36C24624R0045 0001.docx

DOCX document 28 KB Posted

Attached to
Y1DZ--Correct FCA Deficiencies Steam 590-20-903 Distribution System
Solicitation number
36C24624R0045
Issued by

About this file

This amendment to a solicitation provides additional responses to contractor questions and extends the proposal due date to April 22, 2024 at 1:00 PM EST. The work involves correcting deficiencies in the steam distribution system at the Hampton VA Medical Center. The solicitation was issued by the Department of Veterans Affairs Network Contracting Office and involves trades such as abatement, concrete, structural steel, joint sealants, painting, electrical, earthwork, and plantings. The value is estimated between $5 million and $10 million. A site visit was originally scheduled but has been cancelled and will be rescheduled. Commercial and Institutional Building Construction is the applicable NAICS code rather than Plumbing, Heating, and Air Conditioning Contractors. Past performance questionnaires and the Submittal Exchange program should be used rather than a specified but obsolete system. Additional safety protocol details will be provided prior to rescheduling the site visit.

View the file

Other files

File Type Posted
36C24624R0045 0013.docx DOCX document
59020903_Addendum_2_08082024 AMEND 0012.pdf PDF
36C24624R0045 0012.docx DOCX document
20240628_SteamT Investigation_AMcD.pdf PDF
36C24624R0045 0011.docx DOCX document
36C24624R0045 0010.docx DOCX document
RFI 011 for Mech work.pdf PDF
36C24624R0045 0009.docx DOCX document
36C24624R0045 0008.docx DOCX document
Attach 1 RFI 009 - CO comments Amend 0008.pdf PDF
RFI 010 a Amend 0008.pdf PDF
Attachment I - RFI 010.pdf PDF
Attachment J - 59020903_Addendum_1_05302024_W RFI10.pdf PDF
36C24624R0045 0007.docx DOCX document
Attach 1 RFI 009 - Revision 3 - BAE Response_Redacted.pdf PDF
36C24624R0045 0006.docx DOCX document
Attach 2 RFI 009 Specification Appendix 2.pdf PDF
ATTENDANCE LOG - PRE PROPOSAL SITE VISIT Steam.pdf PDF
36C24624R0045 0005.docx DOCX document
BAE Response - RFI 005 04.12.24_Redacted.pdf PDF
BAE Response - RFI 007 04.12.24_Redacted.pdf PDF
BAE Response - RFI 008 04.15.24_Redacted.pdf PDF
36C24624R0045 0004.docx DOCX document
BAE Field Report additional photos Part 3.pdf PDF
Attachment J - Bonding Information.docx DOCX document
BAE Field Report additional photos Part 1.pdf PDF
BAE Field Report additional photos Part 4.pdf PDF
36C24624R0045 0003.docx DOCX document
BAE Field Report additional photos Part 2.pdf PDF
Portion of BOD.pdf PDF
20240315_M001.pdf PDF
36C24624R0045 0002.docx DOCX document
20240315_A102_N.pdf PDF
Attachment B - Corp Experience Form.docx DOCX document
Attachment D - EMR Certification Form 2024.docx DOCX document
Attachment C - Past Performance Questionnaire.docx DOCX document
Attachment E - RFI Form R0045.doc DOC document
Attachment F - Cost Breakdown with Schedule of Values.xlsx XLSX spreadsheet
Attachment H - Boiler Plant and Site Visit.pdf PDF
590-20-903_Dwg Pkg.pdf PDF
Appendix E_Hampton-Asb LBD Report.pdf PDF
Attachment G - Contractor Training Requirements 590-20-903_11-2-2023.pdf PDF
Attachment I - Construction Safety Pamphlet for Dist.pdf PDF
Attachment A - Wage Determination VA20240022 Mod 1 Dated 02232024.pdf PDF
36C24624R0045_RFP.docx DOCX document
590-20-903 IFB_Specs.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 590-20-903 36C246 Department of Veterans Affairs Network Contracting Office 6 1201 Broad Rock Blvd Richmond VA 23249 36C246 Department of Veterans Affairs Network Contracting Office 6 1201 Broad Rock Blvd Richmond VA 23249 To all Offerors/Bidders

36C24624R0045 03-13-2024

X X X

NEW DUE DATE APRIL 22, 2024, 1:00 PM EST

X

The purpose for this amendment to the solicitation is to provide remaining responses to RFIs received and to cancel the site visit initially Scheduled for Friday, March 15, 2024. SEE CONT

INUATION PAGE

*********** IMPORTANT OFFEROR INFORMATION*********

The Site Visit has been CANCELLED and will be rescheduled.

The Proposal due date has been e xtended to Monday, April 22, 2024 at 1:00 PM

EST

Madeline Lucena-Pulst Contracting Officer

AMEND 0001 CONTINUATION PAGE

Origination Date
RFI NO.
Question
Respondent
Response
3/8/2024
001
This project is currently solicited under the NAICS 238160 for small businesses with less than $19.0 million annual revenue. However, this project is estimated magnitude of construction between $5,000,000.00 and $10,000,000.00. Additionally, this project includes multiple trades beyond just 238220 Plumbing, Heating, and Air Conditioning Contractors; to include abatement, concrete, structural steel, joint sealants, painting, electrical, earthwork, and plantings.

In order to ensure the Richmond VA Medical Center receives bids from qualified contractors, capable of handling a $5-10M project with multiple trades, will you allow a business that is considered small under 236220 Commercial and Institutional Building Construction or 237110 Water and Sewer Line and Related Structures Construction bid this project? Those NAICS would be more applicable to this larger, multi-trade project.

VA
The work is to be done in Hampton, not Richmond. NAICS code 238220 Plumbing, Heating, and Air Conditioning Contractors is hereby replaced by NAICS Code 236220 Commercial Building Contractors.
3/12/2024
002
1. Can CPARs be used in lieu of PPQs?

2. Contractor must use “VA TRIGIA CPMS” per the specifications. This program does not seem to exist anymore, and we request this be changed to the Submittal Exchange which is widely used in NCO 6.

3. For the site visit, the solicitation states to fill the permit out 24 hours prior to the site visit. The actual permit readings need to be taken at the same time as the permit is being issued, this is not possible 24 hours prior. This would require the contractor to bring a full staff to enter, remain, and exit the tunnel to properly follow OSHA standards. They would also have to provide safety equipment and air monitoring equipment to access the tunnel for the site visit. This is going to create a logistical nightmare for each contractor attempting to gain access to the tunnel. We believe that since a majority of the work is in the tunnel, it is imperative to have a proper site investigation. Without being able to investigate the site, poor subcontractor bid participation is expected. For the government to receive the best value and price on this project, the contractors must have the opportunity to access the tunnel. As it currently stands, the procedure for going in the tunnel at the site visit is conflicting and confusing. OSHA defines that the “host” is responsible for coordination of entry and exit to the confined space. We have attached the OSHA regulations regarding hosting for your convenience. They are highlighted in yellow. We need times of the required safety training, how long it will take, and details for scheduling. We feel it would be reasonable to consider the possibility of briefing the entire crew at one time during the site visit. Will the COR accompany the contractor into the tunnel so that the contractor knows where the work is to be performed?

VA

VA

VA

1. Yes.

2. <Pending response from VA Engineering.>

3. Site Visit has been cancelled. Safety and Engineering will provide additional guidance prior to rescheduling the site visit.

END OF AMENDMENT 36C24624R0045 0001