RFI 011 for Mech work.pdf

PDF 133 KB Posted

Attached to
Y1DZ--Correct FCA Deficiencies Steam 590-20-903 Distribution System
Solicitation number
36C24624R0045
Issued by

About this file

This document is a Request for Information (RFI) issued by the Department of Veterans Affairs (VA) for a contract to correct steam distribution system deficiencies at the Hampton VA Medical Center.

The key details are:

  • The RFI is for Solicitation No. 36C24624R0045, titled "Y1DZ--Correct FCA Deficiencies Steam 590-20-903 Distribution System."
  • It contains two questions from a potential contractor regarding pipe insulation requirements, specifically whether aluminum jacketing is required and the correct scale for the mechanical plans.
  • The VA responded that aluminum jacketing is required for pumped condensate return piping within the tunnel and up to 6 feet above the finished floor in the boiler plant, while PVC or aluminum jacketing is required for vacuum and gravity condensate return piping within 6 feet of a manhole opening.
  • The VA also confirmed that the correct scale for drawings M101-M104 is 1/16"=1'0", not 1/64"=1' as originally indicated.

View the file

Other files

File Type Posted
36C24624R0045 0013.docx DOCX document
59020903_Addendum_2_08082024 AMEND 0012.pdf PDF
36C24624R0045 0012.docx DOCX document
20240628_SteamT Investigation_AMcD.pdf PDF
36C24624R0045 0011.docx DOCX document
36C24624R0045 0010.docx DOCX document
36C24624R0045 0009.docx DOCX document
36C24624R0045 0008.docx DOCX document
Attach 1 RFI 009 - CO comments Amend 0008.pdf PDF
RFI 010 a Amend 0008.pdf PDF
Attachment I - RFI 010.pdf PDF
Attachment J - 59020903_Addendum_1_05302024_W RFI10.pdf PDF
36C24624R0045 0007.docx DOCX document
Attach 1 RFI 009 - Revision 3 - BAE Response_Redacted.pdf PDF
36C24624R0045 0006.docx DOCX document
Attach 2 RFI 009 Specification Appendix 2.pdf PDF
ATTENDANCE LOG - PRE PROPOSAL SITE VISIT Steam.pdf PDF
36C24624R0045 0005.docx DOCX document
BAE Response - RFI 005 04.12.24_Redacted.pdf PDF
BAE Response - RFI 007 04.12.24_Redacted.pdf PDF
BAE Response - RFI 008 04.15.24_Redacted.pdf PDF
36C24624R0045 0004.docx DOCX document
BAE Field Report additional photos Part 3.pdf PDF
Attachment J - Bonding Information.docx DOCX document
BAE Field Report additional photos Part 1.pdf PDF
BAE Field Report additional photos Part 4.pdf PDF
36C24624R0045 0003.docx DOCX document
BAE Field Report additional photos Part 2.pdf PDF
Portion of BOD.pdf PDF
20240315_M001.pdf PDF
36C24624R0045 0002.docx DOCX document
20240315_A102_N.pdf PDF
36C24624R0045 0001.docx DOCX document
Attachment B - Corp Experience Form.docx DOCX document
Attachment D - EMR Certification Form 2024.docx DOCX document
Attachment C - Past Performance Questionnaire.docx DOCX document
Attachment E - RFI Form R0045.doc DOC document
Attachment F - Cost Breakdown with Schedule of Values.xlsx XLSX spreadsheet
Attachment H - Boiler Plant and Site Visit.pdf PDF
590-20-903_Dwg Pkg.pdf PDF
Appendix E_Hampton-Asb LBD Report.pdf PDF
Attachment G - Contractor Training Requirements 590-20-903_11-2-2023.pdf PDF
Attachment I - Construction Safety Pamphlet for Dist.pdf PDF
Attachment A - Wage Determination VA20240022 Mod 1 Dated 02232024.pdf PDF
36C24624R0045_RFP.docx DOCX document
590-20-903 IFB_Specs.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMATION (RFI)

36C24624R0045

TO: Contracting Officer Madeline Lucena-Pulst (email: madeline.lucena-pulst@va.gov)

RFI NO.: 011 DATE: 6/11/24 REFERENCE: Mechanical Spec & Plans

REPLY NEEDED BY:

INFORMATION NEEDED:

Q1: In reference to Spec section 23 07 11, Paragraph 3.3:

It was noted in the photos provided in the documents as well as during the pre-bid site visit that the pipe insulation located in the tunnels, crawlspace, and plant DOES NOT include a field-applied jacketing (i.e. aluminum jacket or PVC jacket). Spec section 230711, Para 3.3.A.2.d indicates aluminum jacketing on steam and condensate below 6-ft above finished floor. Para 3.3.B.2.d and Para 3.3.D.3 indicates the same. However, Para 3.3.C.2 (pumped condensate, vacuum, gravity, etc.) does not indicate a field-applied jacket. Can you please confirm if aluminum jacketing is required on any of the piping to be insulated under this contract? If so, please clarify to what extent, specifically if it applies to any piping in the tunnels.

Q2: The scales for the Mechanical plans M101-M104 are wrong. The plans show a 1/64”=1’ scale, but it should be 1/16”=1’ scale. The overall scale of 1/64”=1’ for M100 is right but if you measure the same areas in M100 against M101-104, they are far off. See below for better understanding, M100 at 1/64” scale

PROJECT NUMBER: 590-20-903 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents. When submitting questions on this project the

Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.

PROJECT TITLE: Correct FCA Deficiencies Steam

PROJECT LOCATION: Department of Veterans Affairs

Hampton VA Medical Center

100 Emancipation Drive

Hampton, Va. 23667

SUBMITTED BY: City/State:

PHONE NO.:

REPLY:

1. Contractor shall follow guidelines for pipe jacketing set forth in specification section 23 07 11.

Pumped condensate return within the tunnel and up to 6’ above the finished floor within the boiler plant shall be jacketed with aluminum. Vacuum and gravity condensate return within the tunnel will fall under spec section 230711 paragraph C and will only require PVC premolded fitting coverings.

Contractor shall also provide PVC or aluminum jacketing on all (vacuum, gravity, pumped) condensate return piping within tunnel that is within 6 feet of a manhole opening to protect insulation against field observed water infiltration damage.

2. BAE concurs. The proper scale for sheets M101-M104 is 1/16”=1’0”.

REPLY FROM: BAE (RR)

DATE: 6/12/2024

ATTACHMENTS: None

COPY TO: File