About this file

This document is a Request for Quotation (RFQ) for an Arc Flash Analysis for the VA Loma Linda Healthcare System (VALLHCS) located in Loma Linda, California. The objective is to provide a contractor to perform an Arc Flash Hazard Analysis to determine the Arc Flash Boundary, incident energy at the working distance, and required personal protective equipment for personnel working within the Arc Flash Boundary.

The solicitation is set-aside for 100% Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 238210. The period of performance is September 1, 2024 to August 31, 2025. Quotations are due by August 23, 2024 at 10:00 am PDT. The evaluation factors are price and past performance, with price being more important. Contractors must possess specific licenses and certifications to perform the work. The contractor will be required to provide all labor, materials, tools, and equipment necessary to complete the Arc Flash Analysis and provide a detailed report within 30 days of work completion.

View the file

Other files for this federal contract opportunity

Other files attached to H959--ARC FLASH ANALYSIS - POP (09/01/2024 - 08/31/2025), newest first.
File Type Posted
Tbl 4_1 MV Prot Dev Settingsa.pdf PDF
Tbl 3-1_2 Prot Dev Eval.pdf PDF
sc_calc format.pdf PDF
Loma Linda MV TCCs.pdf PDF
E-109.pdf PDF
E-103.pdf PDF
CLC ReHab SIGNAL LINE DRAWINGS.png PNG image
CLC PC SIGNAL LINE DRAWINGS.png PNG image
Tbl 3_3 Equip Eval.pdf PDF
lf_calc format.pdf PDF
input_data format.pdf PDF
EYE Clinic One Line Drawings.docx DOCX document
E-112.pdf PDF
E-110.pdf PDF
E-108.pdf PDF
E-104.pdf PDF
CANCER CENTER SIGNAL LINE DRAWINGS 2017.png PNG image
Arc Flash Study 2016 Schneider Full Facility.pdf PDF
20110460 - Sheet - E-611 - SINGLE LINE DIAGRAM OP Pharmacy.pdf PDF
116801E5.1.5.pdf PDF
022712 SCC and OCPD Coordination Study - VA Loma Linda.pdf PDF
VALL Electrical Single Line Diagrams.pdf PDF
Short Circuit Study - Op Pharmacy.pdf PDF
Loma Linda-60pc.pdf PDF
E601 BEHAVIORAL HEALTH BUILDING.pdf PDF
E-115.pdf PDF
E-114.pdf PDF
E-113.pdf PDF
E-101.pdf PDF
Cover.pdf PDF
116801E5.1.12.pdf PDF
116801E5.1.11.pdf PDF
116801E5.1.10.pdf PDF
116801E5.1.8.pdf PDF
116801E5.1.2.pdf PDF
116801E5.1.1.pdf PDF
Tbl 6-1_2_Arc_Flash.pdf PDF
E-111.pdf PDF
E-107.pdf PDF
E-106.pdf PDF
E-105.pdf PDF
E-102.pdf PDF
E1.1 AUDIOLOGY.pdf PDF
E-001.pdf PDF
Arc Flash Study CLC Reb.pdf PDF
Arc Flash Study CLC Ph 2.pdf PDF
116801E5.1.9.pdf PDF
116801E5.1.7.pdf PDF
116801E5.1.6.pdf PDF
36C26224Q1724.docx DOCX document
Show all 50

H959--ARC FLASH ANALYSIS - POP (09/01/2024 - 08/31/2025) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA Loma Linda - Jerry L. Pettis VAHCS – Loma Linda, California Electrical Condition Assessment – Coordination Sheet Descriptions and Analysis

Prepared for: Dept. of Veterans Affairs Section 4 Page 5 Prepared by: Wiley|Wilson

Coordination Sheet Name

Comments

Medium Voltage

01_MV_Util SCE_R-A4_R-A3

Coordination is acceptable and remains so with recommendations made on curve 05_R-A3_US-1A but will be further reviewed in future submittals once SCE upstream protection is provided to ensure proper coordination with the Utility.

Feeders are properly protected and are not subject to damage.

01GF_MV_Util SCE_R-A4_R-A3 Coordination is acceptable but will be further reviewed in future submittals once SCE upstream protection is provided to ensure proper coordination with the utility.

02_MV_Gen_R-A4_R-A3

Relay 1B does not coordinate with Relay FDR A-3 and Rely FDR A-4 and remains so with recommendations made on curve 05_R-A3_US-1A. Therefore, we recommend increasing the long time pickup from 500A to 1100A.

Future submittals will discuss more in depth the protection of the generator.

Feeders are properly protected and are not subject to damage.

02GF_MV_Gen_R-A4_R-A3 Coordination is acceptable.

03_R-A3_Outpatient

Transformer Outpatient Pharmacy is properly protected.

Relay FDR A-3 does not coordinate with Relay US-7. However, Recommendations made on curve 05_R-A3_US-1A will provide for proper coordination.

There appears to be a miscoordination between FU Outpatient Pharmacy and FU XF Outpatient Pharmacy. However, these devices are in series and tripping of either will result in the same outage so this is acceptable.

Feeders are properly protected and are not subject to damage.

03GF_R-A3_Outpatient Coordination is acceptable.

VA Loma Linda - Jerry L. Pettis VAHCS – Loma Linda, California Electrical Condition Assessment – Coordination Sheet Descriptions and Analysis

Prepared for: Dept. of Veterans Affairs Section 4 Page 6 Prepared by: Wiley|Wilson

Coordination Sheet Name

Comments

04_R-A3_Cancer

XF US-7 is properly protected.

Relay FDR A-3 does not coordinate with Relay US-7. However, recommendations made on curve 05_R-A3_US-1A will provide for proper coordination.

A larger concern on this curve is that both of the relays do not coordinate with FU XF US-7. Further examination of this coordination will be provided in future submissions.

Feeders are properly protected and are not subject to damage.

04GF_R-A3_Cancer

05_R-A3_US-1A

Transformer US-1A West is properly protected.

Relay FDR A-3 does not coordinate with FU US-1A West. Therefore, we recommend increasing the INST of Relay FDR A-3 from 1400A to 2200A. This recommendation will provide for proper coordination. This recommendation shall be made to the following relays to ensure proper coordination across the system: FDR A-2, FDR B-1, FDR B-2 and FDR B-

3. See Table 4.1 for further information.

Feeders are properly protected and are not subject to damage.

06_R-A1_US-6

Transformer US-6 East is properly protected.

Relay FDR A-1 does not coordinate with FU US-6 East. Therefore, we recommend increasing the INST of Relay FDR A- 1 from 1400A to 2400A. This recommendation will provide for proper coordination.

Feeders are properly protected and are not subject to damage.