36C24619B0039-013.pdf
PDF 5 MB Posted
- Attached to
- Construct New Clinical Lab Expansion (VA-18-00152139) Federal contract opportunity
- Solicitation number
- 36C24619B0039
About this file
This solicitation seeks a qualified Service Disabled Veteran Owned Small Business to construct a new clinical lab expansion project located at a VA medical center in Richmond, Virginia. The project includes approximately 18,050 square feet of partial renovation and addition work with an estimated construction cost between $5,000,000 to $10,000,000. Drawings and specifications will be provided in the solicitation on or about August 15, 2019. Questions must be emailed to the Contracting Officer by the specified due date. The work shall be completed within 680 calendar days of receiving the notice to proceed. This is a 100% set-aside for SDVOSBs.
36C24619B0039 S02 PLUMBING_Bid_Documents.pdf
View the file
Other files for this federal contract opportunity
Show all 39
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PLUMBING VALVE SYMBOLS
BALL VALVE
CHECK VALVE
ANGLE GLOBE VALVE
BUTTERFLY VALVE
MODULATING CONTROL VALVE
TWO POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
AUTOMATIC FLOW CONTROL VALVE
PRESSURE RELIEF VALVE
MANUAL AIR VENT
TEST PLUG (PRESSURE/TEMPERATURE)
GLOBE VALVE
PRESSURE REGULATING VALVE
THREE-WAY TWO POSITION CONTROL VALVE
AUTOMATIC AIR VENT
AV
FE
GENERAL PLUMBING SYMBOLS
LIMIT OF DEMOLITION
ANCHOR
REDUCER OR INCREASER
DIRECTION OF FLOW
SIDE CONNECTION
ECCENTRIC REDUCER
BOTTOM CONNECTION, 45° OR 90°
TOP CONNECTION, 45° OR 90°
DIRECTION OF PIPE PITCH (DOWN)
UNION
RISE OR DROP IN PIPE
CAPPED OUTLET
AND EXISTING WORK
POINT OF CONNECTION BETWEEN NEW
PRESSURE GAGE
THERMOMETER
STRAINER
FLOW ELEMENT
PIPE UP
PIPE DOWN
CO CLEAN OUT
HOSE BIB
PUMP
PLUMBING PIPING SYMBOLS
DOMESTIC HOT WATER, HOT WATER
DOMESTIC COLD WATER, COLD WATER
DOMESTIC HOT WATER RETURN, HOT WATER RETURN
STORM DRAIN
SANITARY VENT
SANITARY SEWER
PA PASCAL
PD PRESSURE DROP OR DIFFERENCE
PDI PLUMBING AND DRAINAGE INSTITUTE
PG PRESSURE GAGE
PP PLUMBING PUMP
PPM PARTS PER MILLION
PRS PRESSURE REDUCING STATION
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH
ATMOSPHERE
PSIG POUNDS PER SQUARE INCH GAUGE
PTRV PRESSURE TEMPERATURE RELIEF
VALVE
PW POTABLE WATER
RD ROOF DRAIN
RDL ROOF DRAIN LEADER
RL ROOF LEADER
RO REVERSE OSMOSIS WATER
RWL RAIN WATER LEADER
SAN SANITARY SEWER
SMACNA SHEET METAL AND AIR CONDITIONING
CONTRACTORS NATIONAL ASSOCIATION
SCFM STANDARD CUBIC FOOT/MINUTE
SCW SOFTENED COLD WATER
SDMH STORM DRAIN MANHOLE
SP SUMP PUMP
SPR SPRINKLER LINE
SQFT SQUARE FEET
SS STAINLESS STEEL
ST STORAGE TANK
SW STORM WATER
TCV TEMPERATURE CONTROL VALVE
TD TEMPERATURE DIFFERENCE
TD TRENCH DRAIN
TDH TOTAL DYNAMIC HEAD
TEMP TEMPERATURE
TMV THERMOSTATIC MIXING VALVE
TP TRAP PRIMER
TSTAT THERMOSTAT
TWR TEMPERED WATER RETURN
TWS TEMPERED WATER SUPPLY
TYP TYPICAL
UPC UNIFORM PLUMBING CODE
V VENT
VAC VACUUM
VB VACUUM BREAKER
VCO VACUUM CLEANER OUTLET
VP VACUUM PUMP
VS VENT STACK
VSMC VARIABLE SPEED MOTOR CONTROLLER
VTR VENT THROUGH ROOF
W WASTE
WC WATER CLOSET
WCO WALL CLEANOUT
WG WATER GAGE
WH WALL HYDRANT
WH WATER HEATER
WHA WATER HAMMER ARRESTER
WL WATER LINE
WM WATER METER
WPD WATER PRESSURE DROP
WS WASTE STACK
YCO YARD CLEANOUT
YH YARD HYDRANT
L/S LITER PER SECOND
LA LABORATORY AIR
LAV LAVATORY
LBS/HR POUNDS PER HOUR
LCW LABORATORY COLD WATER
LHW LABORATORY HOT WATER
LNG LIQUID NATURAL GAS
LOX LIQUID OXYGEN
LV LABORATORY VACUUM
LW LOW WATER
M METER
MA MEDICAL AIR
MAV MANUAL AIR VENT
MBH 1000 BTUH
MED MEDICAL
MER MECHANICAL EQUIPMENT ROOM
MH MANHOLE
MOU MEMORANDUM OF UNDERSTADING
MSB MOP SERVICE BASIN
MV MEDICAL VACUUM
N2 NITROGEN
N20 NITROUS OXIDE
NC NORMALLY CLOSED
NG NATURAL GAS
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NOM NOMINAL
NPW NON POTABLE WATER
NTS NOT TO SCALE
O2 OXYGEN
OC ON CENTER
OD OUTSIDE DIAMETER
OR OPERATING ROOM
ORD OVERFLOW ROOF DRAIN
OVFL OVERFLOW
KW KILOWATT
KWHR KILOWATT-HOUR
ICW INDUSTRIAL COLD WATER
INV INVERT
IPC INTERNATIONAL PLUMBING CODE
IRW IRRIGATION WATER
IW INDIRECT WASTE
IWH INSTANTANEOUS WATER HEATER
IWR INDUSTRIAL WATER RETURN
IWS INDUSTRIAL WATER SUPPLY
H&CW HOT AND COLD WATER
HB HOSE BIBB
HD HUB DRAIN
HEX HEAT EXCHANGER
HP HORSEPOWER
HS HAND SINK
HST HOT WATER STORAGE TANK (DOMESTIC)
HWB HOT WATER BOILER
HWCP HOT WATER CIRCULATING PUMP
HWP HOT WATER PUMP
HYD HYDRANT
GAL GALLON
GCO GRADE CLEANOUTS
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GRS GAS REGULATOR STATION
GT GREASE TRAP
GVTR GAS VENT THROUGH ROOF
GWH GAS FIRED WATER HEATER
PLUMBING ABBREVIATIONS
F FAHRENHEIT
FCO FLOOR CLEANOUT
FCW FILTERED COLD WATER
FD FLOOR DRAIN
FDC FIRE DEPARTMENT (HOSE) CONNECTION
FM FLOW METER
FOP FUEL OIL PUMP
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FOV FUEL OIL VENT
FS FLOOR SINK
FS FLOW SWITCH
FU FIXTURE UNITS
EL ELEVATION
EMCS ENERGY MONOSERRAT AND CENTRAL
SYSTEM
EPA ENVIROMENTAL PROTECTION AGENCY
EPACT ENERGY POLICY ACT
ESC ESCUTCHEON
ESH EMERGENCY SHOWER
ET EXPANSION TANK
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EWS EYE WASH STATION
EX EXISTING
DCW DOMESTIC COLD WATER
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DHWR DOMESTIC WATER RETURN
DHWS DOMESTIC HOT WATER SUPPLY
DI DEIONIZED WATER
DN DOWN
DOE DEPARTMENT OF ENERGY
DS DOWNSPOUT
DW DISHWASHER
DWG DRAWING
DWH DOMESTIC WATER HEATER
DWR DRINKING WATER RETURN
DWS DRINKING WATER SUPPLY
DWV DRAIN WASTE VENT
C CELSIUS
CGA COMPRESSED GAS ASSOCIATION
CI CAST IRON
CO CLEANOUT
CS CLINICAL SINK
CV CONTROL VALVE
BFP REDUCED PRESSURE BACKFLOW
PREVENTER
BHP BREAK HORSEPOWER
BSP BLACK STEEL PIPE
BT BATHTUB
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
A/E ARCHITECT / ENGINEER
AD AREA DRAIN
AFF ABOVE FINISH FLOOR
AFG ABOVE FINISH GRADE
AG AIR GAP
AP ACCESS PANEL
AS AUTOMATIC SPRINKLER
ASD ADJUSTABLE SPEED DRIVES
ASD AUTOMATIC SPRINKLER DRAIN
ASHRAE AMERICAN SOCIETY HEATING,
REFRIGERATION, AIR CONDITIONING
ENGINEERS
ASME AMERICAN SOCIETY MECHANICAL
ENGINEERS
ASPE AMERICAN SOCIETY PLUMBING
ENGINEERS
ASR AUTOMATIC SPRINKLER RISER
AV ACID VENT
AW ACID WASTE
P-3
TYPICAL UNIT NO.
PUMP NO. 3
EQUIPMENT ABBREVIATION (PUMP)
CIRCUIT SETTER (BALANCING VALVE)
WATER HAMMER ARRESTOR
GATE VALVE
ACID WASTE
ACID VENT
INSTRUMENT AIR
CARBON DIOXIDE
CONDENSATE DRAINCD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD
LOW PRESSURE STEAMLPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS LPS
MEDIUM PRESSURE STEAMMPS MPS MPS MPS MPS MPS MPS MPS MPS MPS MPS MPS MPS MPS MPS MPS MPS MPS MPS MPS MPS MPS MPS MPS MPS MPS MPS MPS MPS MPS MPS MPS MPS MPS MPS MPS MPS
DE-IONIZED WATER
PNEUMATIC TUBE SYSTEM PIPE
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
F i l e
P a t h
FULLY
SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:
ARCHITECT/ENGINEER OF RECORD
SEAL
CONSULTANT
321 4 5 6 7 8 9 10
NEW CLINICAL LAB FOR
SURGICAL EXPANSION
RICHMOND, VIRGINIA
652-319
PROJECT DIRECTOR
AUGUST 2018
REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
BID DOCUMENTS
DWG. OF 162
NAME: TINA DEBELLA, PE
PHONE: 804.675.5495
EMAIL: Tina.DeBella@va.gov
PLUMBING ABBREVIATIONS & SYMBOLS
PL001
DMDCDL
13 Aug 2018
2"
3"
2" 3"
10" SD RISER
12"
8"10"
10" 8"
6"
6"
3" VTR
5" VTR
3" VTR
3" VTR
W V U T S R Q P N
W V U T S R Q P N
8" SD RISER
2"
3"
3"
2" 7
3"
3"
4"
3"
3"
3"
3"7
3"
3"3"
3"
3"
3"
3"
3"
3"
3"
2"
3"3"
2"
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
COCO
CO
CO
CO
CO
4"
4"
4"
2"
4" 2"
4"4"
CO
CO
CO
CO
3"
4"
3"
T-2 pH MONITORING
PANEL
3" VTR
CO
CO
T-1
CO
CO
CO
4"
4"
3"
CO
3"
4 4 4
4 CO
8" RISER FROM 3RD
FLR INTERSTITIAL
2"
CO
CO
7 KEY NOTES
1. NEW 4" RISER DROPS THROUGH FLOOR TO 1ST FLOOR MECH
ROOM AND CONNECTS TO EXISTING 4" RISER. IF BID
ALTERNATE SELECTED TO EXCLUDE BATHROOM FINISHES,
EXCLUDE STANDARD SANITARY SEWER DRAINAGE SYSTEM.
INSTALL SANITARY VENT SYSTEM EXTENSION FROM 2ND FLR.
2. ABANDON SYSTEM IN PLACE. BID ALTERNATE.
3. REROUTE EXISTING VENTS THRU ROOF IN 2ND INTERSTITIAL
TO LOCATION INDICATED. FILL PENETRATION.
4. REMOVE R.D. SEAL PENETRATIONS (NOT BID ALTERNATE).
5. OFFSET AND EXTEND EXISTING STORM DRAIN RISER TO 3RD
FLOOR INTERSTITIAL. REDUCE FROM 10" TO 8" DIA.
6. EXTEND EXISTING VENT THRU ROOF
7. 1 1/2" CRP SANITARY UP
8. 3" CRP SANITARY UP
9. 4" CRP SANITARY UP
10. 2" CRP SANITARY UP
11. DEMOLISH 3" ATVTR (GALVANIZED STEEL VENT FOR
ABANDONED 2ND FLOOR STEAM STERILIZERS) AND FILL
PENETRATIONS. INCLUDE ALL HANGERS AND
APPURTENANCES RELATED TO THIS SYSTEM.
12. 4" SANITARY UP
13. 1 1/2" SANITARY UP
14. 3" SANITARY UP
15. 2" SANITARY UP
16. INSTALL PIPE CHASE THOUGH SLAB 12" X 30"
1. COORDINATE ALL WORK WITH GENERAL CONTRACTOR,
OTHER TRADES, AND THE COR TO MINIMIZE DISRUPTION OF
AREAS OUTSIDE OF THE PROJECT LIMITS OF WORK.
2. ALL TIE-INS TO EXISTING SYSTEMS TO BE COORDINATED AND
SCHEDULED WITH VAMC. ASSUME ALL TIE-INS WILL BE
PERFORMED DURING OFF PEAK HOURS (NIGHTS AND
WEEKENDS).
3. COORDINATE PLUMBING INSTALLATION WITH OTHER TRADES.
OFFSET LINES AS NEEDED TO AVOID CONFLICTS.
4. PIPING HAS BEEN INDICATED ON DRAWINGS IN APPROXIMATE
LOCATIONS. EXACT ROUTING WILL BE DETERMINED IN THE
FIELD.
5. FIELD VERIFY ALL EXISTING PLUMBING PIPE LOCATIONS,
SIZES, AND INVERTS.
6. SLEEVE ALL PENETRATIONS, FIRESTOP OR SEAL AS
REQUIRED.
7. REFER TO ARCHITECTURAL PLANS FOR RATED WALL
LOCATIONS.
8. COORDINATE CLEANOUTS AND FLOOR DRAINS WITH
ARCHITECTURAL FINISH PLAN.
9. ALL HANGAR SUPPORTS SHALL BE INSTALLED VERTICALLY
AND UPRIGHT
10. ALL PIPES SHALL BE INSTALLED PARALLEL AND
PERPENDICULAR TO BUILDING
11. PROVIDE HOUSEKEEPING PADS FOR ALL FLOOR MOUNTED
EQUIPMENT.
12. NEW SANITARY RISERS REQUIRE CORE DRILLING TO
INTERSTITIAL SPACES. COORDINATE PENETRATIONS WITH
CONCRETE WAFFLE SLAB. ADJUST AS NECESSARY TO AVOID
DAMAGING STRUCTURAL MEMBERS.
13. ALL STORM DRAINS SLOPED 18"/FT MINIMUM.
14. LIGHT WEIGHT LINES ARE EXISTING VENT LINES. THEY ARE
TO REMAIN UNLESS OTHERWISE NOTED.
GENERAL NOTES
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
F i t h
FULLY
SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:
ARCHITECT/ENGINEER OF RECORD
SEAL
CONSULTANT
321 4 5 6 7 8 9 10
NEW CLINICAL LAB FOR
SURGICAL EXPANSION
RICHMOND, VIRGINIA
652-319
PROJECT DIRECTOR
AUGUST 2018
REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
BID DOCUMENTS
DWG. OF 162
NAME: TINA DEBELLA, PE
PHONE: 804.675.5495
EMAIL: Tina.DeBella@va.gov
2ND FLOOR INTERSTITIAL SPACE
PLUMBING SANITARY WASTE AND VENT
PL123
DMDCDL
SCALE:
PL123
PLUMBING SANITARY WASTE AND VENT
2ND FLOOR INTERSTITIAL SPACE
1/8" = 1'-0"
NPQRSTUVW
X
Wn
P-707
P-707
P-101
P-201
P-502
P-418
P-202
P-101 [3]
P-101
P-420 [3]
P-418
P-101
P-528
P-608 [2]
FD-F
P-420 [3]
P-528 P-528
P-528
P-418
P-418P-418
P-528
P-528
P-528
FD-F
FD-E
P-524
FD-F
FD-F
P-708
P-707
FD-F
P-707
FD-F
P-418
P-707
FD-F
FD-F
FD-F
FD-F
FD-F
FD-F
FD-F
FD-F
3 3
16 6
16 3
1 1 1
4"
2"
4"
2"
1 1/2"
P-528
P-418
FD-F
P-707
3" VTR
3 3
FD-F 16
FD-F
CORRIDOR
C3F-1
CORRIDOR
C3F-2
BIOMED
3F-101
ANCILLARY TESTING
3F-103
DRUG TESTING
3F-105
IT CLOSET
3F-104
ELEC CLOS
3F-102
ACCESSIONING
3F-106a
FEE BASIS
3F-106b
MICROBIOLOGY
3F-106d
HEMATOLOGY
3F-106e
CHEMISTRY
3F-106f
REFRIGERATEDSTORAGE
3F-126
BLOOD BANK
3F-106c
CYTOLOGY
3F-106h
OPEN OFFICE
3F-106j
ARCHIVE
3F-124
CLEAN SUPPLY
3F-131
BSL-3 LAB
3F-129
STAFF TOILET
3F-108
DRUG TESTING TOILET
3F-105a
IMMUNOLOGY
3F-107
MEN'S TOILET
3F-109
WOMEN'S TOILET
3F-111
JANITOR
3F-110
EQUIPMENT ROOM
3F-130
GAS TANK ROOM
3F-127
BREAK ROOM
3F-112
CORRIDOR
C3F-3
OFFICE #1
3F-114
OFFICE #2
3F-115
OFFICE #3
3F-116
OFFICE #4
3F-117
OFFICE #5
3F-118
ADMINISTRATION
3F-120
DIRECTOR'S OFFICE
3F-121
CMT OFFICE
3F-122
OFFICE #6
3F-123
ADPAC/RESIDENTS
3F-119
FLAMMABLE
STORAGE
3F-125
ANTE ROOM
3F-128
HISTOLOGY
3F-106g
STAIR
3F-S2
CONF ROOM
3F-113
P-528
P-418
1 1. 1 1/2" ACID WASTE DOWN AND 1 1/2" ACID VENT
UP
2. OFFSET VENT AS SHOWN
3. 3" ACID WASTE DOWN
4. 4" ACID WASTE DOWN
5. 5" SANITARY VENT EXTENSION SERVING 1ST
FLOOR FIXTURES
6. 3" VENT SANITARY VENT EXTENSION SERVING
2ND FLOOR FIXTURES
7. 8" STORM DRAIN RISER
8. 1 1/2" SANITARY DOWN AND 1 1/2" VENT UP
9. 2" SANITARY DOWN
10. 1 1/2" VENT UP
11. 4" SANITARY DOWN AND 3" VENT UP
12. 4" SANITARY DOWN
13. 3" VENT UP
14. 2" SANITARY DOWN
15. WALL CLEANOUT
16. 2" ACID WASTE DOWN AND 2" ACID VENT UP
17. 3" ACID WASTE AND 3" ACID VENT UP
18. 2" SANITARY DOWN AND 2" VENT UP
19. 1.5" SANITARY VENT THROUGH ROOF FOR STEAM
STERILIZER.
20. STORM DRAIN RISER.
# KEY NOTES
GENERAL NOTES
1. COORDINATE ALL WORK WITH GENERAL
CONTRACTOR, OTHER TRADES, AND THE COR
TO MINIMIZE DISRUPTION OF AREAS OUTSIDE
OF THE PROJECT LIMITS OF WORK.
2. ALL TIE-INS TO EXISTING SYSTEMS TO BE
COORDINATED AND SCHEDULED WITH VAMC.
ASSUME ALL TIE-INS WILL BE PERFORMED
DURING OFF PEAK HOURS (NIGHTS AND
WEEKENDS).
3. COORDINATE PLUMBING INSTALLATION WITH
OTHER TRADES. OFFSET LINES AS NEEDED TO
AVOID CONFLICTS.
4. PIPING HAS BEEN INDICATED ON DRAWINGS IN
APPROXIMATE LOCATIONS. EXACT ROUTING
WILL BE DETERMINED IN THE FIELD.
5. FIELD VERIFY ALL EXISTING PLUMBING PIPE
LOCATIONS, SIZES, AND INVERTS.
6. SLEEVE ALL PENETRATIONS, FIRESTOP OR SEAL
AS REQUIRED.
7. REFER TO ARCHITECTURAL PLANS FOR RATED
WALL LOCATIONS.
8. COORDINATE CLEANOUTS AND FLOOR DRAINS
WITH ARCHITECTURAL FINISH PLAN.
9. ALL HANGAR SUPPORTS SHALL BE INSTALLED
VERTICALLY AND UPRIGHT
10. ALL PIPES SHALL BE INSTALLED PARALLEL AND
PERPENDICULAR TO BUILDING
11. PROVIDE HOUSEKEEPING PADS FOR ALL FLOOR
MOUNTED EQUIPMENT.
12. NEW SANITARY RISERS REQUIRE CORE
DRILLING TO INTERSTITIAL SPACES.
COORDINATE PENETRATIONS WITH CONCRETE
WAFFLE SLAB. ADJUST AS NECESSARY TO
AVOID DAMAGING STRUCTURAL MEMBERS.
13. ALL STORM DRAINS SLOPED 18"/FT MINIMUM.
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
F i t h
FULLY
SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:
ARCHITECT/ENGINEER OF RECORD
SEAL
CONSULTANT
321 4 5 6 7 8 9 10
NEW CLINICAL LAB FOR
SURGICAL EXPANSION
RICHMOND, VIRGINIA
652-319
PROJECT DIRECTOR
AUGUST 2018
REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
BID DOCUMENTS
DWG. OF 162
NAME: TINA DEBELLA, PE
PHONE: 804.675.5495
EMAIL: Tina.DeBella@va.gov
3RD FLOOR
PLUMBING SANITARY WASTE AND VENT
PL131
DMDPFM
SCALE:
PL102
PLUMBING SANITARY WASTE AND VENT
3RD FLOOR
4" @ 18"/1' SLOPE6" @ 18"/1' SLOPE
6" @ 18"/1' SLOPE
6" @ 18"/1' SLOPE
4" @ 18"/1' SLOPE
6"
SCALE:
PL133
PLUMBING SANITARY WASTE AND VENT
3RD FLOOR INTERSTITIAL SPACE
1/8" = 1'-0"
3" VTR
FROM
2ND FL
4" COUP TO 4" RD
UP TO 4" RD UP TO 4" RD
UP TO 4" RD
UP TO 4" RD
UP TO 4" RD
4" CO
6"
UP TO 4" RD
UP TO 4" RD
4" CO
4" CO
4" CO
1 1/2" 1 1/2" 1 1/2"
1 1/2"
2" VTR
2"
2"2"
2" 2"
2"
2"
1 1/2"
2" VTR
3" VTR
2"
2"
2"
3" VTR
3" 1 1/2"
2"
3"
1 1/2"
1 1/2"1 1/2"
3" VTR
5" VTR FROM
1ST FLR
3" VTR
FROM
2ND FL
3" VTR
FROM
2ND FL
1 1/2"2" VTR
3"3" VTR
1 1/2"
1 1/2"
2"
3" 2"3"
2" VTR
2"
2" 1 1/2" 1 1/2"
2"
3" VTR
FROM
2ND FL
3" VTR
1 1/2"
1 1/2" VTR
UP TO 4" ORD
4" CO
UP TO 4" ORDUP TO 4" ORD
UP TO 4" ORD
4" @ 18"/1' SLOPE
6" @ 18"/1' SLOPE
6" @ 18"/1' SLOPE
6" @ 18"/1' SLOPE
4" CO
4" CO
4" CO
6" ORD EXIT
TO DAYLIGHT
6" ORD EXIT
TO DAYLIGHT
UP TO 4" ORDUP TO 4" ORDUP TO 4" ORD
UP TO 4" ORD
4" @ 18"/1' SLOPE
6" @ 18"/1' SLOPE
6" @ 18"/1' SLOPE 6" @ 18"/1' SLOPE
4" CO
1" FROM
AHU COIL
COND DRAIN
TYP 4 PLACES
4" @ 18"/1' SLOPE
8" SD RISER
DROP TO 2ND FLR INTERSTITIAL
4" CO
GENERAL NOTES
1. COORDINATE ALL WORK WITH GENERAL CONTRACTOR,
OTHER TRADES, AND THE COR TO MINIMIZE DISRUPTION
OF AREAS OUTSIDE OF THE PROJECT LIMITS OF WORK.
2. ALL TIE-INS TO EXISTING SYSTEMS TO BE
COORDINATED AND SCHEDULED WITH VAMC. ASSUME
ALL TIE-INS WILL BE PERFORMED DURING OFF PEAK
HOURS (NIGHTS AND WEEKENDS).
3. COORDINATE PLUMBING INSTALLATION WITH OTHER
TRADES. OFFSET LINES AS NEEDED TO AVOID
CONFLICTS.
4. PIPING HAS BEEN INDICATED ON DRAWINGS IN
APPROXIMATE LOCATIONS. EXACT ROUTING WILL BE
DETERMINED IN THE FIELD.
5. FIELD VERIFY ALL EXISTING PLUMBING PIPE LOCATIONS,
SIZES, AND INVERTS.
6. SLEEVE ALL PENETRATIONS, FIRESTOP OR SEAL AS
REQUIRED.
7. REFER TO ARCHITECTURAL PLANS FOR RATED WALL
LOCATIONS.
8. COORDINATE CLEANOUTS AND FLOOR DRAINS WITH
ARCHITECTURAL FINISH PLAN.
9. ALL HANGAR SUPPORTS SHALL BE INSTALLED
VERTICALLY AND UPRIGHT
10. ALL PIPES SHALL BE INSTALLED PARALLEL AND
PERPENDICULAR TO BUILDING
11. PROVIDE HOUSEKEEPING PADS FOR ALL FLOOR
MOUNTED EQUIPMENT.
12. NEW SANITARY RISERS REQUIRE CORE DRILLING TO
INTERSTITIAL SPACES. COORDINATE PENETRATIONS
WITH CONCRETE SLAB. ADJUST AS NECESSARY TO
AVOID DAMAGING STRUCTURAL MEMBERS.
13. ALL STORM DRAINS SLOPED 18"/FT MINIMUM.
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
F i t h
FULLY
SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:
ARCHITECT/ENGINEER OF RECORD
SEAL
CONSULTANT
321 4 5 6 7 8 9 10
NEW CLINICAL LAB FOR
SURGICAL EXPANSION
RICHMOND, VIRGINIA
652-319
PROJECT DIRECTOR
AUGUST 2018
REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
BID DOCUMENTS
DWG. OF 162
NAME: TINA DEBELLA, PE
PHONE: 804.675.5495
EMAIL: Tina.DeBella@va.gov
3RD FLOOR INTERSTITIAL SPACE
PLUMBING SANITARY WASTE AND VENT
PL133
ROOF
3F-RF
SCALE:
PL141
ROOF PLUMBING
1/8" = 1'-0"
4" ROOF DRAIN
2,250 SQFT AREA
3" VTR
FROM
2ND FL
2" VTR
2" VTR
3" VTR
3" VTR5" VTR FROM
1ST FLR
3" VTR
FROM
2ND FL
3" VTR
FROM
2ND FL
2" VTR
3" VTR
2" VTR
CH-1
EF-1
EF-2
CU-1
3" VTR
FROM
2ND FL
3" VTR
1 1/2" VTR
P-805
3/4" CW
4" ROOF DRAIN
2,250 SQFT AREA
4" ROOF DRAIN
2,250 SQFT AREA
4" ROOF DRAIN
3,120 SQFT AREA
4" ROOF DRAIN
3,120 SQFT AREA
4" ROOF DRAIN
2,250 SQFT AREA
4" ROOF DRAIN
2,250 SQFT AREA
4" ROOF DRAIN
2,250 SQFT AREA
4" OVERFLOW
ROOF DRAIN
4" OVERFLOW
ROOF DRAIN
4" OVERFLOW
ROOF DRAIN
4" OVERFLOW
ROOF DRAIN
4" OVERFLOW
ROOF DRAIN
4" OVERFLOW
ROOF DRAIN
4" OVERFLOW
ROOF DRAIN
4" OVERFLOW
ROOF DRAIN
TYP
2" VTR
KEY NOTES
1. RELOCATE FIRE PROTECTION STANDPIPE AND
ROOF MANIFOLD
2. BID ALTERNATIVE-DELETE OVERFLOW ROOF
DRAINS AND ASSOCIATED PIPING. ADJUST ROOF
TAPERED INSULATION TO ALLOW PERIMETER
SCUPPER OVERFLOW.
3. ROOF DRAIN/OVERFLOW DRAIN COMBO SET IS
ACCEPTABLE ALTERNATIVE TO SEPARATE UNITS.
1. COORDINATE ALL WORK WITH GENERAL CONTRACTOR,
OTHER TRADES, AND THE COR TO MINIMIZE DISRUPTION
OF AREAS OUTSIDE OF THE PROJECT LIMITS OF WORK.
2. ALL TIE-INS TO EXISTING SYSTEMS TO BE
COORDINATED AND SCHEDULED WITH VAMC. ASSUME
ALL TIE-INS WILL BE PERFORMED DURING OFF PEAK
HOURS (NIGHTS AND WEEKENDS).
3. COORDINATE PLUMBING INSTALLATION WITH OTHER
TRADES. OFFSET LINES AS NEEDED TO AVOID
CONFLICTS.
4. PIPING HAS BEEN INDICATED ON DRAWINGS IN
APPROXIMATE LOCATIONS. EXACT ROUTING WILL BE
DETERMINED IN THE FIELD.
5. FIELD VERIFY ALL EXISTING PLUMBING PIPE LOCATIONS,
SIZES, AND INVERTS.
6. SLEEVE ALL PENETRATIONS, FIRESTOP OR SEAL AS
REQUIRED.
7. REFER TO ARCHITECTURAL PLANS FOR RATED WALL
LOCATIONS.
8. COORDINATE CLEANOUTS AND FLOOR DRAINS WITH
ARCHITECTURAL FINISH PLAN.
9. ALL HANGAR SUPPORTS SHALL BE INSTALLED
VERTICALLY AND UPRIGHT
10. ALL PIPES SHALL BE INSTALLED PARALLEL AND
PERPENDICULAR TO BUILDING
11. PROVIDE HOUSEKEEPING PADS FOR ALL FLOOR
MOUNTED EQUIPMENT.
12. NEW SANITARY RISERS REQUIRE CORE DRILLING TO
INTERSTITIAL SPACES. COORDINATE PENETRATIONS
WITH CONCRETE SLAB. ADJUST AS NECESSARY TO
AVOID DAMAGING STRUCTURAL MEMBERS.
13. ALL STORM DRAINS SLOPED 18"/FT MINIMUM.
GENERAL NOTES
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
F i t h
FULLY
SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:
ARCHITECT/ENGINEER OF RECORD
SEAL
CONSULTANT
321 4 5 6 7 8 9 10
NEW CLINICAL LAB FOR
SURGICAL EXPANSION
RICHMOND, VIRGINIA
652-319
PROJECT DIRECTOR
AUGUST 2018
REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
BID DOCUMENTS
DWG. OF 162
NAME: TINA DEBELLA, PE
PHONE: 804.675.5495
EMAIL: Tina.DeBella@va.gov
ROOF PLUMBING
PL141
4"
3/4"
2"
1 1/4" 1/2"
W V U T S R Q P N
W V U T S R Q P N
C D
CD
1"
CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD
1"
C D
C D
GENERAL NOTES
1. COORDINATE ALL WORK WITH GENERAL
CONTRACTOR, OTHER TRADES, AND THE COR TO
MINIMIZE DISRUPTION OF AREAS OUTSIDE OF
THE PROJECT LIMITS OF WORK.
2. ALL TIE-INS TO EXISTING SYSTEMS TO BE
COORDINATED AND SCHEDULED WITH VAMC.
ASSUME ALL TIE-INS WILL BE PERFORMED
DURING OFF PEAK HOURS (NIGHTS AND
WEEKENDS).
3. COORDINATE PLUMBING INSTALLATION WITH
OTHER TRADES. OFFSET LINES AS NEEDED TO
AVOID CONFLICTS.
4. FIELD VERIFY ALL EXISTING PLUMBING PIPE
LOCATIONS, SIZES, AND INVERTS.
5. ALL HANGAR SUPPORTS SHALL BE INSTALLED
VERTICALLY AND UPRIGHT
6. ALL PIPES SHALL BE INSTALLED PARALLEL AND
PERPENDICULAR TO BUILDING
7. PROVIDE HOUSEKEEPING PADS FOR ALL FLOOR
MOUNTED EQUIPMENT.
8. ALL PIPING THIS SHEET SHOWN IN HALFTONE IS
EXISTING AND TO REMAIN. MODIFY PIPING AS
NECESSARY TO INSTALL BALANCING VALVES
AND RELATED EQUIPMENT.
KEY NOTES
1. INSTALL NEW 34" BALL VALVE, CHECK VALVE, AND
BALANCING VALVE.
2. RECORD FLOW PRIOR TO INSTALLING NEW
BALANCING VALVE ON 2ND FLOOR HWR MAIN.
RESET EXISTING 2ND FLOOR BALANCING VALVES
TO RECORDED FLOWS DURING COMMISSIONING
OF 3RD FLOOR SYSTEM.
3. TIE-IN TO EXISTING CONDENSATE DRAIN
4. NEW PNEUMATIC TUBE BRANCHS CONNECTED TO
EXISTING SYSTEM. BRANCHES TURN UP
THROUGH THIRD FLOOR TO THIRD FLOOR
INTERSTITIAL SPACE.
5. CONNECT TO EXISTING TRANSFER STATION #41
ABOVE ROOM 2A-190.
5. CONNECT TO EXISTING TRANSFER STATION #21
ABOVE ROOM CORRIDOR.
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
F i t h
FULLY
SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:
ARCHITECT/ENGINEER OF RECORD
SEAL
CONSULTANT
321 4 5 6 7 8 9 10
NEW CLINICAL LAB FOR
SURGICAL EXPANSION
RICHMOND, VIRGINIA
652-319
PROJECT DIRECTOR
AUGUST 2018
REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
BID DOCUMENTS
DWG. OF 162
NAME: TINA DEBELLA, PE
PHONE: 804.675.5495
EMAIL: Tina.DeBella@va.gov
2ND FLOOR INTERSTITIAL SPACE
PLUMBING SUPPLY PIPING
PP123
DMDCDL
SCALE:
PP123
PLUMBING SUPPLY PIPING
2ND FLOOR INTERSTITIAL SPACE
F
PF
R E
F
R E
F
P F
P F
P
F
PF
NPQRSTUVW
X
Wn
P-707
P-707
P-101
P-201
P-502
P-418
P-202
P-101 [3]
P-101
P-420 [3]
P-418
P-101
P-528
P-608
FD-F
P-420 [3]
P-528 P-528
P-528
P-528
P-528
P-418
P-528
P-528
P-528
FD-F
FD-E
P-524
FD-F
FD-F
P-707
FD-F
P-707
FD-F
P-418
P-707
FD-F
FD-F
FD-F
FD-F
FD-F
FD-F
FD-F
FD-F
P-528
P-418
FD-F
P-707
FD-F
FD-F
DI BEDS
RELOCATED AIR
COMPRESSOR
RELOCATED
CIRCULATION
PUMP
FILTERS
HIGH PRESSURE
CYLINDERS
CORRIDOR
C3F-1
CORRIDOR
C3F-2
BIOMED
3F-101
ANCILLARY TESTING
3F-103
DRUG TESTING
3F-105
IT CLOSET
3F-104
ELEC CLOS
3F-102
ACCESSIONING
3F-106a
FEE BASIS
3F-106b
MICROBIOLOGY
3F-106d
HEMATOLOGY
3F-106e
CHEMISTRY
3F-106f
REFRIGERATEDSTORAGE
3F-126
BLOOD BANK
3F-106c
CYTOLOGY
3F-106h
OPEN OFFICE
3F-106j
ARCHIVE
3F-124
CLEAN SUPPLY
3F-131
BSL-3 LAB
3F-129
STAFF TOILET
3F-108
DRUG TESTING TOILET
3F-105a
IMMUNOLOGY
3F-107
MEN'S TOILET
3F-109
WOMEN'S TOILET
3F-111
JANITOR
3F-110
EQUIPMENT ROOM
3F-130
GAS TANK ROOM
3F-127
BREAK ROOM
3F-112
CORRIDOR
C3F-3
OFFICE #1
3F-114
OFFICE #2
3F-115
OFFICE #3
3F-116
OFFICE #4
3F-117
OFFICE #5
3F-118
ADMINISTRATION
3F-120
DIRECTOR'S OFFICE
3F-121
CMT OFFICE
3F-122
OFFICE #6
3F-123
ADPAC/RESIDENTS
3F-119
FLAMMABLE STORAGE
3F-125
ANTE ROOM
3F-128
HISTOLOGY
3F-106g
STAIR
3F-S2
CONF ROOM
3F-113
P-528
P-418
GENERAL NOTES
1. DOMESTIC WATER SUPPLY LINES TO INDIVIDUAL SINKS
AND LAVATORIES ARE 12" UNLESS OTHERWISE NOTED.
2. INSTALL THERMOSTATIC MIXING VALVE ON ALL SINKS
AND LAVS TO LIMIT HOT WATER SUPPLY TEMP TO 110
DEG F.
3. COORDINATE ALL WORK WITH GENERAL CONTRACTOR,
OTHER TRADES, AND THE COR TO MINIMIZE DISRUPTION
OF AREAS OUTSIDE OF THE PROJECT LIMITS OF WORK.
4. ALL TIE-INS TO EXISTING SYSTEMS TO BE COORDINATED
AND SCHEDULED WITH VAMC. ASSUME ALL TIE-INS WILL
BE PERFORMED DURING OFF PEAK HOURS (NIGHTS AND
WEEKENDS).
5. COORDINATE PLUMBING INSTALLATION WITH OTHER
TRADES. OFFSET LINES AS NEEDED TO AVOID
CONFLICTS.
6. PIPING HAS BEEN INDICATED ON DRAWINGS IN
APPROXIMATE LOCATIONS. EXACT ROUTING WILL BE
DETERMINED IN THE FIELD.
7. FIELD VERIFY ALL EXISTING PLUMBING PIPE LOCATIONS,
SIZES, AND INVERTS.
8. SLEEVE ALL PENETRATIONS, FIRESTOP OR SEAL AS
REQUIRED.
9. REFER TO ARCHITECTURAL PLANS FOR RATED WALL
LOCATIONS.
10. COORDINATE CLEANOUTS AND FLOOR DRAINS WITH
ARCHITECTURAL FINISH PLAN.
11. ALL HANGAR SUPPORTS SHALL BE INSTALLED
VERTICALLY AND UPRIGHT
12. ALL PIPES SHALL BE INSTALLED PARALLEL AND
PERPENDICULAR TO BUILDING
13. PROVIDE FULL PORT BALL VALVES AT ALL DOMESTIC
WATER BRANCH CONNECTIONS. IN ADDITION, PROVIDE
CHECK VALVES AT ALL LOCATIONS SERVING FIXTURES
WITH THERMOSTATIC MIXING VALVES.
14. PROVIDE HOUSEKEEPING PADS FOR ALL FLOOR
MOUNTED EQUIPMENT.
15. PROVIDE ISOLATION VALVES, PRESSURE REGULATION,
AND INDIVIDULAL CONNECTIONS TO COMPONENTS FOR
LAB EQUIPMENT PER MANUFACTURER
RECOMMENDATIONS. REUSE EXISTING VALVES, TUBING,
AND FITTINGS WHERE POSSIBLE.
KEY NOTES
1. 1
2" DOMESTIC WATER SUPPLY TO GROSSING STATION.
2. 1
2" ANAEROBIC GAS CONNECTION TO EQUIPMENT.
3. 1
2" DI WATER SUPPLY TO BENCH TOP EQUIPMENT.
4. 1
2" DI WATER SUPPLY TO FREE STANDING EQUIPMENT.
5. 1
2" COMPRESSED AIR SUPPLY TO FREE STANDING
EQUIPMENT.
6. DOMESTIC WATER SUPPLY TO FIXTURE. PROVIDE
ANGLE STOP ISOLATION.
7. 1
2" DOMESTIC WATER SUPPLY TO BENCH TOP
EQUIPMENT.
8. RELOCATE EXISTING AIR COMPRESSOR AND INSTALL IN
LOCATION SHOWN. REUSE EXISTING VALVES TUBING
AND FITTINGS WHERE POSSIBLE.
9. RELOCATE EXISTING DI WATER SUPPLY SYSTEM.
REUSE EXISTING PUMP, PIPING, VALVES AND FITTINGS
WHERE POSSIBLE.
10. 1" DOMESTIC WATER SUPPLY FROM INTERSTITIAL TO DI
WATER SUPPLY SYSTEM.
11. 1" DI WATER SUPPLY TO INTERSTITIAL.
12. 1" DI WATER RETURN FROM INTERSTITIAL.
13. RELOCATE EXISTING ANAEROBIC GAS SUPPLY SYSTEM.
REUSE EXISTING MANIFOLDS, PIG TAILS, AND
CONTROLS.
14. 1
2" ANAEROBIC GAS SUPPLY TO INTERSTITIAL
15. 1" DI WATER SUPPLY TO STEAM STERILIZER. PROVIDE
BACKFLOW PREVENTER IN ADDITION TO LOCAL
EQUIPMENT ISOLATION VALVE.
16. 1
2" MEDIUM PRESSURE (50-80 PSI) STEAM FROM 3RD
INTERSTITIAL TO STEAM STERILIZER. PROVIDE XX LB/HR
F&T STEAM TRAP WITH INLET STRAINER, CHECK VALVE
AND ISOLATION GATE VALVES CONNECTED TO DRIP LEG
OF SUPPLY LINE AND DISCHARGING TO CONDENSATE
DRAIN LINE. SEE DETAIL DRAWING
17. 1" CONDENSATE DRAIN DOWN TO 2ND INTERSTITIAL.
18. PNEUMATIC TUBE LINES UP FROM 2ND FLOOR
INTERSTITIAL LEVEL.
19. PNEUMATIC TUBE LINE DOWN FROM 3RD FLOOR
INTERSTITIAL LEVEL.
20. DRUG TESTING LAV AND WATER CLOSET SENSORS TO
BE WIRED VIA ELECTRICAL DISCONNECT SWITCH IN
DRUG TESTING OFFICE 3F-105. SEE ELECTRICAL SHEET
EP131 FOR DETAILS.
21. LOCATION OF ZONE SHUT-OFF VALVE FOR CO2 AND
ALARM PANEL FOR CO2 AND COMPRESSED AIR IN WALL
EXTERIOR TO GAS TANK ROOM.
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
F i t h
FULLY
SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:
ARCHITECT/ENGINEER OF RECORD
SEAL
CONSULTANT
321 4 5 6 7 8 9 10
NEW CLINICAL LAB FOR
SURGICAL EXPANSION
RICHMOND, VIRGINIA
652-319
PROJECT DIRECTOR
AUGUST 2018
REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
BID DOCUMENTS
DWG. OF 162
NAME: TINA DEBELLA, PE
PHONE: 804.675.5495
EMAIL: Tina.DeBella@va.gov
3RD FLOOR
PLUMBING SUPPLY PIPING
PP131
DMDCDL
SCALE:
PP131
PLUMBING SUPPLY PIPING
3RD FLOOR
1 1/4" 2"
1/2"
1 1/4"
1 1/2"
3/4" 1 1/2"
3/4"
1/2"1"
1 1/4"
1/2"
1 1/4" 1/2"
2"
2"
1 1/4"
1/2"
1/2"
SET
0.5 GPM
SET
0.5 GPM1/2"
1/2"
1/2"
1/2"
1/2"
1 1/4"
1/2"
1 1/4" 1 1/4"
1 1/4"
1/2"
1/2"
1"
1/2"
SET
0.5 GPM
1/2"
1/2"
1/2"
1/2"
1 1/4"
1/2"3/4"
1"
1/2" 1/2"
1/2"
1/2"
1/2"
1/2"
TYPE "C"
1"
MPS MPS
M P
S
1/2"
3/4"45
1/2"
GENERAL NOTES
1. DOMESTIC WATER SUPPLY LINES TO INDIVIDUAL
SINKS AND LAVATORIES ARE 12" UNLESS
OTHERWISE NOTED.
2. DOMESTIC WATER SUPPLY LINES TO INDIVIDUAL
EMERGENCY SHOWERS ARE 1 14" UNLESS
OTHERWISE NOTED.
3. DI WATER SUPPLY LINES TO INDIVIDUAL
EQUIPMENT ARE 12" UNLESS OTHERWISE NOTED.
4. ANAEROBIC GAS SUPPLY LINES ARE 12" UNLESS
OTHERWISE NOTED.
5. COMPRESSED AIR SUPPLY LINES ARE 12" UNLESS
OTHERWISE NOTED.
6. INSTALL THERMOSTATIC MIXING VALVE ON ALL
SINKS AND LAVS TO LIMIT HOT WATER SUPPLY
TEMP TO 110 DEG F.
7. COORDINATE ALL WORK WITH GENERAL
CONTRACTOR, OTHER TRADES, AND THE COR TO
MINIMIZE DISRUPTION OF AREAS OUTSIDE OF
THE PROJECT LIMITS OF WORK.
8. ALL TIE-INS TO EXISTING SYSTEMS TO BE
COORDINATED AND SCHEDULED WITH VAMC.
ASSUME ALL TIE-INS WILL BE PERFORMED
DURING OFF PEAK HOURS (NIGHTS AND
WEEKENDS).
9. COORDINATE PLUMBING INSTALLATION WITH
OTHER TRADES. OFFSET LINES AS NEEDED TO
AVOID CONFLICTS.
10. PIPING HAS BEEN INDICATED ON DRAWINGS IN
APPROXIMATE LOCATIONS. EXACT ROUTING
WILL BE DETERMINED IN THE FIELD.
11. FIELD VERIFY ALL EXISTING PLUMBING PIPE
LOCATIONS, SIZES, AND INVERTS.
12. SLEEVE ALL PENETRATIONS, FIRESTOP OR SEAL
AS REQUIRED.
13. REFER TO ARCHITECTURAL PLANS FOR RATED
WALL LOCATIONS.
14. COORDINATE CLEANOUTS AND FLOOR DRAINS
WITH ARCHITECTURAL FINISH PLAN.
15. ALL HANGAR SUPPORTS SHALL BE INSTALLED
VERTICALLY AND UPRIGHT
16. ALL PIPES SHALL BE INSTALLED PARALLEL AND
PERPENDICULAR TO BUILDING
17. PROVIDE FULL PORT BALL VALVES AT ALL
DOMESTIC WATER BRANCH CONNECTIONS. IN
ADDITION, PROVIDE CHECK VALVES AT ALL
LOCATIONS SERVING FIXTURES WITH
THERMOSTATIC MIXING VALVES.
18. PROVIDE HOUSEKEEPING PADS FOR ALL FLOOR
MOUNTED EQUIPMENT.
KEY NOTES
1. 1
2" DOMESTIC COLD WATER DOWN
2. 1 14" DOMESTIC COLD WATER DOWN
3. 1 12" DOMESTIC WATER DOWN
4. 3
4" DOMESTIC COLD WATER UP TO ROOF.
5. 2 X 6" P-TUBES. SUPPLY FROM 2ND STORY
INTERSTITIAL. PROVIDE DROPS TO 3RD STORY
TERMINALS.
6. LIMIT OF CONSTRUCTION OF DCW SUPPLY IF BID
ALTERNATE SELECTED TO REMOVE BATHROOM
FINISHES.
7. IF BID ALTERNATE SELECTED TO REMOVE
BATHROOM FINISHES, INSTALL FULL DHW SUPPLY
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
F i t h
FULLY
SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:
ARCHITECT/ENGINEER OF RECORD
SEAL
CONSULTANT
321 4 5 6 7 8 9 10
NEW CLINICAL LAB FOR
SURGICAL EXPANSION
RICHMOND, VIRGINIA
652-319
PROJECT DIRECTOR
AUGUST 2018
REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
BID DOCUMENTS
DWG. OF 162
NAME: TINA DEBELLA, PE
PHONE: 804.675.5495
EMAIL: Tina.DeBella@va.gov
3RD FLOOR INTERSTITIAL SPACE
PLUMBING SUPPLY PIPING
PP133
DMDCDL
SCALE:
PP133
PLUMBING SUPPLY PIPING
3RD FLOOR INTERSTITIAL SPACE
9" [225mm] DIA. TWO-PIECE
NICKEL BRONZE FLASHING
STRAINER
FLASHING PAN
VINYL FLOORING FLASHING, MIN. 24" [600mm] SQUARE 2 1/2 LB. [1.1kg] TO 4 LB. [1.8kg] LEAD OR 16 OZ. [453g] COPPER
CAULKED,
NO-HUB OR
THREADED
CONNECTION
FLASHING COLLAR
LOOSE GRAVEL
AT WEEP HOLES
PROVIDE FLASHING WHEN
DRAIN IS INSTALLED IN A
NON-MEMBRANE FLOOR
VA
RIE
S
MINIMUM 16 GAGE GALVANIZED STEEL
PLATE 12"x48" [300x1200mm] MIN.
SECURED TO A MIN. 4 STUDS PER
LAVATORY
1/4" [6mm]Ø MOLLY BOLT HOLLOW
WALL ANCHOR (1 EA. SIDE OF LAV)
MIN. (3) 1/4" [6mm]
MACHINE BOLTS
W/DOUBLE LOCK
NUTS ON BACK SIDE
MIN. 5 1/4" [131mm]Ø
GALV. MACHINE
BOLTS WELDED TO
PLATE
1/4" [6mm]
TYP. 1/8"
TYP. [3mm]
A A
PLAN
SECTION A
NOTES:
1. AT LAVS WITH FOOT PEDAL CONTROLS
PROVIDE AN ADDITIONAL 16 GAGE
GALVANIZED STEEL PLATE 12"x16" [300x600mm] SECURED TO A MINIMUM
OF 2 STUDS PER FOOT PEDAL.
2. PROVIDE 20 GAGE STUDS WHEN
HEIGHT EXCEEDS 12'-0" [3600mm]
STEEL HANGER BY LAV MFGR
STEEL WALL
PLATE
WALL ANCHOR
STUDS
3' -3
[9 m m
T O
F
LO
O R
FOR FIXTURE
HEIGHT SEE
ARCHITECTURAL
DRAWINGS
SCALE:
PL501
LAVATORY MOUNTING DETAIL
NTS
SCALE:
PL501
TYPE F FLOOR DRAIN
NTS
NEUTRALIZED WASTE
WATER TO SANITARY
SYSTEM
SCALE:
PL501
ACID WASTE NEUTRALIZATION SYSTEM
NTS
VENT TO
ATMOSPHERE
T-2
SAMPLING
TANK
T-1
DILUTION
TANK
120V PH MONITORING
PANEL W/ PROGRAMMABLE
ALARM SET POINTS.
SET LOW ALARM AT PH<5.
SET HIGH ALARM AT PH>11.
PH PROBE.
HOUSEKEEPING PAD
ACID WASTE
INLET
LIMESTONE
CHIPS
SUPPORT
STAND
FAUCET SEE
SPEC 22 40 00
LAMINAR FLOW
CONTROL DEVICE
OFFSET
WASTE
TRAP
PARALLEL
TO WALL
LOOSE
KEY STOP
ESCUTCHEON
FINISHED
FLOOR
[8 m m
] 8" [200mm]
/4
[2 m m
F O
R F
IX
T
U R
E H
E
IG
H T
S S
E E
A R
C H
IT
E
C T
U R
A L
D R
A W
IN
G
S
SCALE:
PL501
TYPICAL LAVATORY
NTS
PRESSURE RELIEF VALVE (PVR) BEND
NIPPLE
CONTROL PANEL
STATION
ANCHORED TO
SLAB
PVR FOR STATION BED
VERTICALLY FROM
ABOVE FLOOR
AREA ABOVE STATIONS
SHALL BE KEPT CLEAR
OF OBSTRUCTIONS TO
TUBING
COMMUNICATION
CABLE/ CONDUIT
ENTRYPOWER
CONDUIT
ENTRY
TOP VIEWFRONT VIEW
NOTES:
1. COORDINATE WITH VENDOR AND FURR-IN STATION
2. STATION SHALL BE ANCHORED TO THE SLAB. NOTCH TRACK TO FIT STATION LEGS.
3. CONTROL REQUIREMENTS: ETHERNET PROTOCOL AVAILABLE. CONSULT SWISSLOG. TRADITIONAL RS422 SYSTEMS:
4-CONDUCTOR PLENUM RATED PVC INSULATED CABLE, #22 AWG SHIELDED TWISTED PAIR WITH GROUND WIRE. 5 VDC
MAXIMUM OPEN CIRCUIT VOLTAGE, 200 MA MAXIMUM SHORT CIRCUIT CURRENT.
WALL
SCALE:
PL501
PNEUMATIC TUBE SYSTEM STATION
: NTS
SCALE:
PL501
P-101 WATER CLOSET DETAIL
NTS
[4 m m
2' -9
[8 m m ][9 m m
FINISHED
FLOOR
FINISHED
WALL
GRAB BAR SEE
ARCH. DWGS
C WATER CLOSET
PLANELEVATION
L
18" [450mm]
F O
R F
IX
T
U R
E H
E
IG
H T
S E
E A
R C
H
IT
E C
T U
R A
L D
R A
W
IN
G S
SEE SPEC 22 40 00
FOR FIXTURE
SPECIFICS
SEE SPEC FOR
VALVE TYPE/DETAILS
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
F i t h
FULLY
SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:
ARCHITECT/ENGINEER OF RECORD
SEAL
CONSULTANT
321 4 5 6 7 8 9 10
NEW CLINICAL LAB FOR
SURGICAL EXPANSION
RICHMOND, VIRGINIA
652-319
PROJECT DIRECTOR
AUGUST 2018
REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
BID DOCUMENTS
DWG. OF 162
NAME: TINA DEBELLA, PE
PHONE: 804.675.5495
EMAIL: Tina.DeBella@va.gov
PLUMBING DETAILS
PL501
PLUMBING FIXTURE ROUGH-IN SCHEDULE
MARK DESCRIPTION WASTE PIPE VENT PIPE
HOT
WATER
COLD
WATER
REMARKS
P-101 WATER CLOSET FLOOR MOUNTED 4 SEE DWG --- 1 -
P-201 URINAL 2 SEE DWG --- 3/4 -
P-202 URINAL, WHEELCHAIR 2 SEE DWG --- 3/4 -
P-418 LAVATORY WALL MOUNTED 1 1/2 SEE DWG 1/2 1/2
CONNECT DHW/CW TO THERMOSTATIC MIXING VALVE.
PROVIDE MAXIMUM 110°F
P-420 LAVATORY COUNTER MOUNTED 1 1/2 SEE DWG 1/2 1/2
CONNECT DHW/CW TO THERMOSTATIC MIXING VALVE.
PROVIDE MAXIMUM 110°F
P-502 FLOOR SINK 3 SEE DWG
P-524 DOUBLE COMPARTMENT SINK 1 1/2 SEE DWG 1/2 1/2
CONNECT DHW/CW TO THERMOSTATIC MIXING VALVE.
PROVIDE MAXIMUM 110°F
P-528 SINGLE COMPARTMENT SINK 1 1/2 SEE DWG 1/2 1/2
CONNECT DHW/CW TO THERMOSTATIC MIXING VALVE.
PROVIDE MAXIMUM 110°F
P-608 WATER COOLER, GLASS FILLER 1 1/2 SEE DWG --- 1/2 -
P-707 EMERGENCY SHOWER/EYEWASH --- SEE DWG 1 1/4 1 1/4
CONNECT DHW/CW TO THERMOSTATIC MIXING VALVE.
PROVIDE 85°F TEMPERED WATER
P-708 EMERGENCY EYE WASH, WALL MOUNT 1 1/2 SEE DWG 1/2 1/2
CONNECT DHW/CW TO THERMOSTATIC MIXING VALVE.
PROVIDE 85°F TEMPERED WATER
P-805 LAWN FAUCET --- --- --- 3/4 -
FD-E FLOOR DRAIN 4 SEE DWG --- --- -
FD-F FLOOR DRAIN 3 SEE DWG --- --- -
PLUMBING LOAD SUMMARY
MARK DESCRIPTION
QTY
SANITARY
DRAINS
QTY ACID
DRAINS
CWFU EACH CWFU
HWFU
EACH
HWFU DFU EACH
DFU
SANITARY
DRAINS
DFU ACID
DRAINS
P-101 WATER CLOSET FLOOR MOUNTED 6 0 10 60 0 0 4 24 0
P-201 URINAL 1 0 2 2 0 0 2 2 0
P-202 URINAL, WHEELCHAIR 1 0 2 2 0 0 2 2 0
P-418 LAVATORY WALL MOUNTED 2 5 1.5 10.5 1.5 10.5 1 2 5
P-420 LAVATORY COUNTER MOUNTED 6 0 1.5 9 1.5 9 1 6 0
P-502 MOP SINK 1 0 1.5 1.5 1.5 1.5 2 2 0
P-524 DOUBLE COMPARTMENT SINK 1 0 1.5 1.5 1.5 1.5 3 3 0
P-528 SINGLE COMPARTMENT SINK 0 8 1.5 12 1.5 12 3 0 24
P-608 WATER COOLER, GLASS FILLER 2 0 0.25 0.5 0 0 0.5 1 0
P-707 EMERGENCY SHOWER/EYEWASH 0 5 0 0 0 0 0 0 0
P-708 EMERGENCY EYE WASH, WALL MOUNT 0 1 0 0 0 0 0 0 0
P-805 LAWN FAUCET 1 0 0.5 0.5 0 0 0 0 0
FD-E FLOOR DRAIN, 4", EQMT ROOM 1 0 0 0 0 0 0.5 0.5 0
FD-F FLOOR DRAIN, 3" 0 17 0 0 0 0 0.5 0 8.5
TOTAL 22 36 99.5 34.5 42.5 37.5
ACID NEUTRALIZATION TANK SCHEDULE
MARK BUILDING LOCATION SYSTEM DESCRIPTION MATERIAL VOLUME INLET CONNECTION
OULET
CONNECTION
VENT CONNECTION LIMESTONE CHIPS
T-1 500
MECH SERVICE BAY
2-B-E
ACID WASTE
NEUTRALIZATION
TANK
POLYETHYLENE OR
POLYPROPYLENE
100 GAL 4" 4" 3" 1000 LB
T-2 500
MECH SERVICE BAY
2-B-E
ACID WASTE SAMPLING TANK
POLYETHYLENE OR
POLYPROPYLENE
5 GAL 4" 4" NONE NONE
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
F i t h
FULLY
SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:
ARCHITECT/ENGINEER OF RECORD
SEAL
CONSULTANT
321 4 5 6 7 8 9 10
NEW CLINICAL LAB FOR
SURGICAL EXPANSION
RICHMOND, VIRGINIA
652-319
PROJECT DIRECTOR
AUGUST 2018
REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
BID DOCUMENTS
DWG. OF 162
NAME: TINA DEBELLA, PE
PHONE: 804.675.5495
EMAIL: Tina.DeBella@va.gov
PLUMBING SCHEDULES
PL601
GROUND
L1
L1-INT
L2
L3
L4
L5
L2-INT
L3-INT
L4-INT
L5-INT
012 3
013 2
014 0
020 2
010 1
023 0
030 2
040 2
Z-5 0
BP 510
BP 511
BP 512
BP 513
BP 514
BP 515
Z-6 0
BP 610
BP 611
BP 612
BP 613
BP 614
BP 615
BP 490
BP 395
BP 290
041 3
SCC
BP190
Z-1
Z-2
Z-3
Z-4
RFID
5C
RFID
4A
RFID
4B
RFID
4C
RFID
432 BLOOD
BANK
RFID
ACCESSIONING
RFID
2E
RFID
PACU
RFID
2H
RFID
2G
RFID
2F
RFID
OR
RFID
224 POLY
TRAUMA
2B
RFID
INTERSIT
CARDIAC
CATH LAB
NO
RFID
1F
RFID
311 BLOOD
DRAW
RFID
BB100
RFID
EMERGENCY
RFID
113 GREEN
CLINIC
RFID
RX
4D
GENERAL NOTES
1. DRAWING SHOWS THE EXISTING PNEUMATIC SYSTEM ON CAMPUS PLUS
ADDITIONS FOR THE NEW CONSTRUCTION. CONTRACTOR SHALL COORDINATE
WITH EXISTING VENDOR/REP FOR EXTENSION OF EXISTING PNEUMATIC
SYSTEM INTO THE LAB.
PNEUMATIC TUBE SYSTEM RISER DIAGRAM LEGEND
RECESSED STATION (STANDARD AND RFID
TRANSFER UNIT
SELECTIVE BYPASS
VACUUM BYPASS VALVE
BYPASS (BP), STORAGE (S), VAULT (V), OR
RESOLUTION (R) PIPE
TRANSFER UNIT OPEN PORT END CAP OR CAPPED
TUBE
ZONE BLOWER
SYSTEM CONTROL CENTER
CARRIER ARRIVAL INDICATOR (CAI)
ETHERNET CONNECTION
NEW TUBE OR EQUIPMENT
EXISTING TUBE OR EQUIPMENT
RFID
A B C D E F
BP
BP
BP
BP
BP
BP
BP
SCC
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
F i t h
FULLY
SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:
ARCHITECT/ENGINEER OF RECORD
SEAL
CONSULTANT
321 4 5 6 7 8 9 10
NEW CLINICAL LAB FOR
SURGICAL EXPANSION
RICHMOND, VIRGINIA
652-319
PROJECT DIRECTOR
AUGUST 2018
REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
BID DOCUMENTS
DWG. OF 162
NAME: TINA DEBELLA, PE
PHONE: 804.675.5495
EMAIL: Tina.DeBella@va.gov
PNEUMATIC TUBE SYSTEM
SCHEMATIC DIAGRAM
PL602
DMDCDL
SCALE:
PL602
SCHEMATIC DIAGRAM
PNEUMATIC TUBE SYSTEM
NTS
lforster Text Box lforster Typewritten Text
REF-2
lforster Typewritten Text
REFERENCE DRAWING
Rectangle
Typewritten Text
REF-1
lforster Typewritten Text
REFERENCE DRAWING
Rectangle
| PL001 - PLUMBING ABBREVIATIONS & SYMBOLS |
| PL123 - 2ND FLOOR INTERSTITIAL SPACE PLUMBING SANITARY WASTE AND VENT |
| PL131 - 3RD FLOOR PL131 - PLUMBING SANITARY WASTE AND VENT |
| PL133 - 3RD FLOOR INTERSTITIAL SPACE PLUMBING SANITARY WASTE AND VENT |
| PL141 - ROOF PLUMBING |
| PP123 - 2ND FLOOR INTERSTITIAL SPACE PLUMBING SUPPLY PIPING |
| PP131 - 3RD FLOOR PLUMBING SUPPLY PIPING |
| PP133 - 3RD FLOOR INTERSTITIAL SPACE SUPPLY PIPING |
| PL501 - PLUMBING DETAILS |
| PL601 - PLUMBING SCHEDULES |
| PL602 - PNEUMATIC TUBE SYSTEM SCHEMATIC DIAGRAM |
| REF-1 - SWISSLOG - REFERENCE DRAWING 1 |
| REF-2 - SWISSLOG - REFERENCE DRAWING 2 |