This document is a technical specification section for HVAC and Boiler Plant Insulation (Section 23 07 11) for the EHRM Infrastructure Upgrades project at the Sousley Campus in Lexington, Kentucky. The specification provides comprehensive requirements for thermal insulation materials, installation methods, and performance standards for HVAC piping, ductwork, and equipment across various temperature ranges and service conditions.

The document details multiple insulation material types including mineral fiber, calcium silicate, rigid cellular phenolic foam, polyisocyanurate, cellular glass, and flexible elastomeric cellular thermal insulation. It specifies precise installation techniques, thickness requirements based on pipe diameter and operating temperature, and comprehensive guidelines for insulating different components such as pipes, valves, fittings, equipment, and ductwork. The specification includes detailed requirements for vapor barriers, jacketing, attachment methods, and compliance with fire safety standards like NFPA 90A, ensuring thermal efficiency, condensation control, and personnel safety across different HVAC system applications.

View the file

Other files

File Type Posted
0006 - 596-22-700 DBA Wages - Fayette County - 08-22-2025.pdf PDF
36C77625B0040 0006.pdf PDF
36C77625B0040 0005.pdf PDF
0004 - 596-22-700 Spec Section 02 82 13.13 Revisions.pdf PDF
0004 - 596-22-700 Drawings 00_General Revisions.pdf PDF
0004 - 596-22-700 TR Photos - Question 58.pdf PDF
0004 - 596-22-700 Lexington TR Notes-MASTER.pdf PDF
0004 - 596-22-700 Spec Section 00 01 10 Revisions.pdf PDF
0004 - 596-22-700 Spec Section 01 00 00 Revisions.pdf PDF
0004 - 596-22-700 Drawings 02_Civil Revisions.pdf PDF
0004 - 596-22-700 Responses to Tech Questions - 8-19-25.pdf PDF
36C77625B0040 0004.pdf PDF
0004 - 596-22-700 Spec Section 08 11 13 Revisions.pdf PDF
0004 - 596-22-700 Spec Section 08 71 00 Revisions.pdf PDF
0004 - 596-22-700 Drawings 01_Environmental Revisions.pdf PDF
36C77625B0040 0003.pdf PDF
0003 - 596-22-700 Responses to Tech Questions - 8-12-25.pdf PDF
0003 - 596-22-700 DBA Wages - Fayette County - 08-08-2025.pdf PDF
0002 - 596-22-700 DBA Wages - Fayette County - 07-18-2025.pdf PDF
36C77625B0040 0002.pdf PDF
36C77625B0040 0001.pdf PDF
0001 - 596-22-700 Site Visit Sign-in Sheet - 7-8-25.pdf PDF
07 - 596-22-700 Drawings 03_Structural.pdf PDF
09 - 596-22-700 Drawings 05_Fire Protection.pdf PDF
15 - 596-22-700 ICRA III.pdf PDF
17 - 596-22-700 Brand Name Justification.pdf PDF
18 - 596-22-700 DBA Wages - Fayette County - 06-06-2025.pdf PDF
19 - 596-22-700 VAAR 852.219-75 LOS - Construction.docx DOCX document
01 - 596-22-700 Specs 1.pdf PDF
03 - 596-22-700 Spec Section 01 31 00.01.pdf PDF
04 - 596-22-700 Drawings 00_General.pdf PDF
08 - 596-22-700 Drawings 04_Architectural.pdf PDF
11 - 596-22-700 Drawings 07_Electrical.pdf PDF
IFB 36C77625B0040 - 6-25-25.pdf PDF
02 - 596-22-700 Specs 2.pdf PDF
10 - 596-22-700 Drawings 06_Mechanical.pdf PDF
12 - 596-22-700 Drawings 08_Telecom.pdf PDF
16 - 596-22-700 PCRA.pdf PDF
05 - 596-22-700 Drawings 01_Environmental.pdf PDF
06 - 596-22-700 Drawings 02_Civil.pdf PDF
13 - 596-22-700 Drawings 09_Security.pdf PDF
14 - 596-22-700 ICRA II.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EHRM Infrastructure Upgrades – Lexington‐Leestown, KY

VA 596-22-700

Sousley Campus Lexington, KY 40511

Bid Documents – Addendum 01

02-01-20

23 07 11 - 1

HVAC AND BOILER PLANT INSULATION

SECTION 23 07 11

HVAC AND BOILER PLANT INSULATION

PART 1 - GENERAL

1.1 DESCRIPTION

A. Field applied insulation for thermal efficiency and condensation control for

1. HVAC piping, ductwork and equipment.

B. Definitions

1. ASJ: All service jacket, white finish facing or jacket.

2. Air conditioned space: Space having air temperature and/or humidity controlled by mechanical equipment.

3. Cold: Equipment, ductwork or piping handling media at design temperature of 16 degrees C (60 degrees F) or below.

4. Concealed: Ductwork and piping above ceilings and in chases, and pipe spaces.

5. Exposed: Piping, ductwork, and equipment exposed to view in finished areas including mechanicaland electrical equipment rooms or exposed to outdoor weather. Attics and crawl spaces where air handling units are located are considered to be mechanical rooms. Shafts, chases, unfinished attics, crawl spaces and pipe basements are not considered finished areas.

6. FSK: Foil-scrim-kraft facing.

7. Hot: HVAC Ductwork handling air at design temperature above 16 degrees C (60 degrees F);HVAC equipment or piping handling media above 41 degrees C (105 degrees F) and piping media and equipment 32 to 230 degrees C(90 to 450 degrees F).

8. Density: kg/m3 - kilograms per cubic meter (Pcf - pounds per cubic foot).

9. Runouts: Branch pipe connections up to 25-mm (one-inch) nominal size to fan coil units or reheat coils for terminal units.

10. Thermal conductance: Heat flow rate through materials.

a. Flat surface: Watt per square meter (BTU per hour per square foot).

b. Pipe or Cylinder: Watt per square meter (BTU per hour per linear foot).

Noah.Medley Cloud

Noah.Medley Polygon

Noah.Medley Text Box

Noah.Medley Text Box 08/15/2025

Sousley Campus Lexington, KY 40511

Bid Documents – Addendum 01

02-01-20

23 07 11 - 2

HVAC AND BOILER PLANT INSULATION

11. Thermal Conductivity (k): Watt per meter, per degree C (BTU per inch thickness, per hour, per square foot, per degree F temperature difference).

12. Vapor Retarder (Vapor Barrier): A material which retards the transmission (migration) of water vapor. Performance of the vapor retarder is rated in terms of permeance (perms). For the purpose of this specification, vapor retarders shall have a maximum published permeance of 0.1 perms and vapor barriers shall have a maximum published permeance of 0.001 perms.

13. HWH: Hot water heating supply.

14. HWHR: Hot water heating return.

15. CPD: Condensate pump discharge.

16. R: Pump recirculation.

17. CW: Cold water.

18. SW: Soft water.

19. HW: Hot water.

20. CH: Chilled water supply.

21. CHR: Chilled water return.

22. RS: Refrigerant suction.

23. PVDC: Polyvinylidene chloride vapor retarder jacketing, white.

1.2 RELATED WORK

A Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, and SAMPLES.

B. Section 07 84 00, FIRESTOPPING.

C. Section 23 05 11, COMMON WORK RESULTS FOR HVAC.

D. Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS.

1.3 QUALITY ASSURANCE

A. Refer to article QUALITY ASSURANCE, in Section 23 05 11, COMMON WORK

RESULTS FOR HVAC

B. Criteria:

1. Comply with NFPA 90A, particularly paragraphs 4.3.3.1 through

4.3.3.6, 4.3.10.2.6, and 5.4.6.4, parts of which are quoted as follows:

4.3.3.1 Pipe insulation and coverings, duct coverings, duct

linings, vapor retarder facings, adhesives, fasteners, tapes, and supplementary materials added to air ducts, plenums, panels, and duct silencers used in duct systems, unless otherwise provided for in 4.3.3.1.1 or 4.3.3.1.2., shall have, in the form in which they are used, a maximum flame spread index of 25 without evidence of continued progressive combustion and a maximum smoke http://www.nfpa.org/codesonline/document.asp?action=load&scope=0&path=NFPA/codes/nfpa0050-0099/0090a/codes-0121752&sub=&default=false#codes-id00090a00292#codes-id00090a00292

Sousley Campus Lexington, KY 40511

Bid Documents – Addendum 01

02-01-20

23 07 11 - 3

HVAC AND BOILER PLANT INSULATION

developed index of 50 when tested in accordance with ASTM E84, Standard Method of Test of Surface Burning Characteristics of

Building Materials, or with ANSI/UL723, Standard for Test for

Surface Burning Characteristics of Building Materials. Pipe and duct insulation and coverings, duct linings and their adhesives, and tapes shall use the specimen preparation and mounting procedures of ASTM E2231. Standard Practice for Specimen

Preparation and Mounting of Pipe and Duct Insulation Materials to assess Surface Burning Characteristics.

4.3.3.1.1 The flame spread index and smoke developed index

requirements of 4.3.3.1 shall not apply to air duct weatherproof coverings where they are located entirely outside a building, do not penetrate a wall or roof, and do not create an exposure hazard.

4.3.3.1.2 Smoke detectors required by 6.4.4 shall not be required to meet flame spread index or smoke developed index requirements.

4.3.3.2 Closure systems for use with rigid and flexible air ducts tested in accordance with ANSI/UL 181, Standard for Safety

Factory-Made Air Ducts and Air Connectors, shall have been tested, listed, and used in accordance with the conditions of their listings, in accordance with one of the following:

(1) ANSI/UL 181A, Standard for Safety Closure Systems for Use with Rigid Air Ducts and Air Connectors

(2) ANSI/UL 181B, Standard for Safety Closure Systems for Use with Flexible Air Ducts and Air Connectors

4.3.3.3 Coverings and linings for air ducts, pipes, plenums and panels including all pipe and duct insulation materials shall not flame, glow, smolder, or smoke when tested in accordance with a similar test for pipe covering, ASTM C411, Standard Test Method for

Hot-Surface Performance of High-Temperature Thermal Insulation, at the temperature to which they are exposed in service. In no case shall the test temperature be below 121°C (250°F).

4.3.3.4 Air duct coverings shall not extend through walls or

floors that are required to be fire stopped or required to have a fire resistance rating, unless such coverings meet the requirements of NFPA 80.

4.3.3.5* Air duct linings shall be interrupted at fire dampers to prevent interference with the operation of devices.

4.3.3.6 Air duct coverings shall not be installed so as to

conceal or prevent the use of any service opening.

4.3.11.2.6 Materials within a ceiling cavity plenum exposed to the airflow shall:

(1) Be noncombustible,

(2) Exhibit a maximum flame spread index of 25 and a maximum smoke developed index of 50 when tested in accordance with

ASTM E84 Standard Method of Test of Surface Burning

Characteristics of Building Materials, or with ANSI/UL723, javascript:parent.loadDoc('/nfpa0050-0099/0090a/codes-0122085',%20'',%20'codes-id00090a00304')

Sousley Campus Lexington, KY 40511

Bid Documents – Addendum 01

02-01-20

23 07 11 - 4

HVAC AND BOILER PLANT INSULATION

Standard for Test for Surface Burning Characteristics of

Building Materials.

(3) Comply with 4.3.11.2.6.1 through 4.3.11.2.6.11,as applicable.

4.3.11.2.6.1 Electrical wires and cables and optical fiber cables shall be listed as having a maximum peak optical density of 0.50 or less, an average optical density of 0.15 or less and a and a maximum flame spread distance of 1.5 m (5 ft) or less when tested in accordance with NFPA 262 or shall be installed in metal raceways without an overall nonmetallic covering, metal sheathed cable without an overall nonmetallic covering, or totally enclosed nonventilated metallic busway without an overall nonmetallic covering

4.3.11.2.6.2 Pneumatic tubing for control systems shall be listed as having a maximum peak optical density of 0.5 or less, an average optical density of 0.15 or less, and a maximum flame spread distance of 1.5 m (5 ft) or less when tested in accordance with ANSI/UL 1820, Standard for Safety Fire Test of Pneumatic

Tubing for Flame and Smoke Characteristics.

4.3.11.2.6.3 Nonmetallic sprinkler piping shall be listed as

having a maximum peak optical density of 0.5 or less, an average optical density of 0.15 or less, and a maximum flame spread distance of 1.5 m (5 ft) or less when tested in accordance with

ANSI/UL 1887, Standard for Safety Fire Test of Plastic Pipe for

Visible Flame and Smoke Characteristics.

4.3.11.2.6.4 Communication raceways shall be listed as having a maximum peak optical density of 0.5 or less, an average optical density of 0.15 or less, and a maximum flame spread distance of

1.5 m (5 ft) or less when tested in accordance with ANSI/UL 2024, Standard for Safety for Cable Routing Assemblies and

Communication Raceways.

4.3.11.2.6.5 Loudspeakers, recessed lighting fixtures, and other electrical with combustible enclosures including their assemblies and accessories, nonmetallic cable, wraps, nonmetallic wraps, nonmetallic cable supports and other discrete products, shall be permitted in the ceiling cavity plenum where listed as having a maximum peak optical density of 0.5 or less, an average optical density of 0.15 or less, and a peak heat release rate of 100 kW or less when tested in accordance with ANSI/UL 2043, Standard for

Safety Fire Test for Heat and Visible Smoke Release for Discrete

Products and Their Accessories Installed in Air-Handling Spaces.

4.3.11.2.6.6 Plastic piping and tubing used in plumbing systems shall be permitted to be used within a ceiling cavity plenum if it exhibits a flame spread index of 25 or less and a smoke developed index of 50 or less when tested in accordance with ASTM

E84,Standard Test Method for Surface Burning Characteristics for

Surface Burning Characteristics of Building Materials, or

ANSI/UL 723, Surface Burning Characteristics of Building

Materials , at full width of the tunnel and with no water or other liquid in the pipe during the test, unless permitted by

4.3.11.2.6.7.

javascript:parent.loadDoc('/nfpa0200-0299/0262',%20'',%20'codes-nfc262')

Sousley Campus Lexington, KY 40511

Bid Documents – Addendum 01

02-01-20

23 07 11 - 5

HVAC AND BOILER PLANT INSULATION

4.3.11.2.6.7 Plastic water distribution piping shall be listed as having a maximum peak optical density of 0.5 or less, an average optical density of 0.15 or less, and a maximum flame spread distance of 1.5 m (5 ft) or less when tested in accordance with

ANSI/UL 2846, Fire Test of Plastic Water Distribution Plumbing

Pipe for Visible Flame and Smoke Characteristics and shall be installed in accordance with its listing, shall be permitted to be within a ceiling cavity plenum.4.3.11.2.6.8 Supplementary materials for air distribution systems shall be permitted when complying with the provisions of 4.3.3.

4.3.11.2.6.9 Smoke detectors shall not be required to meet the provisions of 4.3.

4.3.11.2.6.10 Air ducts complying with 4.3.1.2 and air

connections complying with4.3.2 shall be permitted.

4.3.11.2.6.11 Materials that, in the form in which they are used, shall have a potential heat value not exceeding 8141k/kg (3500

Btu/lb), when tested in accordance with NFPA 259 and include either of the following:

(1) Materials having a structural base of noncombustible material with a surfacing not exceeding a thickness of

3.2mm (1/8”) that has a flame spread index not greater than

50.

(2) Materials, in the form and thickness used, having neither a flame spread greater than 25 nor evidence of continued progressive combustion, and of such composition that surfaces that would be exposed by cutting through the material on any plane would have neither a flame spread index greater than 25 nor evidence of continued progressive combustion, when tested in accordance with ASTM E84.

Standard Method of Test of Surface Burning Characteristics of Building Materials.

2. Test methods: ASTM E84, UL 723, or NFPA 255.

3. Specified k factors are at 24 degrees C (75 degrees F) mean temperature unless stated otherwise. Where optional thermal insulation material is used, select thickness to provide thermal conductance no greater than that for the specified material. For pipe, use insulation manufacturer's published heat flow tables. For domestic hot water supply and return, run out insulation and condensation control insulation, no thickness adjustment need be made.

4. All materials shall be compatible and suitable for service temperature, and shall not contribute to corrosion or otherwise attack surface to which applied in either the wet or dry state.

http://www.nfpa.org/codesonline/document.asp?action=load&scope=0&path=NFPA/codes/nfpa0050-0099/0090a/codes-0121752&sub=&default=false#codes-id00090a00285#codes-id00090a00285 http://www.nfpa.org/codesonline/document.asp?action=load&scope=0&path=NFPA/codes/nfpa0050-0099/0090a/codes-0121752&sub=&default=false#codes-id00090a00285#codes-id00090a00285 http://www.nfpa.org/codesonline/document.asp?action=load&scope=0&path=NFPA/codes/nfpa0050-0099/0090a/codes-0121752&sub=&default=false#codes-id00090a00285#codes-id00090a00285

Sousley Campus Lexington, KY 40511

Bid Documents – Addendum 01

02-01-20

23 07 11 - 6

HVAC AND BOILER PLANT INSULATION

C. Every package or standard container of insulation or accessories delivered to the job site for use must have a manufacturer's stamp or label giving the name of the manufacturer and description of the material.

1.4 SUBMITTALS

A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT

DATA, and SAMPLES.

B. Shop Drawings:

1. All information, clearly presented, shall be included to determine compliance with drawings and specifications and ASTM, federal and military specifications.

a. Insulation materials: Specify each type used and state surface burning characteristics.

b. Insulation facings and jackets: Each type used. Make it clear that white finish will be furnished for exposed ductwork, casings and equipment.

c. Insulation accessory materials: Each type used.

d. Manufacturer's installation and fitting fabrication instructions for flexible unicellular insulation.

e. Make reference to applicable specification paragraph numbers for coordination.

C. Samples:

1. Each type of insulation: Minimum size 100 mm (4 inches) square for board/block/ blanket; 150 mm (6 inches) long, full diameter for round types.

2. Each type of facing and jacket: Minimum size 100 mm (4 inches square).

3. Each accessory material: Minimum 120 ML (4 ounce) liquid container or 120 gram (4 ounce) dry weight for adhesives / cement / mastic.

1.5 STORAGE AND HANDLING OF MATERIAL

Store materials in clean and dry environment, pipe covering jackets shall be clean and unmarred. Place adhesives in original containers.

Maintain ambient temperatures and conditions as required by printed instructions of manufacturers of adhesives, mastics and finishing cements.

Sousley Campus Lexington, KY 40511

Bid Documents – Addendum 01

02-01-20

23 07 11 - 7

HVAC AND BOILER PLANT INSULATION

1.6 APPLICABLE PUBLICATIONS

A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by basic designation only.

B. Federal Specifications (Fed. Spec.):

L-P-535E (2)- 1999 Plastic Sheet (Sheeting): Plastic Strip; Poly (Vinyl

Chloride) and Poly (Vinyl Chloride - Vinyl Acetate), Rigid.

C. Federal Specifications (Fed. Spec.):

L-P-535E (2)- 1999......Plastic Sheet (Sheeting): Plastic Strip; Poly

(Vinyl Chloride) and Poly (Vinyl Chloride -

Vinyl Acetate), Rigid.

D. Military Specifications (Mil. Spec.):

MIL-A-3316C -1987 Adhesives, Fire-Resistant, Thermal Insulation

MIL-A-24179A (1)-2016 Adhesive, Flexible Unicellular-Plastic

Thermal Insulation

MIL-C-19565C (1)- 2016 Coating Compounds, Thermal Insulation, Fire-and

Water-Resistant, Vapor-Barrier

MIL-C-20079H-1987 ......Cloth, Glass; Tape, Textile Glass; and Thread, Glass and Wire-Reinforced Glass

E. American Society for Testing and Materials (ASTM):

A167-99 2014............Standard Specification for Stainless and

Heat-Resisting Chromium-Nickel Steel Plate, Sheet, and Strip

B209-2014...............Standard Specification for Aluminum and

Aluminum-Alloy Sheet and Plate

C411-2019...............Standard test method for Hot-Surface

Performance of High-Temperature Thermal

Insulation

C449-2019...............Standard Specification for Mineral Fiber

Hydraulic-Setting Thermal Insulating and

Finishing Cement

C533-2017...............Standard Specification for Calcium Silicate

Block and Pipe Thermal Insulation

C534-2017...............Standard Specification for Preformed Flexible

Elastomeric Cellular Thermal Insulation in

Sheet and Tubular Form

Sousley Campus Lexington, KY 40511

Bid Documents – Addendum 01

02-01-20

23 07 11 - 8

HVAC AND BOILER PLANT INSULATION

C547-2017...............Standard Specification for Mineral Fiber pipe

Insulation

C552-07 ................Standard Specification for Cellular Glass

Thermal Insulation

C553-2015...............Standard Specification for Mineral Fiber

Blanket Thermal Insulation for Commercial and

Industrial Applications

C585-2016...............Standard Practice for Inner and Outer Diameters of Rigid Thermal Insulation for Nominal Sizes of Pipe and Tubing (NPS System) R (1998)

C612-2014...............Standard Specification for Mineral Fiber Block and Board Thermal Insulation

C1126- 2019.............Standard Specification for Faced or Unfaced

Rigid Cellular Phenolic Thermal Insulation

C1136- 2017.............Standard Specification for Flexible, Low

Permeance Vapor Retarders for Thermal

Insulation

D1668-97a 2017 .........Standard Specification for Glass Fabrics (Woven and Treated) for Roofing and Waterproofing

E84-2014................Standard Test Method for Surface Burning

Characteristics of Building

Materials

E119-2007...............Standard Test Method for Fire Tests of Building

Construction and Materials

E136-2019...............Standard Test Methods for Behavior of Materials in a Vertical Tube Furnace at 750 degrees C

(1380 F)

F. National Fire Protection Association (NFPA):

90A-2018................Standard for the Installation of Air

Conditioning and Ventilating Systems

96-2018.................Standards for Ventilation Control and Fire

Protection of Commercial Cooking Operations

101-2018................Life Safety Code

251-2014................Standard methods of Tests of Fire Endurance of

Building Construction Materials

255-2006................Standard Method of tests of Surface Burning

Characteristics of Building Materials

Sousley Campus Lexington, KY 40511

Bid Documents – Addendum 01

02-01-20

23 07 11 - 9

HVAC AND BOILER PLANT INSULATION

G. Underwriters Laboratories, Inc (UL):

723-2018................UL Standard for Safety Test for Surface Burning

Characteristics of Building Materials with

Revision of 09/08

H. Manufacturer’s Standardization Society of the Valve and Fitting

Industry (MSS):

SP58-2018...............Pipe Hangers and Supports Materials, Design, and Manufacture

PART 2 - PRODUCTS

2.1 MINERAL FIBER OR FIBER GLASS

A. ASTM C612 (Board, Block), Class 1 or 2, density 48 kg/m3 (3 pcf), k =

0.037 (0.26) at 24 degrees C (75 degrees F), external insulation for temperatures up to 204 degrees C (400 degrees F) with foil scrim (FSK) facing.

B. ASTM C553 (Blanket, Flexible) Type I, Class B-3, Density 16 kg/m3 (1 pcf), k = 0.045 (0.31) at 24 degrees C (75 degrees F), for use at temperatures up to 204 degrees C (400 degrees F) with foil scrim (FSK) facing.

C. ASTM C547 (Pipe Fitting Insulation and Preformed Pipe Insulation), Class 1, k = 0.037 (0.26) at 24 degrees C (75 degrees F), for use at temperatures up to 230 degrees C (450 degrees F) with an all service vapor retarder jacket with polyvinyl chloride premolded fitting covering.

2.2 MINERAL WOOL OR REFRACTORY FIBER

A. Comply with Standard ASTM C612, Class 3, 450 degrees C (850 degrees F).

2.3 RIGID CELLULAR PHENOLIC FOAM

A. Preformed (molded) pipe insulation, ASTM C1126, type III, grade 1, k =

0.021(0.15) at 10 degrees C (50 degrees F), for use at temperatures up to 121 degrees C (250 degrees F) with all service vapor retarder jacket with polyvinyl chloride premolded fitting covering.

B. Equipment and Duct Insulation, ASTM C 1126, type II, grade 1, k = 0.021

(0.15) at 10 degrees C (50 degrees F), for use at temperatures up to

121 degrees C (250 degrees F) with rigid cellular phenolic insulation and covering, and all service vapor retarder jacket.

2.4 CELLULAR GLASS CLOSED-CELL

A. Comply with Standard ASTM C177, C518, density 120 kg/m3 (7.5 pcf) nominal, k = 0.033 (0.29) at 240 degrees C (75 degrees F).

Sousley Campus Lexington, KY 40511

Bid Documents – Addendum 01

02-01-20

23 07 11 - 10

HVAC AND BOILER PLANT INSULATION

B. Pipe insulation for use at temperatures up to 200 degrees C (400 degrees F) with all service vapor retarder jacket.

2.5 POLYISOCYANURATE CLOSED-CELL RIGID

A. Preformed (fabricated) pipe insulation, ASTM C591, type IV, K=0.027(0.19) at 24 degrees C (75 degrees F), flame spread not over 25, smoke developed not over 50, for use at temperatures up to 149 degree C

(300 degree F) with factory applied PVDC or all service vapor retarder jacket with polyvinyl chloride premolded fitting covers.

B. Equipment and duct insulation, ASTM C 591,type IV, K=0.027(0.19) at 24 degrees C (75 degrees F), for use at temperatures up to 149 degrees C

(300 degrees F) with PVDC or all service jacket vapor retarder jacket.

2.6 FLEXIBLE ELASTOMERIC CELLULAR THERMAL

ASTM C177, C518, k = 0.039 (0.27) at 24 degrees C (75 degrees F), flame spread not over 25, smoke developed not over 50, for temperatures from minus 4 degrees C (40 degrees F) to 93 degrees C (200 degrees F). No jacket required.

2.7 DUCT WRAP FOR KITCHEN HOOD GREASE DUCTS

A. Light weight, high temperature mineral fiber or ceramic fiber insulating material with low thermal conductivity K value of 0.060 W/m2 degrees C (0.417 Btu in/hr ft² degrees F) at mean temperature of 260 degrees C (500 degrees F).

B. Material shall be fully encapsulated by UL classified aluminum foil and tested to ASTM E84 standard.

C. Material shall be UL tested for internal grease fire to 1093 degrees C

(2,000 degrees F) with zero clearance and for through-penetration firestop.

D. Material shall be UL classified for 2 hour fire rating for grease duct enclosure, and meet NFPA 96 requirements for direct applied insulating material to grease ducts with zero clearance.

E. Material flame spread and smoke developed ratings shall not be higher than 5, as per ASTM E 84/UL 723 Flammability Test.

2.8 CALCIUM SILICATE

A. Preformed pipe Insulation: ASTM C533, Type I and Type II with indicator denoting asbestos-free material.

B. Premolded Pipe Fitting Insulation: ASTM C533, Type I and Type II with indicator denoting asbestos-free material.

C. Equipment Insulation: ASTM C533, Type I and Type II

Sousley Campus Lexington, KY 40511

Bid Documents – Addendum 01

02-01-20

23 07 11 - 11

HVAC AND BOILER PLANT INSULATION

D. Characteristics:

Insulation Characteristics

ITEMS TYPE I TYPE II

Temperature, maximum degrees C

(degrees F)

649 (1200) 927 (1700)

Density (dry), Kg/m3 (lb/ ft3) 232 (14.5) 288 (18)

Thermal conductivity:

Min W/ m K (Btu in/h ft2 degrees F)@ mean temperature of 93 degrees C

(200 degrees F)

0.059

(0.41)

0.078

(0.540)

Surface burning characteristics:

Flame spread Index, Maximum

Smoke Density index, Maximum 0 0

2.9 INSULATION FACINGS AND JACKETS

A. Vapor Retarder, higher strength with low water permeance = 0.02 or less perm rating, Beach puncture 50 units for insulation facing on exposed ductwork, casings and equipment, and for pipe insulation jackets.

Facings and jackets shall be all service type (ASJ) or PVDC Vapor

Retarder jacketing.

B. ASJ jacket shall be white kraft bonded to 0.025 mm (1 mil) thick aluminum foil, fiberglass reinforced, with pressure sensitive adhesive closure. Comply with ASTM C1136. Beach puncture 50 units, Suitable for painting without sizing. Jackets shall have minimum 40 mm (1-1/2 inch) lap on longitudinal joints and minimum 75 mm (3 inch) butt strip on end joints. Butt strip material shall be same as the jacket. Lap and butt strips shall be self-sealing type with factory-applied pressure sensitive adhesive.

C. Vapor Retarder medium strength with low water vapor permeance of 0.02 or less perm rating), Beach puncture 25 units: Foil-Scrim-Kraft (FSK) or PVDC vapor retarder jacketing type for concealed ductwork and equipment.

D. Field applied vapor barrier jackets shall be provided, in addition to the specified facings and jackets, on all exterior piping and ductwork

Sousley Campus Lexington, KY 40511

Bid Documents – Addendum 01

02-01-20

23 07 11 - 12

HVAC AND BOILER PLANT INSULATION

as well as on interior piping and ductwork exposed to outdoor air

(i.e.; in ventilated attics, piping in ventilated (not air conditioned) spaces, etc.)in high humidity areasconveying fluids below ambient temperature. The vapor barrier jacket shall consist of a multi-layer laminated cladding with a maximum water vapor permeance of 0.001 perms.

The minimum puncture resistance shall be 35 cm-kg (30 inch-pounds) for interior locations and 92 cm-kg (80 inch-pounds) for exterior or exposed locations or where the insulation is subject to damage.

E. Glass Cloth Jackets: Presized, minimum 0.18 kg per square meter (7.8 ounces per square yard), 2000 kPa (300 psig) bursting strength with integral vapor retarder where required or specified. Weather proof if utilized for outside service.

F. Factory composite materials may be used provided that they have been tested and certified by the manufacturer.

G. Pipe fitting insulation covering (jackets): Fitting covering shall be premolded to match shape of fitting and shall be polyvinyl chloride

(PVC) conforming to Fed Spec L-P-335, composition A, Type II Grade GU, and Type III, minimum thickness 0.7 mm (0.03 inches). Provide color matching vapor retarder pressure sensitive tape.

H. Aluminum Jacket-Piping systems and circular breeching and stacks: ASTM

B209, 3003 alloy, H-14 temper, 0.6 mm (0.023 inch) minimum thickness with locking longitudinal joints. Jackets for elbows, tees and other fittings shall be factory-fabricated to match shape of fitting and of

0.6 mm (0.024) inch minimum thickness aluminum. Fittings shall be of same construction as straight run jackets but need not be of the same alloy. Factory-fabricated stainless steel bands shall be installed on all circumferential joints. Bands shall be 13 mm (0.5 inch) wide on 450 mm (18 inch) centers. System shall be weatherproof if utilized for outside service.

I. Aluminum jacket-Rectangular breeching: ASTM B209, 3003 alloy, H-14 temper, 0.5 mm (0.020 inches) thick with 32 mm (1-1/4 inch) corrugations or 0.8 mm (0.032 inches) thick with no corrugations.

System shall be weatherproof if used for outside service.

2.10 REMOVABLE INSULATION JACKETS

A. Insulation and Jacket:

1. Non-Asbestos Glass mat, type E needled fiber.

Sousley Campus Lexington, KY 40511

Bid Documents – Addendum 01

02-01-20

23 07 11 - 13

HVAC AND BOILER PLANT INSULATION

2. Temperature maximum of 450°F, Maximum water vapor transmission of

0.00 perm, and maximum moisture absorption of 0.2 percent by volume.

3. Jacket Material: Silicon/fiberglass and LFP 2109 pure PTFE.

4. Construction: One piece jacket body with three-ply braided pure

Teflon or Kevlar thread and insulation sewn as part of jacket. Belt fastened.

2.11 PIPE COVERING PROTECTION SADDLES

A. Cold pipe support: Premolded pipe insulation 180 degrees (half-shells) on bottom half of pipe at supports. Material shall be cellular glass or high density Polyisocyanurate insulation of the same thickness as adjacent insulation. Density of Polyisocyanurate insulation shall be a minimum of 48 kg/m3 (3.0 pcf).

Nominal Pipe Size and Accessories Material (Insert Blocks)

Nominal Pipe Size mm (inches) Insert Blocks mm (inches)

Up through 125 (5) 150 (6) long

150 (6) 150 (6) long

200 (8), 250 (10), 300 (12) 225 (9) long

350 (14), 400 (16) 300 (12) long

450 through 600 (18 through 24) 350 (14) long

B. Warm or hot pipe supports: Premolded pipe insulation (180 degree half-shells) on bottom half of pipe at supports. Material shall be high density Polyisocyanurate (for temperatures up to 149 degrees C [300 degrees F]), cellular glass or calcium silicate. Insulation at supports shall have same thickness as adjacent insulation. Density of

Polyisocyanurate insulation shall be a minimum of 48 kg/m3 (3.0 pcf).

C. Boiler Plant Pipe supports: MSS SP58, Type 39. Apply at all pipe support points, except where MSS SP58, Type 3 pipe clamps provided as part of the support system.

2.12 ADHESIVE, MASTIC, CEMENT

A. Mil. Spec. MIL-A-3316, Class 1: Jacket and lap adhesive and protective finish coating for insulation.

B. Mil. Spec. MIL-A-3316, Class 2: Adhesive for laps and for adhering insulation to metal surfaces.

C. Mil. Spec. MIL-A-24179, Type II Class 1: Adhesive for installing flexible unicellular insulation and for laps and general use.

Sousley Campus Lexington, KY 40511

Bid Documents – Addendum 01

02-01-20

23 07 11 - 14

HVAC AND BOILER PLANT INSULATION

D. Mil. Spec. MIL-C-19565, Type I: Protective finish for outdoor use.

E. Mil. Spec. MIL-C-19565, Type I or Type II: Vapor barrier compound for indoor use.

F. ASTM C449: Mineral fiber hydraulic-setting thermal insulating and finishing cement.

G. Other: Insulation manufacturers' published recommendations.

2.13 MECHANICAL FASTENERS

A. Pins, anchors: Welded pins, or metal or nylon anchors with galvanized steel-coated or fiber washer, or clips. Pin diameter shall be as recommended by the insulation manufacturer.

B. Staples: Outward clinching monel or galvanized steel.

C. Wire: 1.3 mm thick (18 gage) soft annealed galvanized or 1.9 mm (14 gage) copper clad steel or nickel copper alloy.

D. Bands: 13 mm (0.5 inch) nominal width, brass, galvanized steel, aluminum or stainless steel.

2.14 REINFORCEMENT AND FINISHES

A. Glass fabric, open weave: ASTM D1668, Type III (resin treated) and Type

I (asphalt treated).

B. Glass fiber fitting tape: Mil. Spec MIL-C-20079, Type II, Class 1.

C. Tape for Flexible Elastomeric Cellular Insulation: As recommended by the insulation manufacturer.

D. Hexagonal wire netting: 25 mm (one inch) mesh, 0.85 mm thick (22 gage) galvanized steel.

E. Corner beads: 50 mm (2 inch) by 50 mm (2 inch), 0.55 mm thick (26 gage) galvanized steel; or, 25 mm (1 inch) by 25 mm (1 inch), 0.47 mm thick

(28 gage) aluminum angle adhered to 50 mm (2 inch) by 50 mm (2 inch)

Kraft paper.

F. PVC fitting cover: Fed. Spec L-P-535, Composition A, 11-86 Type II, Grade GU, with Form B Mineral Fiber insert, for media temperature 4 degrees C (40 degrees F) to 121 degrees C (250 degrees F). Below 4 degrees C (40 degrees F) and above 121 degrees C (250 degrees F).

Provide double layer insert. Provide color matching vapor barrier pressure sensitive tape.

2.15 FIRESTOPPING MATERIAL

Other than pipe and duct insulation, refer to Section 07 84 00

FIRESTOPPING.

Sousley Campus Lexington, KY 40511

Bid Documents – Addendum 01

02-01-20

23 07 11 - 15

HVAC AND BOILER PLANT INSULATION

2.16 FLAME AND SMOKE

Unless shown otherwise all assembled systems shall meet flame spread 25 and smoke developed 50 rating as developed under ASTM, NFPA and UL standards and specifications. See paragraph 1.3 "Quality Assurance".

PART 3 - EXECUTION

3.1 GENERAL REQUIREMENTS

A. Required pressure tests of duct and piping joints and connections shall be completed and the work approved by the COR for application of insulation. Surface shall be clean and dry with all foreign materials, such as dirt, oil, loose scale and rust removed.

B. Except for specific exceptions, insulate entire specified equipment, piping (pipe, fittings, valves, accessories), and duct systems.

Insulate each pipe and duct individually. Do not use scrap pieces of insulation where a full length section will fit.

C. Where removal of insulation of piping, ductwork and equipment is required to comply with Section 02 82 11, TRADITIONAL ASBESTOS

ABATEMENT and Section 02 82 13.13, GLOVEBAG ASBESTOS ABATEMENT, such areas shall be reinsulated to comply with this specification.

D. Insulation materials shall be installed in a first class manner with smooth and even surfaces, with jackets and facings drawn tight and smoothly cemented down at all laps. Insulation shall be continuous through all sleeves and openings, except at fire dampers and duct heaters (NFPA 90A). Vapor retarders shall be continuous and uninterrupted throughout systems with operating temperature 16 degrees

C (60 degrees F) and below. Lap and seal vapor retarder over ends and exposed edges of insulation. Anchors, supports and other metal projections through insulation on cold surfaces shall be insulated and vapor sealed for a minimum length of 150 mm (6 inches).

E. Install vapor stops at all insulation terminations on either side of valves, pumps and equipment and particularly in straight lengths of pipe insulation.

F. Construct insulation on parts of equipment such as chilled water pumps and heads of chillers, convertors and heat exchangers that must be opened periodically for maintenance or repair, so insulation can be removed and replaced without damage. Install insulation with bolted 1 mm thick (20 gage) galvanized steel or aluminum covers as complete

Sousley Campus Lexington, KY 40511

Bid Documents – Addendum 01

02-01-20

23 07 11 - 16

HVAC AND BOILER PLANT INSULATION

units, or in sections, with all necessary supports, and split to coincide with flange/split of the equipment.

G. Insulation on hot piping and equipment shall be terminated square at items not to be insulated, access openings and nameplates. Cover all exposed raw insulation with white sealer or jacket material.

H. Protect all insulations outside of buildings with aluminum jacket using lock joint or other approved system for a continuous weather tight system. Access doors and other items requiring maintenance or access shall be removable and sealable.

I. Insulate PRVs, flow meters, with removable and replaceable jacket (RJ) clearly labeled with the device information, unless otherwise directed by the COR or as indicated in section 230711 3.1.J.

J. HVAC work not to be insulated:

1. Internally insulated ductwork and air handling units where the internal insulation meets the required R value.

2. Relief air ducts (Economizer cycle exhaust air) unless the dewpoint of the space where installed will cause condensation.

3. Exhaust air ducts and plenums, and ventilation exhaust air shafts unless the dewpoint of the space where installed will cause condensation.

4. Equipment: Expansion tanks, and hot water pumps.

5. In hot piping: Unions, flexible connectors, control valves, , safety valves and discharge vent piping, vacuum breakers, thermostatic vent valves, steam traps 20 mm (3/4 inch) and smaller, exposed piping through floor for convectors and radiators. Insulate piping to within approximately 75 mm (3 inches) of uninsulated items.

K. Boiler plant work not to be insulated(NI)or if insulated the insulation shall be removal jacket type (RJ):

1. Pipes, valves and fittings:

a. Gas fuel(NI)

b. Tank drains (NI)

c. Vents-tank, safety and back pressure valves except protective.

(NI)

d. Threaded valves (RJ)

e. Check valves (RJ)

f. Unions (RJ)

g. Dielectric flanges and unions (RJ)

Sousley Campus Lexington, KY 40511

Bid Documents – Addendum 01

02-01-20

23 07 11 - 17

HVAC AND BOILER PLANT INSULATION

h. Non-return stop and check valve drains (NI)

i. Pressure transmission to gages (NI)

j. Piping in control panels (NI)

3. Equipment:

a. Pumps-inlet to outlet (NI)

b. Safety valves(NI)

c. Water meters(NI)

d. Chemical feeders(NI)

e. All nameplates (NI)

4. Specialties:

a. Pressure reducing valves(RJ)

b. Control valves-water and steam(NI)

c. Level sensors-piping, valves and blowdown(NI)

d. Back pressure regulators-oil and steam(NI)

e. Strainers under 65 mm (2-1/2 inch) pipe size(RJ)

f. Expansion bellows(RJ)

g. Flexible connectors(RJ)

h. Ball joints except piping between joints (NI)

L. Apply insulation materials subject to the manufacturer's recommended temperature limits. Apply adhesives, mastic and coatings at the manufacturer's recommended minimum coverage.

M. Elbows, flanges and other fittings shall be insulated with the same material as is used on the pipe straights. The elbow/ fitting insulation shall be field-fabricated, mitered or factory prefabricated to the necessary size and shape to fit on the elbow/ fitting. Use of polyurethane spray-foam to fill a PVC elbow jacket is prohibited on cold applications.

N. Firestop Pipe and Duct insulation:

1. Provide firestopping insulation at fire and smoke barriers through penetrations. Fire stopping insulation shall be UL listed as defines in Section 07 84 00, FIRESTOPPING.

2. Pipe and duct penetrations requiring fire stop insulation including, but not limited to the following:

a. Pipe risers through floors

b. Pipe or duct chase walls and floors

c. Smoke partitions

d. Fire partitions

Sousley Campus Lexington, KY 40511

Bid Documents – Addendum 01

02-01-20

23 07 11 - 18

HVAC AND BOILER PLANT INSULATION

O. Freeze protection of above grade outdoor piping (over heat tracing tape): 26 mm (10 inch) thick insulation, for all pipe sizes 75 mm (3 inches) and smaller and 25 mm(1inch) thick insulation for larger pipes.

Provide metal jackets for all pipes. Provide for cold water make-up to cooling towers and condenser water piping and chilled water piping as described in Section 23 21 13, HYDRONIC PIPING (electrical heat tracing systems).

P. Provide vapor barrier jackets over insulation as follows:

1. All piping and ductwork exposed to outdoor weather.

2. All interior piping and ducts conveying fluids exposed to outdoor air (i.e. in attics, ventilated (not air conditioned) spaces, etc.)

below ambient air temperature, in high humidity areas.

Q. Provide metal jackets over insulation as follows:

1. All piping and ducts exposed to outdoor weather.

2. Piping exposed in building, within 1800 mm (6 feet) of the floor, that connects to sterilizers, kitchen and laundry equipment. Jackets may be applied with pop rivets. Provide aluminum angle ring escutcheons at wall, ceiling or floor penetrations.

3. A 50 mm (2 inch) overlap is required at longitudinal and circumferential joints.

3.2 INSULATION INSTALLATION

A. Mineral Fiber Board:

1. Faced board: Apply board on pins spaced not more than 300 mm (12 inches) on center each way, and not less than 75 mm (3 inches) from each edge of board. In addition to pins, apply insulation bonding adhesive to entire underside of horizontal metal surfaces. Butt insulation edges tightly and seal all joints with laps and butt strips. After applying speed clips cut pins off flush and apply vapor seal patches over clips.

2. Plain board:

a. Insulation shall be scored, beveled or mitered to provide tight joints and be secured to equipment with bands spaced 225 mm (9 inches) on center for irregular surfaces or with pins and clips on flat surfaces. Use corner beads to protect edges of insulation.

b. For hot equipment: Stretch 25 mm (1 inch) mesh wire, with edges wire laced together, over insulation and finish with insulating

Sousley Campus Lexington, KY 40511

Bid Documents – Addendum 01

02-01-20

23 07 11 - 19

HVAC AND BOILER PLANT INSULATION

and finishing cement applied in one coat, 6 mm (1/4 inch) thick, trowel led to a smooth finish.

c. For cold equipment: Apply meshed glass fabric in a tack coat 1.5 to 1.7 square meter per liter (60 to 70 square feet per gallon) of vapor mastic and finish with mastic at 0.3 to 0.4 square meter per liter (12 to 15 square feet per gallon) over the entire fabric surface.

d. Chilled water pumps: Insulate with removable and replaceable 1 mm thick (20 gage) aluminum or galvanized steel covers lined with insulation. Seal closure joints/flanges of covers with gasket material. Fill void space in enclosure with flexible mineral fiber insulation.

3. Exposed, unlined ductwork and equipment in unfinished areas, mechanical and electrical equipment rooms and attics, interstitial spaces and duct work exposed to outdoor weather:

a. 50 mm (2 inch) thick insulation faced with ASJ (white all service jacket): Supply air duct unlined air handling units and after filter housing.

b. 50 mm (2 inch) thick insulation faced with ASJ: Return air duct, mixed air plenums and prefilter housing.

c. Outside air intake ducts: 25 mm (one inch) thick insulation faced with ASJ.

d. Exposed, unlined supply and return ductwork exposed to outdoor weather: 50 mm (2 inch) thick insulation faced with a reinforcing membrane and two coats of vapor barrier mastic or multi-layer vapor barrier with a maximum water vapor permeability of 0.001 perms.

4. Supply air duct in the warehouse and in the laundry: 25 mm (one inch) thick insulation faced with ASJ.

5. Cold equipment: 40 mm (1-1/2inch) thick insulation faced with ASJ.

a. Chilled water pumps, water filter, chemical feeder pot or tank.

b. Pneumatic, cold storage water and surge tanks.

6. Hot equipment: 40 mm (1-1/2 inch) thick insulation faced with ASJ.

a. Air separators.

b. Domestic water heaters and hot water storage tanks (not factory insulated).

Sousley Campus Lexington, KY 40511

Bid Documents – Addendum 01

02-01-20

23 07 11 - 20

HVAC AND BOILER PLANT INSULATION

7. Laundry: Hot exhaust ducts from dryers, where duct is exposed in the laundry.

B. Flexible Mineral Fiber Blanket:

1. Adhere insulation to metal with 75 mm (3 inch) wide strips of insulation bonding adhesive at 200 mm (8 inches) on center all around duct. Additionally secure insulation to bottom of ducts exceeding 600 mm (24 inches) in width with pins welded or adhered on

450 mm (18 inch) centers. Secure washers on pins. Butt insulation edges and seal joints with laps and butt strips. Staples may be used to assist in securing insulation. Seal all vapor retarder penetrations with mastic. Sagging duct insulation will not be acceptable. Install firestop duct insulation where required.

2. Supply air ductwork to be insulated includes main and branch ducts from AHU discharge to room supply outlets, and the bodies of ceiling outlets to prevent condensation. Insulate sound attenuator units, coil casings and damper frames. To prevent condensation insulate trapeze type supports and angle iron hangers for flat oval ducts that are in direct contact with metal duct.

3. Concealed supply air ductwork.

a. Above ceilings at a roof level, in attics, and duct work exposed to outdoor weather: 50 mm (2 inch) thick insulation faced with

FSK.

b. Above ceilings for other than roof level: 40 mm (1 ½ inch) thick insulation faced with FSK.

4. Concealed return air duct:

a. In attics (where not subject to damage) and where exposed to outdoor weather: 50mmm (2 inch)thick insulation faced with FSK.

b. Above ceilings at a roof level, unconditioned areas, and in chases with external wall or containing steam piping; 40 mm (1-

1/2 inch) thick, insulation faced with FSK.

c. Concealed return air ductwork in other locations need not be insulated.

5. Concealed outside air duct: 40 mm (1-1/2 inch) thick insulation faced with FSK.

C. Molded Mineral Fiber Pipe and Tubing Covering:

Sousley Campus Lexington, KY 40511

Bid Documents – Addendum 01

02-01-20

23 07 11 - 21

HVAC AND BOILER PLANT INSULATION

1. Fit insulation to pipe or duct, aligning longitudinal joints. Seal longitudinal joint laps and circumferential butt strips by rubbing hard with a nylon sealing tool to assure a positive seal. Staples may be used to assist in securing insulation. Seal all vapor retarder penetrations on cold piping with a generous application of vapor barrier mastic. Provide inserts and install with metal insulation shields at outside pipe supports. Install freeze protection insulation over heating cable.

2. Contractor's options for fitting, flange and valve insulation:

a. Insulating and finishing cement for sizes less than 100 mm (4 inches) operating at surface temperature of 16 degrees C (61 degrees F) or more.

b. Factory premolded, one piece PVC covers with mineral fiber, (Form

B), inserts. Provide two insert layers for pipe temperatures below 4 degrees C (40 degrees F), or above 121 degrees C (250 degrees F). Secure first layer of insulation with twine. Seal seam edges with vapor barrier mastic and secure with fitting tape.

c. Factory molded, ASTM C547 or field mitered sections, joined with adhesive or wired in place. For hot piping finish with a smoothing coat of finishing cement. For cold fittings, 16 degrees

C (60 degrees F) or less, vapor seal with a layer of glass fitting tape imbedded between two 2 mm (1/16 inch) coats of vapor barrier mastic.

d. Fitting tape shall extend over the adjacent pipe insulation and overlap on itself at least 50 mm (2 inches).

3. Nominal thickness in millimeters and inches specified in the schedule at the end of this section.

D. Rigid Cellular Phenolic Foam:

1. Rigid closed cell phenolic insulation may be provided for piping, ductwork and equipment for temperatures up to 121 degrees C (250 degrees F).

2. Note the NFPA 90A burning characteristics requirements of 25/50 in paragraph 1.3.B

3. Provide secure attachment facilities such as welding pins.

4. Apply insulation with joints tightly drawn together

5. Apply adhesives, coverings, neatly finished at fittings, and valves.

Sousley Campus Lexington, KY 40511

Bid Documents – Addendum 01

02-01-20

23 07 11 - 22

HVAC AND BOILER PLANT INSULATION

6. Final installation shall be smooth, tight, neatly finished at all edges.

7. Minimum thickness in millimeters (inches) specified in the schedule at the end of this section.

8. Exposed, unlined supply and return ductwork exposed to outdoor weather: 50 mm (2 inch) thick insulation faced with a multi-layer vapor barrier with a maximum water vapor permeance of 0.00 perms.

9. Condensation control insulation: Minimum 25 mm (1.0 inch) thick for all pipe sizes.

a. HVAC: Cooling coil condensation piping to waste piping fixture or drain inlet. Omit insulation on plastic piping in mechanical rooms.

E. Cellular Glass Insulation:

1. Pipe and tubing, covering nominal thickness in millimeters and inches as specified in the schedule at the end of this section.

2. Underground Piping: Type II, factory jacketed with a 3 mm laminate jacketing consisting of 3000 mm x 3000 mm (10 ft x 10 ft) asphalt impregnated glass fabric, bituminous mastic and outside protective plastic film.

a. 75 mm (3 inches) thick for hot water piping.

b. As scheduled at the end of this section for chilled water piping.

c. Underground piping: Apply insulation with joints tightly butted.

Seal longitudinal self-sealing lap. Use field fabricated or factory made fittings. Seal butt joints and fitting with jacketing as recommended by the insulation manufacturer. Use 100 mm (4 inch) wide strips to seal butt joints.

d. Provide expansion chambers for pipe loops, anchors and wall penetrations as recommended by the insulation manufacturer.

e. Underground insulation shall be inspected and approved by the COR as follows:

1) Insulation in place before coating.

2) After coating.

f. Sand bed and backfill: Minimum 75 mm (3 inches) all around insulated pipe or tank, applied after coating has dried.

3. Cold equipment: 50 mm (2 inch) thick insulation faced with ASJ for chilled water pumps, water filters, chemical feeder pots or tanks, expansion tanks, air separators and air purgers.

Sousley Campus Lexington, KY 40511

Bid Documents – Addendum 01

02-01-20

23 07 11 - 23

HVAC AND BOILER PLANT INSULATION

4. Exposed, unlined supply and return ductwork exposed to outdoor weather: 50 mm (2 inch) thick insulation faced with a reinforcing membrane and two coats of vapor barrier mastic or multi-layer vapor barrier with a water vapor permeability of 0.00 perms.

F. Polyisocyanurate Closed-Cell Rigid Insulation:

1. Polyisocyanurate closed-cell rigid insulation (PIR) may be provided for exterior piping, equipment and ductwork for temperature up to

149 degree C (300 degree F).

2. Install insulation, vapor barrier and jacketing per manufacturer’s recommendations. Particular attention should be paid to recommendations for joint staggering, adhesive application, external hanger design, expansion/contraction joint design and spacing and vapor barrier integrity.

3. Install insulation with all joints tightly butted (except expansion) joints in hot applications).

4. If insulation thickness exceeds 63 mm (2.5 inches), install as a double layer system with longitudinal (lap) and butt joint staggering as recommended by manufacturer.

5. For cold applications, vapor barrier shall be installed in a continuous manner. No staples, rivets, screws or any other attachment device capable of penetrating the vapor barrier shall be used to attach the vapor barrier or jacketing. No wire ties capable of penetrating the vapor barrier shall be used to hold the insulation in place. Banding shall be used to attach PVC or metal jacketing.

6. Elbows, flanges and other fittings shall be insulated with the same material as is used on the pipe straights. The elbow/ fitting insulation shall be field-fabricated, mitered or factory prefabricated to the necessary size and shape to fit on the elbow/ fitting. Use of polyurethane spray-foam to fill PVC elbow jacket is prohibited on cold applications.

7. For cold applications, the vapor barrier on elbows/fittings shall be either mastic-fabric-mastic or 2 mil thick PVDC vapor barrier adhesive tape.

8. All PVC and metal jacketing shall be installed so as to naturally shed water. Joints shall point down and shall be sealed with either adhesive or caulking (except for periodic slip joints).

Sousley Campus Lexington, KY 40511

Bid Documents – Addendum 01

02-01-20

23 07 11 - 24

HVAC AND BOILER PLANT INSULATION

9. Underground piping: Follow instructions for above ground piping but the vapor retarder jacketing shall be 6 mil thick PVDC or minimum 30 mil thick rubberized bituminous membrane. Sand bed and backfill shall be a minimum of 150 mm (6 inches) all around insulated pipe.

10. Exposed, unlined supply and return ductwork exposed to outdoor weather: 50 mm (2 inch) thick insulation faced with a multi-layer vapor barrier with a water vapor permeance of 0.00 perms.

11. Note the NFPA 90A burning characteristic requirements of 25/50 in paragraph 1.3B. Refer to paragraph 3.1 for items not to be insulated.

12. Minimum thickness in millimeter (inches) specified in the schedule at the end of this section.

G. Flexible Elastomeric Cellular Thermal Insulation:

1. Apply insulation and fabricate fittings in accordance with the manufacturer's installation instructions and finish with two coats of weather resistant finish as recommended by the insulation manufacturer.

2. Pipe and tubing insulation:

a.…