04 - 596-22-700 Drawings 00_General.pdf
PDF 10 MB Posted
- Solicitation number
- 36C77625B0040
About this file
This document is a set of architectural and engineering drawings for the EHRM (Electronic Health Record Modernization) Infrastructure Upgrades project at the Lexington VA Health Care System in Lexington, Kentucky. The comprehensive bid documents cover multiple buildings (1, 2, 3, 4, 12, 16, 17, 25, 27, 28, 29, 37, 47, and 48) and include detailed phasing notes, infection control requirements, and technical specifications for telecommunications, electrical, mechanical, and fire protection systems upgrades.
The project is divided into four distinct phases: Phase IA involves demolishing and constructing a new data center in Building 17, Phase IB establishes a temporary fiber backbone connection, Phase II focuses on telecommunications room renovations in smaller, non-patient care buildings, and Phase III addresses renovations in larger, more complex patient care buildings. The project requires extensive coordination with VA personnel, careful management of existing infrastructure, and precise cutover scheduling for network systems. The work includes installing new pathway infrastructure, cabling, certification testing, and demolition of old systems while maintaining facility operations.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
CONSULTANTS:
Drawing # OF
U.S. DEPARTMENT OF VETERANS AFFAIRS
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
ARCH: SETH CAVIN, LICENSE #8468 EXP. 06/30/2024
ENGR: SPUR DESIGN, LLC COA #5197 EXP. 12/31/2025
CIVIL ENGINEER
OLSSON
550 ST LOUIS ST,
SPRINGFIELD, MO 65806
(417) 885-1736
MECH / ELEC / PLUMB ENG.
SPUR DESIGN
2519 MADISON AVE, SUITE 100
KANSAS CITY, MO 64108
(913) 369-7200
The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.
FIRE PROTECTION ENGINEER
FULLY SPRINKLERED
INDUSTRIAL HYGENIST
RIVERFRONT SAFETY & HEALTH
1139 OLIVE ST, SUITE 300
ST. LOUIS, MO 63101
(713) 864-2900
TELECOMMUNICATIONS
ASPEN COMMUNICATIONS, LLC
7 KIJI-DAVA CIRCLE, SUITE A
PRESCOTT, AZ 86301
(928) 774-0992
PHYSICAL SECURITY
FORCE PROTECT
10901 FRONT BEACH RD, #1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
RATED ENGINEERING
609 S. KELLY AVE., SUITE H2
EDMOND, OK 73003
(405) 856-2965
STRUCTURAL
STAND
8234 ROBINSON
OVERLAND PARK, KS 66204
(913) 214-2169
/1
/2
:0 :1
P
M
COVER SHEET
NSM 1 258AJS
BID DOCUMENTS
EHRM INFRASTRUCTURE UPGRADES
LEXINGTON, KY
VA PROJECT NUMBER: 596-22-700
EHRM INFRASTRUCTURE
UPGRADES LEXINGTON, KY
03/15/2024
596-22-700
LEXINGTON VA HEALTH CARE
2250 LEESTOWN RD
LEXINGTON, KY 40511
LEXINGTON VA HEALTH CARE SYSTEM
2250 LEESTOWN RD
LEXINGTON, KY 40511
BID DOCUMENTS
GI000
SPUR #: 2207
LOCATION
PLAN
N
W N
E W
C I R
R D
W N
E W
C I R
R D
LEESTOWN RD
LEESTOWN RD
C I T
A T
I O
N B
L V
D
AREA
PLAN
N
LEESTOWN RD
PROJECT LOCATION
SHEET INDEX
SEQUENCE NUMBER SHEET NAME
[00] GENERAL
1 GI000 COVER SHEET
2 GI001 GENERAL INFORMATION
3 GI002 ICRA CONSTRUCTION DETAILS
4 GI010 GENERAL PHASING NOTES
[01] ENVIRONMENTAL
5 HA000 HAZARDOUS MATERIALS - GENERAL NOTES
6 HA010 BUILDING 1 - GROUND FLOOR - ENVIRONMENTAL HAZARDS
7 HA011 BUILDING 1 - FIRST FLOOR - ENVIRONMENTAL HAZARDS
8 HA012 BUILDING 1 - SECOND FLOOR - ENVIRONMENTAL HAZARDS
9 HA013 BUILDING 1 - THIRD FLOOR - ENVIRONMENTAL HAZARDS
10 HA020 BUILDING 2 - GROUND FLOOR - ENVIRONMENTAL HAZARDS
11 HA021 BUILDING 2 - FIRST FLOOR - ENVIRONMENTAL HAZARDS
12 HA022 BUILDING 2 - SECOND FLOOR - ENVIRONMENTAL HAZARDS
13 HA030 BUILDING 3 - GROUND FLOOR - ENVIRONMENTAL HAZARDS
14 HA031 BUILDING 3 - FIRST FLOOR - ENVIRONMENTAL HAZARDS
15 HA032 BUILDING 3 - SECOND FLOOR - ENVIRONMENTAL HAZARDS
16 HA040 BUILDING 4 - GROUND FLOOR - ENVIRONMENTAL HAZARDS
17 HA041 BUILDING 4 - FIRST FLOOR - ENVIRONMENTAL HAZARDS
18 HA121 BUILDING 12 - FIRST FLOOR - ENVIRONMENTAL HAZARDS
19 HA160 BUILDING 16 - GROUND FLOOR - ENVIRONMENTAL HAZARDS
20 HA161 BUILDING 16 - FIRST FLOOR - ENVIRONMENTAL HAZARDS
21 HA162 BUILDING 16 - SECOND FLOOR - ENVIRONMENTAL HAZARDS
22 HA170 BUILDING 17 - GROUND FLOOR - ENVIRONMENTAL HAZARDS
23 HA171 BUILDING 17 - FIRST FLOOR - ENVIRONMENTAL HAZARDS
24 HA172 BUILDING 17 - SECOND FLOOR - ENVIRONMENTAL HAZARDS
25 HA250 BUILDING 25 - GROUND FLOOR - ENVIRONMENTAL HAZARDS
26 HA251 BUILDING 25 - FIRST FLOOR - ENVIRONMENTAL HAZARDS
27 HA252 BUILDING 25 - SECOND FLOOR - ENVIRONMENTAL HAZARDS
28 HA270 BUILDING 27 - GROUND FLOOR - ENVIRONMENTAL HAZARDS
29 HA271 BUILDING 27 - FIRST FLOOR - ENVIRONMENTAL HAZARDS
30 HA272 BUILDING 27 - SECOND FLOOR - ENVIRONMENTAL HAZARDS
31 HA280 BUILDING 28 - GROUND FLOOR - ENVIRONMENTAL HAZARDS
32 HA281 BUILDING 28 - FIRST FLOOR - ENVIRONMENTAL HAZARDS
33 HA282 BUILDING 28 - SECOND FLOOR - ENVIRONMENTAL HAZARDS
34 HA290 BUILDING 29 - GROUND FLOOR - ENVIRONMENTAL HAZARDS
35 HA291 BUILDING 29 - FIRST FLOOR - ENVIRONMENTAL HAZARDS
36 HA292 BUILDING 29 - SECOND FLOOR - ENVIRONMENTAL HAZARDS
37 HA371 BUILDING 37 - FIRST FLOOR - ENVIRONMENTAL HAZARDS
38 HA471 BUILDING 47 - FIRST FLOOR - ENVIRONMENTAL HAZARDS
39 HA481 BUILDING 48 - FIRST FLOOR - ENVIRONMENTAL HAZARDS
[02] CIVIL
40 GS001 GENERAL LAYOUT PLAN
41 GS002 OVERALL SITE AND DEMOLITION PLAN
42 GS003 SITE AND DEMOLITION PLAN 1
43 GS004 SITE AND DEMOLITION PLAN 2
44 GS005 SITE AND DEMOLITION PLAN 3
45 GS006 GRADING PLAN 1
46 GS007 GRADING PLAN 2
47 GS008 GRADING PLAN 3
48 GS009 UTILITY PLAN 1
49 GS010 UTILITY PLAN 2
50 GS011 UTILITY PLAN 3
51 GS012 OVERALL EROSION CONTROL PLAN
52 GS013 EROSION CONTROL PLAN 1
53 GS014 EROSION CONTROL PLAN 2
54 GS015 EROSION CONTROL PLAN 3
55 GS016 EROSION CONTROL DETAILS
56 GS017 DETAILS 1
57 GS018 DETAILS 2
[03] STRUCTURAL
58 SE001 STRUCTURAL GENERAL NOTES AND DETAILS
59 SE101 BUILDING 17 - ENLARGED PLANS
60 SE102 BUILDING 25 - ENLARGED PLAN
[04] ARCHITECTURAL
61 AS001 ARCHITECTURAL SITE PLAN
62 A-101 BUILDING 1 - REFERENCE PLANS
63 A-102 BUILDINGS 2 & 3 - REFERENCE PLANS
64 A-103 BUILDINGS 4 & 12 - REFERENCE PLANS
65 A-104 BUILDINGS 16 & 17 - REFERENCE PLANS
66 A-105 BUILDING 25 - REFERENCE PLANS
67 A-106 BUILDINGS 27 & 28 - REFERENCE PLANS
68 A-107 BUILDINGS 29, 37, 47, & 48 - REFERENCE PLANS
69 AE101 BUILDING 1 - ENLARGED PLANS
70 AE102 BUILDINGS 1 & 2 - ENLARGED PLANS
71 AE103 BUILDING 3 - ENLARGED PLANS
72 AE104 BUILDINGS 4, 12, & 16 - ENLARGED PLANS
73 AE105 BUILDING 16 - ENLARGED PLANS
74 AE106 BUILDINGS 16 & 17 - ENLARGED PLANS
75 AE107 BUILDING 17 - ENLARGED PLANS
76 AE108 BUILDING 17 - NEW MCR ENLARGED PLANS
77 AE109 BUILDINGS 25 - ENLARGED PLANS
78 AE110 BUILDING 27 - ENLARGED PLANS
79 AE111 BUILDINGS 28 - ENLARGED PLANS
80 AE112 BUILDING 29 - ENLARGED PLANS
81 AE113 BUILDINGS 29, 37, 47, & 48 - ENLARGED PLANS
82 AE201 BUILDING 17 - MECH PAD BLAST WALL ELEVATIONS & DETAILS
AND MCR ELEVATION
83 AE202 GENERATOR BLAST WALL ELEVATIONS & DETAILS
84 AE511 FIBER CHASE PLAN DETAILS
85 AE601 DOOR SCHEDULE & DETAILS
86 AF711 PARTITION, FINISH SCHEDULES & DETAILS
SHEET INDEX
SEQUENCE NUMBER SHEET NAME
[05] FIRE PROTECTION
87 FA001 FIRE ALARM NOTES MATRIX AND RISER DIAGRAM
88 FA101 BUILDING 1 - FIRE ALARM REFERENCE PLANS
89 FA102 BUILDINGS 2 & 3 - FIRE ALARM REFERENCE PLANS
90 FA103 BUILDING 4 - FIRE ALARM REFERENCE PLANS
91 FA104 BUILDINGS 16 & 17 - FIRE ALARM REFERENCE PLANS
92 FA105 BUILDING 25 - FIRE ALARM REFERENCE PLANS
93 FA106 BUILDINGS 27 & 28 - FIRE ALARM REFERENCE PLANS
94 FA107 BUILDING 29 - FIRE ALARM REFERENCE PLANS
95 FA108 BUILDINGS 1 & 2 - FIRE ALARM ENLARGED PLANS
96 FA109 BUILDINGS 3 & 4 - FIRE ALARM ENLARGED PLANS
97 FA110 BUILDING 16 - FIRE ALARM ENLARGED PLANS
98 FA111 BUILDING 17 - FIRE ALARM ENLARGED PLANS
99 FA112 BUILDINGS 25 & 27 - FIRE ALARM ENLARGED PLANS
100 FA113 BUILDINGS 28 & 29 - FIRE ALARM ENLARGED PLANS
101 FA500 FIRE ALARM DETAILS
102 FX001 FIRE SPRINKLER NOTES
103 FX101 BUILDING 1 - FIRE SPRINKLER REFERENCE PLANS
104 FX102 BUILDINGS 2 & 3 - FIRE SPRINKLER REFERENCE PLANS
105 FX103 BUILDINGS 4 - FIRE SPRINKLER REFERENCE PLANS
106 FX104 BUILDINGS 16 & 17 - FIRE SPRINKLER REFERENCE PLANS
107 FX105 BUILDING 25 - FIRE SPRINKLER REFERENCE PLANS
108 FX106 BUILDINGS 27 & 28 - FIRE SPRINKLER REFERENCE PLANS
109 FX107 BUILDINGS 29 - FIRE SPRINKLER REFERENCE PLANS
110 FX108 BUILDINGS 1 & 2 - FIRE SPRINKLER ENLARGED PLANS
111 FX109 BUILDINGS 3 & 4 - FIRE SPRINKLER ENLARGED PLANS
112 FX110 BUILDING 16 - FIRE SPRINKLER ENLARGED PLANS
113 FX111 BUILDING 17 - FIRE SPRINKLER ENLARGED PLANS
114 FX112 BUILDINGS 25 & 27 - FIRE SPRINKLER ENLARGED PLANS
115 FX113 BUILDINGS 28 & 29 - FIRE SPRINKLER ENLARGED PLANS
116 FX500 FIRE SPRINKLER DETAILS
[06] MECHANICAL
117 M-000 LEGEND AND ABBREVIATIONS
118 M-101 BLDG 1 - REFERENCE PLANS
119 M-102 BLDG 2 & 3 - REFERENCE PLANS
120 M-103 BLDG 4, 12, 37, 47 & 48 - REFERENCE PLANS
121 M-104 BLDG 16 & 17 - REFERENCE PLANS
122 M-105 BLDG 25 - REFERENCE PLANS
123 M-106 BLDG 27 & 28 - REFERENCE PLANS
124 M-107 BLDG 29 - REFERENCE PLANS
125 M-401 BLDG 1 - ENLARGED PLANS
126 M-402 BLDG 2, 3, & 4 - ENLARGED PLANS
127 M-403 BLDG 16 & 17 - ENLARGED PLANS
128 M-404 BLDG 17 MCR ENLARGED PLANS
129 M-405 BLDG 25 - ENLARGED PLANS
130 M-406 BLDG 28 & 29 - ENLARGED PLANS
131 M-501 MECHANICAL DETAILS
132 M-502 MECHANICAL DETAILS
133 M-601 MECHANICAL SCHEDULES
134 M-701 MECHANICAL CONTROLS
[07] ELECTRICAL
135 E-001 ELECTRICAL SYMBOLS AND LEGEND
136 E-002 SITE PLAN
137 E-101 BUILDING 1 - REFERENCE PLANS
138 E-102 BUILDING 2, 3 - REFERENCE PLANS
139 E-103 BUILDING 4, 12 - REFERENCE PLANS
140 E-104 BUILDING 16, 17 - REFERENCE PLANS
141 E-105 BUILDING 25 - REFERENCE PLANS
142 E-106 BUILDING 27, 28 - REFERENCE PLANS
143 E-107 BUILDING 29, 37, 47, 48 - REFERENCE PLANS
144 E-401 BUILDING 1 - ENLARGED PLANS
145 E-402 BUILDING 1, 2 - ENLARGED PLANS
146 E-403 BUILDING 3 - ENLARGED PLANS
147 E-404 BUILDING 4, 12, 16 - ENLARGED PLANS
148 E-405 BUILDING 16 - ENLARGED PLANS
149 E-406 BUILDING 16, 17 - ENLARGED PLANS
150 E-407 BUILDING 17 - ENLARGED PLANS
151 E-408 BUILDING 17 - ENLARGED PLANS
152 E-409 BUILDING 25, 27 - ENLARGED PLANS
153 E-410 BUILDING 27 - ENLARGED PLANS
154 E-411 BUILDING 27, 28 - ENLARGED PLANS
155 E-412 BUILDING 29 - ENLARGED PLANS
156 E-413 BUILDING 29, 37, 47, 48 - ENLARGED PLANS
157 E-414 ELECTRICAL SITE ENLARGED PLANS
158 E-501 ELECTRICAL DETAILS
159 E-502 ELECTRICAL DETAILS
160 E-503 ELECTRICAL DETAILS
161 E-504 ELECTRICAL GROUNDING DIAGRAMS
162 E-505 ELECTRICAL GROUNDING DIAGRAMS
163 E-601 ELECTRICAL ONE-LINE DIAGRAMS - BUILDING 1, 2
164 E-602 ELECTRICAL ONE-LINE DIAGRAMS - BUILDING 3, 4, 12
165 E-603 ELECTRICAL ONE-LINE DIAGRAMS - BUILDING 16, 17 -
DEMOLITION
166 E-604 ELECTRICAL ONE-LINE DIAGRAMS - BUILDING 16, 17 - NEW WORK
167 E-605 ELECTRICAL ONE-LINE DIAGRAMS - BUILDING 17 - NEW WORK
168 E-606 ELECTRICAL ONE-LINE DIAGRAMS - BUILDING 25, 27, 28
169 E-701 ELECTRICAL PANEL SCHEDULES - BUILDING 1, 2, 4
170 E-702 ELECTRICAL PANEL SCHEDULES - BUILDING 3, 16
171 E-703 ELECTRICAL PANEL SCHEDULES - BUILDING 17
172 E-704 ELECTRICAL PANEL SCHEDULES - BUILDING 25, 28
173 E-705 ELECTRICAL PANEL SCHEDULES - BUILDING 29
SHEET INDEX
SEQUENCE NUMBER SHEET NAME
[08]TELECOMMUNICATIONS
174 T-001 ICT OVERALL SITE REDUNDANT FIBER PLAN
175 T-002 ICT REDUNDANT FIBER PLAN - AREA A
176 T-003 ICT REDUNDANT FIBER PLAN - AREA B
177 T-004 ICT REDUNDANT FIBER PLAN - AREA C
178 T-005 ICT REDUNDANT FIBER PLAN - AREA D
179 T-006 ICT REDUNDANT FIBER RISER & DETAILS
180 T-201 ICT PLANS - BUILDING 1 - GROUND LEVEL
181 T-202 ICT PLANS - BUILDING 1 - LEVEL 1
182 T-203 ICT PLANS - BUILDING 1 - LEVEL 2
183 T-204 ICT PLANS - BUILDING 1 - LEVEL 3
184 T-205 ICT PLANS - BUILDING 1 - LEVEL 4
185 T-206 ICT PLANS - BUILDING 2 - GROUND LEVEL
186 T-207 ICT PLANS - BUILDING 2 - LEVEL 1
187 T-208 ICT PLANS - BUILDING 2 - LEVEL 2
188 T-209 ICT PLANS - BUILDING 3 - GROUND LEVEL
189 T-210 ICT PLANS - BUILDING 3 - LEVEL 1
190 T-211 ICT PLANS - BUILDING 3 - LEVEL 2
191 T-212 ICT PLANS - BUILDING 4 - LEVEL 1
192 T-213 ICT PLANS - BUILDING 12 - LEVEL 1
193 T-214 ICT PLANS - BUILDING 16 - GROUND LEVEL
194 T-215 ICT PLANS - BUILDING 16 - LEVEL 1
195 T-216 ICT PLANS - BUILDING 16 - LEVEL 2
196 T-217 ICT PLANS - BUILDING 17 - GROUND LEVEL
197 T-218 ICT PLANS - BUILDING 17 - LEVEL 1
198 T-219 ICT PLANS - BUILDING 17 - LEVEL 2
199 T-220 ICT PLANS - BUILDING 25 - GROUND LEVEL
200 T-221 ICT PLANS - BUILDING 25 - LEVEL 1
201 T-222 ICT PLANS - BUILDING 25 - LEVEL 2
202 T-223 ICT PLANS - BUILDING 27 - GROUND LEVEL
203 T-224 ICT PLANS - BUILDING 27 - LEVEL 1
204 T-225 ICT PLANS - BUILDING 27 - LEVEL 2
205 T-226 ICT PLANS - BUILDING 28 - GROUND LEVEL
206 T-227 ICT PLANS - BUILDING 28 - LEVEL 1
207 T-228 ICT PLANS - BUILDING 28 - LEVEL 2
208 T-229 ICT PLANS - BUILDING 29 - GROUND LEVEL
209 T-230 ICT PLANS - BUILDING 29 - LEVEL 1
210 T-231 ICT PLANS - BUILDING 29 - LEVEL 2
211 T-232 ICT PLANS - BUILDING 47, 48 - GROUND LEVEL
212 T-301 BUILDING 1 - ENLARGED TR PLANS
213 T-302 BUILDINGS 1 & 2 - ENLARGED TR PLANS
214 T-303 BUILDINGS 2 & 3 - ENLARGED TR PLANS
215 T-304 BUILDINGS 4, 12, & 16 - ENLARGED TR PLANS
216 T-305 BUILDING 16 - ENLARGED TR PLANS
217 T-306 BUILDING 16 & 17 - ICT ENLARGED TR PLANS
218 T-307 BUILDING 17 - ENLARGED TR PLANS
219 T-308 BUILDING 17 - ENLARGED TR PLANS
220 T-309 BUILDINGS 25, 27 ENLARGED TR PLANS
221 T-310 BUILDING 27 - ENLARGED TR PLAN
222 T-311 BUILDING 27 & 28 - ENLARGED TR PLAN
223 T-312 BUILDING 29 - ENLARGED TR PLANS
224 T-313 BUILDINGS 29, 37, 47, & 48 - ENLARGED TR PLANS
225 T-314 BUILDINGS 201, 202, 205, 206, 20, 22, 67 - ENLARGED TR PLANS
226 T-501 ICT - DETAILS
227 T-502 ICT - DETAILS
228 T-503 ICT - DETAILS
229 T-504 ICT - DETAILS
230 T-505 ICT - DETAILS
231 T-601 DIAMOND ANALYSIS PLAN
232 T-602 DIAMOND ANALYSIS PLAN
233 T-603 DIAMOND ANALYSIS PLAN
234 T-604 DIAMOND ANALYSIS PLAN
235 T-605 DIAMOND ANALYSIS PLAN
236 T-606 DIAMOND ANALYSIS PLAN
[09] SECURITY
237 T-000 ELECTRONIC SECURITY SYSTEM COVER SHEET
238 TY101 BUILDING 1 - REFERENCE PLANS
239 TY102 BUILDINGS 2 & 3 - REFERENCE PLANS
240 TY103 BUILDINGS 4 & 12 - REFERENCE PLANS
241 TY104 BUILDINGS 16 & 17 - REFERENCE PLANS
242 TY105 BUILDING 25 - REFERENCE PLANS
243 TY106 BUILDINGS 27 & 28 - REFERENCE PLANS
244 TY107 BUILDINGS 29, 37, 47 & 48 - REFERENCE PLANS
245 TY401 BUILDING 1 - ENLARGED PLANS
246 TY402 BUILDINGS 1 & 2 - ENLARGED PLANS
247 TY403 BUILDING 3 - ENLARGED PLANS
248 TY404 BUILDINGS 4, 12 & 16 - ENLARGED PLANS
249 TY405 BUILDING 16 - ENLARGED PLANS
250 TY406 BUILDINGS 16 & 17 - ENLARGED PLANS
251 TY407 BUILDING 17 - ENLARGED PLANS
252 TY408 BUILDING 17 - NEW MCR ENLARGED PLANS
253 TY409 BUILDING 25 - ENLARGED PLANS
254 TY410 BUILDING 28 - ENLARGED PLANS
255 TY411 BUILDING 29 - ENLARGED PLANS
256 TY412 BUILDINGS 37, 47 & 48 - ENLARGED PLANS
257 TY500 ELECTRONIC SECURITY SYSTEM DETAILS
258 TY600 ELECTRONIC SECURITY SYSTEM RISERS
TOTAL SHEETS: 258
CONTRACTOR
STAGING
AREA
A L
E X
A N
D R
I A
D R
G R
E E
N D
A L E
R D
No. REVISION DESCRIPTION DATE
ABBREVIATIONS CODES STANDARDS AND EXECUTIVE ORDERS
4' -0
M
A X
4' -0
M
A X
2' -1
0" M
A X
2' -3
M
IN
1'-6" MIN
1. GENERAL CONTRACTOR TO PROVIDE SUPPORT BLOCKING
FOR ALL WALL MOUNTED ACCESSORIES, FIXTURES, AND
EQUIPMENT. ALL EQUIPMENT IN TELECOMMUNICATION
ROOMS TO BE MOUNTED ON FIRE-RETARDANT-TREATED
PLYWOOD, REFER TO ROOM FINISH SCHEDULE FOR MORE
DETAIL.
2. PROVIDE ADA SUPPORT BRACKETS PLACED AT ALL OPEN
COUNTERTOPS @ 36"-48" MAX ON CENTER.
3. SPECIFIED MAXIMUMS ARE MEASURED FROM AFTER
FINISHED FLOOR TO THE OPERABLE PART OF THE FIXTURE.
4. FIXTURES SHOWN ARE REPRESENTATIONAL ONLY. NOT ALL
FIXTURES MAY BE USED. REFER TO SPECIFICATIONS FOR
FIXTURE TYPES USED IN THIS PROJECT.
5. FIXTURES MAY OVERLAP WAINSCOT. WHERE APPLICABLE,
BACKING TO BE PROVIDED AS SHIM FOR FLUSH
APPLICATION. SHIM TO MATCH SCHEDULED WALL FINISH.
6" MAX
9" M
IN
SHOWER
VA TOILET ROOM
TURNING RADIUS
DRINKING
FOUNTAIN
PAPER TOWEL
DISPENSER
SANITARY
NAPKIN
DISPENSER
4' -0
"M A
X
WASTE
RECEPTACLE
LAVATORY
WITH MIRROR
ON CENTER
WALL
4' -0
M
A X
SOAP
DISPENSER
2' -1
0" M
A X
T O
B .O
. R E
F
LE
C T
IV
E
S U
R F
A C
E
3' -4
"M A
X
17 MIN
2' -3
M
IN
3' -0
M
A X
1'-6" MIN
WALL
2' -9
" 4' -0
M
IN
2'-0" MIN
8" MIN
WALL
LAVATORY
WITH APRON
1' -5
M
A X
1'-6" MIN
URINAL
WALL
1'-5" - 1'-7" (AMBULATORY)
1'-4" - 1'-6" (WHEELCHAIR)
CLEAR FLOOR
5'-6"
CLEAR FLOOR
6'-0"
3'-0" MIN
2' -9
3' -0
1'-0" MIN
3'-6" MIN 1'-0"MAX
4'-6" MIN
1' -5
'-7
1' -6
M
IN
A N
S I I
C C
A
7.
1)
1' -3
M
IN
A D
A /A
B A
2' -9
'-0
WALL
WALL
4' -0
M
A X
WALL HOOK
7' -0
CLOCK
WALL
FINISHED FLOOR
FIRE EXTINGUISHER
CABINET
WEIGHT > 40LBS
FIRE EXTINGUISHER
CABINET
WEIGHT < 40LBS
4' -0
"M A
X
4' -0
M
A X
TOILET SEAT
COVER
DISPENSER
BABY
CHANGING
STATION
CLEAR FLOOR SPACE
@ WATER CLOSET
5'-6"
2'-6"
4' -0
2'-6"
4' -0
HANDRAILS AND
BUMPERGUARDS
FIXTURE MOUNTING HEIGHTS AND CLEARANCES
18" MIN
M
IN
FRONT APPROACH,
PULL SIDE
36" MIN
M
IN
HINGE APPROACH,
PULL SIDE
HINGE APPROACH,
PULL SIDE
*12" MIN48
M
IN
FRONT APPROACH,
PUSH SIDE
M
IN
HINGE APPROACH,
PUSH SIDE
22" MIN 24" MIN
*4 8"
M
IN
LATCH APPROACH,
PULL SIDE
24" MIN*4
2"
M
IN
LATCH APPROACH,
PUSH SIDE
*IF BOTH CLOSER
AND LATCH ARE
PROVIDED
*54" MIN IF CLOSER
IS PROVIDED
*48" IF CLOSER IS
PROVIDED
FRONT APPROACH,
PUSH SIDE
M
IN
42" MIN
DOOR AND FIXTURE CLEARANCES
MATERIALS LEGEND
PURPOSE: THE PUBLIC BUILDINGS AMENDMENT ACT OF 1988, PUBLIC LAW (PUB. L.) 100-678 REQUIRES FEDERAL AGENCIES TO FOLLOW NATIONAL RECOGNIZED "MODEL" BUILDING CODES. THE FEDERAL PARTICIPATION IN THE DEVELOPMENT AND USE OF VOLUNTARY STANDARDS, OFFICE OF MANAGEMENT AND BUDGET (OMB) CIRCULAR A-119, REQUIRES ALL EXECUTIVE AGENCIES TO RELY ON VOLUNTARY STANDARDS, BOTH DOMESTIC AND INTERNATIONAL, WHENEVER FEASIBLE, AND TO PARTICIPATE IN
VOLUNTARY STANDARD BODIES.
GENERAL: VA HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING CODES AND STANDARDS AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE MODERNIZATION, ALTERATION, ADDITION, OR IMPROVEMENT OF ITS REAL PROPERTY AND THE CONSTRUCTION OF NEW STRUCTURES. VA DESIGN MANUALS AND MASTER SPECIFICATIONS
SPECIFY OTHER CODES AND STANDARDS THAT VA FOLLOWS ON ITS PROJECTS:
• VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL
INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).
• 2024 INTERNATIONAL BUILDING CODE (IBC) (ONLY WHEN SPECIFICALLY REFERENCED IN VA DESIGN DOCUMENTS, SEE NOTES BELOW)
• 2024 INTERNATIONAL EXISTING BUILDING CODE (IEBC) (IF APPLICABLE)
• 2024 NFPA 101 LIFE SAFETY CODE (SEE NOTES BELOW)
• 2024 NATIONAL FIRE CODES (NFPA)
• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.
• 2023 VA SEISMIC DESIGN REQUIREMENTS, H-18-8
• 2024 INTERNATIONAL MECHANICAL CODE
• 2023 NATIONAL ELECTRICAL CODE (NEC), NFPA 70
• 2024 INTERNATIONAL PLUMBING CODE (IPC)
• 2022 SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME) A 17.1.
• 2023 ARCHITECTURAL BARRIERS ACT (ABA) STANDARDS INCLUDING VA SUPPLEMENT, VA BARRIER FREE DESIGN STANDARD (PG-18-13)
• 2022 ANSI ICC A117.1 ACCESIBLE AND USABLE BUILDINGS AND FACILITIES
• 2022 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE AND COMMENTARY, AMERICAN CONCRETE INSTITUTE AND COMMENTARY (ACI 318-19)
• 2023 STEEL CONSTRUCTION MANUAL (15TH EDITION), AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
• ENERGY POLICY ACT OF 2005 (EPACT)
• 2007 DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND
NEW LOW-RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435.
• 2006 FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)
• 2018 EXECUTIVE ORDER 13834: EFFICIENT FEDERAL OPERATIONS
• 2022 THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS SECTION 010000 OF THE VA MASTER CONSTRUCTION
SPECIFICATION.
• 2022 VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 62.1
• 2022 SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15
• 2023 PHYSICAL SECURITY AND RESILIENCY DESIGN MANUAL
LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES. HOWEVER, LOCAL AUTHORITIES SHOULD BE NOTIFIED ABOUT PLANNED PROJECTS AND GIVEN OPPORTUNITY TO REVIEW DRAWINGS PROVIDED THAT VA DOES NOT PAY FOR REVIEW OR INSPECTION FEES.
NOTES:
1. NFPA 101 PRIMARILY ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES WHILE THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT
NOT LIMITED TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION, AND ENERGY CONSERVATION. VA BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 101 AND DOCUMENTS REFERENCED BY NFPA 101 IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF THE JOINT COMMISSION. THEREFORE, DESIGNS SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF NFPA 101 AND DOCUMENTS REFERENCED THEREIN.
DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE ADDRESSED ABOVE IN THIS PROGRAM GUIDE. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES
EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).
2. CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.
ASHRAE 90.1 - 2019 EDITION
BUILDING LOCATION: LEXINGTON, KY
CLIMATE ZONE (TABLE ANNEX 1-1): ZONE 4A
INTERIOR DESIGN CONDITIONS:
THE INTERIOR DESIGN TEMPERATURES FOR HEATING AND COOLING AS DEPICTED IN THE PROJECT DESIGN CONDITIONS SCHEDULE IN THE MECHANICAL CONTROL DRAWINGS SHALL BE THE MAXIMUM
AND MINIMUM VALUES FOR THE ASSOCIATED TEMPERATURE CONTROL ZONES.
BUILDING ENVELOPE REQUIREMENTS (5.5 )
BUILDING ENVELOPE REQUIREMENTS FOR CLIMATE ZONE 4 (A,B,C)
ROOFS REQUIRED DESIGNED
INSULATION: R-30 c.i. EXISTING METAL BUILDINGS: R-19 + R-11 Ls or R-25 + R-8 Ls N/A
ATTIC AND OTHER: R-49 N/A
WALLS, ABOVE GRADE
MASS: R-9.5 c.i. EXISTING METAL BUILDING: R-0 + R-15.8 c.i. N/A STEEL-FRAMED: R-13 + R-7.5 c.i. EXISTING WOOD-FRAMED AND OTHER: R-13 + R-3.8 c.i. or R-20 N/A
WALL, BELOW GRADE
BELOW-GRADE WALL: R-7.5 c.i. EXISTING
FLOORS
MASS: R-14.6 c.i. EXISTING
STEEL-FRAMED: R-30 EXISTING
WOOD-FRAMED AND OTHER: R-30 N/A
SLAB-ON-GRADE FLOORS
UNHEATED SLABS: R-15 for 24 in. EXISTING HEATED SLABS: R-20 for 24 in. EXISTING
OPAQUE DOORS
SWINGING: U-0.370 EXISTING
NONSWINGING: U-0.310 N/A
FENESTRATION (TABLE 5.5-4):
VERTICAL FENESTRATION, U-FACTOR
FIXED: U-0.36 EXISTING
OPERABLE: U-0.45 EXISTING
ENTRANCE DOOR: U-0.63 EXISTING
DEFINITIONS
c.i = CONTINUOUS INSULATION Ls = LINEAR SYSTEM
NR = NO (INSULATION) REQUIREMENT
ENERGY REQUIREMENTS
N
1. DRAWINGS ARE PART OF A COMPLETE DOCUMENTS SET. CONTRACTOR SHALL
CONFIRM ALL ITEMS REQUIRED BASED UPON THE OVERALL DESIGN INTENT OF THE
ENTIRE DOCUMENT SET.
2. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS, PRIOR TO BEGINNING ANY
WORK, TO CONFIRM THE ACCURACY OF THE DRAWINGS AND REPORT ANY
DISCREPANCIES TO THE ARCHITECT. DO NOT SCALE THE DRAWINGS. FIELD VERIFY
ALL DIMENSIONS AND EXISTING STRUCTURAL CONDITIONS.
3. ALL AREAS NOT INVOLVED IN THE SCOPE OF WORK FOR THIS PROJECT SHALL BE KEPT
CLEAN AND FREE OF OBSTRUCTIONS AT ALL TIMES.
4. ERECT BARRICADES AND WARNING SIGNS TO DIVERT AND WARN PASSERS-BY OF THE
CONSTRUCTION WORK. PROVIDE DUST PROOFING ENCLOSURES TO SEPARATE WORK
AREAS FROM THE EXISTING FACILITIES.
5. ALL TRASH AND DEBRIS TO BE REMOVED ON A DAILY BASIS.
6. PROVIDE PROTECTION FOR ALL EXISTING SURFACES AND CONDITIONS TO REMAIN IN
PLACE DURING THE SCOPE OF WORK. SHOULD ANY DAMAGE OCCUR, PATCH AND
REPAIR ANY DAMAGE TO ADJACENT FINISHES TO MATCH EXISTING.
7. ANY DAMAGE CAUSED TO THE BUILDING OR OWNER EQUIPMENT SHALL BE REPAIRED
OR REPLACED BACK TO ITS ORIGINAL CONDITIONS AT NO ADDITIONAL COST TO THE
OWNER.
8. COVER ALL RETURN AIR GRILLES WITHIN THE AREA OF CONSTRUCTION TO PREVENT
PARTICULATE MATERIAL FROM EXHAUSTING INTO SURROUNDING SPACES.
9. APPROPRIATE LIGHT FIXTURES SHALL BE TEMPORARILY SUSPENDED TO PROVIDE
ADEQUATE LIGHTING LEVELS FOR CONSTRUCTION.
10. CONTRACTOR AND SUBCONTRACTORS ARE REQUIRED TO COORDINATE WITH OTHER
DISCIPLINES TO INSTALL COMPLETE AND OPERATIONAL SYSTEMS. DRAWINGS, AS A
WHOLE, REPRESENT A COMPLETE SET AND DEPICT REQUIREMENTS FOR COMPLETE
AND OPERATIONAL SYSTEMS. INDIVIDUAL DRAWINGS MAY NOT DEPICT COMPLETE AND
ACCURATE INFORMATION TO COORDINATE COMPLETE AND OPERATIONAL SYSTEMS,
BUT DO SO AS AN ENTIRE DOCUMENT TO BE REFERENCED WITH OTHER INDIVIDUAL
DRAWINGS. CONTRACTOR AND SUBCONTRACTORS ARE REQUIRED TO REFERENCE
OTHER SHEETS AND SPECIFICATIONS AS AN ENTIRE SET OF CONSTRUCTION
DOCUMENTS THAT REFLECT WORK REQUIRED TO ACHIEVE A COMPLETE AND
OPERATIONAL GOAL. LACK OF COORDINATION AND REVIEW OF DRAWINGS AND
SPECIFICATIONS AS AN ENTIRE DOCUMENT TO INSTALL COMPLETE AND OPERATIONAL
SYSTEMS, BEING OBVIOUS AND TYPICAL INDUSTRY STANDARD, IDENTIFIED IN THE
DRAWINGS AND SPECIFICATIONS, SHALL NOT BE IN ANY WAY AN ADDITIONAL COST TO
THE GOVERNMENT.
11. CONSTRUCTION PHASING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR
(GC), REFER TO GI010 - GENERAL PHASING NOTES.
12. FOR MINOR SYSTEM INTERRUPTIONS, CONTRACTOR SHALL SUBMIT A REQUEST, IN
WRITING, TO INTERRUPT ANY SUCH SERVICES TO COR (CONTRACTING OFFICER’S
REPRESENTATIVE) 5 WORKING DAYS IN ADVANCE OF PROPOSED INTERRUPTION.
REQUEST SHALL STATE REASON, DATE, EXACT TIME OF, AND APPROXIMATE DURATION
OF SUCH INTERRUPTION. MAJOR INTERRUPTIONS OF ANY SYSTEM MUST BE
REQUESTED, IN WRITING, AT LEAST 10 WORKING DAYS PRIOR TO THE DESIRED TIME
AND SHALL BE PERFORMED AS DIRECTED BY THE COR. MAJOR INTERRUPTIONS SHALL
BE COORDINATED WITH OTHER MAJOR INTERRUPTIONS AND MAY NOT BE SCHEDULED
FOR ONE DISCIPLINE MORE THAN TWICE THROUGHOUT THE OVERALL CONSTRUCTION
SCHEDULE UNLESS REQUESTED IN WRITING AND APPROVED BY THE COR.
CONTRACTOR WILL BE ADVISED, IN WRITING, OF APPROVAL OF REQUEST, OR OF
WHICH OTHER DATE AND/OR TIME SUCH INTERRUPTION WILL CAUSE THE LEAST
INCONVENIENCE TO OPERATIONS OF THE MEDICAL CENTER. INTERRUPTION TIME
APPROVED BY THE MEDICAL CENTER MAY OCCUR AT TIMES OTHER THAN
CONTRACTOR'S NORMAL WORKING HOURS. SCHEDULE INTERRUPTION MAY BE ON
WEEKENDS OR LATE HOURS AND MAY NOT BE AN ADDITIONAL COST TO THE
GOVERNMENT. COORDINATE ALL INTERRUPTIONS THAT MAY AFFECT THE NORMAL
OPERATION OF THE FACILITY WITH THE COR WHEN SUBMITTING THE CONSTRUCTION
SCHEDULE OR UPDATES TO THE CONSTRUCTION SCHEDULE.
13. NO ASBESTOS CONTAINING MATERIALS ARE TO BE USED ON THIS PROJECT. SPUR
DESIGN, THE A/E OF RECORD, CAN CERTIFY THAT NO ASBESTOS CONTAINING
BUILDING MATERIALS (ACBM) OR LEAD BASED PAINT (LBP) PRODUCTS WERE
DESIGNED/SPECIFIED AS BUILDING MATERIAL IN ANY OF THE CONSTRUCTION
DOCUMENTS.
13. REFER TO THE DESIGN BINDER FOR THE ICRA INFORMATION DOCUMENTATION.
GENERAL NOTES
AREA NAME
150 SF
A101
A101
SIM
A
00.0
A101
1 1
A101
LEVEL NAME
00'-00"
00'-00" 4B
3A
FIBERGLASS BATT
INSULATION
RIGID INSULATION
CONCRETE / PRECAST
CONCRETE
EARTH / SOIL
SAND, EIFS FINISH, OR
PLASTER FINISH
GYPSUM BOARD FINISH
BRICK
CONCRETE MASONRY
UNIT
STONE / CAST STONE
GYPSUM BOARD SECTION
EXTERIOR SHEATHING
BOARD SECTION
PLYWOOD SECTION
Room Name
150 SF / 150 SF
001A
/1 A101
X0000
6"
3' -0
M
A X
ROOM TAG
AREA TAG
SPECIALTY EQUIPMENT TAG
DOOR TAG
KEYED NOTE TAG
WALL TAG
WINDOW TAG
A101
SIM
A101
SIM
A
ACB ACOUSTIC CEILING BAFFLE
ACP ACOUSTIC CEILING PANEL
ACST ACOUSTIC
ADA AMERICANS WITH DISABILITIES ACT
ACT ACOUSTICAL CEILING TILE
ADDL ADDITIONAL
ADDN ADDITION
ADJ ADJACENT, ADJOINING, OR
ADJUSTABLE
ADMIN ADMINISTRATION
AE ARCHITECT/ENGINEER
AF ACCESS FLOORING
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHJ AUTHORITY HAVING JURISDICTION
AIA AMERICAN INSTITUTE OF
ARCHITECTS
ALT ALTERNATE
ALT NO ALTERNATE NUMBER
ALUM ALUMINIUM (TRIM)
AMT AMOUNT
APPROX APPROXIMATE
ARCH ARCHITECT
ASC ABOVE SUSPENDED CEILING
AT ACOUSTIC CEILING TILE
AVG AVERAGE
B
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BLT IN BUILT-IN
BOS BOTTOM OF STEEL
BOT BOTTOM
BRKT BRACKET
BTWN BETWEEN
C
CAB CABINET
CAV CAVITY
CBB CONCRETE BACKER BOARD
CD CONSTRUCTION DOCUMENTS
CFM CUBIC FEET PER MINUTE
CFS CUBIC FEET PER SECOND
CG CORNER GUARD
CH BD CHALK BOARD
CIP CAST-IN-PLACE
CJ CONTROL JOINT
CL CENTER LINE
CLG CEILING
CLG HT CEILING HEIGHT
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CO CONTRACTING OFFICER
COL COLUMN
COMM COMMUNICATION
CONC CONCRETE
CONT CONTINUOUS
COORD COORDINATE
COR CONTRACTING OFFICER'S
REPRESENTATIVE
CP CONTRACTOR PROVIDED
CP/CI CONTRACTOR PROVIDED /
CONTRACTOR INSTALLED
CPT CAROET/CARPET TILE
CS CONCRETE SEALED
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTR CENTER
CU FT CUBIC FEET
D
DBL DOUBLE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DIA DIAMETER
DIR DIRECTION
DIST DISTANCE
DOC DOCUMENT
DR DOOR
DS DOWNSPOUT
DWG DRAWING
DWP DIMENSIONAL WALL PANEL
E
EA EACH
EJ EXPANSION JOINT
EL ELEVATION
ELEV ELEVATOR
ENTR ENTRANCE
EPY EPXOY FLOORING
EQ EQUAL
ETR EXISTING TO REMAIN
EX EXISTING
EXP EXPOSED
EXT EXTERIOR
F
FAB FABRIC
FED FEDERAL
FF FINISH FACE
FF EL FINISH FLOOR ELEVATION
FIN FINISH
FIN BS FINISH BOTH SIDES
FIN FLR FINISH FLOOR
FIN GR FINISH GRADE
FIXT FIXTURE
FLDG FOLDING
FLEX FLEXIBLE
FLG FLOORING
FLMT FLUSH MOUNT
FLR FLOOR
FOC FACE OF CONCRETE
FOM FACE OF MASONRY
FP FIRE PROTECTION
FR FIRE RESISTANT
FT FEET
FTG FOOTING
FV FIELD VERIFY
FWC FABRIC WALL COVERING
G
GDR GUARDRAIL
GL GLASS/GLAZING
GRAN GRANITE
GR FL GROUND FLOOR
GT GROUT
GSM GALVANIZED SHEET METAL
GYP BD GYPSUM BOARD
H
HDW HARDWARE
HEPA HIGH EFFICIENCY
PARTICULATE AIR (FILTER)
HM HOLLOW METAL
HORIZ HORIZONTAL
HR HANDRAIL
HT HEIGHT
I
IBC INTERNATIONAL BUILDING CODE
INSUL INSULATION
INT INTERIOR
ILO IN LIEU OF
J
J-BOX JUNCTION BOX
L
LAV LAVATORY
LBS POUND
LDG LANDING
LF LINEAR FEET (FOOT)
LIN LINEAR
LN LINOLEUM
LOC LOCATION
LT LIGHT
LVR LOUVER
LVT LUXURY VINYL TILE
M
MAT CARPET MAT / WALK-OFF MAT
MATL MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MEMB MEMBRANE
MFR MANUFACTURER
MID MIDDLE
MIL STD MILITARY STANDARD
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MOD MODIFY
MTG MOUNTING
MTL METAL
MVBL MOVABLE
N
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
O
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OPNG OPENING
OPP OPPOSITE
OPR OPERABLE
ORD OVERFLOW ROOF DRAIN
ORIG ORIGINAL
P
P PAINT
PA PUBLIC ADDRESS
PBD PARTICLE BOARD
PCF POUNDS PER CUBIC FOOT
PCT PERCENT
PERF PERFORATED
PERIM PERIMETER
PERP PERPENDICULAR
PL PROPERTY LINE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PNL PANEL
PR PAIR
PRB PROFILE BASE
PRKG PARKING
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PORCELAIN TILE
PWR POWER
Q
QA QUALITY ASSURANCE
QC QUALITY CONTROL
QTY QUANTITY
REFERENCE SYMBOLS IDENTIFICATION TAGS
NOTE: NOT ALL ABBREVIATIONS OR SYMBOLS WILL BE UTILIZED FOR THIS PROJECT.
GRID HEAD AND
LINE
LEVEL INDICATOR
MATCH LINE AND
VIEW REFERENCE
NORTH ARROW W/
PROJECT NORTH
SPOT ELEVATION
DETAIL
SECTION
**48" MIN IF BOTH CLOSER
AND LATCH PROVIDED
WALL
SECTION
BUILDING
SECTION
DETAIL
ELEVATION
INTERIOR
ELEVATION
BUILDING
ELEVATION
1 1
6'- 0"
5'- 6"
BARIATRIC TOILET ROOM
TURNING RADIUS
CLEAR FLOOR SPACE
@ ADA LAVATORY
CLEAR FLOOR SPACE @ ADA
DRINKING FOUNTAIN
4"
6"
3"
6" 1'
-6
6" MAX
7" - 9" 11" MIN
17" - 25"
M
IN
6' -0
(ANSI ICC A117.1)
39"- 41"
(A N
S I I
C C
A
7.
1)
M
IN
(A N
S I I
C C
A
7.
1)
1"
3' -6
M
A X
5' -0
M
A X
R
RAF RESILIENT ATHETIC FLOORING
RB RUBBER BASE/RESILIENT BASE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REC RECESSED
REF REFERENCE
REM REMOVABLE
REP REPAIR
REPL REPLACE
REQ REQUIRE
REQD REQUIRED
RES RESINOUS FLOORING
RES-W RESINOUS / EPOXY WALL / CEILING
RF RUBBER FLOORING
RFG ROOFING
RM ROOM
RO ROUGH OPENING
RP RESIN PANEL
RSF RESILIENT SHEET FLOORING
RV ROOF VENT
RWC RIGID VINYL WALLCOVERING
S
SC SPECIALTY COATING
SD STATIC DISSIPATIVE FLOORING/TILE
SCHED SCHEDULE
SECT SECTION
SF SQUARE FOOT (FEET)
SGL SINGLE
SIM SIMILAR
SJ SCORED JOINT
SLNT SEALANT
SM SHEET METAL
SPEC SPECIFICATION
SQ SQUARE
SQ IN SQUARE INCH
SQ YD SQUARE YARD
SS SOLID SURFACE
ST STONE
STD STANDARD
STOR STORAGE
SV SHEET VINYL (ROLLED OR TILE)
T
TEL TELEPHONE
TEMP TEMPORARY
TER TERRAZO
TOF TOP OF FOOTING/ FOUNDATION
TOM TOP OF MASONRY
TOS TOP OF SLAB/ STEEL
U
UNO UNLESS NOTED OTHERWISE
UTIL UTILITY
V
VAR VARIES
VC VA PROVIDED / CONTRACTOR
INSTALLED
VCT VINYL COMPOSITION TILE
VFAT VINYL FACED ACOUSTICLAL TILE
VP VENEERED PLASTER
VT VINYL TILE
VV VA PROVIDED / VA INSTALLED
VWC VINYL WALLCOVERING
VWF VINYL WALL FABRIC
W
W/ WITH
W/O WITHOUT
W/C WATER CLOSET
WC WHEELCHAIR
WD WOOD
WFAB WALL FABRIC
WPM WATERPROOF MEMBRANE
WSF WELDED SHEET FLOOR
X
X BRACE CROSS BRACE
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
CONSULTANTS:
Drawing # OF
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
ARCH: SETH CAVIN, LICENSE #8468 EXP. 06/30/2024
ENGR: SPUR DESIGN, LLC COA #5197 EXP. 12/31/2025
CIVIL ENGINEER
OLSSON
550 ST LOUIS ST,
SPRINGFIELD, MO 65806
(417) 885-1736
MECH / ELEC / PLUMB ENG.
SPUR DESIGN
2519 MADISON AVE, SUITE 100
KANSAS CITY, MO 64108
(913) 369-7200
The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.
FIRE PROTECTION ENGINEER
FULLY SPRINKLERED
INDUSTRIAL HYGENIST
RIVERFRONT SAFETY & HEALTH
1139 OLIVE ST, SUITE 300
ST. LOUIS, MO 63101
(713) 864-2900
TELECOMMUNICATIONS
ASPEN COMMUNICATIONS, LLC
7 KIJI-DAVA CIRCLE, SUITE A
PRESCOTT, AZ 86301
(928) 774-0992
PHYSICAL SECURITY
FORCE PROTECT
10901 FRONT BEACH RD, #1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
RATED ENGINEERING
609 S. KELLY AVE., SUITE H2
EDMOND, OK 73003
(405) 856-2965
STRUCTURAL
STAND
8234 ROBINSON
OVERLAND PARK, KS 66204
(913) 214-2169
/1
/2
:0 :1
P
M
GENERAL INFORMATION
NSM 2 258AJS
BID DOCUMENTS
EHRM INFRASTRUCTURE
UPGRADES LEXINGTON, KY
03/15/2024
596-22-700
LEXINGTON VA HEALTH CARE
2250 LEESTOWN RD
LEXINGTON, KY 40511
GI001
SPUR #: 2207
CONTROLS DEFINED BELOW FOR THE LEVEL OF PRECAUTIONS IDENTIFIED FOR THE ACTIVITY MUST BE IN PLACE BEFORE THE ACTIVITY BEGINS AND MAINTAINED UNTIL WORK IS COMPLETED AND THE AREA IS ACTIVATED. CONTROL MEASURES FOR EACH PRECAUTION LEVEL MUST ALSO INCLUDE THE CONTROL MEASURES IN THE PRECEDING LEVEL(S). AS THE ACTIVITY PROGRESSES, A FULL RE-
EVALUATION OF REMAINING ACTIVITY TYPE AND PATIENT RISK IS REQUIRED PRIOR TO
DOWNGRADING THE LEVEL OF PRECAUTIONS.
LEVEL I:
1. PERFORM WORK ACTIVITY IN A MANNER THAT DOES NOT CREATE DUST.
2. IMMEDIATELY REPLACE ANY CEILING TILE, CLOSE ACCESS PANELS, ETC., UPON COMPLETION
OF WORK.
3. ANY MATERIALS AND EQUIPMENT BEING BROUGHT INTO THE FACILITY MUST BE FREE OF
CONTAMINANTS AND LOOSE MATERIAL.
LEVEL II:
ALL CONTROL MEASURES IN LEVEL I AND THE FOLLOWING:
1. PROVIDE ACTIVE MEANS TO CONTROL AIRBORNE DUST FROM DISPERSING INTO OCCUPIED
AREAS AND/OR WATER MIST SURFACE TO CONTROL DUST (E.G., MOBILE DUST CONTAINMENT
CART OR SOME OTHER SYSTEM).
2. IF WORK SITE CONTAINED, MUST BE NEUTRAL OR NEGATIVELY PRESSURIZED.
3. ENSURE WORKER CLOTHING IS CLEAN AND FREE OF VISIBLE DUST BEFORE LEAVING THE
WORK AREA.
4. REMOVE/ISOLATE/TAPE OFF AIR DIFFUSERS (SUPPLY AND RETURN) TO PROTECT THE HVAC
SYSTEM FROM DUST AND REDUCE AIR TURBULENCE. REBALANCE SYSTEM TO ADDRESS
DIFFUSER ISOLATION.
5. WHEN THE WORK INVOLVES OR IMPACTS POTABLE WATER SYSTEMS INCLUDING
STAGNATION DUE TO REDUCED USAGE, THE PIPING SHALL BE FLUSHED TWICE A WEEK OR
ISOLATED FROM THE MAIN SYSTEM.
6. SEAL/CLOSE DOORS TO PREVENT DUST MIGRATION. MAY PUT ZIPPER PLASTIC BARRIER
OVER DOOR.
7. CONSIDER HEPA CART USE.
8. CONTAIN ALL TRASH AND DEBRIS IN THE WORK AREA. PERFORM DAILY CLEANING AND
DISPOSAL OF TRASH (COVERED) FROM WORK AREA USING AN IDENTIFIED EXIT ROUTE.
9. ANY EQUIPMENT, TOOLS, OR MATERIALS REMOVED FROM THE WORK AREA MUST BE IN
SEALED CONTAINERS AND/OR CLEANED OF DUST AND DEBRIS PRIOR TO REMOVAL FROM THE
AREA.
10. NONPOROUS/SMOOTH AND CLEANABLE CONTAINERS (WITH A HARD LID) MUST BE USED TO
TRANSPORT TRASH AND DEBRIS FROM THE CONSTRUCTION AREAS. THESE CONTAINERS
MUST BE DAMP-WIPED CLEANED AND FREE OF VISIBLE DUST/DEBRIS BEFORE LEAVING THE
CONTAINED WORK AREA.
11. INSTALL A STICKY (DUST COLLECTION) MAT AT ENTRANCE OF CONTAINED WORK AREA
BASED ON FACILITY POLICY. STICKY MATS MUST BE CHANGED ROUTINELY AND WHEN VISIBLY
SOILED.
12. MAINTAIN CLEAN SURROUNDINGS WHEN AREA IS NOT CONTAINED BY DAMP MOPPING OR
HEPA VACUUMING SURFACES AT LEAST DAILY.
LEVEL III:
ALL CONTROL MEASURES IN LEVELS I AND II AND THE FOLLOWING:
1. ENSURE AVAILABILITY OF EQUIPMENT FOR CLEANING HANDS.
2. CONSTRUCT AND COMPLETE CRITICAL BARRIERS MEETING NFPA 241 REQUIREMENTS.
BARRIERS MUST EXTEND TO THE CEILING OR IF CEILING TILE IS REMOVED, TO THE DECK
ABOVE.
3. ALL (PLASTIC OR HARD) BARRIER CONSTRUCTION ACTIVITIES MUST BE COMPLETED IN A
MANNER THAT PREVENTS DUST RELEASE. PLASTIC BARRIERS MUST BE EFFECTIVELY
AFFIXED TO FLOOR AND CEILING (OR FLOOR/ROOF DECK ABOVE) AND SECURE FROM
MOVEMENT OR DAMAGE.
4. SEAL ALL PENETRATIONS IN CONTAINMENT BARRIERS, INCLUDING FLOORS AND CEILING,
USING APPROVED MATERIALS (UL SCHEDULE FIRESTOP IF APPLICABLE FOR BARRIER TYPE).
5. MAINTAIN .01 INCHES /WATER GAUGE NEGATIVE PRESSURIZATION OF THE ENTIRE
WORKSPACE BY USE OF HEPA EXHAUST AIR SYSTEMS DIRECTED OUTDOORS (UNLESS A
WORK SPECIFIC WAIVER IS APPROVED BY VHA’S OFFICE OF HEALTHCARE ENGINEERING);
THIS MUST BE MAINTAINED CONTINUOUSLY 24/7 FOR THE DURATION OF THE PROJECT.
EXHAUST DISCHARGED DIRECTLY TO THE OUTDOORS THAT IS 25 FEET OR GREATER FROM
ENTRANCES, AIR INTAKES AND WINDOWS IS NOT REQUIRED TO BE HEPA-FILTERED.
EXHAUSTING DISCHARGED AIR INTO SHARED OR RECIRCULATING HVAC SYSTEMS, OR OTHER
SHARED EXHAUST SYSTEMS (E.G., BATHROOM EXHAUST) IS PROHIBITED.
6. INSTALL A DIFFERENTIAL PRESSURE SENSING DEVICE (E.G., MAGNEHELIC, MANOMETER, OR
DIGITAL MONITORING) ON EXTERIOR OF WORK CONTAINMENT TO CONTINUALLY MONITOR
AND DOCUMENT NEGATIVE PRESSURIZATION. THE “BALL IN THE WALL” OR SIMILAR
APPARATUS ARE NOT ACCEPTABLE.
LEVEL IV:
ALL CONTROL MEASURES IN LEVELS I, II AND III AND THE FOLLOWING:
1. BARRIERS MUST BE HARD BARRIERS UNLESS TEMPORARY TO INSTALL FINAL BARRIER.
2. CONTAINMENT MUST INCLUDE AN ANTEROOM TO ENSURE PRESSURE CONTROL. ANTEROOM
MUST BE LARGE ENOUGH FOR EQUIPMENT STAGING, CART CLEANING, WORKERS’ PPE AND
CLEANING.
3. WORKER CLOTHING AND/OR PPE MUST BE REMOVED OR CLEAN AND FREE OF VISIBLE DUST
BEFORE LEAVING THE WORK AREA ANTEROOM. HEPA VACUUMING OF CLOTHING OR USE OF
COVER SUITS IS ACCEPTABLE.
4. WORKERS MUST WEAR SHOE COVERS OR HAVE A METHOD TO CLEAN SHOES IN ANTEROOM.
SHOE COVERS MUST BE REMOVED PRIOR TO EXITING THE ANTEROOM TO THE OCCUPIED
SPACE (NON-WORK AREA). DAMAGED SHOE COVERS MUST BE CHANGED IMMEDIATELY.
GENERAL ICRA NOTES - LEVEL OF PRECAUTIONS & CONTROL MEASURES
CONTROLS DEFINED BELOW SHALL BE COMPLETED UPON COMPLETION OF THE ACTIVITY AND
INSPECTED PRIOR TO TERMINATING MEASURES DEFINED IN TABLE 5.
LEVELS I -II:
CLEANING:
1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH HORIZONTAL
SURFACES AND FLOORING MATERIALS.
2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION ON UPPER
SURFACES AS WELL AS AIR DIFFUSER SURFACES.
HVAC SYSTEMS:
1. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
VERIFY THAT HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.
2. VERIFY THE HVAC SYSTEMS MEET ORIGINAL AIRFLOW AND AIR EXCHANGE DESIGN
SPECIFICATIONS.
WATER SYSTEMS:
1. UNTIL THE POTABLE WATER SYSTEM IS ACTIVATED AND IN USE, FLUSHING SHALL
CONTINUE AT LEAST TWICE PER WEEK IN ACCORDANCE WITH VHA DIRECTIVE 1061.
LEVELS III - IV:
CONSTRUCTION AREAS MUST BE INSPECTED BY AN INFECTION PREVENTIONIST AND
ENGINEERING REPRESENTATIVE (AND OTHERS AS DETERMINED BY THE FACILITY) FOR FINAL
ACTIVITY/PROJECT CLOSE OUT AND REMOVAL OF INFECTION PREVENTION AND CONTROL
MEASURES.
WORK AREA CLEANING:
1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH HORIZONTAL
SURFACES AND FLOORING MATERIALS.
2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION ON UPPER
SURFACES AS WELL AS AIR DIFFUSER SURFACES.
REMOVAL OF CRITICAL BARRIERS:
1. CRITICAL BARRIERS MUST REMAIN IN PLACE DURING ALL WORK INVOLVING DRYWALL
REMOVAL, CREATION OF DUST AND ACTIVITIES BEYOND SIMPLE TOUCH-UP WORK. THE
BARRIER MAY NOT BE REMOVED UNTIL A WORK AREA CLEANING HAS BEEN PERFORMED.
ADDITIONAL CLEANING MAY BE NEEDED AFTER REMOVAL OF BARRIER.
2. ALL (PLASTIC OR HARD) BARRIER REMOVAL ACTIVITIES MUST BE COMPLETED IN A MANNER
THAT PREVENTS DUST RELEASE. USE THE FOLLOWING PRECAUTIONS WHEN REMOVING
HARD BARRIERS:
1. CAREFULLY REMOVE SCREWS AND PAINTER TAPE.
2. IF DUST WILL BE GENERATED DURING SCREW REMOVAL, USE HAND-HELD HEPA
VACUUM.
3. DRYWALL CUTTING IS PROHIBITED DURING REMOVAL PROCESS.
4. CLEAN ALL STUD TRACKS WITH HEPA VACUUM BEFORE REMOVING OUTER HARD
BARRIER.
5. USE A PLASTIC BARRIER TO ENCLOSE AREA IF DUST COULD BE GENERATED.
NEGATIVE AIR REQUIREMENTS:
1. THE USE OF NEGATIVE AIR MUST BE DESIGNED TO REMOVE CONTAMINANTS FROM THE
WORK AREA.
2. NEGATIVE AIR DEVICES (FANS, FILTERS, MONITORING AND DOCUMENTATION EQUIPMENT)
MUST REMAIN OPERATIONAL AT ALL TIMES AND IN PLACE FOR A PERIOD AFTER COMPLETION
OF DUST CREATING ACTIVITIES TO REMOVE CONTAMINANTS FROM THE WORK AREA AND
BEFORE REMOVAL OF CRITICAL BARRIERS.
HVAC SYSTEMS:
1. UPON REMOVAL OF CRITICAL BARRIERS, REMOVE ISOLATION OF HVAC SYSTEM IN AREAS
WHERE WORK IS BEING PERFORMED.
2. VERIFY THAT HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.
3. VERIFY AND DOCUMENT THROUGH A TAB THE HVAC SYSTEMS MEETS ORIGINAL AIRFLOW
AND AIR EXCHANGE DESIGN SPECIFICATIONS.
WATER SYSTEMS:
UNTIL THE POTABLE WATER SYSTEM IS ACTIVATED AND IN USE, FLUSHING SHALL CONTINUE AT
LEAST TWICE PER WEEK IN ACCORDANCE WITH VHA DIRECTIVE 1061.
MINIMUM INFECTION PREVENTION AND CONTROL MEASURES REQUIRED UPON
COMPLETION OF THE ACTIVITY
INSPECTIONS AND NON-INVASTIVE ACTIVITES
MATRIX OF PRECAUTIONS FOR CONSTRUCTION & RENOVATION
TYPE A
INCLUDES BUT NOT LIMITED TO:
• REMOVAL OF CEILING TILES FOR VISUAL INSPECTION LIMITED TO 1 TILE PER
50 SQUARE FEET.
• PAINTING (BUT NOT SANDING).
• WALL COVERING, ELECTRICAL TRIM, MINOR PLUMBING AND ACTIVITIES WHICH
DO NOT GENERATE DUST OR REQUIRE CUTTING OF WALLS OR ACCESS TO
CEILINGS OTHER THAN FOR VISUAL INSPECTION
SMALL SCALE, SHORT DURATION ACTIVITIES WHICH CREATES MINIMAL DUSTTYPE B
INCLUDES BUT NOT LIMITED TO:
• INSTALLATION OF TELEPHONE AND COMPUTER CABLING.
• ACCESS TO CHASE SPACES.
• CUTTING OF WALLS OR CEILING WHERE DUST MIGRATION CAN BE
CONTROLLED.
WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR REQUIRES
DEMOLITION OR REMOVAL OF ANY FIXED BUILDING COMPONENTS OR ASSEMBLIES
TYPE C
INCLUDES BUT NOT LIMITED TO:
• SANDING OF WALLS FOR PAINTING OR WALL COVERING.
• REMOVAL OF FLOOR COVERINGS, CEILING TILES OR CASEWORK.
• NEW WALL CONSTRUCTION.
• MINOR DUCT WORK OR ELECTRICAL WORK ABOVE CEILINGS.
• MAJOR CABLING ACTIVITIES.
• ANY ACTIVITY WHICH CANNOT BE COMPLETED WITHIN A SINGLE WORK SHIFT.
MAJOR DEMOLITION AND CONSTRUCTION PROJECTSTYPE D
INCLUDES BUT NOT LIMITED TO:
• ACTIVITIES WHICH REQUIRE CONSECUTIVE WORK SHIFTS.
• REQUIRES HEAVY DEMOLITION OR REMOVAL OF A COMPLETE CABLING
SYSTEM.
• NEW CONSTRUCTION.
INFECTION CONTROL RISK ASSESSMENT (ICRA)
LOW RISK
PATIENT RISK GROUPS
MEDIUM RISK HIGH RISK HIGHEST RISK
• OFFICE AREAS • CARDIOLOGY
• ECHOCARDIOGRAPHY
• ENDOSCOPY
• NUCLEAR MEDICINE
• PHYSICAL THERAPY
• RADIOLOGY/MRI
• RESPIRATORY
THERAPY
• CCU
• EMERGENCY ROOM
• LABOR & DELIVERY
• LABORATORY (SPECIMEN)
• NEWBORN NURSERY
• OUTPATIENT SURGERY
• PEDIATRICS
• PHARMACY
• POST ANESTHESIA CARE
UNIT
• SURGICAL UNITS
• ANY AREA FOR
IMMUNOCOMPROMISED PATIENTS
• BURN UNIT
• CARDIAC CATH LAB
• CENTRAL STERILE SUPPLY
• INTENSIVE CARE UNITS
• MEDICAL UNIT
• NEGATIVE PRESSURE ISOLATION
ROOMS
• ONCOLOGY
• OPERATING ROOMS INCLUDING
• C-SECTION ROOMS
RISK RELATED GROUP TYPE A TYPE B TYPE C TYPE D
LOW RISK GROUP
MEDIUM RISK GROUP
HIGH RISK GROUP
HIGHEST RISK GROUP
I
I
I
II
II
II
II
III
II
III
IV
IV
III
IV
IV
IV
IC MATRIX - CLASS OF PRECAUTIONS:
CONSTRUCTION PROJECT BY PATIENT RISK
CONSTRUCTION PROJECT TYPE
NOTE: INFECTION CONTROL APPROVAL WILL BE REQUIRED WHEN THE CONSTRUCTION ACTIVITY AND RISK LEVEL INDICATE
THAT CLASS III OR CLASS IV CONTROL PROCEDURES ARE NECESSARY.
5/8" FIRE RESISTANT GYPSUM
BOARD - BOTH SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH EXISTING
AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
/2
4 7/8"
3 5/8" 16 GAUGE METAL STUDS @
16" O.C. WALL TO EXTEND TO
UNDERSIDE OF DECK
B
FIRE RESISTANT SEALANT, BOTH
SIDES
SMOKE RATED
A
PLASTIC SHEET BARRIER
NON RATED
PLASTIC SHEET
BARRIER
EXISTING WALL
ASSEMBLY
EXISTING CEILING
BOTTOM SEALING RUNNER
TOP SEALING RUNNER
SUPPORT POLES,
QUANTITY PER MANUF.
RECOMMENDATIONS
REQU.
AS
3 5/8" INSULATED WALL WITH 16
GAUGE METAL STUDS @ 16" O.C.
(2) LAYERS 5/8" GYPSUM BOARD
EACH SIDE. WALL TO EXTEND TO
UNDERSIDE OF DECK
5/8" FIRE RESISTANT GYPSUM
BOARD - BOTH SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH EXISTING
AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
W A
L L
H E
IG
H
T V
A R
IE
S
F
IE
L D
V E
R
IF
Y
6 1/8"
D
FIRE RESISTANT SEALANT, BOTH
SIDES
2-HR RATED AND SMOKE
RATED
U.L. DESIGN NO. U404
3 5/8" INSULATED WALL WITH 16
GAUGE METAL STUDS @ 16" O.C.
WALL TO EXTEND TO UNDERSIDE
OF DECK
5/8" FIRE RESISTANT GYPSUM
BOARD - BOTH SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH EXISTING
AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
W A
L L
H E
IG
H
T V
A R
IE
S
F
IE
L D
V E
R
IF
Y
4 7/8"
C
FIRE RESISTANT SEALANT, BOTH
SIDES
1-HR RATED AND SMOKE RATED
U.L. DESIGN NO. U404
OUTSIDE OF BUILDING
WEEKLY CHANGED
HEPA FILTER
HEPA NEGATIVE
AIR UNIT
WEEKLY CHANGED
(OR MORE AS
NEEDED) PRE FILTER
FIRE RATED PLYWOOD
F
LE
X D
U C
T
SUPPLY DUCTS EITHER KEEP
RUNNING OR COVER WHEN
RUNNING TO KEEP DUST OUT.
TAPE ALL SERVICES
TO PROTECT AGAINST
CONTAMINATION A
O
V
FIRE EXTINGUISHER ON PORTABLE
FLOOR BRACKET (ILSM MAY REQUIRE
MORE THAN ONE)
SUSPENDED PLASTIC
ZIPPER WALL
CURTAIN BARRIER
6 MIL PLASTIC
TEMPORARY DIGITAL MANOMETER FOR NEGATIVE
PRESSURE MONITORING OUTSIDE OF ICRA BARRIER
FOR VA'S INSPECTION. INDICATOR SHALL BE AT -0.01
OR GREATER (VERIFY DAILY). IF NOT, VERIFY ALL
OPENINGS, SUCH AS DOOR CLOSED, AND/OR CHANGE
OUT NEGATIVE AIR PRE-FILTER.
PROVIDE STICKY MAT, DRY MAT, WET MAT
(CHANGED END OF SHIFT OR MORE IF
NECESSARYTO MAINTAIN CLEANLINESS)
PROVIDE WIPES AND SPRAY FOR WET MAT
POST ICRA ILSM FIRE
INSPECTION SHEETS
CONTAINER VISIBLE TO
PUBLIC
COVER ALL RETURNS AT THE
GRATE/DIFFUSERS
OPTIONAL EXHAUST DUCTS
(COVER THE GRATES AND THE DIFFUSERS)
E
DOOR OPENING
VENT TO OUTSIDE ROUTE
TO BE APPROVED BY COR.
FIRE PULL STATION WITH AUDIO/
VISUAL
ILSM SIGNAGE
ICRA BARRIER, SEE PLANS FOR TYPE AND LOCATION
GI002
GI002
HEATED DETECTOR CUT-OFF
BASIS OF DESIGN: HEPA NEGATIVE AIR UNIT
INTEGRAL WITH EDGEGUARD BARRIER SYSTEM.
FIRE RATED PLYWOOD (TEMP.
REMOVE GLASS PANEL)
EXISTING WINDOW FRAME
TYPE A OR C ICRA BARRIER,
SEE PLANS FOR TYPE AND
LOCATION
TYPE B OR D ICRA BARRIER,
SEE PLANS FOR TYPE AND
LOCATION
EXISTING CEILING
EXISTING CONCRETE SLAB FLOOR OR
ROOF ASSEMBLY
FINISHED FLOORING TO BE KEPT
CLEAN. FLOORS NOT BEING
REPLACED MUST BE PROTECTED.
COVER WITH ROSIN PAPER/ FIRE
RATED PLYWOOD.
WHEN WORKING ABOVE CEILING WITH
BARRIERS THAT TERMINATE AT CEILING,
PROVIDE PLASTIC ENCLOSURE IN
PLENUM SPACE.
PLASTIC WINDOW
SWIVEL CASTERS
WITH TWO LOCKING
BRAKES
MOBILE CART
A D
JU
S
T A
B
LE
H E
IG
H
T
HEPA NEGATIVE AIR
UNIT
EXISTING WALL
EXISTING CEILING
FLEX DUCT
XXXXXX
XXXXXX
XXXXXX
A .F
.F
4' -0
THIS IS A RESTRICTED AREA
AREA UNDER CONSTRUCTION
PERSONNEL ENTERING MUST HAVE: HARD HAT,
SAFETY GLASSES AND PROPER I.D.
COMING SOON!!
--DESCRIPTION ON NEWLY PROPOSED OCCUPANCY--
ICRA, ISLM, WATCH,
MISC. FORMS
PAPER CADDY
INDICATOR
(REFER TO
PLAN AND
ELEVATION)
FRAMED PICTURE
OF C.O.R. WITH
CONTACT
INFORMATION
CONSTRUCTION
SUPERVISOR
NAME AND CELL NUMBER
XXXXX
BOILER/CHILLER PLANT AFTER
HOURS CONTACT PHONE XXXXX
FIRE EMERGENCY DIAL 911
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
CONSULTANTS:
Drawing # OF
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
ARCH: SETH CAVIN, LICENSE #8468 EXP. 06/30/2024
ENGR: SPUR DESIGN, LLC COA #5197 EXP. 12/31/2025
CIVIL ENGINEER
OLSSON
550 ST LOUIS ST,
SPRINGFIELD, MO 65806
(417) 885-1736
MECH / ELEC / PLUMB ENG.
SPUR DESIGN
2519 MADISON AVE, SUITE 100
KANSAS CITY, MO 64108
(913) 369-7200
The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.
FIRE PROTECTION ENGINEER
FULLY SPRINKLERED
INDUSTRIAL HYGENIST
RIVERFRONT SAFETY & HEALTH
1139 OLIVE ST, SUITE 300
ST. LOUIS, MO 63101
(713) 864-2900
TELECOMMUNICATIONS
ASPEN COMMUNICATIONS, LLC
7 KIJI-DAVA CIRCLE, SUITE A
PRESCOTT, AZ 86301
(928) 774-0992
PHYSICAL SECURITY
FORCE PROTECT
10901 FRONT BEACH RD, #1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
RATED ENGINEERING
609 S. KELLY AVE., SUITE H2
EDMOND, OK 73003
(405) 856-2965
STRUCTURAL
STAND
8234 ROBINSON
OVERLAND PARK, KS 66204
(913) 214-2169
/1
/2
:0 :1
P
M
ICRA CONSTRUCTION DETAILS
NSM 3 258AJS
BID DOCUMENTS
EHRM INFRASTRUCTURE
UPGRADES LEXINGTON, KY
03/15/2024
596-22-700
LEXINGTON VA HEALTH CARE
2250 LEESTOWN RD
LEXINGTON, KY 40511
GI002
SPUR #: 2207
3/4" = 1'-0"
ICRA BARRIER WALL TYPES5
1/2" = 1'-0"
GENERAL ICRA CONSTRUCTION PLAN LAYOUT13/8" = 1'-0"
SECTION AT ICRA CONSTRUCTION PLAN3 3/8" = 1'-0"
ICRA MOBILE CONTAINMENT CART2
3/8" = 1'-0"
ICRA ELEVATION4
CONSTRUCTION PHASING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR (GC), IN COORDINATION WITH VETERANS AFFAIRS (VA) UNLESS OTHERWISE STATED IN THIS DOCUMENT. THE TRADES INVOLVED INCLUDE, BUT ARE NOT LIMITED TO, ARCHITECTURE, STRUCTURAL, CIVIL, ELECTRICAL, MECHANICAL, FIRE PROTECTION, ABATEMENT, AND TELECOMMUNICATIONS. THE PHASES DESCRIBED IN THESE DOCUMENTS CAN BE SCHEDULED CONCURRENTLY IN ORDER TO MEET THE MILESTONE DATES IN THE CONTRACT. THE GC SHALL SUBMIT PROPOSED PHASING PLANS FOR THE ENTIRE PROJECT AND FOR EACH BUILDING WITH DETAILED CONSTRUCTION SCHEDULES FOR REVIEW AND APPROVAL TO THE CONTRACTING OFFICER'S REPRESENTATIVE (COR) 30
DAYS PRIOR TO BEGINNING WORK.
THE OPERATIONS OF THE FACILITY WILL CONTINUE WITHOUT SERVICE INTERRUPTION WHILE CONSTRUCTION OCCURS. THE GC SHALL MAINTAIN A PROTECTIVE DEMARCATION BETWEEN ACTIVE AND CONSTRUCTION AREAS DURING EACH PHASE.
GC WILL CONDUCT A PRE-CONSTRUCTION MEETING WITH THE COR TO IDENTIFY AREAS WHERE AFTER HOURS WORK WILL BE REQUIRED. AREAS INCLUDE BUT ARE NOT LIMITED TO: OCCUPIED SPACES WHERE CONSTRUCTION WOULD DISRUPT THE WORK ENVIRONMENT OF THE INDIVIDUAL OCCUPYING THE SPACE (OFFICES THAT OPERATE 8AM - 5PM), FOR AREAS THAT OPERATE 24/7, AND PUBLIC AREAS.
FIELD VERIFY ACTUAL CONDITIONS AND DIMENSIONS. NOTIFY COR OF ANY DEVIATION FROM DRAWINGS OR ANY UNFORESEEN CONDITIONS THAT MAY CONFLICT WITH NEW WORK.
THE EXISTING INFRASTRUCTURE SUPPORTING THE IT VOICE AND DATA NETWORK SHALL REMAIN FULLY OPERATIONAL UNTIL THE NEW INFRASTRUCTURE IS COMPLETE AND A COORDINATED CUTOVER SCHEDULE/PLAN HAS BEEN APPROVED BY THE LOCAL VA OFFICE OF INFORMATION TECHNOLOGY (OIT) AND COR. A CUTOVER SCHEDULE/PLAN SHALL BE SUBMITTED BY THE GC AND APPROVED BY THE VA A MINIMUM OF 30 DAYS BEFORE THE SCHEDULED CUTOVER IS TO COMMENCE.
ANY ELECTRICAL OUTAGE REQUEST SHALL BE SUBMITTED TO THE COR 14 CALENDAR DAYS IN ADVANCE.