36C24624R0045 0006.docx
DOCX document 30 KB Posted
- Solicitation number
- 36C24624R0045
About this file
This document is an amendment to Solicitation 36C24624R0045 for the "Y1DZ--Correct FCA Deficiencies Steam 590-20-903 Distribution System" contract opportunity with the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 6.
The amendment provides responses to several Requests for Information (RFIs) submitted by potential offerors. Key points include: changing the NAICS code from 238220 (Plumbing, Heating, and Air Conditioning Contractors) to 236220 (Commercial Building Contractors) to better reflect the scope of work, clarifying site visit and safety requirements, confirming that CPARs can be used in lieu of Past Performance Questionnaires, and providing additional details on the pipe sizes and routing in the crawlspace. The new proposal due date is June 4, 2024 by 1:00 PM EST.
View the file
Other files
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7.
ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF
PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE
OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERE
D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED
STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF
CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF
SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 590-20-903 36C246 Department of Veterans Affairs Network Contracting Office 6 1201 Broad Rock Blvd Richmond VA 23249 36C246 Department of Veterans Affairs Network Contracting Office 6 1201 Broad Rock Blvd Richmond VA 23249 To all Offerors/Bidders
36C24624R0045 03-13-2024
X X X Tuesday, June 4, 2024 by 1:00 PM EST X
The purpose for this amendment to the solicitation is to provide RFI Responses. Please see attachments and continuation page for details.
*********** IMPORTANT OFFEROR INFORMATION*********
NEW Proposal due date is Tuesday, June 4, 2024 by 1:00 PM EST.
Madeline Lucena-Pulst Contracting Officer
SOLICITATION 36C24624R0045
AMEND 0004 CONTINUATION PAGE
| Origination Date |
| RFI NO. |
| Question |
| Respondent |
| Response |
| 3/8/2024 |
| 001 |
| This project is currently solicited under the NAICS 238160 for small businesses with less than $19.0 million annual revenue. However, this project is estimated magnitude of construction between $5,000,000.00 and $10,000,000.00. Additionally, this project includes multiple trades beyond just 238220 Plumbing, Heating, and Air Conditioning Contractors; to include abatement, concrete, structural steel, joint sealants, painting, electrical, earthwork, and plantings. |
In order to ensure the Richmond VA Medical Center receives bids from qualified contractors, capable of handling a $5-10M project with multiple trades, will you allow a business that is considered small under 236220 Commercial and Institutional Building Construction or 237110 Water and Sewer Line and Related Structures Construction bid this project? Those NAICS would be more applicable to this larger, multi-trade project.
| VA |
| The work is to be done in Hampton, not Richmond. NAICS code 238220 Plumbing, Heating, and Air Conditioning Contractors is hereby replaced by NAICS Code 236220 Commercial Building Contractors. |
| 3/12/2024 |
| 002 |
| 1. Can CPARs be used in lieu of PPQs? |
2. Contractor must use “VA TRIGIA CPMS” per the specifications. This program does not seem to exist anymore, and we request this be changed to the Submittal Exchange which is widely used in NCO 6.
3. For the site visit, the solicitation states to fill the permit out 24 hours prior to the site visit. The actual permit readings need to be taken at the same time as the permit is being issued, this is not possible 24 hours prior. This would require the contractor to bring a full staff to enter, remain, and exit the tunnel to properly follow OSHA standards. They would also have to provide safety equipment and air monitoring equipment to access the tunnel for the site visit. This is going to create a logistical nightmare for each contractor attempting to gain access to the tunnel. We believe that since a majority of the work is in the tunnel, it is imperative to have a proper site investigation. Without being able to investigate the site, poor subcontractor bid participation is expected. For the government to receive the best value and price on this project, the contractors must have the opportunity to access the tunnel. As it currently stands, the procedure for going in the tunnel at the site visit is conflicting and confusing. OSHA defines that the “host” is responsible for coordination of entry and exit to the confined space. We have attached the OSHA regulations regarding hosting for your convenience. They are highlighted in yellow. We need times of the required safety training, how long it will take, and details for scheduling. We feel it would be reasonable to consider the possibility of briefing the entire crew at one time during the site visit. Will the COR accompany the contractor into the tunnel so that the contractor knows where the work is to be performed?
VA
VA
VA
1. Yes.
2. Use software that will allow you to provide the VA with a file that can be opened and edited by Microsoft Project.
3. Site Visit has been cancelled. Safety and Engineering will provide additional guidance prior to rescheduling the site visit.
Site Visit will not include access to the tunnel. Attached are the additional photos and field report provided by the AE to describe the work site in detail. The Site Visit is now schedule for April 23, see page 1 above.
| 3/12/2024 |
| 003 |
| “This project is a very heavy mechanical project that should rightfully be placed under 238220. This is not a general construction project, but a heavy mechanical project that will be performed primarily by the mechanical trade. We request that this be changed back to the original NAICS code of 238220. For general contractors that perform their own mechanical work, this makes it harder for actual mechanical contractors to qualify. The general trades NAICS code is not more applicable than a project that focuses solely on the mechanical aspect. General Construction (GC) projects typically are not more than 80% mechanical. We request this be left as 238220.” |
| VA CO |
| The NAICS for this requirement shall remain 236220. Potential offerors must be capable of meeting the requirement in its entirety including other trades. The solicitation does not inhibit any small business identifying as GC, if they are registered prior to award. However, it is the contractor’s responsibility to register timely under the appropriate NAICS code(s). Please contact SAM.gov directly with questions on updating entity information. Thank you. |
| Mon 4/8/2024 5:50 PM |
| 004 |
| there is no amount listed for the bid guarantee – typically we see 20% or $1,000,000 depending on what’s greater. Can you please advise of the proper amount for the bid guarantee? |
| VA CO |
| See BONDING INFORMATION ATTACHMENT J |
| Fri 4/12/2024 1:24 PM |
| 005 |
| There are 2 condensate return lines in the crawlspace that do not specify size. Please clarify. |
| AE/VA |
| See attachment. REFERENCE: M103 |
One 8” steam supply pipe and one 6” condensate return pipe are routed in the crawlspace at this location. The intended work is to replace the existing 6” condensate return pipe with a new pipe of identical size, route, and characteristics as existing.
| Fri 4/12/2024 1:24 PM |
| 006 |
| MD-B110-102 shows the pipe layout for the existing crawlspace plan. Is there a new, updated layout for the crawlspace piping? |
| AE/VA |
| The new mechanical work to be conducted in the crawlspace is identified in keynote 3 on sheet M103. Refer to sheets B110- |
A101 and B110-A102 for pipe routing in crawlspace. The new condensate return pipe shall run in the same location and manor as the existing piping.
| Fri 4/12/2024 1:24 PM |
| 007 |
| Please clarify sizes of the highlighted pipes. |
| AE/VA |
| See attachment. REFERENCE: M-B110-101. |
Size these pipes at 1-1/2”. Adjust size if necessary to match existing pipe size at connection point.
| Mon 4/15/2024 10:19 AM |
| 008 |
| On both the demo & new plans, there is a 2” pumped condensate return (PCR) line in Bldg. 15 going into the trench along with |
3 other lines. MD-100 and M-100 show only 3 lines but not the 2” PCR. Does it tie into the 4” PCR? If not, how far does it go? Thank you.
| AE/VA |
| See attachment. REFERENCE: MD-100 and M-100. |
Bancroft believes the 2” PCR pipe in question extends less than 50ft into the tunnel then leaves north as a direct buried pipe to serve buildings along Harris Avenue (bldg. 14). The extent of this project work shall be to replace pipe to match existing size and route up where it exits the tunnel.
| Wed 4/24/2024 7:36 PM |
| 009 |
See Attach 1 RFI009 and Attach 2 RFI009
AE/COR
Detailed responses are provided in the attachments to Amend 6.
More complete response for questions #8 and 12 will be forthcoming.
END OF AMENDMENT 36C24624R0045 0006
ATTACHMENT(s)
See attached document: Attach 1 RFI 009 - Revision 3 - BAE Response_Redacted.
See attached document: Attach 2 RFI 009 Specification Appendix 2.