This document is a combined synopsis/solicitation for an Arc Flash Analysis contract issued by the Department of Veterans Affairs (VA) for the VA Loma Linda Healthcare System (VALLHCS) in Loma Linda, California.
The VA is seeking to award a one-year contract to provide an Arc Flash Analysis of the VALLHCS electrical distribution system, including transformers, power panels, load centers, and disconnects. The contractor will be required to collect system data, perform an Arc Flash analysis, provide a written report, and place Arc Flash warning labels on all evaluated equipment. The work must comply with OSHA, NFPA, IEEE, and other industry standards. The solicitation is set-aside for 100% Service-Disabled Veteran-Owned Small Businesses (SDVOSB). Responses are due by August 23, 2024, and a site visit is scheduled for August 19, 2024. Award will be based on a comparative evaluation of price and past performance, with price being the more important factor.
View the file
Other files for this federal contract opportunity
Show all 50
H959--ARC FLASH ANALYSIS - POP (09/01/2024 - 08/31/2025) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA Loma Linda - Jerry L. Pettis VAHCS - Loma Linda, California
Electrical Condition Assessment - Arc Flash Hazard Evaluation
Prepared for: Dept. of Veterans Affairs Section 6 Page 6 Prepared by: Wiley|Wilson
BUS: 1_SW US-1A West R: 1_FDR A-3 12.000 7.160 7.160 6.990 0.0167 0.083 Yes Yes SWG 152 26 36 0.87
BUS: 1_SW US-1B West R: 1_FDR B-3 12.000 7.150 7.150 6.980 0.0167 0.083 Yes Yes SWG 152 26 36 0.87
BUS: 1_SW US-2A East R: 1_FDR B-2 12.000 7.410 7.410 7.230 0.0167 0.083 Yes Yes SWG 152 27 36 0.90
BUS: 1_SW US-2B East R: 1_FDR A-2 12.000 7.400 7.400 7.220 0.0167 0.083 Yes Yes SWG 152 27 36 0.90
BUS: 1_SW US-3A West R: 1_FDR A-3 12.000 7.080 7.080 6.910 0.0167 0.083 Yes Yes SWG 152 26 36 0.86
BUS: 1_SW US-3B West R: 1_FDR A-3 12.000 7.070 7.070 6.900 0.0167 0.083 Yes Yes SWG 152 26 36 0.86
BUS: 1_SW US-4A East R: 1_FDR B-2 12.000 7.480 7.480 7.300 0.0167 0.083 Yes Yes SWG 152 27 36 0.91
BUS: 1_SW US-4B East R: 1_FDR A-2 12.000 7.470 7.470 7.290 0.0167 0.083 Yes Yes SWG 152 27 36 0.91
BUS: 1_SW US-5A East R: 1_FDR A-1 12.000 7.470 7.470 7.280 0.0167 0.083 Yes Yes SWG 152 27 36 0.91
BUS: 1_SW US-5B East R: 1_FDR B-1 12.000 7.460 7.460 7.270 0.0167 0.083 Yes Yes SWG 152 27 36 0.91
BUS: 1_SW US-6 East R: 1_FDR A-1 12.000 7.460 7.460 7.270 0.0167 0.083 Yes Yes SWG 152 27 36 0.91
BUS: 1_US-7-1 R: 1_FDR A-3 12.000 6.980 6.980 6.820 0.0167 0.083 Yes Yes SWG 152 25 36 0.85
SWGR: 1_NORTH R: 1_2A 12.000 7.500 6.500 5.390 1.157 0.050 Yes Yes SWG 152 256 36 8.06 (*N3)
SWGR: 1_SOUTH R: 1_2A 12.000 7.500 6.500 5.390 1.157 0.050 Yes Yes SWG 152 256 36 8.06 (*N3)
SWGR: 1_US-7 R: 1_US-7 12.000 6.980 6.980 6.820 0.0167 0.083 Yes Yes SWG 152 25 36 0.85
Notes:
(*N3) - Arcing Current Low Tolerances Used NFPA 70E 2015 Annex D.4 - IEEE 1584 Bus + Line Side Report (Include Line Side + Load Side Contributions), 80% Cleared Fault Threshold, include Ind. Motors for 5.0 Cycles), mis-coordination checked
Notes
TABLE 6.1 - ARC FLASH EVALUATION REPORT
Bus Name Bus (kV)Protective Device
Name
Bus Bolted Fault (kA)
Incident Energy
(cal/cm2)
Arc Flash Boundary
(in.)
Working Distance
(in.)
Ground
Prot Dev Bolted Fault (kA)
Prot Dev Arcing Fault (kA)
Trip/ Delay Time (sec.)
Breaker Opening
Time (sec.)
Equip Type
Gap (mm)
Bus Arcing Fault (kA)
VA Loma Linda - Jerry L. Pettis VAHCS - Loma Linda, California
Electrical Condition Assessment - Arc Flash Hazard Evaluation
Prepared for: Dept. of Veterans Affairs Section 6 Page 7 Prepared by: Wiley|Wilson
EXPOSED
MOVABLE
CONDUCTOR
EXPOSED FIXED
CIRCUIT PART
BUS: 1_SW US-1A West R: 1_FDR A-3 12.000 10 ft. 0 in. 5 ft. 0 in. 2 ft. 2 in.
BUS: 1_SW US-1B West R: 1_FDR B-3 12.000 10 ft. 0 in. 5 ft. 0 in. 2 ft. 2 in.
BUS: 1_SW US-2A East R: 1_FDR B-2 12.000 10 ft. 0 in. 5 ft. 0 in. 2 ft. 2 in.
BUS: 1_SW US-2B East R: 1_FDR A-2 12.000 10 ft. 0 in. 5 ft. 0 in. 2 ft. 2 in.
BUS: 1_SW US-3A West R: 1_FDR A-3 12.000 10 ft. 0 in. 5 ft. 0 in. 2 ft. 2 in.
BUS: 1_SW US-3B West R: 1_FDR A-3 12.000 10 ft. 0 in. 5 ft. 0 in. 2 ft. 2 in.
BUS: 1_SW US-4A East R: 1_FDR B-2 12.000 10 ft. 0 in. 5 ft. 0 in. 2 ft. 2 in.
BUS: 1_SW US-4B East R: 1_FDR A-2 12.000 10 ft. 0 in. 5 ft. 0 in. 2 ft. 2 in.
BUS: 1_SW US-5A East R: 1_FDR A-1 12.000 10 ft. 0 in. 5 ft. 0 in. 2 ft. 2 in.
BUS: 1_SW US-5B East R: 1_FDR B-1 12.000 10 ft. 0 in. 5 ft. 0 in. 2 ft. 2 in.
BUS: 1_SW US-6 East R: 1_FDR A-1 12.000 10 ft. 0 in. 5 ft. 0 in. 2 ft. 2 in.
BUS: 1_US-7-1 R: 1_FDR A-3 12.000 10 ft. 0 in. 5 ft. 0 in. 2 ft. 2 in.
SWGR: 1_NORTH R: 1_2A 12.000 10 ft. 0 in. 5 ft. 0 in. 2 ft. 2 in.
SWGR: 1_SOUTH R: 1_2A 12.000 10 ft. 0 in. 5 ft. 0 in. 2 ft. 2 in.
SWGR: 1_US-7 R: 1_US-7 12.000 10 ft. 0 in. 5 ft. 0 in. 2 ft. 2 in.
Boundaries have been determined using NFPA 70E, Table 130.4(D)(a).
TABLE 6.2 - APPROACH BOUNDARIES
TO LIVE PARTS FOR SHOCK PROTECTION
BUS NAME PROTECTIVE DEVICE NAME
LINE-TO-LINE
VOLTAGE
(kV)
LIMITED APPROACH BOUNDARY RESTRICTED APPROACH
BOUNDARY; INCLUDES
INADVERTENT
MOVEMENT ADDER
| Table 6.1 |
| Table-6.2 |
File details come from the government source that posted it. Updated .