59020903_Addendum_2_08082024 AMEND 0012.pdf

PDF 574 KB Posted

Attached to
Y1DZ--Correct FCA Deficiencies Steam 590-20-903 Distribution System
Solicitation number
36C24624R0045
Issued by

About this file

This document appears to be an Addendum to a federal contract for the Correction of FCA Deficiencies to the Steam Distribution System at the Hampton VA Medical Center. It provides supplemental instructions and revised drawings, specifically to update Detail #8 for steam and condensate single expansion joint (SEJ) type bellows. The related federal contract opportunity is for the Correct FCA Deficiencies Steam 590-20-903 Distribution System, with Solicitation Number 36C24624R0045, issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6. The addendum does not contain any information about required products or services, response dates, award dates, pricing terms, set asides, incumbents, or other salient details beyond the technical revisions provided.

View the file

Other files

File Type Posted
36C24624R0045 0013.docx DOCX document
36C24624R0045 0012.docx DOCX document
20240628_SteamT Investigation_AMcD.pdf PDF
36C24624R0045 0011.docx DOCX document
36C24624R0045 0010.docx DOCX document
RFI 011 for Mech work.pdf PDF
36C24624R0045 0009.docx DOCX document
36C24624R0045 0008.docx DOCX document
Attach 1 RFI 009 - CO comments Amend 0008.pdf PDF
RFI 010 a Amend 0008.pdf PDF
Attachment I - RFI 010.pdf PDF
Attachment J - 59020903_Addendum_1_05302024_W RFI10.pdf PDF
36C24624R0045 0007.docx DOCX document
Attach 1 RFI 009 - Revision 3 - BAE Response_Redacted.pdf PDF
36C24624R0045 0006.docx DOCX document
Attach 2 RFI 009 Specification Appendix 2.pdf PDF
ATTENDANCE LOG - PRE PROPOSAL SITE VISIT Steam.pdf PDF
36C24624R0045 0005.docx DOCX document
BAE Response - RFI 005 04.12.24_Redacted.pdf PDF
BAE Response - RFI 007 04.12.24_Redacted.pdf PDF
BAE Response - RFI 008 04.15.24_Redacted.pdf PDF
36C24624R0045 0004.docx DOCX document
BAE Field Report additional photos Part 3.pdf PDF
Attachment J - Bonding Information.docx DOCX document
BAE Field Report additional photos Part 1.pdf PDF
BAE Field Report additional photos Part 4.pdf PDF
36C24624R0045 0003.docx DOCX document
BAE Field Report additional photos Part 2.pdf PDF
Portion of BOD.pdf PDF
20240315_M001.pdf PDF
36C24624R0045 0002.docx DOCX document
20240315_A102_N.pdf PDF
36C24624R0045 0001.docx DOCX document
Attachment B - Corp Experience Form.docx DOCX document
Attachment D - EMR Certification Form 2024.docx DOCX document
Attachment C - Past Performance Questionnaire.docx DOCX document
Attachment E - RFI Form R0045.doc DOC document
Attachment F - Cost Breakdown with Schedule of Values.xlsx XLSX spreadsheet
Attachment H - Boiler Plant and Site Visit.pdf PDF
590-20-903_Dwg Pkg.pdf PDF
Appendix E_Hampton-Asb LBD Report.pdf PDF
Attachment G - Contractor Training Requirements 590-20-903_11-2-2023.pdf PDF
Attachment I - Construction Safety Pamphlet for Dist.pdf PDF
Attachment A - Wage Determination VA20240022 Mod 1 Dated 02232024.pdf PDF
36C24624R0045_RFP.docx DOCX document
590-20-903 IFB_Specs.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TO: Anna Bernas-Kelly (COR)

Hampton VA Medical Center

100 Emancipation Drive

Hampton, VA 23667

PROJECT NAME: Correct FCA Deficiencies Steam Distribution System

CONTRACT NO: 36C24624R0045

STATION PROJECT NO: 590-20-903

A/E PROJECT NO: 22-118

ADDENDUM NO. #2

ISSUE DATE: 08/08/2024

The following instructions and the listed documents below are hereby created to be incorporated as part of the contract documents.

SUPPLEMENTAL INSTRUCTIONS:

1. This Addendum is being submitted to provide an updated detail.

SPECIFICATIONS INCLUDED AS PART OF THIS ASI:

NONE.

DRAWINGS INCLUDED AS PART OF THIS ASI:

1. M501. Detail #8 was added for steam and condensate single expansion joint (SEJ) type bellows.

END OF ADDENDUM #2

ANCHOR BOLTS

D=PIPE O.D.

P

D+ NOTE a C

NOTES:

a.INSTALL WALL PLATE FIRST THEN

WELD ON REMAINING ASSEMBLY.

ONE WALL PLATE FOR BOTH

CHILLED WATER S.&R. IS OPTIONAL.

NOTE a

T

E

D=PIPE O.D.

P

T

L+3"[76]

L+4" [101]

L+8" [203]

ANCHOR BOLTS

N=NUMBER

S=SIZE

DRILL Ø S+1/8"[3.175]

D+4"[101]

D+8"[230]

PIPE ANCHOR SCHEDULE

D L P T E N S

6" 81 2" 3

4" 3 8"

4" 4" 7

8"

BOLT PATTERN

8" 3 4" 1

2" 1 4" 4" 7

8"

10"

12"

14"

16"

18"

12"

14"

16"

18"

20"

4"

4"

4"

4"

1"

2"

2"

2"

2"

8"

4"

4"

2"

2"

4"

4"

4"

4"

6"

8" 8"

8"

8"

1"

IN MM MM MM MM MM MM MM

216 22

102610

IN IN IN IN IN IN

2" 13

10" 254

NOTE:

a. WHERE USED FOR COPPER TUBE OR PIPE, BRAZE TO FABRICATED STEEL

ANCHOR

STL PIPE OR COPPER

TUBE

INSULATE AS INDICATED FOR ALL

CHILLED WATER. INSULATE PIPE

ONLY FOR STEAM & CONDENSATE

5/16" [8]

D+1" D+[25]

N=NUMBER

S=SIZE DRILL Ø =

S+1/16" DRILL Ø =

S+[2]

D+1 1/2" D+[38]

D+3 3/4" D+[95]

D+2 1/2" D+[64]

D+4 3/4" D+[121]

INSULATE AS INDICATED FOR ALL CHILLED

WATER. INSULATE PIPE ONLY FOR STEAM &

CONDENSATE

SPIDER

NOTES:

1.

2.

INSTALL PIPE INSULATION COMPLETELY THRU ENTIRE PIPE GUIDE.

FACTORY PAINT GUIDE WITH ENAMEL FINISH.

BOLTS

MANUFACTURED COPPER PIPE GUIDE

MANUFACTURED PIPE GUIDE

NOTE: ALL WELDED CONSTRUCTION.

NOTE: FOR WALL MOUNTED PIPE WITHIN FINNED

TUBE ENCLOSURES AND BEHIND UNIT

VENTILATORS. (3/4" THRU 1 1/4" DIAMETER.)

STEEL BRACKET

NYLON PIPE

GUIDE

BOLTS

INSTALL FOR MAXIMUM TRAVEL

DIRECTION OF

PIPE TRAVELDIELECTRIC LEAD SPACER ON

COPPER PIPE ONLY

PIPE

PIPE CLAMP TIGHT TO

BARE PIPE.

GUIDE MOUNTING

BOLT HOLES

STEEL

MOUNTING

FRAME

ALIGNMENT GUIDES

SEE GUIDE DETAIL.

SLIP TYPE EXPANSION JOINT.

ALIGNMENT GUIDES SEE

GUIDE DETAIL.MAIN ANCHOR

ANCHOR

4" CHANNEL BASE

GUSSET PLATE

INSULATION

ANCHOR

SADDLE: GRINNEL SERIES

160 THRU 162 OR EQUAL.1/2" MIN. GUIDE

EXTENSION BEYOND

INSULATION.

4" CHANNEL FRAME

PIPE ROLL STAND

GRINNEL #271 OR

EQUAL.

4 x D

MAX

4 x D

MAX

14 x D

MAX SEE TABLE FOR ADDITIONAL GUIDE SPACING

ANCHOR EXPANSION JOINT 1ST GUIDE 2ND GUIDE ADDT'L GUIDES

PIPE SIZE

MAX DISTANCE

FROM BELLOWS TO

1ST GUIDE/ANCHOR

APPROX. DISTANCE

FROM 1ST GUIDE

TO 2ND GUIDE

APPROX. DISTANCE

BETWEEN ADDITIONAL

PIPE GUIDES AT 150PSI

PIPE ANCHOR, EXPANSION JOINT, AND GUIDE SPACING

1" 4" 1' 4" 12' 2" 8" 2' 4" 18' 3" 1' 3' 6" 23' 4" 1' 4" 4' 8" 31' 6" 2' 7' 40' 8" 2' 8" 9' 4" 45'

LARGE PIPE ANCHOR 6" -18"

NTS1

SMALL PIPE ANCHOR 1 1/2"- 4"

NTS2

STEAM AND CONDENSATE PIPE DOUBLE EXPANSION JOINT

NTS3

TYPICAL PIPE ALIGNMENT GUIDE

NTS4

PIPING GUIDE SPACING

NTS5SUPPORT/ANCHOR FOR PIPE RISERS

NTS6

CONCRETE EQUIPMENT BASES

NTS

NOTE: ALL WELDED CONSTRUCTION.

BELLOWS MULTI-PLY

304 STAINLESS STEEL

ALIGNMENT GUIDES SEE

GUIDE DETAIL.MAIN ANCHOR

ANCHOR

4" CHANNEL BASE

GUSSET PLATE

INSULATION

ANCHOR

SADDLE: GRINNEL SERIES

160 THRU 162 OR EQUAL.1/2" MIN. GUIDE

EXTENSION BEYOND

INSULATION.

4" CHANNEL FRAME

PIPE ROLL STAND

GRINNEL #271 OR

EQUAL.

STEAM AND CONDENSATE PIPE SINGLE EXPANSION JOINT (SEJ)

NTS8

DRAIN HOUSING/PIPE

SCHEDULE STD

CARBON STEEL

WELD ENDS

SCHEDULE STD

CARBON STEEL

INTERNAL

GUIDE RING

LIFTING LUG

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

K:

\C

C G

_P R

O

JE

C

TS

\2

2\

-1

_5

-2 0-

3_

H am pt on

, V A_

FC

A

St ea m D ef ic it\

0- D es ig n D oc um en ts

\4

D ra w in gs

\W O

R

KI

N G

\A U

TO

C

AD

\5

-2

0-

_M

1.

dw g 8/

8/

0:

:5

AM

ISSUE FOR BIDOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

CORRECT FCA DEFICIENCIES

STEAM DISTRIBUTION SYSTEM

HAMPTON, VIRGINIA

590-20-903

Project Director

Revisions: Date:

www. bancroft-ae.com

BAE PROJECT NO. 22-118

3300 Dundee Road Northbrook, IL 60062

T: 847.952.9362

VA CONTRACT NO. 36C24622C007030% DESIGN DEVELOPMENT SUBMISSION 12/09/2022

05/30/2024

60% DESIGN DEVELOPMENT SUBMISSION 04/10/2023

95% CONSTRUCTION DOCUMENTS SUBMISSION 08/02/2023

100% CONSTRUCTION DOCUMENTS SUBMISSION 10/09/2023

ISSUE FOR BID 11/14/2023

ADDENDUM 1 05/30/2024

ADDENDUM 2 08/08/2024

MECHANICAL - DETAILS

RH RR

M501

File details come from the government source that posted it. Updated .