About this file

This document is a Solicitation for an Arc Flash Analysis to be conducted at the VA Loma Linda Healthcare System (VALLHCS). The VA is seeking to purchase an Arc Flash Analysis, including data collection, analysis, and placement of warning labels, to comply with NFPA, IEEE, and Joint Commission requirements. The solicitation is set aside for 100% Service-Disabled Veteran-Owned Small Businesses (SDVOSB) and the NAICS code is 238210.

The contractor will be required to provide all labor, materials, and equipment to complete the Arc Flash Analysis, which must meet specified standards and include a detailed report. The analysis will cover the VALLHCS's 12kV, 408/277V, and 208/120V electrical systems, including transformers, power panels, and disconnects. The contractor will be responsible for obtaining any necessary utility data. The period of performance is 09/01/2024 - 08/31/2025, with the option to extend services. Quotes are due by 08/23/2024 and the award will be based on price and past performance, with price being more important.

View the file

Other files for this federal contract opportunity

Other files attached to H959--ARC FLASH ANALYSIS - POP (09/01/2024 - 08/31/2025), newest first.
File Type Posted
Tbl 3-1_2 Prot Dev Eval.pdf PDF
sc_calc format.pdf PDF
MV Coordination Descrip Tbl.pdf PDF
Loma Linda MV TCCs.pdf PDF
E-109.pdf PDF
E-103.pdf PDF
CLC ReHab SIGNAL LINE DRAWINGS.png PNG image
CLC PC SIGNAL LINE DRAWINGS.png PNG image
VALL Electrical Single Line Diagrams.pdf PDF
Short Circuit Study - Op Pharmacy.pdf PDF
Loma Linda-60pc.pdf PDF
E601 BEHAVIORAL HEALTH BUILDING.pdf PDF
E-115.pdf PDF
E-114.pdf PDF
E-113.pdf PDF
E-101.pdf PDF
Cover.pdf PDF
116801E5.1.12.pdf PDF
116801E5.1.11.pdf PDF
116801E5.1.10.pdf PDF
116801E5.1.8.pdf PDF
116801E5.1.2.pdf PDF
116801E5.1.1.pdf PDF
Tbl 6-1_2_Arc_Flash.pdf PDF
E-111.pdf PDF
E-107.pdf PDF
E-106.pdf PDF
E-105.pdf PDF
E-102.pdf PDF
E1.1 AUDIOLOGY.pdf PDF
E-001.pdf PDF
Arc Flash Study CLC Reb.pdf PDF
Arc Flash Study CLC Ph 2.pdf PDF
116801E5.1.9.pdf PDF
116801E5.1.7.pdf PDF
116801E5.1.6.pdf PDF
116801E5.1.4.pdf PDF
116801E5.1.3.pdf PDF
79of89-EE002 PARKING GARAGE.pdf PDF
36C26224Q1724_1.docx DOCX document
Tbl 3_3 Equip Eval.pdf PDF
lf_calc format.pdf PDF
input_data format.pdf PDF
EYE Clinic One Line Drawings.docx DOCX document
E-112.pdf PDF
E-110.pdf PDF
E-108.pdf PDF
E-104.pdf PDF
CANCER CENTER SIGNAL LINE DRAWINGS 2017.png PNG image
36C26224Q1724.docx DOCX document
Show all 50

H959--ARC FLASH ANALYSIS - POP (09/01/2024 - 08/31/2025) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA Loma Linda - Jerry L. Pettis VAHCS - Loma Linda, California Electrical Condition Assessment

Prepared for: Dept. of Veterans Affairs Section 4 Page 2 Prepared by: Wiley|Wilson

BUILDING EQUIPMENT DESIGNATION PROTECTIVE DEVICE

DESIGNATION DEVICE DESCRIPTION CT

RATIO FUNCTION EXISTING SETTINGS PROPOSED SETTINGS

Phase Tap = 5.0 (600A) TBD Time Dial = 11.0 TBD Neutral Tap = 1.5 (15A) TBD Time Dial = 4.0 TBD Phase Tap = 12.0 (480A) No Change Time Dial = 5.0 No Change Instantaneous = 35 (1400A) 60 (2400A) Neutral Tap = 1 (10A) No Change Time Dial = 1.0 No Change Phase Tap = 12.0 (480A) No Change Time Dial = 5.0 No Change Instantaneous = 35 (1400A) 55 (2200A) Neutral Tap = 1 (10A) No Change Time Dial = 1.0 No Change Phase Tap = 12.0 (480A) No Change Time Dial = 5.0 No Change Instantaneous = 35 (1400A) 55 (2200A) Neutral Tap = 1 (10A) No Change Time Dial = 1.0 No Change

51P1P = 6 (240A) TBD

U3, Very Inverse 15.0 TBD

50P1P = 72 (2880A) TBD

50P1D = 0.001 (sec) TBD

51N1P = 1.25 (12.5A) TBD

U3, Very Inverse 2.0 TBD Phase Tap = 12.0 (480A) No Change Time Dial = 5.0 No Change Instantaneous = 35 (1400A) 55 (2200A) Neutral Tap = 1 (10A) No Change Time Dial = 1.0 No Change Phase Tap = 12.0 (480A) No Change Time Dial = 5.0 No Change Instantaneous = 35 (1400A) 55 (2200A) Neutral Tap = 1 (10A) No Change Time Dial = 1.0 No Change Phase Tap = 12.0 (480A) No Change Time Dial = 5.0 No Change Instantaneous = 35 (1400A) 55 (2200A) Neutral Tap = 1 (10A) No Change Time Dial = 1.0 No Change

200/5 50/51

200/5

50/51

50/5

200/5

50/51

50/5

200/5

50/51

50/5

600/5

50/5

50/51

50/51

200/5

50/5

200/5

50/51

50/5

200/5

50/51

50/5

1 SWGR: 1_SOUTH R: 1_FDR B-1

Electro-Mechanical

WESTINGHOUSE

CO-11

1 SWGR: 1_SOUTH R: 1_FDR B-2

Electro-Mechanical

WESTINGHOUSE

CO-11

1 SWGR: 1_SOUTH R: 1_FDR B-3

Electro-Mechanical

WESTINGHOUSE

CO-11

1 SWGR: 1_NORTH R: 1_FDR A-2

Electro-Mechanical

WESTINGHOUSE

CO-11

1 SWGR: 1_NORTH R: 1_FDR A-3

Electro-Mechanical

WESTINGHOUSE

CO-11

1 SWGR: 1_NORTH R: 1_FDR A-4

Electronic

SEL

751A

1 SWGR: 1_NORTH R: 1_2A

Electro-Mechanical

WESTINGHOUSE

CO-11

1 SWGR: 1_NORTH R: 1_FDR A-1

Electro-Mechanical

WESTINGHOUSE

CO-11

TABLE 4.1 MEDIUM VOLTAGE PROTECTIVE DEVICE SETTINGS

VA Loma Linda - Jerry L. Pettis VAHCS - Loma Linda, California Electrical Condition Assessment

Prepared for: Dept. of Veterans Affairs Section 4 Page 3 Prepared by: Wiley|Wilson

BUILDING EQUIPMENT DESIGNATION PROTECTIVE DEVICE

DESIGNATION DEVICE DESCRIPTION CT

RATIO FUNCTION EXISTING SETTINGS PROPOSED SETTINGS

TABLE 4.1 MEDIUM VOLTAGE PROTECTIVE DEVICE SETTINGS

50P = 20 (800A) TBD

50P1D = 0.001 (sec) TBD

51G = 1 (40A) TBD

U3, Very Inverse 4 TBD

50G = 7 (280A) TBD

50G1D = 0.001 (sec) TBD 51P1P = 5 (500A) 11 (1100A) U3, Very Inverse 3.0 No Change

51P1P = 5 (300A) TBD

U3, Very Inverse 8.63 TBD

50P1P = 25.68 (1540.8A) TBD

50P1D = 0.001 (sec) TBD

51G1P = 0.5 (30A) TBD

U3, Very Inverse 15.0 TBD

50G1P = 10.72 (643.2A) TBD

50G1D = 0.5 (sec) TBD

50/51

50/51

500/5

200/5

300/5

No Change

No Change

1 SWGR: 1_US-7 FU: 1_XF Outpatient Pharmacy

COOPER

Bay-O-Net High Amp Overload Trip = 65A No Change

No Change

Trip = 125A No Change

1 XF: 1_Outpatient Pharmacy

FU: 1_Outpatient Pharmacy

GOULD SHAWMUT

CL-14, 15.5kV E-Rated Trip = 65A No Change

No Change

Trip = 125A No Change

Trip = 125A No Change

Trip = 125A No ChangeFU: 1_US-5B East WESTINGHOUSE CLE-1, -2, 14.4kV, E-Rated

1 BUS: 1_SW US-6 East FU: 1_US-6 East GOULD SHAWMUT CS-3, 15.5kV E-Rated No Change

No Change

Trip = 125A No Change

Trip = 125A No Change

1 BUS: 1_SW US-3A West FU: 1_US-3A West WESTINGHOUSE CLE-1, -2, 14.4kV, E-Rated Trip = 125A No Change

Trip = 125A

Trip = 150A

1 BUS: 1_SW US-5A East FU: 1_US-5A East WESTINGHOUSE CLE-1, -2, 14.4kV, E-Rated

1 BUS: 1_SW US-5B East

1 SWGR: 1_US-7 R: 1_US-7

Electronic

SEL

751A

1 BUS: 1_SW US-1A West FU: 1_US-1A West WESTINGHOUSE CLE-1, -2, 14.4kV, E-Rated

1 SWGR: 1_SOUTH R: 1_1B GEN

Static Relay

SEL

700G

1 SWGR: 1_US-7 FU: 1_XF US-7 GOULD SHAWMUT

CL-14, 15.5kV E-Rated Trip = 125A

1 SWGR: 1_NORTH FU: 1_T-FCH COOPER

Bay-O-Net High Amp Overload Trip = 100A

1 BUS: 1_ SW US-2B East FU: 1_US-2B East WESTINGHOUSE CLE-1, -2, 14.4kV, E-Rated Trip = 125A

1 BUS: 1_ SW US-3B West FU: 1_US-3B West WESTINGHOUSE CLE-1, -2, 14.4kV, E-Rated

1 BUS: 1_SW US-4A East FU: 1_US-4A East WESTINGHOUSE CLE-1, -2, 14.4kV, E-Rated

1 BUS: 1_SW US-4B East FU: 1_US-4B East WESTINGHOUSE CLE-1, -2, 14.4kV, E-Rated

Trip = 125A

1 BUS: 1_SW US-1B West FU: 1_US-1B West WESTINGHOUSE CLE-1, -2, 14.4kV, E-Rated

1 BUS: 1_SW US-2A East FU: 1_US-2A East WESTINGHOUSE CLE-1, -2, 14.4kV, E-Rated

1 SWGR: 1_SOUTH R: 1_1B

Electronic

SEL

Table 4-1