This document is a combined synopsis/solicitation for a commercial services contract from the Department of Veterans Affairs (VA) Veterans Health Administration (VHA) for an Arc Flash Analysis at the VA Loma Linda Healthcare System (VALLHCS).
The VA is seeking a contractor to provide all labor, materials, supplies, and qualified personnel to complete an Arc Flash Analysis of the VALLHCS electrical distribution system, in compliance with NFPA 70E and other industry standards. The analysis must determine the Arc Flash Boundary, incident energy, and required personal protective equipment. The contractor will place Arc Flash warning labels on all evaluated equipment. The contractor must have specific licenses and certifications, and comply with VA security, safety, and other requirements. The period of performance is 09/01/2024 - 08/31/2025. Quotes are due by 08/23/2024. The procurement is set-aside for 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) firms under NAICS code 238210. Award will be based on a comparative evaluation of price and past performance.
View the file
Other files for this federal contract opportunity
Show all 50
H959--ARC FLASH ANALYSIS - POP (09/01/2024 - 08/31/2025) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KWH
BATTERY
CABINET
S
S
WALL-MOUNT
MAINTENANCE
BYPASS
(MBP)
EX.
EX.
EX.
800A, 480Y/277V, 3PH, 4W + G
FIRST FLOOR ELECTRICAL ROOMMAIN SWITCHBOARD "MSB"
100A 3P
NEW MANHOLE
65,000 AIC
400A, 208/120V,3PH, 4W + G.
3P 100A
100A
(4
K cM
IL
(1
/0
G
C
[2 S
E T
S
K cM
IL
(1
K cM
IL
G
"C
225AF
225AF
(4
A
W G
G
(1
)1 -1
/2
C
FIRST FLOOR ELECTRICAL ROOM
3P 100A
4 5 6 7
NEMA 1
125A 3P
225A 3P
15A 3P
15A 3P
XFMR "T-DPA1"
112.5KVA
480 - 208/120V, 3PH, 4W + G.
(4
K cM
IL
G
(1 )3
C
250A 3P
3 4 5
175A 3P
225A 3P
7 98
40A 60A 3P
#2/0 GND.
(3
/0
G
C
400A 3P
(4
/0
A W
G
(1
G
)2
C
(3
A
W G
G
(1 )1
-1 /2
C
(4
/0
A W
G
G
(1
)2
C
(4
A
W G
G
C
EXISTING SOUTHERN
CALIFORNIA EDISON (S.C.E.)
MAN HOLE
12KV SERVICE
200A 3P
(4
/0
A W
G
G
(1 )2
C
(3
G
C
(3
G
C
(3
A
W G
G
(1
)3 /4
C
(3
A
W G
G
(1
)3 /4
C
3P
3P
(4
A
W G
G
(1 )1
-1 /2
C
(4
A
W G
G
(1
)1 -1
/2
C
400A, 480Y/277V, 3PH, 4W + G
MAIN SWITCHBOARD "EMDB"
200A 3P
225A 3P
100A 3P
100A 3P
(4
K cM
IL
(1
G
)4
C
(4
/0
A W
G
G
)2
C
(4
A
W G
G
(1
)1 -1
/2
C
65,000 AIC
NEMA 3R
22,000 AIC
NEMA 1
(4
A
W G
G
(1
)1 -1
/2
C
(4
A
W G
G
(1
)1 -1
/2
C
60A 3P
(3
A
W G
G
(1
)1
C
125A 3P
(4
A
W G
G
(1
)1 -1
/2
C
30A 3P
EMER. GENERATOR LOAD SUMMARY
EQUIPMENT
PANEL "LL2A"
PANEL "EL1A"
1.8
KVA AMPERE
150.9
183.8152.7EMERGENCY GENERATOR
CONNECTED
EX. MANHOLE BY OTHERS
PAD MOUNTED, GAS FUELDED
NEMA 4X ENCLOSURE
OUTDOOR WEATHERPROOF
SOUND ATTENUATED ENCLOSURE
400A 3P
250A 3P
PAD MOUNTED OIL FILLED
NORMAL POWER XFMR "T-MSB"
12.47kV - 480Y/277V, 3∅, 4W
750kVA, 5.75%Z
GROUNDING ELECTRODE
PER DETAIL 01/E-512
LIFE SAFETY
SECTION 1
OPTIONAL
STAND-BY
SECTION 2
1" C.
PANEL "ER1A"
PANEL "ER1B"
42.2
22.1
DISTRIBUTION PANEL "DPA1"
LOAD SUMMARY
EQUIPMENT
PANEL "LL2A"
PANEL "EL1A"
PANEL "L1A"
DISTRIBUTION PANEL "DPA1"
ELEVATOR #1
ELEVATOR #2
1.8
KVA AMPERE
150.9
6.1
37.7
17.5
25.3
288.0239.3MAIN SWITCHBOARD "MSB"
1.7PUMP "P-2"
PANEL "R1A"
PANEL "R2A"
PANEL "R2B"
PUMP "P-1"
12.7
21.5
0.1
1.7
CONNECTED
PANEL "ER1A" 42.2
(4
A
W G
G
C
PANEL "UPS-A" 2.6
ATS-E
ATS-LS
R A
P A
N E
L
R A
P A
N E
L
R B
P A
N E
L
1.0 1.0
L A
P A
N E
L
15 19
P N
L
L C
P
L T
G C
T R
L
E L A
P A
N E
L c c b b a a
NENE
L L A
P A
N E
L
E R
A
P A
N E
L
U P
S -A
P A
N E
L
IN
V
E R
T E
R
P V
S Y
S T
E M
B O
X
P V
C O
M B
IN
E
R
E R
B
P A
N E
L
GF
KWH
STST
EX. UNIT SUBSTATION "US-6A"
EX. XFMR
(E)MEDIUM VOLTAGE SWITCHGEAR "MVS"
12K V, 3∅, 3W+G
1500kVA/1905kVA (FA)
12KV, 3PH, 3W
DEL PRI
480Y/277, 3PH, 4W, Y SEC.
EX.
EX.
EX.
EX
EX.
BEHAVIORAL HEALTH SERVICES
ELECTRICAL EQUIPMENT YARD
EXISTING FEED TO DISTRIBUTION
SWITCHBOARD "MDS"
SPACE
SPACE
1ST FLR.
ELEC.
ROOM
HOT WATER PUMP
P-1
1ST FLR.
ELEC.
ROOM
SPARE
60AS
40AF
60AS
60AF
ELEVATOR
ELEV-1
ELEVATOR
ELEV-2
TYP. OF 5
2ND FLR.
ELEC.
ROOM
2ND FLR.
ELEC.
ROOM
TYP. OF 3
XFMR "T-ER1A"
45 KVA
480-208Y/120V
3PH, 4W
200A, 4 POLE, 60Hz
480/277V, 3∅, 4W+G
50 KA.I.C. MIN.
#6 GND.
OPTIONAL STAND-BY
OPEN TRANSITION
187.5 KVA
EMER.GENERATOR
480/277VV-3∅
150 KW
1ST FLR.
SPARE
HOT WATER PUMP
P-2
100A, 4 POLE, 60Hz
480/277V, 3∅, 4W+G
50 KA.I.C. MIN.
LIFE SAFETY
OPEN TRANSITION
"UPS1"
10 KVA
208-208Y/120V
3PH, 4W
SPARESPARE
1ST FLR.
ELEC.
ROOM
2ND FLR.
ELEC.
ROOM
TYP. OF 3
TYP. OF 3
2ND FLR.
ELEC.
ROOM
ROOF
NEMA 3R NEMA 3R
1ST FLR.
ELEC.
ROOM
800AF
800AT
GFSC
65E
S P
D
30A 30A
SPARESPARE
NOTE 4
SEE DRAWING
SEE DRAWING
NOTE 13
SEE DRAWING
NOTE 9
SEE DRAWING
NOTE 8
SEE DRAWING
NOTE 6
SEE DRAWING
NOTE 10
NOTE 16
SEE DRAWING
NOTE 16
SEE DRAWING
SEE DRAWING
NOTE 12
SEE DRAWING
NOTE 14
SEE DRAWING
NOTE 15
SEE DRAWING
NOTE 1
SEE DRAWING
NOTE 2
SEE DRAWING
NOTE 3
NOTE 5
SEE DRAWING
SEE DRAWING
NOTE 7
SEE DRAWING
NOTE 11
SEE DRAWING
NOTE 18
SEE DRAWING
NOTE 18
SEE DRAWING
NOTE 17
SEE DRAWING
NOTE 17
SEE DRAWING
NOTE 19
NORTH
Steph Vargas, LEED AP
Michael Lehman, AIA
Department of Veterans Affairs
15231 Laguna Canyon Road, Suite 200 Irvine, CA 92618
Tel: 949-417-7550 Fax: 949-585-9391
Copyright © 2009 by EWINGCOLE
Revisions: Date
PRINCIPAL
PROJECT MANAGER
Approved: VA Project Engineer
ARCHITECTS/ENGINEERS
Drawing Title
Approved: VP, Administration Support
Project Title
Location
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of Construction and Facilities Management
Dwg. of
VA FORM 08-6231
o n e ig h t i c o fo t o q u a rt r in e f o o t th re ig h th s t o a lf t th q u a rt rs t o e f o o t o d lf i n c h t th c h t
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9
CONSULTANTS
Approved: C.E.O.
Approved: Chief, Project Section
Approved: Chief, Maint., & Operations Office
Approved: Chief, Engineering Dept.
Approved: Chief, Env. of Care Dept.
Approved: Chief, Env. Management Dept.
Approved: Dir., Facilities Management
Approved: Chief, Medical Officer
PROJECT ARCH/ENG
PROJECT DESIGNER
EwingCole Project Number
W \0
P ro d u c ti o n \0
M
E P
\E le c \B
IM
\2
E
C
E N
T R
A L . r v t
/2
/2
:0
:0
A
M
605-327
N.M.05.09.16
VA Loma Linda Healthcare System
E-611
A/E OP Pharmacy
11201 BENTON STREET
LOMA LINDA, CA 92357
K.K
SINGLE LINE DIAGRAM
ISSUED FOR 100% SUBMITTAL
20110460
NOT FOR CONSTRUCTION
SHEET NOTES:
EXISTING SOUTHERN CALIFORNIA EDISON (SCE) MANHOLE.
EXISTING SCE MAIN VOLTAGE SWITCHGEAR "MVS" ON CONCRETE PAD LOCATED IN THE
BEHAVIORAL HEALTH SERVICES ELECTRICAL EQUIPMENT YARD, PROVIDED BY THE
UTILITY COMPANY. VERIFY EXACT LOCATION OF UTILITY YARD WITH THE VA FACILITY AND
PLANNING DEPARTMENT.
EXISTING ELECTRICAL UNIT SUBSTATION "US-6A"; LOCATED IN THE BEHAVIORAL HEALTH
SERVICES ELECTRICAL EQUIPMENT YARD.
NEW MEDIUM VOLTAGE DRAWOUT CIRCUIT BREAKER FOR THE OUTPATIENT PHARMACY
PROJECT, EXACT BUCKET LOCATION IN THE UNIT SUBSTATION "US-6A" TO BE VERIFIED
WITH THE VA.
12 KV FEEDER FROM NEW CIRCUIT BREAKER IN EXISTING UNIT SUBSTATION IN THE
BEHAVIORAL HEALTH SERVICES EQUIPMENT YARD TO EXISTING MANHOLE. FEEDER AND
CONDUIT IN EXISTING CONCRETE DUCT BANK 30" BELOW GRADE. NEW FEEDER SHALL
BE SUPPLIED BY THE ELECTRICAL CONTRACTOR, DUCT BANK AND CONDUIT BY
OTHERS AND INSTALLED IN THE SEPARATE PROJECT. VERIFY EXACT LOCATION AND
ROUTING OF DUCT BANK WITH THE VA. FEEDER SHALL MATCH FEEDER FROM SHEET
NOTE 7.
NEW UNDERGROUND MANHOLE, 8'X6'X7'D WITH ENGRAVED TRAFFIC COVER PLATE,
"ELECT". VERIFY EXACT LOCATION WITH THE VA FACILITY AND PLANNING DEPARTMENT
AND FROM BEHAVIORAL HEALTH SERVICES AS-BUILT.
NEW FEEDER AND CONDUIT IN DUCT BANK, 4"C. PVC SCH. 40, 3#2 15KV-CU-133% IL-
SHIELDED-MV-105 + 1#6-600V-CU-GND.
NEW MV TRANSFORMER AND FUSED SWITCH ON CONCRETE PAD.
PROVIDE AN ADDITIONAL SPARE 4" CONDUIT FOR FUTURE (VERIFY FINAL TERMINATION
WITH THE VA). REFER TO DETAIL 9/E-E511 FOR DUCK BANK.
KWH POWER METER IN THE PAD MOUNTED MAIN SWITCHBOARD ENCLOSURE.
PAD MOUNTED MAIN SWITCHBOARD "MSB", SEE FIRST FLOOR POWER PLAN FOR EXACT
LOCATION.
NEW STEP-DOWN TRANSFORMER, 112.5KVA, 480-208/120V, 3 PHASE, 4W.
TRANSFORMER LOCATED ON THE FIRST FLOOR ELECTRICAL ROOM.
NEW EXTERIOR EMERGENCY STAND-BY GENERATOR, 150KVA, 480Y/277V 3PH, 4W.
EXACT LOCATION TO BE VERIFIED WITH VA FACILITY DEPARTMENT.
NEW PAD MOUNTED AUTOMATIC TRANSFER SWITCH (ATS), 200A, 4 POLE, OPEN
TRANSITION. VERIFY EXACT LOCATION WITH THE ARCHITECTURAL PLANS.
NEW DISTRIBUTION PANEL "DPA1", LOCATED ON THE FIRST FLOOR ELECTRICAL ROOM.
PROVIDE CONTROL CIRCUIT TO BUILDING BMS FOR INITIATIALIZATION OF GENERATOR
START SEQUENCE, UPON LOSS OF BUILDING POWER.
PROVIDE SHUNT TRIP CIRCUIT BREAKER AND CONNECT TO THE FIRE ALARM SYSTEM.
PROVIDE 120V POWER CONNECTION FROM R1A-15. COORDINATE WITH THE ELEVATOR
INSTALLER AND SHOP DRAWINGS.
PROVIDE A CURRENT LIMITING FUSED DISCONNECT SWITCH OR CIRCUIT BREAKER
CAPABLE OF BEING LOCKED IN THE OPEN POSITION. THE DISCONNECTING MEANS
SHALL BE PROVIDED WITH ALL ASSOCIATED WIRING AND CONDUIT TO THE
CONTROLLER. COORDINATE FUSE SIZE AND ADDITIONAL REQUIREMENTS WITH
ELEVATOR SHOP DRAWINGS AND INSTALLER.
UNINTERRUPTABLE POWER SUPPLY (UPS) WITH MINIMUM 22 MINUTES OF RUNTIME AND
WALL-MOUNT MAINTENANCE BYPASS MANUFACTURERED BY EATON (MODEL 9355) OR
APPROVED EQUAL.
5 5
6 6
6 6
6 6
6 6
6 6
6 6
4 ISSUED FOR 100% SUBMITTAL 08.17.12
5 REVISED UTILITIES 08.16.13
6 BULLETIN 00 04.08.15
7 ADDENDUM 02 10.19.15
8 BULLETIN 01 11.17.15
9 BULLETIN 03 01.27.16
Kyle Kavanaugh, PE
Neil Meris
RECORD DOCUMENTS:
These documents released by EwingCole for use as Record Documents will show the reported location of work and significant changes made during the construction process, and are based on unverified information provided by the Contractor and other parties which will be assumed reliable. EwingCole cannot and does not warrant the accuracy and/or completeness of this information and shall not be responsible for any errors or omissions which may be incorporated therein as a result. Future construction planning must include field confirmation of existing conditions.
RECORD DOCUMENT 06.17.17
File details come from the government source that posted it. Updated .