36C24619B0039-0003002.pdf

PDF 11 MB Posted

Attached to
Construct New Clinical Lab Expansion (VA-18-00152139) Federal contract opportunity
Solicitation number
36C24619B0039
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6

About this file

This federal contract opportunity notice seeks a qualified Service Disabled Veteran Owned Small Business construction company to provide labor, materials, equipment and supervision for a clinical lab expansion project at the McGuire VA Medical Center in Richmond, Virginia. The project scope includes a partial renovation and 18,050 square foot addition, with construction to be completed within 680 calendar days of the notice to proceed. The estimated cost is between $5-10 million. Drawings and specifications will be provided on August 15th, with a pre-proposal site visit also scheduled. Questions must be emailed to the contracting officer by the specified date. This procurement is fully set aside for SDVOSBs only.

36C24619B0039 0003 Revised Sheets - VAMC RICHMOND CLINIC LAB PROJECT.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Construct New Clinical Lab Expansion (VA-18-00152139), newest first.
File Type Posted
36C24619B0039-0003000.docx DOCX document
36C24619B0039-0003002.pdf PDF
36C24619B0039-0003003.pdf PDF
36C24619B0039-0003001.pdf PDF
36C24619B0039-0003000.docx DOCX document
36C24619B0039-0003001.pdf PDF
36C24619B0039-0003003.pdf PDF
36C24619B0039-0002000.docx DOCX document
36C24619B0039-0002000.docx DOCX document
36C24619B0039-0001000.docx DOCX document
36C24619B0039-0001000.docx DOCX document
36C24619B0039-009.pdf PDF
36C24619B0039-008.pdf PDF
36C24619B0039-003.pdf PDF
36C24619B0039-012.pdf PDF
36C24619B0039-013.pdf PDF
36C24619B0039-010.pdf PDF
36C24619B0039-007.pdf PDF
36C24619B0039-005.pdf PDF
36C24619B0039-002.docx DOCX document
36C24619B0039-006.pdf PDF
36C24619B0039-004.pdf PDF
36C24619B0039-001.docx DOCX document
36C24619B0039-011.pdf PDF
36C24619B0039-009.pdf PDF
36C24619B0039-005.pdf PDF
36C24619B0039-008.pdf PDF
36C24619B0039-006.pdf PDF
36C24619B0039-007.pdf PDF
36C24619B0039-010.pdf PDF
36C24619B0039-002.docx DOCX document
36C24619B0039-013.pdf PDF
36C24619B0039-012.pdf PDF
36C24619B0039-011.pdf PDF
36C24619B0039-001.docx DOCX document
36C24619B0039-004.pdf PDF
36C24619B0039-003.pdf PDF
36C24619B0039-000.docx DOCX document
36C24619B0039-000.docx DOCX document
Show all 39

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPLICABLE CODES

· VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA

NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER

GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL).

· IBC - INTERNATIONAL BUILDING CODE, 2015

· NFPA 101 - LIFE SAFETY CODE, 2015

· NFPA NATIONAL FIRE CODES, WITH THE EXCEPTION OF NFPA 5000

AND NFPA 900

· OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA)

STANDARDS

· VA SEISMIC DESIGN REQUIREMENTS, H-18-8

· NATIONAL ELECTRIC CODE (NEC)

· INTERNATIONAL PLUMBING CODE (IPC)

· ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS

(ABAAS) INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN

GUIDE (PG-18-13)

· BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE,

AMERICAN CONCRETE INSTITUTE AND COMMENTARY (ACI 318)

· MANUAL of Steel Construction, Load and Resistance Factor Design

Specificatoins for Structural Steel Buildings, American Institute of STeel

Construction (AISC)

· Energy policy Act of 2005 (EPAct)

· DOE Interim Final Rule: Energy Conservation Standards for New Federal, Commercial and Multi-Family High-Rise Residential Buildings and New

Low-Rise Residential Buildings, 10 CFR Parts 433, 434 and 435.

· Federal Leadership in High Performance and Sustainable Buildings:

Memorandum of Understanding (MOU)

· Executive Order 13423: Strengthening Federal Environmental, Energy, and Transportation Management.

· The provisions for Construction and Safety Signs. Stated in the General

Requirements Section 01010 of the VA Master Construction Specification.

· Ventilation for Acceptable Indoor Air Quality - ASHRAE Standard 62.1 -

· Safety Standard for Refrigeration Systems - ASHRAE Standard 15 - 2007

LOCAL CODES

As an agency of the federal government, VA is not subject to local imposition of code enforcement procedures (drawing reviews, building permits, inspections, fees, etc). VA must function as the Authority Having Jurisdiction (AHJ) and thus has the responsibility to guard public health and safety through enforcing its adopted codes. However, local authorities should be notrified about planned projects and given opportunity to review drawings, provided that VA does not pay for review or inspection fees.

NOTES:

1. NFPA 101 primarily addresses life safety and fire protection features, while the IBC addresses a wide range of considerations, including, but not limited to, structural strength, seismic stabilty, sanitation, adequate light and ventilation, and energy conservation. VA buildings must meet the requirements of NFPA 101 and documents referenced by NFPA 101 in order to comply with the accreditation requirements of The Joint Commission. Therefore, designs shall comply with the requirements of the latest edition of NFPA 101 and documents referenced therein. Design features not addressed by NFPA 101 or documenents referenced therein shall comply with the requirements of the latest edition of the IBC or as otherwise addressed above . For design features that are addressed by both the IBC as well as NFPA 101 or a document referenced by NFPA 101, the requirements of NFPA 101 or the document referenced by

NFPA 101 shall be used exclusively (this applies even if the IBC requirements are different).

2. Conflicts between Nationally Recognized Codes and Standards and VA

Requirements - Should a conflict exist between VA requirements and VA adopted nationally recognized codes and standards, the conflict shall be brought to the attention of VA. The resolution of the conflict shall be made by the authority having jurisdiction for VA to ensure a consistency system wide.

GENERAL DESCRIPTION

This project is for new Clinical Pathology Laboratory space to be constructed on top of an existing building wing. The current laboratory space is being taken over by an expasion project for new OR suites, and as a result the laboratory needs to move. The new space will be immediately adjacent to the new OR suites and will maintain the current close proximity to inpatient units and active Primary

Care clinics.

The construction must be done in a manner that keeps adjacent spaces and the existing lower floor opeation during the construction period.

The new space will be approximately 18,500 square feet and will include the following Clinical Pathology Laboratory departments; blood bank, microbiology, histology, chemistry, hematology, ancillary, cytology, pathology, as well as support areas that include administrative spaces and storage functions.

The new addition will provide specialized spaces for automated clinical laboratory spaces. The enhancement will aide in maximizing the flow for staffing, specimen sampling times and employee morale. These modifications will also bring the new spaces up to current design standards and will correct numerous

Facility Condition Assessment deficiencies, including finishes, accessibility and utility systems. Heating, Ventilation, and Air Conditioning systems will be replaced and upgraded to improve environmental controls and conditions. A roof-top chiller will also be included as part of the Heating, Ventilation, and Air

Conditioning upgrades due to limited capacities at the central utility plant.

BUILDING CODE SUMMARY

Use and Occupancy Classification - IBC Group I-2, Health Care LSC OR MIXED

USE Occupancy.

Type of Construction - type I-B

Occupancy Separation Required - Occupancy Separation is not required.

Hazardous Room Separation - NFPA 101, 18.3.2.1.2

1 hr FIRE ResistIVE Rating:

Storage Rooms Larger than 100sf and storing combustible material

Smoke Partitions:

Laboratories employing flammable or coMbustible materials in quantities less than those that would be considered a severe hazard.

Storage Rooms larger than 50sf but not exceeding

100sf and storing combustible material.

Smoke Barriers - Shall be provided to limit the size of smoke compartments to

22,500sf.

Smoke Barriers shall be 1hr rated fire partitions. Doors within corridors may be 20 minute rated, or

1 3/4 inch thick, solid-bonded, wood core doors.

Travel distance from any part of the health care facility to a smoke barrier door shall not exceed 200ft.

Laboratories in which chemicals are handled or stored shall comply with NFPA

45.

GENERAL BUILDING HEIGHTS AND AREAS

Allowable Height (Tabular) - Unlimited (NFPA 101, Table 18.1.6.1)

Max. Allowable Floor Area (if Sprinklered) - Unlimited (IBC, Table 506.2)

Calculated Actual Floor Area (Project Area Only) - 18,049sf

Total Area of 3rd Floor - Unknown, Existing

CODE REVIEW

Type of Construction - IBC I-B

Occupancy Separation Required -

Fire Resistive Requirements:

Exterior Walls, Bearing - Noncombustible, 2 hr rating.

Exterior Walls, Non-Bearing - Noncombustible, 0 hr rating.

Interior Walls, Bearing - Noncombustible, 2 hr rating.

Structural Frame - Noncombustible, 2 hr rating.

Floor-Ceiling - Noncombustible, 2 hr rating.

Roof-Ceiling - Noncombustible, 2 hr rating

Permanent Partitions - Nonbearing, Noncombustible, 0 hr

Rating.

Boiler Room Enclosure - N/A

Fire Protection Systems - Space is to be Fully Sprinklered.

Occupant Load Factor - IBC I-2, 240sf per occupant person.

Occupancy Factor Actual Area Actual Load

IBC I-2 Occupancy 240 18,049 sf 75 Occupants

Means of Egress, NFPA 101, Table A.7.6

Maximum Allowable Travel Distance to Exit (I-2) - Max. 200 Feet

Maximum Common Path of Travel - 100 Feet

Maximum Dead End Corridors - 30 Feet

Exits, NFPA 101, 7.4.1.1

Number of Exits Required: 2

Clear Width of Exits: 41.5 inches, NFPA 101, 18.2.3.6(1)

Clear Width of Corridors: 8 Feet, NFPA 101, 18.2.3.4

Exit signs: Exit marking is provided in areas accessible to the public in accordance with NFPA 101.

FIRE SUPPRESSION

Sprinkler System, NFPA 101, 18.3.5.1

Building is required to be protected throughout with an approved, supervised automatic sprinkler system installed in accordance with NFPA 13. The sprinkler system shall be hydraulically designed in accordance with the 2016 edition of

NFPA 13 and the SEVENTH Edition of the Deparment of Veterans Affairs Fire

Protection Design Manual.

Minimum Design Requirements:

Storage mechanical and electrical rooms shall be protected as (NFPA 101A.4.3):

Ordinary Hazard Occupancy, Group 1: 0.15 gpm/ft2 over 1,500sf.

Hose stream allowance: 250 GPM

All other areas shall be protected as (NFPA 101A.4.2): Light Hazard Occupancy:

0.10gpm/ft2 over 1,500sf.

HOse stream allowance: 100 GPM

Portable Fire Extinguishers (NFPA 101, 18.3.5.12):

Fire Extinguishers are required to be provided in accordance with NFPA 101, Section 9.9, and NFPA 10. All sprinklers within the smoke zone shall be changed to quick response sprinklers (NFPA 101, 18.3.5.6).

FIRE ALARM SYSTEM

A fire alarm system is required throughout the building. The fire alarm system must be installed in accordance with the 2015 International Building Code, NFPA

101 and NFPA 72. (NFPA 101, 18.3.4.2.1, 18.3.4.5.2)

Fire Alarm Control Panel (FACP):

Power for the equipment must be from the emergency power system. The FACP must provide power, supervision, control and logic for the entire system. The

FACP must monitor all fire alarm devices and control and notification circuits for alarm, supervisory and trouble conditions.

Fire Alarm Devices: Manual Pull Stations:

Manual pull stations must be double action addressable manual pull stations.

Manual pull stations will be provided at the entrance to each stair enclosure, at building exits, and at intervals as required to limit travel distance to 200 feet.

Manual pull stations will be installed in accordance with ABA requirements and limitations.

Manual pull stations are permitted to be key operated in institutional areas

(NFPA 101 A.9.6.2.7, IBC 907.2.6.3.2.1).

Smoke Detectors:

Smoke detectors will meet the installation requirements of NFPA 72.

Smoke detectors will be provided as follows: At smoke barrier doors.

Within spaces open to the corridors (NFPA 101, 18.3.6.1) In all elevator machine rooms and at elevator doors.

In areas not continuously occupied that contain fire alarm control equipment.

Duct detectors will be provided on the supply and return air fans of air handling units in accordance with NFPA 90A and the International Mechanical Code. Duct detectors obstructed from view will be provided with a remote indicating light installed on the ceiling below.

Sprinkler System Alarms and Supervisory Devices:

Water flow detection devices on sprinkler systems will be monitored by an addressable interface device. Valve supervisory switches on sprinkler systems will be monitored by an addressable interface device.

Pressure switches on the dry pipe sytesms will be monitored by an addressable interface device.

Audible and Visual indicating appliances shall be provided as required by NFPA

72 (NFPA 101, 18.3.4.3.1, 9.6.3)

Walls and Ceilings, NFPA 101, 18.3.3.1

Interior finish flame spread shall be limited per Chapter

10 of the NFPA 101 to Class A and B materials as follows:

Class A (Flame Spread Index 0-25; Smoke Develped 0-450):

Throughout, Except as noted for Class B allowances.

Class B (Flame Spread Index 26-75; Smoke Developed 0-450):

- Individual rooms having a capacity less than four persons.

- Corridor wall finish not exceeding 48 inches in height that is restricted to the lower half of the wall.

Class C (Flame Spread Index 76-200; Smoke Developed 0-450)

- Not permitted.

Floors, NFPA 101, 18.3.3.3

Interior Floor Finishes shall be Class I or Class II in exit enclosures and exit access corridors and spaces not separated from them by corridor walls, complying with NFPA 101, 18.3.6.

Some allowances for Wall, Ceiling, and Floor materials ratings may be possible for some materials in a fully sprinklered building (NFPA 101, 10.2.8). Fabric draperies, curtains (excluding shower curtains, but including cubicle curtains), and other loosely hanging fabrics and films serving as furnishings or decorations in health care occupancies must meet the flame resistance requirements of

NFPA 701, Standard Methods of Fire Tests for Flame-Resistant Textiles and

Films. (NFPA 101, 18.7.5.1, 10.3.1)

Upholstered furniture and matresses. Upholstered furniture and mattresses must also meet specific requirements, based on NFPA 206, NFPA 261, NFPA 266, 16

CFR 1632, ASTME E1537, and ASTME E1590. (NFPA 101, 18.7.5.2, 10.3.2)

INTERIOR FINISHES

PROJECT NUMBER

BUILDING

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

A

Office of

Construction and Facilities

Management

U.S. Department of

Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORD

SEAL

CONSULTANT

321 4 5 6 7 8 9 10

NAME:

FULLY SPRINKLERED

PROJECT DIRECTOR

FULL SIZE DWG: 30x42

PHONE:

EMAIL:

TINA DEBELLA, PE

804.675.5494

Tina.Debella@va.gov

NEW CLINICAL LAB FOR

SURGICAL EXPANSION

RICHMOND, VIRGINIA

652-319

DWG \-___ OF 162

P

M

GX001

BUILDING CODE SUMMARY

AUGUST 2018 TJK DAR

BID DOCUMENTS

REVISIONS DATE

REVISED WITH BID DOCUMENTS 09-10-2019

AutoCAD SHX Text A

AutoCAD SHX Text A

NPQRSTUVW

XYZ

AE301

AE301

AE303

AE303

AE302

AE302

1' - 0"22' - 4"25' - 1 1/2"25' - 1 1/2"22' - 4"22' - 4"25' - 1 1/2"25' - 1 1/2"22' - 4"

AE401

F9

F5

AE311

F3

AE311

F9

AE311

441 SF

CORRIDOR

3F-CDR1

1181 SF

CORRIDOR

3F-CDR2

188 SF

BIOMED

3F-101

405 SF

ANCILLARY TESTING

3F-103

117 SF

DRUG TESTING

3F-105

81 SF

IT CLOSET

3F-104

106 SF

ELEC CLOS

3F-102

387 SF

ACCESSIONING

3F-106a

467 SF

FEE BASIS

3F-106b

1015 SF

HEMATOLOGY

3F-106e

1529 SF

CHEMISTRY

3F-106f

231 SF

REFRIGERATED

STORAGE

3F-126

544 SF

BLOOD BANK

3F-106c

495 SF

CYTOLOGY

3F-106h

1179 SF

OPEN OFFICE

3F-106j

273 SF

ARCHIVE

3F-124

372 SF

CLEAN SUPPLY

3F-131

147 SF

BSL-3 LAB

3F-129

70 SF

STAFF TOILET

3F-108

AE511

B1

AE511

D1

65 SF

DRUG TESTING TOILET

3F-105a

511 SF

IMMUNOLOGY

3F-107

301 SF

MEN'S TOILET

3F-109

304 SF

WOMEN'S TOILET

3F-111

52 SF

JANITOR

3F-110

C L R

AE401

C8

AE401

A8

AE402

AE402

AE402

D1

3BBN2AEN

3BBN

3BBN

3BBN

2AEN

2AEN

2AEN

2AEN

2AEN

3BE1

121 SF

EQUIPMENT ROOM

3F-130

93 SF

GAS TANK ROOM

3F-127

378 SF

BREAK ROOM

3F-112

112 SF

HALLWAY

3F-HL1

109 SF

OFFICE #1

3F-114

115 SF

OFFICE #2

3F-115

100 SF

OFFICE #3

3F-116

113 SF

OFFICE #4

3F-117

107 SF

OFFICE #5

3F-118

228 SF

ADMINISTRATION

3F-120

132 SF

DIRECTOR'S OFFICE

3F-121

94 SF

CMT OFFICE

3F-122

87 SF

OFFICE #6

3F-123

345 SF

ADPAC/RESIDENTS

3F-119

77 SF

FLAMMABLE STORAGE

3F-125

125 SF

ANTE ROOM

3F-128

1560 SF

HISTOLOGY

3F-106g

163 SF

STAIR

3F-ST1

2AEN

3BBN

3BBN

3BBN

3BBN

2AEN

2AEN

3BBN

3BBN

3BBN

3FAN

2AEN

2AEN

2AEN

2AEN

3BEN

3BE1

2AEN

3BEN

3BE1

3BE1 2AEN

2AEN

3BBN

NOT IN

CONTRACT

3BBN

3BBN

10' - 11"24' - 10"13' - 9"

9"

8' - 4 1/2"11' - 1 1/2"

13' - 7"9' - 5"8' - 1 3/4"

8' - 5 1/2"9' - 5 1/4"7' - 3"12' - 0"8' - 9 1/2"

2' - 5"

3' - 9"4' - 8"8' - 0" 10' - 9"11' - 7"6' - 2"16' - 6 1/2"

6' - 7"5' - 4 1/2"7' - 10"11' - 2"

9"

9' - 1 1/2"4' - 0"12' - 0"3' - 0"18' - 0"

9' - 3"

3BEN

3BBN

3BBN

2AEN

3BEN

3BBN

3BE1

3BEN

3BE1

3BBN

3BEN

3BEN

3BEN

3BBN

3BBN

W4

129 128

C2

115 117

118114

A

B

C

S

A

C

A

C1

4 4

C L R

Wn

10"

AI602

2' - 4"19' - 6"2' - 8"22' - 9 1/2"2' - 8"22' - 1 1/2"3' - 0"19' - 4"3' - 0"19' - 4"3' - 0"22' - 1 1/2"3' - 0"39' - 3 1/2"5' - 10"

2' - 6"19' - 4"3' - 0"22' - 1 1/2"3' - 0"22' - 1 1/2"

F7

AE311

9 1/2"

1' - 9 3/4"

3' - 0"

EQ EQ

13' - 1 1/4" 11' - 3"

ALIGN

9' - 5 1/2"

2' - 5 3/4"

1' - 6 1/2"8' - 2 3/4"

2' - 7 1/4"

1' - 8 1/2"

19' - 9"

3' - 4" 4' - 6"

8' - 7" 6' - 8" 5' - 4 1/2" 8' - 4 1/2" 2' - 0" 8' - 0" 38' - 9 3/4"

3BBN

3BBN

3BBN

3BBN

3BEN

3BEN

3BEN

3BBN

3BBN

3BBN

3BBN

3BBN

3BBN

2AEN

2AEN

2AEN

3BBN

3BBN

3BBN

3BBN

3BBN

3BE1

6BBN

3BEN

2AEN

3BEN

3BE1

3BE1

3BEN

3BE1

3BE1

3FAN

3FAN

3BEN

2AEN

2AEN

2AEN

2AEN

6ABN

3WB2

3WB2

3WB2

3WB2

3WB2

3WB2

3WB2

3WB2

6ABN

6ABN

6ABN

6ABN

2AEN 6ABN

6ABN 6ABN

6ABN

3BBN

3BBN

10 10

222 SF

CONF ROOM

3F-113

1' - 4"

B

6"

8' - 10"

6"

10' - 4 1/4"

6"

13' - 9 3/4" 10' - 9 3/4"

15' - 5 3/4"

6"

6' - 4 1/4"

1' - 4"

6"

1' - 6"

12' - 0 1/4"8' - 9 3/4"

1' - 6"

12' - 0 1/4"8' - 9 3/4"

6BEN

6BEN

6BEN

6BEN

6BEN

6BEN

6BEN

6BEN

6BEN

6BBN3BBN

3BBN9

2' - 4"

7' - 5" 11' - 10 1/4"

2' - 4"

6' - 7 3/4" 8' - 0"

2' - 4"

15' - 7"8' - 10 1/4"

2' - 4"

4' - 0" 4' - 8"

15' - 6 1/2"

TN

N

PROJECT NUMBER

BUILDING

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

A

Office of

Construction and Facilities

Management

U.S. Department of

Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORD

SEAL

CONSULTANT

321 4 5 6 7 8 9 10

NAME:

FULLY SPRINKLERED

PROJECT DIRECTOR

FULL SIZE DWG: 30x42

PHONE:

EMAIL:

KEYPLAN

LAB EXPANSION

TINA DEBELLA, PE

804.675.5494

Tina.Debella@va.gov

NEW CLINICAL LAB FOR

SURGICAL EXPANSION

RICHMOND, VIRGINIA

652-319

DWG \-___ OF 162

P

M

AE131

3RD FLOOR PLAN

AUGUST 2018 TJK TLK

BID DOCUMENTS

1/8" = 1'-0"

3RD FLOOR PLAN

KEY NOTES

8 LOUVER, SEE MECHANICAL.

9 30" x 42" ALUMINUM-FRAMED WINDOW WITH WIRED GLASS.

10 PROVIDE 6" BATT INSULATION TO ACHIEVE R-19 IN CAVITIES SURROUNDINGCROSS

BRACING.

KEY NOTES

1 INFILL EXTERIOR OPENING TO MATCH EXISTING BRICK. PATCH AND PAINTINTERIOR

SURFACES TO PROVIDE SEAMLESS FINISH.

2 AIR SHAFT.

3 SHAFT WALL - INSULATED.

4 PROVIDE NEW FLOOR, WALL AND CEILING FINISHES TO MATCH EXISTING ATDEMO

LOCATIONS.

5 CMU SHAFT.

6 OPERABLE PARTITION. SEE SHEET AI435 FOR ELEVATION AND APPLIED GRAPHICPATTERN.

7 EMERGENCY EYE WASH AND SHOWER.

8'0 4' 16'

SCALE:1/8"=1'-0"

REVISIONS DATE

09-10-2019REVISED WITH BID DOCUMENTS

AutoCAD SHX Text A

EXTERIOR FACE BRICK

VERIFY

8" 4"

WEATHER BARRIER

RIGID INSULATION

SHEATHING

COLD FORMED METAL FRAMING

WITH R-19 BATT INSULATION

VAPOR RETARDER

INTERIOR FINISH

1 3/4"

6" COLD FORMED METAL FURRING

1' - 0" +/- 4"

WEATHER BARRIER

RIGID INSULATION w/ ZEE GIRT

SHEATHING

COLD FORMED METAL FRAMING

VAPOR RETARDER

INTERIOR FINISH

EXTERIOR METAL PANEL SYSTEM

ZEE SUBGIRT

SHEATHING

TOP OF

STRUCTURE

(E) WAFFLE SLAB

(E) VAPOR BARRIER

(E) FACE BRICK

LEDGER ANGLE WITH

THROUGH WALL FLASHING

AND WEEP;

RE: STRUCT.

EXTERIOR BRICK WALL

ASSEMBLY

ALIGN EXTERIOR FACE BRICK

V.I.F.

1' - 0"

8 3/4"

TOPPING SLAB

4"

TOP OF

STRUCTURE

(E) WAFFLE SLAB

(E) WEATHER BARRIER

(E) FACE BRICK

LAP WEATHER BARRIER

EXTERIOR METAL PANEL

WALL ASSEMBLY, 6" STUD

4" 1' - 0"

METAL PANEL SYSTEM

1' - 4"

TOPPING SLAB

ATTACH FURRING TO

(E) FACE BRICK

SEE ELEVATIONS

(E) VAPOR BARRIER

(E) FACE BRICK

EXTERIOR METAL PANEL

WALL ASSEMBLY, FURRING

4" +/-

METAL PANEL SOFFIT

w/ WEEP HOLES

1' - 4" +/-

(E) WAFFLE SLAB

EXTERIOR BRICK WALL

ASSEMBLY

1' - 0"

THROUGH WALL FLASHING

AND WEEP

CMU CURB, GROUT FULL

FLASH TO (E) ROOF SYSTEM

M

I N

WRAP ROOF MEMBRANE

OVER PARAPET AND

AIR INFILTRATION BARRIER

EXTERIOR METAL WALL

ASSEMBLY

1' - 4" 3"

PARAPET COPING

BY METAL PANEL SYSTEM

TUBE STEEL SUPPORTS

SEE STRUCTURAL

PROVIDE CONTINUOUS

VAPOR BARRIER TO DECK

SEE

ELEVATIONS

2 HOUR FIREPROOFING

4"

DEEP LEG DEFLECTION TRACK

WRAP ROOF MEMBRANE

OVER PARAPET AND

AIR INFILTRATION BARRIER

EXTERIOR BRICK WALL

ASSEMBLY

1' - 0" 3"

PREFINISHED METAL CAP

MATCH (E) PROFILE,

MATERIAL AND FINISH

TUBE STEEL SUPPORTS

SEE STRUCTURAL

PROVIDE CONTINUOUS

VAPOR BARRIER TO DECK

SEE

ELEVATIONS

2 HOUR FIREPROOFING

4"

DEEP LEG DEFLECTION TRACK

W

(E) METAL PANEL WALL

NEW BRICK TO ALIGN

WITH (E) BRICK

MICU

EXPANSION

FACE OF (E) BRICK

8"10"

STEEL COLUMN - HSS 8 X 8

2HR RATED PROTECTION

2" EXPANSION JOINT

Wn

CANTILEVER COLD FORMED

METAL FRAMING

W

(E) FACE BRICK

WRAP AIR INFILTRATION

BARRIER

FACE OF (E) STRUCTURE

STEEL COLUMN - HSS 8 X 8

2HR RATED PROTECTION

2" EXPANSION JOINT

8"10"

Wn

CANTILEVER COLD FORMED

METAL FRAMING

EXTERIOR BRICK WALL

ASSEMBLY

ALIGN EXTERIOR FACE BRICK

4" +/- 1' - 0"

EXTERIOR METAL PANEL

WALL ASSEMBLY

CONTINUOUS WEATHER/AIR BARRIER

METAL PANEL SYSTEM

OUTSIDE CORNER:

SHOP NOTCHED FIELD

TRANSVERSE BEND

3" 8" 3"

COLD FORMED METAL FURRING

EXTERIOR METAL PANEL SYSTEM

ZEE SUBGIRT

SHEATHING

COPING BY METAL PANEL SYSTEM

C CHANEL, SEE STRUCTURAL

KNIFE PLATE AT

GRIDLINES, SEE

STRUCTURAL

SOFFIT PANEL BY METAL

PANEL SYSTEM

WRAP WEATHER BARRIER

SHEATH KNIFE PLATE

w/ PREFINISHED METAL

FLASHING OVER

WEATHER BARRIER

DEDUCT ALTERNATE

PROJECT NUMBER

BUILDING

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

A

Office of

Construction and Facilities

Management

U.S. Department of

Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORD

SEAL

CONSULTANT

321 4 5 6 7 8 9 10

NAME:

FULLY SPRINKLERED

PROJECT DIRECTOR

FULL SIZE DWG: 30x42

PHONE:

EMAIL:

TINA DEBELLA, PE

804.675.5494

Tina.Debella@va.gov

NEW CLINICAL LAB FOR

SURGICAL EXPANSION

RICHMOND, VIRGINIA

652-319

DWG \-___ OF 162

A

M

AE511

DETAILS - EXTERIOR

AUGUST 2018 TJK TLK

BID DOCUMENTS

3" = 1'-0"

AE511

F8

BRICK FACE EXTERIOR WALL ASSEMBLY

3" = 1'-0"

AE511

D9

METAL PANEL EXTERIOR WALL ASSEMBLY

1 1/2" = 1'-0"

AE511

F6

DETAIL-EXTERIOR-BRICK AT EXISTING, TYP

1 1/2" = 1'-0"

AE511

F3

DETAIL-EXTERIOR-METAL AT EXISTING, TYP

1 1/2" = 1'-0"

AE511

F1

DETAIL-EXTERIOR-METAL AT EXISTING, LOW

1 1/2" = 1'-0"

AE511

D6

DETAIL-EXTERIOR-BRICK AT ROOF

1 1/2" = 1'-0"

AE511

D4

DETAIL-EXTERIOR-METAL PARAPET

1 1/2" = 1'-0"

AE511

B4

DETAIL-EXTERIOR-BRICK PARAPET

1" = 1'-0"

AE511

B1

DETAIL-PLAN-NW CORNER

1" = 1'-0"

AE511

D1

DETAIL-PLAN-SW CORNER

1 1/2" = 1'-0"

AE511

B9

DETAIL-EXTERIOR-PLAN-METAL TO BRICK

SCALE: 3"=1'-0"

3" 6" 9" 12"1' 2'0 6"

SCALE:1-1/2"=1'-0"

SCALE:1"=1'-0"

1' 2'

1 1/2" = 1'-0"

AE511

B6

DETAIL-EXTERIOR-SUN SHADE SECTION

REVISIONS DATE

REVISED WITH BID DOCUMENTS 09-10-2019

AutoCAD SHX Text A

TOP OF

STRUCTURE

(E) WAFFLE SLAB

(E) WEATHER BARRIER

(E) FACE BRICK

TOPPING SLAB

PREFINISHED METAL

SILL PAN

VERIFY

7" 5"

FACE OF BRICK BEYOND

INTERIOR WALL

STOREFRONT FRAME

8 3/4"

PREFINISHED METAL

SILL PAN

5"

FACE OF BRICK

BEYOND

INTERIOR WALL

BEYOND

STOREFRONT FRAME

EXTERIOR BRICK

WALL ASSEMBLY

WRAP WEATHER

BARRIER

FINISH SILL

VERIFY

8" 4"

5"

INTERIOR WALL

BEYOND

STOREFRONT FRAME

EXTERIOR BRICK

WALL ASSEMBLY

WRAP WEATHER

BARRIER

1 1/2" MIN.

PREFINISHED METAL

SILL PAN

FACE OF BRICK

BEYOND

INTERIOR WALL

STOREFRONT FRAME

5"

THROUGH WALL

FLASHING AND

WEEP

STEEL BEAM w/

2-HR RATING

WRAP VAPOR BARRIER

DEEP LEG

DEFLECTION TRACK

VERIFY

1' - 0"

STEEL ANGLE; RE:

STRUCT

STEEL FRAMING;

RE: STRUCT

PREFINISHED METAL

SILL PAN

INSULATE CAVITY

STOREFRONT FRAME

5"

MID-SPAN BRACING

FINISH SOFFIT

STEEL BEAM WITH

2-HR RATING

PREFINISHED METAL

SILL PAN

STOREFRONT FRAME

5"

EXTERIOR METAL

PANEL WALL

ASSEMBLY

SOFFIT BY METAL PANEL

SYSTEM MANUFACTURER

1' - 0" +/- 4"

5"

INTERIOR WALL

BEYOND

STOREFRONT FRAME

WRAP WEATHER

BARRIER

EXTERIOR METAL

PANEL WALL

ASSEMBLY

1' - 0" +/- 4"

PREFINISHED METAL

SILL PAN

5"

FACE OF METAL

PANEL BEYOND

INTERIOR WALL

BEYOND

STOREFRONT FRAME

EXTERIOR METAL

PANEL WALL

ASSEMBLY

WRAP WEATHER

BARRIER

1' - 0" +/- 4"

(E) WINDOW LEDGER

ANGLE AND FLASHING

REPAIR INTERIOR WALL

AS REQUIRED

HOLLOW METAL FRAME

(E) EXTERIOR BRICK

WALL ASSEMBLY

METAL DOOR

2"

NEW PARAPET AND

ROOF FLASHING

SOLID SURFACE SILL

HOLLOW METAL FRAME

(E) EXTERIOR BRICK

WALL ASSEMBLY

METAL DOOR

PREFINISHED METAL

FLASHING

METAL TRANSITION

STRIP

2" MIN.

LAP WEATHER BARRIER

MATCH (E) EXTERIOR WALL CONSTRUCTION:

- FACE BRICK

- WEATHER BARRIER

- SHEATHING

- 6" COLD FORMED METAL FRAMING

w/ BATT INSULATION

- INTERIOR FINISH, GYP

(E) EXTERIOR BRICK

WALL ASSEMBLY

DEEP LEG DEFLECTION TRACK

PROJECT NUMBER

BUILDING

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

A

Office of

Construction and Facilities

Management

U.S. Department of

Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF RECORD

SEAL

CONSULTANT

321 4 5 6 7 8 9 10

NAME:

FULLY SPRINKLERED

PROJECT DIRECTOR

FULL SIZE DWG: 30x42

PHONE:

EMAIL:

TINA DEBELLA, PE

804.675.5494

Tina.Debella@va.gov

NEW CLINICAL LAB FOR

SURGICAL EXPANSION

RICHMOND, VIRGINIA

652-319

DWG \-___ OF 162

A

M

AE602

WINDOW DETAILS

AUGUST 2018 TJK TLK

BID DOCUMENTS

1 1/2" = 1'-0"

AE602

F9

DETAIL-WINDOW-SILL, TYP

1 1/2" = 1'-0"

AE602

F7

DETAIL-WINDOW-SILL, NEW BRICK

1 1/2" = 1'-0"

AE602

D9

DETAIL-WINDOW-JAMB, TYP

1 1/2" = 1'-0"

AE602

A9

DETAIL-WINDOW-HEAD, TYP

1 1/2" = 1'-0"

AE602

C9

DETAIL-WINDOW-INTERMEDIATE

1 1/2" = 1'-0"

AE602

A7

DETAIL-WINDOW-HEAD, MTL PANEL

1 1/2" = 1'-0"

AE602

C7

DETAIL-WINDOW-JAMB, MTL PANEL

1 1/2" = 1'-0"

AE602

D7

DETAIL-WINDOW-SILL, MTL. PANEL

1 1/2" = 1'-0"

AE602

A5

DETAIL-EXISTING WINDOW HEAD

1 1/2" = 1'-0"

AE602

C5

DETAIL-EXTERIOR DOOR SILL

1 1/2" = 1'-0"

AE602

D5

DETAIL-EXISTING WINDOW SILL

1' 2'0 6"

SCALE:1-1/2"=1'-0"

REVISIONS DATE

REVISED WITH BID DOCUMENTS 09-10-2019

AutoCAD SHX Text A

CORRIDOR

C3F-1

CORRIDOR

C3F-2

BIOMED

3F-101

ANCILLARY TESTING

3F-103

DRUG TESTING

3F-105

IT CLOSET

3F-104

ELEC CLOS

3F-102

ACCESSIONING

3F-106a

FEE BASIS

3F-106b

MICROBIOLOGY

3F-106d

HEMATOLOGY

3F-106e

CHEMISTRY

3F-106f

REFRIGERATEDSTORAGE

3F-126

BLOOD BANK

3F-106c

CYTOLOGY

3F-106h

OPEN OFFICE

3F-106j

ARCHIVE

3F-124

CLEAN SUPPLY

3F-131

BSL-3 LAB

3F-129

STAFF TOILET

3F-108

DRUG TESTING TOILET

3F-105a

IMMUNOLOGY

3F-107

MEN'S TOILET

3F-109

WOMEN'S TOILET

3F-111

JANITOR

3F-110

EQUIPMENT ROOM

3F-130

GAS TANK ROOM

3F-127

BREAK ROOM

3F-112

CORRIDOR

C3F-3

OFFICE #1

3F-114

OFFICE #2

3F-115

OFFICE #3

3F-116

OFFICE #4

3F-117

OFFICE #5

3F-118

ADMINISTRATION

3F-120

DIRECTOR'S OFFICE

3F-121

CMT OFFICE

3F-122

OFFICE #6

3F-123

ADPAC/RESIDENTS

3F-119

FLAMMABLE STORAGE

3F-125

ANTE ROOM

3F-128

HISTOLOGY

3F-106g

STAIR

3F-S2

CONF ROOM

3F-113

NPQRSTUVW

X

Wn

SCALE:

MH131

3RD FLOOR MECHANICAL DUCTING

1/8" = 1'-0"

CE1

10"Ø

500-VF-2

CD2

10"Ø

OA INTAKE

EA CHASE

CD1

8"Ø

CD2

8"Ø

CD1

8"Ø

CD1(3)

8"Ø

CD1

8"Ø

CD1

8"Ø

CD1

10"Ø

CD1

8"Ø

CD1

8"Ø

CD1

10"Ø

CD1

8"Ø

CD1

6"Ø

CD3

8"Ø

CD2

16"Ø

CD2

8"Ø

CD3

10"Ø

CD3

10"Ø

CD1

10"Ø

CD1

10"Ø

CD1

8"Ø

CD1

8"Ø

CD3

6"Ø

CD1(4)

8"Ø

CD2

10"Ø

CD3

6"Ø

REF-1

CD3

6"Ø

BSC-1

BSC-2

FH-1

BSC-3

CD1

6"Ø

BSC-6

BSC-4

BSC-5

CD2

8"Ø

CD1

8"Ø

CD1

6"Ø

CD2

8"Ø

CD1

8"Ø

CD1

8"Ø

CD1

6"Ø

CD3

10"Ø

CD1

8"Ø

CD3

10"Ø

CD1

10"Ø

CD1

8"Ø

CD2

10"Ø

CD1

10"Ø

CD1

10"Ø

CD1

8"Ø

CD2

8"Ø

175CD2

8"Ø

CD2

8"Ø

CE1

8"Ø

CE1

10"Ø

CE1

12"Ø

CE3

6" X 6"

CE3

6" X 6"

CE2

16"Ø

CE2

6"Ø

CE1

14"Ø

CE2

12"Ø

500-EF 83

E

F

A49

500-ERC 3

LVR-1

CE4

10" X 10"

MOP-5

CE3

9"Ø

CE3

12"x12"

CE3

12"x12"

CE3

6" X 6"

CE3

6" X 6"

CE2

14"Ø

CD2

8"Ø

CD2

10"Ø

CD2

10"Ø

CD2

10"Ø

CD2

10"Ø

CD2

10"Ø

CD2

8"Ø

CD2

8"Ø

CD2

8"Ø

CD2

8"Ø

CD2

10"Ø

CD2

10"Ø

CD2

10"Ø

CD2

10"Ø

CE2

14"Ø

CG1

8"Ø

CG2

16"Ø

CG1

8"Ø

CG1

8"Ø

CG1

12"Ø

CG1

6"Ø

CG1

14"Ø

CG1

6"Ø

CG1

8"Ø

CG1

8"Ø

CG1

6"Ø

CG1

8"Ø

CG1

8"Ø

CG1

8"Ø

CG1

6"Ø

CG1

10"Ø

CG1

10"Ø

CD2

10"Ø

CD2

8"Ø

CD1(4)

10"Ø

CE1

10"Ø

EX-1

10"Ø

EX-1

10"Ø

EX-1

10"Ø

MOP-6

MOP-4

CD2

10"Ø

CD1

10"Ø

CD2

10"Ø

CD1

10"Ø

CD2

10"Ø

CD2

8"Ø

CD2

8"Ø

CD2

8"Ø

CD1

8"Ø

CD1

8"Ø

CD1

8"Ø

CD2

10"Ø

CE2

18"Ø

CD2

10"Ø

F

AHU AC-3

F

F

F

CD1(2)

10"Ø

500-EF 2

500-EF 1

F

T VAV1-4

T

VAV2-5

T

VAV1-8

T

VAV1-14

T

VAV1-11

T

VAV1-17

T

VAV1-18

T

VAV2-2

T VAV2-4

T

VAV2-7

T VAV1-2

T VAV2-15

T

VAV2-9T

VAV2-6

T

VAV2-17

T

VAV1-3

TVAV2-11

TVAV2-14

T VAV2-8

T

VAV1-9

T

VAV1-10

T VAV1-7

T

VAV1-6

T VAV1-12T

VAV1-13

T

VAV1-1

T

VAV1-15

TVAV1-16

T

VAV2-3

T

TEMPTRAK

CD1

8"Ø

CD1

6"Ø

CD1

6"Ø

CD1

6"Ø

CD1

6"Ø

45 CD1

6"Ø

CD1

6"Ø

CD1

6"Ø

CD1

6"Ø

10 CD1

6"Ø

CD1

6"Ø

CD1

6"Ø

CD1

6"Ø

CD1

6"Ø

CD1

6"Ø

CD1

6"Ø

CD1

6"Ø

CD1

6"Ø

T

VAV1-5

CD2

16"Ø

T

VAV2-1

T

VAV2-10

T

VAV2-12

T VAV2-13 T

VAV2-16

CG2

16"Ø

CG1

8"Ø

CE2

16"Ø

CE2

12"Ø

CE2

16"Ø

FH-3

GENERAL NOTES

KEY NOTES

1. DEMO EXISTING METAL OA PLENUM AND WALL LOUVER IN THIS AREA.

CONNECT EXISTING 40x48, 20x12, AND 32x28 OA DUCTS TO INTAKE

CHASE. SEE MH431 FOR MORE DETAIL. AIR HANDLER TO BE

MODIFIED AS PART OF MICU PROJECT, NIC.

2. DEMO EXISTING ROOFTOP PENTHOUSE AND EXTEND SHAFT TO NEW

ROOF LEVEL AND INSTALL NEW ROOFTOP HOOD.

3. DEMO EXISTING METAL EA DUCTS AND WALL LOUVER IN THIS AREA,

48x40, 28x32, 28x32. CMU SHAFT TO REMAIN. CONNECT EACH TO NEW EA CHASE (NOTE 4) WITH A DUCT OF EQUIVALENT SIZE. 46x30 AND 18x18 EA DUCT TO REMAIN. SEE MH431 FOR MORE DETAIL.

4. DEMO EXISTING ROOFTOP PENTHOUSE AND EXTEND SHAFT TO NEW

ROOF LEVEL AND INSTALL NEW ROOFTOP HOOD.

5. EXISTING CONDENSER UNITS (NOT SHOWN) TO REMAIN AND BE KEPT

IN SERVICE.

6. UNDER CUT DOORS BY 34".

1. INSTALL CEILING REGISTERS A MINIMUM OF 12" FROM AN

EXTERIOR WALL.

2. PROVIDE A MINIMUM OF THREE TIMES THE FAN DIAMETER OF

STRAIGHT DUCTWORK OFF THE SUPPLY AIR DISCHARGE BEFORE

ANY TAKEOFFS OR ELBOWS.

3. PROVIDE LOCKING QUADRANT VOLUME BALANCING DAMPERS AT

ALL BRANCH TAKEOFFS TO CEILING SUPPLY AND EXHAUST

DEVICES.

4. PROVIDE ACCESS DOORS IN DUCTWORK WHERE INDICATED OR

REQUIRED FOR ACCESS TO SYSTEM COMPONENTS INCLUDING THE

FOLLOWING: DAMPER MOTORS AND/OR MOTOR OPERATED

DAMPERS, FIRE DAMPERS AND SMOKE DAMPERS.

5. DUCT DIMENSIONS SHOWN ON DRAWINGS ARE NET FREE

INTERIOR, NOT INCLUDING LINING OR INSULATION.

6. EXISTING SYSTEMS NOT INDICATED ON THIS SHEET TO REMAIN.

7. EQUIPMENT SHOWN IN HALFTONE IS EXISTING AND TO REMAIN.

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

F i l e

P a t h

FULLY

SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:

ARCHITECT/ENGINEER OF RECORD

SEAL

CONSULTANT

321 4 5 6 7 8 9 10

NEW CLINICAL LAB FOR

SURGICAL EXPANSION

RICHMOND, VIRGINIA

652-319

PROJECT DIRECTOR

AUGUST 2018

REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

BID DOCUMENTS

DWG. OF 162

KEYPLAN

LAB EXPANSION

PLAN

NORTH

NAME: TINA DEBELLA, PE

PHONE: 804.675.5495

EMAIL: Tina.DeBella@va.gov

TN

N

3RD FLOOR

MECHANICAL DUCTING

MH131

CDLPFM

8'0 4' 16'

SCALE:1/8"=1'-0"

13 Aug 2018

A REVISED WITH BID DOCUMENTS 09.10.2019

A lforster Text Box

SCALE:

MH133

3RD FLOOR INTERSTITIAL MECHANICAL DUCTING

1/8" = 1'-0"

NPQRSTUVW

EF-1

ON ROOF

24X66 EA UP

TO AHU-57

EF-2

ON ROOF

18X40 RA UP

TO AHU-58

20X40 SA DN

FR AHU-58

22X65 SA DN

FR AHU-57

OA INTAKE

EA OUT

VAV2-3

VAV2-4

VAV2-5

VAV2-7

VAV2-14

VAV2-16

VAV2-17

VAV2-6

VAV1-8

VAV1-16

270 VAV1-15

VAV1-9

VAV1-17

VAV1-10

VAV1-3

VAV1-4

VAV1-6

VAV1-7

VAV1-20

VAV1-11

VAV1-18

VAV1-2

VAV1-14

VAV1-19

VAV1-12

VAV1-13

EX FROM

INTERSTITIAL

x1

8x8 x1

10x10 x1

10x10 x1 x1 x8 x1

8x8

8x8 x8

8x

8x8 8x810x10 x1

8x8

6x6

8x 88x8

8x88x8 8x8 10x10 12x10

8x810x10 x1

8x8

10x1012x1215x12

8x8 8x8 x1

8x8

15x12

8x810x10 x1

VAV1-5

10x10

10x1012x12

12x10 x1 x1 x1 x1 x1 x1

12x12

8x810x10 x1

12x12

8x

10x1012x1214x12

8x8

8x

10x1016x16

16x16

10x10 x1

14x12

16x16

6x

10x10

8x

12x12

8x

10x10 12x12 x1

8x8

6x

6x

6x

6x

6x

8x

VAV2-15

VAV2-9

VAV2-11

VAV2-13

VAV2-12

VAV2-10

VAV2-8

10x10

12x1014x14 x1

10x10

12x10 14x12 x1 x1

12x12 x8

14x12 x1 x8

12x10

16x16 x1

14x12

6x6

12x12

12x12 x1

18x18 x1

14x14 x1 x1 x1 x1

24x2028x2036x24 28x24 x1 x4

12x12 16x16 x1 x2

16x16 x1 x1

14x14

20x18 20x20 24x20 24x20 x1

8x8

8x812 x1

12x1216x1616x1618x20 x2

VAV2-2

VAV2-1

8x8

EF-3

ON ROOF

x1

4 14 x1

18x18 18x18

8x88x8

8x8 8x8

8x8

8x8

16x16

6x

6x66x6

6x6

6x612 x1

18x18

14x14

10x10 x1

8x x1

12x12 x1

16x16

8x

20x18

14x14

14x14

8x8 12x12

8x

14x14 16x16 18x18 x1

6x x1 x1 x2

6x

14x14 x1

10x10 18x18 x1

24x20 26x24 x1 x1 x1

VAV1-21

VAV1-22

6x

6x

6x

6x6

6x6

8x

10x10

VAV1-1

12x12 x1

GENERAL NOTES

KEY NOTES#

1. TAPER OA/EA CHASE TO MEET ROOF CURB AS NEEDED.

1. INSTALL CEILING REGISTERS A MINIMUM OF 12" FROM AN

EXTERIOR WALL.

2. PROVIDE A MINIMUM OF THREE TIMES THE FAN DIAMETER OF

STRAIGHT DUCTWORK OFF THE SUPPLY AIR DISCHARGE BEFORE

ANY TAKEOFFS OR ELBOWS.

3. PROVIDE LOCKING QUADRANT VOLUME BALANCING DAMPERS AT

ALL BRANCH TAKEOFFS TO CEILING SUPPLY AND EXHAUST

DEVICES.

4. PROVIDE ACCESS DOORS IN DUCTWORK WHERE INDICATED OR

REQUIRED FOR ACCESS TO SYSTEM COMPONENTS INCLUDING THE

FOLLOWING: DAMPER MOTORS AND/OR MOTOR OPERATED

DAMPERS, FIRE DAMPERS AND SMOKE DAMPERS.

5. DUCT DIMENSIONS SHOWN ON DRAWINGS ARE NET FREE

INTERIOR, NOT INCLUDING LINING OR INSULATION.

6. EXISTING SYSTEMS NOT INDICATED ON THIS SHEET TO REMAIN.

7. PNEUMATIC TUBE SYSTEM TO BE CONSIDERED AS BID ALTERNATE.

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

F i l e

P a t h

FULLY

SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:

ARCHITECT/ENGINEER OF RECORD

SEAL

CONSULTANT

321 4 5 6 7 8 9 10

NEW CLINICAL LAB FOR

SURGICAL EXPANSION

RICHMOND, VIRGINIA

652-319

PROJECT DIRECTOR

AUGUST 2018

REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

BID DOCUMENTS

DWG. OF 162

KEYPLAN

LAB EXPANSION

PLAN

NORTH

NAME: TINA DEBELLA, PE

PHONE: 804.675.5495

EMAIL: Tina.DeBella@va.gov

TN

N

3RD FLOOR INTERSTITIAL

MECHANICAL DUCTING

MH133

CDLPFM

8'0 4' 16'

SCALE:1/8"=1'-0"

13 Aug 2018

A REVISED WITH BID DOCUMENTS 09.10.2019

A

FAN SCHEDULE

SYMBOL FAN TYPE SERVICE MFR MODEL

WHEEL

DIA IN

CFM @ SL

SP IN WC

@ SL

APPROX

RPM

SONES HP ELEC DRIVE TYPE DAMPER TYPE

APPROX

ROOF

OPENING

REMARKS

EF-1 LAB EXH LAB GREENHECK VK-MS-15 15 2725 0'-1 1/4" 1797 1.5 460/60/3 DIRECT BACKDRAFT 20"x20"

EF-2 LAB EXH LAB GREENHECK VK-HS-10 10 1000 0'-1" 2994 1.0 460/60/3 DIRECT BACKDRAFT 14"x14"

EF-3 LAB EXH LAB GREENHECK VK-MS-20 20 3760 0'-1" 1170 2.0 460/60/3 DIRECT BACKDRAFT 22"x22"

AIR SEPARATOR SCHEDULE

SYMBOL MFR MODEL SERVICE GPM

MAX W.P.D

(FT.WG)

WITH INTEGRAL

STRAINER

LOCATION REMARKS

ASC-1

SPIRO-

THERM

VSR400

CHILLED

WATER

197 1.0 YES ROOF ---

ASH-1

SPIRO-

THERM

VSR400 HOT WATER 134 1.0 YES MECH ROOM ---

SHELL AND TUBE HEAT EXCHANGER SCHEDULE

SYMBOL MFR MODEL

SHELL

DIA IN

TUBE

LENGTH FT

NO

PASSES

TUBE SIDE SHELL SIDE

HEATING

SURFACE

SQ FT

REMARKS

EWT F LWT F MBH GPM

PD FT

WC

PD FT

WC

STEAM

INLET

PSIG

LBS/HR

HX-1 TACO G12410-S 12 5 2 160 180 1730 160 1.1 --- 10 1730 --- -

HX-2 TACO G12410-S 12 5 2 160 180 1730 160 1.1 --- 10 1730 --- -

PACKAGED AIR COOLED WATER CHILLER SCHEDULE

SYMBOL MFR MODEL

CAPACITY

TONS @ SL

AMBIENT

TEMP F

CHILLED WATER DATA

KW INPUT @

SL

KW PER

TON

MIN CIRCUIT

AMP

EER @ SL MOP MCA ELEC

NO

COMPR

STEPS

CAPACITY

CONTROL

APPROX

OPER

WEIGHT LB

LOW AMB

CONTROL F

REMARKS

EWT F LWT F GPM PD FT WC

CH-1 TRANE CGAM 130 95 56 42 196.7 9.1 137.2 1.06 261.1 10.3 300A 285.1 460/60/3 6 6 10000 STANDARD 1, 2, 3

1. 35% PROPYLENE GLYCOL 2. INCLUDE MANUFACTURER'S ROOF SUPPORT FRAME AND VIBRATION ISOLATION. 3. PROVIDE FACTORY HYDRONIC PACKAGE AND BUFFER TANK.

PUMP SCHEDULE

SYMBOL SERVICE PUMP TYPE DRIVE TYPE MFR SERIES MODEL GPM

HEAD FT

WC

EFF % HP RPM ELEC

SUCTION

SIZE IN

DISCH

SIZE IN

REMARKS

HWP-1

HEATING

WATER

BASE MOUNTED END

SUCTION

VFD TACO FI 2009D 160 63 71 5 1760 208/60/3 2.5 2

HWP-2

HEATING

WATER

BASE MOUNTED END

SUCTION

VFD TACO FI 2009D 160 63 71 5 1760 208/60/3 2.5 2

NOTES: BOTH PUMPS 100% CAPACITY, ONE PRIMARY, ONE STANDBY, ALTERNATE ROLES TO BALANCE MAINTENANCE SCHEDULE

UNIT COOLER SCHEDULE (REFRIGERATION SERVICE)

MARK LOCATION

SYSTEM AND/OR

SERVICE

EVAPORATOR

SECTION TEMP

CAPACITY

REFRIGERANT

REFRIGERANT

CHARGE (LBS)

ROOM

VOLUME

(CF)

ROOM DESIGN

TEMP

AIR FLOW

MOTOR

REMARKS

POWER EACH

PHASE VOLT

°F [°C] BTUH [W] °F [°C] CFM [L/s] HP [W]

REF-1 3F129

WALK-IN

REFRIGERATOR

26.2 -3.2 24,000 7,034

R404A

(A1 RATING) 4 2079 35 2 2850 1345 3 0.05 37 1 460 1.7 MCA, 15 A FUSE, 1.6 FLA

AIR COOLED CONDENSING UNIT SCHEDULE (REFRIGERATION SERVICE)

MARK LOCATION

SYSTEM AND/OR

SERVICE

CAPACITY SUCTION TEMP AMBIENT AIR

MAX COND

TEMP

COMPRESSOR MOTOR CONDENSER FAN MOTOR

REMARKS#

COMP

POWER

PHASE VOLT

# COND.

FAN

POWER

BTUH [W] °F [°C] °F [°C] °F [°C] HP [kW] HP [W]

CU-1 ROOF

WALK-IN

REFRIGERATOR

24,000 7,034 25.7 -3.5 95 35 101 38 1 2 1.5 3 460 1 0.32 240

15 MOP, 9.1 MCA, 1.0 FLA.

EC MOTOR.

EXHAUST AND FUME HOOD SCHEDULE

SYMBOL LOCATION ROOM NUMBER

EQUIPMENT OR

SERVICE

MFR MODEL TYPE SIZE CFM

FACE

VELOCITY

HOOD S.P.

FAN SERVING

HOOD

REMARKS

BSC-1 IMMUNOLOGY 3F108 BIO SAFETY CABINET BAKER STERILGARD III SG403 CLASS II A/B3 48"x31"x100" 350 100 - - RECIRC. 120/1/60. 20 AMPS.

FH-1 ACCESSIONING 3F107a FUME HOOD BAKER STERILGARD SG403A-HE CLASS II A2 54"x31"x62" 610 100 - - RECIRC. 120/1/60. 20 AMPS.

BSC-2 BSL-3 LAB 3F132 BIO SAFETY CABINET BAKER STERILGARD III SG603A CLASS II A2 78"x31"x82" 510 100 VENT, REMOVE BLOWER MOTOR.

BSC-3 MICROBIOLOGY 3F107d BIO SAFETY CABINET BAKER STERILGARD SG603A-HE CLASS II A2 78"x31"x82" 1020 100-110 VENT, REMOVE BLOWER MOTOR.

BSC-4 MICROBIOLOGY 3F107d BIO SAFETY CABINET BAKER STERILGARD III SG603A CLASS II A2 78"x31"x82" 510 100 VENT, REMOVE BLOWER MOTOR.

BSC-5 MICROBIOLOGY 3F107d BIO SAFETY CABINET BAKER STERILGARD III SG403A CLASS II A2 54"x31"x62 340 100 VENT, REMOVE BLOWER MOTOR.

EX-1 CHEMISTRY 3F107f

AUTOMATED

CHEMISTRY LINE

SIEMENS VISTA 1500 85"x52"x55.5" 400 INTERNAL FAN

LAB ANALYZER X3. APPROXIMATELY

300-400 CFM

BSC-6 CYTOLOGY 3F107h BIO SAFETY CABINET BAKER STERILGARD SG403A-HE CLASS II A2 54"x31"x62" 620 100 VENT. REMOVE BLOWER MOTOR.

MOP-4 HISTOLOGY 3F107g FUME HOOD AND

GROSSING STATION

MOPEC MB100 CLASS II B1 48"x31"x82" 300 100

NOT CURRENTLY EXHAUST, WOULD

LIKE IT TO BE. M-F 8 HRS/DSY

MOP-5 HISTOLOGY 3F107g FUME HOOD AND

GROSSING STATION

MOPEC MB600 CLASS II B1 48"x31"x82" 600 100 HIGH SMELL

MOP-6 HISTOLOGY 3F107g FUME HOOD AND

GROSSING STATION

MOPEC MB600 CLASS II B1 48"x31"x82" 600 100

FH-3 HISTOLOGY 3F107g HIGH SMELL FUME

HOOD

CLASSIC

MODULAR

SYSTEMS

CLASS II B1

W:38"

H(MAX):28"

18" HIGH SASH

740 100 INTAKE ONLY THROUGH FACE

1.

2.

LOUVER & HOOD SCHEDULE

SYMBOL MFR MODEL

OVERALL

W x L (IN)

OVERALL

HEIGHT (IN) CFM FREE AREA LOCATION REMARKS

VNTR-1 GREENHECK FGR 112 x 123 29.5 21839 NA ROOF

VNTI-1 GREENHECK FGI 123 x 123 29.5 34096 NA ROOF

LVR-1 GREENHECK EDJ 96 X 120 120 16360 40% EXISTING NORTH WALL

AIR DEVICE SCHEDULE

SYMBOL TYPE MFR MODEL FRAME MATERIAL FINISH

DAMPER

TYPE

ACCESSORIES REMARKS

CD1 CEILING DIFFUSER TITUS TDC LAY-IN

STAINLESS STEEL

OR ALUMINUM

OFF-WHITE ENAMEL NONE

SQUARE TO ROUND

ADAPTER

CD2 CEILING DIFFUSER TITUS TMRA

DUCT

MOUNTED

STAINLESS STEEL

OR ALUMINUM

OFF-WHITE ENAMEL NONE --- ---

CD3 CEILING DIFFUSER TITUS TDC

SURFACE

MOUNT

STAINLESS STEEL

OR ALUMINUM

OFF-WHITE ENAMEL NONE --- ---

CE1 CEILING EXHAUST TITUS 50F LAY-IN

STAINLESS STEEL

OR ALUMINUM

OFF-WHITE ENAMEL NONE --- ---

CE2 CEILING EXHAUST TITUS TMRA

DUCT

MOUNTED

STAINLESS STEEL

OR ALUMINUM

OFF-WHITE ENAMEL NONE --- ---

CE3 CEILING EXHAUST TITUS 50F

SURFACE

MOUNT

STAINLESS STEEL

OR ALUMINUM

OFF-WHITE ENAMEL NONE --- ---

CE4 TYPE II VAPOR HOOD

CAPTIVE

AIRE

VHB LAY-IN STAINLESS STEEL OFF-WHITE ENAMEL NONE --- ---

CG1 CEILING RETURN TITUS 50F LAY-IN

STAINLESS STEEL

OR ALUMINUM

OFF-WHITE ENAMEL NONE --- ---

CG2 CEILING RETURN TITUS TMRA

DUCT

MOUNTED

STAINLESS STEEL

OR ALUMINUM

OFF-WHITE ENAMEL NONE --- ---

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

F i l e

P a t h

FULLY

SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:

ARCHITECT/ENGINEER OF RECORD

SEAL

CONSULTANT

321 4 5 6 7 8 9 10

NEW CLINICAL LAB FOR

SURGICAL EXPANSION

RICHMOND, VIRGINIA

652-319

PROJECT DIRECTOR

AUGUST 2018

REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

BID DOCUMENTS

DWG. OF 162

NAME: TINA DEBELLA, PE

PHONE: 804.675.5495

EMAIL: Tina.DeBella@va.gov

MECHANICAL SCHEDULES

MH601

WBRCDL

13 Aug 2018

A REVISED WITH BID DOCUMENTS 09.10.2019

A

A

GENERAL NOTES

1. EQUIPMENT SHOWN WITH BOLD LINEWEIGHTS INDICATES EQUIPMENT TO BE

FURNISHED AND INSTALLED BY THE CONTRACTOR.

2. ALL VACANCY SENSORS SHALL BE SET TO THE MAXIMUM DELAY OFF.

3. ALL LIGHTS WILL BE SWITCHED WITH THE VACANCY SENSOR, DURING

EMERGENCY OPERATIONS, THE EMERGENCY FIXTURES WILL REMAIN ON.

REFER TO THE EMERGENCY BYPASS DETAIL ON SHEET EL501 FOR A POSSIBLE

CONFIGURATION.

4. SEE LUMINARIES SCHEDULE ON SHEET EL501.

KEY NOTES

1. FIND EXISTING STAIRWELL LIGHTING CIRCUIT AND ADD NEW STAIRWELL LIGHT

FIXTURES TO THIS CIRCUIT. PROVIDE CONDUIT AND CONDUCTOR AS REQUIRED

TO ADD THESE FIXTURES TO THIS CIRCUIT. MOUNT 8'-0" AFF. FIELD-VERIFY

CIRCUIT LOADING WILL NOT EXCEED 14A, AND PROVIDE REPORT TO COR,

ACCORDINGLY. ("S"-TYPE LUMINAIRES.)

2. PROVIDE A UL-LISTED CONTROL PANEL, INCLUDING FABRICATION, BY A UL 508

PANEL SHOP. CABINET SHALL INCLUDE RAIL-MOUNTED TIMER SUITABLE FOR

8-HOUR ON WITH AUTOMATIC OFF. LIGHTING CONTROL ACCESSORIES SHALL

INCLUDE TWO (2) STATUS LIGHTS (GREEN AT ON, RED AT AUTO-OFF) ON OUTER

COVER AND A HAND-OFF-AUTO SWITCH. PROVIDE ADDITIONAL COMPONENTS AS

REQUIRED FOR COMPLETE FUNCTIONALITY. PROVIDE FUNCTIONALITY FOR

MOMENTARY WALL SWITCHES AND PROVIDE TWO (2) CONTROLLED

CONTACTORS FOR 20 AMP 277V LIGHTING CIRCUITS. TURN OFF LIGHTS ON

3F-ESP1 CCT #11 5 MINUTES AFTER LIGHTS ON 3F-ESP1 CCT #13.

3. PROVIDE 24VDC OR 120VAC MOMENTARY WALL SWITCH, AT CONTRACTOR'S

OPTION, TO MATCH THE TIMING CONTACTOR LIGHTING CONTROL PANEL.

NPQRSTUVW

QQQ

Q Q Q Q

Q

QQQ

Q Q Q Q

INTERSTITIAL

3F-INT

S

S

PANEL 3F-ESP1

CIRCUITS #11

PANEL 3F-ESP1

CIRCUITS #11

PANEL 3F-ESP1

CIRCUITS #13

PANEL 3F-ESP1

CIRCUITS #13

Q

Q

Q Q

Q

Q

Q Q

Q

Q

Q

Q

Q

Q

Q

Q

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

F i l e

P a t h

FULLY

SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:

ARCHITECT/ENGINEER OF RECORD

SEAL

CONSULTANT

321 4 5 6 7 8 9 10

NEW CLINICAL LAB FOR

SURGICAL EXPANSION

RICHMOND, VIRGINIA

652-319

PROJECT DIRECTOR

AUGUST 2018

REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

BID DOCUMENTS

DWG. OF 162

KEYPLAN

LAB EXPANSION

PLAN

NORTH

NAME: TINA DEBELLA, PE

PHONE: 804.675.5495

EMAIL: Tina.DeBella@va.gov

TN

N

3RD FLOOR

INTERSTITIAL LIGHTING PLAN

EL132

MMMGGR

SCALE:

EL132

3RD FLOOR INTERSTITIAL LIGHTING PLAN

1/8" = 1'-0"

8'0 4' 16'

SCALE:1/8"=1'-0"

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A REVISED WITH BID DOCUMENTS 09.10.2019

FURNISHED AND INSTALLED BY THE CONTRACTOR.

2. ELECTRICAL GEAR SHOWN FOR LOCATION PURPOSE. REFER TO ONE-LINE

DIAGRAM ON SHEET EP601 FOR EQUIPMENT INTERCONNECTION

REQUIREMENTS.

3. HATCHED AREA SHOWS RELATIVE LOCATION OF NEW LAB AND NEW

ELECTRICAL ROOM ON 3RD FLOOR TO PROVIDE LATERAL DISTANCE

INFORMATION FOR ELECTRICAL RUNS. UTILIZE ELECTRICAL ROOMS FOR

VERTICAL ROUTING AND INTERSTITIAL SPACES FOR LATERAL ROUTING OF

ELECTRICAL CONDUITS WHERE POSSIBLE.

EP101

VAULT-3

NEW LAB ABOVE SEE

GENERAL NOTE 3

EP101

VAULT-4

ECLDOF

X F

M R

P N

L P

N L

P N

L P

N L

P N

L P

N L

P N

L P

N L

P N

L

A T

S A

T S

A T

S X

F M

R X

F M

R D

IS

C

D

IS

C

SWGR

ECPDOF

ECBCF

TSF

ATS-SF

LIFE

SAFETY #1

EELOF

TEF

EEPDOF

ECBEF

TCF

ATS-CF

CRITICAL

#1

ESLDOF

ESPDOF

ECBSF

EELDOF

SIDE PNL

EEPOF

ATS-EF

EQUIP #1

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

F i l e

P a t h

FULLY

SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:

ARCHITECT/ENGINEER OF RECORD

SEAL

CONSULTANT

321 4 5 6 7 8 9 10

NEW CLINICAL LAB FOR

SURGICAL EXPANSION

RICHMOND, VIRGINIA

652-319

PROJECT DIRECTOR

AUGUST 2018

REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

BID DOCUMENTS

DWG. OF 162

NAME: TINA DEBELLA, PE

PHONE: 804.675.5495

EMAIL: Tina.DeBella@va.gov

BASEMENT

POWER PLAN

EP101

WBRGGR

SCALE:

EP101

BASEMENT POWER PLAN

1/8" = 1'-0"

SCALE:

EP101

TRANSFORMER VAULT-3

ENLARGED POWER PLAN

1/4" = 1'-0"

KEYPLAN

LAB EXPANSION

PLAN

NORTH

N

TN

8'0 4' 16'

SCALE:1/8"=1'-0"

4'0 2' 8'

SCALE:1/4"=1'-0"

A REVISED WITH BID DOCUMENTS 09.10.2019

SCALE:

EP101

TRANSFORMER VAULT 4

ENLARGED POWER PLAN

1/4" = 1'-0"

# KEY NOTES

1. FURNISH AND INSTALL GROUND BAR. CONNECT TO ALL AVAILABLE GROUNDING

POINTS PER NEC REQUIREMENTS. ADD GROUND RODS AS NECESSARY.

2. FURNISH AND INSTALL L6-30R TYPE RECEPTACLE.

3. RELOCATE SIEMENS APTIO AUTOMATION ELECTRICAL GEAR LOCATED IN

ELECTRICAL ROOM 3A-148 TO THIS EQUIPMENT ROOM. ELECTRICAL GEAR

INCLUDES FLOOR MOUNTED UPS, 60kVA;208V-400/231V SPECIAL EQUIPMENT

TRANSFORMER & ASSOCIATED PANELBOARD. RE-FEED TO MAINTAIN EXISTING

POWER SOURCE WHICH IS PANEL LD3AA#1,3,5 LOCATED WITHIN ORIGIN ROOM.

USE (4#4+1#8G)1-1/4"C. PROVIDE A 60-AMP, 3-POLE ENCLOSED CIRCUIT BREAKER

IN-LINE, ADJACENT TO TRANSFORMER, BETWEEN TRANSFORMER AND UPS.

PROVIDE A 40-AMP, 3-POLE ENCLOSED CIRCUIT BREAKER IN-LINE, ADJACENT TO

TRANSFORMER, BETWEEN TRANSFORMER AND APTIO DISCONNECT. REFERENCE

ONE-LINE AND SHEET EP131 FOR ADDITIONAL REQUIREMENTS. PROVIDE RACKING

AND ADJUST LOCATIONS AS REQUIRED TO PROVIDE NEC 110.26 WORKING

CLEARANCE.

4. RELOCATE SIEMENS APTIO AUTOMATION SYSTEM AIR COMPRESSOR FROM ROOM

3A-147 TO EQUIPMENT ROOM. RE-FEED TO MAINTAIN EXISTING POWER SOURCE

WHICH IS PANEL EEL3AC#12,14,16 LOCATED IN ELEC ROOM 3A-148. USE

(4#8+1#10G)1"C. PROVIDE LOCAL LOCKABLE DISCONNECT.

5. PROVIDE CONNECTION FOR AUTOFLUSH AND AUTOSINK POWER. COORDINATE

POWER CONNECTION METHOD WITH EQUIPMENT CONFIGURATION.

6. PROVIDE CONNECTION FOR ROBOT COMMUNICATION SYSTEM POWER.

EQUIPMENT BY VENDOR. PROVIDE 120V, 1Ø POWER SOURCE, CAPPED OFF.

7. PROVIDE GFCI-TYPE RECEPTACLE AT ELEVATION 4 INCHES ABOVE TOP OF SINK

BOWL.

8. PROVIDE DEADFRONT-STYLE GFCI PROTECTION AS REQUIRED TO PROTECT

RECEPTACLES CONNECTED TO THIS CIRCUIT.

9. ROVIDE EQUIPMENT RACKING SUCH THAT THE FRONT OF THE TRANSFORMER

AND THE FRONT OF THE ECB ARE ABOVE/BELOW EACH OTHER.

10. LOCATE DISCONNECT SWITCH ABOVE THE GROUND BAR LOCATION. MOUNT

GROUND BAR SO IT DOES NOT AFFECT EQUIPMENT CLEARANCE AT DISCONNECT.

11. PROVIDE RECEPTACLES FOR ACCESS CONTROL PANELS IN EXISTING MICU

BIOMED ROOM. COORDINATE WITH TELECOM SHEET TN132.

12. PROVIDE SWITCH AND CIRCUIT AS REQUIRED TO TOGGLE TOILET AND SINK

FIXTURES BETWEEN OPERABLE AND NON-OPERABLE STATES.

13. BASE BID:BOLD DASHED BOUNDARY INDICATES EQUIPMENT TO BE INSTALLED,

EXCEPT FOR PORTIONS IDENTIFIED AS PART OF A DEDUCTIVE BID ALTERNATE.

VERIFY IF THIS EQUIPMENT IS TO BE INSTALLED PRIOR TO COMMENCEMENT OF

WORK. ELECTRICAL INFRASTRUCTURE IN THIS BOUNDARY IS INCLUDED UNDER

THE BASE BID.

14. DEDUCTIVE BID ALTERNATE 4: ELECTRICAL INFRASTRUCTURE ON THIS SHEET IN

THIS BOUNDARY IS EXCLUDED UNDER DEDUCTIVE BID ALTERNATE 4. REFERENCE

EP131.2 FOR ADDITIONAL REQUIREMENTS.

15. DEDUCTIVE BID ALTERNATE 5: ELECTRICAL INFRASTRUCTURE ON THIS SHEET IN

THIS BOUNDARY IS EXCLUDED UNDER DEDUCTIVE BID ALTERNATE 5. REFERENCE

EP131.2 FOR ADDITIONAL REQUIREMENTS.

16. DEDUCTIVE BID ALTERNATE 6: ELECTRICAL INFRASTRUCTURE ON THIS SHEET IN

THIS BOUNDARY IS EXCLUDED UNDER DEDUCTIVE BID ALTERNATE 6. REFERENCE

EP131.2 FOR ADDITIONAL REQUIREMENTS.

17. PROVIDE DOORBELL SYSTEM PUSH BUTTON +48" AFF. SEE 5/EP132 FOR

ADDITIONAL REQUIREMENTS.

18. PROVIDE POWER CONNECTION, RACEWAYS, AND ENCLOSURES FOR PACS

SYSTEM AT THIS LOCATION. SEE 3/TN502 AND 7/TN502 FOR ADDITIONAL

REQUIREMENTS. PROVIDE PACS SYSTEM MATCHING HOSPITAL STANDARD.

19. BASE BID:SAME AS KEY NOTE#18, EXCEPT NO POWER CONDUCTORS OR PACS

COMPONENTS.

DEDUCTIVE BID ALTERNATE #2: OMIT PACS SYSTEM FROM DOOR IDENTIFIED IN

ENTIRETY.

20. PROVIDE SPLIT-YOKE RECEPTACLE(S), WITH TOP HALF OCCUPANCY-SWITCHED

PER ASHRAE 90.1.

GFCI, AC

AC

GFCI, AC

GFCI

GFCI

GFCI

GFCI

GFCI, AC

GFCI, AC

GFCI

GFCI, AC

GFCI

XFMR

PANEL

UPS

AIR COMP.

J6

J J

5J 5 GFCI, AC

PANEL 3F-NL1

CIRCUIT #53

PANEL 3F-NL1

CIRCUIT #51

PANEL 3F-NL1

CIRCUIT #55

7 7

PANEL 3F-NL1

CIRCUIT #59

PANEL 3F-NL1

CIRCUIT #61

PACS

PANEL 3F-NL1

CIRCUIT #69

J

J

PANEL 3F-NL1

CIRCUIT #79,81

PANEL 3F-NL1

CIRCUIT #57

PANEL 3F-NL1

CIRCUIT #49

PANEL 3F-NL1

CIRCUIT #71

PANEL 3F-NL1

CIRCUIT #41

PANEL 3F-NL1

CIRCUIT #19

PANEL 3F-NL1

CIRCUIT #18

PANEL 3F-NL1

CIRCUIT #12

PANEL 3F-NL1

CIRCUIT #8

PANEL 3F-NL1

CIRCUIT #21

PANEL 3F-NL2

CIRCUIT #30

JPANEL 3F-ESP1

CIRCUIT #2

J

PANEL 3F-ESP1

CIRCUIT #4

PANEL 3F-EEL2

CIRCUIT #83

J J

PANEL 3F-NL1

CIRCUIT #43

PANEL 3F-NL1

CIRCUIT #23

PANEL 3F-NL1

CIRCUIT #47

PANEL 3F-NL1

CIRCUIT #14

PANEL 3F-NL1

CIRCUIT #10

PANEL 3F-NL1

CIRCUIT #45

CORRIDOR

C3F-1

CORRIDOR

C3F-2

BIOMED

3F-101

ANCILLARY TESTING

3F-103

DRUG TESTING

3F-105

IMMUNOLOGY

3F-107

IT CLOSET

ACCESSIONING

3F-106a

FEE BASIS

3F-106b

MICROBIOLOGY

3F-106d

HEMATOLOGY

3F-106e

CHEMISTRY

3F-106f

REFRIGERATEDSTORAGE

3F-126

BLOOD BANK

3F-106c

CYTOLOGY

3F-106h

OPEN OFFICE

3F-106j

ARCHIVE

3F-124

CLEAN SUPPLY

3F-131

BSL-3 LAB

3F-129

MEN'S TOILET

3F-109

WOMEN'S TOILET

3F-111

STAFF TOILET

3F-108

DRUG TESTING TOILET

3F-105a

JANITOR

3F-110

EQUIPMENT ROOM

3F-130

FLAMMABLE STORAGE

3F-125

ANTE ROOM

3F-128

BREAK ROOM

3F-112

CORRIDOR

C3F-3

OFFICE #1

3F-114

OFFICE #2

3F-115

OFFICE #3

3F-116

OFFICE #4

3F-117

OFFICE #5

3F-118

ADMINISTRATION

3F-120

DIRECTOR'S OFFICE

3F-121

CMT OFFICE

3F-122

OFFICE #6

3F-123

ADPAC/RESIDENTS

3F-119

HISTOLOGY

3F-106g

GAS TANK ROOM

3F-127

STAIR

3F-S2

CONF ROOM

3F-113

DEDUCTIVE BID

ALTERNATE 5

DEDUCTIVE BID

ALTERNATE 4

DEDUCTIVE BID

ALTERNATE 6

13 16 13 14

P

F

PF

R E

F

R E

F

P F

P F

P

F

PF

J 17

M

PANEL 3F-EEL2

CIRCUIT #27

PANEL 3F-EEL2

CIRCUIT #29

ECB

18 18

18 18

19 19

19 19

19 1919

13 16

13 16

13 14

PANEL 3F-NL1

CIRCUIT #63

PANEL 3F-NL2

CIRCUIT #6 (PART)

3F-EEL2

3F-TN1

3F-NH1

3F-EEP1

3F-TCE13F-TEE1

3F-EEL1

3F-ESP1

3F-NL1

3F-NL2

3F-TCE1

-ECB

1 10

3F-NL1-ECB

+48"

AFF

3F-ECL1

ECB

E C

B

ECB

3F-EEL1

-ECB9

PANEL 3F-EEL2

CIRCUIT #1

GENERAL NOTES

1. EQUIPMENT SHOWN WITH BOLD LINEWEIGHTS INDICATES EQUIPMENT

TO BE FURNISHED AND INSTALLED BY THE CONTRACTOR.

2. ELECTRICAL GEAR SHOWN FOR LOCATION PURPOSE. REFER TO

ONE-LINE DIAGRAM ON SHEET EP401 FOR EQUIPMENT

INTERCONNECTION REQUIREMENTS.

3. MAINTAIN NEC REQUIRED CLEARANCES DURING INSTALLATION OF NEW

ELECTRICAL GEAR. PROVIDE STRUT RACKING AS REQUIRED FOR

COMPLIANCE.

4. ANY FLOOR MOUNTED ELECTRICAL GEAR SHALL BE INSTALLED ON AN

EQUIPMENT PAD, 4" MINIMUM THICKNESS.

5. EQUIPMENT FOR BOTH THE BASE BID AND DEDUCTIVE BID ALTERNATES

ARE SHOWN ON THE PLANS.

6. ALL WIRE RUNS SHOWN ON DRAWINGS ARE RUN THROUGH THE SPACE

ABOVE THE CEILING GRID ON THIS FLOOR. LOCATE PRE-FURNITURE

INFRASTRUCTURE AS REQUIRED TO FEED FURNITURE SHOWN ON TN131

AFTER FURNITURE IS INSTALLED.

7. MOUNT CEILING - MOUNTED AND POWER-POLE JUNCTION BOXES

CONCEALED, WITHIN THE ABOVE - CEILING SPACE.

8. LOCATE ABOVE-COUNTER RECEPTACLES SO BOTTOM OF FACEPLATE IS

AT LEAST 3.15 INCHES ABOVE-COUNTER TOP, AT SAME HEIGHT AS

ADJACENT RECEPTACLES.

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

F i l e

P a t h

FULLY

SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:

ARCHITECT/ENGINEER OF RECORD

SEAL

CONSULTANT

321 4 5 6 7 8 9 10

NEW CLINICAL LAB FOR

SURGICAL EXPANSION

RICHMOND, VIRGINIA

652-319

PROJECT DIRECTOR

AUGUST 2018

REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

BID DOCUMENTS

DWG. OF 162

NAME: TINA DEBELLA, PE

PHONE: 804.675.5495

EMAIL: Tina.DeBella@va.gov

3RD FLOOR POWER PLAN

PRE FURNITURE CONSTRUCTION

EP131.1

WBRGGR

SCALE:

EP131.1

PRE FURNITURE CONSTRUCTION

3RD FLOOR POWER PLAN

1/8" = 1'-0"

SCALE:

EP131.1

ENLARGED PLAN

ELEC CLOS 3F103

1/2" = 1'-0"

KEYPLAN

LAB EXPANSION

PLAN

NORTH

N

TN

8'0 4' 16'

SCALE:1/8"=1'-0"

2' 4'0 1'

SCALE:1/2"=1'-0"

EP132.1

EP132.1

EP133.1

EP133.1

EP132.1

EP132.1

EP132.1

EP132.1

EP132.1

EP131.1

A REVISED WITH BID DOCUMENTS 09.10.2019

FURNISHED AND INSTALLED BY THE CONTRACTOR.

2. ELECTRICAL GEAR SHOWN FOR LOCATION PURPOSE. REFER TO ONE-LINE

DIAGRAM ON SHEET EP401 FOR EQUIPMENT INTERCONNECTION

REQUIREMENTS.

3. MAINTAIN NEC REQUIRED CLEARANCES DURING INSTALLATION OF NEW

ELECTRICAL GEAR.PROVIDE STRUT RACKING AS REQUIRED FOR COMPLIANCE.

4. ANY FLOOR MOUNTED ELECTRICAL GEAR SHALL BE INSTALLED ON AN

EQUIPMENT PAD, 4" MINIMUM THICKNESS.

5. EQUIPMENT FOR BOTH THE DEDUCTIVE BID ALTERNATES ARE SHOWN ON THIS

SHEET. LOCATE PRE-FURNITURE INFRASTRUCTURE AS REQUIRED TO FEED

FURNITURE SHOWN ON TN131 AFTER FURNITURE IS INSTALLED.

KEY NOTES

1. FURNISH AND INSTALL GROUND BAR. CONNECT TO ALL AVAILABLE GROUNDING

POINTS PER NEC REQUIREMENTS. ADD GROUND RODS AS NECESSARY.

2. DISCONNECT SWITCH SHALL BE PLACED ABOVE THE GROUND BAR LOCATION.

THIS WILL NOT AFFECT EQUIPMENT CLEARANCE.

3. BOLD DASHED BOUNDARY INDICATES EQUIPMENT TO BE INSTALLED AS PART OF

A DEDUCTIVE BID ALTERNATE. VERIFY IF THIS EQUIPMENT IS TO BE INSTALLED

PRIOR TO COMMENCEMENT OF WORK.

4. DEDUCTIVE BID ALTERNATE 4:ELECTRICAL INFRASTRUCTURE IN THIS

BOUNDARY IS INCLUDED UNDER DEDUCTIVE BID ALTERNATE 4.

5. DEDUCTIVE BID ALTERNATE 5:ELECTRICAL INFRASTRUCTURE IN THIS

BOUNDARY IS INCLUDED UNDER DEDUCTIVE BID ALTERNATE 5.

6. DEDUCTIVE BID ALTERNATE 6:ELECTRICAL INFRASTRUCTURE IN THIS

BOUNDARY IS INCLUDED UNDER DEDUCTIVE BID ALTERNATE 6.

7. ROVIDE EQUIPMENT RACKING SUCH THAT THE FRONT OF THE TRANSFORMER

AND THE FRONT OF THE ECB ARE ABOVE/BELOW EACH OTHER.

NPQRSTUVW

Wn

450 SF

CORRIDOR

C3F-1

81 SF

IT CLOSET

3F-104

105 SF

ELEC CLOS

3F-102

387 SF

ACCESSIONING

3F-106a

467 SF

FEE BASIS

3F-106b

MICROBIOLOGY

3F-106d

1019 SF

HEMATOLOGY

3F-106e

1534 SF

CHEMISTRY

3F-106f

231 SF

REFRIGERATEDSTORAGE

3F-126

544 SF

BLOOD BANK

3F-106c

496 SF

CYTOLOGY

3F-106h

1179 SF

OPEN OFFICE

3F-106j

273 SF

ARCHIVE

3F-124

372 SF

CLEAN SUPPLY

3F-131

BSL-3 LAB

3F-129

70 SF

STAFF TOILET

3F-108

121 SF

EQUIPMENT ROOM

3F-130

77 SF

FLAMMABLE STORAGE

3F-125

125 SF

ANTE ROOM

3F-128

1583 SF

HISTOLOGY

3F-106g

93 SF

GAS TANK ROOM

3F-127

164 SF

STAIR

3F-S2

STAIR

3F-S2

J J J

J JJ J

JJ

JJ

J

J

J J J

J

J J

J

DEDUCTIVE BID

ALTERNATE 5

DEDUCTIVE BID

ALTERNATE 4

DEDUCTIVE BID

ALTERNATE 6

HATCHED AREA NOT

SUBJECT TO DEDUCTIVE

ALTERNATES, REFER

TO SHEET EP131

3 5

3 63 4

3F-EEL2

3F-TN1

3F-NH1

3F-EEP1

3F-TCE13F…