Portion of BOD.pdf
PDF 6 MB Posted
- Solicitation number
- 36C24624R0045
About this file
This document is a Basis of Design that provides details on the existing conditions and requirements for the Correct FCA Deficiencies Steam Distribution System project at the Hampton Veterans Affairs Medical Center in Hampton, VA.
The document describes the existing steam tunnels, piping, and mechanical equipment across several buildings that require repair or replacement. Key areas of focus include the steam tunnels, return condensate piping, fuel tanks, and mechanical equipment in Buildings 15 and 110. The document includes detailed photos and plans to illustrate the existing conditions. It also outlines a risk assessment matrix that will be used to evaluate potential impacts during construction, such as noise, vibration, and air quality. The information in this Basis of Design will inform the technical requirements for the federal contract opportunity solicitation number 36C24624R0045 to Correct FCA Deficiencies Steam 590-20-903 Distribution System, which is being issued by the Department of Veterans Affairs Veterans Health Administration.
View the file
Other files
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Hampton Veterans Affairs Medical Center, Hampton, VA, Correct FCA Deficiencies Steam Distribution System | December 9, 2022
1 Executive Summary
1-4
RISK ASSESSMENT AND EVALUATION
1-3
A pre-construction risk assessment and evaluation is an indispensable tool for any project, whether demolition, construction or renovation. A risk assessment is complex and involves utility standards, air quality requirements, construction noise, and other impacts including fire safety and vibration, and any unique hazards respect to the facility.
Areas to be assessed and evaluated during construction are Noise, Vibration (structural integrity), Air
Quality affected by demolition, construction, solder/welding, sanding, painting, and cleaning.
The risk assessment matrix to the right will provide the VA with information on particular areas of construction that may have negative effects on employees and patients. This matrix will be updated as the project further develops.
Hampton Veterans Affairs Medical Center, Hampton, VA, Correct FCA Deficiencies Steam Distribution System | December 9, 2022
1 Executive Summary
1-4
Hampton Veterans Affairs Medical Center, Hampton, VA, Correct FCA Deficiencies Steam Distribution System | December 9, 2022
Existing Conditions
• Existing Conditions
• Existing Site Plan
• Existing Building 15
• Fuel Tanks
• Existing Building 110 Mechanical Room
Basis of Design
2-1
Hampton Veterans Affairs Medical Center, Hampton, VA, Correct FCA Deficiencies Steam Distribution System | December 9, 2022
2-2
Existing Conditions 2
EXISTING CONDITIONS
STEAM TUNNELS
The existing tunnels beneath Black Avenue and McClellan Avenue are constructed of reinforced concrete walls, floor and roof. There are intermediate vertical steel plates which are embedded into the concrete walls at approximately every 11 linear feet. Steel supports for the pipes are connected to these embedded steel plates. The embedded steel plates appear to have significant rusting, which will be reviewed by the structural engineer during their upcoming site visit.
STEEL STEAM PIPE SUPPORTS
Existing pipe supports are spaced at approximately 11 linear feet. The existing pipe supports have rusting and deterioration throughout. These will be replaced. Extent of repairs/restoration or replacement will be further described in structural systems.
RETURN CONDENSATE PIPING
Existing return condensate piping will be replaced. Replacement of piping will be described in mechanical systems.
FUEL TANKS
The existing fuel tanks appear to be in good condition, but do show some rusting on the exterior of the tanks. Existing fuel tanks #1, #2 and #3 were testing in 2017 using ultrasonic thickness testing.
Testing indicated that each tank has a service life of greater than 30 years from time of report. The scope of work for this project will require testing of the tanks to determine their current condition.
Ultrasonic thickness testing will be performed by a qualified testing agency. The report will provide existing conditions of each tank and recommended repairs.
BUILDING 15 MECHANICAL EQUIPMENT
Replacement of mechanical and electrical equipment will be further described in this document under electrical systems and mechanical systems.
Refer to Appendix ‘A’ for photographs of Existing Conditions.
2-3
PLACE CAMPUS
PLAN HERE
Existing Site
BUILDING 15-
AREA OF WORK
BUILDING 110
MECHANICAL
ROOM -
AREA OF WORK
STEAM TUNNELS -
AREA OF WORK
Hampton Veterans Affairs Medical Center, Hampton, VA, Correct FCA Deficiencies Steam Distribution System | December 9, 2022
2-4
Existing Building 15
Existing Fuel Tanks (BLDG 15A) Plan
2-5
Hampton Veterans Affairs Medical Center, Hampton, VA, Correct FCA Deficiencies Steam Distribution System | December 9, 2022
Existing Building 110 Plan
2-6
KEYPLAN - BUILDING 110/110A/110B
Mechanical Room
Hampton Veterans Affairs Medical Center, Hampton, VA, Correct FCA Deficiencies Steam Distribution System | December 9, 2022
A Appendix
Photographs
• Building 15 - Boiler House
• Building 15A—Fuel Tanks
• Building 110
• Steam Tunnel Piping and Supports
Basis of Design
A-1
1 3 4
5 6 7
KEY PLAN - BUILDING 15, FIRST FLOOR
Hampton Veterans Affairs Medical Center, Hampton, VA, Correct FCA Deficiencies Steam Distribution System | December 9, 2022
A-2
1 4
6 7
Fig. 1—Building 15 - southwest corner Fig. 2—Building 15 - southwest exterior (fuel piping) Fig. 4—Building 15 - west exterior
Fig. 6—Building 15 - southeast corner (steam tunnel entrance)
Fig. 5—Building 15 - west exterior
Fig. 3—-Building 15 - west exterior
Fig. 7—Building 15 - boiler feedwater pump Fig. 8—Building 15 - boiler feedwater pump
A-3
KEY PLAN - BUILDING 15, BASEMENT
Hampton Veterans Affairs Medical Center, Hampton, VA, Correct FCA Deficiencies Steam Distribution System | December 9, 2022
A-4
5 6 7
Fig. 3—Building 15 - #1 condensate drip pump
Fig. 4—Building 15 - Boiler Blow Down Tank
Fig. 1—Building 15 - Fuel pipe valve assembly Fig. 2—Building 15 - Fuel pumps and piping
Fig. 6—Building 15 - condensate transfer pump and condensate tank
Fig. 5—Building 15 - Boiler Blow Down Tank
Fig. 7—Building 15 - condensate transfer pump and condensate tank
A-5
ENLARGED KEY PLAN - BUILDING 15 AT STEAM ENTRANCE, BASEMENT
Hampton Veterans Affairs Medical Center, Hampton, VA, Correct FCA Deficiencies Steam Distribution System | December 9, 2022
A-6
5 6 7
Fig. 1—Building 15 - Steam piping tunnel entrance
Fig. 2—Building 15 - Steam piping tunnel entrance
Fig. 3—Building 15 - Steam piping tunnel entrance
Fig. 4—Building 15 - Steam piping tunnel entrance
Fig. 5—Building 15 - Steam piping tunnel entrance
Fig. 6—Building 15 - Steam piping tunnel entrance
Fig. 7—Building 15 - Steam piping tunnel entrance
A-7
KEY PLAN - FUEL TANKS (BUILDING 15A)
Hampton Veterans Affairs Medical Center, Hampton, VA, Correct FCA Deficiencies Steam Distribution System | December 9, 2022
A-8
3 4
5 6 7
Fig. 1—Building 15A - Fuel tanks #1, #2 and #4 Fig. 2—Building 15A - Fuel tanks #1 and #3
Fig. 3—Building 15A - 150,000 gallon fuel tank (Tank #3)
Fig. 4—Building 15A - Fuel tanks #2 and #4
Fig. 5—Building 15A - Flood Basin Fig. 6—Building 15A - Fuel Piping Fig. 7—Building 15A - Fuel Piping
A-9
KEY PLAN - BUILDING 110, BASEMENT MECHANICAL ROOM
Hampton Veterans Affairs Medical Center, Hampton, VA, Correct FCA Deficiencies Steam Distribution System | December 9, 2022
A-10
3 4
5 6 7
Fig. 1—Building 110 - Existing Motive Pump #3 Fig. 2—Building 110 - Basement Mechanical room Fig. 3—Building 110 - Basement Mechanical room
Fig. 5—Building 110 - Existing Motive Pump #1 Fig. 6—Building 110 - Basement Mechanical room Fig. 7—Building 110 - Basement Mechanical room, condensate piping
Fig. 4—Building 110 - Basement mechanical room, north wall
A-11
STEAM TUNNELS - BLACK AVE TO MCCLELLAN AVE
Steam Tunnel - Black Ave tunnel at Bldg 15 entrance
Steam Tunnel - Black Ave tunnel at manhole Steam Tunnel - Piping and supports
Steam Tunnel - Piping and supports
Steam Tunnels - condensate return piping
Steam Tunnel - steel channel support Steam Tunnel - Piping and supports Steam Tunnel - Piping and supports
Hampton Veterans Affairs Medical Center, Hampton, VA, Correct FCA Deficiencies Steam Distribution System | December 9, 2022
A-10
Steam Tunnel - PRV valve
Black Avenue - Tunnel Access Black Avenue - Tunnel Access
Steam Tunnel - Piping and supports Steam Tunnel - Piping and supports
Steam Tunnel - Piping and supports
Steam Tunnel - Piping and supports
1 2 3 4
6 7
2 3 4