36C24619B0039-013.pdf

PDF 5 MB Posted

Attached to
Construct New Clinical Lab Expansion (VA-18-00152139) Federal contract opportunity
Solicitation number
36C24619B0039
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6

About this file

This solicitation seeks a qualified Service Disabled Veteran Owned Small Business to construct a new clinical lab expansion project located at a VA medical center in Richmond, Virginia. The project includes approximately 18,050 square feet of partial renovation and addition work with an estimated construction cost between $5,000,000 to $10,000,000. Drawings and specifications will be provided in the solicitation on or about August 15, 2019. Questions must be emailed to the Contracting Officer by the specified due date. The work shall be completed within 680 calendar days of receiving the notice to proceed. This is a 100% set-aside for SDVOSBs.

36C24619B0039 S02 PLUMBING_Bid_Documents.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Construct New Clinical Lab Expansion (VA-18-00152139), newest first.
File Type Posted
36C24619B0039-0003000.docx DOCX document
36C24619B0039-0003002.pdf PDF
36C24619B0039-0003003.pdf PDF
36C24619B0039-0003001.pdf PDF
36C24619B0039-0003002.pdf PDF
36C24619B0039-0003000.docx DOCX document
36C24619B0039-0003001.pdf PDF
36C24619B0039-0003003.pdf PDF
36C24619B0039-0002000.docx DOCX document
36C24619B0039-0002000.docx DOCX document
36C24619B0039-0001000.docx DOCX document
36C24619B0039-0001000.docx DOCX document
36C24619B0039-012.pdf PDF
36C24619B0039-013.pdf PDF
36C24619B0039-010.pdf PDF
36C24619B0039-007.pdf PDF
36C24619B0039-005.pdf PDF
36C24619B0039-002.docx DOCX document
36C24619B0039-006.pdf PDF
36C24619B0039-009.pdf PDF
36C24619B0039-008.pdf PDF
36C24619B0039-003.pdf PDF
36C24619B0039-004.pdf PDF
36C24619B0039-001.docx DOCX document
36C24619B0039-011.pdf PDF
36C24619B0039-010.pdf PDF
36C24619B0039-002.docx DOCX document
36C24619B0039-012.pdf PDF
36C24619B0039-009.pdf PDF
36C24619B0039-005.pdf PDF
36C24619B0039-008.pdf PDF
36C24619B0039-006.pdf PDF
36C24619B0039-007.pdf PDF
36C24619B0039-011.pdf PDF
36C24619B0039-001.docx DOCX document
36C24619B0039-004.pdf PDF
36C24619B0039-003.pdf PDF
36C24619B0039-000.docx DOCX document
36C24619B0039-000.docx DOCX document
Show all 39

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PLUMBING VALVE SYMBOLS

BALL VALVE

CHECK VALVE

ANGLE GLOBE VALVE

BUTTERFLY VALVE

MODULATING CONTROL VALVE

TWO POSITION CONTROL VALVE

THREE-WAY MODULATING CONTROL VALVE

AUTOMATIC FLOW CONTROL VALVE

PRESSURE RELIEF VALVE

MANUAL AIR VENT

TEST PLUG (PRESSURE/TEMPERATURE)

GLOBE VALVE

PRESSURE REGULATING VALVE

THREE-WAY TWO POSITION CONTROL VALVE

AUTOMATIC AIR VENT

AV

FE

GENERAL PLUMBING SYMBOLS

LIMIT OF DEMOLITION

ANCHOR

REDUCER OR INCREASER

DIRECTION OF FLOW

SIDE CONNECTION

ECCENTRIC REDUCER

BOTTOM CONNECTION, 45° OR 90°

TOP CONNECTION, 45° OR 90°

DIRECTION OF PIPE PITCH (DOWN)

UNION

RISE OR DROP IN PIPE

CAPPED OUTLET

AND EXISTING WORK

POINT OF CONNECTION BETWEEN NEW

PRESSURE GAGE

THERMOMETER

STRAINER

FLOW ELEMENT

PIPE UP

PIPE DOWN

CO CLEAN OUT

HOSE BIB

PUMP

PLUMBING PIPING SYMBOLS

DOMESTIC HOT WATER, HOT WATER

DOMESTIC COLD WATER, COLD WATER

DOMESTIC HOT WATER RETURN, HOT WATER RETURN

STORM DRAIN

SANITARY VENT

SANITARY SEWER

PA PASCAL

PD PRESSURE DROP OR DIFFERENCE

PDI PLUMBING AND DRAINAGE INSTITUTE

PG PRESSURE GAGE

PP PLUMBING PUMP

PPM PARTS PER MILLION

PRS PRESSURE REDUCING STATION

PRV PRESSURE REDUCING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH

ATMOSPHERE

PSIG POUNDS PER SQUARE INCH GAUGE

PTRV PRESSURE TEMPERATURE RELIEF

VALVE

PW POTABLE WATER

RD ROOF DRAIN

RDL ROOF DRAIN LEADER

RL ROOF LEADER

RO REVERSE OSMOSIS WATER

RWL RAIN WATER LEADER

SAN SANITARY SEWER

SMACNA SHEET METAL AND AIR CONDITIONING

CONTRACTORS NATIONAL ASSOCIATION

SCFM STANDARD CUBIC FOOT/MINUTE

SCW SOFTENED COLD WATER

SDMH STORM DRAIN MANHOLE

SP SUMP PUMP

SPR SPRINKLER LINE

SQFT SQUARE FEET

SS STAINLESS STEEL

ST STORAGE TANK

SW STORM WATER

TCV TEMPERATURE CONTROL VALVE

TD TEMPERATURE DIFFERENCE

TD TRENCH DRAIN

TDH TOTAL DYNAMIC HEAD

TEMP TEMPERATURE

TMV THERMOSTATIC MIXING VALVE

TP TRAP PRIMER

TSTAT THERMOSTAT

TWR TEMPERED WATER RETURN

TWS TEMPERED WATER SUPPLY

TYP TYPICAL

UPC UNIFORM PLUMBING CODE

V VENT

VAC VACUUM

VB VACUUM BREAKER

VCO VACUUM CLEANER OUTLET

VP VACUUM PUMP

VS VENT STACK

VSMC VARIABLE SPEED MOTOR CONTROLLER

VTR VENT THROUGH ROOF

W WASTE

WC WATER CLOSET

WCO WALL CLEANOUT

WG WATER GAGE

WH WALL HYDRANT

WH WATER HEATER

WHA WATER HAMMER ARRESTER

WL WATER LINE

WM WATER METER

WPD WATER PRESSURE DROP

WS WASTE STACK

YCO YARD CLEANOUT

YH YARD HYDRANT

L/S LITER PER SECOND

LA LABORATORY AIR

LAV LAVATORY

LBS/HR POUNDS PER HOUR

LCW LABORATORY COLD WATER

LHW LABORATORY HOT WATER

LNG LIQUID NATURAL GAS

LOX LIQUID OXYGEN

LV LABORATORY VACUUM

LW LOW WATER

M METER

MA MEDICAL AIR

MAV MANUAL AIR VENT

MBH 1000 BTUH

MED MEDICAL

MER MECHANICAL EQUIPMENT ROOM

MH MANHOLE

MOU MEMORANDUM OF UNDERSTADING

MSB MOP SERVICE BASIN

MV MEDICAL VACUUM

N2 NITROGEN

N20 NITROUS OXIDE

NC NORMALLY CLOSED

NG NATURAL GAS

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NOM NOMINAL

NPW NON POTABLE WATER

NTS NOT TO SCALE

O2 OXYGEN

OC ON CENTER

OD OUTSIDE DIAMETER

OR OPERATING ROOM

ORD OVERFLOW ROOF DRAIN

OVFL OVERFLOW

KW KILOWATT

KWHR KILOWATT-HOUR

ICW INDUSTRIAL COLD WATER

INV INVERT

IPC INTERNATIONAL PLUMBING CODE

IRW IRRIGATION WATER

IW INDIRECT WASTE

IWH INSTANTANEOUS WATER HEATER

IWR INDUSTRIAL WATER RETURN

IWS INDUSTRIAL WATER SUPPLY

H&CW HOT AND COLD WATER

HB HOSE BIBB

HD HUB DRAIN

HEX HEAT EXCHANGER

HP HORSEPOWER

HS HAND SINK

HST HOT WATER STORAGE TANK (DOMESTIC)

HWB HOT WATER BOILER

HWCP HOT WATER CIRCULATING PUMP

HWP HOT WATER PUMP

HYD HYDRANT

GAL GALLON

GCO GRADE CLEANOUTS

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GPR GAS PRESSURE REGULATOR

GRS GAS REGULATOR STATION

GT GREASE TRAP

GVTR GAS VENT THROUGH ROOF

GWH GAS FIRED WATER HEATER

PLUMBING ABBREVIATIONS

F FAHRENHEIT

FCO FLOOR CLEANOUT

FCW FILTERED COLD WATER

FD FLOOR DRAIN

FDC FIRE DEPARTMENT (HOSE) CONNECTION

FM FLOW METER

FOP FUEL OIL PUMP

FOR FUEL OIL RETURN

FOS FUEL OIL SUPPLY

FOV FUEL OIL VENT

FS FLOOR SINK

FS FLOW SWITCH

FU FIXTURE UNITS

EL ELEVATION

EMCS ENERGY MONOSERRAT AND CENTRAL

SYSTEM

EPA ENVIROMENTAL PROTECTION AGENCY

EPACT ENERGY POLICY ACT

ESC ESCUTCHEON

ESH EMERGENCY SHOWER

ET EXPANSION TANK

EWC ELECTRIC WATER COOLER

EWH ELECTRIC WATER HEATER

EWS EYE WASH STATION

EX EXISTING

DCW DOMESTIC COLD WATER

DHW DOMESTIC HOT WATER

DHWR DOMESTIC HOT WATER RETURN

DHWR DOMESTIC WATER RETURN

DHWS DOMESTIC HOT WATER SUPPLY

DI DEIONIZED WATER

DN DOWN

DOE DEPARTMENT OF ENERGY

DS DOWNSPOUT

DW DISHWASHER

DWG DRAWING

DWH DOMESTIC WATER HEATER

DWR DRINKING WATER RETURN

DWS DRINKING WATER SUPPLY

DWV DRAIN WASTE VENT

C CELSIUS

CGA COMPRESSED GAS ASSOCIATION

CI CAST IRON

CO CLEANOUT

CS CLINICAL SINK

CV CONTROL VALVE

BFP REDUCED PRESSURE BACKFLOW

PREVENTER

BHP BREAK HORSEPOWER

BSP BLACK STEEL PIPE

BT BATHTUB

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

A/E ARCHITECT / ENGINEER

AD AREA DRAIN

AFF ABOVE FINISH FLOOR

AFG ABOVE FINISH GRADE

AG AIR GAP

AP ACCESS PANEL

AS AUTOMATIC SPRINKLER

ASD ADJUSTABLE SPEED DRIVES

ASD AUTOMATIC SPRINKLER DRAIN

ASHRAE AMERICAN SOCIETY HEATING,

REFRIGERATION, AIR CONDITIONING

ENGINEERS

ASME AMERICAN SOCIETY MECHANICAL

ENGINEERS

ASPE AMERICAN SOCIETY PLUMBING

ENGINEERS

ASR AUTOMATIC SPRINKLER RISER

AV ACID VENT

AW ACID WASTE

P-3

TYPICAL UNIT NO.

PUMP NO. 3

EQUIPMENT ABBREVIATION (PUMP)

CIRCUIT SETTER (BALANCING VALVE)

WATER HAMMER ARRESTOR

GATE VALVE

ACID WASTE

ACID VENT

INSTRUMENT AIR

CARBON DIOXIDE

CONDENSATE DRAINCD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD

LOW PRESSURE STEAMLPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS

MEDIUM PRESSURE STEAMMPS MPS MPS MPS MPS MPS MPS MPS MPS MPS MPS MPS MPS MPS MPS MPS MPS MPS MPS MPS MPS MPS MPS MPS MPS MPS MPS MPS MPS MPS MPS MPS MPS MPS MPS MPS MPS

DE-IONIZED WATER

PNEUMATIC TUBE SYSTEM PIPE

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

F i l e

P a t h

FULLY

SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:

ARCHITECT/ENGINEER OF RECORD

SEAL

CONSULTANT

321 4 5 6 7 8 9 10

NEW CLINICAL LAB FOR

SURGICAL EXPANSION

RICHMOND, VIRGINIA

652-319

PROJECT DIRECTOR

AUGUST 2018

REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

BID DOCUMENTS

DWG. OF 162

NAME: TINA DEBELLA, PE

PHONE: 804.675.5495

EMAIL: Tina.DeBella@va.gov

PLUMBING ABBREVIATIONS & SYMBOLS

PL001

DMDCDL

13 Aug 2018

2"

3"

2" 3"

10" SD RISER

12"

8"10"

10" 8"

6"

6"

3" VTR

5" VTR

3" VTR

3" VTR

W V U T S R Q P N

W V U T S R Q P N

8" SD RISER

2"

3"

3"

2" 7

3"

3"

4"

3"

3"

3"

3"7

3"

3"3"

3"

3"

3"

3"

3"

3"

3"

2"

3"3"

2"

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

COCO

CO

CO

CO

CO

4"

4"

4"

2"

4" 2"

4"4"

CO

CO

CO

CO

3"

4"

3"

T-2 pH MONITORING

PANEL

3" VTR

CO

CO

T-1

CO

CO

CO

4"

4"

3"

CO

3"

4 4 4

4 CO

8" RISER FROM 3RD

FLR INTERSTITIAL

2"

CO

CO

7 KEY NOTES

1. NEW 4" RISER DROPS THROUGH FLOOR TO 1ST FLOOR MECH

ROOM AND CONNECTS TO EXISTING 4" RISER. IF BID

ALTERNATE SELECTED TO EXCLUDE BATHROOM FINISHES,

EXCLUDE STANDARD SANITARY SEWER DRAINAGE SYSTEM.

INSTALL SANITARY VENT SYSTEM EXTENSION FROM 2ND FLR.

2. ABANDON SYSTEM IN PLACE. BID ALTERNATE.

3. REROUTE EXISTING VENTS THRU ROOF IN 2ND INTERSTITIAL

TO LOCATION INDICATED. FILL PENETRATION.

4. REMOVE R.D. SEAL PENETRATIONS (NOT BID ALTERNATE).

5. OFFSET AND EXTEND EXISTING STORM DRAIN RISER TO 3RD

FLOOR INTERSTITIAL. REDUCE FROM 10" TO 8" DIA.

6. EXTEND EXISTING VENT THRU ROOF

7. 1 1/2" CRP SANITARY UP

8. 3" CRP SANITARY UP

9. 4" CRP SANITARY UP

10. 2" CRP SANITARY UP

11. DEMOLISH 3" ATVTR (GALVANIZED STEEL VENT FOR

ABANDONED 2ND FLOOR STEAM STERILIZERS) AND FILL

PENETRATIONS. INCLUDE ALL HANGERS AND

APPURTENANCES RELATED TO THIS SYSTEM.

12. 4" SANITARY UP

13. 1 1/2" SANITARY UP

14. 3" SANITARY UP

15. 2" SANITARY UP

16. INSTALL PIPE CHASE THOUGH SLAB 12" X 30"

1. COORDINATE ALL WORK WITH GENERAL CONTRACTOR,

OTHER TRADES, AND THE COR TO MINIMIZE DISRUPTION OF

AREAS OUTSIDE OF THE PROJECT LIMITS OF WORK.

2. ALL TIE-INS TO EXISTING SYSTEMS TO BE COORDINATED AND

SCHEDULED WITH VAMC. ASSUME ALL TIE-INS WILL BE

PERFORMED DURING OFF PEAK HOURS (NIGHTS AND

WEEKENDS).

3. COORDINATE PLUMBING INSTALLATION WITH OTHER TRADES.

OFFSET LINES AS NEEDED TO AVOID CONFLICTS.

4. PIPING HAS BEEN INDICATED ON DRAWINGS IN APPROXIMATE

LOCATIONS. EXACT ROUTING WILL BE DETERMINED IN THE

FIELD.

5. FIELD VERIFY ALL EXISTING PLUMBING PIPE LOCATIONS,

SIZES, AND INVERTS.

6. SLEEVE ALL PENETRATIONS, FIRESTOP OR SEAL AS

REQUIRED.

7. REFER TO ARCHITECTURAL PLANS FOR RATED WALL

LOCATIONS.

8. COORDINATE CLEANOUTS AND FLOOR DRAINS WITH

ARCHITECTURAL FINISH PLAN.

9. ALL HANGAR SUPPORTS SHALL BE INSTALLED VERTICALLY

AND UPRIGHT

10. ALL PIPES SHALL BE INSTALLED PARALLEL AND

PERPENDICULAR TO BUILDING

11. PROVIDE HOUSEKEEPING PADS FOR ALL FLOOR MOUNTED

EQUIPMENT.

12. NEW SANITARY RISERS REQUIRE CORE DRILLING TO

INTERSTITIAL SPACES. COORDINATE PENETRATIONS WITH

CONCRETE WAFFLE SLAB. ADJUST AS NECESSARY TO AVOID

DAMAGING STRUCTURAL MEMBERS.

13. ALL STORM DRAINS SLOPED 18"/FT MINIMUM.

14. LIGHT WEIGHT LINES ARE EXISTING VENT LINES. THEY ARE

TO REMAIN UNLESS OTHERWISE NOTED.

GENERAL NOTES

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

F i t h

FULLY

SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:

ARCHITECT/ENGINEER OF RECORD

SEAL

CONSULTANT

321 4 5 6 7 8 9 10

NEW CLINICAL LAB FOR

SURGICAL EXPANSION

RICHMOND, VIRGINIA

652-319

PROJECT DIRECTOR

AUGUST 2018

REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

BID DOCUMENTS

DWG. OF 162

NAME: TINA DEBELLA, PE

PHONE: 804.675.5495

EMAIL: Tina.DeBella@va.gov

2ND FLOOR INTERSTITIAL SPACE

PLUMBING SANITARY WASTE AND VENT

PL123

DMDCDL

SCALE:

PL123

PLUMBING SANITARY WASTE AND VENT

2ND FLOOR INTERSTITIAL SPACE

1/8" = 1'-0"

NPQRSTUVW

X

Wn

P-707

P-707

P-101

P-201

P-502

P-418

P-202

P-101 [3]

P-101

P-420 [3]

P-418

P-101

P-528

P-608 [2]

FD-F

P-420 [3]

P-528 P-528

P-528

P-418

P-418P-418

P-528

P-528

P-528

FD-F

FD-E

P-524

FD-F

FD-F

P-708

P-707

FD-F

P-707

FD-F

P-418

P-707

FD-F

FD-F

FD-F

FD-F

FD-F

FD-F

FD-F

FD-F

3 3

16 6

16 3

1 1 1

4"

2"

4"

2"

1 1/2"

P-528

P-418

FD-F

P-707

3" VTR

3 3

FD-F 16

FD-F

CORRIDOR

C3F-1

CORRIDOR

C3F-2

BIOMED

3F-101

ANCILLARY TESTING

3F-103

DRUG TESTING

3F-105

IT CLOSET

3F-104

ELEC CLOS

3F-102

ACCESSIONING

3F-106a

FEE BASIS

3F-106b

MICROBIOLOGY

3F-106d

HEMATOLOGY

3F-106e

CHEMISTRY

3F-106f

REFRIGERATEDSTORAGE

3F-126

BLOOD BANK

3F-106c

CYTOLOGY

3F-106h

OPEN OFFICE

3F-106j

ARCHIVE

3F-124

CLEAN SUPPLY

3F-131

BSL-3 LAB

3F-129

STAFF TOILET

3F-108

DRUG TESTING TOILET

3F-105a

IMMUNOLOGY

3F-107

MEN'S TOILET

3F-109

WOMEN'S TOILET

3F-111

JANITOR

3F-110

EQUIPMENT ROOM

3F-130

GAS TANK ROOM

3F-127

BREAK ROOM

3F-112

CORRIDOR

C3F-3

OFFICE #1

3F-114

OFFICE #2

3F-115

OFFICE #3

3F-116

OFFICE #4

3F-117

OFFICE #5

3F-118

ADMINISTRATION

3F-120

DIRECTOR'S OFFICE

3F-121

CMT OFFICE

3F-122

OFFICE #6

3F-123

ADPAC/RESIDENTS

3F-119

FLAMMABLE

STORAGE

3F-125

ANTE ROOM

3F-128

HISTOLOGY

3F-106g

STAIR

3F-S2

CONF ROOM

3F-113

P-528

P-418

1 1. 1 1/2" ACID WASTE DOWN AND 1 1/2" ACID VENT

UP

2. OFFSET VENT AS SHOWN

3. 3" ACID WASTE DOWN

4. 4" ACID WASTE DOWN

5. 5" SANITARY VENT EXTENSION SERVING 1ST

FLOOR FIXTURES

6. 3" VENT SANITARY VENT EXTENSION SERVING

2ND FLOOR FIXTURES

7. 8" STORM DRAIN RISER

8. 1 1/2" SANITARY DOWN AND 1 1/2" VENT UP

9. 2" SANITARY DOWN

10. 1 1/2" VENT UP

11. 4" SANITARY DOWN AND 3" VENT UP

12. 4" SANITARY DOWN

13. 3" VENT UP

14. 2" SANITARY DOWN

15. WALL CLEANOUT

16. 2" ACID WASTE DOWN AND 2" ACID VENT UP

17. 3" ACID WASTE AND 3" ACID VENT UP

18. 2" SANITARY DOWN AND 2" VENT UP

19. 1.5" SANITARY VENT THROUGH ROOF FOR STEAM

STERILIZER.

20. STORM DRAIN RISER.

# KEY NOTES

GENERAL NOTES

1. COORDINATE ALL WORK WITH GENERAL

CONTRACTOR, OTHER TRADES, AND THE COR

TO MINIMIZE DISRUPTION OF AREAS OUTSIDE

OF THE PROJECT LIMITS OF WORK.

2. ALL TIE-INS TO EXISTING SYSTEMS TO BE

COORDINATED AND SCHEDULED WITH VAMC.

ASSUME ALL TIE-INS WILL BE PERFORMED

DURING OFF PEAK HOURS (NIGHTS AND

WEEKENDS).

3. COORDINATE PLUMBING INSTALLATION WITH

OTHER TRADES. OFFSET LINES AS NEEDED TO

AVOID CONFLICTS.

4. PIPING HAS BEEN INDICATED ON DRAWINGS IN

APPROXIMATE LOCATIONS. EXACT ROUTING

WILL BE DETERMINED IN THE FIELD.

5. FIELD VERIFY ALL EXISTING PLUMBING PIPE

LOCATIONS, SIZES, AND INVERTS.

6. SLEEVE ALL PENETRATIONS, FIRESTOP OR SEAL

AS REQUIRED.

7. REFER TO ARCHITECTURAL PLANS FOR RATED

WALL LOCATIONS.

8. COORDINATE CLEANOUTS AND FLOOR DRAINS

WITH ARCHITECTURAL FINISH PLAN.

9. ALL HANGAR SUPPORTS SHALL BE INSTALLED

VERTICALLY AND UPRIGHT

10. ALL PIPES SHALL BE INSTALLED PARALLEL AND

PERPENDICULAR TO BUILDING

11. PROVIDE HOUSEKEEPING PADS FOR ALL FLOOR

MOUNTED EQUIPMENT.

12. NEW SANITARY RISERS REQUIRE CORE

DRILLING TO INTERSTITIAL SPACES.

COORDINATE PENETRATIONS WITH CONCRETE

WAFFLE SLAB. ADJUST AS NECESSARY TO

AVOID DAMAGING STRUCTURAL MEMBERS.

13. ALL STORM DRAINS SLOPED 18"/FT MINIMUM.

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

F i t h

FULLY

SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:

ARCHITECT/ENGINEER OF RECORD

SEAL

CONSULTANT

321 4 5 6 7 8 9 10

NEW CLINICAL LAB FOR

SURGICAL EXPANSION

RICHMOND, VIRGINIA

652-319

PROJECT DIRECTOR

AUGUST 2018

REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

BID DOCUMENTS

DWG. OF 162

NAME: TINA DEBELLA, PE

PHONE: 804.675.5495

EMAIL: Tina.DeBella@va.gov

3RD FLOOR

PLUMBING SANITARY WASTE AND VENT

PL131

DMDPFM

SCALE:

PL102

PLUMBING SANITARY WASTE AND VENT

3RD FLOOR

4" @ 18"/1' SLOPE6" @ 18"/1' SLOPE

6" @ 18"/1' SLOPE

6" @ 18"/1' SLOPE

4" @ 18"/1' SLOPE

6"

SCALE:

PL133

PLUMBING SANITARY WASTE AND VENT

3RD FLOOR INTERSTITIAL SPACE

1/8" = 1'-0"

3" VTR

FROM

2ND FL

4" COUP TO 4" RD

UP TO 4" RD UP TO 4" RD

UP TO 4" RD

UP TO 4" RD

UP TO 4" RD

4" CO

6"

UP TO 4" RD

UP TO 4" RD

4" CO

4" CO

4" CO

1 1/2" 1 1/2" 1 1/2"

1 1/2"

2" VTR

2"

2"2"

2" 2"

2"

2"

1 1/2"

2" VTR

3" VTR

2"

2"

2"

3" VTR

3" 1 1/2"

2"

3"

1 1/2"

1 1/2"1 1/2"

3" VTR

5" VTR FROM

1ST FLR

3" VTR

FROM

2ND FL

3" VTR

FROM

2ND FL

1 1/2"2" VTR

3"3" VTR

1 1/2"

1 1/2"

2"

3" 2"3"

2" VTR

2"

2" 1 1/2" 1 1/2"

2"

3" VTR

FROM

2ND FL

3" VTR

1 1/2"

1 1/2" VTR

UP TO 4" ORD

4" CO

UP TO 4" ORDUP TO 4" ORD

UP TO 4" ORD

4" @ 18"/1' SLOPE

6" @ 18"/1' SLOPE

6" @ 18"/1' SLOPE

6" @ 18"/1' SLOPE

4" CO

4" CO

4" CO

6" ORD EXIT

TO DAYLIGHT

6" ORD EXIT

TO DAYLIGHT

UP TO 4" ORDUP TO 4" ORDUP TO 4" ORD

UP TO 4" ORD

4" @ 18"/1' SLOPE

6" @ 18"/1' SLOPE

6" @ 18"/1' SLOPE 6" @ 18"/1' SLOPE

4" CO

1" FROM

AHU COIL

COND DRAIN

TYP 4 PLACES

4" @ 18"/1' SLOPE

8" SD RISER

DROP TO 2ND FLR INTERSTITIAL

4" CO

GENERAL NOTES

1. COORDINATE ALL WORK WITH GENERAL CONTRACTOR,

OTHER TRADES, AND THE COR TO MINIMIZE DISRUPTION

OF AREAS OUTSIDE OF THE PROJECT LIMITS OF WORK.

2. ALL TIE-INS TO EXISTING SYSTEMS TO BE

COORDINATED AND SCHEDULED WITH VAMC. ASSUME

ALL TIE-INS WILL BE PERFORMED DURING OFF PEAK

HOURS (NIGHTS AND WEEKENDS).

3. COORDINATE PLUMBING INSTALLATION WITH OTHER

TRADES. OFFSET LINES AS NEEDED TO AVOID

CONFLICTS.

4. PIPING HAS BEEN INDICATED ON DRAWINGS IN

APPROXIMATE LOCATIONS. EXACT ROUTING WILL BE

DETERMINED IN THE FIELD.

5. FIELD VERIFY ALL EXISTING PLUMBING PIPE LOCATIONS,

SIZES, AND INVERTS.

6. SLEEVE ALL PENETRATIONS, FIRESTOP OR SEAL AS

REQUIRED.

7. REFER TO ARCHITECTURAL PLANS FOR RATED WALL

LOCATIONS.

8. COORDINATE CLEANOUTS AND FLOOR DRAINS WITH

ARCHITECTURAL FINISH PLAN.

9. ALL HANGAR SUPPORTS SHALL BE INSTALLED

VERTICALLY AND UPRIGHT

10. ALL PIPES SHALL BE INSTALLED PARALLEL AND

PERPENDICULAR TO BUILDING

11. PROVIDE HOUSEKEEPING PADS FOR ALL FLOOR

MOUNTED EQUIPMENT.

12. NEW SANITARY RISERS REQUIRE CORE DRILLING TO

INTERSTITIAL SPACES. COORDINATE PENETRATIONS

WITH CONCRETE SLAB. ADJUST AS NECESSARY TO

AVOID DAMAGING STRUCTURAL MEMBERS.

13. ALL STORM DRAINS SLOPED 18"/FT MINIMUM.

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

F i t h

FULLY

SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:

ARCHITECT/ENGINEER OF RECORD

SEAL

CONSULTANT

321 4 5 6 7 8 9 10

NEW CLINICAL LAB FOR

SURGICAL EXPANSION

RICHMOND, VIRGINIA

652-319

PROJECT DIRECTOR

AUGUST 2018

REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

BID DOCUMENTS

DWG. OF 162

NAME: TINA DEBELLA, PE

PHONE: 804.675.5495

EMAIL: Tina.DeBella@va.gov

3RD FLOOR INTERSTITIAL SPACE

PLUMBING SANITARY WASTE AND VENT

PL133

ROOF

3F-RF

SCALE:

PL141

ROOF PLUMBING

1/8" = 1'-0"

4" ROOF DRAIN

2,250 SQFT AREA

3" VTR

FROM

2ND FL

2" VTR

2" VTR

3" VTR

3" VTR5" VTR FROM

1ST FLR

3" VTR

FROM

2ND FL

3" VTR

FROM

2ND FL

2" VTR

3" VTR

2" VTR

CH-1

EF-1

EF-2

CU-1

3" VTR

FROM

2ND FL

3" VTR

1 1/2" VTR

P-805

3/4" CW

4" ROOF DRAIN

2,250 SQFT AREA

4" ROOF DRAIN

2,250 SQFT AREA

4" ROOF DRAIN

3,120 SQFT AREA

4" ROOF DRAIN

3,120 SQFT AREA

4" ROOF DRAIN

2,250 SQFT AREA

4" ROOF DRAIN

2,250 SQFT AREA

4" ROOF DRAIN

2,250 SQFT AREA

4" OVERFLOW

ROOF DRAIN

4" OVERFLOW

ROOF DRAIN

4" OVERFLOW

ROOF DRAIN

4" OVERFLOW

ROOF DRAIN

4" OVERFLOW

ROOF DRAIN

4" OVERFLOW

ROOF DRAIN

4" OVERFLOW

ROOF DRAIN

4" OVERFLOW

ROOF DRAIN

TYP

2" VTR

KEY NOTES

1. RELOCATE FIRE PROTECTION STANDPIPE AND

ROOF MANIFOLD

2. BID ALTERNATIVE-DELETE OVERFLOW ROOF

DRAINS AND ASSOCIATED PIPING. ADJUST ROOF

TAPERED INSULATION TO ALLOW PERIMETER

SCUPPER OVERFLOW.

3. ROOF DRAIN/OVERFLOW DRAIN COMBO SET IS

ACCEPTABLE ALTERNATIVE TO SEPARATE UNITS.

1. COORDINATE ALL WORK WITH GENERAL CONTRACTOR,

OTHER TRADES, AND THE COR TO MINIMIZE DISRUPTION

OF AREAS OUTSIDE OF THE PROJECT LIMITS OF WORK.

2. ALL TIE-INS TO EXISTING SYSTEMS TO BE

COORDINATED AND SCHEDULED WITH VAMC. ASSUME

ALL TIE-INS WILL BE PERFORMED DURING OFF PEAK

HOURS (NIGHTS AND WEEKENDS).

3. COORDINATE PLUMBING INSTALLATION WITH OTHER

TRADES. OFFSET LINES AS NEEDED TO AVOID

CONFLICTS.

4. PIPING HAS BEEN INDICATED ON DRAWINGS IN

APPROXIMATE LOCATIONS. EXACT ROUTING WILL BE

DETERMINED IN THE FIELD.

5. FIELD VERIFY ALL EXISTING PLUMBING PIPE LOCATIONS,

SIZES, AND INVERTS.

6. SLEEVE ALL PENETRATIONS, FIRESTOP OR SEAL AS

REQUIRED.

7. REFER TO ARCHITECTURAL PLANS FOR RATED WALL

LOCATIONS.

8. COORDINATE CLEANOUTS AND FLOOR DRAINS WITH

ARCHITECTURAL FINISH PLAN.

9. ALL HANGAR SUPPORTS SHALL BE INSTALLED

VERTICALLY AND UPRIGHT

10. ALL PIPES SHALL BE INSTALLED PARALLEL AND

PERPENDICULAR TO BUILDING

11. PROVIDE HOUSEKEEPING PADS FOR ALL FLOOR

MOUNTED EQUIPMENT.

12. NEW SANITARY RISERS REQUIRE CORE DRILLING TO

INTERSTITIAL SPACES. COORDINATE PENETRATIONS

WITH CONCRETE SLAB. ADJUST AS NECESSARY TO

AVOID DAMAGING STRUCTURAL MEMBERS.

13. ALL STORM DRAINS SLOPED 18"/FT MINIMUM.

GENERAL NOTES

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

F i t h

FULLY

SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:

ARCHITECT/ENGINEER OF RECORD

SEAL

CONSULTANT

321 4 5 6 7 8 9 10

NEW CLINICAL LAB FOR

SURGICAL EXPANSION

RICHMOND, VIRGINIA

652-319

PROJECT DIRECTOR

AUGUST 2018

REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

BID DOCUMENTS

DWG. OF 162

NAME: TINA DEBELLA, PE

PHONE: 804.675.5495

EMAIL: Tina.DeBella@va.gov

ROOF PLUMBING

PL141

4"

3/4"

2"

1 1/4" 1/2"

W V U T S R Q P N

W V U T S R Q P N

C D

CD

1"

CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD

1"

C D

C D

GENERAL NOTES

1. COORDINATE ALL WORK WITH GENERAL

CONTRACTOR, OTHER TRADES, AND THE COR TO

MINIMIZE DISRUPTION OF AREAS OUTSIDE OF

THE PROJECT LIMITS OF WORK.

2. ALL TIE-INS TO EXISTING SYSTEMS TO BE

COORDINATED AND SCHEDULED WITH VAMC.

ASSUME ALL TIE-INS WILL BE PERFORMED

DURING OFF PEAK HOURS (NIGHTS AND

WEEKENDS).

3. COORDINATE PLUMBING INSTALLATION WITH

OTHER TRADES. OFFSET LINES AS NEEDED TO

AVOID CONFLICTS.

4. FIELD VERIFY ALL EXISTING PLUMBING PIPE

LOCATIONS, SIZES, AND INVERTS.

5. ALL HANGAR SUPPORTS SHALL BE INSTALLED

VERTICALLY AND UPRIGHT

6. ALL PIPES SHALL BE INSTALLED PARALLEL AND

PERPENDICULAR TO BUILDING

7. PROVIDE HOUSEKEEPING PADS FOR ALL FLOOR

MOUNTED EQUIPMENT.

8. ALL PIPING THIS SHEET SHOWN IN HALFTONE IS

EXISTING AND TO REMAIN. MODIFY PIPING AS

NECESSARY TO INSTALL BALANCING VALVES

AND RELATED EQUIPMENT.

KEY NOTES

1. INSTALL NEW 34" BALL VALVE, CHECK VALVE, AND

BALANCING VALVE.

2. RECORD FLOW PRIOR TO INSTALLING NEW

BALANCING VALVE ON 2ND FLOOR HWR MAIN.

RESET EXISTING 2ND FLOOR BALANCING VALVES

TO RECORDED FLOWS DURING COMMISSIONING

OF 3RD FLOOR SYSTEM.

3. TIE-IN TO EXISTING CONDENSATE DRAIN

4. NEW PNEUMATIC TUBE BRANCHS CONNECTED TO

EXISTING SYSTEM. BRANCHES TURN UP

THROUGH THIRD FLOOR TO THIRD FLOOR

INTERSTITIAL SPACE.

5. CONNECT TO EXISTING TRANSFER STATION #41

ABOVE ROOM 2A-190.

5. CONNECT TO EXISTING TRANSFER STATION #21

ABOVE ROOM CORRIDOR.

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

F i t h

FULLY

SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:

ARCHITECT/ENGINEER OF RECORD

SEAL

CONSULTANT

321 4 5 6 7 8 9 10

NEW CLINICAL LAB FOR

SURGICAL EXPANSION

RICHMOND, VIRGINIA

652-319

PROJECT DIRECTOR

AUGUST 2018

REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

BID DOCUMENTS

DWG. OF 162

NAME: TINA DEBELLA, PE

PHONE: 804.675.5495

EMAIL: Tina.DeBella@va.gov

2ND FLOOR INTERSTITIAL SPACE

PLUMBING SUPPLY PIPING

PP123

DMDCDL

SCALE:

PP123

PLUMBING SUPPLY PIPING

2ND FLOOR INTERSTITIAL SPACE

F

PF

R E

F

R E

F

P F

P F

P

F

PF

NPQRSTUVW

X

Wn

P-707

P-707

P-101

P-201

P-502

P-418

P-202

P-101 [3]

P-101

P-420 [3]

P-418

P-101

P-528

P-608

FD-F

P-420 [3]

P-528 P-528

P-528

P-528

P-528

P-418

P-528

P-528

P-528

FD-F

FD-E

P-524

FD-F

FD-F

P-707

FD-F

P-707

FD-F

P-418

P-707

FD-F

FD-F

FD-F

FD-F

FD-F

FD-F

FD-F

FD-F

P-528

P-418

FD-F

P-707

FD-F

FD-F

DI BEDS

RELOCATED AIR

COMPRESSOR

RELOCATED

CIRCULATION

PUMP

FILTERS

HIGH PRESSURE

CYLINDERS

CORRIDOR

C3F-1

CORRIDOR

C3F-2

BIOMED

3F-101

ANCILLARY TESTING

3F-103

DRUG TESTING

3F-105

IT CLOSET

3F-104

ELEC CLOS

3F-102

ACCESSIONING

3F-106a

FEE BASIS

3F-106b

MICROBIOLOGY

3F-106d

HEMATOLOGY

3F-106e

CHEMISTRY

3F-106f

REFRIGERATEDSTORAGE

3F-126

BLOOD BANK

3F-106c

CYTOLOGY

3F-106h

OPEN OFFICE

3F-106j

ARCHIVE

3F-124

CLEAN SUPPLY

3F-131

BSL-3 LAB

3F-129

STAFF TOILET

3F-108

DRUG TESTING TOILET

3F-105a

IMMUNOLOGY

3F-107

MEN'S TOILET

3F-109

WOMEN'S TOILET

3F-111

JANITOR

3F-110

EQUIPMENT ROOM

3F-130

GAS TANK ROOM

3F-127

BREAK ROOM

3F-112

CORRIDOR

C3F-3

OFFICE #1

3F-114

OFFICE #2

3F-115

OFFICE #3

3F-116

OFFICE #4

3F-117

OFFICE #5

3F-118

ADMINISTRATION

3F-120

DIRECTOR'S OFFICE

3F-121

CMT OFFICE

3F-122

OFFICE #6

3F-123

ADPAC/RESIDENTS

3F-119

FLAMMABLE STORAGE

3F-125

ANTE ROOM

3F-128

HISTOLOGY

3F-106g

STAIR

3F-S2

CONF ROOM

3F-113

P-528

P-418

GENERAL NOTES

1. DOMESTIC WATER SUPPLY LINES TO INDIVIDUAL SINKS

AND LAVATORIES ARE 12" UNLESS OTHERWISE NOTED.

2. INSTALL THERMOSTATIC MIXING VALVE ON ALL SINKS

AND LAVS TO LIMIT HOT WATER SUPPLY TEMP TO 110

DEG F.

3. COORDINATE ALL WORK WITH GENERAL CONTRACTOR,

OTHER TRADES, AND THE COR TO MINIMIZE DISRUPTION

OF AREAS OUTSIDE OF THE PROJECT LIMITS OF WORK.

4. ALL TIE-INS TO EXISTING SYSTEMS TO BE COORDINATED

AND SCHEDULED WITH VAMC. ASSUME ALL TIE-INS WILL

BE PERFORMED DURING OFF PEAK HOURS (NIGHTS AND

WEEKENDS).

5. COORDINATE PLUMBING INSTALLATION WITH OTHER

TRADES. OFFSET LINES AS NEEDED TO AVOID

CONFLICTS.

6. PIPING HAS BEEN INDICATED ON DRAWINGS IN

APPROXIMATE LOCATIONS. EXACT ROUTING WILL BE

DETERMINED IN THE FIELD.

7. FIELD VERIFY ALL EXISTING PLUMBING PIPE LOCATIONS,

SIZES, AND INVERTS.

8. SLEEVE ALL PENETRATIONS, FIRESTOP OR SEAL AS

REQUIRED.

9. REFER TO ARCHITECTURAL PLANS FOR RATED WALL

LOCATIONS.

10. COORDINATE CLEANOUTS AND FLOOR DRAINS WITH

ARCHITECTURAL FINISH PLAN.

11. ALL HANGAR SUPPORTS SHALL BE INSTALLED

VERTICALLY AND UPRIGHT

12. ALL PIPES SHALL BE INSTALLED PARALLEL AND

PERPENDICULAR TO BUILDING

13. PROVIDE FULL PORT BALL VALVES AT ALL DOMESTIC

WATER BRANCH CONNECTIONS. IN ADDITION, PROVIDE

CHECK VALVES AT ALL LOCATIONS SERVING FIXTURES

WITH THERMOSTATIC MIXING VALVES.

14. PROVIDE HOUSEKEEPING PADS FOR ALL FLOOR

MOUNTED EQUIPMENT.

15. PROVIDE ISOLATION VALVES, PRESSURE REGULATION,

AND INDIVIDULAL CONNECTIONS TO COMPONENTS FOR

LAB EQUIPMENT PER MANUFACTURER

RECOMMENDATIONS. REUSE EXISTING VALVES, TUBING,

AND FITTINGS WHERE POSSIBLE.

KEY NOTES

1. 1

2" DOMESTIC WATER SUPPLY TO GROSSING STATION.

2. 1

2" ANAEROBIC GAS CONNECTION TO EQUIPMENT.

3. 1

2" DI WATER SUPPLY TO BENCH TOP EQUIPMENT.

4. 1

2" DI WATER SUPPLY TO FREE STANDING EQUIPMENT.

5. 1

2" COMPRESSED AIR SUPPLY TO FREE STANDING

EQUIPMENT.

6. DOMESTIC WATER SUPPLY TO FIXTURE. PROVIDE

ANGLE STOP ISOLATION.

7. 1

2" DOMESTIC WATER SUPPLY TO BENCH TOP

EQUIPMENT.

8. RELOCATE EXISTING AIR COMPRESSOR AND INSTALL IN

LOCATION SHOWN. REUSE EXISTING VALVES TUBING

AND FITTINGS WHERE POSSIBLE.

9. RELOCATE EXISTING DI WATER SUPPLY SYSTEM.

REUSE EXISTING PUMP, PIPING, VALVES AND FITTINGS

WHERE POSSIBLE.

10. 1" DOMESTIC WATER SUPPLY FROM INTERSTITIAL TO DI

WATER SUPPLY SYSTEM.

11. 1" DI WATER SUPPLY TO INTERSTITIAL.

12. 1" DI WATER RETURN FROM INTERSTITIAL.

13. RELOCATE EXISTING ANAEROBIC GAS SUPPLY SYSTEM.

REUSE EXISTING MANIFOLDS, PIG TAILS, AND

CONTROLS.

14. 1

2" ANAEROBIC GAS SUPPLY TO INTERSTITIAL

15. 1" DI WATER SUPPLY TO STEAM STERILIZER. PROVIDE

BACKFLOW PREVENTER IN ADDITION TO LOCAL

EQUIPMENT ISOLATION VALVE.

16. 1

2" MEDIUM PRESSURE (50-80 PSI) STEAM FROM 3RD

INTERSTITIAL TO STEAM STERILIZER. PROVIDE XX LB/HR

F&T STEAM TRAP WITH INLET STRAINER, CHECK VALVE

AND ISOLATION GATE VALVES CONNECTED TO DRIP LEG

OF SUPPLY LINE AND DISCHARGING TO CONDENSATE

DRAIN LINE. SEE DETAIL DRAWING

17. 1" CONDENSATE DRAIN DOWN TO 2ND INTERSTITIAL.

18. PNEUMATIC TUBE LINES UP FROM 2ND FLOOR

INTERSTITIAL LEVEL.

19. PNEUMATIC TUBE LINE DOWN FROM 3RD FLOOR

INTERSTITIAL LEVEL.

20. DRUG TESTING LAV AND WATER CLOSET SENSORS TO

BE WIRED VIA ELECTRICAL DISCONNECT SWITCH IN

DRUG TESTING OFFICE 3F-105. SEE ELECTRICAL SHEET

EP131 FOR DETAILS.

21. LOCATION OF ZONE SHUT-OFF VALVE FOR CO2 AND

ALARM PANEL FOR CO2 AND COMPRESSED AIR IN WALL

EXTERIOR TO GAS TANK ROOM.

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

F i t h

FULLY

SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:

ARCHITECT/ENGINEER OF RECORD

SEAL

CONSULTANT

321 4 5 6 7 8 9 10

NEW CLINICAL LAB FOR

SURGICAL EXPANSION

RICHMOND, VIRGINIA

652-319

PROJECT DIRECTOR

AUGUST 2018

REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

BID DOCUMENTS

DWG. OF 162

NAME: TINA DEBELLA, PE

PHONE: 804.675.5495

EMAIL: Tina.DeBella@va.gov

3RD FLOOR

PLUMBING SUPPLY PIPING

PP131

DMDCDL

SCALE:

PP131

PLUMBING SUPPLY PIPING

3RD FLOOR

1 1/4" 2"

1/2"

1 1/4"

1 1/2"

3/4" 1 1/2"

3/4"

1/2"1"

1 1/4"

1/2"

1 1/4" 1/2"

2"

2"

1 1/4"

1/2"

1/2"

SET

0.5 GPM

SET

0.5 GPM1/2"

1/2"

1/2"

1/2"

1/2"

1 1/4"

1/2"

1 1/4" 1 1/4"

1 1/4"

1/2"

1/2"

1"

1/2"

SET

0.5 GPM

1/2"

1/2"

1/2"

1/2"

1 1/4"

1/2"3/4"

1"

1/2" 1/2"

1/2"

1/2"

1/2"

1/2"

TYPE "C"

1"

MPS MPS

M P

S

1/2"

3/4"45

1/2"

GENERAL NOTES

1. DOMESTIC WATER SUPPLY LINES TO INDIVIDUAL

SINKS AND LAVATORIES ARE 12" UNLESS

OTHERWISE NOTED.

2. DOMESTIC WATER SUPPLY LINES TO INDIVIDUAL

EMERGENCY SHOWERS ARE 1 14" UNLESS

OTHERWISE NOTED.

3. DI WATER SUPPLY LINES TO INDIVIDUAL

EQUIPMENT ARE 12" UNLESS OTHERWISE NOTED.

4. ANAEROBIC GAS SUPPLY LINES ARE 12" UNLESS

OTHERWISE NOTED.

5. COMPRESSED AIR SUPPLY LINES ARE 12" UNLESS

OTHERWISE NOTED.

6. INSTALL THERMOSTATIC MIXING VALVE ON ALL

SINKS AND LAVS TO LIMIT HOT WATER SUPPLY

TEMP TO 110 DEG F.

7. COORDINATE ALL WORK WITH GENERAL

CONTRACTOR, OTHER TRADES, AND THE COR TO

MINIMIZE DISRUPTION OF AREAS OUTSIDE OF

THE PROJECT LIMITS OF WORK.

8. ALL TIE-INS TO EXISTING SYSTEMS TO BE

COORDINATED AND SCHEDULED WITH VAMC.

ASSUME ALL TIE-INS WILL BE PERFORMED

DURING OFF PEAK HOURS (NIGHTS AND

WEEKENDS).

9. COORDINATE PLUMBING INSTALLATION WITH

OTHER TRADES. OFFSET LINES AS NEEDED TO

AVOID CONFLICTS.

10. PIPING HAS BEEN INDICATED ON DRAWINGS IN

APPROXIMATE LOCATIONS. EXACT ROUTING

WILL BE DETERMINED IN THE FIELD.

11. FIELD VERIFY ALL EXISTING PLUMBING PIPE

LOCATIONS, SIZES, AND INVERTS.

12. SLEEVE ALL PENETRATIONS, FIRESTOP OR SEAL

AS REQUIRED.

13. REFER TO ARCHITECTURAL PLANS FOR RATED

WALL LOCATIONS.

14. COORDINATE CLEANOUTS AND FLOOR DRAINS

WITH ARCHITECTURAL FINISH PLAN.

15. ALL HANGAR SUPPORTS SHALL BE INSTALLED

VERTICALLY AND UPRIGHT

16. ALL PIPES SHALL BE INSTALLED PARALLEL AND

PERPENDICULAR TO BUILDING

17. PROVIDE FULL PORT BALL VALVES AT ALL

DOMESTIC WATER BRANCH CONNECTIONS. IN

ADDITION, PROVIDE CHECK VALVES AT ALL

LOCATIONS SERVING FIXTURES WITH

THERMOSTATIC MIXING VALVES.

18. PROVIDE HOUSEKEEPING PADS FOR ALL FLOOR

MOUNTED EQUIPMENT.

KEY NOTES

1. 1

2" DOMESTIC COLD WATER DOWN

2. 1 14" DOMESTIC COLD WATER DOWN

3. 1 12" DOMESTIC WATER DOWN

4. 3

4" DOMESTIC COLD WATER UP TO ROOF.

5. 2 X 6" P-TUBES. SUPPLY FROM 2ND STORY

INTERSTITIAL. PROVIDE DROPS TO 3RD STORY

TERMINALS.

6. LIMIT OF CONSTRUCTION OF DCW SUPPLY IF BID

ALTERNATE SELECTED TO REMOVE BATHROOM

FINISHES.

7. IF BID ALTERNATE SELECTED TO REMOVE

BATHROOM FINISHES, INSTALL FULL DHW SUPPLY

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

F i t h

FULLY

SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:

ARCHITECT/ENGINEER OF RECORD

SEAL

CONSULTANT

321 4 5 6 7 8 9 10

NEW CLINICAL LAB FOR

SURGICAL EXPANSION

RICHMOND, VIRGINIA

652-319

PROJECT DIRECTOR

AUGUST 2018

REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

BID DOCUMENTS

DWG. OF 162

NAME: TINA DEBELLA, PE

PHONE: 804.675.5495

EMAIL: Tina.DeBella@va.gov

3RD FLOOR INTERSTITIAL SPACE

PLUMBING SUPPLY PIPING

PP133

DMDCDL

SCALE:

PP133

PLUMBING SUPPLY PIPING

3RD FLOOR INTERSTITIAL SPACE

9" [225mm] DIA. TWO-PIECE

NICKEL BRONZE FLASHING

STRAINER

FLASHING PAN

VINYL FLOORING FLASHING, MIN. 24" [600mm] SQUARE 2 1/2 LB. [1.1kg] TO 4 LB. [1.8kg] LEAD OR 16 OZ. [453g] COPPER

CAULKED,

NO-HUB OR

THREADED

CONNECTION

FLASHING COLLAR

LOOSE GRAVEL

AT WEEP HOLES

PROVIDE FLASHING WHEN

DRAIN IS INSTALLED IN A

NON-MEMBRANE FLOOR

VA

RIE

S

MINIMUM 16 GAGE GALVANIZED STEEL

PLATE 12"x48" [300x1200mm] MIN.

SECURED TO A MIN. 4 STUDS PER

LAVATORY

1/4" [6mm]Ø MOLLY BOLT HOLLOW

WALL ANCHOR (1 EA. SIDE OF LAV)

MIN. (3) 1/4" [6mm]

MACHINE BOLTS

W/DOUBLE LOCK

NUTS ON BACK SIDE

MIN. 5 1/4" [131mm]Ø

GALV. MACHINE

BOLTS WELDED TO

PLATE

1/4" [6mm]

TYP. 1/8"

TYP. [3mm]

A A

PLAN

SECTION A

NOTES:

1. AT LAVS WITH FOOT PEDAL CONTROLS

PROVIDE AN ADDITIONAL 16 GAGE

GALVANIZED STEEL PLATE 12"x16" [300x600mm] SECURED TO A MINIMUM

OF 2 STUDS PER FOOT PEDAL.

2. PROVIDE 20 GAGE STUDS WHEN

HEIGHT EXCEEDS 12'-0" [3600mm]

STEEL HANGER BY LAV MFGR

STEEL WALL

PLATE

WALL ANCHOR

STUDS

3' -3

[9 m m

T O

F

LO

O R

FOR FIXTURE

HEIGHT SEE

ARCHITECTURAL

DRAWINGS

SCALE:

PL501

LAVATORY MOUNTING DETAIL

NTS

SCALE:

PL501

TYPE F FLOOR DRAIN

NTS

NEUTRALIZED WASTE

WATER TO SANITARY

SYSTEM

SCALE:

PL501

ACID WASTE NEUTRALIZATION SYSTEM

NTS

VENT TO

ATMOSPHERE

T-2

SAMPLING

TANK

T-1

DILUTION

TANK

120V PH MONITORING

PANEL W/ PROGRAMMABLE

ALARM SET POINTS.

SET LOW ALARM AT PH<5.

SET HIGH ALARM AT PH>11.

PH PROBE.

HOUSEKEEPING PAD

ACID WASTE

INLET

LIMESTONE

CHIPS

SUPPORT

STAND

FAUCET SEE

SPEC 22 40 00

LAMINAR FLOW

CONTROL DEVICE

OFFSET

WASTE

TRAP

PARALLEL

TO WALL

LOOSE

KEY STOP

ESCUTCHEON

FINISHED

FLOOR

[8 m m

] 8" [200mm]

/4

[2 m m

F O

R F

IX

T

U R

E H

E

IG

H T

S S

E E

A R

C H

IT

E

C T

U R

A L

D R

A W

IN

G

S

SCALE:

PL501

TYPICAL LAVATORY

NTS

PRESSURE RELIEF VALVE (PVR) BEND

NIPPLE

CONTROL PANEL

STATION

ANCHORED TO

SLAB

PVR FOR STATION BED

VERTICALLY FROM

ABOVE FLOOR

AREA ABOVE STATIONS

SHALL BE KEPT CLEAR

OF OBSTRUCTIONS TO

TUBING

COMMUNICATION

CABLE/ CONDUIT

ENTRYPOWER

CONDUIT

ENTRY

TOP VIEWFRONT VIEW

NOTES:

1. COORDINATE WITH VENDOR AND FURR-IN STATION

2. STATION SHALL BE ANCHORED TO THE SLAB. NOTCH TRACK TO FIT STATION LEGS.

3. CONTROL REQUIREMENTS: ETHERNET PROTOCOL AVAILABLE. CONSULT SWISSLOG. TRADITIONAL RS422 SYSTEMS:

4-CONDUCTOR PLENUM RATED PVC INSULATED CABLE, #22 AWG SHIELDED TWISTED PAIR WITH GROUND WIRE. 5 VDC

MAXIMUM OPEN CIRCUIT VOLTAGE, 200 MA MAXIMUM SHORT CIRCUIT CURRENT.

WALL

SCALE:

PL501

PNEUMATIC TUBE SYSTEM STATION

: NTS

SCALE:

PL501

P-101 WATER CLOSET DETAIL

NTS

[4 m m

2' -9

[8 m m ][9 m m

FINISHED

FLOOR

FINISHED

WALL

GRAB BAR SEE

ARCH. DWGS

C WATER CLOSET

PLANELEVATION

L

18" [450mm]

F O

R F

IX

T

U R

E H

E

IG

H T

S E

E A

R C

H

IT

E C

T U

R A

L D

R A

W

IN

G S

SEE SPEC 22 40 00

FOR FIXTURE

SPECIFICS

SEE SPEC FOR

VALVE TYPE/DETAILS

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

F i t h

FULLY

SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:

ARCHITECT/ENGINEER OF RECORD

SEAL

CONSULTANT

321 4 5 6 7 8 9 10

NEW CLINICAL LAB FOR

SURGICAL EXPANSION

RICHMOND, VIRGINIA

652-319

PROJECT DIRECTOR

AUGUST 2018

REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

BID DOCUMENTS

DWG. OF 162

NAME: TINA DEBELLA, PE

PHONE: 804.675.5495

EMAIL: Tina.DeBella@va.gov

PLUMBING DETAILS

PL501

PLUMBING FIXTURE ROUGH-IN SCHEDULE

MARK DESCRIPTION WASTE PIPE VENT PIPE

HOT

WATER

COLD

WATER

REMARKS

P-101 WATER CLOSET FLOOR MOUNTED 4 SEE DWG --- 1 -

P-201 URINAL 2 SEE DWG --- 3/4 -

P-202 URINAL, WHEELCHAIR 2 SEE DWG --- 3/4 -

P-418 LAVATORY WALL MOUNTED 1 1/2 SEE DWG 1/2 1/2

CONNECT DHW/CW TO THERMOSTATIC MIXING VALVE.

PROVIDE MAXIMUM 110°F

P-420 LAVATORY COUNTER MOUNTED 1 1/2 SEE DWG 1/2 1/2

CONNECT DHW/CW TO THERMOSTATIC MIXING VALVE.

PROVIDE MAXIMUM 110°F

P-502 FLOOR SINK 3 SEE DWG

P-524 DOUBLE COMPARTMENT SINK 1 1/2 SEE DWG 1/2 1/2

CONNECT DHW/CW TO THERMOSTATIC MIXING VALVE.

PROVIDE MAXIMUM 110°F

P-528 SINGLE COMPARTMENT SINK 1 1/2 SEE DWG 1/2 1/2

CONNECT DHW/CW TO THERMOSTATIC MIXING VALVE.

PROVIDE MAXIMUM 110°F

P-608 WATER COOLER, GLASS FILLER 1 1/2 SEE DWG --- 1/2 -

P-707 EMERGENCY SHOWER/EYEWASH --- SEE DWG 1 1/4 1 1/4

CONNECT DHW/CW TO THERMOSTATIC MIXING VALVE.

PROVIDE 85°F TEMPERED WATER

P-708 EMERGENCY EYE WASH, WALL MOUNT 1 1/2 SEE DWG 1/2 1/2

CONNECT DHW/CW TO THERMOSTATIC MIXING VALVE.

PROVIDE 85°F TEMPERED WATER

P-805 LAWN FAUCET --- --- --- 3/4 -

FD-E FLOOR DRAIN 4 SEE DWG --- --- -

FD-F FLOOR DRAIN 3 SEE DWG --- --- -

PLUMBING LOAD SUMMARY

MARK DESCRIPTION

QTY

SANITARY

DRAINS

QTY ACID

DRAINS

CWFU EACH CWFU

HWFU

EACH

HWFU DFU EACH

DFU

SANITARY

DRAINS

DFU ACID

DRAINS

P-101 WATER CLOSET FLOOR MOUNTED 6 0 10 60 0 0 4 24 0

P-201 URINAL 1 0 2 2 0 0 2 2 0

P-202 URINAL, WHEELCHAIR 1 0 2 2 0 0 2 2 0

P-418 LAVATORY WALL MOUNTED 2 5 1.5 10.5 1.5 10.5 1 2 5

P-420 LAVATORY COUNTER MOUNTED 6 0 1.5 9 1.5 9 1 6 0

P-502 MOP SINK 1 0 1.5 1.5 1.5 1.5 2 2 0

P-524 DOUBLE COMPARTMENT SINK 1 0 1.5 1.5 1.5 1.5 3 3 0

P-528 SINGLE COMPARTMENT SINK 0 8 1.5 12 1.5 12 3 0 24

P-608 WATER COOLER, GLASS FILLER 2 0 0.25 0.5 0 0 0.5 1 0

P-707 EMERGENCY SHOWER/EYEWASH 0 5 0 0 0 0 0 0 0

P-708 EMERGENCY EYE WASH, WALL MOUNT 0 1 0 0 0 0 0 0 0

P-805 LAWN FAUCET 1 0 0.5 0.5 0 0 0 0 0

FD-E FLOOR DRAIN, 4", EQMT ROOM 1 0 0 0 0 0 0.5 0.5 0

FD-F FLOOR DRAIN, 3" 0 17 0 0 0 0 0.5 0 8.5

TOTAL 22 36 99.5 34.5 42.5 37.5

ACID NEUTRALIZATION TANK SCHEDULE

MARK BUILDING LOCATION SYSTEM DESCRIPTION MATERIAL VOLUME INLET CONNECTION

OULET

CONNECTION

VENT CONNECTION LIMESTONE CHIPS

T-1 500

MECH SERVICE BAY

2-B-E

ACID WASTE

NEUTRALIZATION

TANK

POLYETHYLENE OR

POLYPROPYLENE

100 GAL 4" 4" 3" 1000 LB

T-2 500

MECH SERVICE BAY

2-B-E

ACID WASTE SAMPLING TANK

POLYETHYLENE OR

POLYPROPYLENE

5 GAL 4" 4" NONE NONE

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

F i t h

FULLY

SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:

ARCHITECT/ENGINEER OF RECORD

SEAL

CONSULTANT

321 4 5 6 7 8 9 10

NEW CLINICAL LAB FOR

SURGICAL EXPANSION

RICHMOND, VIRGINIA

652-319

PROJECT DIRECTOR

AUGUST 2018

REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

BID DOCUMENTS

DWG. OF 162

NAME: TINA DEBELLA, PE

PHONE: 804.675.5495

EMAIL: Tina.DeBella@va.gov

PLUMBING SCHEDULES

PL601

GROUND

L1

L1-INT

L2

L3

L4

L5

L2-INT

L3-INT

L4-INT

L5-INT

012 3

013 2

014 0

020 2

010 1

023 0

030 2

040 2

Z-5 0

BP 510

BP 511

BP 512

BP 513

BP 514

BP 515

Z-6 0

BP 610

BP 611

BP 612

BP 613

BP 614

BP 615

BP 490

BP 395

BP 290

041 3

SCC

BP190

Z-1

Z-2

Z-3

Z-4

RFID

5C

RFID

4A

RFID

4B

RFID

4C

RFID

432 BLOOD

BANK

RFID

ACCESSIONING

RFID

2E

RFID

PACU

RFID

2H

RFID

2G

RFID

2F

RFID

OR

RFID

224 POLY

TRAUMA

2B

RFID

INTERSIT

CARDIAC

CATH LAB

NO

RFID

1F

RFID

311 BLOOD

DRAW

RFID

BB100

RFID

EMERGENCY

RFID

113 GREEN

CLINIC

RFID

RX

4D

GENERAL NOTES

1. DRAWING SHOWS THE EXISTING PNEUMATIC SYSTEM ON CAMPUS PLUS

ADDITIONS FOR THE NEW CONSTRUCTION. CONTRACTOR SHALL COORDINATE

WITH EXISTING VENDOR/REP FOR EXTENSION OF EXISTING PNEUMATIC

SYSTEM INTO THE LAB.

PNEUMATIC TUBE SYSTEM RISER DIAGRAM LEGEND

RECESSED STATION (STANDARD AND RFID

TRANSFER UNIT

SELECTIVE BYPASS

VACUUM BYPASS VALVE

BYPASS (BP), STORAGE (S), VAULT (V), OR

RESOLUTION (R) PIPE

TRANSFER UNIT OPEN PORT END CAP OR CAPPED

TUBE

ZONE BLOWER

SYSTEM CONTROL CENTER

CARRIER ARRIVAL INDICATOR (CAI)

ETHERNET CONNECTION

NEW TUBE OR EQUIPMENT

EXISTING TUBE OR EQUIPMENT

RFID

A B C D E F

BP

BP

BP

BP

BP

BP

BP

SCC

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

F i t h

FULLY

SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:

ARCHITECT/ENGINEER OF RECORD

SEAL

CONSULTANT

321 4 5 6 7 8 9 10

NEW CLINICAL LAB FOR

SURGICAL EXPANSION

RICHMOND, VIRGINIA

652-319

PROJECT DIRECTOR

AUGUST 2018

REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

BID DOCUMENTS

DWG. OF 162

NAME: TINA DEBELLA, PE

PHONE: 804.675.5495

EMAIL: Tina.DeBella@va.gov

PNEUMATIC TUBE SYSTEM

SCHEMATIC DIAGRAM

PL602

DMDCDL

SCALE:

PL602

SCHEMATIC DIAGRAM

PNEUMATIC TUBE SYSTEM

NTS

lforster Text Box lforster Typewritten Text

REF-2

lforster Typewritten Text

REFERENCE DRAWING

Rectangle

Typewritten Text

REF-1

lforster Typewritten Text

REFERENCE DRAWING

Rectangle

PL001 - PLUMBING ABBREVIATIONS & SYMBOLS
PL123 - 2ND FLOOR INTERSTITIAL SPACE PLUMBING SANITARY WASTE AND VENT
PL131 - 3RD FLOOR PL131 - PLUMBING SANITARY WASTE AND VENT
PL133 - 3RD FLOOR INTERSTITIAL SPACE PLUMBING SANITARY WASTE AND VENT
PL141 - ROOF PLUMBING
PP123 - 2ND FLOOR INTERSTITIAL SPACE PLUMBING SUPPLY PIPING
PP131 - 3RD FLOOR PLUMBING SUPPLY PIPING
PP133 - 3RD FLOOR INTERSTITIAL SPACE SUPPLY PIPING
PL501 - PLUMBING DETAILS
PL601 - PLUMBING SCHEDULES
PL602 - PNEUMATIC TUBE SYSTEM SCHEMATIC DIAGRAM
REF-1 - SWISSLOG - REFERENCE DRAWING 1
REF-2 - SWISSLOG - REFERENCE DRAWING 2

File details come from the government source that posted it. Updated .