AS06_Add Docs in Response to Q-As_SPS Equip Site Prep.pdf
PDF 31 MB Posted
- Solicitation number
- 36C26325B0023_1
About this file
This document is a User Manual for the ENDODRY Storage and Drying System site requirements, specifically detailing installation specifications for a medical equipment washer-disinfector system. The manual outlines critical site preparation requirements, including air supply quality standards (ISO 8573-1:2010 class 1.2.1), and establishes customer responsibilities for meeting installation specifications.
The document includes important contractual provisions, such as customer acknowledgment of site requirements, potential financial penalties for installation delays, and warranty disclaimers. Customers must ensure compliance with the specified site requirements by the agreed installation date, with potential charges for standby fees or rescheduling expenses if specifications are not met. The manual is specifically designed for North American customers and is part of a broader installation process for medical equipment, likely related to the Veterans Affairs Minneapolis VAMC project referenced in the accompanying federal contract opportunity description.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
| 1
USER MANUAL
WASHER-DISINFECTOR
CUSTOMER
REQUIREMENTS
NORTH AMERICA
ENDODRY™
Storage & Drying Sytem
2 |
50098-678-EN Rev E
© � 2019 All rights reserved. This publication is protected by copyright. Copying, disclosure to others, or the use of this publication is prohibited without the express written consent of Medivators Inc.
ADVANTAGE PLUS™
is a trademark of Medivators Inc.
DSD EDGE™
ENDODRY™
All other company or product names referenced in this document are trademarks of their respective owner.
Medivators reserves the right to make changes in the specifications shown herein without notice or obligation. Contact your Medivators representative or Medivators customer service for more information.
| 3SITE REQUIREMENTS
This purpose of this document is to provide the facility with requirements to ensure correct installation and subsequent proper performance of the ENDODRY™ Storage and Drying System.
READ THE ENTIRE DOCUMENT.
APPLICABLE DOCUMENTS
• ENDODRY Storage and Drying System User Manual.
Any deviation from these specifications may cause operational issues that would not be covered by the Warranty.
4 |
BY SIGNING BELOW CUSTOMER ACKNOWLEDGES THAT:
1. Customer reviewed these Site Requirements for the ENDODRY™ Storage and Drying System as indicated in this document.
2. The customer assumes complete responsibility for meeting the specifications and requirements set forth in the Site Requirements documentation to ensure proper installation and performance of the ENDODRY Storage and Drying System. Failure of the customer to comply with these Site Requirements and any deviation from the specifications set forth herein may compromise the functionality of the system, and/or may cause operational issues which will not be covered by the Cantel Medical warranty, and are hereby disclaimed by Cantel Medical.
3. The customer assumes complete responsibility for meeting the specifications and requirements set forth in the Site Requirements documentation by the agreed upon installation date between the Customer and Cantel Medical. If the Cantel Medical installation team encounters any delays due to site requirements not meeting specifications and requirements, the Customer will be charged Medivators current rates for stand-by fees, until the site requirements are met and installation activity resumes; or, if it is determined that the delay results in rescheduling the installation to a later date, the Customer will be charged for all expenses at current Medivators rates (flights, lodging, and car rental, if applicable), and travel and labor time related to the return installation dispatch.
4. If installation is canceled or moved 48 hours prior to the agreed upon installation date, no fee will be charged.
5. For customers who request or accept Medivators space planning suggestions for the site prior to installation (“Space Planning Services”), Customer agrees that the Disclaimer, indicated in this document on Page 9, will apply to such Space Planning Services.
Customer Representative
Title
Signature Date Email
| 5
AIR SUPPLY
1. Quality: ISO 8573-1:2010 class 1.2.1
• Particle Size: Incoming air filtered down to <1 micron in size.
• Moisture Content: Pressure dew point (PDP) of -40°C or better required and no liquid water.
• Oil Content: < 0.01mg of oil per cubic meter of compressed air (liquid, aerosol or vapor oil).
2. Pressure: The below pressures are required at the point of cabinet connection. Facility should consult with their Maintenance Department or their qualified air vendor to identify potential issues with the air supply.
• ENDODRY™ Cabinet for ADVANTAGE PLUS™ Endoscope Reprocessor: 58-145 psi (4-10 bar).
• ENDODRY Cabinet for DSD EDGE™ Automated Endoscope Reprocessor: 72-145 psi (5-10 bar).
3. Volume: The below volumes are required at the point of cabinet connection.
• ADVANTAGE PLUS Endoscope Reprocessor/ENDODRY Cabinet: Minimum requirement of 4.2 scfm (120 l/min ANR) per cabinet.
• DSD EDGE Automated Endoscope Reprocessor/ENDODRY Cabinet: Minimum requirement of 7 scfm (200 l/min ANR) per cabinet.
4. Flexible Air Hose: A 5 foot (1.5 Meter) line is included with each cabinet.
• One end will be pre-configured to connect to ENDODRY™ Drying Cabinet.
• Open end will be ¼” or 6mm inner diameter and it is the responsibility of the facility to make that connection to their air supply line.
The compressors listed below are suggestions that the facility can purchase directly from either the compressor manufacturer or authorized dealer. Medivators is not responsible for air compressor warranty, service and maintenance.
ADVANTAGE HOOKUPS DSD HOOKUPS
# of Cabinets
BeaconMedaes (Requires Additional Dryer)
Powerex (w/ Dryer)
# of Cabinets
BeaconMedaes (Requires Additional Dryer)
Powerex (w/ Dryer)
1 LES03-145T-RD-xxx SES0308TM** 1 LES05-145T-RD-xxx SES0508TM**
2 LES05-145T-RD-xxx SES05058TM** 2 LES10-145RD LSE1504
3 LES07-145T-RD-xxx LSE1504 3 LES15-145RD LSE1504
4 LES07-145T-RD-xxx LSE1504 4 LES20-145RD LSE2005
5 LES15-145RD LSE1504 5 LES20-145RD LSE2005
6 |
ELECTRICAL SUPPLY
• 100-240 VAC ± 10%, single phase, 50/60 Hz, 15 amp circuit (120v), 10 amp circuit (230v).
• Power input: 75W
• A NEMA 5-15 power cord for the North America market and a CEE 7 power cord for the European market is included with the ENDODRY™ Storage and Drying System. The cord is approximately 6 feet (1.8 meters) in length.
• A GFI/RCD protected outlet located on the wall above the ENDODRY Storage and Drying System, see Floor & Wall Section.
• Medivators equipment must be on dedicated circuits.
NETWORKING
• The ENDODRY Storage and Drying System is a networkable piece of equipment and has the capabilities to communicate to other Medivators technologies via a LAN interface (RJ45, 10/100 Mbit).
• A 6.5 foot (2 meter) cable is included with the cabinet.
• A RJ45 wall mounted network jack located on the wall above the ENDODRY Storage and Drying System, see Floor & Wall section.
DIMENSIONS
Shipping Dimensions
• Crate Dimensions: H84”x W47”x D31”
• Crate Weight: 583 lbs.
Reprocessor Dimensions
• Dimensions: H74.8” X W23.6” X D21.3”
• Weight: 375 lbs (170 kg)
FLOOR & WALL
• The floor must be level.
• For optimal user-safety and operation, it is recommended that the ENDODRY Storage and Drying System always be placed directly on the floor, and not on an elevated platform.
• The back of the one-sided ENDODRY Storage and Drying System will be placed flush against the wall. All electrical, network and air connections must be placed a minimum of 78.7 inches (200 cm) off of the floor above the cabinet.
• The two-sided ENDODRY Storage and Drying System is designed to fit into an opening in the wall. The rough opening for a single unit is H75.2” X W24” (191cm x 61cm). All electrical, network and air connections must be placed a minimum of 78.7 inches (200 cm) off of the floor above the cabinet. The electrical, network and air connections must be located on the loading side of the ENDODRY Storage and Drying System.
| 7
.6
21.3"
41.7"
EN
D
O
R Y
St or ag e an d ry in g
Sy st em
TM
El ec tri ca l C on ne ct io n
Ai r C
N et w k C
2 3
-S id ed V er si
3D ie
M im um fa ci lit y al l c ns he ig ht is
8.
7” fr om fl oo r.
pt fo r D rs pe
Le ft -O
L
B To p Vi ew
A Fr t 3
.3
3.
9”
.e nd oi nf tio np re ve nt n.
co m to ow nl oa th ev it fil e.
Fo r c la rif ic at d/ q ue pl ea se c ta
T hn
S up po rt
.8
.4
9.
4.5”12” 4.8”
1 3
8 |
62.2"
21.3"
St
Sy em
TM
El tri ca l C
Ai r C
2 3
Tw o-
Si de
Ve
(P as s-
Th ru pt r D ft/
LU
/O
U ft/
LU
/O
To
Vi
Fr t 3
W
3D
1 3
9" fa ci lit l c
8.
7” fr
*M su en t u si ng a
” w l.
4.5” 12”4.8”
*1
5.
3"
.e oi nf np n.
nl oa fil e.
rif
9.
| 9
SPACE-PLANNING SERVICES
For customers who request or accept Medivators space planning suggestions for the site prior to installation (“Space Planning Services”), Customer agrees that the following Disclaimer will apply to such Space Planning Services:
CUSTOMER ACKNOWLEGES AND ACCEPTS THAT SPACE PLANNING SERVICES ARE OFFERED AND
PROVIDED “AS IS” WITH NO REPRESENTATION OR WARRANTY, EXPRESS OR IMPLIED, OF ANY KIND WHATSOEVER, INCLUDING, WITHOUT LIMITATION, ANY WARRANTIES OR REPRESENTATIONS AS TO THE ADEQUACY OF ANY DESIGN, MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE, OR THAT ANY OF THE SERVICES WILL MEET CUSTOMER’S NEEDS OR REQUIREMENTS OR BE CAPABLE OF IMPLEMENTATION.
IN NO EVENT SHALL MEDIVATORS BE LIABLE TO CUSTOMER OR ANY THIRD PARTY FOR LOSS OF PROFITS, LOSS OF USE, OR ANY DIRECT, INDIRECT, INCIDENTAL, CONSEQUENTIAL OR SPECIAL DAMAGES OF ANY KIND, WHETHER OR NOT A PARTY WAS, IS, OR SHOULD BE AWARE OF SUCH LOSS OR DAMAGES.
CUSTOMER AGREES THAT IT WILL RELY ON, USE AND OR OTHERWISE EMPLOY ARCHITECTS, ENGINEERS, CONSTRUCTION PROFESSIONALS AND OTHER VENDORS OR SERVICE PROVIDERS (COLLECTIVELY, “PROJECT PROFESSIONALS”) REGARDING THE FEASIBILITY OR IMPLEMENTATION OF ANYSPACE PLANNING SERVICES PROVIDED BY MEDIVATORS. By accepting the Space Planning Services, (i) Customer agrees to hold Medivators and its affiliates entirely free from any liability, including financial responsibility, for all claims, losses, damages, suits, actions, costs, liabilities, or expenses incurred by Customer or its agents or affiliates as a result of any design defect, any requirement of corrective or other action or its use, reliance on, modification or implementation of any of the Space Planning Services; (ii) Customer acknowledges that Medivators is not a licensed architect or engineer or otherwise in the business of construction or space design and Customer accepts the risks involved in using such Space Planning Services from Medivators; and (iii) Customer agrees to communicate to the Project Professionals the content of all the Space Planning Services including, without limitation, all designs and plans, specifications and attachments, and to have such Project Professionals check, review, verify and approve such content prior to incorporating, using or otherwise implementing any Space Planning Service.
10 |
ENDODRY™ STORAGE AND DRYING SYSTEM
PRE-SITE REQUIREMENTS CHECKLIST
INITIAL AND SIGN AT THE TIME OF PRE-SITE INSPECTION
Customer Site Requirements Criteria Initials
ENDODRY™ Cabinet for ADVANTAGE PLUS™ Endoscope Reprocessor provides air supply of 58-145 psi (4-10 bar).
ENDODRY Cabinet for DSD EDGE™ Automated Endoscope Reprocessor provides air supply of 72-145 psi (5-10 bar).
Air supply provides a flow rate of 4.2 scfm (120 l/min ANR) for the Advantage and 7 scfm (200 l/min ANR) for the DSD.
Air supply maximum particle size is <1 micron, maximum dew point is -40°C, maximum oil content is 0.01 mg/m3.
Air Supply plumbed to the wall a minimum of 78.7 inches (200 cm) off of the floor above the cabinet.
GFI/RCD protected outlet located on the wall a minimum of 78.7 inches (200 cm) off of the floor above the cabinet.
RJ45 wall mounted network jack located on the wall a minimum of 78.7 inches (200 cm) off of the floor above the cabinet (ENDODRY™ Cabinet for ADVANTAGE PLUS™ Endoscope Reprocessor only).
Installation site has a level floor.
Installation site accommodates the dimensions of H74.8” x W23.6” x D21.3” (190cm x 60cm x 54cm)
Customer Site
Serial #
Medivators Customer and Technical Support: Toll Free: 1-800-444-4729 · FAX: 1-866-421-7696
Medivators BV Sourethweg 11 6422PC Heerlen The Netherlands Tel: +31.45.5.471.471
Cantel Medical Asia/Pacic Pte. Ltd.
1A International Business Park #05-01 Singapore 609933 Tel: +65.6227.9698 www.medivators.com
Medivators Inc.
14605 28th Avenue North Minneapolis, MN 55447 USA Toll Free: +1.800.444.4729
ESCAD Medical GmbH Zur Ohmdwiesen 5 88633 Heiligenberg Germany Tel: +49.7554.9999.500 Fax: +49.7554.9999.558
HS4119 REV G PG 1
HS4119 REV G PG 2
HS4119 REV G PG 3
HS4119 REV G PG 4
| 1
USER MANUAL
WASHER-DISINFECTOR
SITE REQUIREMENTS
NORTH AMERICA
ADVANTAGE PLUS™ Pass-Thru Endoscope Reprocessing System
2 |
50098-1324-EN.NA Rev B
© � 2018 All rights reserved. This publication is protected by copyright. Copying, disclosure to others, or the use of this publication is prohibited without the express written consent of Medivators Inc.
MEDIVATORS™
ADVANTAGE PLUS™
ENDORA™
INTERCEPT™
RAPICIDE™
All other company or product names referenced in this document are trademarks of their respective owner.
Medivators reserves the right to make changes in the specifications shown herein without notice or obligation. Contact your Medivators representative or Medivators customer service for more information.
| 3SITE REQUIREMENTS
The purpose of this document is to provide the customer with requirements that need to be met to ensure the proper installation of the ADVANTAGE PLUS™ Pass-Thru Endoscope Reprocessing System.
• ADVANTAGE PLUS Pass-Thru Endoscope Reprocessor User Manual (PN 50098-704-EN.NA)
It is the responsibility of the customer to meet these requirements to ensure proper installation of the ADVANTAGE PLUS Pass-Thru Endoscope Reprocessor by providing qualified personnel to install the facility connections for the ADVANTAGE PLUS Pass-Thru Endoscope Reprocessing System to the building supply (Water, Electrical, Drain, Air and Network/Internet) during the installation process. Medivators will make the physical connections between the facility connections and the ADVANTAGE PLUS Pass-Thru Endoscope Reprocessing System.
Any deviation from these specifications may cause operational issues that would not be covered by the Warranty.
BY SIGNING BELOW CUSTOMER ACKNOWLEDGES THAT:
1. Customer reviewed the Site Requirements for the ADVANTAGE PLUS Pass-Thru Endoscope Reprocessor(s) as indicated in this document.
2. The customer assumes complete responsibility for meeting the specifications and requirements set forth in the Site Requirements documentation to ensure proper installation and performance of the ADVANTAGE PLUS Pass-Thru Endoscope Reprocessor(s). Failure of the customer to comply with the Site Requirements or any deviation from the specifications set forth herein will compromise the functionality of the reprocessor(s), and/or may cause operational issues which will not be covered by the Cantel Medical warranty and are hereby disclaimed by Cantel Medical.
3. The customer assumes complete responsibility for meeting the specifications and requirements set forth in the Site Requirements documentation by the agreed upon installation date between the Customer and Cantel Medical. If the Cantel Medical installation team encounters any delays due to site requirements not meeting specifications and requirements, the Customer will be charged Medivators current rates for stand-by fees, until the site requirements are met and installation activity resumes; or, if it is determined that the delay results in rescheduling the installation to a later date, the Customer will be charged for all expenses at current Medivators rates (flights, lodging, and car rental, if applicable), and travel and labor time related to the return installation dispatch.
4. If installation is canceled or moved 48hrs prior to the agreed upon installation date, no fee will be charged.
5. For customers who request or accept Medivators space planning suggestions for the site prior to installation (“Space Planning Services”), Customer agrees that the Disclaimer, indicated in this document on Page 8, will apply to such Space Planning Services.
4 |
Wall Preparation
• Refer to the included installation diagram (Appendix E and Appendix F).
| • | Wall rough opening: | |
| 1. | 1 reprocessor: | 52-1/2” wide x 79-3/4” high |
| 2. | 2 reprocessors: | 104-1/4” wide x 79-3/4” high |
| 3. | 3 reprocessors: | 155-3/4” wide x 79-3/4” high |
| 4. | 4 reprocessors: | 207-1/2” wide x 79-3/4” high |
• The wall opening must remain rough and consider the finished flooring. An optional trim kit is available to finish and seal the opening once the ADVANTAGE PLUS™ Pass-Thru Endoscope Reprocessor is installed.
Medivators trim requires 4” of uninterrupted wall space on the sides and top of the reprocessor for trim attachment and is the responsibility of the facility to install.
• The interface between the wall opening and the floor must not have a cove or fillet, including wall space required for trim.
• Optimal FINISHED wall thickness is 4-1/2” to 7”. Walls larger than 7” will require a custom trim kit be manufactured by the facility.
• The facility connections are made inside the wall, access panels supplied by the facility will be required to provide access to these connections (example in Appendix F).
• Access panels must be placed on the dirty side.
• All facility connections must be accessible in the opening.
IMPORTANT: A minimum of 6” of space is required below the facility connections in the wall opening to allow for machine connections to be made.
• The facility connections must not be more than 3 feet above the top of the ADVANTAGE PLUS Pass-Thru Endoscope Reprocessing System.
| • | The facility connections are divided into three groups: |
| 1. | Water/Air |
| 2. | Electrical/Networking |
| 3. | Ventilation |
• Three access holes in the underside of the wall are required to make the connections between the facility and the ADVANTAGE PLUS Pass-Thru Endoscope Reprocessing System. Access holes need to be free of sharp edges. See the attached installation diagram for the measurements.
| 5
Floor
• The floor must be level to allow for the proper leveling and sealing of the reprocessor.
• Do not slope the floor to the floor drains.
IMPORTANT: There can be no more than a ¼” in elevation variation across the floor underneath the Pass-Thru(s).
Water Supply (refer to Appendix E) The water supply must be able to provide an on-demand water temperature of 95°F ± 4°F.
NOTE: It is the Responsibility of the Facility to meet the water supply requirements.
It is also the facilities responsibility to install, maintain and troubleshoot the water supply system. Please consult a local certified plumber for your specific installation.
NOTE: The use of an on-demand water heater could be used if the system can meet the same temperature and flow specifications similar to the thermostatic mixing valves.
Colder climate locations should take into consideration worse case scenarios of water supply temperatures and flow when reviewing an on-demand option.
• Potable water is the minimum standard; RO water is preferred, but not required.
• It is the responsibility of the facility to filter the incoming water to 1 micron.
• If a mixing valve is used, then it must be a thermostatic mixing valve.
One mixing valve per reprocessor is REQUIRED.
• The thermostatic mixing valve must be accessible to aid in adjustment.
• Post thermostatic mixing valve the facility must include a thermometer followed by a bypass valve to a drain.
• Appendix D includes a suggested list of thermostatic mixing valves.
• Cantel Medical REQUIRES the addition of pressure regulators, temperature and pressure gauges on each of the hot and cold-water supply lines prior to entering the thermostatic mixing valve. It is the responsibility of the facility to purchase, install and maintain these devices. Temperature and pressure gauges on the incoming water lines provide a means of monitoring the water system of the facility should water temperature issues arise. Consult a qualified plumber to assist in determining the proper regulators, temperature and pressure gauges to use.
• The incoming waterline must be a minimum of 1/2” ID providing a minimum flow rate of 2.6 GPM (per machine) and a DYNAMIC water pressure between 40 to 87 PSI at the gauge before the Bypass Valve.
• Water consumption is approximately 8 gallons per cycle for a standard endoscope disinfection cycle and 11.5 gallons per cycle for an endoscope disinfection cycle with a detergent wash per machine. Water consumption for the ADVANTAGE PLUS™ Pass-Thru Endoscope Reprocessing System will vary depending on the incoming water temperatures. The reprocessor will extend the initial flush up to 15 minutes to allow the water to come up to temperature to meet the minimum required temperature of the disinfectant.
• Ensure water hardness is less than 200 ppm CaCO3 for optimal performance.
6 |
NOTE: An emergency eye wash valve WILL NOT meet the water temperature specifications for the ADVANTAGE PLUS™ Pass-Thru Endoscope Reprocessor and should not be used.
NOTE: After the mixing valve Bypass valve with a path to a drain separate from the main machine drain with a shutoff valve MUST be installed so the operator can run water through the mixing valve if the water temperature falls too low and needs to be brought to temperature.
NOTE: Mixing Valve should be located within 4 FEET of the reprocessor and be easily accessible to operators for adjustments.
NOTE: The ADVANTAGE PLUS Pass-Thru Endoscope Reprocessor does not require backflow protection for the incoming water supply, nor is a backflow protection device installed in the reprocessor. Please consult your local codes, standards and/or guidelines, for applicable requirements. Some backflow protection devices may require their own additional drain. The customer is responsible for meeting local requirements.
Drain (refer to Appendix F)
• The drain must be in the floor in the location indicated in the installation diagram.
• The drain system must accommodate draining of 10.5 gal/min.
• Facility must supply a flush floor drain with a minimum diameter of 4”.
WARNING: An open trench drain CANNOT be used as the drain system for the ADVANTAGE PLUS Pass-Thru Endoscope Reprocessor.
Air Supply
• Facility must supply a 1/4” NPT female connection with a shutoff valve and pressure gauge located in the wall behind an access panel.
• The facility supplied compressed air must meet these requirements:
o 58 to 145 psi (4 to 10 bar) o The demand of compressed air is 1.1 scfm (32 l/min ANR) o Filtered to 5 microns
• The maximum dew point is 45°F.
• The maximum oil concentration is 5 mg/m3.
Electrical Supply
• 120 VAC ± 10%, single phase, 60 Hz, 1200 watts per unit
• Facility must supply a GFI protected NEMA 5-15R outlet located in the wall behind an access panel per unit.
• Power consumption: 180 watts at idle, 480 watts during a cycle in one basin, 720 watts during a cycle in both basins, and a nominal peak of 1200 watts per unit.
| 7
Heat Load
• Idle: 600 BTU/hr.
• Cycle (1 basin): 1600 BTU/hr.
• Cycle (2 basins): 2400 BTU/hr.
Ventilation
NOTE: It is the Facility’s Responsibility to ensure ventilation requirements are met.
Ventilation requirements are determined by OSHA based on the chemical being used for disinfection.
• It is a health and safety requirement to have a minimum of 10 air changes per hour in the room.
• Facility must supply a 4” round duct connection located in the wall behind an access panel.
o A minimum of 25 cfm (12 L/s) at 0.25 inches-water (62 PA) static pressure is required to properly vent the ADVANTAGE PLUS™ Pass-Thru Endoscope Reprocessing System.
Network
• Facility is required to supply an RJ45 network connection receptacle located in the wall behind an access panel.
• The ADVANTAGE PLUS Pass-Thru Endoscope Reprocessing System is equipped with a PC running Windows 7 which will allow full networking along with the capability of remote diagnostics.
Dimensions
• Shipping Dimensions o Crate Dimensions: 85.5” H x 69.5” W x 44” D o Crate Weight: 1100 lbs.
• Reprocessor Dimensions o The physical dimensions are 51-1/2” Wide x 78-3/4” High x 31-1/4” Deep.
o The installed weight is 882 lbs.
Endoscope & User Information
• Fill out the ADVANTAGE PLUS Pass-Thru Endoscope Reprocessor, Endoscope List & Operator ID form
(PN 50092-380) (Appendix A and B).
The included checklist should be used to ensure the installation site meets the required specifications. A pre-site visit by an employee of Medivators/Cantel Medical should be made prior to installation to ensure the specifications are met and an effective installation of the equipment is possible.
8 |
SPACE-PLANNING SERVICES
For customers who request or accept Medivators space planning suggestions for the site prior to installation, the following disclaimer will apply:
CUSTOMER ACKNOWLEGES AND ACCEPTS THAT SPACE PLANNING SERVICES ARE OFFERED AND
PROVIDED “AS IS” WITH NO REPRESENTATION OR WARRANTY, EXPRESS OR IMPLIED, OF ANY KIND WHATSOEVER, INCLUDING, WITHOUT LIMITATION, ANY WARRANTIES OR REPRESENTATIONS AS TO THE ADEQUACY OF ANY DESIGN, MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE, OR THAT ANY OF THE SERVICES WILL MEET CUSTOMER’S NEEDS OR REQUIREMENTS OR BE CAPABLE OF IMPLEMENTATION.
IN NO EVENT SHALL MEDIVATORS BE LIABLE TO CUSTOMER OR ANY THIRD PARTY FOR LOSS OF PROFITS, LOSS OF USE, OR ANY DIRECT, INDIRECT, INCIDENTAL, CONSEQUENTIAL OR SPECIAL DAMAGES OF ANY KIND, WHETHER OR NOT A PARTY WAS, IS, OR SHOULD BE AWARE OF SUCH LOSS OR DAMAGES.
CUSTOMER AGREES THAT IT WILL RELY ON, USE AND OR OTHERWISE EMPLOY ARCHITECTS, ENGINEERS, CONSTRUCTION PROFESSIONALS AND OTHER VENDORS OR SERVICE PROVIDERS (COLLECTIVELY, “PROJECT PROFESSIONALS”) REGARDING THE FEASIBILITY OR IMPLEMENTATION OF ANYSPACE PLANNING SERVICES PROVIDED BY MEDIVATORS. By accepting the Space Planning Services, (i) Customer agrees to hold Medivators and its affiliates entirely free from any liability, including financial responsibility, for all claims, losses, damages, suits, actions, costs, liabilities, or expenses incurred by Customer or its agents or affiliates as a result of any design defect, any requirement of corrective or other action or its use, reliance on, modification or implementation of any of the Space Planning Services; (ii) Customer acknowledges that Medivators is not a licensed architect or engineer or otherwise in the business of construction or space design and Customer accepts the risks involved in using such Space Planning Services from Medivators; and (iii) Customer agrees to communicate to the Project Professionals the content of all the Space Planning Services including, without limitation, all designs and plans, specifications and attachments, and to have such Project Professionals check, review, verify and approve such content prior to incorporating, using or otherwise implementing any Space Planning Service.
| 9APPENDIX A
USER / OPERATOR ID FOR
MEDIVATORS REPROCESSING SUITE OF EQUIPMENT
# First and Last Name (please print)
Group A = Administtrator O = Operator B = Biomed D = Doctor (if using)
Barcode # from badge (if applicable)
Facility
10 |
| 11APPENDIX B
FACILITY ENDOSCOPE LIST
# Model # Serial # Brand Internal ID Customer Barcode
Department
12 |
| 13APPENDIX C
PRE-SITE REQUIREMENTS CHECKLIST
INITIAL AND SIGN AT THE TIME OF PRE-SITE INSPECTION
Inspection Item Description Initials
Wall Preparation Wall opening meets specification for the number of reprocessors
Facility connections are in the proper locations and are accessible
Openings in underside of the wall are the proper size and in the proper locations
Water Supply ¾” G male or ½” NPT female connection with shutoff valve and pressure gauge
Potable or RO water filtered to 1 micron
Pressure of 40 to 87 psi (2 to 6 bars) (dynamic pressure)
Minimum flow rate of 1.32 gal/min (5 L/min), 2.6 gal/min (10 L/min) preferred (dynamic)
Supplied water temperature 95°F ± 4ºF (35°C ± 2ºC)
Drain Floor drain meets requirements and is installed in the proper location
Capable of draining 10.5 gal/min (40 L/min)
Air Supply 1/4” NPT female connection with shutoff valve and pressure gauge
Pressure of 58 to 145 psi (4 to 10 bar)
The demand of compressed air is 1.1 scfm (32 l/min ANR)
Air dry and oil free per specifications
Filtered to 5 microns
Electrical Supply 120 VAC ±10%, single phase, 60 Hz, 1200 Watts
GFI protected NEMA 5-15R receptacle
Ventilation Minimum of 10 room air exchanges per hour
4” round duct
A minimum of 25 cfm (12 L/s) at 0.25 inches-water (62 PA) static pressure at duct
Network RJ45 receptacle
Internet access
Customer Site
Representatice
14 |
| 15APPENDIX D
Because each installation can be unique in terms of facility and plumbing code requirements, Cantel Medical cannot recommend specific mixing valves for each installation. Experience with prior successful installations has demonstrated that the valves listed below can be expected to meet most water supply needs. The manufacturer of these valves may, from time to time, obsolete a model in this list and replace it by a like model. This list cannot be viewed as an endorsement by Cantel Medical as we do not manufacture, test, validate or certify thermostatic mixing valves. The customer assumes the responsibility for choosing the proper fit for their individual installation needs.
Due to variations in local codes, please consult your plumber before selecting a mixing valve.
Manufacturer Valve Series Specifications
Honeywell AM-1 1070 Series 70-120°F ± 3°F (21-49° C ± 2°C) at 0.5-10 GPM
WATTS LFMMV 80-120°F ± 3°F (27-49° C ± 2°C) at 0.5-20 GPM
WATTS LFL1170 60-120°F ± 3°F (16-49° C ± 2°C) at 0.5-20 GPM
Symmons 6-102-1 70-110°F at 0.5– 5 GPM
6-200-1 70-110°F at 0.5– 5 GPM
WARNING: An emergency eye wash valve WILL NOT meet the water temperature specifications for the ADVANTAGE PLUS™ Endoscope Reprocessors and should not be used.
16 |
| 17APPENDIX E
AD
VA
TA
G E
PL
Pa ss -T hr u os ep ro ce ys te mTM
10/16/2018 9:12:22 AM
s hu t o ff va lv yp as r t es tin ar
Te p/ P ur bo ua ge ix gu r hu t o r s lin
Fl r d ra
1 2 3 4 5 6 7 8 ir nn le ric nn til cc el ai ls
Pl bi
*L li pr t e ts ith l/f lo
3 4 3 6 1
12 11 iri fic di ite pa ac t T
1.
0.
4.
o r 7
.5
0.
3 6
Se pp di x ll vi sh fro irt
Si de f t
18 |
| 19APPENDIX F
VA
TA
PL
Pa
-T hr r F tp rin t
¼
0m irt
F op ki fe rr oc ot tia l F oc
(r eq ui dr ex ki t 7
-6 no bs tru
, L el pa ce lli t, un ei gh t 8 lb
(4 kg
¾
¼
23 ¼ in.
590mm
17 ¾ in.
450mm
½
6m
6422PC Heerlen
Cantel Medical Asia/Paci�c Pte. Ltd.
Manufactured in the USA by:
Cantel Medical Devices (China) Co. Ltd.
Unit 804-805, Innov Tower Block A, Hongmei Road, Xuhui 200233 Shanghai Tel: +86 21 60161380 Fax: +86 21 61210913
30 [762]
UNIT WIDHT
14 [356]
MAGNETIC
BACKSPLASH
34-42 [864-1066]
WORKING HEIGHT
ADJUSTABLE
FROM
48-56 [1220-1422]
UNIT HEIGHT
MOVING FROM
57 [1448]
(NOTE
C & D)
2 [51] GAP
REQUIRES
(NOTE B)
5-5/16-8-1/4 [135-209]
HEIGHT
OF SHELF
106 [2692]
UNIT LENGTH
75.5 - 83.5 [1905 - 2109]
FAUCET HEIGHT
MOVING FROM
I T
EQUIPMENT DRAWING OF
AMSCO® 73 REPROCESSING SINK
3 BAYS, 106 L"
Corporation
SIZE: SCALE: DRAWN BY: DRAWING NUMBER: PART NUMBER
& REVISIONA N/A Michel Blouin 10241623
This document contains confidential and proprietary information of STERIS Corporation. Neither this document nor the information herein are to be reproduced, either in part or in whole, except as specifically authorized by STERIS Corporation.
TYPICAL INSTALLATION
NOTES:
A. UNLESS OTHERWISE SPECIFIED, ALL DIMENSIONS ARE IN INCHES [MM].
B. A MINIMUM GAP OF 2" TO ALL ADJACENT WALLS AS PINCH POINT PREVENTION IS REQUIRED.
C. IF THE AMSCO 70 IS NOT AGAINST A WALL THAT ENDS TO CEILING, A WALL OF AT LEAST 57 IN HEIGHT
IS REQUIRED TO PREVENT THE ACCESS TO THE BACK OF SINK AND TO SUPPORT UTILITIES.
D. REPRESENT MINIMUM CLEAR SPACE TO PREVENT COLLISION WITH THE SINK BACKSPLASH.
FRONT VIEW
QTY.6
LEVELING FEET
0-5/8"
GROUND
TOP VIEW
WALL
24" L X 17" W X 10" D
RIGHT SIDE VIEW
Page 1 of 8 10241623.F
Released
1-1/2 [38]
2 [51]
3-15/32 [88]
[1092]
1 [25]
64 [1626]
1-3/16 [31]
20-28 [509-711]
(NOTE A)
[152]
[533]
MIN.
[533]
[660]
[660]
6-3/16 [157]
FIXED
LOCATION
HW HOT WATER
CW COLD WATER
PW PURE WATER
A COMPRESSED AIR
D WALL DRAIN LOCATION
T document nor the information herein are to be reproduced, either in part or in whole, except as specifically authorized by STERIS Corporation.
UTILITY (PLUMBING)
CONNECTION POSITION
A. REPRESENTS THE HIGH AND LOW RANGE OF MOVEMENT OF THE UTILITY CONNECTIONS ON SINK. POSITION FLEXIBLE HOSES TO ALLOW UNOBSTRUCTED MOVEMENT THROUGH THIS RANGE. THE HORIZONTAL POSITION
OF INLETS DEPENDS ON THE FLOW (LEFT-TO RIGHT) OR (RIGHT-TO-LEFT).
B. MINIMUM FLOOR LEVELNESS ACROSS FOOTPRINT OF SINK FL25 (1/4" DEFECT IN 10').
SEE DETAIL B
D (QTY 3)
SIDE VIEW
CW, PW,
HW, A
FINISHED
FLOOR
DETAIL B
UTILITY CONNECTION
SEE DETAIL C
DETAIL C
DRAINING SUPPORT
FLOOR ANCHORING
CL
Page 2 of 8 10241623.F
6-1/2 [165]6-1/2
[165]
[635]
MAX.
[432]
36-1/2 [927]48-1/2
[1232]
T document nor the information herein are to be reproduced, either in part or in whole, except as specifically authorized by STERIS Corporation.
ALCOVE POSITION
A. STERIS SUGGESTS HAVING THE WALL UTILITIES LOCATED IN THE PREFERRED LOCATION FOR WALL UTILITIES.
B. STERIS SUGGESTS HAVING THE WALL UTILITIES NOT TO EXCEED 4" OFF OF FINISHED WALL. THE USE OF A
RECESSES IN THE WALL CAN EASE INSTALLATION.
PREFERRED
FOR WALL
UTILITIES
FOR WALL
UTILITIES
UTILITY
CONNECTION
Page 3 of 8 10241623.F
UTILITY REQUIREMENTS CHART (PLUMBING)
UTILITY PARAMETER REQUIREMENT NOTES
HOT WATER
(HW)
(NOTE 5 - 6)
CONNECTION SIZE / TYPE 1/2 in / FEMALE NPT [1/2 in / MALE BSPT]
1. STERIS REQUIRES CUSTOMER TO INSTALL
WATER HAMMER ARRESTOR, UNION &
PRESSURE GAUGE.
2. CUSTOMER MUST PROVIDE UTILITY
CONNECTIONS WITH SHUTOFFS DISCONNECTS
WITHIN 2 FEET OF THE PERIMETER OF THE
EQUIPMENT AND BELOW THE CEILING DECK.
*STERIS PROVIDES FLEXIBLE HOSES 36 IN
LONG WITH INSTRUCTIONS FOR EACH
UTILITY (HOT WATER,COLD WATER,
PURE WATER)
3. BACK FLOW PREVENTER BY CUSTOMER
AGAINST BACK SIPHONAGE MAY BE REQUIRED
(LOCAL PLUMBING CODE)
PRESSURE RANGE
15 - 50 psig DYNAMIC
[103-345 kPa] MAX. 90 psig STATIC [620 kPA]
OPERATING FLOW RATE 11.3 US GPM [43 L/min] TO
20.0 US GPM [76 L/min]
TEMPERATURE RANGE
(NOTE 4) 110°F [43°C] TO 140°F [60°C]
WATER QUALITY (NOTE 5) HARDNESS (CaCO3) : 50-80 ppm (MAX. 120 ppm)
COLD WATER
(CW)
(NOTE 5 - 6)
4. EQUIPMENT HAS NO CAPABILITY TO
INCREASE WATER TEMPERATURE. THE
MAXIMUM TEMPERATURE THAT WILL BE
AVAILABLE IN ANY OF THE WASH, SONIC KLENZ,
OR AQUA KLENZ BAYS WILL BE THE MAXIMUM
HOT WATER TEMPERATURE.
5. STERIS RECOMMENDS THE FOLLOWING WATER
QUALITY PARAMETERS:
TOTAL DISSOLVED SOLIDS: 100-200 ppm (MAX. 500 ppm) TOTAL ALKALINITY (CaCO3) : 70-120 ppm (MAX. 180 ppm) pH : 6.8-7 (MAX. 7.5 ppm) TOTAL SILICA : 0.1-0.5 ppm (MAX. 1 ppm)
A WATER PRESSURE REGULATOR (NOT
PROVIDED BY STERIS) CAN BE INSTALLED IF
REQUIRED.
30 - 50 psig DYNAMIC
[206-345 kPa]
OPERATING FLOW RATE 15.5 US GPM [59 L/min] TO
20.0 US GPM [76 L/min]
TEMPERATURE RANGE 40° [4°C]-70°F [21°C]
WATER QUALITY (NOTE 5) HARDNESS (CaCO3) : 50-80 ppm (MAX. 120 ppm)
PURE WATER
(PW)
(NOTE 6-7)
6. SAMPLING VALVES INSTALLATION AS CLOSE AS
POSSIBLE TO WATER CONNECTIONS IS
RECOMMENDED.
7. PURE WATER IS OPTIONAL. IF UNAVAILABLE,
UNIT WILL USE HOT OR COLD WATER FOR
RINSING.
5 - 30 psig DYNAMIC
[30 - 206 kPa]
OPERATING FLOW RATE 5.0 US GPM [18.2 L/min] TO
23.7 US GPM [90 L/min]
TEMPERATURE RANGE 70°F [21.1°C] TO 140°F [60°C]
RESISTIVITY
(CONDUCTIVITY) 0.5-0.1 M -cm [2-10 µS/cm] pH 6.8 - 7.5
T document nor the information herein are to be reproduced, either in part or in whole, except as specifically authorized by STERIS Corporation.
Page 4 of 8 10241623.F
UTILITY REQUIREMENTS CHART (PLUMBING)
UTILITY PARAMETER REQUIREMENT NOTES
COMPRESSED
AIR
(A)
CONNECTION SIZE / TYPE 1/4 in / FEMALE NPT
1. AIR SPECIFICATIONS (AS PER ISO-8573-1
CLASS 5):
MAX. PARTICLES SIZE 40 microns MAX. PARTICULATE DENSITY 10 mg/m³
MAX. DEW POINT FOR WATER CONTENT
45°F [7°C]
MAX. OIL CONCENTRATION FOR THE OIL
CONTENT 25 mg/m³
2. STERIS RECOMMENDS A REFRIGERATED AIR
DRYER WHERE ENVIRONMENTAL DEW POINT
CONDITIONS ARE HIGHER THAN
RECOMMENDED (CONTACT STERIS SALES
REPRESENTATIVE).
PRESSURE RANGE MIN 80 psig DYNAMIC [552 kPa] MAX. 125 psig STATIC [860 kPA]
OPERATING FLOW RATE 4 SCFM [113 L/min]
DRAIN
(D)
CONNECTION SIZE / TYPE 1 1/2 in / ABS
1. STERIS RECOMMENDS REFERING TO THE
LOCAL PLUMBING CODE TO INSTALL A WALL
DRAIN OR A FLOOR DRAIN (ADAPTERS /
CONNECTIONS NOT PROVIDED BY STERIS)
2. MAX OFFSET OF 3/4 in [19 mm] FROM
OUTLET.
OPERATING FLOW RATE GRAVITY DRAIN : 15 US GPM PER BAY
[56.7L/min]
T document nor the information herein are to be reproduced, either in part or in whole, except as specifically authorized by STERIS Corporation.
Page 5 of 8 10241623.F
T document nor the information herein are to be reproduced, either in part or in whole, except as specifically authorized by STERIS Corporation.
PHYSICAL SPECIFICATIONS
SHIPPING DIMENSION L x H x W 124 in x 65 in x 38 in [3150mm x 1651mm x 965mm]
1. LEVELING FEET ARE PROVIDED FOR PROPER INSTALLATION.
2. PERMISSIBLE ENVIRONMENTAL CONDITIONS.
THIS EQUIPMENT IS DESIGNED TO GIVE OPTIMAL RESULTS
UNDER THE FOLLOWING CONDITIONS:
- INDOOR USE ONLY;
- ALTITUDE OF OPERATION UP TO 6562 ft [2000 m];
- TEMPERATURE OF 41 TO 104°F [5 to 40°C];
- MAXIMUM RELATIVE HUMIDITY IS 80% FOR TEMPERATURE UP
TO 88°F [31°C], DECREASING LINEARLY TO 50% RELATIVE
HUMIDITY AT 104°F [40°C];
- POLLUTION DEGREE 2: EQUIPMENT MUST BE INSTALLED IN AN
ENVIRONMENT WHERE NORMALLY ONLY NON-CONDUCTIVE
POLLUTION OCCURS BUT WHERE OCCASIONAL, TEMPORARY
CONDUCTIVITY CAUSED BY CONDENSATION CAN BE EXPECTED
(AS DETERMINED ACCORDING TO INTERNATIONAL STANDARD
EN/IEC 61010-1).
3. STERIS ASSUMES NO RESPONSIBILITY FOR CHANGES MADE TO,
OR FAILURE TO OBSERVE THE SPECIFICATIONS ON EQUIPMENT
DRAWING AND NOTE PAGES. SPECIFICATIONS AND
DESCRIPTIONS ARE SUBJECT TO CHANGE WITHOUT NOTICE.
SHIPPING WEIGHT 1300 lbs [590 kg]
OPERATING DIMENSION L x H x W 106 in x 56 in x 30 in [2693mm x 1422mm x 762mm]
OPERATING WEIGHT
(WITH WATER AND FULLY LOADED) 1400 lbs [635 kg]
NOISE LEVEL:
WEIGHTED EQUIVALENT
SURFACE SOUND PRESSURE LEVEL
85.0 dB (A)
CALCULATED AS DESCRIBED
IN ISO 3746.
UTILITY REQUIREMENTS CHART (ELECTRIC)
UTILITY
PARAMETER AND REQUIREMENT NOTES
CONNECTION
SIZE/TYPE
NOMINAL
AMPERAGE
RECOMMENDED
CIRCUIT
ELECTRICITY
(EL)
208-240V 60 Hz, 1-Ph N/A 19A 25A
1. ALL CONNECTIONS SHOULD BE IN
ACCORDANCE WITH LOCAL CODES.
2. NEUTRAL WIRE REQUIRED.
3. ALWAYS FOLLOW LOCAL ELECTRICAL CODES
AND SAFETY-RELATED WORK PRACTICES TO
DETERMINE THE VALUE OF PROTECTION.
4. WIRING ON THE EQUIPMENT TERMINATES AT
A JUNCTION BOX. WIRING BETWEEN JUNCTION
BOX AND BUILDING SERVICE LINES ARE NOT
SUPPLIED BY STERIS.
5. DISCONNECT SWITCH WITH OFF POSITION
LOCKOUT (SUPPLIED BY OTHERS) MUST BE
INSTALLED IN ELECTRIC SUPPLY LINES NEAR
THE EQUIPMENT.
6. A GFCI BREAKER CANNOT BE USED AS MAIN
CIRCUIT BREAKER
Page 6 of 8 10241623.F
13-15/32 [342]
30-38 [757-960]
[76]
E ELECTRICAL
T document nor the information herein are to be reproduced, either in part or in whole, except as specifically authorized by STERIS Corporation.
UTILITY (ELECTRICITY)
NOTE:
THE ELECTRIC CONNECTION IS MADE AT POSITION "E" DURING INSTALLATION.
Page 7 of 8 10241623.F
87 [2210]
13 [330]
9-5/8 [244]
43-1/2 [1105]
9-1/2 [241]
[483]
[102]
[483]
[203]
[229]
[457]
T document nor the information herein are to be reproduced, either in part or in whole, except as specifically authorized by STERIS Corporation.
A. CONCRETE FLOOR MUST REMAIN FREE OF DEFECTS IN THESE AREAS FOR INSTALLATION
OF SEISMIC ANCHORS (NOT PROVIDED BY STERIS) SEE SEISMIC REPORTS 10270009, 11863510 AND 11053375.
B. ALL SEISMIC INSTALLATIONS MUST BE DONE PER LOCAL CODES-HARDWARE SUPPLIED BY OTHER
SEISMIC ANCHOR HOLE POSTIONS
FINISHED WALL
(NOTE A)PREFERRED
LOCATION OF
FLOOR SINK
(NOTE A)
EXCLUDED FROM
EXCLUDED
FROM
PREFERRED
Page 8 of 8 10241623.F
Feuille 1
Vues new_view_35 new_view_37 new_view_57
Zones
A1
Feuille 2
Vues new_view_38 new_view_68
B new_view_71
C
Zones
A1
Feuille 3
Vues new_view_82 new_view_83 new_view_85
Zones
A1
Feuille 4
Zones
A1
Feuille 5
Zones
A1
Feuille 6
Vues new_view_64
Zones
A1
Feuille 7
Vues new_view_44 new_view_45 new_view_46
Zones
A1
Feuille 8
Vues new_view_55
Zones
A1
AMSCO PASS-THROUGH WINDOW
Item ________________________ Location(s)___________________
The Selections Checked Below Apply To This Equipment
CSSD MODELS*
❑ PTWAMDR1100 (Automated) Window Width = 28" (711mm)/Height = 45" (1143mm), 120V Shelf extends 25" on either side of window
❑ PTWAMDR2100 (Automated) Window Width = 34" (864mm)/Height = 45" (1143mm), 120V
❑ PTWAMDR3100 (Automated) Window Width = 40" (1016mm)/Height = 45" (1143mm), 120V
ENDO MODELS
❑ PTWAENDO1100 (Automated)
Shelf extends 25" on one side of window and 4" on other side.
❑ PTWAENDO2100 (Automated)
❑ PTWAENDO3100 (Automated)
Shelf extends 25" on one side of the window and 4" on other side.
❑ PTWMENDO1200 (Manual)
❑ PTWMENDO2200 (Manual)
❑ PTWMENDO3200 (Manual)
Shelf extends 25" on one side of the window and 4" on other side.
APPLICATION
The AMSCO line of pass-through windows come in manual and automated configurations. The Automated windows have two configurations: CSSD/MDR and ENDO.
DESCRIPTION
The AMSCO Pass-Through Window is an in-line vertical lift window with a single operable (movable) panel and a single non-operable (fixed) panel, an integral continuous stainless steel shelf. The automated pass-through windows are equipped with a microwave no-touch sensor plate for opening and closing. All windows are fully assembled and ready to install.
STANDARD FEATURES
The AMSCO Pass Through Window is constructed from anodized aluminum extrusions, close-tolerance moving parts and tempered glass. All frames have a clear anodized aluminum finish, fastened with screws, joints are sealed and ¼" (6.4mm) clear tempered glass is dry glazed. All moving panels are guided using industry proven dual rope and counterbalance system.
The Shelf has been developed specifically for the needs of this window.
The shelf extends 25" (635mm) on either side of the window along the full width of the window (CSSD Models) or 4" (102mm) on the decontamination side and 25" (635mm) on the clean side of the window (ENDO Models). The continuous shelf provides a smooth surface through the window. The shelf is secured by two stainless steel brackets under the shelf on each side of the window (total of four brackets). The manual window is available in the ENDO configuration.
The Automated Window features automated opening and closing activated by a microwave, no-touch, sensor plate located on each side of the window at the edge of the shelf.
Operation of the motorized window ensures that opening and closing of the window is hands-free.
STANDARDS
The AMSCO Automated Pass-Through Window meets the applicable requirements of the following standards:
• Underwriters Laboratories (UL) Standard 61010.
• Canadian Standards Association (CSA) CAN/CSA-22.2 No. 68.
SD1041 (Rev AB)
MDR/CSSD Models
FINISHED OPENINGS, SERVICE WIDTHS & WEIGHTS FOR MDR / CSSD WINDOWS
UNIT
X
FINISHED OPENING
WIDTH
Z
SERVICE
SHIPPING
WEIGHT
(LBs,Kg)
OPERATING
(LBs, Kg)
PTWAMDR1100 28-1/4" (718mm) 45-1/4" (1149mm) 24" (610mm) 315, 142 270, 122
PTWAMDR2100 34-1/4" (870mm) 45-1/4" (1149mm) 30" (762mm) 335, 151 280, 127
PTWAMDR3100 40-1/4" (1022mm) 45-1/4" (1149mm) 36" (914mm) 375, 170 300, 136
ENDO Models
FINISHED OPENINGS, SERVICE WIDTHS & WEIGHTS FOR ENDO WINDOWS
SHIPPING
(LBs,Kg)
(LBs, Kg)
PTWAENDO1100
PTWMENDO1200 28-1/4" (718mm) 45-1/4" (1149mm) 24" (610mm) 280, 127 250, 113
PTWAENDO2100
PTWMENDO2200 34-1/4" (870mm) 45-1/4" (1149mm) 30" (762mm) 300, 136 260, 118
PTWAENDO3100
PTWENDO3200 40-1/4" (1022mm) 45-1/4" (1149mm) 36" (914mm) 350, 159 275, 125
For Further Information, contact:
STERIS Corporation 5960 Heisley Road Mentor, OH 44060-1834 • USA 440-354-2600 • 800-548-4873 www.steris.com
This document is intended for the exclusive use of STERIS customers, including architects or designers. Reproduction in whole or in part by any party other than a customer is prohibited.SD1041 ©2020, STERIS Corporation. All rights reserved. (Rev AB)
Application
Description standard Features
Standards
PTWAMDR1100 Automated: Off
PTWAMDR2100 Automated: Off
PTWAMDR3100 Automated: Off
PTWAENDO1100 Automated: Off
PTWAENDO2100 Automated: On
PTWAENDO3100 Automated: Off
PTWMENDO1200 Manual: Off
PTWMENDO2200 Manual: Off
PTWMENDO3200 Manual: Off
Item:
undefined_2:
Locations:
Site Requirements
MEDIVATORS® and ADVANTAGE PLUS® are a registered trademark of Medivators Inc.
MEDIVATORS ADVANTAGE® is a trademark of Medivators Inc.
Windows and Windows 7 are registered trademarks of Microsoft Corporation.
50097-420 Rev G
© 2014, Medivators Inc.
All rights reserved. This publication is protected by copyright. Copying, disclosure to others, or the use of this publication is prohibited without the express written consent of MEDIVATORS.
MEDIVATORS reserves the right to make changes in the specifications shown herein without notice or obligation. Contact your MEDIVATORS representative or MEDIVATORS customer service for more information.
The purpose of this section is to provide the customer with requirements that need to be met to ensure the ADVANTAGE PLUS® endoscope reprocessor system Model 2.0 will be properly installed.
Applicable Documents
• ADVANTAGE PLUS Endoscope List and Operator ID Form (PN 50092-380)
• ADVANTAGE PLUS Endoscope Reprocessor User Manual (PN 50097-429)
It is the responsibility of the customer to meet these requirements to ensure proper installation of the ADVANTAGE PLUS endoscope reprocessor.
The ADVANTAGE PLUS endoscope reprocessor will be delivered on a pallet along with multiple boxes. It is important to keep all the boxes received with the ADVANTAGE PLUS endoscope reprocessor together.
It is the responsibility of the customer to provide qualified personnel to provide the connections for the ADVANTAGE PLUS endoscope reprocessor to the building supply (Water, Electrical, Drain, Air and Network/Internet) during the installation process.
Any deviation from these specifications may cause operational issues that would not be covered by the Warranty.
IMPORTANT: It is the responsibility of the customer to mount and plumb the pre-filter assembly supplied.
Water Supply
• Potable water is the minimum standard.
• The water supply must be connected to a thermostatic mixing valve set to provide an on-demand water temperature of 35°C ± 2°C (95°F ± 4°F ). One mixing valve per reprocessor.
• The mixing valve must be accessible and located near the prefilter to aid in adjustment. The mixing valve should include a thermometer followed by a bypass valve to a drain.
• The incoming waterline must be a minimum of 1/2” ID providing a flow rate of 1.32 GPM and a dynamic water pressure of 35 to 87 psi.
• Water consumption is approximately 8 gallons/cycle for a standard endoscope disinfection cycle and 13 gallons/cycle for an endoscope disinfection cycle with a detergent wash. Water consumption for the ADVANTAGE PLUS endoscope reprocessor will vary depending on the incoming water temperatures. The reprocessor will extend the initial flush to allow the water to come up to temperature to meet the minimum required temperature of the disinfectant. Ensure water hardness is less than 12 gpg (200 ppm) for optimal performance.
• The pre-filter assembly is wall mounted and has the dimensions of 26” H x 38” W x 6”D. The incoming water connection to the pre-filter assembly is 1/2” NPT on the right hand side. It is the responsibility of the customer to mount and plumb the pre-filter assembly. All fittings and hoses for the output of the pre-filter assembly are included.
• A shut-off valve must be installed before the pre-filtration system. It is important that the valve be mounted within reach of the operator.
The MEDIVATORS® endoscope reprocessors do not require backflow protection for the incoming water supply, nor is a backflow protection device installed in the reprocessor. If building or plumbing codes require backflow protection, then please consult your local codes, standards and/or guidelines, for applicable requirements.
Drain
• A drain system capable of draining 3.17 GPM, less than 18” from the floor and vented will ensure the proper operation of the ADVANTAGE PLUS endoscope reprocessor. The supplied drain line has a 1” ID, 1 3/8” OD.
• The ADVANTAGE PLUS endoscope reprocessor may include an air compressor that requires a dedicated 120
VAC 15 amp circuit.
• If the ADVANTAGE PLUS endoscope reprocessor model purchased did not include the air compressor, the system may utilize house compressed air (dry, oil free) which must meet these required air pressure specifications: 58 to 125 PSI with a minimum flow volume of 1.5 CFM, maximum particle size is 5 microns, maximum dew point is 7°C (45°F), maximum oil concentration is 5 mg/m3.
• A 1/4” ID flexible air hose (EPDM, braided, 150 psi minimum) is required to connect the ADVANTAGE PLUS® endoscope reprocessor to the house air. This is not supplied with the ADVANTAGE PLUS endoscope reprocessor. The hose connects to a barbed fitting on the back of the ADVANTAGE PLUS endoscope reprocessor.
• 120 VAC ± 10%, single phase, 60 Hz, 15 Amp circuit
• A GFI protected outlet (NEMA 5-15R) should be located within the operator’s reach.
• Power consumption is 150 watts at idle, 400 watts during a cycle in one basin, 600 watts during a cycle in both basins, and a nominal peak of 1000 watts.
• The ADVANTAGE PLUS endoscope reprocessor can operate uninterrupted with power losses up to 0.5 seconds. Power losses greater than 0.5 seconds without proper shutdown may produce system alarms, system shutdown and system damage.
• If all the optional accessories are installed with the ADVANTAGE PLUS endoscope reprocessor (AVMS, compressor), three NEMA 5-15 receptacles are required.
• A UPS with a minimum rating of 1500 VA/865 watts is highly recommended. The role of the UPS is to solely protect the computer and will allow the ADVANTAGE PLUS endoscope reprocessor to operate for a short period of time without power allowing for an orderly shut down of the computer in the event of a power outage.
Head Load
• Idle: 500 BTU/hr
• Cycle (1 basin): 1400 BTU/hr
• Cycle (2 basins): 2000 BTU/hr
It is the Customer’s Responsibility to ensure the room is in compliance with this requirement. This is not a requirement of the ADVANTAGE PLUS endoscope reprocessor but of the chemicals that are used for disinfection.
• It is a health and safety requirement to have a minimum of 10 air changes per hour in the room. During cycle operation and the chemical heating process, chemical vapor may be produced. The air exchange will minimize staff exposure to chemical vapors.
• A 4” flexible duct may be connected from the back of the ADVANTAGE PLUS endoscope reprocessor to the facility’s exhaust system to aid in fume extraction. To properly vent the ADVANTAGE PLUS endoscope reprocessor 25 CFM at 0.25 inches-water static pressure is required.
• The ADVANTAGE PLUS endoscope reprocessor may also be supplied with an active vapor management system to aid in chemical vapor management. Please refer to the purchase order to determine the correct configuration of the ADVANTAGE PLUS endoscope reprocessor.
Dimensions
• The ADVANTAGE PLUS endoscope reprocessor physical dimensions are 62” H x 49” W x 31” D, weight 400 lbs.
• If the optional air compressor is used it may be placed on the floor on either side or the back of the ADVANTAGE PLUS endoscope reprocessor.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .