MV Coordination Descrip Tbl.pdf
PDF 52 KB Posted
- Attached to
- H959--ARC FLASH ANALYSIS - POP (09/01/2024 - 08/31/2025) Federal contract opportunity
- Solicitation number
- 36C26224Q1724
About this file
This document is a Request for Quotation (RFQ) for an Arc Flash Analysis for the VA Loma Linda Healthcare System (VALLHCS) located in Loma Linda, California. The objective is to provide a contractor to perform an Arc Flash Hazard Analysis to determine the Arc Flash Boundary, incident energy at the working distance, and required personal protective equipment for personnel working within the Arc Flash Boundary.
The solicitation is set-aside for 100% Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 238210. The period of performance is September 1, 2024 to August 31, 2025. Quotations are due by August 23, 2024 at 10:00 am PDT. The evaluation factors are price and past performance, with price being more important. Contractors must possess specific licenses and certifications to perform the work. The contractor will be required to provide all labor, materials, tools, and equipment necessary to complete the Arc Flash Analysis and provide a detailed report within 30 days of work completion.
View the file
Other files for this federal contract opportunity
Show all 50
H959--ARC FLASH ANALYSIS - POP (09/01/2024 - 08/31/2025) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA Loma Linda - Jerry L. Pettis VAHCS – Loma Linda, California Electrical Condition Assessment – Coordination Sheet Descriptions and Analysis
Prepared for: Dept. of Veterans Affairs Section 4 Page 5 Prepared by: Wiley|Wilson
Coordination Sheet Name
Comments
Medium Voltage
01_MV_Util SCE_R-A4_R-A3
Coordination is acceptable and remains so with recommendations made on curve 05_R-A3_US-1A but will be further reviewed in future submittals once SCE upstream protection is provided to ensure proper coordination with the Utility.
Feeders are properly protected and are not subject to damage.
01GF_MV_Util SCE_R-A4_R-A3 Coordination is acceptable but will be further reviewed in future submittals once SCE upstream protection is provided to ensure proper coordination with the utility.
02_MV_Gen_R-A4_R-A3
Relay 1B does not coordinate with Relay FDR A-3 and Rely FDR A-4 and remains so with recommendations made on curve 05_R-A3_US-1A. Therefore, we recommend increasing the long time pickup from 500A to 1100A.
Future submittals will discuss more in depth the protection of the generator.
Feeders are properly protected and are not subject to damage.
02GF_MV_Gen_R-A4_R-A3 Coordination is acceptable.
03_R-A3_Outpatient
Transformer Outpatient Pharmacy is properly protected.
Relay FDR A-3 does not coordinate with Relay US-7. However, Recommendations made on curve 05_R-A3_US-1A will provide for proper coordination.
There appears to be a miscoordination between FU Outpatient Pharmacy and FU XF Outpatient Pharmacy. However, these devices are in series and tripping of either will result in the same outage so this is acceptable.
Feeders are properly protected and are not subject to damage.
03GF_R-A3_Outpatient Coordination is acceptable.
VA Loma Linda - Jerry L. Pettis VAHCS – Loma Linda, California Electrical Condition Assessment – Coordination Sheet Descriptions and Analysis
Prepared for: Dept. of Veterans Affairs Section 4 Page 6 Prepared by: Wiley|Wilson
Coordination Sheet Name
Comments
04_R-A3_Cancer
XF US-7 is properly protected.
Relay FDR A-3 does not coordinate with Relay US-7. However, recommendations made on curve 05_R-A3_US-1A will provide for proper coordination.
A larger concern on this curve is that both of the relays do not coordinate with FU XF US-7. Further examination of this coordination will be provided in future submissions.
Feeders are properly protected and are not subject to damage.
04GF_R-A3_Cancer
05_R-A3_US-1A
Transformer US-1A West is properly protected.
Relay FDR A-3 does not coordinate with FU US-1A West. Therefore, we recommend increasing the INST of Relay FDR A-3 from 1400A to 2200A. This recommendation will provide for proper coordination. This recommendation shall be made to the following relays to ensure proper coordination across the system: FDR A-2, FDR B-1, FDR B-2 and FDR B-
3. See Table 4.1 for further information.
Feeders are properly protected and are not subject to damage.
06_R-A1_US-6
Transformer US-6 East is properly protected.
Relay FDR A-1 does not coordinate with FU US-6 East. Therefore, we recommend increasing the INST of Relay FDR A- 1 from 1400A to 2400A. This recommendation will provide for proper coordination.