This federal contract opportunity notice seeks qualified service-disabled veteran-owned small businesses to construct a new clinical lab expansion for the Department of Veterans Affairs located in Richmond, Virginia. The project includes renovating approximately 18,050 square feet of an existing medical center building and adding new construction. The contractor will be responsible for all labor, materials, equipment, transportation and supervision required according to the construction drawings and specifications. The work must be completed within 680 calendar days of receiving the notice to proceed. The NAICS code is 236220 with a small business size standard of $36.5 million. The estimated construction cost is between $5 million and $10 million. Interested vendors should monitor the solicitation to be posted on or around August 15th for full details. A pre-proposal site visit will also be scheduled. Questions must be emailed to the contracting officer by the response due date. This opportunity is 100% set aside for service-disabled veteran-owned small businesses.
36C24619B0039 0003 Revised Sheets - VAMC RICHMOND CLINIC LAB PROJECT.pdf
View the file
Other files for this federal contract opportunity
Show all 39
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPLICABLE CODES
· VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA
NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER
GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL).
· IBC - INTERNATIONAL BUILDING CODE, 2015
· NFPA 101 - LIFE SAFETY CODE, 2015
· NFPA NATIONAL FIRE CODES, WITH THE EXCEPTION OF NFPA 5000
AND NFPA 900
· OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA)
STANDARDS
· VA SEISMIC DESIGN REQUIREMENTS, H-18-8
· NATIONAL ELECTRIC CODE (NEC)
· INTERNATIONAL PLUMBING CODE (IPC)
· ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS
(ABAAS) INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN
GUIDE (PG-18-13)
· BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE,
AMERICAN CONCRETE INSTITUTE AND COMMENTARY (ACI 318)
· MANUAL of Steel Construction, Load and Resistance Factor Design
Specificatoins for Structural Steel Buildings, American Institute of STeel
Construction (AISC)
· Energy policy Act of 2005 (EPAct)
· DOE Interim Final Rule: Energy Conservation Standards for New Federal, Commercial and Multi-Family High-Rise Residential Buildings and New
Low-Rise Residential Buildings, 10 CFR Parts 433, 434 and 435.
· Federal Leadership in High Performance and Sustainable Buildings:
Memorandum of Understanding (MOU)
· Executive Order 13423: Strengthening Federal Environmental, Energy, and Transportation Management.
· The provisions for Construction and Safety Signs. Stated in the General
Requirements Section 01010 of the VA Master Construction Specification.
· Ventilation for Acceptable Indoor Air Quality - ASHRAE Standard 62.1 -
· Safety Standard for Refrigeration Systems - ASHRAE Standard 15 - 2007
LOCAL CODES
As an agency of the federal government, VA is not subject to local imposition of code enforcement procedures (drawing reviews, building permits, inspections, fees, etc). VA must function as the Authority Having Jurisdiction (AHJ) and thus has the responsibility to guard public health and safety through enforcing its adopted codes. However, local authorities should be notrified about planned projects and given opportunity to review drawings, provided that VA does not pay for review or inspection fees.
NOTES:
1. NFPA 101 primarily addresses life safety and fire protection features, while the IBC addresses a wide range of considerations, including, but not limited to, structural strength, seismic stabilty, sanitation, adequate light and ventilation, and energy conservation. VA buildings must meet the requirements of NFPA 101 and documents referenced by NFPA 101 in order to comply with the accreditation requirements of The Joint Commission. Therefore, designs shall comply with the requirements of the latest edition of NFPA 101 and documents referenced therein. Design features not addressed by NFPA 101 or documenents referenced therein shall comply with the requirements of the latest edition of the IBC or as otherwise addressed above . For design features that are addressed by both the IBC as well as NFPA 101 or a document referenced by NFPA 101, the requirements of NFPA 101 or the document referenced by
NFPA 101 shall be used exclusively (this applies even if the IBC requirements are different).
2. Conflicts between Nationally Recognized Codes and Standards and VA
Requirements - Should a conflict exist between VA requirements and VA adopted nationally recognized codes and standards, the conflict shall be brought to the attention of VA. The resolution of the conflict shall be made by the authority having jurisdiction for VA to ensure a consistency system wide.
GENERAL DESCRIPTION
This project is for new Clinical Pathology Laboratory space to be constructed on top of an existing building wing. The current laboratory space is being taken over by an expasion project for new OR suites, and as a result the laboratory needs to move. The new space will be immediately adjacent to the new OR suites and will maintain the current close proximity to inpatient units and active Primary
Care clinics.
The construction must be done in a manner that keeps adjacent spaces and the existing lower floor opeation during the construction period.
The new space will be approximately 18,500 square feet and will include the following Clinical Pathology Laboratory departments; blood bank, microbiology, histology, chemistry, hematology, ancillary, cytology, pathology, as well as support areas that include administrative spaces and storage functions.
The new addition will provide specialized spaces for automated clinical laboratory spaces. The enhancement will aide in maximizing the flow for staffing, specimen sampling times and employee morale. These modifications will also bring the new spaces up to current design standards and will correct numerous
Facility Condition Assessment deficiencies, including finishes, accessibility and utility systems. Heating, Ventilation, and Air Conditioning systems will be replaced and upgraded to improve environmental controls and conditions. A roof-top chiller will also be included as part of the Heating, Ventilation, and Air
Conditioning upgrades due to limited capacities at the central utility plant.
BUILDING CODE SUMMARY
Use and Occupancy Classification - IBC Group I-2, Health Care LSC OR MIXED
USE Occupancy.
Type of Construction - type I-B
Occupancy Separation Required - Occupancy Separation is not required.
Hazardous Room Separation - NFPA 101, 18.3.2.1.2
1 hr FIRE ResistIVE Rating:
Storage Rooms Larger than 100sf and storing combustible material
Smoke Partitions:
Laboratories employing flammable or coMbustible materials in quantities less than those that would be considered a severe hazard.
Storage Rooms larger than 50sf but not exceeding
100sf and storing combustible material.
Smoke Barriers - Shall be provided to limit the size of smoke compartments to
22,500sf.
Smoke Barriers shall be 1hr rated fire partitions. Doors within corridors may be 20 minute rated, or
1 3/4 inch thick, solid-bonded, wood core doors.
Travel distance from any part of the health care facility to a smoke barrier door shall not exceed 200ft.
Laboratories in which chemicals are handled or stored shall comply with NFPA
45.
GENERAL BUILDING HEIGHTS AND AREAS
Allowable Height (Tabular) - Unlimited (NFPA 101, Table 18.1.6.1)
Max. Allowable Floor Area (if Sprinklered) - Unlimited (IBC, Table 506.2)
Calculated Actual Floor Area (Project Area Only) - 18,049sf
Total Area of 3rd Floor - Unknown, Existing
CODE REVIEW
Type of Construction - IBC I-B
Occupancy Separation Required -
Fire Resistive Requirements:
Exterior Walls, Bearing - Noncombustible, 2 hr rating.
Exterior Walls, Non-Bearing - Noncombustible, 0 hr rating.
Interior Walls, Bearing - Noncombustible, 2 hr rating.
Structural Frame - Noncombustible, 2 hr rating.
Floor-Ceiling - Noncombustible, 2 hr rating.
Roof-Ceiling - Noncombustible, 2 hr rating
Permanent Partitions - Nonbearing, Noncombustible, 0 hr
Rating.
Boiler Room Enclosure - N/A
Fire Protection Systems - Space is to be Fully Sprinklered.
Occupant Load Factor - IBC I-2, 240sf per occupant person.
Occupancy Factor Actual Area Actual Load
IBC I-2 Occupancy 240 18,049 sf 75 Occupants
Means of Egress, NFPA 101, Table A.7.6
Maximum Allowable Travel Distance to Exit (I-2) - Max. 200 Feet
Maximum Common Path of Travel - 100 Feet
Maximum Dead End Corridors - 30 Feet
Exits, NFPA 101, 7.4.1.1
Number of Exits Required: 2
Clear Width of Exits: 41.5 inches, NFPA 101, 18.2.3.6(1)
Clear Width of Corridors: 8 Feet, NFPA 101, 18.2.3.4
Exit signs: Exit marking is provided in areas accessible to the public in accordance with NFPA 101.
FIRE SUPPRESSION
Sprinkler System, NFPA 101, 18.3.5.1
Building is required to be protected throughout with an approved, supervised automatic sprinkler system installed in accordance with NFPA 13. The sprinkler system shall be hydraulically designed in accordance with the 2016 edition of
NFPA 13 and the SEVENTH Edition of the Deparment of Veterans Affairs Fire
Protection Design Manual.
Minimum Design Requirements:
Storage mechanical and electrical rooms shall be protected as (NFPA 101A.4.3):
Ordinary Hazard Occupancy, Group 1: 0.15 gpm/ft2 over 1,500sf.
Hose stream allowance: 250 GPM
All other areas shall be protected as (NFPA 101A.4.2): Light Hazard Occupancy:
0.10gpm/ft2 over 1,500sf.
HOse stream allowance: 100 GPM
Portable Fire Extinguishers (NFPA 101, 18.3.5.12):
Fire Extinguishers are required to be provided in accordance with NFPA 101, Section 9.9, and NFPA 10. All sprinklers within the smoke zone shall be changed to quick response sprinklers (NFPA 101, 18.3.5.6).
FIRE ALARM SYSTEM
A fire alarm system is required throughout the building. The fire alarm system must be installed in accordance with the 2015 International Building Code, NFPA
101 and NFPA 72. (NFPA 101, 18.3.4.2.1, 18.3.4.5.2)
Fire Alarm Control Panel (FACP):
Power for the equipment must be from the emergency power system. The FACP must provide power, supervision, control and logic for the entire system. The
FACP must monitor all fire alarm devices and control and notification circuits for alarm, supervisory and trouble conditions.
Fire Alarm Devices: Manual Pull Stations:
Manual pull stations must be double action addressable manual pull stations.
Manual pull stations will be provided at the entrance to each stair enclosure, at building exits, and at intervals as required to limit travel distance to 200 feet.
Manual pull stations will be installed in accordance with ABA requirements and limitations.
Manual pull stations are permitted to be key operated in institutional areas
(NFPA 101 A.9.6.2.7, IBC 907.2.6.3.2.1).
Smoke Detectors:
Smoke detectors will meet the installation requirements of NFPA 72.
Smoke detectors will be provided as follows: At smoke barrier doors.
Within spaces open to the corridors (NFPA 101, 18.3.6.1) In all elevator machine rooms and at elevator doors.
In areas not continuously occupied that contain fire alarm control equipment.
Duct detectors will be provided on the supply and return air fans of air handling units in accordance with NFPA 90A and the International Mechanical Code. Duct detectors obstructed from view will be provided with a remote indicating light installed on the ceiling below.
Sprinkler System Alarms and Supervisory Devices:
Water flow detection devices on sprinkler systems will be monitored by an addressable interface device. Valve supervisory switches on sprinkler systems will be monitored by an addressable interface device.
Pressure switches on the dry pipe sytesms will be monitored by an addressable interface device.
Audible and Visual indicating appliances shall be provided as required by NFPA
72 (NFPA 101, 18.3.4.3.1, 9.6.3)
Walls and Ceilings, NFPA 101, 18.3.3.1
Interior finish flame spread shall be limited per Chapter
10 of the NFPA 101 to Class A and B materials as follows:
Class A (Flame Spread Index 0-25; Smoke Develped 0-450):
Throughout, Except as noted for Class B allowances.
Class B (Flame Spread Index 26-75; Smoke Developed 0-450):
- Individual rooms having a capacity less than four persons.
- Corridor wall finish not exceeding 48 inches in height that is restricted to the lower half of the wall.
Class C (Flame Spread Index 76-200; Smoke Developed 0-450)
- Not permitted.
Floors, NFPA 101, 18.3.3.3
Interior Floor Finishes shall be Class I or Class II in exit enclosures and exit access corridors and spaces not separated from them by corridor walls, complying with NFPA 101, 18.3.6.
Some allowances for Wall, Ceiling, and Floor materials ratings may be possible for some materials in a fully sprinklered building (NFPA 101, 10.2.8). Fabric draperies, curtains (excluding shower curtains, but including cubicle curtains), and other loosely hanging fabrics and films serving as furnishings or decorations in health care occupancies must meet the flame resistance requirements of
NFPA 701, Standard Methods of Fire Tests for Flame-Resistant Textiles and
Films. (NFPA 101, 18.7.5.1, 10.3.1)
Upholstered furniture and matresses. Upholstered furniture and mattresses must also meet specific requirements, based on NFPA 206, NFPA 261, NFPA 266, 16
CFR 1632, ASTME E1537, and ASTME E1590. (NFPA 101, 18.7.5.2, 10.3.2)
INTERIOR FINISHES
PROJECT NUMBER
BUILDING
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
A
Office of
Construction and Facilities
Management
U.S. Department of
Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD
SEAL
CONSULTANT
321 4 5 6 7 8 9 10
NAME:
FULLY SPRINKLERED
PROJECT DIRECTOR
FULL SIZE DWG: 30x42
PHONE:
EMAIL:
TINA DEBELLA, PE
804.675.5494
Tina.Debella@va.gov
NEW CLINICAL LAB FOR
SURGICAL EXPANSION
RICHMOND, VIRGINIA
652-319
DWG \-___ OF 162
P
M
GX001
BUILDING CODE SUMMARY
AUGUST 2018 TJK DAR
BID DOCUMENTS
REVISIONS DATE
REVISED WITH BID DOCUMENTS 09-10-2019
AutoCAD SHX Text A
AutoCAD SHX Text A
NPQRSTUVW
XYZ
AE301
AE301
AE303
AE303
AE302
AE302
1' - 0"22' - 4"25' - 1 1/2"25' - 1 1/2"22' - 4"22' - 4"25' - 1 1/2"25' - 1 1/2"22' - 4"
AE401
F9
F5
AE311
F3
AE311
F9
AE311
441 SF
CORRIDOR
3F-CDR1
1181 SF
CORRIDOR
3F-CDR2
188 SF
BIOMED
3F-101
405 SF
ANCILLARY TESTING
3F-103
117 SF
DRUG TESTING
3F-105
81 SF
IT CLOSET
3F-104
106 SF
ELEC CLOS
3F-102
387 SF
ACCESSIONING
3F-106a
467 SF
FEE BASIS
3F-106b
1015 SF
HEMATOLOGY
3F-106e
1529 SF
CHEMISTRY
3F-106f
231 SF
REFRIGERATED
STORAGE
3F-126
544 SF
BLOOD BANK
3F-106c
495 SF
CYTOLOGY
3F-106h
1179 SF
OPEN OFFICE
3F-106j
273 SF
ARCHIVE
3F-124
372 SF
CLEAN SUPPLY
3F-131
147 SF
BSL-3 LAB
3F-129
70 SF
STAFF TOILET
3F-108
AE511
B1
AE511
D1
65 SF
DRUG TESTING TOILET
3F-105a
511 SF
IMMUNOLOGY
3F-107
301 SF
MEN'S TOILET
3F-109
304 SF
WOMEN'S TOILET
3F-111
52 SF
JANITOR
3F-110
C L R
AE401
C8
AE401
A8
AE402
AE402
AE402
D1
3BBN2AEN
3BBN
3BBN
3BBN
2AEN
2AEN
2AEN
2AEN
2AEN
3BE1
121 SF
EQUIPMENT ROOM
3F-130
93 SF
GAS TANK ROOM
3F-127
378 SF
BREAK ROOM
3F-112
112 SF
HALLWAY
3F-HL1
109 SF
OFFICE #1
3F-114
115 SF
OFFICE #2
3F-115
100 SF
OFFICE #3
3F-116
113 SF
OFFICE #4
3F-117
107 SF
OFFICE #5
3F-118
228 SF
ADMINISTRATION
3F-120
132 SF
DIRECTOR'S OFFICE
3F-121
94 SF
CMT OFFICE
3F-122
87 SF
OFFICE #6
3F-123
345 SF
ADPAC/RESIDENTS
3F-119
77 SF
FLAMMABLE STORAGE
3F-125
125 SF
ANTE ROOM
3F-128
1560 SF
HISTOLOGY
3F-106g
163 SF
STAIR
3F-ST1
2AEN
3BBN
3BBN
3BBN
3BBN
2AEN
2AEN
3BBN
3BBN
3BBN
3FAN
2AEN
2AEN
2AEN
2AEN
3BEN
3BE1
2AEN
3BEN
3BE1
3BE1 2AEN
2AEN
3BBN
NOT IN
CONTRACT
3BBN
3BBN
10' - 11"24' - 10"13' - 9"
9"
8' - 4 1/2"11' - 1 1/2"
13' - 7"9' - 5"8' - 1 3/4"
8' - 5 1/2"9' - 5 1/4"7' - 3"12' - 0"8' - 9 1/2"
2' - 5"
3' - 9"4' - 8"8' - 0" 10' - 9"11' - 7"6' - 2"16' - 6 1/2"
6' - 7"5' - 4 1/2"7' - 10"11' - 2"
9"
9' - 1 1/2"4' - 0"12' - 0"3' - 0"18' - 0"
9' - 3"
3BEN
3BBN
3BBN
2AEN
3BEN
3BBN
3BE1
3BEN
3BE1
3BBN
3BEN
3BEN
3BEN
3BBN
3BBN
W4
129 128
C2
115 117
118114
A
B
C
S
A
C
A
C1
4 4
C L R
Wn
10"
AI602
2' - 4"19' - 6"2' - 8"22' - 9 1/2"2' - 8"22' - 1 1/2"3' - 0"19' - 4"3' - 0"19' - 4"3' - 0"22' - 1 1/2"3' - 0"39' - 3 1/2"5' - 10"
2' - 6"19' - 4"3' - 0"22' - 1 1/2"3' - 0"22' - 1 1/2"
F7
AE311
9 1/2"
1' - 9 3/4"
3' - 0"
EQ EQ
13' - 1 1/4" 11' - 3"
ALIGN
9' - 5 1/2"
2' - 5 3/4"
1' - 6 1/2"8' - 2 3/4"
2' - 7 1/4"
1' - 8 1/2"
19' - 9"
3' - 4" 4' - 6"
8' - 7" 6' - 8" 5' - 4 1/2" 8' - 4 1/2" 2' - 0" 8' - 0" 38' - 9 3/4"
3BBN
3BBN
3BBN
3BBN
3BEN
3BEN
3BEN
3BBN
3BBN
3BBN
3BBN
3BBN
3BBN
2AEN
2AEN
2AEN
3BBN
3BBN
3BBN
3BBN
3BBN
3BE1
6BBN
3BEN
2AEN
3BEN
3BE1
3BE1
3BEN
3BE1
3BE1
3FAN
3FAN
3BEN
2AEN
2AEN
2AEN
2AEN
6ABN
3WB2
3WB2
3WB2
3WB2
3WB2
3WB2
3WB2
3WB2
6ABN
6ABN
6ABN
6ABN
2AEN 6ABN
6ABN 6ABN
6ABN
3BBN
3BBN
10 10
222 SF
CONF ROOM
3F-113
1' - 4"
B
6"
8' - 10"
6"
10' - 4 1/4"
6"
13' - 9 3/4" 10' - 9 3/4"
15' - 5 3/4"
6"
6' - 4 1/4"
1' - 4"
6"
1' - 6"
12' - 0 1/4"8' - 9 3/4"
1' - 6"
12' - 0 1/4"8' - 9 3/4"
6BEN
6BEN
6BEN
6BEN
6BEN
6BEN
6BEN
6BEN
6BEN
6BBN3BBN
3BBN9
2' - 4"
7' - 5" 11' - 10 1/4"
2' - 4"
6' - 7 3/4" 8' - 0"
2' - 4"
15' - 7"8' - 10 1/4"
2' - 4"
4' - 0" 4' - 8"
15' - 6 1/2"
TN
N
PROJECT NUMBER
BUILDING
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
A
Office of
Construction and Facilities
Management
U.S. Department of
Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD
SEAL
CONSULTANT
321 4 5 6 7 8 9 10
NAME:
FULLY SPRINKLERED
PROJECT DIRECTOR
FULL SIZE DWG: 30x42
PHONE:
EMAIL:
KEYPLAN
LAB EXPANSION
TINA DEBELLA, PE
804.675.5494
Tina.Debella@va.gov
NEW CLINICAL LAB FOR
SURGICAL EXPANSION
RICHMOND, VIRGINIA
652-319
DWG \-___ OF 162
P
M
AE131
3RD FLOOR PLAN
AUGUST 2018 TJK TLK
BID DOCUMENTS
1/8" = 1'-0"
3RD FLOOR PLAN
KEY NOTES
8 LOUVER, SEE MECHANICAL.
9 30" x 42" ALUMINUM-FRAMED WINDOW WITH WIRED GLASS.
10 PROVIDE 6" BATT INSULATION TO ACHIEVE R-19 IN CAVITIES SURROUNDINGCROSS
BRACING.
KEY NOTES
1 INFILL EXTERIOR OPENING TO MATCH EXISTING BRICK. PATCH AND PAINTINTERIOR
SURFACES TO PROVIDE SEAMLESS FINISH.
2 AIR SHAFT.
3 SHAFT WALL - INSULATED.
4 PROVIDE NEW FLOOR, WALL AND CEILING FINISHES TO MATCH EXISTING ATDEMO
LOCATIONS.
5 CMU SHAFT.
6 OPERABLE PARTITION. SEE SHEET AI435 FOR ELEVATION AND APPLIED GRAPHICPATTERN.
7 EMERGENCY EYE WASH AND SHOWER.
8'0 4' 16'
SCALE:1/8"=1'-0"
REVISIONS DATE
09-10-2019REVISED WITH BID DOCUMENTS
AutoCAD SHX Text A
EXTERIOR FACE BRICK
VERIFY
8" 4"
WEATHER BARRIER
RIGID INSULATION
SHEATHING
COLD FORMED METAL FRAMING
WITH R-19 BATT INSULATION
VAPOR RETARDER
INTERIOR FINISH
1 3/4"
6" COLD FORMED METAL FURRING
1' - 0" +/- 4"
WEATHER BARRIER
RIGID INSULATION w/ ZEE GIRT
SHEATHING
COLD FORMED METAL FRAMING
VAPOR RETARDER
INTERIOR FINISH
EXTERIOR METAL PANEL SYSTEM
ZEE SUBGIRT
SHEATHING
TOP OF
STRUCTURE
(E) WAFFLE SLAB
(E) VAPOR BARRIER
(E) FACE BRICK
LEDGER ANGLE WITH
THROUGH WALL FLASHING
AND WEEP;
RE: STRUCT.
EXTERIOR BRICK WALL
ASSEMBLY
ALIGN EXTERIOR FACE BRICK
V.I.F.
1' - 0"
8 3/4"
TOPPING SLAB
4"
TOP OF
STRUCTURE
(E) WAFFLE SLAB
(E) WEATHER BARRIER
(E) FACE BRICK
LAP WEATHER BARRIER
EXTERIOR METAL PANEL
WALL ASSEMBLY, 6" STUD
4" 1' - 0"
METAL PANEL SYSTEM
1' - 4"
TOPPING SLAB
ATTACH FURRING TO
(E) FACE BRICK
SEE ELEVATIONS
(E) VAPOR BARRIER
(E) FACE BRICK
EXTERIOR METAL PANEL
WALL ASSEMBLY, FURRING
4" +/-
METAL PANEL SOFFIT
w/ WEEP HOLES
1' - 4" +/-
(E) WAFFLE SLAB
EXTERIOR BRICK WALL
ASSEMBLY
1' - 0"
THROUGH WALL FLASHING
AND WEEP
CMU CURB, GROUT FULL
FLASH TO (E) ROOF SYSTEM
M
I N
WRAP ROOF MEMBRANE
OVER PARAPET AND
AIR INFILTRATION BARRIER
EXTERIOR METAL WALL
ASSEMBLY
1' - 4" 3"
PARAPET COPING
BY METAL PANEL SYSTEM
TUBE STEEL SUPPORTS
SEE STRUCTURAL
PROVIDE CONTINUOUS
VAPOR BARRIER TO DECK
SEE
ELEVATIONS
2 HOUR FIREPROOFING
4"
DEEP LEG DEFLECTION TRACK
WRAP ROOF MEMBRANE
OVER PARAPET AND
AIR INFILTRATION BARRIER
EXTERIOR BRICK WALL
ASSEMBLY
1' - 0" 3"
PREFINISHED METAL CAP
MATCH (E) PROFILE,
MATERIAL AND FINISH
TUBE STEEL SUPPORTS
SEE STRUCTURAL
PROVIDE CONTINUOUS
VAPOR BARRIER TO DECK
SEE
ELEVATIONS
2 HOUR FIREPROOFING
4"
DEEP LEG DEFLECTION TRACK
W
(E) METAL PANEL WALL
NEW BRICK TO ALIGN
WITH (E) BRICK
MICU
EXPANSION
FACE OF (E) BRICK
8"10"
STEEL COLUMN - HSS 8 X 8
2HR RATED PROTECTION
2" EXPANSION JOINT
Wn
CANTILEVER COLD FORMED
METAL FRAMING
W
(E) FACE BRICK
WRAP AIR INFILTRATION
BARRIER
FACE OF (E) STRUCTURE
STEEL COLUMN - HSS 8 X 8
2HR RATED PROTECTION
2" EXPANSION JOINT
8"10"
Wn
CANTILEVER COLD FORMED
METAL FRAMING
EXTERIOR BRICK WALL
ASSEMBLY
ALIGN EXTERIOR FACE BRICK
4" +/- 1' - 0"
EXTERIOR METAL PANEL
WALL ASSEMBLY
CONTINUOUS WEATHER/AIR BARRIER
METAL PANEL SYSTEM
OUTSIDE CORNER:
SHOP NOTCHED FIELD
TRANSVERSE BEND
3" 8" 3"
COLD FORMED METAL FURRING
EXTERIOR METAL PANEL SYSTEM
ZEE SUBGIRT
SHEATHING
COPING BY METAL PANEL SYSTEM
C CHANEL, SEE STRUCTURAL
KNIFE PLATE AT
GRIDLINES, SEE
STRUCTURAL
SOFFIT PANEL BY METAL
PANEL SYSTEM
WRAP WEATHER BARRIER
SHEATH KNIFE PLATE
w/ PREFINISHED METAL
FLASHING OVER
WEATHER BARRIER
DEDUCT ALTERNATE
PROJECT NUMBER
BUILDING
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
A
Office of
Construction and Facilities
Management
U.S. Department of
Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD
SEAL
CONSULTANT
321 4 5 6 7 8 9 10
NAME:
FULLY SPRINKLERED
PROJECT DIRECTOR
FULL SIZE DWG: 30x42
PHONE:
EMAIL:
TINA DEBELLA, PE
804.675.5494
Tina.Debella@va.gov
NEW CLINICAL LAB FOR
SURGICAL EXPANSION
RICHMOND, VIRGINIA
652-319
DWG \-___ OF 162
A
M
AE511
DETAILS - EXTERIOR
AUGUST 2018 TJK TLK
BID DOCUMENTS
3" = 1'-0"
AE511
F8
BRICK FACE EXTERIOR WALL ASSEMBLY
3" = 1'-0"
AE511
D9
METAL PANEL EXTERIOR WALL ASSEMBLY
1 1/2" = 1'-0"
AE511
F6
DETAIL-EXTERIOR-BRICK AT EXISTING, TYP
1 1/2" = 1'-0"
AE511
F3
DETAIL-EXTERIOR-METAL AT EXISTING, TYP
1 1/2" = 1'-0"
AE511
F1
DETAIL-EXTERIOR-METAL AT EXISTING, LOW
1 1/2" = 1'-0"
AE511
D6
DETAIL-EXTERIOR-BRICK AT ROOF
1 1/2" = 1'-0"
AE511
D4
DETAIL-EXTERIOR-METAL PARAPET
1 1/2" = 1'-0"
AE511
B4
DETAIL-EXTERIOR-BRICK PARAPET
1" = 1'-0"
AE511
B1
DETAIL-PLAN-NW CORNER
1" = 1'-0"
AE511
D1
DETAIL-PLAN-SW CORNER
1 1/2" = 1'-0"
AE511
B9
DETAIL-EXTERIOR-PLAN-METAL TO BRICK
SCALE: 3"=1'-0"
3" 6" 9" 12"1' 2'0 6"
SCALE:1-1/2"=1'-0"
SCALE:1"=1'-0"
1' 2'
1 1/2" = 1'-0"
AE511
B6
DETAIL-EXTERIOR-SUN SHADE SECTION
REVISIONS DATE
REVISED WITH BID DOCUMENTS 09-10-2019
AutoCAD SHX Text A
TOP OF
STRUCTURE
(E) WAFFLE SLAB
(E) WEATHER BARRIER
(E) FACE BRICK
TOPPING SLAB
PREFINISHED METAL
SILL PAN
VERIFY
7" 5"
FACE OF BRICK BEYOND
INTERIOR WALL
STOREFRONT FRAME
8 3/4"
PREFINISHED METAL
SILL PAN
5"
FACE OF BRICK
BEYOND
INTERIOR WALL
BEYOND
STOREFRONT FRAME
EXTERIOR BRICK
WALL ASSEMBLY
WRAP WEATHER
BARRIER
FINISH SILL
VERIFY
8" 4"
5"
INTERIOR WALL
BEYOND
STOREFRONT FRAME
EXTERIOR BRICK
WALL ASSEMBLY
WRAP WEATHER
BARRIER
1 1/2" MIN.
PREFINISHED METAL
SILL PAN
FACE OF BRICK
BEYOND
INTERIOR WALL
STOREFRONT FRAME
5"
THROUGH WALL
FLASHING AND
WEEP
STEEL BEAM w/
2-HR RATING
WRAP VAPOR BARRIER
DEEP LEG
DEFLECTION TRACK
VERIFY
1' - 0"
STEEL ANGLE; RE:
STRUCT
STEEL FRAMING;
RE: STRUCT
PREFINISHED METAL
SILL PAN
INSULATE CAVITY
STOREFRONT FRAME
5"
MID-SPAN BRACING
FINISH SOFFIT
STEEL BEAM WITH
2-HR RATING
PREFINISHED METAL
SILL PAN
STOREFRONT FRAME
5"
EXTERIOR METAL
PANEL WALL
ASSEMBLY
SOFFIT BY METAL PANEL
SYSTEM MANUFACTURER
1' - 0" +/- 4"
5"
INTERIOR WALL
BEYOND
STOREFRONT FRAME
WRAP WEATHER
BARRIER
EXTERIOR METAL
PANEL WALL
ASSEMBLY
1' - 0" +/- 4"
PREFINISHED METAL
SILL PAN
5"
FACE OF METAL
PANEL BEYOND
INTERIOR WALL
BEYOND
STOREFRONT FRAME
EXTERIOR METAL
PANEL WALL
ASSEMBLY
WRAP WEATHER
BARRIER
1' - 0" +/- 4"
(E) WINDOW LEDGER
ANGLE AND FLASHING
REPAIR INTERIOR WALL
AS REQUIRED
HOLLOW METAL FRAME
(E) EXTERIOR BRICK
WALL ASSEMBLY
METAL DOOR
2"
NEW PARAPET AND
ROOF FLASHING
SOLID SURFACE SILL
HOLLOW METAL FRAME
(E) EXTERIOR BRICK
WALL ASSEMBLY
METAL DOOR
PREFINISHED METAL
FLASHING
METAL TRANSITION
STRIP
2" MIN.
LAP WEATHER BARRIER
MATCH (E) EXTERIOR WALL CONSTRUCTION:
- FACE BRICK
- WEATHER BARRIER
- SHEATHING
- 6" COLD FORMED METAL FRAMING
w/ BATT INSULATION
- INTERIOR FINISH, GYP
(E) EXTERIOR BRICK
WALL ASSEMBLY
DEEP LEG DEFLECTION TRACK
PROJECT NUMBER
BUILDING
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
A
Office of
Construction and Facilities
Management
U.S. Department of
Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD
SEAL
CONSULTANT
321 4 5 6 7 8 9 10
NAME:
FULLY SPRINKLERED
PROJECT DIRECTOR
FULL SIZE DWG: 30x42
PHONE:
EMAIL:
TINA DEBELLA, PE
804.675.5494
Tina.Debella@va.gov
NEW CLINICAL LAB FOR
SURGICAL EXPANSION
RICHMOND, VIRGINIA
652-319
DWG \-___ OF 162
A
M
AE602
WINDOW DETAILS
AUGUST 2018 TJK TLK
BID DOCUMENTS
1 1/2" = 1'-0"
AE602
F9
DETAIL-WINDOW-SILL, TYP
1 1/2" = 1'-0"
AE602
F7
DETAIL-WINDOW-SILL, NEW BRICK
1 1/2" = 1'-0"
AE602
D9
DETAIL-WINDOW-JAMB, TYP
1 1/2" = 1'-0"
AE602
A9
DETAIL-WINDOW-HEAD, TYP
1 1/2" = 1'-0"
AE602
C9
DETAIL-WINDOW-INTERMEDIATE
1 1/2" = 1'-0"
AE602
A7
DETAIL-WINDOW-HEAD, MTL PANEL
1 1/2" = 1'-0"
AE602
C7
DETAIL-WINDOW-JAMB, MTL PANEL
1 1/2" = 1'-0"
AE602
D7
DETAIL-WINDOW-SILL, MTL. PANEL
1 1/2" = 1'-0"
AE602
A5
DETAIL-EXISTING WINDOW HEAD
1 1/2" = 1'-0"
AE602
C5
DETAIL-EXTERIOR DOOR SILL
1 1/2" = 1'-0"
AE602
D5
DETAIL-EXISTING WINDOW SILL
1' 2'0 6"
SCALE:1-1/2"=1'-0"
REVISIONS DATE
REVISED WITH BID DOCUMENTS 09-10-2019
AutoCAD SHX Text A
CORRIDOR
C3F-1
CORRIDOR
C3F-2
BIOMED
3F-101
ANCILLARY TESTING
3F-103
DRUG TESTING
3F-105
IT CLOSET
3F-104
ELEC CLOS
3F-102
ACCESSIONING
3F-106a
FEE BASIS
3F-106b
MICROBIOLOGY
3F-106d
HEMATOLOGY
3F-106e
CHEMISTRY
3F-106f
REFRIGERATEDSTORAGE
3F-126
BLOOD BANK
3F-106c
CYTOLOGY
3F-106h
OPEN OFFICE
3F-106j
ARCHIVE
3F-124
CLEAN SUPPLY
3F-131
BSL-3 LAB
3F-129
STAFF TOILET
3F-108
DRUG TESTING TOILET
3F-105a
IMMUNOLOGY
3F-107
MEN'S TOILET
3F-109
WOMEN'S TOILET
3F-111
JANITOR
3F-110
EQUIPMENT ROOM
3F-130
GAS TANK ROOM
3F-127
BREAK ROOM
3F-112
CORRIDOR
C3F-3
OFFICE #1
3F-114
OFFICE #2
3F-115
OFFICE #3
3F-116
OFFICE #4
3F-117
OFFICE #5
3F-118
ADMINISTRATION
3F-120
DIRECTOR'S OFFICE
3F-121
CMT OFFICE
3F-122
OFFICE #6
3F-123
ADPAC/RESIDENTS
3F-119
FLAMMABLE STORAGE
3F-125
ANTE ROOM
3F-128
HISTOLOGY
3F-106g
STAIR
3F-S2
CONF ROOM
3F-113
NPQRSTUVW
X
Wn
SCALE:
MH131
3RD FLOOR MECHANICAL DUCTING
1/8" = 1'-0"
CE1
10"Ø
500-VF-2
CD2
10"Ø
OA INTAKE
EA CHASE
CD1
8"Ø
CD2
8"Ø
CD1
8"Ø
CD1(3)
8"Ø
CD1
8"Ø
CD1
8"Ø
CD1
10"Ø
CD1
8"Ø
CD1
8"Ø
CD1
10"Ø
CD1
8"Ø
CD1
6"Ø
CD3
8"Ø
CD2
16"Ø
CD2
8"Ø
CD3
10"Ø
CD3
10"Ø
CD1
10"Ø
CD1
10"Ø
CD1
8"Ø
CD1
8"Ø
CD3
6"Ø
CD1(4)
8"Ø
CD2
10"Ø
CD3
6"Ø
REF-1
CD3
6"Ø
BSC-1
BSC-2
FH-1
BSC-3
CD1
6"Ø
BSC-6
BSC-4
BSC-5
CD2
8"Ø
CD1
8"Ø
CD1
6"Ø
CD2
8"Ø
CD1
8"Ø
CD1
8"Ø
CD1
6"Ø
CD3
10"Ø
CD1
8"Ø
CD3
10"Ø
CD1
10"Ø
CD1
8"Ø
CD2
10"Ø
CD1
10"Ø
CD1
10"Ø
CD1
8"Ø
CD2
8"Ø
175CD2
8"Ø
CD2
8"Ø
CE1
8"Ø
CE1
10"Ø
CE1
12"Ø
CE3
6" X 6"
CE3
6" X 6"
CE2
16"Ø
CE2
6"Ø
CE1
14"Ø
CE2
12"Ø
500-EF 83
E
F
A49
500-ERC 3
LVR-1
CE4
10" X 10"
MOP-5
CE3
9"Ø
CE3
12"x12"
CE3
12"x12"
CE3
6" X 6"
CE3
6" X 6"
CE2
14"Ø
CD2
8"Ø
CD2
10"Ø
CD2
10"Ø
CD2
10"Ø
CD2
10"Ø
CD2
10"Ø
CD2
8"Ø
CD2
8"Ø
CD2
8"Ø
CD2
8"Ø
CD2
10"Ø
CD2
10"Ø
CD2
10"Ø
CD2
10"Ø
CE2
14"Ø
CG1
8"Ø
CG2
16"Ø
CG1
8"Ø
CG1
8"Ø
CG1
12"Ø
CG1
6"Ø
CG1
14"Ø
CG1
6"Ø
CG1
8"Ø
CG1
8"Ø
CG1
6"Ø
CG1
8"Ø
CG1
8"Ø
CG1
8"Ø
CG1
6"Ø
CG1
10"Ø
CG1
10"Ø
CD2
10"Ø
CD2
8"Ø
CD1(4)
10"Ø
CE1
10"Ø
EX-1
10"Ø
EX-1
10"Ø
EX-1
10"Ø
MOP-6
MOP-4
CD2
10"Ø
CD1
10"Ø
CD2
10"Ø
CD1
10"Ø
CD2
10"Ø
CD2
8"Ø
CD2
8"Ø
CD2
8"Ø
CD1
8"Ø
CD1
8"Ø
CD1
8"Ø
CD2
10"Ø
CE2
18"Ø
CD2
10"Ø
F
AHU AC-3
F
F
F
CD1(2)
10"Ø
500-EF 2
500-EF 1
F
T VAV1-4
T
VAV2-5
T
VAV1-8
T
VAV1-14
T
VAV1-11
T
VAV1-17
T
VAV1-18
T
VAV2-2
T VAV2-4
T
VAV2-7
T VAV1-2
T VAV2-15
T
VAV2-9T
VAV2-6
T
VAV2-17
T
VAV1-3
TVAV2-11
TVAV2-14
T VAV2-8
T
VAV1-9
T
VAV1-10
T VAV1-7
T
VAV1-6
T VAV1-12T
VAV1-13
T
VAV1-1
T
VAV1-15
TVAV1-16
T
VAV2-3
T
TEMPTRAK
CD1
8"Ø
CD1
6"Ø
CD1
6"Ø
CD1
6"Ø
CD1
6"Ø
45 CD1
6"Ø
CD1
6"Ø
CD1
6"Ø
CD1
6"Ø
10 CD1
6"Ø
CD1
6"Ø
CD1
6"Ø
CD1
6"Ø
CD1
6"Ø
CD1
6"Ø
CD1
6"Ø
CD1
6"Ø
CD1
6"Ø
T
VAV1-5
CD2
16"Ø
T
VAV2-1
T
VAV2-10
T
VAV2-12
T VAV2-13 T
VAV2-16
CG2
16"Ø
CG1
8"Ø
CE2
16"Ø
CE2
12"Ø
CE2
16"Ø
FH-3
GENERAL NOTES
KEY NOTES
1. DEMO EXISTING METAL OA PLENUM AND WALL LOUVER IN THIS AREA.
CONNECT EXISTING 40x48, 20x12, AND 32x28 OA DUCTS TO INTAKE
CHASE. SEE MH431 FOR MORE DETAIL. AIR HANDLER TO BE
MODIFIED AS PART OF MICU PROJECT, NIC.
2. DEMO EXISTING ROOFTOP PENTHOUSE AND EXTEND SHAFT TO NEW
ROOF LEVEL AND INSTALL NEW ROOFTOP HOOD.
3. DEMO EXISTING METAL EA DUCTS AND WALL LOUVER IN THIS AREA,
48x40, 28x32, 28x32. CMU SHAFT TO REMAIN. CONNECT EACH TO NEW EA CHASE (NOTE 4) WITH A DUCT OF EQUIVALENT SIZE. 46x30 AND 18x18 EA DUCT TO REMAIN. SEE MH431 FOR MORE DETAIL.
4. DEMO EXISTING ROOFTOP PENTHOUSE AND EXTEND SHAFT TO NEW
ROOF LEVEL AND INSTALL NEW ROOFTOP HOOD.
5. EXISTING CONDENSER UNITS (NOT SHOWN) TO REMAIN AND BE KEPT
IN SERVICE.
6. UNDER CUT DOORS BY 34".
1. INSTALL CEILING REGISTERS A MINIMUM OF 12" FROM AN
EXTERIOR WALL.
2. PROVIDE A MINIMUM OF THREE TIMES THE FAN DIAMETER OF
STRAIGHT DUCTWORK OFF THE SUPPLY AIR DISCHARGE BEFORE
ANY TAKEOFFS OR ELBOWS.
3. PROVIDE LOCKING QUADRANT VOLUME BALANCING DAMPERS AT
ALL BRANCH TAKEOFFS TO CEILING SUPPLY AND EXHAUST
DEVICES.
4. PROVIDE ACCESS DOORS IN DUCTWORK WHERE INDICATED OR
REQUIRED FOR ACCESS TO SYSTEM COMPONENTS INCLUDING THE
FOLLOWING: DAMPER MOTORS AND/OR MOTOR OPERATED
DAMPERS, FIRE DAMPERS AND SMOKE DAMPERS.
5. DUCT DIMENSIONS SHOWN ON DRAWINGS ARE NET FREE
INTERIOR, NOT INCLUDING LINING OR INSULATION.
6. EXISTING SYSTEMS NOT INDICATED ON THIS SHEET TO REMAIN.
7. EQUIPMENT SHOWN IN HALFTONE IS EXISTING AND TO REMAIN.
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
F i l e
P a t h
FULLY
SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:
ARCHITECT/ENGINEER OF RECORD
SEAL
CONSULTANT
321 4 5 6 7 8 9 10
NEW CLINICAL LAB FOR
SURGICAL EXPANSION
RICHMOND, VIRGINIA
652-319
PROJECT DIRECTOR
AUGUST 2018
REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
BID DOCUMENTS
DWG. OF 162
KEYPLAN
LAB EXPANSION
PLAN
NORTH
NAME: TINA DEBELLA, PE
PHONE: 804.675.5495
EMAIL: Tina.DeBella@va.gov
TN
N
3RD FLOOR
MECHANICAL DUCTING
MH131
CDLPFM
8'0 4' 16'
SCALE:1/8"=1'-0"
13 Aug 2018
A REVISED WITH BID DOCUMENTS 09.10.2019
A lforster Text Box
SCALE:
MH133
3RD FLOOR INTERSTITIAL MECHANICAL DUCTING
1/8" = 1'-0"
NPQRSTUVW
EF-1
ON ROOF
24X66 EA UP
TO AHU-57
EF-2
ON ROOF
18X40 RA UP
TO AHU-58
20X40 SA DN
FR AHU-58
22X65 SA DN
FR AHU-57
OA INTAKE
EA OUT
VAV2-3
VAV2-4
VAV2-5
VAV2-7
VAV2-14
VAV2-16
VAV2-17
VAV2-6
VAV1-8
VAV1-16
270 VAV1-15
VAV1-9
VAV1-17
VAV1-10
VAV1-3
VAV1-4
VAV1-6
VAV1-7
VAV1-20
VAV1-11
VAV1-18
VAV1-2
VAV1-14
VAV1-19
VAV1-12
VAV1-13
EX FROM
INTERSTITIAL
x1
8x8 x1
10x10 x1
10x10 x1 x1 x8 x1
8x8
8x8 x8
8x
8x8 8x810x10 x1
8x8
6x6
8x 88x8
8x88x8 8x8 10x10 12x10
8x810x10 x1
8x8
10x1012x1215x12
8x8 8x8 x1
8x8
15x12
8x810x10 x1
VAV1-5
10x10
10x1012x12
12x10 x1 x1 x1 x1 x1 x1
12x12
8x810x10 x1
12x12
8x
10x1012x1214x12
8x8
8x
10x1016x16
16x16
10x10 x1
14x12
16x16
6x
10x10
8x
12x12
8x
10x10 12x12 x1
8x8
6x
6x
6x
6x
6x
8x
VAV2-15
VAV2-9
VAV2-11
VAV2-13
VAV2-12
VAV2-10
VAV2-8
10x10
12x1014x14 x1
10x10
12x10 14x12 x1 x1
12x12 x8
14x12 x1 x8
12x10
16x16 x1
14x12
6x6
12x12
12x12 x1
18x18 x1
14x14 x1 x1 x1 x1
24x2028x2036x24 28x24 x1 x4
12x12 16x16 x1 x2
16x16 x1 x1
14x14
20x18 20x20 24x20 24x20 x1
8x8
8x812 x1
12x1216x1616x1618x20 x2
VAV2-2
VAV2-1
8x8
EF-3
ON ROOF
x1
4 14 x1
18x18 18x18
8x88x8
8x8 8x8
8x8
8x8
16x16
6x
6x66x6
6x6
6x612 x1
18x18
14x14
10x10 x1
8x x1
12x12 x1
16x16
8x
20x18
14x14
14x14
8x8 12x12
8x
14x14 16x16 18x18 x1
6x x1 x1 x2
6x
14x14 x1
10x10 18x18 x1
24x20 26x24 x1 x1 x1
VAV1-21
VAV1-22
6x
6x
6x
6x6
6x6
8x
10x10
VAV1-1
12x12 x1
GENERAL NOTES
KEY NOTES#
1. TAPER OA/EA CHASE TO MEET ROOF CURB AS NEEDED.
1. INSTALL CEILING REGISTERS A MINIMUM OF 12" FROM AN
EXTERIOR WALL.
2. PROVIDE A MINIMUM OF THREE TIMES THE FAN DIAMETER OF
STRAIGHT DUCTWORK OFF THE SUPPLY AIR DISCHARGE BEFORE
ANY TAKEOFFS OR ELBOWS.
3. PROVIDE LOCKING QUADRANT VOLUME BALANCING DAMPERS AT
ALL BRANCH TAKEOFFS TO CEILING SUPPLY AND EXHAUST
DEVICES.
4. PROVIDE ACCESS DOORS IN DUCTWORK WHERE INDICATED OR
REQUIRED FOR ACCESS TO SYSTEM COMPONENTS INCLUDING THE
FOLLOWING: DAMPER MOTORS AND/OR MOTOR OPERATED
DAMPERS, FIRE DAMPERS AND SMOKE DAMPERS.
5. DUCT DIMENSIONS SHOWN ON DRAWINGS ARE NET FREE
INTERIOR, NOT INCLUDING LINING OR INSULATION.
6. EXISTING SYSTEMS NOT INDICATED ON THIS SHEET TO REMAIN.
7. PNEUMATIC TUBE SYSTEM TO BE CONSIDERED AS BID ALTERNATE.
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
F i l e
P a t h
FULLY
SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:
ARCHITECT/ENGINEER OF RECORD
SEAL
CONSULTANT
321 4 5 6 7 8 9 10
NEW CLINICAL LAB FOR
SURGICAL EXPANSION
RICHMOND, VIRGINIA
652-319
PROJECT DIRECTOR
AUGUST 2018
REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
BID DOCUMENTS
DWG. OF 162
KEYPLAN
LAB EXPANSION
PLAN
NORTH
NAME: TINA DEBELLA, PE
PHONE: 804.675.5495
EMAIL: Tina.DeBella@va.gov
TN
N
3RD FLOOR INTERSTITIAL
MECHANICAL DUCTING
MH133
CDLPFM
8'0 4' 16'
SCALE:1/8"=1'-0"
13 Aug 2018
A REVISED WITH BID DOCUMENTS 09.10.2019
A
FAN SCHEDULE
SYMBOL FAN TYPE SERVICE MFR MODEL
WHEEL
DIA IN
CFM @ SL
SP IN WC
@ SL
APPROX
RPM
SONES HP ELEC DRIVE TYPE DAMPER TYPE
APPROX
ROOF
OPENING
REMARKS
EF-1 LAB EXH LAB GREENHECK VK-MS-15 15 2725 0'-1 1/4" 1797 1.5 460/60/3 DIRECT BACKDRAFT 20"x20"
EF-2 LAB EXH LAB GREENHECK VK-HS-10 10 1000 0'-1" 2994 1.0 460/60/3 DIRECT BACKDRAFT 14"x14"
EF-3 LAB EXH LAB GREENHECK VK-MS-20 20 3760 0'-1" 1170 2.0 460/60/3 DIRECT BACKDRAFT 22"x22"
AIR SEPARATOR SCHEDULE
SYMBOL MFR MODEL SERVICE GPM
MAX W.P.D
(FT.WG)
WITH INTEGRAL
STRAINER
LOCATION REMARKS
ASC-1
SPIRO-
THERM
VSR400
CHILLED
WATER
197 1.0 YES ROOF ---
ASH-1
SPIRO-
THERM
VSR400 HOT WATER 134 1.0 YES MECH ROOM ---
SHELL AND TUBE HEAT EXCHANGER SCHEDULE
SYMBOL MFR MODEL
SHELL
DIA IN
TUBE
LENGTH FT
NO
PASSES
TUBE SIDE SHELL SIDE
HEATING
SURFACE
SQ FT
REMARKS
EWT F LWT F MBH GPM
PD FT
WC
PD FT
WC
STEAM
INLET
PSIG
LBS/HR
HX-1 TACO G12410-S 12 5 2 160 180 1730 160 1.1 --- 10 1730 --- -
HX-2 TACO G12410-S 12 5 2 160 180 1730 160 1.1 --- 10 1730 --- -
PACKAGED AIR COOLED WATER CHILLER SCHEDULE
SYMBOL MFR MODEL
CAPACITY
TONS @ SL
AMBIENT
TEMP F
CHILLED WATER DATA
KW INPUT @
SL
KW PER
TON
MIN CIRCUIT
AMP
EER @ SL MOP MCA ELEC
NO
COMPR
STEPS
CAPACITY
CONTROL
APPROX
OPER
WEIGHT LB
LOW AMB
CONTROL F
REMARKS
EWT F LWT F GPM PD FT WC
CH-1 TRANE CGAM 130 95 56 42 196.7 9.1 137.2 1.06 261.1 10.3 300A 285.1 460/60/3 6 6 10000 STANDARD 1, 2, 3
1. 35% PROPYLENE GLYCOL 2. INCLUDE MANUFACTURER'S ROOF SUPPORT FRAME AND VIBRATION ISOLATION. 3. PROVIDE FACTORY HYDRONIC PACKAGE AND BUFFER TANK.
PUMP SCHEDULE
SYMBOL SERVICE PUMP TYPE DRIVE TYPE MFR SERIES MODEL GPM
HEAD FT
WC
EFF % HP RPM ELEC
SUCTION
SIZE IN
DISCH
SIZE IN
REMARKS
HWP-1
HEATING
WATER
BASE MOUNTED END
SUCTION
VFD TACO FI 2009D 160 63 71 5 1760 208/60/3 2.5 2
HWP-2
HEATING
WATER
BASE MOUNTED END
SUCTION
VFD TACO FI 2009D 160 63 71 5 1760 208/60/3 2.5 2
NOTES: BOTH PUMPS 100% CAPACITY, ONE PRIMARY, ONE STANDBY, ALTERNATE ROLES TO BALANCE MAINTENANCE SCHEDULE
UNIT COOLER SCHEDULE (REFRIGERATION SERVICE)
MARK LOCATION
SYSTEM AND/OR
SERVICE
EVAPORATOR
SECTION TEMP
CAPACITY
REFRIGERANT
REFRIGERANT
CHARGE (LBS)
ROOM
VOLUME
(CF)
ROOM DESIGN
TEMP
AIR FLOW
MOTOR
REMARKS
POWER EACH
PHASE VOLT
°F [°C] BTUH [W] °F [°C] CFM [L/s] HP [W]
REF-1 3F129
WALK-IN
REFRIGERATOR
26.2 -3.2 24,000 7,034
R404A
(A1 RATING) 4 2079 35 2 2850 1345 3 0.05 37 1 460 1.7 MCA, 15 A FUSE, 1.6 FLA
AIR COOLED CONDENSING UNIT SCHEDULE (REFRIGERATION SERVICE)
MARK LOCATION
SYSTEM AND/OR
SERVICE
CAPACITY SUCTION TEMP AMBIENT AIR
MAX COND
TEMP
COMPRESSOR MOTOR CONDENSER FAN MOTOR
REMARKS#
COMP
POWER
PHASE VOLT
# COND.
FAN
POWER
BTUH [W] °F [°C] °F [°C] °F [°C] HP [kW] HP [W]
CU-1 ROOF
WALK-IN
REFRIGERATOR
24,000 7,034 25.7 -3.5 95 35 101 38 1 2 1.5 3 460 1 0.32 240
15 MOP, 9.1 MCA, 1.0 FLA.
EC MOTOR.
EXHAUST AND FUME HOOD SCHEDULE
SYMBOL LOCATION ROOM NUMBER
EQUIPMENT OR
SERVICE
MFR MODEL TYPE SIZE CFM
FACE
VELOCITY
HOOD S.P.
FAN SERVING
HOOD
REMARKS
BSC-1 IMMUNOLOGY 3F108 BIO SAFETY CABINET BAKER STERILGARD III SG403 CLASS II A/B3 48"x31"x100" 350 100 - - RECIRC. 120/1/60. 20 AMPS.
FH-1 ACCESSIONING 3F107a FUME HOOD BAKER STERILGARD SG403A-HE CLASS II A2 54"x31"x62" 610 100 - - RECIRC. 120/1/60. 20 AMPS.
BSC-2 BSL-3 LAB 3F132 BIO SAFETY CABINET BAKER STERILGARD III SG603A CLASS II A2 78"x31"x82" 510 100 VENT, REMOVE BLOWER MOTOR.
BSC-3 MICROBIOLOGY 3F107d BIO SAFETY CABINET BAKER STERILGARD SG603A-HE CLASS II A2 78"x31"x82" 1020 100-110 VENT, REMOVE BLOWER MOTOR.
BSC-4 MICROBIOLOGY 3F107d BIO SAFETY CABINET BAKER STERILGARD III SG603A CLASS II A2 78"x31"x82" 510 100 VENT, REMOVE BLOWER MOTOR.
BSC-5 MICROBIOLOGY 3F107d BIO SAFETY CABINET BAKER STERILGARD III SG403A CLASS II A2 54"x31"x62 340 100 VENT, REMOVE BLOWER MOTOR.
EX-1 CHEMISTRY 3F107f
AUTOMATED
CHEMISTRY LINE
SIEMENS VISTA 1500 85"x52"x55.5" 400 INTERNAL FAN
LAB ANALYZER X3. APPROXIMATELY
300-400 CFM
BSC-6 CYTOLOGY 3F107h BIO SAFETY CABINET BAKER STERILGARD SG403A-HE CLASS II A2 54"x31"x62" 620 100 VENT. REMOVE BLOWER MOTOR.
MOP-4 HISTOLOGY 3F107g FUME HOOD AND
GROSSING STATION
MOPEC MB100 CLASS II B1 48"x31"x82" 300 100
NOT CURRENTLY EXHAUST, WOULD
LIKE IT TO BE. M-F 8 HRS/DSY
MOP-5 HISTOLOGY 3F107g FUME HOOD AND
GROSSING STATION
MOPEC MB600 CLASS II B1 48"x31"x82" 600 100 HIGH SMELL
MOP-6 HISTOLOGY 3F107g FUME HOOD AND
GROSSING STATION
MOPEC MB600 CLASS II B1 48"x31"x82" 600 100
FH-3 HISTOLOGY 3F107g HIGH SMELL FUME
HOOD
CLASSIC
MODULAR
SYSTEMS
CLASS II B1
W:38"
H(MAX):28"
18" HIGH SASH
740 100 INTAKE ONLY THROUGH FACE
1.
2.
LOUVER & HOOD SCHEDULE
SYMBOL MFR MODEL
OVERALL
W x L (IN)
OVERALL
HEIGHT (IN) CFM FREE AREA LOCATION REMARKS
VNTR-1 GREENHECK FGR 112 x 123 29.5 21839 NA ROOF
VNTI-1 GREENHECK FGI 123 x 123 29.5 34096 NA ROOF
LVR-1 GREENHECK EDJ 96 X 120 120 16360 40% EXISTING NORTH WALL
AIR DEVICE SCHEDULE
SYMBOL TYPE MFR MODEL FRAME MATERIAL FINISH
DAMPER
TYPE
ACCESSORIES REMARKS
CD1 CEILING DIFFUSER TITUS TDC LAY-IN
STAINLESS STEEL
OR ALUMINUM
OFF-WHITE ENAMEL NONE
SQUARE TO ROUND
ADAPTER
CD2 CEILING DIFFUSER TITUS TMRA
DUCT
MOUNTED
STAINLESS STEEL
OR ALUMINUM
OFF-WHITE ENAMEL NONE --- ---
CD3 CEILING DIFFUSER TITUS TDC
SURFACE
MOUNT
STAINLESS STEEL
OR ALUMINUM
OFF-WHITE ENAMEL NONE --- ---
CE1 CEILING EXHAUST TITUS 50F LAY-IN
STAINLESS STEEL
OR ALUMINUM
OFF-WHITE ENAMEL NONE --- ---
CE2 CEILING EXHAUST TITUS TMRA
DUCT
MOUNTED
STAINLESS STEEL
OR ALUMINUM
OFF-WHITE ENAMEL NONE --- ---
CE3 CEILING EXHAUST TITUS 50F
SURFACE
MOUNT
STAINLESS STEEL
OR ALUMINUM
OFF-WHITE ENAMEL NONE --- ---
CE4 TYPE II VAPOR HOOD
CAPTIVE
AIRE
VHB LAY-IN STAINLESS STEEL OFF-WHITE ENAMEL NONE --- ---
CG1 CEILING RETURN TITUS 50F LAY-IN
STAINLESS STEEL
OR ALUMINUM
OFF-WHITE ENAMEL NONE --- ---
CG2 CEILING RETURN TITUS TMRA
DUCT
MOUNTED
STAINLESS STEEL
OR ALUMINUM
OFF-WHITE ENAMEL NONE --- ---
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
F i l e
P a t h
FULLY
SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:
ARCHITECT/ENGINEER OF RECORD
SEAL
CONSULTANT
321 4 5 6 7 8 9 10
NEW CLINICAL LAB FOR
SURGICAL EXPANSION
RICHMOND, VIRGINIA
652-319
PROJECT DIRECTOR
AUGUST 2018
REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
BID DOCUMENTS
DWG. OF 162
NAME: TINA DEBELLA, PE
PHONE: 804.675.5495
EMAIL: Tina.DeBella@va.gov
MECHANICAL SCHEDULES
MH601
WBRCDL
13 Aug 2018
A REVISED WITH BID DOCUMENTS 09.10.2019
A
A
GENERAL NOTES
1. EQUIPMENT SHOWN WITH BOLD LINEWEIGHTS INDICATES EQUIPMENT TO BE
FURNISHED AND INSTALLED BY THE CONTRACTOR.
2. ALL VACANCY SENSORS SHALL BE SET TO THE MAXIMUM DELAY OFF.
3. ALL LIGHTS WILL BE SWITCHED WITH THE VACANCY SENSOR, DURING
EMERGENCY OPERATIONS, THE EMERGENCY FIXTURES WILL REMAIN ON.
REFER TO THE EMERGENCY BYPASS DETAIL ON SHEET EL501 FOR A POSSIBLE
CONFIGURATION.
4. SEE LUMINARIES SCHEDULE ON SHEET EL501.
KEY NOTES
1. FIND EXISTING STAIRWELL LIGHTING CIRCUIT AND ADD NEW STAIRWELL LIGHT
FIXTURES TO THIS CIRCUIT. PROVIDE CONDUIT AND CONDUCTOR AS REQUIRED
TO ADD THESE FIXTURES TO THIS CIRCUIT. MOUNT 8'-0" AFF. FIELD-VERIFY
CIRCUIT LOADING WILL NOT EXCEED 14A, AND PROVIDE REPORT TO COR,
ACCORDINGLY. ("S"-TYPE LUMINAIRES.)
2. PROVIDE A UL-LISTED CONTROL PANEL, INCLUDING FABRICATION, BY A UL 508
PANEL SHOP. CABINET SHALL INCLUDE RAIL-MOUNTED TIMER SUITABLE FOR
8-HOUR ON WITH AUTOMATIC OFF. LIGHTING CONTROL ACCESSORIES SHALL
INCLUDE TWO (2) STATUS LIGHTS (GREEN AT ON, RED AT AUTO-OFF) ON OUTER
COVER AND A HAND-OFF-AUTO SWITCH. PROVIDE ADDITIONAL COMPONENTS AS
REQUIRED FOR COMPLETE FUNCTIONALITY. PROVIDE FUNCTIONALITY FOR
MOMENTARY WALL SWITCHES AND PROVIDE TWO (2) CONTROLLED
CONTACTORS FOR 20 AMP 277V LIGHTING CIRCUITS. TURN OFF LIGHTS ON
3F-ESP1 CCT #11 5 MINUTES AFTER LIGHTS ON 3F-ESP1 CCT #13.
3. PROVIDE 24VDC OR 120VAC MOMENTARY WALL SWITCH, AT CONTRACTOR'S
OPTION, TO MATCH THE TIMING CONTACTOR LIGHTING CONTROL PANEL.
NPQRSTUVW
QQQ
Q Q Q Q
Q
QQQ
Q Q Q Q
INTERSTITIAL
3F-INT
S
S
PANEL 3F-ESP1
CIRCUITS #11
PANEL 3F-ESP1
CIRCUITS #11
PANEL 3F-ESP1
CIRCUITS #13
PANEL 3F-ESP1
CIRCUITS #13
Q
Q
Q Q
Q
Q
Q Q
Q
Q
Q
Q
Q
Q
Q
Q
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
F i l e
P a t h
FULLY
SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:
ARCHITECT/ENGINEER OF RECORD
SEAL
CONSULTANT
321 4 5 6 7 8 9 10
NEW CLINICAL LAB FOR
SURGICAL EXPANSION
RICHMOND, VIRGINIA
652-319
PROJECT DIRECTOR
AUGUST 2018
REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
BID DOCUMENTS
DWG. OF 162
KEYPLAN
LAB EXPANSION
PLAN
NORTH
NAME: TINA DEBELLA, PE
PHONE: 804.675.5495
EMAIL: Tina.DeBella@va.gov
TN
N
3RD FLOOR
INTERSTITIAL LIGHTING PLAN
EL132
MMMGGR
SCALE:
EL132
3RD FLOOR INTERSTITIAL LIGHTING PLAN
1/8" = 1'-0"
8'0 4' 16'
SCALE:1/8"=1'-0"
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A REVISED WITH BID DOCUMENTS 09.10.2019
FURNISHED AND INSTALLED BY THE CONTRACTOR.
2. ELECTRICAL GEAR SHOWN FOR LOCATION PURPOSE. REFER TO ONE-LINE
DIAGRAM ON SHEET EP601 FOR EQUIPMENT INTERCONNECTION
REQUIREMENTS.
3. HATCHED AREA SHOWS RELATIVE LOCATION OF NEW LAB AND NEW
ELECTRICAL ROOM ON 3RD FLOOR TO PROVIDE LATERAL DISTANCE
INFORMATION FOR ELECTRICAL RUNS. UTILIZE ELECTRICAL ROOMS FOR
VERTICAL ROUTING AND INTERSTITIAL SPACES FOR LATERAL ROUTING OF
ELECTRICAL CONDUITS WHERE POSSIBLE.
EP101
VAULT-3
NEW LAB ABOVE SEE
GENERAL NOTE 3
EP101
VAULT-4
ECLDOF
X F
M R
P N
L P
N L
P N
L P
N L
P N
L P
N L
P N
L P
N L
P N
L
A T
S A
T S
A T
S X
F M
R X
F M
R D
IS
C
D
IS
C
SWGR
ECPDOF
ECBCF
TSF
ATS-SF
LIFE
SAFETY #1
EELOF
TEF
EEPDOF
ECBEF
TCF
ATS-CF
CRITICAL
#1
ESLDOF
ESPDOF
ECBSF
EELDOF
SIDE PNL
EEPOF
ATS-EF
EQUIP #1
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
F i l e
P a t h
FULLY
SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:
ARCHITECT/ENGINEER OF RECORD
SEAL
CONSULTANT
321 4 5 6 7 8 9 10
NEW CLINICAL LAB FOR
SURGICAL EXPANSION
RICHMOND, VIRGINIA
652-319
PROJECT DIRECTOR
AUGUST 2018
REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
BID DOCUMENTS
DWG. OF 162
NAME: TINA DEBELLA, PE
PHONE: 804.675.5495
EMAIL: Tina.DeBella@va.gov
BASEMENT
POWER PLAN
EP101
WBRGGR
SCALE:
EP101
BASEMENT POWER PLAN
1/8" = 1'-0"
SCALE:
EP101
TRANSFORMER VAULT-3
ENLARGED POWER PLAN
1/4" = 1'-0"
KEYPLAN
LAB EXPANSION
PLAN
NORTH
N
TN
8'0 4' 16'
SCALE:1/8"=1'-0"
4'0 2' 8'
SCALE:1/4"=1'-0"
A REVISED WITH BID DOCUMENTS 09.10.2019
SCALE:
EP101
TRANSFORMER VAULT 4
ENLARGED POWER PLAN
1/4" = 1'-0"
# KEY NOTES
1. FURNISH AND INSTALL GROUND BAR. CONNECT TO ALL AVAILABLE GROUNDING
POINTS PER NEC REQUIREMENTS. ADD GROUND RODS AS NECESSARY.
2. FURNISH AND INSTALL L6-30R TYPE RECEPTACLE.
3. RELOCATE SIEMENS APTIO AUTOMATION ELECTRICAL GEAR LOCATED IN
ELECTRICAL ROOM 3A-148 TO THIS EQUIPMENT ROOM. ELECTRICAL GEAR
INCLUDES FLOOR MOUNTED UPS, 60kVA;208V-400/231V SPECIAL EQUIPMENT
TRANSFORMER & ASSOCIATED PANELBOARD. RE-FEED TO MAINTAIN EXISTING
POWER SOURCE WHICH IS PANEL LD3AA#1,3,5 LOCATED WITHIN ORIGIN ROOM.
USE (4#4+1#8G)1-1/4"C. PROVIDE A 60-AMP, 3-POLE ENCLOSED CIRCUIT BREAKER
IN-LINE, ADJACENT TO TRANSFORMER, BETWEEN TRANSFORMER AND UPS.
PROVIDE A 40-AMP, 3-POLE ENCLOSED CIRCUIT BREAKER IN-LINE, ADJACENT TO
TRANSFORMER, BETWEEN TRANSFORMER AND APTIO DISCONNECT. REFERENCE
ONE-LINE AND SHEET EP131 FOR ADDITIONAL REQUIREMENTS. PROVIDE RACKING
AND ADJUST LOCATIONS AS REQUIRED TO PROVIDE NEC 110.26 WORKING
CLEARANCE.
4. RELOCATE SIEMENS APTIO AUTOMATION SYSTEM AIR COMPRESSOR FROM ROOM
3A-147 TO EQUIPMENT ROOM. RE-FEED TO MAINTAIN EXISTING POWER SOURCE
WHICH IS PANEL EEL3AC#12,14,16 LOCATED IN ELEC ROOM 3A-148. USE
(4#8+1#10G)1"C. PROVIDE LOCAL LOCKABLE DISCONNECT.
5. PROVIDE CONNECTION FOR AUTOFLUSH AND AUTOSINK POWER. COORDINATE
POWER CONNECTION METHOD WITH EQUIPMENT CONFIGURATION.
6. PROVIDE CONNECTION FOR ROBOT COMMUNICATION SYSTEM POWER.
EQUIPMENT BY VENDOR. PROVIDE 120V, 1Ø POWER SOURCE, CAPPED OFF.
7. PROVIDE GFCI-TYPE RECEPTACLE AT ELEVATION 4 INCHES ABOVE TOP OF SINK
BOWL.
8. PROVIDE DEADFRONT-STYLE GFCI PROTECTION AS REQUIRED TO PROTECT
RECEPTACLES CONNECTED TO THIS CIRCUIT.
9. ROVIDE EQUIPMENT RACKING SUCH THAT THE FRONT OF THE TRANSFORMER
AND THE FRONT OF THE ECB ARE ABOVE/BELOW EACH OTHER.
10. LOCATE DISCONNECT SWITCH ABOVE THE GROUND BAR LOCATION. MOUNT
GROUND BAR SO IT DOES NOT AFFECT EQUIPMENT CLEARANCE AT DISCONNECT.
11. PROVIDE RECEPTACLES FOR ACCESS CONTROL PANELS IN EXISTING MICU
BIOMED ROOM. COORDINATE WITH TELECOM SHEET TN132.
12. PROVIDE SWITCH AND CIRCUIT AS REQUIRED TO TOGGLE TOILET AND SINK
FIXTURES BETWEEN OPERABLE AND NON-OPERABLE STATES.
13. BASE BID:BOLD DASHED BOUNDARY INDICATES EQUIPMENT TO BE INSTALLED,
EXCEPT FOR PORTIONS IDENTIFIED AS PART OF A DEDUCTIVE BID ALTERNATE.
VERIFY IF THIS EQUIPMENT IS TO BE INSTALLED PRIOR TO COMMENCEMENT OF
WORK. ELECTRICAL INFRASTRUCTURE IN THIS BOUNDARY IS INCLUDED UNDER
THE BASE BID.
14. DEDUCTIVE BID ALTERNATE 4: ELECTRICAL INFRASTRUCTURE ON THIS SHEET IN
THIS BOUNDARY IS EXCLUDED UNDER DEDUCTIVE BID ALTERNATE 4. REFERENCE
EP131.2 FOR ADDITIONAL REQUIREMENTS.
15. DEDUCTIVE BID ALTERNATE 5: ELECTRICAL INFRASTRUCTURE ON THIS SHEET IN
THIS BOUNDARY IS EXCLUDED UNDER DEDUCTIVE BID ALTERNATE 5. REFERENCE
EP131.2 FOR ADDITIONAL REQUIREMENTS.
16. DEDUCTIVE BID ALTERNATE 6: ELECTRICAL INFRASTRUCTURE ON THIS SHEET IN
THIS BOUNDARY IS EXCLUDED UNDER DEDUCTIVE BID ALTERNATE 6. REFERENCE
EP131.2 FOR ADDITIONAL REQUIREMENTS.
17. PROVIDE DOORBELL SYSTEM PUSH BUTTON +48" AFF. SEE 5/EP132 FOR
ADDITIONAL REQUIREMENTS.
18. PROVIDE POWER CONNECTION, RACEWAYS, AND ENCLOSURES FOR PACS
SYSTEM AT THIS LOCATION. SEE 3/TN502 AND 7/TN502 FOR ADDITIONAL
REQUIREMENTS. PROVIDE PACS SYSTEM MATCHING HOSPITAL STANDARD.
19. BASE BID:SAME AS KEY NOTE#18, EXCEPT NO POWER CONDUCTORS OR PACS
COMPONENTS.
DEDUCTIVE BID ALTERNATE #2: OMIT PACS SYSTEM FROM DOOR IDENTIFIED IN
ENTIRETY.
20. PROVIDE SPLIT-YOKE RECEPTACLE(S), WITH TOP HALF OCCUPANCY-SWITCHED
PER ASHRAE 90.1.
GFCI, AC
AC
GFCI, AC
GFCI
GFCI
GFCI
GFCI
GFCI, AC
GFCI, AC
GFCI
GFCI, AC
GFCI
XFMR
PANEL
UPS
AIR COMP.
J6
J J
5J 5 GFCI, AC
PANEL 3F-NL1
CIRCUIT #53
PANEL 3F-NL1
CIRCUIT #51
PANEL 3F-NL1
CIRCUIT #55
7 7
PANEL 3F-NL1
CIRCUIT #59
PANEL 3F-NL1
CIRCUIT #61
PACS
PANEL 3F-NL1
CIRCUIT #69
J
J
PANEL 3F-NL1
CIRCUIT #79,81
PANEL 3F-NL1
CIRCUIT #57
PANEL 3F-NL1
CIRCUIT #49
PANEL 3F-NL1
CIRCUIT #71
PANEL 3F-NL1
CIRCUIT #41
PANEL 3F-NL1
CIRCUIT #19
PANEL 3F-NL1
CIRCUIT #18
PANEL 3F-NL1
CIRCUIT #12
PANEL 3F-NL1
CIRCUIT #8
PANEL 3F-NL1
CIRCUIT #21
PANEL 3F-NL2
CIRCUIT #30
JPANEL 3F-ESP1
CIRCUIT #2
J
PANEL 3F-ESP1
CIRCUIT #4
PANEL 3F-EEL2
CIRCUIT #83
J J
PANEL 3F-NL1
CIRCUIT #43
PANEL 3F-NL1
CIRCUIT #23
PANEL 3F-NL1
CIRCUIT #47
PANEL 3F-NL1
CIRCUIT #14
PANEL 3F-NL1
CIRCUIT #10
PANEL 3F-NL1
CIRCUIT #45
CORRIDOR
C3F-1
CORRIDOR
C3F-2
BIOMED
3F-101
ANCILLARY TESTING
3F-103
DRUG TESTING
3F-105
IMMUNOLOGY
3F-107
IT CLOSET
ACCESSIONING
3F-106a
FEE BASIS
3F-106b
MICROBIOLOGY
3F-106d
HEMATOLOGY
3F-106e
CHEMISTRY
3F-106f
REFRIGERATEDSTORAGE
3F-126
BLOOD BANK
3F-106c
CYTOLOGY
3F-106h
OPEN OFFICE
3F-106j
ARCHIVE
3F-124
CLEAN SUPPLY
3F-131
BSL-3 LAB
3F-129
MEN'S TOILET
3F-109
WOMEN'S TOILET
3F-111
STAFF TOILET
3F-108
DRUG TESTING TOILET
3F-105a
JANITOR
3F-110
EQUIPMENT ROOM
3F-130
FLAMMABLE STORAGE
3F-125
ANTE ROOM
3F-128
BREAK ROOM
3F-112
CORRIDOR
C3F-3
OFFICE #1
3F-114
OFFICE #2
3F-115
OFFICE #3
3F-116
OFFICE #4
3F-117
OFFICE #5
3F-118
ADMINISTRATION
3F-120
DIRECTOR'S OFFICE
3F-121
CMT OFFICE
3F-122
OFFICE #6
3F-123
ADPAC/RESIDENTS
3F-119
HISTOLOGY
3F-106g
GAS TANK ROOM
3F-127
STAIR
3F-S2
CONF ROOM
3F-113
DEDUCTIVE BID
ALTERNATE 5
DEDUCTIVE BID
ALTERNATE 4
DEDUCTIVE BID
ALTERNATE 6
13 16 13 14
P
F
PF
R E
F
R E
F
P F
P F
P
F
PF
J 17
M
PANEL 3F-EEL2
CIRCUIT #27
PANEL 3F-EEL2
CIRCUIT #29
ECB
18 18
18 18
19 19
19 19
19 1919
13 16
13 16
13 14
PANEL 3F-NL1
CIRCUIT #63
PANEL 3F-NL2
CIRCUIT #6 (PART)
3F-EEL2
3F-TN1
3F-NH1
3F-EEP1
3F-TCE13F-TEE1
3F-EEL1
3F-ESP1
3F-NL1
3F-NL2
3F-TCE1
-ECB
1 10
3F-NL1-ECB
+48"
AFF
3F-ECL1
ECB
E C
B
ECB
3F-EEL1
-ECB9
PANEL 3F-EEL2
CIRCUIT #1
GENERAL NOTES
1. EQUIPMENT SHOWN WITH BOLD LINEWEIGHTS INDICATES EQUIPMENT
TO BE FURNISHED AND INSTALLED BY THE CONTRACTOR.
2. ELECTRICAL GEAR SHOWN FOR LOCATION PURPOSE. REFER TO
ONE-LINE DIAGRAM ON SHEET EP401 FOR EQUIPMENT
INTERCONNECTION REQUIREMENTS.
3. MAINTAIN NEC REQUIRED CLEARANCES DURING INSTALLATION OF NEW
ELECTRICAL GEAR. PROVIDE STRUT RACKING AS REQUIRED FOR
COMPLIANCE.
4. ANY FLOOR MOUNTED ELECTRICAL GEAR SHALL BE INSTALLED ON AN
EQUIPMENT PAD, 4" MINIMUM THICKNESS.
5. EQUIPMENT FOR BOTH THE BASE BID AND DEDUCTIVE BID ALTERNATES
ARE SHOWN ON THE PLANS.
6. ALL WIRE RUNS SHOWN ON DRAWINGS ARE RUN THROUGH THE SPACE
ABOVE THE CEILING GRID ON THIS FLOOR. LOCATE PRE-FURNITURE
INFRASTRUCTURE AS REQUIRED TO FEED FURNITURE SHOWN ON TN131
AFTER FURNITURE IS INSTALLED.
7. MOUNT CEILING - MOUNTED AND POWER-POLE JUNCTION BOXES
CONCEALED, WITHIN THE ABOVE - CEILING SPACE.
8. LOCATE ABOVE-COUNTER RECEPTACLES SO BOTTOM OF FACEPLATE IS
AT LEAST 3.15 INCHES ABOVE-COUNTER TOP, AT SAME HEIGHT AS
ADJACENT RECEPTACLES.
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
F i l e
P a t h
FULLY
SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:
ARCHITECT/ENGINEER OF RECORD
SEAL
CONSULTANT
321 4 5 6 7 8 9 10
NEW CLINICAL LAB FOR
SURGICAL EXPANSION
RICHMOND, VIRGINIA
652-319
PROJECT DIRECTOR
AUGUST 2018
REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
BID DOCUMENTS
DWG. OF 162
NAME: TINA DEBELLA, PE
PHONE: 804.675.5495
EMAIL: Tina.DeBella@va.gov
3RD FLOOR POWER PLAN
PRE FURNITURE CONSTRUCTION
EP131.1
WBRGGR
SCALE:
EP131.1
PRE FURNITURE CONSTRUCTION
3RD FLOOR POWER PLAN
1/8" = 1'-0"
SCALE:
EP131.1
ENLARGED PLAN
ELEC CLOS 3F103
1/2" = 1'-0"
KEYPLAN
LAB EXPANSION
PLAN
NORTH
N
TN
8'0 4' 16'
SCALE:1/8"=1'-0"
2' 4'0 1'
SCALE:1/2"=1'-0"
EP132.1
EP132.1
EP133.1
EP133.1
EP132.1
EP132.1
EP132.1
EP132.1
EP132.1
EP131.1
A REVISED WITH BID DOCUMENTS 09.10.2019
FURNISHED AND INSTALLED BY THE CONTRACTOR.
2. ELECTRICAL GEAR SHOWN FOR LOCATION PURPOSE. REFER TO ONE-LINE
DIAGRAM ON SHEET EP401 FOR EQUIPMENT INTERCONNECTION
REQUIREMENTS.
3. MAINTAIN NEC REQUIRED CLEARANCES DURING INSTALLATION OF NEW
ELECTRICAL GEAR.PROVIDE STRUT RACKING AS REQUIRED FOR COMPLIANCE.
4. ANY FLOOR MOUNTED ELECTRICAL GEAR SHALL BE INSTALLED ON AN
EQUIPMENT PAD, 4" MINIMUM THICKNESS.
5. EQUIPMENT FOR BOTH THE DEDUCTIVE BID ALTERNATES ARE SHOWN ON THIS
SHEET. LOCATE PRE-FURNITURE INFRASTRUCTURE AS REQUIRED TO FEED
FURNITURE SHOWN ON TN131 AFTER FURNITURE IS INSTALLED.
KEY NOTES
1. FURNISH AND INSTALL GROUND BAR. CONNECT TO ALL AVAILABLE GROUNDING
POINTS PER NEC REQUIREMENTS. ADD GROUND RODS AS NECESSARY.
2. DISCONNECT SWITCH SHALL BE PLACED ABOVE THE GROUND BAR LOCATION.
THIS WILL NOT AFFECT EQUIPMENT CLEARANCE.
3. BOLD DASHED BOUNDARY INDICATES EQUIPMENT TO BE INSTALLED AS PART OF
A DEDUCTIVE BID ALTERNATE. VERIFY IF THIS EQUIPMENT IS TO BE INSTALLED
PRIOR TO COMMENCEMENT OF WORK.
4. DEDUCTIVE BID ALTERNATE 4:ELECTRICAL INFRASTRUCTURE IN THIS
BOUNDARY IS INCLUDED UNDER DEDUCTIVE BID ALTERNATE 4.
5. DEDUCTIVE BID ALTERNATE 5:ELECTRICAL INFRASTRUCTURE IN THIS
BOUNDARY IS INCLUDED UNDER DEDUCTIVE BID ALTERNATE 5.
6. DEDUCTIVE BID ALTERNATE 6:ELECTRICAL INFRASTRUCTURE IN THIS
BOUNDARY IS INCLUDED UNDER DEDUCTIVE BID ALTERNATE 6.
7. ROVIDE EQUIPMENT RACKING SUCH THAT THE FRONT OF THE TRANSFORMER
AND THE FRONT OF THE ECB ARE ABOVE/BELOW EACH OTHER.
NPQRSTUVW
Wn
450 SF
CORRIDOR
C3F-1
81 SF
IT CLOSET
3F-104
105 SF
ELEC CLOS
3F-102
387 SF
ACCESSIONING
3F-106a
467 SF
FEE BASIS
3F-106b
MICROBIOLOGY
3F-106d
1019 SF
HEMATOLOGY
3F-106e
1534 SF
CHEMISTRY
3F-106f
231 SF
REFRIGERATEDSTORAGE
3F-126
544 SF
BLOOD BANK
3F-106c
496 SF
CYTOLOGY
3F-106h
1179 SF
OPEN OFFICE
3F-106j
273 SF
ARCHIVE
3F-124
372 SF
CLEAN SUPPLY
3F-131
BSL-3 LAB
3F-129
70 SF
STAFF TOILET
3F-108
121 SF
EQUIPMENT ROOM
3F-130
77 SF
FLAMMABLE STORAGE
3F-125
125 SF
ANTE ROOM
3F-128
1583 SF
HISTOLOGY
3F-106g
93 SF
GAS TANK ROOM
3F-127
164 SF
STAIR
3F-S2
STAIR
3F-S2
J J J
J JJ J
JJ
JJ
J
J
J J J
J
J J
J
DEDUCTIVE BID
ALTERNATE 5
DEDUCTIVE BID
ALTERNATE 4
DEDUCTIVE BID
ALTERNATE 6
HATCHED AREA NOT
SUBJECT TO DEDUCTIVE
ALTERNATES, REFER
TO SHEET EP131
3 5
3 63 4
3F-EEL2
3F-TN1
3F-NH1
3F-EEP1
3F-TCE13F…