0004 - 596-22-700 Drawings 00_General Revisions.pdf

PDF 335 KB Posted

Attached to
Y1DA--EHRM Infrastructure Upgrades Construction Lexington - Leestown, KY 596-22-700
Solicitation number
36C77625B0040
Issued by

About this file

This document is a general information sheet for a Veterans Health Administration (VA) project for EHRM Infrastructure Upgrades in Lexington, Kentucky. The project involves a comprehensive set of design standards and requirements, including adoption of multiple 2024 building codes and standards such as the International Building Code, NFPA Life Safety Code, National Fire Codes, and various accessibility standards. The document outlines specific energy requirements for building envelope, insulation, walls, floors, and fenestration for Climate Zone 4, and provides detailed guidelines for fixture mounting heights, door clearances, and ADA compliance. The project is being managed by Spur Design, LLC, with multiple consultants including civil, mechanical, electrical, plumbing, fire protection, and telecommunications engineers, and is currently in the bid document phase with a project number of 596-22-700.

View the file

Other files

File Type Posted
36C77625B0040 0006.pdf PDF
0006 - 596-22-700 DBA Wages - Fayette County - 08-22-2025.pdf PDF
36C77625B0040 0005.pdf PDF
0004 - 596-22-700 Spec Section 01 00 00 Revisions.pdf PDF
0004 - 596-22-700 Spec Section 00 01 10 Revisions.pdf PDF
36C77625B0040 0004.pdf PDF
0004 - 596-22-700 Spec Section 08 11 13 Revisions.pdf PDF
0004 - 596-22-700 Spec Section 08 71 00 Revisions.pdf PDF
0004 - 596-22-700 TR Photos - Question 58.pdf PDF
0004 - 596-22-700 Responses to Tech Questions - 8-19-25.pdf PDF
0004 - 596-22-700 Spec Section 23 07 11.pdf PDF
0004 - 596-22-700 Lexington TR Notes-MASTER.pdf PDF
0004 - 596-22-700 Drawings 01_Environmental Revisions.pdf PDF
0004 - 596-22-700 Spec Section 02 82 13.13 Revisions.pdf PDF
0004 - 596-22-700 Drawings 02_Civil Revisions.pdf PDF
36C77625B0040 0003.pdf PDF
0003 - 596-22-700 Responses to Tech Questions - 8-12-25.pdf PDF
0003 - 596-22-700 DBA Wages - Fayette County - 08-08-2025.pdf PDF
0002 - 596-22-700 DBA Wages - Fayette County - 07-18-2025.pdf PDF
36C77625B0040 0002.pdf PDF
0001 - 596-22-700 Site Visit Sign-in Sheet - 7-8-25.pdf PDF
36C77625B0040 0001.pdf PDF
18 - 596-22-700 DBA Wages - Fayette County - 06-06-2025.pdf PDF
17 - 596-22-700 Brand Name Justification.pdf PDF
IFB 36C77625B0040 - 6-25-25.pdf PDF
16 - 596-22-700 PCRA.pdf PDF
13 - 596-22-700 Drawings 09_Security.pdf PDF
14 - 596-22-700 ICRA II.pdf PDF
05 - 596-22-700 Drawings 01_Environmental.pdf PDF
02 - 596-22-700 Specs 2.pdf PDF
19 - 596-22-700 VAAR 852.219-75 LOS - Construction.docx DOCX document
15 - 596-22-700 ICRA III.pdf PDF
09 - 596-22-700 Drawings 05_Fire Protection.pdf PDF
10 - 596-22-700 Drawings 06_Mechanical.pdf PDF
07 - 596-22-700 Drawings 03_Structural.pdf PDF
06 - 596-22-700 Drawings 02_Civil.pdf PDF
12 - 596-22-700 Drawings 08_Telecom.pdf PDF
01 - 596-22-700 Specs 1.pdf PDF
03 - 596-22-700 Spec Section 01 31 00.01.pdf PDF
04 - 596-22-700 Drawings 00_General.pdf PDF
11 - 596-22-700 Drawings 07_Electrical.pdf PDF
08 - 596-22-700 Drawings 04_Architectural.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABBREVIATIONS CODES STANDARDS AND EXECUTIVE ORDERS

4' -0

M

A X

4' -0

M

A X

2' -1

0" M

A X

2' -3

M

IN

1'-6" MIN

1. GENERAL CONTRACTOR TO PROVIDE SUPPORT BLOCKING

FOR ALL WALL MOUNTED ACCESSORIES, FIXTURES, AND

EQUIPMENT. ALL EQUIPMENT IN TELECOMMUNICATION

ROOMS TO BE MOUNTED ON FIRE-RETARDANT-TREATED

PLYWOOD, REFER TO ROOM FINISH SCHEDULE FOR MORE

DETAIL.

2. PROVIDE ADA SUPPORT BRACKETS PLACED AT ALL OPEN

COUNTERTOPS @ 36"-48" MAX ON CENTER.

3. SPECIFIED MAXIMUMS ARE MEASURED FROM AFTER

FINISHED FLOOR TO THE OPERABLE PART OF THE FIXTURE.

4. FIXTURES SHOWN ARE REPRESENTATIONAL ONLY. NOT ALL

FIXTURES MAY BE USED. REFER TO SPECIFICATIONS FOR

FIXTURE TYPES USED IN THIS PROJECT.

5. FIXTURES MAY OVERLAP WAINSCOT. WHERE APPLICABLE,

BACKING TO BE PROVIDED AS SHIM FOR FLUSH

APPLICATION. SHIM TO MATCH SCHEDULED WALL FINISH.

6" MAX

9" M

IN

SHOWER

VA TOILET ROOM

TURNING RADIUS

DRINKING

FOUNTAIN

PAPER TOWEL

DISPENSER

SANITARY

NAPKIN

DISPENSER

4' -0

"M A

X

WASTE

RECEPTACLE

LAVATORY

WITH MIRROR

ON CENTER

WALL

4' -0

M

A X

SOAP

DISPENSER

2' -1

0" M

A X

T O

B .O

. R E

F

LE

C T

IV

E

S U

R F

A C

E

3' -4

"M A

X

17 MIN

2' -3

M

IN

3' -0

M

A X

1'-6" MIN

WALL

2' -9

" 4' -0

M

IN

2'-0" MIN

8" MIN

WALL

LAVATORY

WITH APRON

1' -5

M

A X

1'-6" MIN

URINAL

WALL

1'-5" - 1'-7" (AMBULATORY)

1'-4" - 1'-6" (WHEELCHAIR)

CLEAR FLOOR

5'-6"

CLEAR FLOOR

6'-0"

3'-0" MIN

2' -9

3' -0

1'-0" MIN

3'-6" MIN 1'-0"MAX

4'-6" MIN

1' -5

'-7

1' -6

M

IN

A N

S I I

C C

A

7.

1)

1' -3

M

IN

A D

A /A

B A

2' -9

'-0

WALL

WALL

4' -0

M

A X

WALL HOOK

7' -0

CLOCK

WALL

FINISHED FLOOR

FIRE EXTINGUISHER

CABINET

WEIGHT > 40LBS

FIRE EXTINGUISHER

CABINET

WEIGHT < 40LBS

4' -0

"M A

X

4' -0

M

A X

TOILET SEAT

COVER

DISPENSER

BABY

CHANGING

STATION

CLEAR FLOOR SPACE

@ WATER CLOSET

5'-6"

2'-6"

4' -0

2'-6"

4' -0

HANDRAILS AND

BUMPERGUARDS

FIXTURE MOUNTING HEIGHTS AND CLEARANCES

18" MIN

M

IN

FRONT APPROACH,

PULL SIDE

36" MIN

M

IN

HINGE APPROACH,

PULL SIDE

HINGE APPROACH,

PULL SIDE

*12" MIN48

M

IN

FRONT APPROACH,

PUSH SIDE

M

IN

HINGE APPROACH,

PUSH SIDE

22" MIN 24" MIN

*4 8"

M

IN

LATCH APPROACH,

PULL SIDE

24" MIN*4

2"

M

IN

LATCH APPROACH,

PUSH SIDE

*IF BOTH CLOSER

AND LATCH ARE

PROVIDED

*54" MIN IF CLOSER

IS PROVIDED

*48" IF CLOSER IS

PROVIDED

FRONT APPROACH,

PUSH SIDE

M

IN

42" MIN

DOOR AND FIXTURE CLEARANCES

MATERIALS LEGEND

PURPOSE: THE PUBLIC BUILDINGS AMENDMENT ACT OF 1988, PUBLIC LAW (PUB. L.) 100-678 REQUIRES FEDERAL AGENCIES TO FOLLOW NATIONAL RECOGNIZED "MODEL" BUILDING CODES. THE FEDERAL PARTICIPATION IN THE DEVELOPMENT AND USE OF VOLUNTARY STANDARDS, OFFICE OF MANAGEMENT AND BUDGET (OMB) CIRCULAR A-119, REQUIRES ALL EXECUTIVE AGENCIES TO RELY ON VOLUNTARY STANDARDS, BOTH DOMESTIC AND INTERNATIONAL, WHENEVER FEASIBLE, AND TO PARTICIPATE IN

VOLUNTARY STANDARD BODIES.

GENERAL: VA HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING CODES AND STANDARDS AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE MODERNIZATION, ALTERATION, ADDITION, OR IMPROVEMENT OF ITS REAL PROPERTY AND THE CONSTRUCTION OF NEW STRUCTURES. VA DESIGN MANUALS AND MASTER SPECIFICATIONS

SPECIFY OTHER CODES AND STANDARDS THAT VA FOLLOWS ON ITS PROJECTS:

• VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL

INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).

• 2024 INTERNATIONAL BUILDING CODE (IBC) (ONLY WHEN SPECIFICALLY REFERENCED IN VA DESIGN DOCUMENTS, SEE NOTES BELOW)

• 2024 INTERNATIONAL EXISTING BUILDING CODE (IEBC) (IF APPLICABLE)

• 2024 NFPA 101 LIFE SAFETY CODE (SEE NOTES BELOW)

• 2024 NATIONAL FIRE CODES (NFPA)

• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.

• 2023 VA SEISMIC DESIGN REQUIREMENTS, H-18-8

• 2024 INTERNATIONAL MECHANICAL CODE

• 2023 NATIONAL ELECTRICAL CODE (NEC), NFPA 70

• 2024 INTERNATIONAL PLUMBING CODE (IPC)

• 2022 SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME) A 17.1.

• 2023 ARCHITECTURAL BARRIERS ACT (ABA) STANDARDS INCLUDING VA SUPPLEMENT, VA BARRIER FREE DESIGN STANDARD (PG-18-13)

• 2022 ANSI ICC A117.1 ACCESIBLE AND USABLE BUILDINGS AND FACILITIES

• 2022 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE AND COMMENTARY, AMERICAN CONCRETE INSTITUTE AND COMMENTARY (ACI 318-19)

• 2023 STEEL CONSTRUCTION MANUAL (15TH EDITION), AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)

• ENERGY POLICY ACT OF 2005 (EPACT)

• 2007 DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND

NEW LOW-RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435.

• 2006 FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)

• 2018 EXECUTIVE ORDER 13834: EFFICIENT FEDERAL OPERATIONS

• 2022 THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS SECTION 010000 OF THE VA MASTER CONSTRUCTION

SPECIFICATION.

• 2022 VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 62.1

• 2022 SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15

• 2023 PHYSICAL SECURITY AND RESILIENCY DESIGN MANUAL

LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES. HOWEVER, LOCAL AUTHORITIES SHOULD BE NOTIFIED ABOUT PLANNED PROJECTS AND GIVEN OPPORTUNITY TO REVIEW DRAWINGS PROVIDED THAT VA DOES NOT PAY FOR REVIEW OR INSPECTION FEES.

NOTES:

1. NFPA 101 PRIMARILY ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES WHILE THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT

NOT LIMITED TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION, AND ENERGY CONSERVATION. VA BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 101 AND DOCUMENTS REFERENCED BY NFPA 101 IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF THE JOINT COMMISSION. THEREFORE, DESIGNS SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF NFPA 101 AND DOCUMENTS REFERENCED THEREIN.

DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE ADDRESSED ABOVE IN THIS PROGRAM GUIDE. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES

EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).

2. CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.

ASHRAE 90.1 - 2019 EDITION

BUILDING LOCATION: LEXINGTON, KY

CLIMATE ZONE (TABLE ANNEX 1-1): ZONE 4A

INTERIOR DESIGN CONDITIONS:

THE INTERIOR DESIGN TEMPERATURES FOR HEATING AND COOLING AS DEPICTED IN THE PROJECT DESIGN CONDITIONS SCHEDULE IN THE MECHANICAL CONTROL DRAWINGS SHALL BE THE MAXIMUM

AND MINIMUM VALUES FOR THE ASSOCIATED TEMPERATURE CONTROL ZONES.

BUILDING ENVELOPE REQUIREMENTS (5.5 )

BUILDING ENVELOPE REQUIREMENTS FOR CLIMATE ZONE 4 (A,B,C)

ROOFS REQUIRED DESIGNED

INSULATION: R-30 c.i. EXISTING METAL BUILDINGS: R-19 + R-11 Ls or R-25 + R-8 Ls N/A

ATTIC AND OTHER: R-49 N/A

WALLS, ABOVE GRADE

MASS: R-9.5 c.i. EXISTING METAL BUILDING: R-0 + R-15.8 c.i. N/A STEEL-FRAMED: R-13 + R-7.5 c.i. EXISTING WOOD-FRAMED AND OTHER: R-13 + R-3.8 c.i. or R-20 N/A

WALL, BELOW GRADE

BELOW-GRADE WALL: R-7.5 c.i. EXISTING

FLOORS

MASS: R-14.6 c.i. EXISTING

STEEL-FRAMED: R-30 EXISTING

WOOD-FRAMED AND OTHER: R-30 N/A

SLAB-ON-GRADE FLOORS

UNHEATED SLABS: R-15 for 24 in. EXISTING HEATED SLABS: R-20 for 24 in. EXISTING

OPAQUE DOORS

SWINGING: U-0.370 EXISTING

NONSWINGING: U-0.310 N/A

FENESTRATION (TABLE 5.5-4):

VERTICAL FENESTRATION, U-FACTOR

FIXED: U-0.36 EXISTING

OPERABLE: U-0.45 EXISTING

ENTRANCE DOOR: U-0.63 EXISTING

DEFINITIONS

c.i = CONTINUOUS INSULATION Ls = LINEAR SYSTEM

NR = NO (INSULATION) REQUIREMENT

ENERGY REQUIREMENTS

N

1. DRAWINGS ARE PART OF A COMPLETE DOCUMENTS SET. CONTRACTOR SHALL

CONFIRM ALL ITEMS REQUIRED BASED UPON THE OVERALL DESIGN INTENT OF THE

ENTIRE DOCUMENT SET.

2. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS, PRIOR TO BEGINNING ANY

WORK, TO CONFIRM THE ACCURACY OF THE DRAWINGS AND REPORT ANY

DISCREPANCIES TO THE ARCHITECT. DO NOT SCALE THE DRAWINGS. FIELD VERIFY

ALL DIMENSIONS AND EXISTING STRUCTURAL CONDITIONS.

3. ALL AREAS NOT INVOLVED IN THE SCOPE OF WORK FOR THIS PROJECT SHALL BE KEPT

CLEAN AND FREE OF OBSTRUCTIONS AT ALL TIMES.

4. ERECT BARRICADES AND WARNING SIGNS TO DIVERT AND WARN PASSERS-BY OF THE

CONSTRUCTION WORK. PROVIDE DUST PROOFING ENCLOSURES TO SEPARATE WORK

AREAS FROM THE EXISTING FACILITIES.

5. ALL TRASH AND DEBRIS TO BE REMOVED ON A DAILY BASIS.

6. PROVIDE PROTECTION FOR ALL EXISTING SURFACES AND CONDITIONS TO REMAIN IN

PLACE DURING THE SCOPE OF WORK. SHOULD ANY DAMAGE OCCUR, PATCH AND

REPAIR ANY DAMAGE TO ADJACENT FINISHES TO MATCH EXISTING.

7. ANY DAMAGE CAUSED TO THE BUILDING OR OWNER EQUIPMENT SHALL BE REPAIRED

OR REPLACED BACK TO ITS ORIGINAL CONDITIONS AT NO ADDITIONAL COST TO THE

OWNER.

8. COVER ALL RETURN AIR GRILLES WITHIN THE AREA OF CONSTRUCTION TO PREVENT

PARTICULATE MATERIAL FROM EXHAUSTING INTO SURROUNDING SPACES.

9. APPROPRIATE LIGHT FIXTURES SHALL BE TEMPORARILY SUSPENDED TO PROVIDE

ADEQUATE LIGHTING LEVELS FOR CONSTRUCTION.

10. CONTRACTOR AND SUBCONTRACTORS ARE REQUIRED TO COORDINATE WITH OTHER

DISCIPLINES TO INSTALL COMPLETE AND OPERATIONAL SYSTEMS. DRAWINGS, AS A

WHOLE, REPRESENT A COMPLETE SET AND DEPICT REQUIREMENTS FOR COMPLETE

AND OPERATIONAL SYSTEMS. INDIVIDUAL DRAWINGS MAY NOT DEPICT COMPLETE AND

ACCURATE INFORMATION TO COORDINATE COMPLETE AND OPERATIONAL SYSTEMS,

BUT DO SO AS AN ENTIRE DOCUMENT TO BE REFERENCED WITH OTHER INDIVIDUAL

DRAWINGS. CONTRACTOR AND SUBCONTRACTORS ARE REQUIRED TO REFERENCE

OTHER SHEETS AND SPECIFICATIONS AS AN ENTIRE SET OF CONSTRUCTION

DOCUMENTS THAT REFLECT WORK REQUIRED TO ACHIEVE A COMPLETE AND

OPERATIONAL GOAL. LACK OF COORDINATION AND REVIEW OF DRAWINGS AND

SPECIFICATIONS AS AN ENTIRE DOCUMENT TO INSTALL COMPLETE AND OPERATIONAL

SYSTEMS, BEING OBVIOUS AND TYPICAL INDUSTRY STANDARD, IDENTIFIED IN THE

DRAWINGS AND SPECIFICATIONS, SHALL NOT BE IN ANY WAY AN ADDITIONAL COST TO

THE GOVERNMENT.

11. CONSTRUCTION PHASING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR

(GC), REFER TO GI010 - GENERAL PHASING NOTES.

12. FOR MINOR SYSTEM INTERRUPTIONS, CONTRACTOR SHALL SUBMIT A REQUEST, IN

WRITING, TO INTERRUPT ANY SUCH SERVICES TO COR (CONTRACTING OFFICER’S

REPRESENTATIVE) 10 WORKING DAYS IN ADVANCE OF PROPOSED INTERRUPTION.

REQUEST SHALL STATE REASON, DATE, EXACT TIME OF, AND APPROXIMATE DURATION

OF SUCH INTERRUPTION. MAJOR INTERRUPTIONS OF ANY SYSTEM MUST BE

REQUESTED, IN WRITING, AT LEAST 15 WORKING DAYS PRIOR TO THE DESIRED TIME

AND SHALL BE PERFORMED AS DIRECTED BY THE COR. MAJOR INTERRUPTIONS SHALL

BE COORDINATED WITH OTHER MAJOR INTERRUPTIONS AND MAY NOT BE SCHEDULED

FOR ONE DISCIPLINE MORE THAN TWICE THROUGHOUT THE OVERALL CONSTRUCTION

SCHEDULE UNLESS REQUESTED IN WRITING AND APPROVED BY THE COR.

CONTRACTOR WILL BE ADVISED, IN WRITING, OF APPROVAL OF REQUEST, OR OF

WHICH OTHER DATE AND/OR TIME SUCH INTERRUPTION WILL CAUSE THE LEAST

INCONVENIENCE TO OPERATIONS OF THE MEDICAL CENTER. INTERRUPTION TIME

APPROVED BY THE MEDICAL CENTER MAY OCCUR AT TIMES OTHER THAN

CONTRACTOR'S NORMAL WORKING HOURS. SCHEDULE INTERRUPTION MAY BE ON

WEEKENDS OR LATE HOURS AND MAY NOT BE AN ADDITIONAL COST TO THE

GOVERNMENT. COORDINATE ALL INTERRUPTIONS THAT MAY AFFECT THE NORMAL

OPERATION OF THE FACILITY WITH THE COR WHEN SUBMITTING THE CONSTRUCTION

SCHEDULE OR UPDATES TO THE CONSTRUCTION SCHEDULE.

13. NO ASBESTOS CONTAINING MATERIALS ARE TO BE USED ON THIS PROJECT. SPUR

DESIGN, THE A/E OF RECORD, CAN CERTIFY THAT NO ASBESTOS CONTAINING

BUILDING MATERIALS (ACBM) OR LEAD BASED PAINT (LBP) PRODUCTS WERE

DESIGNED/SPECIFIED AS BUILDING MATERIAL IN ANY OF THE CONSTRUCTION

DOCUMENTS.

13. REFER TO THE DESIGN BINDER FOR THE ICRA INFORMATION DOCUMENTATION.

GENERAL NOTES

AREA NAME

150 SF

A101

A101

SIM

A

00.0

A101

1 1

A101

LEVEL NAME

00'-00"

00'-00" 4B

3A

FIBERGLASS BATT

INSULATION

RIGID INSULATION

CONCRETE / PRECAST

CONCRETE

EARTH / SOIL

SAND, EIFS FINISH, OR

PLASTER FINISH

GYPSUM BOARD FINISH

BRICK

CONCRETE MASONRY

UNIT

STONE / CAST STONE

GYPSUM BOARD SECTION

EXTERIOR SHEATHING

BOARD SECTION

PLYWOOD SECTION

Room Name

150 SF / 150 SF

001A

/1 A101

X0000

6"

3' -0

M

A X

ROOM TAG

AREA TAG

SPECIALTY EQUIPMENT TAG

DOOR TAG

KEYED NOTE TAG

WALL TAG

WINDOW TAG

A101

SIM

A101

SIM

A

ACB ACOUSTIC CEILING BAFFLE

ACP ACOUSTIC CEILING PANEL

ACST ACOUSTIC

ADA AMERICANS WITH DISABILITIES ACT

ACT ACOUSTICAL CEILING TILE

ADDL ADDITIONAL

ADDN ADDITION

ADJ ADJACENT, ADJOINING, OR

ADJUSTABLE

ADMIN ADMINISTRATION

AE ARCHITECT/ENGINEER

AF ACCESS FLOORING

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AHJ AUTHORITY HAVING JURISDICTION

AIA AMERICAN INSTITUTE OF

ARCHITECTS

ALT ALTERNATE

ALT NO ALTERNATE NUMBER

ALUM ALUMINIUM (TRIM)

AMT AMOUNT

APPROX APPROXIMATE

ARCH ARCHITECT

ASC ABOVE SUSPENDED CEILING

AT ACOUSTIC CEILING TILE

AVG AVERAGE

B

BD BOARD

BLDG BUILDING

BLKG BLOCKING

BLT IN BUILT-IN

BOS BOTTOM OF STEEL

BOT BOTTOM

BRKT BRACKET

BTWN BETWEEN

C

CAB CABINET

CAV CAVITY

CBB CONCRETE BACKER BOARD

CD CONSTRUCTION DOCUMENTS

CFM CUBIC FEET PER MINUTE

CFS CUBIC FEET PER SECOND

CG CORNER GUARD

CH BD CHALK BOARD

CIP CAST-IN-PLACE

CJ CONTROL JOINT

CL CENTER LINE

CLG CEILING

CLG HT CEILING HEIGHT

CLR CLEAR

CMU CONCRETE MASONRY UNIT

CO CONTRACTING OFFICER

COL COLUMN

COMM COMMUNICATION

CONC CONCRETE

CONT CONTINUOUS

COORD COORDINATE

COR CONTRACTING OFFICER'S

REPRESENTATIVE

CP CONTRACTOR PROVIDED

CP/CI CONTRACTOR PROVIDED /

CONTRACTOR INSTALLED

CPT CAROET/CARPET TILE

CS CONCRETE SEALED

CSWK CASEWORK

CT CERAMIC TILE

CTB CERAMIC TILE BASE

CTR CENTER

CU FT CUBIC FEET

D

DBL DOUBLE

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DIA DIAMETER

DIR DIRECTION

DIST DISTANCE

DOC DOCUMENT

DR DOOR

DS DOWNSPOUT

DWG DRAWING

DWP DIMENSIONAL WALL PANEL

E

EA EACH

EJ EXPANSION JOINT

EL ELEVATION

ELEV ELEVATOR

ENTR ENTRANCE

EPY EPXOY FLOORING

EQ EQUAL

ETR EXISTING TO REMAIN

EX EXISTING

EXP EXPOSED

EXT EXTERIOR

F

FAB FABRIC

FED FEDERAL

FF FINISH FACE

FF EL FINISH FLOOR ELEVATION

FIN FINISH

FIN BS FINISH BOTH SIDES

FIN FLR FINISH FLOOR

FIN GR FINISH GRADE

FIXT FIXTURE

FLDG FOLDING

FLEX FLEXIBLE

FLG FLOORING

FLMT FLUSH MOUNT

FLR FLOOR

FOC FACE OF CONCRETE

FOM FACE OF MASONRY

FP FIRE PROTECTION

FR FIRE RESISTANT

FT FEET

FTG FOOTING

FV FIELD VERIFY

FWC FABRIC WALL COVERING

G

GDR GUARDRAIL

GL GLASS/GLAZING

GRAN GRANITE

GR FL GROUND FLOOR

GT GROUT

GSM GALVANIZED SHEET METAL

GYP BD GYPSUM BOARD

H

HDW HARDWARE

HEPA HIGH EFFICIENCY

PARTICULATE AIR (FILTER)

HM HOLLOW METAL

HORIZ HORIZONTAL

HR HANDRAIL

HT HEIGHT

I

IBC INTERNATIONAL BUILDING CODE

INSUL INSULATION

INT INTERIOR

ILO IN LIEU OF

J

J-BOX JUNCTION BOX

L

LAV LAVATORY

LBS POUND

LDG LANDING

LF LINEAR FEET (FOOT)

LIN LINEAR

LN LINOLEUM

LOC LOCATION

LT LIGHT

LVR LOUVER

LVT LUXURY VINYL TILE

M

MAT CARPET MAT / WALK-OFF MAT

MATL MATERIAL

MAX MAXIMUM

MECH MECHANICAL

MEMB MEMBRANE

MFR MANUFACTURER

MID MIDDLE

MIL STD MILITARY STANDARD

MIN MINIMUM

MISC MISCELLANEOUS

MO MASONRY OPENING

MOD MODIFY

MTG MOUNTING

MTL METAL

MVBL MOVABLE

N

NA NOT APPLICABLE

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NTS NOT TO SCALE

O

OA OVERALL

OC ON CENTER

OD OUTSIDE DIAMETER

OPNG OPENING

OPP OPPOSITE

OPR OPERABLE

ORD OVERFLOW ROOF DRAIN

ORIG ORIGINAL

P

P PAINT

PA PUBLIC ADDRESS

PBD PARTICLE BOARD

PCF POUNDS PER CUBIC FOOT

PCT PERCENT

PERF PERFORATED

PERIM PERIMETER

PERP PERPENDICULAR

PL PROPERTY LINE

PLAM PLASTIC LAMINATE

PLBG PLUMBING

PNL PANEL

PR PAIR

PRB PROFILE BASE

PRKG PARKING

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PORCELAIN TILE

PWR POWER

Q

QA QUALITY ASSURANCE

QC QUALITY CONTROL

QTY QUANTITY

REFERENCE SYMBOLS IDENTIFICATION TAGS

NOTE: NOT ALL ABBREVIATIONS OR SYMBOLS WILL BE UTILIZED FOR THIS PROJECT.

GRID HEAD AND

LINE

LEVEL INDICATOR

MATCH LINE AND

VIEW REFERENCE

NORTH ARROW W/

PROJECT NORTH

SPOT ELEVATION

DETAIL

SECTION

**48" MIN IF BOTH CLOSER

AND LATCH PROVIDED

WALL

SECTION

BUILDING

SECTION

DETAIL

ELEVATION

INTERIOR

ELEVATION

BUILDING

ELEVATION

1 1

6'- 0"

5'- 6"

BARIATRIC TOILET ROOM

TURNING RADIUS

CLEAR FLOOR SPACE

@ ADA LAVATORY

CLEAR FLOOR SPACE @ ADA

DRINKING FOUNTAIN

4"

6"

3"

6" 1'

-6

6" MAX

7" - 9" 11" MIN

17" - 25"

M

IN

6' -0

(ANSI ICC A117.1)

39"- 41"

(A N

S I I

C C

A

7.

1)

M

IN

(A N

S I I

C C

A

7.

1)

1"

3' -6

M

A X

5' -0

M

A X

R

RAF RESILIENT ATHETIC FLOORING

RB RUBBER BASE/RESILIENT BASE

RCP REFLECTED CEILING PLAN

RD ROOF DRAIN

REC RECESSED

REF REFERENCE

REM REMOVABLE

REP REPAIR

REPL REPLACE

REQ REQUIRE

REQD REQUIRED

RES RESINOUS FLOORING

RES-W RESINOUS / EPOXY WALL / CEILING

RF RUBBER FLOORING

RFG ROOFING

RM ROOM

RO ROUGH OPENING

RP RESIN PANEL

RSF RESILIENT SHEET FLOORING

RV ROOF VENT

RWC RIGID VINYL WALLCOVERING

S

SC SPECIALTY COATING

SD STATIC DISSIPATIVE FLOORING/TILE

SCHED SCHEDULE

SECT SECTION

SF SQUARE FOOT (FEET)

SGL SINGLE

SIM SIMILAR

SJ SCORED JOINT

SLNT SEALANT

SM SHEET METAL

SPEC SPECIFICATION

SQ SQUARE

SQ IN SQUARE INCH

SQ YD SQUARE YARD

SS SOLID SURFACE

ST STONE

STD STANDARD

STOR STORAGE

SV SHEET VINYL (ROLLED OR TILE)

T

TEL TELEPHONE

TEMP TEMPORARY

TER TERRAZO

TOF TOP OF FOOTING/ FOUNDATION

TOM TOP OF MASONRY

TOS TOP OF SLAB/ STEEL

U

UNO UNLESS NOTED OTHERWISE

UTIL UTILITY

V

VAR VARIES

VC VA PROVIDED / CONTRACTOR

INSTALLED

VCT VINYL COMPOSITION TILE

VFAT VINYL FACED ACOUSTICLAL TILE

VP VENEERED PLASTER

VT VINYL TILE

VV VA PROVIDED / VA INSTALLED

VWC VINYL WALLCOVERING

VWF VINYL WALL FABRIC

W

W/ WITH

W/O WITHOUT

W/C WATER CLOSET

WC WHEELCHAIR

WD WOOD

WFAB WALL FABRIC

WPM WATERPROOF MEMBRANE

WSF WELDED SHEET FLOOR

X

X BRACE CROSS BRACE

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

CONSULTANTS:

Drawing # OF

VA Health Care System Approval:

ARCHITECT:

SPUR DESIGN, LLC

312 SW 25TH STREET

Oklahoma City, OK 73109

(405) 842-6100

ARCH: SETH CAVIN, LICENSE #8468 EXP. 06/30/2024

ENGR: SPUR DESIGN, LLC COA #5197 EXP. 12/31/2025

CIVIL ENGINEER

OLSSON

550 ST LOUIS ST,

SPRINGFIELD, MO 65806

(417) 885-1736

MECH / ELEC / PLUMB ENG.

SPUR DESIGN

2519 MADISON AVE, SUITE 100

KANSAS CITY, MO 64108

(913) 369-7200

The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.

FIRE PROTECTION ENGINEER

FULLY SPRINKLERED

INDUSTRIAL HYGENIST

RIVERFRONT SAFETY & HEALTH

1139 OLIVE ST, SUITE 300

ST. LOUIS, MO 63101

(713) 864-2900

TELECOMMUNICATIONS

ASPEN COMMUNICATIONS, LLC

7 KIJI-DAVA CIRCLE, SUITE A

PRESCOTT, AZ 86301

(928) 774-0992

PHYSICAL SECURITY

FORCE PROTECT

10901 FRONT BEACH RD, #1415

PANAMA CITY BEACH, FL 32407

(502) 836-4232

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

STAMP:

Drawing Number

Building Number

RATED ENGINEERING

609 S. KELLY AVE., SUITE H2

EDMOND, OK 73003

(405) 856-2965

STRUCTURAL

STAND

8234 ROBINSON

OVERLAND PARK, KS 66204

(913) 214-2169

/1

/2

:4 :3

P

M

GENERAL INFORMATION

NSM 2 258AJS

BID DOCUMENTS

EHRM INFRASTRUCTURE

UPGRADES LEXINGTON, KY

03/15/2024

596-22-700

LEXINGTON VA HEALTH CARE

2250 LEESTOWN RD

LEXINGTON, KY 40511

GI001

SPUR #: 2207

No. REVISION DESCRIPTION DATE

1 ADDENDUM 1 08/15/2025

The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.

STAMP:

Sheets
GI001 - GENERAL INFORMATION

File details come from the government source that posted it. Updated .