING CUTTING AND PATCHING TO PREVENT DAMAGE. PROVIDE PROTECTION FROM ADVERSE WEATHER CONDITIONS FOR PORTIONS OF PROJECT THAT MIGHT BE EXPOSED DURING
CUTTING AND PATCHING OPERATIONS.
ADJOINING AREAS: AVOID INTERFERENCE WITH USE OF ADJOINING AREAS OR INTERRUPTION OF FREE PASSAGE TO
ADJOINING AREAS.
EXISTING UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS: WHERE EXISTING SERVICES/SYSTEMS ARE REQUIRED TO BE DEMOLISHED, RELOCATED, OR ABANDONED, BYPASS SUCH SERVICES/SYSTEMS BEFORE CUTTING TO
MINIMIZE INTERRUPTION TO OCCUPIED AREAS.
GENERAL: EMPLOY SKILLED WORKERS TO PERFORM CUTTING AND PATCHING. PROCEED WITH CUTTING AND PATCHING AT
THE EARLIEST FEASIBLE TIME, AND COMPLETE WITHOUT DELAY.
• CUT IN-PLACE CONSTRUCTION TO PROVIDE FOR INSTALLATION OF OTHER COMPONENTS OR PERFORMANCE OF
OTHER CONSTRUCTION, AND SUBSEQUENTLY PATCH AS REQUIRED TO RESTORE SURFACES TO THEIR ORIGINAL
CONDITION.
CUTTING: CUT IN-PLACE CONSTRUCTION BY SAWING, DRILLING, BREAKING, CHIPPING, GRINDING, AND SIMILAR OPERATIONS, INCLUDING EXCAVATION, USING METHODS LEAST LIKELY TO DAMAGE ELEMENTS RETAINED OR ADJOINING CONSTRUCTION. IF POSSIBLE, REVIEW PROPOSED PROCEDURES WITH ORIGINAL INSTALLER; COMPLY WITH ORIGINAL
INSTALLER'S WRITTEN RECOMMENDATIONS.
• IN GENERAL, USE HAND OR SMALL POWER TOOLS DESIGNED FOR SAWING AND GRINDING, NOT HAMMERING AND
CHOPPING. CUT HOLES AND SLOTS AS SMALL AS POSSIBLE, NEATLY TO SIZE REQUIRED, AND WITH MINIMUM
DISTURBANCE OF ADJACENT SURFACES. TEMPORARILY COVER OPENINGS WHEN NOT IN USE.
• FINISHED SURFACES: CUT OR DRILL FROM THE EXPOSED OR FINISHED SIDE INTO CONCEALED SURFACES.
• CONCRETE AND MASONRY: CUT USING A CUTTING MACHINE, SUCH AS AN ABRASIVE SAW OR A DIAMOND-CORE DRILL.
• MECHANICAL AND ELECTRICAL SERVICES: CUT OFF PIPE OR CONDUIT IN WALLS OR PARTITIONS TO BE DEMOLISHED.
CAP, VALVE, OR PLUG AND SEAL REMAINING PORTION OF PIPE OR CONDUIT TO PREVENT ENTRANCE OF MOISTURE OR
OTHER FOREIGN MATTER AFTER CUTTING.
• PROCEED WITH PATCHING AFTER CONSTRUCTION OPERATIONS REQUIRING CUTTING ARE COMPLETE.
PATCHING: PATCH CONSTRUCTION BY FILLING, REPAIRING, REFINISHING, CLOSING UP, AND SIMILAR OPERATIONS FOLLOWING PERFORMANCE OF OTHER WORK. PATCH WITH DURABLE SEAMS THAT ARE AS INVISIBLE AS POSSIBLE.
PROVIDE MATERIALS AND COMPLY WITH INSTALLATION REQUIREMENTS SPECIFIED IN OTHER SECTIONS.
• INSPECTION: WHERE FEASIBLE, TEST AND INSPECT PATCHED AREAS AFTER COMPLETION TO DEMONSTRATE
INTEGRITY OF INSTALLATION.
• EXPOSED FINISHES: RESTORE EXPOSED FINISHES OF PATCHED AREAS AND EXTEND FINISH RESTORATION INTO
RETAINED ADJOINING CONSTRUCTION IN A MANNER THAT WILL ELIMINATE EVIDENCE OF PATCHING AND REFINISHING.
• CLEAN PIPING, CONDUIT, AND SIMILAR FEATURES BEFORE APPLYING PAINT OR OTHER FINISHING MATERIALS.
• RESTORE DAMAGED PIPE COVERING TO ITS ORIGINAL CONDITION.
• FLOORS AND WALLS: WHERE WALLS OR PARTITIONS THAT ARE DEMOLISHED EXTEND ONE FINISHED AREA INTO ANOTHER, PATCH AND REPAIR FLOOR AND WALL SURFACES. PROVIDE AN EVEN SURFACE OF UNIFORM FINISH, COLOR, TEXTURE, AND APPEARANCE. DEMOLISH IN-PLACE FLOOR AND WALL COVERINGS AND REPLACE WITH NEW
MATERIALS, IF NECESSARY, TO ACHIEVE UNIFORM COLOR AND APPEARANCE.
• WHERE PATCHING OCCURS IN A PAINTED SURFACE, APPLY PRIMER AND INTERMEDIATE PAINT COATS OVER THE
PATCH AND APPLY FINAL PAINT COAT OVER ENTIRE UNBROKEN SURFACE CONTAINING THE PATCH. PROVIDE
ADDITIONAL COATS UNTIL PATCH BLENDS WITH ADJACENT SURFACES.
• CEILINGS: PATCH, REPAIR, OR REHANG IN-PLACE CEILINGS AS NECESSARY TO PROVIDE AN EVEN-PLANE SURFACE OF
UNIFORM APPEARANCE.
• EXTERIOR BUILDING ENCLOSURE: PATCH COMPONENTS IN A MANNER THAT RESTORES ENCLOSURE TO A
WEATHERTIGHT CONDITION.
CLEANING: CLEAN AREAS AND SPACES WHERE CUTTING AND PATCHING ARE PERFORMED. COMPLETELY DEMOLISH PAINT, MORTAR, OILS, PUTTY, AND SIMILAR MATERIALS.
PROJECT EXECUTION NOTES:
REFER TO A05.2
GENERAL DEMOLITION NOTES:
1. ALL DEMOLITION WORK SHALL CONFORM TO ALL LOCAL, STATE AND NATIONAL SAFETY CODES.
2. MAINTAIN INTEGRITY OF ALL EXISTING FIRE RATED ASSEMBLIES TO REMAIN, INCLUDING ENCLOSURES AT
COLUMNS, STAIRS, AND SHAFTS.
3. PROTECT ALL EXISTING FINISHES, MILLWORK, AND CONSTRUCTION TO REMAIN.
4. BEFORE STARTING WORK, THE CONTRACTOR SHALL VERIFY EXISTING CONDITIONS, INCLUDING DIMENSIONS AND
ELEVATIONS. THE CONTRACTOR SHALL PREPARE A LIST OF EXISTING DAMAGED AREAS, DOCUMENTED BY DATED PHOTOGRAPHS AND SIGNED BY THE PERSON CONDUCTING THE INVESTIGATION. PRESENT TO OWNER FOR
VERIFICATION PRIOR TO STARTING DEMOLITION.
5. CONTRACTOR SHALL COORDINATE DEMOLITION OPERATIONS WITH THE OWNER, AND PROCURE PRIOR APPROVAL FOR ALL DEMOLITION PROCEDURES, INCLUDING USE OF BUILDING FACILITIES, PLACEMENT OF DUMPSTER, REFUSE
REMOVAL, AND PHASING.
6. CONTRACTOR SHALL COORDINATE REMOVAL AND STORAGE OF ALL SALVAGED ITEMS WITH THE OWNER.
7. PROTECT AND MAINTAIN THE OPERATION OF ANY EXISTING SYSTEMS TO REMAIN FUNCTIONAL DURING THE
PROJECT. PROCURE PRIOR APPROVAL FROM THE OWNER FOR ANY SHUT-DOWNS REQUIRED.
8. CONTRACTOR TO VERIFY STRUCTURAL CONDITIONS BEFORE DEMOLITION BEGINS. PROVIDE TEMPORARY OR
PERMANENT STRUCTURE AS REQUIRED
9. WHERE ELECTRICAL FIXTURES ARE DEMOLISHED, EXISTING WIRING SHALL BE DEMOLISHED BACK TO ELECT. BOX.
REFER TO ELECTRICAL DRAWINGS.
10. AFTER DEMOLITION, ALL ABANDONED PENETRATIONS SHALL BE PATCHED AND FIRE PROTECTED ACCORDING TO
CODE.
11. ITEMS TO BE SALVAGED FOR RE-USE BY OWNER: DOOR HARDWARE, ROLLING FILES, LIGHTING, INC. EMERG.
LIGHTING, FIRE EXTINGUISHERS, SMOKE DETECTORS
12. CONTRACTOR TO PROTECT AREAS TO REMAIN OPERATIONAL FROM DUST & DEBRIS. CONTRACTOR IS
RESPONSIBLE FOR MAINTAINING AND CLEANING ANY AREAS EXPOSED TO DIRT OR DEBRIS FROM DEMOLITION
ACTIVITIES.
13. REFER TO FLOOR PLANS TO DETERMINE EXTENT OF REMOVALS AND DEMOLITION IN REFERENCE TO NEW WORK.
14. REFER TO MECHANICAL, PLUMBING, ELECTRICAL AND STRUCTURAL DRAWINGS FOR ADDITIONAL REMOVALS AND
DEMOLITION.
15. ALL TAGS MAY NOT BE IDENTIFIED ON THE PLANS.
16. THE SOUND LEVEL LIMIT FOR TOOLS AND EQUIPMENT IS 85DBA AND 0.5/ IN./SEC. FOR VIBRATION. GENERAL
CONTRACTOR SHALL HAVE SUBCONTRATORS ARRANGE TEST TRAILS FOR OPERATIONAL DECIBEL AND VIBRATION LEVELS WITH ALL TOOLS AND EQUIPMENT BEFORE WORK CAN COMMENCE. ARRANGE FOR THE VA PROJECT
ENGINEER TO ATTEND/OBSERVE SAID TEST TRAIL TO WITNESS TESTING
DEMOLITION LEGEND:
DEMOLISH OR RELOCATE, REFER TO DEMOLITION SCHEDULE BELOW.
DEMOLISH ALL EXISTING FLOOR COVERING AND ADHESIVE
DEMOLISH ALL EXISTING FLOOR COVERING AND ADHESIVE - ASBESTOS
FLOOR TILE AND MASTIC
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Auburn, ME
207.784.5100
Boston, MA
617.426.5050
Portland, ME
207.775.0053
Portsmouth, NH
603.626.1242 c HA PROJECT NUMBER: 13586
CONSTRUCT CLEAN CORE ADDITION TO
SURGICAL SUITE
PROVIDENCE, RHODE ISLAND
650-337
C U s e rs
\m m o u e \D o c u m e n ts
R e v it
L o c a ls \1
-a rc h -c e n tr a l_ m m o u e
.r v t
/2
/2
:1
:1
A
M
A05.1
SECOND FLOOR DEMOLITION
PLAN
02-22-19 MMO CMP
FINAL CONSTRUCTION
DOCUMENTS
DEMOLITION SCHEDULE
CODE DESCRIPTION
D01 DEMOLISH EXISTING WALL/PARTITIONS (AS SHOWN) OR TO ACCOMMODATE NEW
WORK, REFER TO FLOOR PLANS
D02 DEMOLISH EXISTING DOOR(S)/FRAME(S)
D03 DEMOLISH EXISTING WALL MOUNTED ITEMS IN ROOM: HAND SANITIZERS, TOWEL
DSIPENSORS, GLOVE DISPENSORS, ETC.
D04 DEMOLISH EXISTING EQUIPMENT IN ROOM, COORDINATE WITH & SCHEDULE WITH
COR.
D05 DEMOLISH EXISTING PLUMBING, REFER TO PLUMBING DEMO DRAWINGS
D06 DEMOLISH EXISTING WINDOW, FRAME, OR LOUVER, REFER TO HAZARDOUS
MATERIALS REPORT
D07 DEMOLISH EXISTING COUNTER AND UPPER CABINETS
D09 DEMOLISH EXISTING MECHANICAL PIPING, REFER TO MECHANICAL DRAWINGS
D10 DEMOLISH EXISTING BOLLARDS, REFER TO SITE DEMO. DRAWINGS.
GENERAL NOTE:
1. THE VA WILL REMOVE/RELOCATE
MOVABLE/PORTABLE EQUIPMENT PRIOR TO THE
START OF CONSTRUCTION.
2. THE VA CLINICAL ENGINEERING WILL
REMOVE/RELOCATE ALL FIXED IMAGING
EQUIPMENT.
3. THE GC IS RESPONSIBLE FOR REMOVING BUILT-IN
EQUIPMENT, HIGH DENSITY SHELVING AS NOTED
ABOVE, AND ALL OTHER ITEMS NOTED IN THE
DEMOLITION SCHEDULE BELOW.
LEVEL 00
79' - 3 5/8"
LEVEL 01
90' - 3 5/8"
LEVEL 02
102' - 2 5/8"
LEVEL 03
114' - 1 5/8"
3' 4.8'4.75'4.7'4.5'4' 4.3'2'1'
D06
D09
(TYPICAL AT (5)
LOCATIONS.
5'
LEVEL 00
79' - 3 5/8"
LEVEL 01
90' - 3 5/8"
LEVEL 02
102' - 2 5/8"
LEVEL 03
114' - 1 5/8"
21.8 2.2 2.5 3 4 5 6 7 8
8' - 2 3/4"
/4
8' - 2 3/4" 8 3/8"
4' - 11 3/8"
D01
D06
D01
D06
DEMOLISH
FRAME AND
GLAZING
DEMOLISH
FRAME AND
GLAZING
3' - 11 1/2"
3' - 11 1/8"
D01
D06
D09
(TYPICAL AT (4)
LOCATIONS.
D10
DEMOLITION LEGEND:
DEMOLISH OR RELOCATE, REFER TO DEMOLITION SCHEDULE BELOW.
DEMOLISH ALL EXISTING FLOOR COVERING AND ADHESIVE
DEMOLISH ALL EXISTING FLOOR COVERING AND ADHESIVE - ASBESTOS
FLOOR TILE AND MASTIC
PROJECT EXECUTION NOTES:
EXISTING CONDITIONS: THE EXISTENCE AND LOCATION OF UTILITIES, AND OTHER CONSTRUCTION INDICATED AS EXISTING ARE NOT GUARANTEED.
BEFORE BEGINNING WORK, INVESTIGATE AND VERIFY THE EXISTENCE AND LOCATION OF MECHANICAL AND ELECTRICAL SYSTEMS AND OTHER
CONSTRUCTION AFFECTING THE WORK.
• BEFORE CONSTRUCTION, VERIFY THE LOCATION AND POINTS OF CONNECTION OF UTILITY SERVICES.
EXISTING UTILITIES: THE EXISTENCE AND LOCATION OF UTILITIES AND CONSTRUCTION INDICATED AS EXISTING ARE NOT GUARANTEED. BEFORE BEGINNING SITEWORK, INVESTIGATE AND VERIFY THE EXISTENCE AND LOCATION OF UNDERGROUND UTILITIES AND OTHER CONSTRUCTION AFFECTING
THE WORK.
ACCEPTANCE OF CONDITIONS: EXAMINE SUBSTRATES, AREAS, AND CONDITIONS, WITH INSTALLER OR APPLICATOR PRESENT WHERE INDICATED, FOR COMPLIANCE WITH REQUIREMENTS FOR INSTALLATION TOLERANCES AND OTHER CONDITIONS AFFECTING PERFORMANCE. RECORD
OBSERVATIONS.
• VERIFY COMPATIBILITY WITH AND SUITABILITY OF SUBSTRATES, INCLUDING COMPATIBILITY WITH EXISTING FINISHES OR PRIMERS.
• EXAMINE ROUGHING-IN FOR MECHANICAL AND ELECTRICAL SYSTEMS TO VERIFY ACTUAL LOCATIONS OF CONNECTIONS BEFORE EQUIPMENT AND
FIXTURE INSTALLATION.
EXAMINE WALLS, FLOORS, AND ROOFS FOR SUITABLE CONDITIONS WHERE PRODUCTS AND SYSTEMS ARE TO BE INSTALLED.
• PROCEED WITH INSTALLATION ONLY AFTER UNSATISFACTORY CONDITIONS HAVE BEEN CORRECTED. PROCEEDING WITH THE WORK INDICATES
ACCEPTANCE OF SURFACES AND CONDITIONS.
FIELD MEASUREMENTS: TAKE FIELD MEASUREMENTS AS REQUIRED TO FIT THE WORK PROPERLY. RECHECK MEASUREMENTS BEFORE INSTALLING EACH PRODUCT. WHERE PORTIONS OF THE WORK ARE INDICATED TO FIT TO OTHER CONSTRUCTION, VERIFY DIMENSIONS OF OTHER CONSTRUCTION BY FIELD MEASUREMENTS BEFORE FABRICATION. COORDINATE FABRICATION SCHEDULE WITH CONSTRUCTION PROGRESS TO AVOID DELAYING THE WORK.
SPACE REQUIREMENTS: VERIFY SPACE REQUIREMENTS AND DIMENSIONS OF ITEMS SHOWN DIAGRAMMATICALLY ON DRAWINGS.
REVIEW OF CONTRACT DOCUMENTS AND FIELD CONDITIONS: IMMEDIATELY ON DISCOVERY OF THE NEED FOR CLARIFICATION OF THE CONTRACT DOCUMENTS, SUBMIT A REQUEST FOR INFORMATION TO ARCHITECT. INCLUDE A DETAILED DESCRIPTION OF PROBLEM ENCOUNTERED, TOGETHER WITH
RECOMMENDATIONS FOR CHANGING THE CONTRACT DOCUMENTS.
• REVIEW CONTRACT DOCUMENTS AND DOCUMENTS FOR MECHANICAL AND PLUMBING WORK WITH THE MECHANICAL/PLUMBING CONTRACTOR TO
COORDINATE REQUIREMENTS, FIELD CONDITIONS AND OTHER ITEMS THAT COULD AFFECT THE WORK.
LAY OUT THE WORK:
• ESTABLISH DIMENSIONS WITHIN TOLERANCES INDICATED. DO NOT SCALE DRAWINGS TO OBTAIN REQUIRED DIMENSIONS.
• INFORM INSTALLERS OF LINES AND LEVELS TO WHICH THEY MUST COMPLY.
• CHECK THE LOCATION, LEVEL AND PLUMB, OF EVERY MAJOR ELEMENT AS THE WORK PROGRESSES.
• COORDINATE LAYOUT, LOCATIONS, REMOVALS AND SUPPORTING CONSTRUCTION REQUIREMENTS WITH THE MECHANICAL/PLUMBING
CONTRACTOR.
LOCATE THE WORK AND COMPONENTS OF THE WORK ACCURATELY, IN CORRECT ALIGNMENT AND ELEVATION, AS INDICATED.
• MAKE VERTICAL WORK PLUMB AND MAKE HORIZONTAL WORK LEVEL.
• WHERE SPACE IS LIMITED, INSTALL COMPONENTS TO MAXIMIZE SPACE AVAILABLE FOR MAINTENANCE AND EASE OF REMOVAL FOR REPLACEMENT.
• CONCEAL PIPES, DUCTS, AND WIRING IN FINISHED AREAS, UNLESS OTHERWISE INDICATED.
• MAINTAIN MINIMUM HEADROOM CLEARANCE OF 8 FEET IN SPACES WITHOUT A SUSPENDED CEILING, UNLESS INDICATED OTHERWISE.
COMPLY WITH MANUFACTURER'S WRITTEN INSTRUCTIONS AND RECOMMENDATIONS FOR INSTALLING PRODUCTS IN APPLICATIONS INDICATED.
INSTALL PRODUCTS AT THE TIME AND UNDER CONDITIONS THAT WILL ENSURE THE BEST POSSIBLE RESULTS. MAINTAIN CONDITIONS REQUIRED FOR
PRODUCT PERFORMANCE UNTIL SUBSTANTIAL COMPLETION.
CONDUCT CONSTRUCTION OPERATIONS SO NO PART OF THE WORK IS SUBJECTED TO DAMAGING OPERATIONS OR LOADING IN EXCESS OF THAT
EXPECTED DURING NORMAL CONDITIONS OF OCCUPANCY.
SCHEDULING & TOOLS AND EQUIPMENT: DO NOT USE TOOLS OR EQUIPMENT THAT ARE DISRUPTIVE OR ARE EXCESSIVELY LOUD. COORDINATE ALL
DEMO WORK WITH VAMC COR FOR SCHEDULING.
TEMPLATES: OBTAIN AND DISTRIBUTE TO THE PARTIES INVOLVED TEMPLATES FOR WORK SPECIFIED TO BE FACTORY PREPARED AND FIELD INSTALLED.
CHECK SHOP DRAWINGS OF OTHER WORK TO CONFIRM THAT ADEQUATE PROVISIONS ARE MADE FOR LOCATING AND INSTALLING PRODUCTS TO COMPLY
WITH INDICATED REQUIREMENTS.
ANCHORS AND FASTENERS: PROVIDE ANCHORS AND FASTENERS AS REQUIRED TO ANCHOR EACH COMPONENT SECURELY IN PLACE, ACCURATELY
LOCATED AND ALIGNED WITH OTHER PORTIONS OF THE WORK.
• MOUNTING HEIGHTS: WHERE MOUNTING HEIGHTS ARE NOT INDICATED, MOUNT COMPONENTS AT HEIGHTS DIRECTED BY ARCHITECT.
• ALLOW FOR BUILDING MOVEMENT, INCLUDING THERMAL EXPANSION AND CONTRACTION.
• COORDINATE INSTALLATION OF ANCHORAGES. FURNISH SETTING DRAWINGS, TEMPLATES, AND DIRECTIONS FOR INSTALLING ANCHORAGES, INCLUDING SLEEVES, CONCRETE INSERTS, ANCHOR BOLTS, AND ITEMS WITH INTEGRAL ANCHORS, THAT ARE TO BE EMBEDDED IN CONCRETE OR
MASONRY. DELIVER SUCH ITEMS TO PROJECT SITE IN TIME FOR INSTALLATION.
JOINTS: MAKE JOINTS OF UNIFORM WIDTH. WHERE JOINT LOCATIONS IN EXPOSED WORK ARE NOT INDICATED, ARRANGE JOINTS FOR THE BEST VISUAL
EFFECT. FIT EXPOSED CONNECTIONS TOGETHER TO FORM HAIRLINE JOINTS.
HAZARDOUS MATERIALS: USE PRODUCTS, CLEANERS, AND INSTALLATION MATERIALS THAT ARE NOT CONSIDERED HAZARDOUS.
• NO ASBESTOS CONTAINING MATERIALS SHALL BE USED IN THE WORK.
GENERAL DEMOLITION NOTES:
REFER TO A05.1
CUTTING AND PATCHING NOTES:
REFER TO A05.1
LEVEL 00
79' - 3 5/8"
LEVEL 01
90' - 3 5/8"
LEVEL 02
102' - 2 5/8"
LEVEL 03
114' - 1 5/8"
EA.8F H L
EA.1
KJ
EBB
GF.9
GRADE
/4
/2
D06
LEVEL 00
79' - 3 5/8"
LEVEL 01
90' - 3 5/8"
LEVEL 02
102' - 2 5/8"
LEVEL 03
114' - 1 5/8"
9 10 11
E4.8
E5
D01
13' - 6"
"D01
LEVEL 00
79' - 3 5/8"
LEVEL 01
90' - 3 5/8"
LEVEL 02
102' - 2 5/8"
LEVEL 03
114' - 1 5/8"
E4.8
E5
D06
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Auburn, ME
207.784.5100
Boston, MA
617.426.5050
Portland, ME
207.775.0053
Portsmouth, NH
603.626.1242 c HA PROJECT NUMBER: 13586
CONSTRUCT CLEAN CORE ADDITION TO
SURGICAL SUITE
PROVIDENCE, RHODE ISLAND
650-337
C U s e rs
\m m o u e \D o c u m e n ts
R e v it
L o c a ls \1
-a rc h -c e n tr a l_ m m o u e
.r v t
/2
/2
:1
:1
A
M
A05.2
DEMOLITION ELEVATIONS
02-22-19 MMO CMP
FINAL CONSTRUCTION
DOCUMENTS
SCALE: 1/8" = 1'-0"
B4
EAST DEMO ELEVATION
DEMOLITION SCHEDULE
CODE DESCRIPTION
D01 DEMOLISH EXISTING WALL/PARTITIONS (AS SHOWN) OR TO ACCOMMODATE NEW
WORK, REFER TO FLOOR PLANS
D02 DEMOLISH EXISTING DOOR(S)/FRAME(S)
D03 DEMOLISH EXISTING WALL MOUNTED ITEMS IN ROOM: HAND SANITIZERS, TOWEL
DSIPENSORS, GLOVE DISPENSORS, ETC.
D04 DEMOLISH EXISTING EQUIPMENT IN ROOM, COORDINATE WITH & SCHEDULE WITH
COR.
D05 DEMOLISH EXISTING PLUMBING, REFER TO PLUMBING DEMO DRAWINGS
D06 DEMOLISH EXISTING WINDOW, FRAME, OR LOUVER, REFER TO HAZARDOUS
MATERIALS REPORT
D07 DEMOLISH EXISTING COUNTER AND UPPER CABINETS
D09 DEMOLISH EXISTING MECHANICAL PIPING, REFER TO MECHANICAL DRAWINGS
D10 DEMOLISH EXISTING BOLLARDS, REFER TO SITE DEMO. DRAWINGS.
SCALE: 1/8" = 1'-0"
F6
NORTHEAST DEMO ELEVATION
SCALE: 1/8" = 1'-0"
F4
NORTHWEST DEMO ELEVATION
SCALE: 1/8" = 1'-0"
F9
SOUTHEAST DEMO ELEVATION
A20.1
B4
A20.1
B1
A20.1
E4
A20.1
E5
A 20.1
E
A 20.1
E
F1
A25.1
F1
A25.1
F5
A25.1
F5
A25.1
F1
A25.2
F1
A25.2
F8
A25.1
F8
A25.1
F1
A25.3
F1
A25.3
F5
A25.3
F5
A25.3
F8
A25.3
F8
A25.3
0.5
0.5
1.5
1.5
1.8 2.2 2.5 3 4 5 6 7 8
G.4'
E4.8
E5
ED
E3E2E1 EC.2EC
EB.3
EB.3EBEA.8
EA
A.5
A.5'
A
3'
B
A' A.2'
C.3
D.3
C.5
B' C' D' E' F'
F
F.7' G'
H
D
E
E.1
E4
G.3'
4.8'
C
G.5'
4.75'
4.75'
4.7' 4.7'
4.5'
4'
4'
4.3' 4.3'
L
EA.1
K
J
EBB
G
F.9
2'
A.6'
1'
2"
F1
A30.1
F9
A30.1
F7
A30.1
F5
A30.1
F7
A25.4
F7
A25.4
F1
A25.4
F1
A25.4
N
A35.1
F4
A35.1
F1
5'
A50.3
E4
W6
W6W6
W1
W6 W6
W6 W6
A35.1
F6
A35.1
F9
0"2' - 8"15' - 2"5 7/8"
18' - 3 3/4"
V .I
.F
G A
T E
V .I
.F
V.I.F.
55' - 2 3/8"
SECURITY FENCING. SEE
CIVIL DRAWINGS FOR
MORE INFORMATION.
MECHANICAL PADS, AND CIVIL CURBING
AND POSTS SHOWN GRAY FOR
REFERENCE. SEE CIVIL DRAWINGS FOR
MORE INFORMATION
BASE BID VERTICAL SCREEN
ENCLOSURE WITH 53% FREE
AREA AND 100% SIGHT CUT-OFF
WITH TOP COVER PLATE,
DEDUCT ALTERNATE NO. 2C
V .I .F
V .I .F
V.I.F
7' - 11 1/4"
V.I.F
47' - 3 1/8"
SECURITY FENCING. SEE
CIVIL DRAWINGS FOR
MORE INFORMATION.
TYPICAL DETAILING
SHOWN IS BASE
BID, REFER TO
DEDUCT
ALTERNATE NO. 1
BASE BID
DEDUCT
ALTERNATE
NO. 2A.
BASE BID
DEDUCT
ALTERNATE
NO. 2A.
K-B
STAIR
12J
DIALYSIS
STORAGE
12I
TEL/DATA
ROOM
12H
C104
CORRIDOR
MECHANICAL
ROOM
TREATMENT
TREATMENT
TREATMENT
BATH
SHOWER
12A
CHIEF
12B
BATH
SHOWER
12D
OFFICE
12E
STORAGE
12F
OFFICE
CHIEF
PHYSICAL
THERAPY
OFFICE
A-B
STAIR
B-ST-1
STAIR
SECRETARY
B-AEC-1
ELECTRICAL
CLOSET
STORAGE
ELECTRICAL
PROSTHETICS
OFFICE
CHIEF
PROSTHETICS
BIO MED
STORAGE
STORAGE
3A
PURPLE
HEART ETC
DAV TRANSPT
BARBAR
SHOP
2B
STORAGE
L01
LOBBY
E
ELECTRICAL
ELECTRIC
SWITCH GEAR
MECHANICAL
ELEVATOR
ELEVATOR
GENERAL NOTES:
INTERIOR PARTITION DIMENSIONS ARE
TO CENTERLINE OF METAL STUD FROM
COLUMN CENTER LINE UNLESS
OTHERWISE NOTED.
REFER TO A40 SERIES DRAWINGS FOR
PARTITION TYPE AND CONSTRUCTION
SYSTEMS DESCRIPTIONS.
PROVIDE/INSTALL MOLD/MOISTURE
RESISTANT GYPSUM WALL BOARD AT ALL
TOILET/SHOWER ROOM WALLS/CEILINGS.
PLACE DOOR HINGE AT 6" FROM CORNER
UNLESS NOTED OTHERWISE
ALL PARTITIONS (U.N.O.) EXTEND TO THE
UNDERSIDE OF THE EXISTING/ NEW
STRUCTURE ABOVE. SEAL PERIMETER OF
ALL NEW WALLS WITH CONTINUOUS
SEALANT FOR SMOKE AND SOUND
CONTROL.
SEE DRAWING A60 SERIES FOR DOOR
SCHEDULE.
SEE EXTERIOR ELEVATIONS ON DRAWING
A20.1, A55.1 FOR WINDOW TYPES.
SEE A72 SERIES FOR ENLARGED
EQUIPMENT PLANS.
PROVIDE CONTROL JOINTS IN GPDW
PARTITIONS AT A MAX SPACING OF 30'-0".
LOCATE AT EDGE OF DOOR FRAME UP TO
CEILING WHERE PRACTICAL. REVIEW
LOCATIONS WITH ARCHITECT.
SEE A71 SERIES FOR FLOOR MATERIALS
PLANS.
ALL INTERIOR PARTITIONS ARE TYPE 213
UNLESS OTHERWISE NOTED. FULL
HEIGHT PARTITIONS SHALL BE FRAMED
AROUND MECHANICAL DUCTWORK. IN
NON-RATED PARTITIONS, FILL GAPS
AROUND DUCTWORK WITH SOUND
ATTENUATING BATT (SAB) INSULATION.
IN FIRE-RATED PARTITIONS, SEAL GAPS
AROUND DUCTWORK WITH APPROVED
FIRESTOPPING SYSTEM.
ANY WALL, PARTITION OR SURFACE
DISTURBED AS PART OF DEMOLITION OR
NEW WORK SHALL BE PATCHED AND
FINISHED CONTINUOUSLY TO THE
NEAREST ADJACENT CORNER. MATCH
EXISTING ADJACENT CONSTRUCTION
FINISHES, CONTINUITY AND FIRE
RATINGS UNLESS NOTED OTHERWISE.
LEGEND:
ROOM NAME & NUMBER
FIRE EXTINGUISHER & CABINET
ONE HOUR RATED WALL CONSTRUCTION,
SEE PARTITION TYPES
TWO HOUR RATED WALL CONSTRUCTION,.
SEE PARTITION TYPES
SMOKE TIGHT, SMOKE BARRIER, OR
SMOKE PARTITION, REFER TO LS10.1 LIFE
SAFETY PLAN FOR TYPES/LOCATIONS.
ROOM
NAME
FEC
FIRE RESISTIVE CONSTUCTION NOTES:
FIRE SAFING MATERIALS ON STEEL
ELEMENTS MAY OR MAY NOT BE
SHOWN FOR DRAWING CLARITY, ALL
STEEL ITEMS SHALL BE SPRAYED
WITH FIRE SAFING AS NOTED BELOW:
ALL COLUMNS AND ASSOCIATED
CROSS BRACING TO BE SPRAYED AND
RATED FOR 2 HOURS. UTILIZE U.L.
DESIGN NO. X790.
ALL FLOOR BEAMS TO BE SPRAYED
AND RATED FOR 2 HOURS. UTILIZE
U.L. DESIGN NO. J708.
ALL ROOF STEEL BEAM SUPPORTS TO
BE SPRAYED AND RATED FOR 2
HOURS. UTILIZE U.L. DESIGN NO. P719.
ALL ROOF JOISTS TO BE SPRAYED AND
RATED FOR 1 1/2 HOURS. UTILIZE U.L.
DESIGN NO. P719.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Auburn, ME
207.784.5100
Boston, MA
617.426.5050
Portland, ME
207.775.0053
Portsmouth, NH
603.626.1242 c HA PROJECT NUMBER: 13586
CONSTRUCT CLEAN CORE ADDITION TO
SURGICAL SUITE
PROVIDENCE, RHODE ISLAND
650-337
C U s e rs
\m m o u e \D o c u m e n ts
R e v it
L o c a ls \1
-a rc h -c e n tr a l_ m m o u e
.r v t
/2
/2
:1
:1
A
M
A10.0
GROUND FLOOR PLAN
02-22-19 MMO CMP
FINAL CONSTRUCTION
DOCUMENTS
SCALE: 1/8" = 1'-0"
F1
GROUND FLOOR PLAN
A20.1
B4
A20.1
E4
A20.1
E5
A 20.1
E
A 20.1
E
F1
A25.1
F5
A25.1
F1
A25.2
F1
A25.2
F8
A25.1
F1
A25.3
F5
A25.3
F8
A25.3
0.5
0.5
1.5
1.5
1.8 2.2 2.5 3 4 5 6 7 8
G.4'
9 10
E4.8
E5
E3E2 EC.2ECEB.3EBEA.8EA
A.5
A.5'
A
3'
B
A' A.2'
C.3
D.3
C.5
B' C' D' E' F'
F
F.7' G'
H
D
E
E.1
E4
G.3'
4.8'
C
G.5'
4.75'
4.75'
4.7' 4.7'
4.5'
4.5'
4'
4'
4.3' 4.3'
L
EA.1
K
J
EBB
G F.9
2'
A.6'
1'
F1
A30.1
C3
A30.1
F9
A30.1
F7
A30.1
F5
A30.1
F7
A25.4
F7
A25.4
F1
A25.4
F1
A25.4
B1
A25.4
B1
A25.4
N
A35.1
D1
A35.1
D4
5'
A35.1
D9MECHANICAL ROOM
STAFF LOCKER
FEMALE
TOILET
MALE
TOILET
FEMALE
STAFF LOCKER MALE
113A
OFFICE
115A
OFFICE
OFFICE
OFFICE
CONFERENCE ROOM
110 BREAK / KITCHEN
109A
STAFF
WASHROOM
CONSULT
WAITING
STAIR TOWER-2
DROP OFFICE
119C
PICK UP
119B
PU/DO
119A
OFFICE
ANESTHESIA
CONFERENCE ROOM
118A118
ANESTHESIA
OFFICE
NURSE MANAGER
OFFICE
STAFF LOUNGE AND
CONFERENCE
STAIR K
K-1
CORRIDOR
CORRIDOR
101B
WOMENS
REST
ROOM
MENS
REST
ROOM
COMP
AND
PENSION
COMP
AND
PEN
PSYCHOLOGIST
COMP
AND
PENSION
COMP
AND
PENSION
RECEPTION
160A
COMP
AND
PENSION
COMP
AND
PENSION
VISN
100D
CLINICAL MANAGER
100C
ELEVATOR LOBBY
L11
TYPICAL DETAILING
SHOWN IS BASE
BID, REFER TO
DEDUCT
ALTERNATE NO. 1
BASE BID
BASE BID
DEDUCT
ALTERNATE
NO. 2A.
A35.1
F6 DEDUCT
ALTERNATE
NO. 2A.
RPM CHECK /
PICK UP
STORAGE
MANAGER
OUPATIENT
PHARM
CLEANING
ROOM
CORRIDOR
101A
CORRIDOR
LEGEND:
ROOM NAME & NUMBER
FIRE EXTINGUISHER & CABINET
ONE HOUR RATED WALL CONSTRUCTION,
SEE PARTITION TYPES
TWO HOUR RATED WALL CONSTRUCTION,.
SEE PARTITION TYPES
SMOKE TIGHT, SMOKE BARRIER, OR
SMOKE PARTITION, REFER TO LS10.1 LIFE
SAFETY PLAN FOR TYPES/LOCATIONS.
ROOM
NAME
FEC
GENERAL NOTES:
INTERIOR PARTITION DIMENSIONS ARE
TO CENTERLINE OF METAL STUD FROM
COLUMN CENTER LINE UNLESS
OTHERWISE NOTED.
REFER TO A40 SERIES DRAWINGS FOR
PARTITION TYPE AND CONSTRUCTION
SYSTEMS DESCRIPTIONS.
PROVIDE/INSTALL MOLD/MOISTURE
RESISTANT GYPSUM WALL BOARD AT ALL
TOILET/SHOWER ROOM WALLS/CEILINGS.
PLACE DOOR HINGE AT 6" FROM CORNER
UNLESS NOTED OTHERWISE
ALL PARTITIONS (U.N.O.) EXTEND TO THE
UNDERSIDE OF THE EXISTING/ NEW
STRUCTURE ABOVE. SEAL PERIMETER OF
ALL NEW WALLS WITH CONTINUOUS
SEALANT FOR SMOKE AND SOUND
CONTROL.
SEE DRAWING A60 SERIES FOR DOOR
SCHEDULE.
SEE EXTERIOR ELEVATIONS ON DRAWING
A20.1, A55.1 FOR WINDOW TYPES.
SEE A72 SERIES FOR ENLARGED
EQUIPMENT PLANS.
PROVIDE CONTROL JOINTS IN GPDW
PARTITIONS AT A MAX SPACING OF 30'-0".
LOCATE AT EDGE OF DOOR FRAME UP TO
CEILING WHERE PRACTICAL. REVIEW
LOCATIONS WITH ARCHITECT.
SEE A71 SERIES FOR FLOOR MATERIALS
PLANS.
ALL INTERIOR PARTITIONS ARE TYPE 213
UNLESS OTHERWISE NOTED. FULL
HEIGHT PARTITIONS SHALL BE FRAMED
AROUND MECHANICAL DUCTWORK. IN
NON-RATED PARTITIONS, FILL GAPS
AROUND DUCTWORK WITH SOUND
ATTENUATING BATT (SAB) INSULATION.
IN FIRE-RATED PARTITIONS, SEAL GAPS
AROUND DUCTWORK WITH APPROVED
FIRESTOPPING SYSTEM.
ANY WALL, PARTITION OR SURFACE
DISTURBED AS PART OF DEMOLITION OR
NEW WORK SHALL BE PATCHED AND
FINISHED CONTINUOUSLY TO THE
NEAREST ADJACENT CORNER. MATCH
EXISTING ADJACENT CONSTRUCTION
FINISHES, CONTINUITY AND FIRE
RATINGS UNLESS NOTED OTHERWISE.
FIRE RESISTIVE CONSTUCTION NOTES:
FIRE SAFING MATERIALS ON STEEL
ELEMENTS MAY OR MAY NOT BE
SHOWN FOR DRAWING CLARITY, ALL
STEEL ITEMS SHALL BE SPRAYED
WITH FIRE SAFING AS NOTED BELOW:
ALL COLUMNS AND ASSOCIATED
CROSS BRACING TO BE SPRAYED AND
RATED FOR 2 HOURS. UTILIZE U.L.
DESIGN NO. X790.
ALL FLOOR BEAMS TO BE SPRAYED
AND RATED FOR 2 HOURS. UTILIZE
U.L. DESIGN NO. J708.
ALL ROOF STEEL BEAM SUPPORTS TO
BE SPRAYED AND RATED FOR 2
HOURS. UTILIZE U.L. DESIGN NO. P719.
ALL ROOF JOISTS TO BE SPRAYED AND
RATED FOR 1 1/2 HOURS. UTILIZE U.L.
DESIGN NO. P719.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Auburn, ME
207.784.5100
Boston, MA
617.426.5050
Portland, ME
207.775.0053
Portsmouth, NH
603.626.1242 c HA PROJECT NUMBER: 13586
CONSTRUCT CLEAN CORE ADDITION TO
SURGICAL SUITE
PROVIDENCE, RHODE ISLAND
650-337
C U s e rs
\m m o u e \D o c u m e n ts
R e v it
L o c a ls \1
-a rc h -c e n tr a l_ m m o u e
.r v t
/2
/2
:1
:2
A
M
A10.1
FIRST FLOOR PLAN
02-22-19 JLJ MMO
FINAL CONSTRUCTION
DOCUMENTS
SCALE: 1/8" = 1'-0"
FIRST FLOOR PLAN
F1
ELEVATORS
LEGEND:
ROOM NAME & NUMBER
FIRE EXTINGUISHER & CABINET
ONE HOUR RATED WALL CONSTRUCTION,
SEE PARTITION TYPES
TWO HOUR RATED WALL CONSTRUCTION,.
SEE PARTITION TYPES
SMOKE TIGHT, SMOKE BARRIER, OR
SMOKE PARTITION, REFER TO LS10.1 LIFE
SAFETY PLAN FOR TYPES/LOCATIONS.
ROOM
NAME
FEC
A20.1
B4
A20.1
E4
A20.1
E5
A 20.1
E
A 20.1
E
F1
A25.1
F5
A25.1
F1
A25.2
F1
A25.2
F8
A25.1
F1
A25.3
F5
A25.3
F8
A25.3
0.5
0.5
1.5
1.5
1.8 2.2 2.5 3 4 5 6 7 8
G.4'
9 10
E4.8
E5
E3E2 EC.2EC
EB.3
EB.3EBEA.8EA
A.5
A.5'
A
B
A' A.2'
C.3
D.3
C.5
B' C' D' E' F'
F
F.7' G'
H
D
E
E.1
E4
G.3'
C
G.5'
L
EA.1
K
J
EBB
G
F.9
A.6'
1'
F1
A30.1
C3
A30.1
F9
A30.1
F7
A30.1
F5
A30.1
F7
A25.4
F7
A25.4
F1
A25.4
F1
A25.4
B1
A25.4
B1
A25.4
CLEAN AND STERILE
SUPPLY
EQUIPMENT STORAGE
MECHANICAL
CYSTOSCOPY
SEMI RESTRICTED
CORRIDOR
A-EL-3
FUTURE
CLEAN
EL.
A-EL-2
FUTURE
CLEAN
EL.
CLEAN
AND
STERILE
SUPPLY
CC STORAGE
255A
NURSE
MANAGER
OFFICE
SOILED UTILITY
IUSS
ANESTHESIA
WORKROOM
EQUIPMENT
STORAGE
WORK AREA
CONTROL STATION
ANGIOPLASTY
OR-1
OR-2
OR-3
HOUSE KEEPING
215G
SCRUB
210A
SCRUB
210B
OR ACCESS VESTIBULE
OR ACCESS VESTIBULE
OBSERVATION ROOM
PACU
NURSE STATION
215A
PATIENT
TOILETCORRIDOR
C223
STAIR-K
K-2
STAFF
TOILET/SHOWER
1ST STAGE
RECOVERY PRE-OP
HOLDING
PA
C U P
O
ST
O R
P
E S U R G E
Y
BE
D
PA
C U P
O
ST
E S U R G E
PA
C U P
O
ST
E S U R G E
PA
C U P
O
ST
E S U R G E
PA
C U P
O
ST
E S U R G E
PA
C U P
O
ST
E S U R G E
PA
C U P
O
ST
E S U R G E
PA
C U P
O
ST
E S U R G E
PA
C U P
O
ST
E S U R G E
PA
C U P
O
ST
E S U R G E
215F
PATIENT
TOILET
215E
PATIENT
LOCKERS
215D
VESTIBULE
215C
CLEAN
UTILITIES
MINOR
PROCEDURE
215B
SOILED
UTILITIES
229A
IT
CLOSET
OFFICE
2-DC-1A
CORRIDOR
LINEN
CHUTE
A-2
STAIR
WELL
ELECTRICAL
CLOSET
ELECTRICAL
CLOSET
232A
HOUSE
KEEPING
232D
ELEC
232C
ELEC
OR
STORAGE
233A
INTERVENTIONAL
PAIN
MANAGEMENT
CONSULT
ROOM
CORRIDOR
FEMALE
LOCKERS
202A
TOILET
201B
EMERGENCY
ELECTRICAL
ROOM
201C
ELECTRICAL
ROOM
CORRIDOR
BRONCHOSCOPY
L23
ELEVATOR
LOBBY
SEMI
RESTRICTED
CORRIDOR
L24
LINK
CORRIDOR
E205
EXAM-1
E206
EXAM-2
E207
MICROSCOPE
E208
EXAM-3 E204
CAST
ROOM
C22
CORRIDOR
L21
ELEVATOR
LOBBY
C21
CORRIDOR
L22
LOBBY
E-EL-2
ELEVATOR
E-EL-1
ELEVATOR
OR
RECEPTION
WAITING
ROOM
201A
OFFICE
A-EL-1
FUTURE
SOILED
ELEVATOR
3' - 8"
3' - 8"
ELEC.
CL.
21' - 11 5/8" 5' - 9" 24' - 0" 12' - 7" 9' - 3 3/4" 33' - 9 1/4" 21' - 5 3/8"
/8
/8
/4
E
Q P
A N
E L
S
/4
3' - 11 3/8" 11' - 0 5/8" 6' - 11 5/8"
9"
/4
3' - 8"31' - 8 1/4"
/4
18' - 9 7/8"
/8 " 15' - 1 7/8"
2" EXPANSION
JOINT REFER
TO F8/A82.1
2" EXPANSION
JOINT REFER
TO F8/A82.1
2" EXPANSION
JOINT REFER
TO F8/A82.1
.1
265.1
.2
.2
256.1
222.2
201.2 202A
202.1
2" EXPANSION
JOINT
F.E.C.
F.E.C.
REFER
TO
E9/A50.6
F.E.C. REFER
TO E9/A50.6
SEMI
RESTRICTED
CORRIDOR
2"
EXPANSION
JOINT
2" EXPANSION
JOINT
7/
8"
EXPANSION
JOINT
EXG
EXPANSION
JOINT
7' - 6 1/8" 9' - 0" 15' - 0 1/4"
A50.4
F6
SKYLIGHT
ABOVE
N
A35.1
B1
A35.1
B4
2' - 5 3/8"
1' - 8 1/2" 6' - 10 3/4"
TYPICAL AT (5) LOCATIONS - APPLY
OPAQUE FILIM ON EXISTING GLAZING
BEFORE NEW SHAFTWALL
CONSTRUCTION BEGINS. CLEAN AND
PROTECT FILM BY PLACING PAINTED
5/8" A/B GRADE PLYWOOD SCREWED
TO WINDOW FRAMING. PLYWOOD TO
REMAIN IN PLACE.
NEW 2"
EXPANSION JOINT,
REFER TO F8/A82.1
2" EXPANSION
JOINT REFER
TO E8/A82.1
2" EXPANSION
JOINT REFER
TO F8/A82.1
2" EXPANSION
JOINT REFER
TO E8/A82.1
2" EXPANSION
JOINT REFER
TO E8/A82.1
2" EXPANSION
JOINT REFER
TO F8/A82.1
5'
/2
8' - 0"
9' - 5 3/8"
209.2 208.2 207.2 206.2 A82.1
F4
4' - 8"
A83 .1F5
A 83.1
F1
SEMI
RESTRICTED
CORRIDOR
A72.2
B8
M8800
M8800
208.3
-80 DEGREE
FREEZER
2" EXPANSION
JOINT REFER
TO E8/A82.1
FOR PHASE 5 TEMPORARY
ANESTHESIA WORKROOM
LAYOUT
GENERAL NOTES:
INTERIOR PARTITION DIMENSIONS ARE
TO CENTERLINE OF METAL STUD FROM
COLUMN CENTER LINE UNLESS
OTHERWISE NOTED.
REFER TO A40 SERIES DRAWINGS FOR
PARTITION TYPE AND CONSTRUCTION
SYSTEMS DESCRIPTIONS.
PROVIDE/INSTALL MOLD/MOISTURE
RESISTANT GYPSUM WALL BOARD AT ALL
TOILET/SHOWER ROOM WALLS/CEILINGS.
PLACE DOOR HINGE AT 6" FROM CORNER
UNLESS NOTED OTHERWISE
ALL PARTITIONS (U.N.O.) EXTEND TO THE
UNDERSIDE OF THE EXISTING/ NEW
STRUCTURE ABOVE. SEAL PERIMETER OF
ALL NEW WALLS WITH CONTINUOUS
SEALANT FOR SMOKE AND SOUND
CONTROL.
SEE DRAWING A60 SERIES FOR DOOR
SCHEDULE.
SEE EXTERIOR ELEVATIONS ON DRAWING
A20.1, A55.1 FOR WINDOW TYPES.
SEE A72 SERIES FOR ENLARGED
EQUIPMENT PLANS.
PROVIDE CONTROL JOINTS IN GPDW
PARTITIONS AT A MAX SPACING OF 30'-0".
LOCATE AT EDGE OF DOOR FRAME UP TO
CEILING WHERE PRACTICAL. REVIEW
LOCATIONS WITH ARCHITECT.
SEE A71 SERIES FOR FLOOR MATERIALS
PLANS.
ALL INTERIOR PARTITIONS ARE TYPE 213
UNLESS OTHERWISE NOTED. FULL
HEIGHT PARTITIONS SHALL BE FRAMED
AROUND MECHANICAL DUCTWORK. IN
NON-RATED PARTITIONS, FILL GAPS
AROUND DUCTWORK WITH SOUND
ATTENUATING BATT (SAB) INSULATION.
IN FIRE-RATED PARTITIONS, SEAL GAPS
AROUND DUCTWORK WITH APPROVED
FIRESTOPPING SYSTEM.
ANY WALL, PARTITION OR SURFACE
DISTURBED AS PART OF DEMOLITION OR
NEW WORK SHALL BE PATCHED AND
FINISHED CONTINUOUSLY TO THE
NEAREST ADJACENT CORNER. MATCH
EXISTING ADJACENT CONSTRUCTION
FINISHES, CONTINUITY AND FIRE
RATINGS UNLESS NOTED OTHERWISE.
FIRE RESISTIVE CONSTUCTION NOTES:
FIRE SAFING MATERIALS ON STEEL
ELEMENTS MAY OR MAY NOT BE
SHOWN FOR DRAWING CLARITY, ALL
STEEL ITEMS SHALL BE SPRAYED
WITH FIRE SAFING AS NOTED BELOW:
ALL COLUMNS AND ASSOCIATED
CROSS BRACING TO BE SPRAYED AND
RATED FOR 2 HOURS. UTILIZE U.L.
DESIGN NO. X790.
ALL FLOOR BEAMS TO BE SPRAYED
AND RATED FOR 2 HOURS. UTILIZE
U.L. DESIGN NO. J708.
ALL ROOF STEEL BEAM SUPPORTS TO
BE SPRAYED AND RATED FOR 2
HOURS. UTILIZE U.L. DESIGN NO. P719.
ALL ROOF JOISTS TO BE SPRAYED AND
RATED FOR 1 1/2 HOURS. UTILIZE U.L.
DESIGN NO. P719.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Auburn, ME
207.784.5100
Boston, MA
617.426.5050
Portland, ME
207.775.0053
Portsmouth, NH
603.626.1242 c HA PROJECT NUMBER: 13586
CONSTRUCT CLEAN CORE ADDITION TO
SURGICAL SUITE
PROVIDENCE, RHODE ISLAND
650-337
C U s e rs
\m m o u e \D o c u m e n ts
R e v it
L o c a ls \1
-a rc h -c e n tr a l_ m m o u e
.r v t
/2
/2
:1
:2
A
M
A10.2
SECOND FLOOR PLAN
02-22-19 JLJ MMO
FINAL CONSTRUCTION
DOCUMENTS
GENERAL NOTES:
REFER TO A10.0
B4
A20.1
E4
A20.1
E5
A 20.1
E
A 20.1
E
F1
A25.1
F5
A25.1
F1
A25.2
F1
A25.2
F8
A25.1
F1
A25.3
F5
A25.3
F8
A25.3
0.5
0.5
1.5
1.5
1.8 2.2 2.5 3 4 5 6 7 8
G.4'
9 10
E4.8
E5
E3E2 EC.2EC
EB.3
EB.3EBEA.8EA
A.5
A.5'
A
3'
B
A' A.2'
C.3
D.3
C.5
B' C' D' E' F'
F
F.7' G'
H
D
E
E.1
E4
G.3'
4.8'
C
G.5'
4.75'
4.75'
4.7' 4.7'
4.5'
4.5'
4'
4'
4.3'
L
EA.1
K
J
EBB
G
F.9
2'
A.6'
1'
VTR
SKYLIGHT -
REFER TO
DEDUCT
ALTERANTE 3A.
F1
A30.1
C3
A30.1
F9
A30.1
F7
A30.1
F5
A30.1
F7
A25.4
F7
A25.4
F1
A25.4
F1
A25.4
B1
A25.4
B1
A25.4
N
/8
5'
2" ROOF
EXPANSION
JOINT
2" ROOF
EXPANSION
JOINT
2" ROOF
EXPANSION
JOINT
PROVIDE "KNEE-WALL
FROM NEW ROOF
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .