36C24619B0039-010.pdf

PDF 6 MB Posted

Attached to
Construct New Clinical Lab Expansion (VA-18-00152139) Federal contract opportunity
Solicitation number
36C24619B0039
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6

About this file

This document package includes construction drawings and specifications for a federal construction project along with the associated solicitation opportunity. The Department of Veterans Affairs is seeking a Service Disabled Veteran Owned Small Business to provide all labor, materials, equipment and supervision necessary to complete the Construct New Clinical Lab Expansion project located at the H.H. McGuire VA Medical Center in Richmond, Virginia. The project involves the partial renovation and addition of approximately 18,050 square feet to an existing medical center building. Work shall be performed according to the construction drawings and specifications prepared by AES Group, Inc. and be completed within 680 calendar days of receiving the Notice to Proceed. The estimated construction cost is between $5,000,000 to $10,000,000. Questions regarding the solicitation should be directed to the Contracting Officer. The procurement is fully set aside for SDVOSBs. Offers will only be accepted from SDVOSB concerns.

36C24619B0039 S02 FIRE SPRINKLER_BidDocuments.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Construct New Clinical Lab Expansion (VA-18-00152139), newest first.
File Type Posted
36C24619B0039-0003000.docx DOCX document
36C24619B0039-0003002.pdf PDF
36C24619B0039-0003003.pdf PDF
36C24619B0039-0003001.pdf PDF
36C24619B0039-0003001.pdf PDF
36C24619B0039-0003003.pdf PDF
36C24619B0039-0003002.pdf PDF
36C24619B0039-0003000.docx DOCX document
36C24619B0039-0002000.docx DOCX document
36C24619B0039-0002000.docx DOCX document
36C24619B0039-0001000.docx DOCX document
36C24619B0039-0001000.docx DOCX document
36C24619B0039-010.pdf PDF
36C24619B0039-007.pdf PDF
36C24619B0039-005.pdf PDF
36C24619B0039-002.docx DOCX document
36C24619B0039-006.pdf PDF
36C24619B0039-009.pdf PDF
36C24619B0039-008.pdf PDF
36C24619B0039-003.pdf PDF
36C24619B0039-012.pdf PDF
36C24619B0039-013.pdf PDF
36C24619B0039-004.pdf PDF
36C24619B0039-001.docx DOCX document
36C24619B0039-011.pdf PDF
36C24619B0039-002.docx DOCX document
36C24619B0039-013.pdf PDF
36C24619B0039-012.pdf PDF
36C24619B0039-009.pdf PDF
36C24619B0039-005.pdf PDF
36C24619B0039-008.pdf PDF
36C24619B0039-006.pdf PDF
36C24619B0039-007.pdf PDF
36C24619B0039-011.pdf PDF
36C24619B0039-001.docx DOCX document
36C24619B0039-004.pdf PDF
36C24619B0039-003.pdf PDF
36C24619B0039-000.docx DOCX document
36C24619B0039-000.docx DOCX document
Show all 39

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPRINKLER SYSTEM DESIGN DATA

SYSTEM TYPE

SPACE

OCCUPANCY TYPE

DESIGN AREA

DESIGN DENSITY HOSE STREAM

GPM/SF

SF

GPM

WET

ALL AREAS U.N.O.

NOTES: 1. SEMI-RECESSED PENDENT OR SEMI-RECESSED SIDEWALL HEADS TO BE USED UNDER ALL SUSPENDED CEILINGS.

LIGHT HAZARD 0.10

1. AUTOMATIC FIRE SPRINKLER SYSTEM DESIGN, ENGINEERING AND INSTALLATION AS INDICATED ON THIS PLAN SHALL COMPLY WITH NFPA

13 (2016 EDITION), NFPA 101 (2015 EDITION), VA FIRE PROTECTION DESIGN MANUAL (SEVENTH EDITION) AND OTHER APPLICABLE CODES

AND STANDARDS AS REQUIRED BY THE AUTHORITY HAVING JURISDICTION (AHJ).

2. CONTRACTOR TO PROVIDE WET AUTOMATIC SPRINKLER SYSTEM FOR THE NEW FLOOR AS SHOWN ON THESE DESIGN DOCUMENTS. NEW

SYSTEM PIPING SHALL BE CONNECTED AT THE NEW STAIR RISER IN STAIR 3F121. ALL NEW SPRINKLER AREAS SHALL CONFORM TO

EXISTING FIRE, SMOKE AND FIRE ALARM ZONES.

3. PROVIDE FM-GLOBAL APPROVED AUTOMATIC SPRINKLERS AS INDICATED IN THE TABLE ON THIS DRAWING. REDUCTION IN DESIGN AREA

IS ALLOWED PER NFPA 13.

4. ALL MATERIALS AND DEVICES USED IN THIS PROJECT SHALL BE UL-LISTED AND/OR FM-APPROVED FOR USE IN AUTOMATIC SPRINKLER

SYSTEMS.

5. ALL SPRINKLER PIPING PENETRATIONS THROUGH FIRE RATED ASSEMBLIES SHALL BE SEALED WITH A UL-APPROVED THROUGH

PENETRATION FIRE STOP ASSEMBLY.

6. ALL AUTOMATIC SPRINKLER PIPING INSTALLED UNDER THIS CONTRACT SHALL BE HYDROSTATICALLY TESTED IN ACCORDANCE WITH

NFPA 13 AND OTHER APPLICABLE NFPA STANDARDS, STATE AND LOCAL CODES.

7. SPRINKLER PIPE HANGERS SHALL BE UL-APPROVED. THE SPRINKLER INSTALLATION CONTRACTOR SHALL PROVIDE PIPE HANGERS AS

REQUIRED BY NFPA 13.

1,500

DATE OF TEST: SEPTEMBER 20, 2017

TIME OF TEST: 1:15 PM

FLOW HYDRANT: HYDRANT #6

PRESSURE HYDRANT: HYDRANT #7

STATIC PRESSURE: 45 PSI

RESIDUAL PRESSURE: 43 PSI

PITOT PRESSURE: 40 PSI

2-1/2" HYDT BUTT

FLOW COEFFICIENT 0.80

WATERFLOW: 978 GALLONS

SPRINKLER HEAD TYPE

QUICK RESPONSE, K-5.6 OR 8.0

QUICK RESPONSE, K-5.6 OR 8.0

ORDINARY TEMPERATURE

155F OR 200F

(NOTE 1)

HATCHED AREAS - ORDINARY HAZARD GROUP 1 AUTOMATIC SPRINKLER

DESIGN 155° F OR 200° F QUICK RESPONSE, k-5.6 OR k-8.0 HEADS.

HATCHED AREAS - ORDINARY HAZARD GROUP 2 AUTOMATIC SPRINKLER

DESIGN 155° F QUICK RESPONSE, k-5.6 OR k-8.0 HEADS.

WET

ORDINARY HAZARD GROUP 1 0.15

1,500

WET

ORDINARY HAZARD GROUP 2 0.20

1,500

QUICK RESPONSE, K-5.6 OR 8.0

ORDINARY TEMPERATURE

MECHANICAL

ELECTRICAL

STORAGE

CLEAN STORAGE

FLAMMABLE STORAGE

NON HATCHED AREAS - LIGHT HAZARD AUTOMATIC SPRINKLER DESIGN

155° F QUICK RESPONSE, k-5.6 OR k-8.0 HEADS.

THE EXISTING BOOSTER FIRE PUMP PROVIDES WATER TO THE EXISTING AUTOMATIC

SPRINKLER RISERS AT STAIR #3F121.

PUMP RATING IS 1,500 GPM @ 116 PSI AND 3,000 RPM.

*ABOVE HYDRANT TEST IS VALID 1 YEAR FROM TIME

OF TEST. CONTRACTOR TO PROVIDE UPDATED WATER TEST

INFORMATION AS PART OF SHOP DRAWING SUBMITTAL.

AUTOMATIC SPRINKLER SYSTEM NOTES:

WATER SUPPLY TEST:

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

F i l e

P a t h

FULLY

SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:

ARCHITECT/ENGINEER OF RECORD

SEAL

CONSULTANT

321 4 5 6 7 8 9 10

NEW CLINICAL LAB FOR

SURGICAL EXPANSION

RICHMOND, VIRGINIA

652-319

PROJECT DIRECTOR

AUGUST 2018

REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

BID DOCUMENTS

DWG. OF

KEYPLAN

LAB EXPANSION

PLAN

NORTH

NAME: TINA DEBELLA, PE

PHONE: 804.675.5495

EMAIL: Tina.DeBella@va.gov

TN

N

PROJECT INFORMATION

FIRE SPRINKLER SYSTEM

FX001

86 162

RDLRDL

Owner Image

Owner Typewritten Text

13 AUG 2018

SCALE:

FX131

3RD FLOOR FIRE SPRINKLER PLAN

1/8" = 1'-0"

NPQRSTUVW

437 SF

CORRIDOR

C3F-1

1181 SF

CORRIDOR

C3F-2

188 SF

BIOMED

3F-101

405 SF

ANCILLARY TESTING

3F-103

117 SF

DRUG TESTING

3F-105

81 SF

IT CLOSET

3F-104

106 SF

ELEC CLOS

3F-102

387 SF

ACCESSIONING

3F-106a

467 SF

FEE BASIS

3F-106b

1015 SF

HEMATOLOGY

3F-106e

1529 SF

CHEMISTRY

3F-106f

231 SF

REFRIGERATEDSTORAGE

3F-126

544 SF

BLOOD BANK

3F-106c

495 SF

CYTOLOGY

3F-106h

1179 SF

OPEN OFFICE

3F-106j

273 SF

ARCHIVE

3F-124

372 SF

CLEAN SUPPLY

3F-131

147 SF

BSL-3 LAB

3F-129

70 SF

STAFF TOILET

3F-108

65 SF

DRUG TESTING TOILET

3F-105a

511 SF

IMMUNOLOGY

3F-107

301 SF

MEN'S TOILET

3F-109

304 SF

WOMEN'S TOILET

3F-111

52 SF

JANITOR

3F-110

121 SF

EQUIPMENT ROOM

3F-130

93 SF

GAS TANK ROOM

3F-127

378 SF

BREAK ROOM

3F-112

112 SF

CORRIDOR

C3F-3

109 SF

OFFICE #1

3F-114

115 SF

OFFICE #2

3F-115

100 SF

OFFICE #3

3F-116

113 SF

OFFICE #4

3F-117

107 SF

OFFICE #5

3F-118

228 SF

ADMINISTRATION

3F-120

132 SF

DIRECTOR'S OFFICE

3F-121

94 SF

CMT OFFICE

3F-122

87 SF

OFFICE #6

3F-123

345 SF

ADPAC/RESIDENTS

3F-119

77 SF

FLAMMABLE STORAGE

3F-125

125 SF

ANTE ROOM

3F-128

1560 SF

HISTOLOGY

3F-106g

164 SF

STAIR

3F-S2

W4

Wn

222 SF

CONF ROOM

3F-113

HATCHED AREAS - ORDINARY HAZARD GROUP 1 AUTOMATIC SPRINKLER

DESIGN 155° F OR 200° F QUICK RESPONSE, k-5.6 OR k-8.0 HEADS.

HATCHED AREAS - ORDINARY HAZARD GROUP 2 AUTOMATIC SPRINKLER

DESIGN 155° F QUICK RESPONSE, k-5.6 OR k-8.0 HEADS.

NON HATCHED AREAS - LIGHT HAZARD AUTOMATIC SPRINKLER DESIGN

155° F QUICK RESPONSE, k-5.6 OR k-8.0 HEADS.

8'0 4' 16'

SCALE:1/8"=1'-0"

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

F i l e

P a t h

FULLY

SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:

ARCHITECT/ENGINEER OF RECORD

SEAL

CONSULTANT

321 4 5 6 7 8 9 10

NEW CLINICAL LAB FOR

SURGICAL EXPANSION

RICHMOND, VIRGINIA

652-319

PROJECT DIRECTOR

AUGUST 2018

REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

BID DOCUMENTS

DWG. OF

KEYPLAN

LAB EXPANSION

PLAN

NORTH

NAME: TINA DEBELLA, PE

PHONE: 804.675.5495

EMAIL: Tina.DeBella@va.gov

TN

N

3RD FLOOR PLAN

FIRE SPRINKLER SYSTEM

FX131

87 162

RDLRDL

FX501

SHEET NOTES

CONNECT RISER FROM EXISTING SPRINKLER SYSTEM RISER ON 2ND

FLOOR INTERSTITIAL LEVEL AND CONTINUE TO 3RD FLOOR, 3RD FLOOR

INTERSTITIAL AND ROOF.

1 KEY NOTES

FX501

2 PROVIDE AUTOMATIC SPRINKLERS INSIDE REFRIGERATOR.

1. AUTOMATIC SPRINKLERS WILL NOT BE INSTALLED IN THE

INTERSTITIAL SPACE. SPRINKLER PIPING TO BE INSTALLED

BETWEEN INTERSTITIAL FLOOR AND 2ND FLOOR CEILING. REFER

TO FX501 DETAIL SHEET.

Owner Image

Owner

WET I.T. NOTES

1. RUN PIPE OUTSIDE

WITH WALL PLATE

2. OUTLET TO BE 1'-0"

ABOVE FINSHED

GRADE

3. PROVIDE

SPLASHBLOCK

SPRINKLER LINE

CHROME FNC PLATE

SEAL w/GROUT

INSPECTOR'S TEST CONNECTION

AND MAIN DRAIN

1 " GAVL 45 ELBOW

w/1" GALV WALL PLATE

SPLASHBLOCK

SCALE: N.T.S.

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

F i l e

P a t h

FULLY

SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:

ARCHITECT/ENGINEER OF RECORD

SEAL

CONSULTANT

321 4 5 6 7 8 9 10

NEW CLINICAL LAB FOR

SURGICAL EXPANSION

RICHMOND, VIRGINIA

652-319

PROJECT DIRECTOR

AUGUST 2018

REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

BID DOCUMENTS

DWG. OF

KEYPLAN

LAB EXPANSION

PLAN

NORTH

NAME: TINA DEBELLA, PE

PHONE: 804.675.5495

EMAIL: Tina.DeBella@va.gov

TN

N

FIRE SPRINKLER SYSTEM DETAILS

FIRE SPRINKLER SYSTEM

FX501

88 162

RDLRDL

ROOF MANIFOLD DETAIL

N.T.S.

ROOF MANIFOLD - PHOTO FOR ILLUSTRATION ONLY ROOF MANIFOLD CONTROL VALVE ASSEMBLY - PHOTO

FOR ILLUSTRATION ONLY FLOOR CONTROL VALVE ASSEMBLY - PHOTO FOR

ILLUSTRATION ONLY

INSPECTOR'S TEST CONNECTION

N.T.S.

1. CONNECT RISER FROM EXISTING SPRINKLER SYSTEM RISER ON

2ND FLOOR. PROVIDE NEW FLOOR CONTROL VALVE ASSEMBLY

AND RUN ALL DRAINS TO DAYLIGHT AT GRADE LEVEL. RELOCATE

2ND FLOOR EXISTING ROOF MANIFOLD AND CONTROL VALVE

ASSEMBLY. CONTINUE TO RUN RISER PIPE TO ROOF MANIFOLD

AT ROOF.

SHEET NOTES

Owner Image

Owner

SCALE: N.T.S.

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

F i l e

P a t h

FULLY

SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:

ARCHITECT/ENGINEER OF RECORD

SEAL

CONSULTANT

321 4 5 6 7 8 9 10

NEW CLINICAL LAB FOR

SURGICAL EXPANSION

RICHMOND, VIRGINIA

652-319

PROJECT DIRECTOR

AUGUST 2018

REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

BID DOCUMENTS

DWG. OF

KEYPLAN

LAB EXPANSION

PLAN

NORTH

NAME: TINA DEBELLA, PE

PHONE: 804.675.5495

EMAIL: Tina.DeBella@va.gov

TN

N

FIRE SPRINKLER SYSTEM DETAILS

INTERIOR FIRE MAIN PIPING

FIRE SPRINKLER SYSTEM

FX502

89 162

RDLRDL

SHEET NOTES

THIS DRAWING IS PROVIDED FOR REFERENCE ONLY. CONTRACTOR

SHALL VERIFY ALL DIMENSIONS AND DIAMETERS FOR INCLUSION IN

THEIR CALCULATIONS AND SHOP DRAWINGS.

Owner Image

Owner

P

F

PF

P F

P

F

PF

CORRIDOR

C3F-1

CORRIDOR

C3F-2

81 SF

IT CLOSET

3F-104

105 SF

ELEC CLOS

3F-102

387 SF

ACCESSIONING

3F-106a

467 SF

FEE BASIS

3F-106b

1908 SF

MICROBIOLOGY

3F-106d

1019 SF

HEMATOLOGY

3F-106e

1534 SF

CHEMISTRY

3F-106f

231 SF

REFRIGERATEDSTORAGE

3F-126

544 SF

BLOOD BANK

3F-106c

496 SF

CYTOLOGY

3F-106h

1179 SF

OPEN OFFICE

3F-106j

273 SF

ARCHIVE

3F-124

372 SF

CLEAN SUPPLY

3F-131

147 SF

BSL-3 LAB

3F-129

301 SF

MEN'S TOILET

3F-109

304 SF

WOMEN'S TOILET

3F-111

70 SF

STAFF TOILET

3F-108

52 SF

JANITOR

3F-110

121 SF

EQUIPMENT ROOM

3F-130

77 SF

FLAMMABLE STORAGE

3F-125

125 SF

ANTE ROOM

3F-128

112 SF

CORRIDOR

C3F-3

109 SF

OFFICE #1

3F-114

115 SF

OFFICE #2

3F-115

100 SF

OFFICE #3

3F-116

113 SF

OFFICE #4

3F-117

107 SF

OFFICE #5

3F-118

228 SF

ADMINISTRATION

3F-120

132 SF

DIRECTOR'S OFFICE

3F-121

94 SF

CMT OFFICE

3F-122

87 SF

OFFICE #6

3F-123

345 SF

ADPAC/RESIDENTS

3F-119

1583 SF

HISTOLOGY

3F-106g

93 SF

GAS TANK ROOM

3F-127

164 SF

STAIR

3F-S2

NPQRSTUVW

X

Wn

DEDUCTIVE ALTERNATE # 4

NORTH INTERIOR ROOMS 3F-101, 3F-103, 3F-105, 3F-105A, 3F-107, 3F-112 AND 3F-113

8'0 4' 16'

SCALE:1/8"=1'-0"

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

F i l e

P a t h

FULLY

SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:

ARCHITECT/ENGINEER OF RECORD

SEAL

CONSULTANT

321 4 5 6 7 8 9 10

NEW CLINICAL LAB FOR

SURGICAL EXPANSION

RICHMOND, VIRGINIA

652-319

PROJECT DIRECTOR

AUGUST 2018

REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

BID DOCUMENTS

DWG. OF

KEYPLAN

LAB EXPANSION

PLAN

NORTH

NAME: TINA DEBELLA, PE

PHONE: 804.675.5495

EMAIL: Tina.DeBella@va.gov

TN

N

3RD FLOOR PLAN

DEDUCTIVE BID ALTERNATE #4

FIRE SPRINKLER SYSTEM

FX601

90 162

RDLRDL

SHEET NOTES

1. DESIGN AND INSTALL AUTOMATIC SPRINKLERS IN THE

UNFINISHED SPACES USING BRASS UPRIGHT, 165 DEGREE F,

K-8.0 SPRINKLER HEADS. SYSTEM SHALL BE DESIGNED FOR

0.30/2,000 SQ. FT. AREA WITH 250 GPM HOSE STREAM

ALLOWANCE. ALL OTHER PROVISIONS DESCRIBED IN DESIGN

DOCUMENTS TO REMAIN IN EFFECT.

Owner Image

Owner

DEDUCTIVE ALTERNATE # 5

NORTH INTERIOR ROOMS C3F-3, 3F-114, 3F-115, 3F-116, 3F-117, 3F-118, 3F-120, 3F-121, 3F-122, 3F-119

AND 3F-123

DEDUCTIVE ALTERNATE # 4

NORTH INTERIOR ROOMS 3F-101, 3F-103, 3F-105, 3F-105A, 3F-107, 3F-112 AND 3F-113

P

F

PF

P F

P

F

PF

CORRIDOR

C3F-1

CORRIDOR

C3F-2

81 SF

IT CLOSET

3F-104

105 SF

ELEC CLOS

3F-102

387 SF

ACCESSIONING

3F-106a

467 SF

FEE BASIS

3F-106b

1908 SF

MICROBIOLOGY

3F-106d

1019 SF

HEMATOLOGY

3F-106e

1534 SF

CHEMISTRY

3F-106f

231 SF

REFRIGERATEDSTORAGE

3F-126

544 SF

BLOOD BANK

3F-106c

496 SF

CYTOLOGY

3F-106h

1179 SF

OPEN OFFICE

3F-106j

273 SF

ARCHIVE

3F-124

372 SF

CLEAN SUPPLY

3F-131

147 SF

BSL-3 LAB

3F-129

301 SF

MEN'S TOILET

3F-109

304 SF

WOMEN'S TOILET

3F-111

70 SF

STAFF TOILET

3F-108

JANITOR

3F-110

121 SF

EQUIPMENT ROOM

3F-130

77 SF

FLAMMABLE STORAGE

3F-125

125 SF

ANTE ROOM

3F-128

1583 SF

HISTOLOGY

3F-106g

93 SF

GAS TANK ROOM

3F-127

164 SF

STAIR

3F-S2

NPQRSTUVW

X

Wn

8'0 4' 16'

SCALE:1/8"=1'-0"

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

F i l e

P a t h

FULLY

SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:

ARCHITECT/ENGINEER OF RECORD

SEAL

CONSULTANT

321 4 5 6 7 8 9 10

NEW CLINICAL LAB FOR

SURGICAL EXPANSION

RICHMOND, VIRGINIA

652-319

PROJECT DIRECTOR

AUGUST 2018

REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

BID DOCUMENTS

DWG. OF

KEYPLAN

LAB EXPANSION

PLAN

NORTH

NAME: TINA DEBELLA, PE

PHONE: 804.675.5495

EMAIL: Tina.DeBella@va.gov

TN

N

3RD FLOOR PLAN

DEDUCTIVE BID ALTERNATE #4 AND #5

FIRE SPRINKLER SYSTEM

FX602

91 162

RDLRDL

SHEET NOTES

1. DESIGN AND INSTALL AUTOMATIC SPRINKLERS IN THE

UNFINISHED SPACES USING BRASS UPRIGHT, 165 DEGREE F,

K-8.0 SPRINKLER HEADS. SYSTEM SHALL BE DESIGNED FOR

0.30/2,000 SQ. FT. AREA WITH 250 GPM HOSE STREAM

ALLOWANCE. ALL OTHER PROVISIONS DESCRIBED IN DESIGN

DOCUMENTS TO REMAIN IN EFFECT.

Owner Image

Owner

DEDUCTIVE ALTERNATE # 6

NORTH INTERIOR BATHROOMS 3F-109, 3F-110, 3F-111, 3F-108 AND CORRIDOR C3F-2

DEDUCTIVE ALTERNATE # 5

NORTH INTERIOR ROOMS C3F-3, 3F-114, 3F-115, 3F-116, 3F-117, 3F-118, 3F-120, 3F-121, 3F-122, 3F-119

AND 3F-123

DEDUCTIVE ALTERNATE # 4

NORTH INTERIOR ROOMS 3F-101, 3F-103, 3F-105, 3F-105A, 3F-107, 3F-112 AND 3F-113

P

F

PF

P F

P

F

PF

CORRIDOR

C3F-1

81 SF

IT CLOSET

3F-104

105 SF

ELEC CLOS

3F-102

387 SF

ACCESSIONING

3F-106a

467 SF

FEE BASIS

3F-106b

1908 SF

MICROBIOLOGY

3F-106d

1019 SF

HEMATOLOGY

3F-106e

1534 SF

CHEMISTRY

3F-106f

231 SF

REFRIGERATEDSTORAGE

3F-126

544 SF

BLOOD BANK

3F-106c

496 SF

CYTOLOGY

3F-106h

1179 SF

OPEN OFFICE

3F-106j

273 SF

ARCHIVE

3F-124

372 SF

CLEAN SUPPLY

3F-131

147 SF

BSL-3 LAB

3F-129

70 SF

STAFF TOILET

3F-108

121 SF

EQUIPMENT ROOM

3F-130

77 SF

FLAMMABLE STORAGE

3F-125

125 SF

ANTE ROOM

3F-128

1583 SF

HISTOLOGY

3F-106g

93 SF

GAS TANK ROOM

3F-127

164 SF

STAIR

3F-S2

NPQRSTUVW

X

Wn

8'0 4' 16'

SCALE:1/8"=1'-0"

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

F i l e

P a t h

FULLY

SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:

ARCHITECT/ENGINEER OF RECORD

SEAL

CONSULTANT

321 4 5 6 7 8 9 10

NEW CLINICAL LAB FOR

SURGICAL EXPANSION

RICHMOND, VIRGINIA

652-319

PROJECT DIRECTOR

AUGUST 2018

REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

BID DOCUMENTS

DWG. OF

KEYPLAN

LAB EXPANSION

PLAN

NORTH

NAME: TINA DEBELLA, PE

PHONE: 804.675.5495

EMAIL: Tina.DeBella@va.gov

TN

N

3RD FLOOR PLAN

DEDUCTIVE BID ALTERNATE #4, #5 AND 6

FIRE SPRINKLER SYSTEM

FX603

92 162

RDLRDL

SHEET NOTES

1. DESIGN AND INSTALL AUTOMATIC SPRINKLERS IN THE

UNFINISHED SPACES USING BRASS UPRIGHT, 165 DEGREE F,

K-8.0 SPRINKLER HEADS. SYSTEM SHALL BE DESIGNED FOR

0.30/2,000 SQ. FT. AREA WITH 250 GPM HOSE STREAM

ALLOWANCE. ALL OTHER PROVISIONS DESCRIBED IN DESIGN

DOCUMENTS TO REMAIN IN EFFECT.

Owner Image

Owner

FX001 - PROJECT INFORMATION FIRE SPRINKLER SYSTEM
FX131 - 3RD FLOOR PLAN FIRE SPRINKLER SYSTEM
FX501 - FIRE SPRINKLER SYSTEM DETAILS, FIRE SPRINKLER SYSTEM
FX502 - FIRE SPRINKLER SYSTEM DETAILS, FIRE SPRINKLER SYSTEM, INTERIOR FIRE MAIN PIPING
FX601 - 3RD FLOOR PLAN FIRE SPRINKLER SYSTEM DEDUCTIVE BID ALTERNATE #4
FX602 - 3RD FLOOR PLAN FIRE SPRINKLER SYSTEM DEDUCTIVE BID ALTERNATE #4 AND #5
FX603 - 3RD FLOOR PLAN FIRE SPRINKLER SYSTEM DEDUCTIVE BID ALTERNATE #4, #5 AND #6

File details come from the government source that posted it. Updated .