20110460 - Sheet - E-611 - SINGLE LINE DIAGRAM OP Pharmacy.pdf

PDF 98 KB Posted

Attached to
H959--ARC FLASH ANALYSIS - POP (09/01/2024 - 08/31/2025) Federal contract opportunity
Solicitation number
36C26224Q1724
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 22

About this file

This document is a combined synopsis/solicitation for a commercial services contract from the Department of Veterans Affairs (VA) Veterans Health Administration (VHA) for an Arc Flash Analysis at the VA Loma Linda Healthcare System (VALLHCS).

The VA is seeking a contractor to provide all labor, materials, supplies, and qualified personnel to complete an Arc Flash Analysis of the VALLHCS electrical distribution system, in compliance with NFPA 70E and other industry standards. The analysis must determine the Arc Flash Boundary, incident energy, and required personal protective equipment. The contractor will place Arc Flash warning labels on all evaluated equipment. The contractor must have specific licenses and certifications, and comply with VA security, safety, and other requirements. The period of performance is 09/01/2024 - 08/31/2025. Quotes are due by 08/23/2024. The procurement is set-aside for 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) firms under NAICS code 238210. Award will be based on a comparative evaluation of price and past performance.

View the file

Other files for this federal contract opportunity

Other files attached to H959--ARC FLASH ANALYSIS - POP (09/01/2024 - 08/31/2025), newest first.
File Type Posted
Tbl 3_3 Equip Eval.pdf PDF
lf_calc format.pdf PDF
input_data format.pdf PDF
EYE Clinic One Line Drawings.docx DOCX document
E-112.pdf PDF
E-110.pdf PDF
E-108.pdf PDF
E-104.pdf PDF
CANCER CENTER SIGNAL LINE DRAWINGS 2017.png PNG image
Arc Flash Study 2016 Schneider Full Facility.pdf PDF
116801E5.1.5.pdf PDF
022712 SCC and OCPD Coordination Study - VA Loma Linda.pdf PDF
Tbl 4_1 MV Prot Dev Settingsa.pdf PDF
Tbl 3-1_2 Prot Dev Eval.pdf PDF
sc_calc format.pdf PDF
MV Coordination Descrip Tbl.pdf PDF
Loma Linda MV TCCs.pdf PDF
E-109.pdf PDF
E-103.pdf PDF
CLC ReHab SIGNAL LINE DRAWINGS.png PNG image
CLC PC SIGNAL LINE DRAWINGS.png PNG image
VALL Electrical Single Line Diagrams.pdf PDF
Short Circuit Study - Op Pharmacy.pdf PDF
Loma Linda-60pc.pdf PDF
E601 BEHAVIORAL HEALTH BUILDING.pdf PDF
E-115.pdf PDF
E-114.pdf PDF
E-113.pdf PDF
E-101.pdf PDF
Cover.pdf PDF
116801E5.1.12.pdf PDF
116801E5.1.11.pdf PDF
116801E5.1.10.pdf PDF
116801E5.1.8.pdf PDF
116801E5.1.2.pdf PDF
116801E5.1.1.pdf PDF
Tbl 6-1_2_Arc_Flash.pdf PDF
E-111.pdf PDF
E-107.pdf PDF
E-106.pdf PDF
E-105.pdf PDF
E-102.pdf PDF
E1.1 AUDIOLOGY.pdf PDF
E-001.pdf PDF
Arc Flash Study CLC Reb.pdf PDF
Arc Flash Study CLC Ph 2.pdf PDF
116801E5.1.9.pdf PDF
116801E5.1.7.pdf PDF
116801E5.1.6.pdf PDF
36C26224Q1724.docx DOCX document
Show all 50

H959--ARC FLASH ANALYSIS - POP (09/01/2024 - 08/31/2025) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KWH

BATTERY

CABINET

S

S

WALL-MOUNT

MAINTENANCE

BYPASS

(MBP)

EX.

EX.

EX.

800A, 480Y/277V, 3PH, 4W + G

FIRST FLOOR ELECTRICAL ROOMMAIN SWITCHBOARD "MSB"

100A 3P

NEW MANHOLE

65,000 AIC

400A, 208/120V,3PH, 4W + G.

3P 100A

100A

(4

K cM

IL

(1

/0

G

C

[2 S

E T

S

K cM

IL

(1

K cM

IL

G

"C

225AF

225AF

(4

A

W G

G

(1

)1 -1

/2

C

FIRST FLOOR ELECTRICAL ROOM

3P 100A

4 5 6 7

NEMA 1

125A 3P

225A 3P

15A 3P

15A 3P

XFMR "T-DPA1"

112.5KVA

480 - 208/120V, 3PH, 4W + G.

(4

K cM

IL

G

(1 )3

C

250A 3P

3 4 5

175A 3P

225A 3P

7 98

40A 60A 3P

#2/0 GND.

(3

/0

G

C

400A 3P

(4

/0

A W

G

(1

G

)2

C

(3

A

W G

G

(1 )1

-1 /2

C

(4

/0

A W

G

G

(1

)2

C

(4

A

W G

G

C

EXISTING SOUTHERN

CALIFORNIA EDISON (S.C.E.)

MAN HOLE

12KV SERVICE

200A 3P

(4

/0

A W

G

G

(1 )2

C

(3

G

C

(3

G

C

(3

A

W G

G

(1

)3 /4

C

(3

A

W G

G

(1

)3 /4

C

3P

3P

(4

A

W G

G

(1 )1

-1 /2

C

(4

A

W G

G

(1

)1 -1

/2

C

400A, 480Y/277V, 3PH, 4W + G

MAIN SWITCHBOARD "EMDB"

200A 3P

225A 3P

100A 3P

100A 3P

(4

K cM

IL

(1

G

)4

C

(4

/0

A W

G

G

)2

C

(4

A

W G

G

(1

)1 -1

/2

C

65,000 AIC

NEMA 3R

22,000 AIC

NEMA 1

(4

A

W G

G

(1

)1 -1

/2

C

(4

A

W G

G

(1

)1 -1

/2

C

60A 3P

(3

A

W G

G

(1

)1

C

125A 3P

(4

A

W G

G

(1

)1 -1

/2

C

30A 3P

EMER. GENERATOR LOAD SUMMARY

EQUIPMENT

PANEL "LL2A"

PANEL "EL1A"

1.8

KVA AMPERE

150.9

183.8152.7EMERGENCY GENERATOR

CONNECTED

EX. MANHOLE BY OTHERS

PAD MOUNTED, GAS FUELDED

NEMA 4X ENCLOSURE

OUTDOOR WEATHERPROOF

SOUND ATTENUATED ENCLOSURE

400A 3P

250A 3P

PAD MOUNTED OIL FILLED

NORMAL POWER XFMR "T-MSB"

12.47kV - 480Y/277V, 3∅, 4W

750kVA, 5.75%Z

GROUNDING ELECTRODE

PER DETAIL 01/E-512

LIFE SAFETY

SECTION 1

OPTIONAL

STAND-BY

SECTION 2

1" C.

PANEL "ER1A"

PANEL "ER1B"

42.2

22.1

DISTRIBUTION PANEL "DPA1"

LOAD SUMMARY

EQUIPMENT

PANEL "LL2A"

PANEL "EL1A"

PANEL "L1A"

DISTRIBUTION PANEL "DPA1"

ELEVATOR #1

ELEVATOR #2

1.8

KVA AMPERE

150.9

6.1

37.7

17.5

25.3

288.0239.3MAIN SWITCHBOARD "MSB"

1.7PUMP "P-2"

PANEL "R1A"

PANEL "R2A"

PANEL "R2B"

PUMP "P-1"

12.7

21.5

0.1

1.7

CONNECTED

PANEL "ER1A" 42.2

(4

A

W G

G

C

PANEL "UPS-A" 2.6

ATS-E

ATS-LS

R A

P A

N E

L

R A

P A

N E

L

R B

P A

N E

L

1.0 1.0

L A

P A

N E

L

15 19

P N

L

L C

P

L T

G C

T R

L

E L A

P A

N E

L c c b b a a

NENE

L L A

P A

N E

L

E R

A

P A

N E

L

U P

S -A

P A

N E

L

IN

V

E R

T E

R

P V

S Y

S T

E M

B O

X

P V

C O

M B

IN

E

R

E R

B

P A

N E

L

GF

KWH

STST

EX. UNIT SUBSTATION "US-6A"

EX. XFMR

(E)MEDIUM VOLTAGE SWITCHGEAR "MVS"

12K V, 3∅, 3W+G

1500kVA/1905kVA (FA)

12KV, 3PH, 3W

DEL PRI

480Y/277, 3PH, 4W, Y SEC.

EX.

EX.

EX.

EX

EX.

BEHAVIORAL HEALTH SERVICES

ELECTRICAL EQUIPMENT YARD

EXISTING FEED TO DISTRIBUTION

SWITCHBOARD "MDS"

SPACE

SPACE

1ST FLR.

ELEC.

ROOM

HOT WATER PUMP

P-1

1ST FLR.

ELEC.

ROOM

SPARE

60AS

40AF

60AS

60AF

ELEVATOR

ELEV-1

ELEVATOR

ELEV-2

TYP. OF 5

2ND FLR.

ELEC.

ROOM

2ND FLR.

ELEC.

ROOM

TYP. OF 3

XFMR "T-ER1A"

45 KVA

480-208Y/120V

3PH, 4W

200A, 4 POLE, 60Hz

480/277V, 3∅, 4W+G

50 KA.I.C. MIN.

#6 GND.

OPTIONAL STAND-BY

OPEN TRANSITION

187.5 KVA

EMER.GENERATOR

480/277VV-3∅

150 KW

1ST FLR.

SPARE

HOT WATER PUMP

P-2

100A, 4 POLE, 60Hz

480/277V, 3∅, 4W+G

50 KA.I.C. MIN.

LIFE SAFETY

OPEN TRANSITION

"UPS1"

10 KVA

208-208Y/120V

3PH, 4W

SPARESPARE

1ST FLR.

ELEC.

ROOM

2ND FLR.

ELEC.

ROOM

TYP. OF 3

TYP. OF 3

2ND FLR.

ELEC.

ROOM

ROOF

NEMA 3R NEMA 3R

1ST FLR.

ELEC.

ROOM

800AF

800AT

GFSC

65E

S P

D

30A 30A

SPARESPARE

NOTE 4

SEE DRAWING

SEE DRAWING

NOTE 13

SEE DRAWING

NOTE 9

SEE DRAWING

NOTE 8

SEE DRAWING

NOTE 6

SEE DRAWING

NOTE 10

NOTE 16

SEE DRAWING

NOTE 16

SEE DRAWING

SEE DRAWING

NOTE 12

SEE DRAWING

NOTE 14

SEE DRAWING

NOTE 15

SEE DRAWING

NOTE 1

SEE DRAWING

NOTE 2

SEE DRAWING

NOTE 3

NOTE 5

SEE DRAWING

SEE DRAWING

NOTE 7

SEE DRAWING

NOTE 11

SEE DRAWING

NOTE 18

SEE DRAWING

NOTE 18

SEE DRAWING

NOTE 17

SEE DRAWING

NOTE 17

SEE DRAWING

NOTE 19

NORTH

Steph Vargas, LEED AP

Michael Lehman, AIA

Department of Veterans Affairs

15231 Laguna Canyon Road, Suite 200 Irvine, CA 92618

Tel: 949-417-7550 Fax: 949-585-9391

Copyright © 2009 by EWINGCOLE

Revisions: Date

PRINCIPAL

PROJECT MANAGER

Approved: VA Project Engineer

ARCHITECTS/ENGINEERS

Drawing Title

Approved: VP, Administration Support

Project Title

Location

Date Checked Drawn

Drawing Number

Building Number

Project Number

Office of Construction and Facilities Management

Dwg. of

VA FORM 08-6231

o n e ig h t i c o fo t o q u a rt r in e f o o t th re ig h th s t o a lf t th q u a rt rs t o e f o o t o d lf i n c h t th c h t

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9

CONSULTANTS

Approved: C.E.O.

Approved: Chief, Project Section

Approved: Chief, Maint., & Operations Office

Approved: Chief, Engineering Dept.

Approved: Chief, Env. of Care Dept.

Approved: Chief, Env. Management Dept.

Approved: Dir., Facilities Management

Approved: Chief, Medical Officer

PROJECT ARCH/ENG

PROJECT DESIGNER

EwingCole Project Number

W \0

P ro d u c ti o n \0

M

E P

\E le c \B

IM

\2

E

C

E N

T R

A L . r v t

/2

/2

:0

:0

A

M

605-327

N.M.05.09.16

VA Loma Linda Healthcare System

E-611

A/E OP Pharmacy

11201 BENTON STREET

LOMA LINDA, CA 92357

K.K

SINGLE LINE DIAGRAM

ISSUED FOR 100% SUBMITTAL

20110460

NOT FOR CONSTRUCTION

SHEET NOTES:

EXISTING SOUTHERN CALIFORNIA EDISON (SCE) MANHOLE.

EXISTING SCE MAIN VOLTAGE SWITCHGEAR "MVS" ON CONCRETE PAD LOCATED IN THE

BEHAVIORAL HEALTH SERVICES ELECTRICAL EQUIPMENT YARD, PROVIDED BY THE

UTILITY COMPANY. VERIFY EXACT LOCATION OF UTILITY YARD WITH THE VA FACILITY AND

PLANNING DEPARTMENT.

EXISTING ELECTRICAL UNIT SUBSTATION "US-6A"; LOCATED IN THE BEHAVIORAL HEALTH

SERVICES ELECTRICAL EQUIPMENT YARD.

NEW MEDIUM VOLTAGE DRAWOUT CIRCUIT BREAKER FOR THE OUTPATIENT PHARMACY

PROJECT, EXACT BUCKET LOCATION IN THE UNIT SUBSTATION "US-6A" TO BE VERIFIED

WITH THE VA.

12 KV FEEDER FROM NEW CIRCUIT BREAKER IN EXISTING UNIT SUBSTATION IN THE

BEHAVIORAL HEALTH SERVICES EQUIPMENT YARD TO EXISTING MANHOLE. FEEDER AND

CONDUIT IN EXISTING CONCRETE DUCT BANK 30" BELOW GRADE. NEW FEEDER SHALL

BE SUPPLIED BY THE ELECTRICAL CONTRACTOR, DUCT BANK AND CONDUIT BY

OTHERS AND INSTALLED IN THE SEPARATE PROJECT. VERIFY EXACT LOCATION AND

ROUTING OF DUCT BANK WITH THE VA. FEEDER SHALL MATCH FEEDER FROM SHEET

NOTE 7.

NEW UNDERGROUND MANHOLE, 8'X6'X7'D WITH ENGRAVED TRAFFIC COVER PLATE,

"ELECT". VERIFY EXACT LOCATION WITH THE VA FACILITY AND PLANNING DEPARTMENT

AND FROM BEHAVIORAL HEALTH SERVICES AS-BUILT.

NEW FEEDER AND CONDUIT IN DUCT BANK, 4"C. PVC SCH. 40, 3#2 15KV-CU-133% IL-

SHIELDED-MV-105 + 1#6-600V-CU-GND.

NEW MV TRANSFORMER AND FUSED SWITCH ON CONCRETE PAD.

PROVIDE AN ADDITIONAL SPARE 4" CONDUIT FOR FUTURE (VERIFY FINAL TERMINATION

WITH THE VA). REFER TO DETAIL 9/E-E511 FOR DUCK BANK.

KWH POWER METER IN THE PAD MOUNTED MAIN SWITCHBOARD ENCLOSURE.

PAD MOUNTED MAIN SWITCHBOARD "MSB", SEE FIRST FLOOR POWER PLAN FOR EXACT

LOCATION.

NEW STEP-DOWN TRANSFORMER, 112.5KVA, 480-208/120V, 3 PHASE, 4W.

TRANSFORMER LOCATED ON THE FIRST FLOOR ELECTRICAL ROOM.

NEW EXTERIOR EMERGENCY STAND-BY GENERATOR, 150KVA, 480Y/277V 3PH, 4W.

EXACT LOCATION TO BE VERIFIED WITH VA FACILITY DEPARTMENT.

NEW PAD MOUNTED AUTOMATIC TRANSFER SWITCH (ATS), 200A, 4 POLE, OPEN

TRANSITION. VERIFY EXACT LOCATION WITH THE ARCHITECTURAL PLANS.

NEW DISTRIBUTION PANEL "DPA1", LOCATED ON THE FIRST FLOOR ELECTRICAL ROOM.

PROVIDE CONTROL CIRCUIT TO BUILDING BMS FOR INITIATIALIZATION OF GENERATOR

START SEQUENCE, UPON LOSS OF BUILDING POWER.

PROVIDE SHUNT TRIP CIRCUIT BREAKER AND CONNECT TO THE FIRE ALARM SYSTEM.

PROVIDE 120V POWER CONNECTION FROM R1A-15. COORDINATE WITH THE ELEVATOR

INSTALLER AND SHOP DRAWINGS.

PROVIDE A CURRENT LIMITING FUSED DISCONNECT SWITCH OR CIRCUIT BREAKER

CAPABLE OF BEING LOCKED IN THE OPEN POSITION. THE DISCONNECTING MEANS

SHALL BE PROVIDED WITH ALL ASSOCIATED WIRING AND CONDUIT TO THE

CONTROLLER. COORDINATE FUSE SIZE AND ADDITIONAL REQUIREMENTS WITH

ELEVATOR SHOP DRAWINGS AND INSTALLER.

UNINTERRUPTABLE POWER SUPPLY (UPS) WITH MINIMUM 22 MINUTES OF RUNTIME AND

WALL-MOUNT MAINTENANCE BYPASS MANUFACTURERED BY EATON (MODEL 9355) OR

APPROVED EQUAL.

5 5

6 6

6 6

6 6

6 6

6 6

6 6

4 ISSUED FOR 100% SUBMITTAL 08.17.12

5 REVISED UTILITIES 08.16.13

6 BULLETIN 00 04.08.15

7 ADDENDUM 02 10.19.15

8 BULLETIN 01 11.17.15

9 BULLETIN 03 01.27.16

Kyle Kavanaugh, PE

Neil Meris

RECORD DOCUMENTS:

These documents released by EwingCole for use as Record Documents will show the reported location of work and significant changes made during the construction process, and are based on unverified information provided by the Contractor and other parties which will be assumed reliable. EwingCole cannot and does not warrant the accuracy and/or completeness of this information and shall not be responsible for any errors or omissions which may be incorporated therein as a result. Future construction planning must include field confirmation of existing conditions.

RECORD DOCUMENT 06.17.17

File details come from the government source that posted it. Updated .