36C24619B0039-011.pdf

PDF 2 MB Posted

Attached to
Construct New Clinical Lab Expansion (VA-18-00152139) Federal contract opportunity
Solicitation number
36C24619B0039
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6

About this file

This solicitation seeks construction services for a clinical lab expansion project at a VA medical center. The scope includes all labor, materials, equipment, transportation and supervision to complete renovations and an addition of approximately 18,050 square feet. The drawings and specifications will be provided on August 15, 2019. A pre-proposal conference will be held on an unspecified date. Questions must be emailed to the Contracting Officer by the stated deadline. The estimated cost is between $5-10 million and work must be completed within 680 calendar days of the notice to proceed. This opportunity is 100% set aside for Service-Disabled Veteran-Owned Small Businesses. Offers will only be accepted from SDVOSBs. The NAICS code is 236220 and small business size standard is $36.5 million.

36C24619B0039 S02 MECHANICAL_BidDocuments.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Construct New Clinical Lab Expansion (VA-18-00152139), newest first.
File Type Posted
36C24619B0039-0003000.docx DOCX document
36C24619B0039-0003002.pdf PDF
36C24619B0039-0003003.pdf PDF
36C24619B0039-0003001.pdf PDF
36C24619B0039-0003002.pdf PDF
36C24619B0039-0003000.docx DOCX document
36C24619B0039-0003001.pdf PDF
36C24619B0039-0003003.pdf PDF
36C24619B0039-0002000.docx DOCX document
36C24619B0039-0002000.docx DOCX document
36C24619B0039-0001000.docx DOCX document
36C24619B0039-0001000.docx DOCX document
36C24619B0039-009.pdf PDF
36C24619B0039-008.pdf PDF
36C24619B0039-003.pdf PDF
36C24619B0039-004.pdf PDF
36C24619B0039-001.docx DOCX document
36C24619B0039-011.pdf PDF
36C24619B0039-012.pdf PDF
36C24619B0039-013.pdf PDF
36C24619B0039-010.pdf PDF
36C24619B0039-007.pdf PDF
36C24619B0039-005.pdf PDF
36C24619B0039-002.docx DOCX document
36C24619B0039-006.pdf PDF
36C24619B0039-009.pdf PDF
36C24619B0039-005.pdf PDF
36C24619B0039-008.pdf PDF
36C24619B0039-006.pdf PDF
36C24619B0039-007.pdf PDF
36C24619B0039-001.docx DOCX document
36C24619B0039-004.pdf PDF
36C24619B0039-003.pdf PDF
36C24619B0039-010.pdf PDF
36C24619B0039-002.docx DOCX document
36C24619B0039-013.pdf PDF
36C24619B0039-012.pdf PDF
36C24619B0039-000.docx DOCX document
36C24619B0039-000.docx DOCX document
Show all 39

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL NOTESMECHANICAL ABBREVIATIONS

AAHX AIR TO AIR HEAT EXCHANGER

AB AIR BLENDER

ACC AIR COOLED CONDENSER

ACCH AIR COOLED CHILLER

ACCU AIR-COOLED CONDENSING UNIT

ACU AIR CONDITIONING UNIT

ACD AUTOMATIC CONTROL DAMPER,

MODULATING

ACD-TP AUTOMATIC CONTROL DAMPER,

TWO POSITION

AD ACCESS DOOR

AF AFTER FILTER

AFCV AIR FLOW CONTROL VALVE

AFF ABOVE FINISHED FLOOR

AFMD AIR FLOW MEASURING DEVICE

AHU AIR-HANDLING UNIT

AMP AMPERAGE

AP ACCESS PANEL

APD AIR PRESSURE DROP

ARI AIR CONDITIONING AND

REFRIGERATION INSTITUTE

AS AIR SEPARATOR

ASME AMERICAN SOCIETY OF

MECHANICAL ENGINEERS

AW AIR WASHER

AXF AXIAL FLOW

B BOILER

BD BUTTERFLY DAMPER

BDD BACKDRAFT DAMPER

BDR BASE BOARD RADIATOR

BFP BACKFLOW PREVENTER

BG BOTTOM GRILLE

BHP BRAKE HORSEPOWER

BHW HOT WATER HEATING BOILER

BR BOTTOM REGISTER

BSC BIOLOGICAL SAFETY CABINETS

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

BWT BOILER PLANT WATER TUBE

C CENTIGRADE (CELSIUS)

CC COOLING COIL

CCD COOLING COIL CONDENSATE

DRAIN

CD CEILING DIFFUSER

CENT CENTRIFUGAL

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CFT CUBIC FEET

CFP CHEMICAL FEED PUMP

CG CEILING GRILLE

CH CHILLER

CHP CHILLED WATER PUMP

CHW CHILLER WATER

CHR CHILLED WATER RETURN

CHS CHILLED WATER SUPPLY

CO CLEAN OUT

CO CARBON MONOXIDE

O2 CARBON DIOXIDE

COMP COMPRESSOR UNIT

COP COEFFICIENT OF PERFORMANCE

CP CONDENSATE PUMP

CR CEILING REGISTER

CS CONDENSATE STORAGE TANK

CSG CLEAN STEAM GENERATOR

CT COOLING TOWER

CU CONDENSING UNIT

CUH CABINET UNIT HEATER

CV CONSTANT VOLUME

CW COLD WATER (POTABLE)

CWCC CHILLED WATER COOLING COIL

CWP CONDENSER WATER PUMP

CWR CONDENSER WATER RETURN (TO

COOLING TOWER)

CWS CONDENSER WATER SUPPLY

(FROM COOLING TOWER)

D DAMPER - AUTOMATIC

DB DECIBELS

Db DRY-BULB TEMPERATURE

DDC DIRECT DIGITAL CONTROLS

DEG DEGREE

DF DIFFUSER

DIA DIAMETER

DIW DEIONIZED WATER

DP DEW POINT TEMPERATURE

DP DIFFUSER PLATE

DPA DIFFERENTIAL PRESSURE

ASSEMBLY

DPS DIFFERENTIAL PRESSURE

SENSOR

DX DIRECT EXPANSION

DXCC DIRECT EXPANSION COOLING

COIL

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

EC EVAPORATIVE COOLER

ECC ENGINEERING CONTROL CENTER

ECU EVAPORATIVE CONDENSER UNIT

EDH ELECTRIC DUCT HEATER

EER ENERGY EFFICIENCY RATIO

EF EXHAUST FAN

EG EXHAUST GRILLE

EGS EMERGENCY GAS SHUTOFF

EGT ENTERING GLYCOL TEMP

EH EXHAUST HOOD

EMD END OF MAIN DRIP (STEAM)

ENT ENTERING

ER EXHAUST REGISTER

ERC ELECTRIC REHEAT COIL

ERP ELECTRIC RADIANT PANEL

ESP EXTERNAL STATIC PRESSURE

ET EXPANSION TANK

ETO ETHYLENE OXIDE

EUH ELECTRIC UNIT HEATER

EWC EVAPORATIVE WATER COOLER

EWT ENTERING WATER TEMPERATURE

EX EXISTING

F FAHRENHEIT

F&T FLOAT AND THERMOSTATIC

FA FREE AREA

FC FLEXIBLE CONNECTION

FCU FAN COIL UNIT

FD FLOOR DRAIN

FD FIRE DAMPER

FF FINAL FILTER

FHX FLUE GAS/FEEDWATER HEAT

EXCHANGER

FM FLOW METER

FOP FUEL OIL PUMP

FOT FUEL OIL TANK

FOHX FUEL OIL HEAT EXCHANGER

FPM FEET PER MINUTE

FPS FEET PER SECOND

FPTU FAN POWERED TERMINAL UNIT

FR FLOOR REGISTER

FRP FIBER REINFORCED POLYESTER

FS FLOW SWITCH

FSD COMBINATION FIRE SMOKE

DAMPER

FSTAT FREEZESTAT

FT FEET

FT-LB FOOT-POUND

FTR FIN TUBE RADIATION

FV FACE VELOCITY

GA GAUGE

GAL GALLONS

GH GRAVITY HOOD

GLR GROUND LOOP RETURN

GLS GROUND LOOP SUPPLY

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GPR GAS PRESSURE REGULATOR

GS GALVANIZED STEEL

GSHP GROUND SOURCE HEAT PUMP

H HUMIDIFIER

HAC HOUSEKEEPING AID CLOSET

HB HOSE BIBB

HC HEATING COIL

HD HEAD

HD HOOD

HOA HAND/OFF/AUTOMATIC

HP HEAT PUMP / HORSEPOWER

HPDT HIGH PRESSURE DRIP TRAP

HPR HIGH PRESSURE RETURN

(STEAM CONDENSATE)

HPS HIGH PRESSURE STEAM

HRC HEAT RECOVERY COIL

HRD HEAT RECOVERY DEVICE

HRP HYDRONIC RADIANT (CEILING)

PANEL

HRW HEAT RECOVERY WHEEL

HSTAT HUMIDISTAT

HTM HUMIDIFIER TERMINAL

HUM HUMIDIFIER UNIT MOUNTED

HVU HEATING AND VENTILATING UNIT

HW HOT WATER

HWC HOT WATER COIL

HWP HEATING HOT WATER PUMP

HWR HEATING HOT WATER RETURN

HWS HEATING HOT WATER SUPPLY

HWUH HOT WATER UNIT HEATER

HVD HOISTWAY VENT DAMPER

HX HEAT EXCHANGER

HZ HERTZ

I/O INPUT/OUTPUT

IAQ INDOOR AIR QUALITY

IBT INVERTED BUCKET TRAP

ID INSIDE DIAMETER

IFB INTEGRAL FACE AND BYPASS

IN INCHES

IN HG INCHES OF MERCURY

IN WC INCH WATER COLUMN

IN-LB INCH POUND

IPLV INTEGRATED PART LOAD VALUE

IRH INFRARED HEATER

IU INDUCTION UNIT

IV INLET VANES

kg KILOGRAM kg/HR KILOGRAM PER HOUR kPa KILOPASCAL kW KILOWATT kWh KILOWATT HOUR

L LITER

L/h LITERS PER HOUR L/m LITERS PER MINUTE L/s LITERS PER SECOND

LAT LEAVING AIR TEMPERATURE

LBS/HR POUNDS PER HOUR

LF LINEAR FOOT (FEET)

LGT LEAVING GLYCOL TEMPERATURE

LH LATENT HEAT

LPG LIQUID PROPANE GAS

LPR LOW PRESSURE RETURN

(STEAM CONDENSATE)

LPRC LOW PRESSURE STEAM RETURN

(CLEAN)

LLHX LIQUID TO LIQUID HEAT

EXCHANGER

LPS LOW PRESSURE STEAM

LPSC LOW PRESSURE STEAM (CLEAN)

LSD LINEAR SLOT DIFFUSER

LTCP LOCAL TEMPERATURE CONTROL

PANEL

LVG LEAVING

LVR LOUVER

LWT LEAVING WATER TEMPERATURE

M METER, SI UNIT

M/s METERS PER SECOND

MA MIXED AIR

MAT MIXED AIR TEMPERATURE

MAU MAKE-UP AIR UNIT

MAV MANUAL AIR VENT

MB MIXING BOX

MBH 1000 BTUH

MCA MINIMUM BRANCH CIRCUIT

AMPACITY

MERV MINIMUM EFFICIENCY REPORTING

VALUE

MHP MOTOR HORSEPOWER

MIN MINIMUM

MM MILLIMETER

MOV MOTOR OPERATED VALVE

MPR MEDIUM PRESSURE RETURN

(STEAM CONDENSATE)

MPS MEDIUM PRESSURE STEAM

MTD MEAN TEMPERATURE

DIFFERENCE

MZ MULTI-ZONE

NA NOT APPLICABLE

NC NOISE CRITERIA

NC NORMALLY CLOSED

NG NATURAL GAS

NGFM NATURAL GAS FLOWMETER

NO NORMALLY OPEN

NOAA NATIONAL OCEANIC &

ATMOSPHERIC ADMINISTRATION

NOM NOMINAL

NPLV NON-STANDARD PART LOAD

VALUE

NPSH NET POSITIVE SUCTION HEAD

NTS NOT TO SCALE

OA OUTSIDE AIR

OAG OUTSIDE AIR GRILLE

OAI OUTSIDE AIR INTAKE

OD OUTSIDE DIAMETER

OFM OIL FLOWMETER

P PUMP

PA PASCAL

PC PUMPED CONDENSATE

PCF POUNDS PER CUBIC FOOT

PD PRESSURE DROP

PF PRE-FILTER

PG PRESSURE GAGE

PGW PROPYLENE GLYCOL-WATER

(SOLUTION)

PHC PREHEAT COIL

PPM PARTS PER MILLION

PRS PRESSURE REGULATING (VALVE)

STATION

PRV PRESSURE REGULATING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH –

ABSOLUTE

PSIG POUNDS PER SQUARE INCH –

GAGE

PSS PRIMARY SECONDARY SYSTEM

PSV PRESSURE SAFETY VALVE

PTAC PACKAGED TERMINAL AIR

CONDITIONER

RA RETURN AIR

RAD REFRIGERANT AIR DRYER

RAF RADIO FREQUENCY

RAHX ROTARY AIR HEAT EXCHANGER

RAT RETURN AIR TEMPERATURE

RCCH REMOTE CONDENSER CHILLER

RCU RECIPROCATING CHILLER UNIT

RD REFRIGERANT DISCHARGE

REA RELIEF AIR

RF RETURN FAN

RFZ RADIANT FLOOR ZONE

RG RETURN GRILLE

RH RELATIVE HUMIDITY

RHC REHEAT COIL

RHG REFRIGERANT HOT GAS

RL REFRIGERANT LIQUID LINE

RLA RUN LOAD AMPERE

RO REVERSE OSMOSIS

RPM REVOLUTIONS PER MINUTE

RR RETURN REGISTER

RS REFRIGERANT SUCTION LINE

RTU ROOF TOP UNIT

RV RELIEF VALVE

SA SUPPLY AIR

SAD SOUND ATTENUATING DEVICE

SAT SUPPLY AIR TEMPERATURE

SC SHADING COEFFICIENT

SCFM STANDARD CUBIC FEET PER

MINUTE

SCR SILICON CONTROLLED RECTIFIER

SD SMOKE DETECTOR

SD SUPPLY AIR DIFFUSER

SDPR SMOKE DAMPER

SEN SENSIBLE HEAT

SF SUPPLY FAN

SG SUPPLY AIR GRILLE

SH STEAM HUMIDIFIER

SHC STEAM HEATING COIL

SI SQUARE INCHES

SMACNA SHEET METAL AND AIR

CONDITIONING CONTRACTORS'

NATIONAL ASSOCIATION

SP STATIC PRESSURE

SP GR SPECIFIC GRAVITY

SPD SUPPLY PROCESS AND

DISTRIBUTION

SPS STATIC PRESSURE SENSOR

SQ FT SQUARE FOOT (FEET)

SS STAINLESS STEEL

SSHX STEAM TO STEAM HEAT

EXCHANGER

SSR SOLID SEPARATOR

ST STEAM TRAP

SUH STEAM UNIT HEATER

SV STEAM PRESSURE REDUCING

VALVE

SVS STEAM VENT SILENCER

SWHX STEAM TO WATER HEAT

EXCHANGER

T & PCV TEMPERATURE AND PRESSURE

CONTROL VALVE

TAB TESTING, ADJUSTING, BALANCE

TD TEMPERATURE DIFFERENCE

TDH TOTAL DYNAMIC HEAD

TDS TOTAL DISSOLVED SOLIDS

TG TRANSFER GRILLE

TP TRAP

TR TOP REGISTER

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

TU TERMINAL UNIT

UC UNDER CUT

UC UNIT COOLER

UH UNIT HEATER

UL UNDERWRITERS LABORATORY

URV UPBLAST UNIT VENTILATOR

V VALVE

VAV VARIABLE AIR VOLUME

VD VOLUME DAMPER

VFD VARIABLE FREQUENCY DRIVE

VI VIBRATION ISOLATOR

VIV VARIABLE INLET VANES

VP VACUUM PUMP

VPS VARIABLE PRIMARY SYSTEM

VR VACUUM (STEAM CONDENSATE)

RETURN

VSD VARIABLE SPEED DRIVE

VUH VERTICAL UNIT HEATER

W WATTS

Wb WET-BULB (TEMPERATURE)

WC WATER COOLED

WCCH WATER COOLED CHILLER

WCCU WATER COOLED CONDENSING

UNIT

WCPU WATER COOLED PACKAGED UNIT

WF WATER FILTER

WFCV WATER FLOW CONTROL VALVE

WFM WATER FLOWMETER

WFMD WATER FLOW MEASURING DEVICE

WG WATER GAGE

WPD WATER SIDE PRESSURE DROP

WSHP WATER SOURCE HEAT PUMP

YR YEAR

1. ALL PIPING AND DUCTS IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN A

FURRED CHASE OR ABOVE THE HARD SUSPENDED CEILING.

2. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF FACE SHOWN OR

INDICATED. DUCT SIZES ARE NET INSIDE DIMENSIONS.

3. ACCESS PANELS IN HARD SUSPENDED CEILINGS ARE REQUIRED FOR ALL VALVES,

TRAPS, DAMPERS, CLEANOUTS, CONTROLS, ETC. ACCESS PANELS SHALL BE

FURNISHED AND INSTALLED PER THE ARCHITECTURAL SPECIFICATIONS.

4. TOTAL STATIC PRESSURE NOTED IN THE SCHEDULES INCLUDES DUCT SYSTEM,

TERMINAL UNITS, FILTERS, COILS, ETC.

5. FOR TYPICAL STEAM AND WATER PIPING CONNECTIONS TO EQUIPMENT, SEE

STANDARD EQUIPMENT DETAILS.

6. DIFFUSER, REGISTER AND GRILLE SIZES SHOWN ON FLOOR PLANS ARE NECK SIZES.

7. WATER PIPE CONNECTIONS TO AIR HEATING AND COOLING COILS SHALL BE MADE TO

PROVIDE COUNTER FLOW BETWEEN WATER AND AIR.

8. WALL TYPE EXHAUST REGISTERS NOTED AS "BR" ON DRAWINGS ARE TO BE

INSTALLED WITH BOTTOM ELEVATION OF REGISTER AT 7" [175mm] ABOVE FINISHED

FLOOR.

9. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT LOCATIONS OF

CEILING DIFFUSERS, REGISTERS AND GRILLES.

10. ALTITUDE-BOILER ROOM FLOOR: 400 FT. [122 M] ABOVE SEA LEVEL (APPROX)

11. HANGARS SHALL BE ISOLATED BY TYPES OF ITEMS THEY SUPPORT. DUCTS

INDEPENDENT FROM PIPES, CABLE TRAYS, ETC.

DESIGN CONDITIONS

ROOM DESCRIPTION

INDOOR OUTDOOR

SUMMER WINTER SUMMER WINTER

°F Db % RH °F Db 1% °F Db 1% °F Wb 99% °F Db

OFFICES 75 20-60 70

95 77 19

LABORATORY 75 20-60 70

RESTROOMS 75 NA 70

MECHANICAL/ELECTRICAL ROOMS 86 NA 40

ALL OTHER AREAS 75 20-60 70

OUTSIDE DESIGN CONDITIONS PER VA HVAC DESIGN MANUAL 2011

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

F i l e

P a t h

FULLY

SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:

ARCHITECT/ENGINEER OF RECORD

SEAL

CONSULTANT

321 4 5 6 7 8 9 10

NEW CLINICAL LAB FOR

SURGICAL EXPANSION

RICHMOND, VIRGINIA

652-319

PROJECT DIRECTOR

AUGUST 2018

REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

BID DOCUMENTS

DWG. OF 162

NAME: TINA DEBELLA, PE

PHONE: 804.675.5495

EMAIL: Tina.DeBella@va.gov

MECHANICAL ABBREVIATIONS

MH001

WBRCDL

13 Aug 2018

H4

H7

A

SF-3

VAV-100

DETAIL NUMBER

DRAWING NUMBER WHERE SHOWN

SECTION LETTER

TYPICAL UNIT NO.

SUPPLY FAN NO. 3

EQUIPMENT ABBREVIATION (SUPPLY FAN)

ITEM NUMBER (TERMINAL UNIT NO. 1)

ITEM (TERMINAL UNIT SHOWN)

DRAWING NUMBER WHERE DRAWN

SQUARE 1-WAY CEILING DIFFUSERS

LIMIT OF DEMOLITION

(WALL TYPE)

(WALL TYPE)

DN

DN

UP

UP

SUPPLY DUCT (UP & DOWN)

EXHAUST DUCT (UP & DOWN)

ROUND AND SQUARE 4-WAY CEILING DIFFUSERS

SUPPLY TOP REGISTER OR GRILLE (WALL TYPE)

EXHAUST OR RETURN CEILING REGISTER OR GRILLE

EXHAUST OR RETURN BOTTOM REGISTER OR GRILLE

EXHAUST OR RETURN REGISTER OR TOP GRILLE

VANED ELBOW & AIR SPLIT TYPE DUCT TAKE-OFF

CONNECT NEW DUCT TO EXISTING DUCT

D

INCLINED RISE, IN DIRECTION OF AIR FLOW

INCLINED DROP, IN DIRECTION OF AIR FLOW

R

DNUP RETURN DUCT (UP & DOWN)

SQUARE 3-WAY CEILING DIFFUSERS

SQUARE 2-WAY CEILING DIFFUSERS

LINEAR SLOT DIFFUSER

FC

10x8

FLEXIBLE CONNECTION, EQUIPMENT,

VANED ELBOW (PROVIDE ALL SQUARE OR

RECTANGULAR ELBOWS WITH VANES EVEN IF

SYMBOL IS MISSING)

VANED ELBOW (SHORT RADIUS)

STANDARD RADIUS ELBOW (LONG RADIUS)

NEW DUCT (INSIDE DIMENSIONS: WIDTH x DEPTH)

EXISTING DUCT TO REMAIN

LOUVER (LOUVER SPECIFIED IN ARCHITECTURAL

FIRE DAMPER

FD

VD

DUCT WITH SOUND LINING

FLEXIBLE DUCTWORK (INSULATED)

MANUAL VOLUME DAMPER

EXISTING DUCT TO BE REMOVED

BACK DRAFT DAMPER

BDD

SECTION.)

VIBRATION, OR SEISMIC

HIGH PRESSURE STEAM (60 PSIG AND ABOVE)

HOT WATER HEATING SUPPLY

STEAM CONDENSATE RETURN

LOW PRESSURE STEAM (15 PSIG AND BELOW)

HOT WATER HEATING RETURN

REFRIGERANT LIQUID

X

MEDIUM PRESSURE STEAM (16 PSIG THRU 59 PSIG)

CHILLED WATER SUPPLY

CHILLED WATER RETURN

REFRIGERANT SUCTION

EXISTING PIPE TO BE REMOVED

FE

ANCHOR

REDUCER OR INCREASER

DIRECTION OF FLOW

SIDE CONNECTION

ECCENTRIC REDUCER

BOTTOM CONNECTION, 45° OR 90°

TOP CONNECTION, 45° OR 90°

DIRECTION OF PIPE PITCH (DOWN)

UNION

RISE OR DROP IN PIPE

CAPPED OUTLET

PRESSURE GAGE

THERMOMETER

FLOW ELEMENT

FLOAT & THERMOSTATIC TRAP SET INCLUDING

PIPING ACCESSORIES SEE DETAIL

PIPING ACCESSORIES SEE DETAIL

INVERTED BUCKET TRAP SET INCLUDING

PIPE UP

PIPE DOWN

REFRIGERANT SIGHT GLASS

TEST PLUG (PRESSURE/TEMPERATURE)

AUTOMATIC AIR VENTAV

MANUAL AIR VENT

MV

THERMOSTATIC TRAP SET INCLUDING

PIPING ACCESSORIES SEE DETAIL

QUICK-COUPLE HOSE CONNECTOR

BALL VALVE

CHECK VALVE

ANGLE GLOBE VALVE

BUTTERFLY VALVE

MODULATING CONTROL VALVE

TWO POSITION CONTROL VALVE

THREE-WAY MODULATING CONTROL VALVE

AUTOMATIC BALANCING CONTROL VALVE

PRESSURE SAFETY VALVE

GATE VALVE - THREADED/FLANGED

GLOBE VALVE - THREADED/FLANGED

PRESSURE REGULATING VALVE

THREE-WAY TWO POSITION CONTROL VALVE

WYE STRAINER (WITH BALL VALVE & HOSE CONNECTION)

FLEXIBLE CONNECTION

WATER BALANCE DEVICE

MODULATING CONTROL BUTTERFLY VALVE

CIRCUIT SETTER VALVE

PLUG VALVE

CONTROL VALVE (CV) - FLOAT-OPERATED

PRESSURE REDUCING VALVE (PRV)

WYE STRAINER WITH VALVED DRAIN AND QUICK-COUPLE

WATER LEVEL CONTROLLERLC

FLOW METERM

SENSORS

HOSE CONNECTOR

THERMOSTATT

UNIT MOUNTED THERMOSTATT

DRAWING SYMBOLS

VALVE SYMBOLS PIPING SYMBOLS DUCTWORK SYMBOLS GENERAL PIPING SYMBOLS

TWO POSITION CONTROL VALVE, BALL VALVE

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

F i t h

FULLY

SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:

ARCHITECT/ENGINEER OF RECORD

SEAL

CONSULTANT

321 4 5 6 7 8 9 10

NEW CLINICAL LAB FOR

SURGICAL EXPANSION

RICHMOND, VIRGINIA

652-319

PROJECT DIRECTOR

AUGUST 2018

REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

BID DOCUMENTS

DWG. OF 162

NAME: TINA DEBELLA, PE

PHONE: 804.675.5495

EMAIL: Tina.DeBella@va.gov

MECHANICAL SYMBOLS

MH002

CORRIDOR

C3F-1

CORRIDOR

C3F-2

BIOMED

3F-101

ANCILLARY TESTING

3F-103

DRUG TESTING

3F-105

IT CLOSET

3F-104

ELEC CLOS

3F-102

ACCESSIONING

3F-106a

FEE BASIS

3F-106b

MICROBIOLOGY

3F-106d

HEMATOLOGY

3F-106e

CHEMISTRY

3F-106f

REFRIGERATEDSTORAGE

3F-126

BLOOD BANK

3F-106c

CYTOLOGY

3F-106h

OPEN OFFICE

3F-106j

ARCHIVE

3F-124

CLEAN SUPPLY

3F-131

BSL-3 LAB

3F-129

STAFF TOILET

3F-108

DRUG TESTING TOILET

3F-105a

IMMUNOLOGY

3F-107

MEN'S TOILET

3F-109

WOMEN'S TOILET

3F-111

JANITOR

3F-110

EQUIPMENT ROOM

3F-130

GAS TANK ROOM

3F-127

BREAK ROOM

3F-112

CORRIDOR

C3F-3

OFFICE #1

3F-114

OFFICE #2

3F-115

OFFICE #3

3F-116

OFFICE #4

3F-117

OFFICE #5

3F-118

ADMINISTRATION

3F-120

DIRECTOR'S OFFICE

3F-121

CMT OFFICE

3F-122

OFFICE #6

3F-123

ADPAC/RESIDENTS

3F-119

FLAMMABLE STORAGE

3F-125

ANTE ROOM

3F-128

HISTOLOGY

3F-106g

STAIR

3F-S2

CONF ROOM

3F-113

NPQRSTUVW

X

Wn

SCALE:

MH131

3RD FLOOR MECHANICAL DUCTING

1/8" = 1'-0"

CE1

10"Ø

500-VF-2

CD2

10"Ø

OA INTAKE

EA CHASE

CD1

8"Ø

CD2

8"Ø

CD1

8"Ø

CD1(3)

8"Ø

CD1

8"Ø

CD1

8"Ø

CD1

10"Ø

CD1

8"Ø

CD1

8"Ø

CD1

10"Ø

CD1

8"Ø

CD1

6"Ø

CD3

8"Ø

CD2

16"Ø

CD2

8"Ø

CD3

10"Ø

CD3

10"Ø

CD1

10"Ø

CD1

10"Ø

CD1

8"Ø

CD1

8"Ø

CD3

6"Ø

CD1(4)

8"Ø

CD2

10"Ø

CD3

6"Ø

REF-1

CD3

6"Ø

BSC-1

BSC-2

FH-1

BSC-3

CD1

6"Ø

BSC-6

BSC-4

BSC-5

CD2

8"Ø

CD1

8"Ø

CD1

6"Ø

CD2

8"Ø

CD1

8"Ø

CD1

8"Ø

CD1

6"Ø

CD3

10"Ø

CD1

8"Ø

CD3

10"Ø

CD1

10"Ø

CD1

8"Ø

CD2

10"Ø

CD1

10"Ø

CD1

10"Ø

CD1

8"Ø

CD2

8"Ø

175CD2

8"Ø

CD2

8"Ø

CE1

8"Ø

CE1

10"Ø

CE1

12"Ø

CE3

6" X 6"

CE3

6" X 6"

CE2

16"Ø

CE2

6"Ø

CE1

14"Ø

CE2

12"Ø

500-EF 83

E

F

A49

500-ERC 3

LVR-1

CE4

10" X 10"

FH-3

CE3

9"Ø

CE3

12"x12"

CE3

12"x12"

CE3

6" X 6"

CE3

6" X 6"

CE2

14"Ø

CD2

8"Ø

CD2

10"Ø

CD2

10"Ø

CD2

10"Ø

CD2

10"Ø

CD2

10"Ø

CD2

8"Ø

CD2

8"Ø

CD2

8"Ø

CD2

8"Ø

CD2

10"Ø

CD2

10"Ø

CD2

10"Ø

CD2

10"Ø

CE2

14"Ø

CG1

8"Ø

CG2

16"Ø

CG1

8"Ø

CG1

8"Ø

CG1

12"Ø

CG1

6"Ø

CG1

14"Ø

CG1

6"Ø

CG1

8"Ø

CG1

8"Ø

CG1

6"Ø

CG1

8"Ø

CG1

8"Ø

CG1

8"Ø

CG1

6"Ø

CG1

10"Ø

CG1

10"Ø

CD2

10"Ø

CD2

8"Ø

CD1(4)

10"Ø

CE1

10"Ø

EX-1

10"Ø

EX-1

10"Ø

EX-1

10"Ø

FH-2

FH-4

CD2

10"Ø

CD1

10"Ø

CD2

10"Ø

CD1

10"Ø

CD2

10"Ø

CD2

8"Ø

CD2

8"Ø

CD2

8"Ø

CD1

8"Ø

CD1

8"Ø

CD1

8"Ø

CD2

10"Ø

CE2

18"Ø

CD2

10"Ø

F

AHU AC-3

F

F

F

CD1(2)

10"Ø

500-EF 2

500-EF 1

F

T VAV1-4

T

VAV2-5

T

VAV1-8

T

VAV1-14

T

VAV1-11

T

VAV1-17

T

VAV1-18

T

VAV2-2

T VAV2-4

T

VAV2-7

T VAV1-2

T VAV2-15

T

VAV2-9T

VAV2-6

T

VAV2-17

T

VAV1-3

TVAV2-11

TVAV2-14

T VAV2-8

T

VAV1-9

T

VAV1-10

T VAV1-7

T

VAV1-6

T VAV1-12T

VAV1-13

T

VAV1-1

T

VAV1-15

TVAV1-16

T

VAV2-3

T

TEMPTRAK

CD1

8"Ø

CD1

6"Ø

CD1

6"Ø

CD1

6"Ø

CD1

6"Ø

45 CD1

6"Ø

CD1

6"Ø

CD1

6"Ø

CD1

6"Ø

10 CD1

6"Ø

CD1

6"Ø

CD1

6"Ø

CD1

6"Ø

CD1

6"Ø

CD1

6"Ø

CD1

6"Ø

CD1

6"Ø

CD1

6"Ø

T

VAV1-5

CD2

16"Ø

T

VAV2-1

T

VAV2-10

T

VAV2-12

T VAV2-13 T

VAV2-16

CG2

16"Ø

CG1

8"Ø

CE2

16"Ø

CE2

12"Ø

CE2

16"Ø

GENERAL NOTES

KEY NOTES

1. DEMO EXISTING METAL OA PLENUM AND WALL LOUVER IN THIS AREA.

CONNECT EXISTING 40x48, 20x12, AND 32x28 OA DUCTS TO INTAKE

CHASE. SEE MH431 FOR MORE DETAIL. AIR HANDLER TO BE

MODIFIED AS PART OF MICU PROJECT, NIC.

2. DEMO EXISTING ROOFTOP PENTHOUSE AND EXTEND SHAFT TO NEW

ROOF LEVEL AND INSTALL NEW ROOFTOP HOOD.

3. DEMO EXISTING METAL EA DUCTS AND WALL LOUVER IN THIS AREA,

48x40, 28x32, 28x32. CMU SHAFT TO REMAIN. CONNECT EACH TO NEW EA CHASE (NOTE 4) WITH A DUCT OF EQUIVALENT SIZE. 46x30 AND 18x18 EA DUCT TO REMAIN. SEE MH431 FOR MORE DETAIL.

4. DEMO EXISTING ROOFTOP PENTHOUSE AND EXTEND SHAFT TO NEW

ROOF LEVEL AND INSTALL NEW ROOFTOP HOOD.

5. EXISTING CONDENSER UNITS (NOT SHOWN) TO REMAIN AND BE KEPT

IN SERVICE.

6. UNDER CUT DOORS BY 34".

1. INSTALL CEILING REGISTERS A MINIMUM OF 12" FROM AN

EXTERIOR WALL.

2. PROVIDE A MINIMUM OF THREE TIMES THE FAN DIAMETER OF

STRAIGHT DUCTWORK OFF THE SUPPLY AIR DISCHARGE BEFORE

ANY TAKEOFFS OR ELBOWS.

3. PROVIDE LOCKING QUADRANT VOLUME BALANCING DAMPERS AT

ALL BRANCH TAKEOFFS TO CEILING SUPPLY AND EXHAUST

DEVICES.

4. PROVIDE ACCESS DOORS IN DUCTWORK WHERE INDICATED OR

REQUIRED FOR ACCESS TO SYSTEM COMPONENTS INCLUDING THE

FOLLOWING: DAMPER MOTORS AND/OR MOTOR OPERATED

DAMPERS, FIRE DAMPERS AND SMOKE DAMPERS.

5. DUCT DIMENSIONS SHOWN ON DRAWINGS ARE NET FREE

INTERIOR, NOT INCLUDING LINING OR INSULATION.

6. EXISTING SYSTEMS NOT INDICATED ON THIS SHEET TO REMAIN.

7. EQUIPMENT SHOWN IN HALFTONE IS EXISTING AND TO REMAIN.

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

F i t h

FULLY

SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:

ARCHITECT/ENGINEER OF RECORD

SEAL

CONSULTANT

321 4 5 6 7 8 9 10

NEW CLINICAL LAB FOR

SURGICAL EXPANSION

RICHMOND, VIRGINIA

652-319

PROJECT DIRECTOR

AUGUST 2018

REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

BID DOCUMENTS

DWG. OF 162

KEYPLAN

LAB EXPANSION

PLAN

NORTH

NAME: TINA DEBELLA, PE

PHONE: 804.675.5495

EMAIL: Tina.DeBella@va.gov

TN

N

3RD FLOOR

MECHANICAL DUCTING

MH131

CDLPFM

8'0 4' 16'

SCALE:1/8"=1'-0"

SCALE:

MH133

3RD FLOOR INTERSTITIAL MECHANICAL DUCTING

1/8" = 1'-0"

NPQRSTUVW

EF-1

ON ROOF

24X66 EA UP

TO AHU-57

EF-2

ON ROOF

18X40 RA UP

TO AHU-58

20X40 SA DN

FR AHU-58

22X65 SA DN

FR AHU-57

OA INTAKE

EA OUT

VAV2-3

VAV2-4

VAV2-5

VAV2-7

VAV2-14

VAV2-16

VAV2-17

VAV2-6

VAV1-8

VAV1-16

270 VAV1-15

VAV1-9

VAV1-17

VAV1-10

VAV1-3

VAV1-4

VAV1-6

VAV1-7

VAV1-20

VAV1-11

VAV1-18

VAV1-2

VAV1-14

VAV1-19

VAV1-12

VAV1-13

EX FROM

INTERSTITIAL

x1

8x8 x1

10x10 x1

10x10 x1 x1 x8 x1

8x8

8x8 x8

8x

8x8 8x810x10 x1

8x8

6x6

8x 88x8

8x88x8 8x8 10x10 12x10

8x810x10 x1

8x8

10x1012x1215x12

8x8 8x8 x1

8x8

15x12

8x810x10 x1

VAV1-5

10x10

10x1012x12

12x10 x1 x1 x1 x1 x1 x1

12x12

8x810x10 x1

12x12

8x

10x1012x1214x12

8x8

8x

10x1016x16

16x16

10x10 x1

14x12

16x16

6x

10x10

8x

12x12

8x

10x10 12x12 x1

8x8

6x

6x

6x

6x

6x

8x

VAV2-15

VAV2-9

VAV2-11

VAV2-13

VAV2-12

VAV2-10

VAV2-8

10x10

12x1014x14 x1

10x10

12x10 14x12 x1 x1

12x12 x8

14x12 x8 x1

10x8

14x14 x1

14x12

6x6

12x12

12x12 x1

18x18 x1

14x14 x1 x1 x1 x1

24x2028x2036x24 28x24 x1 x4

12x12 16x16 x1 x2

16x16 x1 x1

14x14

20x18 20x20 24x20 24x20 x1

8x8

8x812 x1

12x1216x1616x1618x20 x2

VAV2-2

VAV2-1

8x8

EF-3

ON ROOF

x1

4 14 x1

18x18 18x18

8x88x8

8x8 8x8

8x8

8x8

16x16

6x

6x66x6

6x6

6x612 x1

18x18

14x14

10x10 x1

8x x1

12x12 x1

16x16

8x

20x18

14x14

14x14

8x8 12x12

8x

14x14 16x16 18x18 x1

6x x1 x1 x2

6x

14x14 x1

10x10 18x18 x1

24x20 26x24 x1 x1 x1

VAV1-21

VAV1-22

6x

6x

6x

6x6

6x6

8x

10x10

VAV1-1

GENERAL NOTES

KEY NOTES#

1. TAPER OA/EA CHASE TO MEET ROOF CURB AS NEEDED.

1. INSTALL CEILING REGISTERS A MINIMUM OF 12" FROM AN

EXTERIOR WALL.

2. PROVIDE A MINIMUM OF THREE TIMES THE FAN DIAMETER OF

STRAIGHT DUCTWORK OFF THE SUPPLY AIR DISCHARGE BEFORE

ANY TAKEOFFS OR ELBOWS.

3. PROVIDE LOCKING QUADRANT VOLUME BALANCING DAMPERS AT

ALL BRANCH TAKEOFFS TO CEILING SUPPLY AND EXHAUST

DEVICES.

4. PROVIDE ACCESS DOORS IN DUCTWORK WHERE INDICATED OR

REQUIRED FOR ACCESS TO SYSTEM COMPONENTS INCLUDING THE

FOLLOWING: DAMPER MOTORS AND/OR MOTOR OPERATED

DAMPERS, FIRE DAMPERS AND SMOKE DAMPERS.

5. DUCT DIMENSIONS SHOWN ON DRAWINGS ARE NET FREE

INTERIOR, NOT INCLUDING LINING OR INSULATION.

6. EXISTING SYSTEMS NOT INDICATED ON THIS SHEET TO REMAIN.

7. PNEUMATIC TUBE SYSTEM TO BE CONSIDERED AS BID ALTERNATE.

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

F i t h

FULLY

SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:

ARCHITECT/ENGINEER OF RECORD

SEAL

CONSULTANT

321 4 5 6 7 8 9 10

NEW CLINICAL LAB FOR

SURGICAL EXPANSION

RICHMOND, VIRGINIA

652-319

PROJECT DIRECTOR

AUGUST 2018

REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

BID DOCUMENTS

DWG. OF 162

KEYPLAN

LAB EXPANSION

PLAN

NORTH

NAME: TINA DEBELLA, PE

PHONE: 804.675.5495

EMAIL: Tina.DeBella@va.gov

TN

N

3RD FLOOR INTERSTITIAL

MECHANICAL DUCTING

MH133

CDLPFM

8'0 4' 16'

GENERAL NOTES

KEY NOTES#

1. HIGH VELOCITY EXHAUST AIR DISCHARGE DUCTWORK. SEE DETAIL 3,

MH505.

SCALE:

MH141

ROOF MECHANICAL

1/8" = 1'-0"

NPQRSTUVW

Wn

ROOF

3F-RF

AHU-57

CH-1

AHU-58

EF-1

EF-2

CU-1

VNTR-1VNTR-1

VNTI-1VNTI-1

4" OVERFLOW

ROOF DRAIN

(TYP 8 PLACES)

4" ROOF DRAIN

(TYP 8 PLACES)

EF-3

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

F i t h

FULLY

SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:

ARCHITECT/ENGINEER OF RECORD

SEAL

CONSULTANT

321 4 5 6 7 8 9 10

NEW CLINICAL LAB FOR

SURGICAL EXPANSION

RICHMOND, VIRGINIA

652-319

PROJECT DIRECTOR

AUGUST 2018

REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

BID DOCUMENTS

DWG. OF 162

KEYPLAN

LAB EXPANSION

PLAN

NORTH

NAME: TINA DEBELLA, PE

PHONE: 804.675.5495

EMAIL: Tina.DeBella@va.gov

TN

N

ROOF MECHANICAL

MH141

CDLPFM

8'0 4' 16'

1. PROVIDE A MINIMUM OF THREE TIMES THE FAN DIAMETER OF

STRAIGHT DUCTWORK OFF THE SUPPLY AIR DISCHARGE BEFORE

ANY TAKEOFFS OR ELBOWS.

2. PROVIDE ACCESS DOORS IN DUCTWORK WHERE INDICATED OR

REQUIRED FOR ACCESS TO SYSTEM COMPONENTS INCLUDING THE

FOLLOWING: DAMPER MOTORS AND/OR MOTOR OPERATED

DAMPERS, FIRE DAMPERS AND SMOKE DAMPERS.

3. DUCT DIMENSIONS SHOWN ON DRAWINGS ARE NET FREE

INTERIOR, NOT INCLUDING LINING OR INSULATION.

4. EXISTING SYSTEMS NOT INDICATED ON THIS SHEET TO REMAIN.

5. EQUIPMENT SHOWN IN HALFTONE IS EXISTING AND TO REMAIN.

KEY NOTES

GENERAL NOTES

1. DEMO EXISTING METAL OA PLENUM AND WALL LOUVER IN THIS AREA.

CONNECT EXISTING 40x48, 20x12, AND 32x28 OA DUCTS TO INTAKE

CHASE. AIR HANDLER TO BE MODIFIED AS PART OF MICU PROJECT,

NIC.

2. DEMO EXISTING METAL EA PLENUM AND WALL LOUVER IN THIS AREA,

48x40, 28x32, 26x32. CMU SHAFT TO REMAIN.

3. DEMO PLENUM ONLY TO THE EXTENT NECESSARY TO INSTALL NEW

LOUVER AND PLENUM. 46x30 AND 18X18 EA CONNECTIONS TO

PLENUM REMAIN.

4. CONNECT NEW OA DUCT FROM EXISTING DUCT TO NEW OA CHASE IN

NEW LAB AREA.

5. CONNECT NEW EA DUCT FROM EXISTING DUCT TO NEW EA CHASE IN

NEW LAB AREA.

500-VF-2

500-EF 83

E

F

A49

500-ERC 3

F

AHU AC-3

F

F

F

500-EF 2

500-EF 1

F

500-VF-2

500-EF 83

E

F

A49

500-ERC 3

AHU AC-3

500-EF 2

500-EF 1

LINE OF NEW

EXTERIOR

NEW EA

CHASE

x

E

A

E

F

NEW OA

CHASE

48x40 OA INTAKE AC-3

OA PLENUM (DEMO)

12x20 OA INTAKE VF-2

32x28 OA INTAKE ERC-3

46x42 EA EF-2/RF-2

18x18 EA A49

EA PLENUM (REMAIN)EA PLENUM (DEMO)

46x30 EA EF-1/RF1

28x32 EA EF-3

F

F

F

LINE OF NEW

EXTERIOR

NEW EA

CHASE

x

E

A

E

F

NEW OA

CHASE

48x40 OA INTAKE AC-3

12x20 OA INTAKE VF-2

32x28 OA INTAKE ERC-3

46x42 EA EF-2/RF-2

18x18 EA A49

EA PLENUM (REMAIN)

46x30 EA EF-1/RF1

28x32 EA EF-3

F

F

40X48 EA

F

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

F i t h

FULLY

SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:

ARCHITECT/ENGINEER OF RECORD

SEAL

CONSULTANT

321 4 5 6 7 8 9 10

NEW CLINICAL LAB FOR

SURGICAL EXPANSION

RICHMOND, VIRGINIA

652-319

PROJECT DIRECTOR

AUGUST 2018

REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

BID DOCUMENTS

DWG. OF 162

KEYPLAN

LAB EXPANSION

PLAN

NORTH

NAME: TINA DEBELLA, PE

PHONE: 804.675.5495

EMAIL: Tina.DeBella@va.gov

TN

N

3RD FLOOR MECHANICAL ROOM

DUCTING DEMO AND NEW WORK

MH431

CDLPFM

8'0 4' 16'

SCALE:1/4"=1'-0"

SCALE:

MH431

MECHANICAL ROOM DEMO PLAN

1/4" = 1'-0" SCALE:

MH431

MECHANICAL ROOM DUCTING NEW WORK

1/4" = 1'-0"

SCALE:

MH431

LOUVER ELEVATION DEMO

1/4" = 1'-0"

SCALE:

MH431

LOUVER ELEVATION NEW WORK

1/4" = 1'-0"

GENERAL NOTES

KEY NOTES#

1. REFRIGERANT LINES FROM WALK-IN COOLER BELOW TO CONDENSER

UNIT CU-1 ON ROOF.

2. CWS/R FROM CHILLER CH-1 ON ROOF

3. CWS/R AND HWS/R TO AIR HANDLER AHU-57 ON ROOF

4. CWS/R AND HWS/R TO AIR HANDLER AHU-58 ON ROOF

1. ALL PIPING RUNOUTS TO VAV BOX REHEAT COILS SHALL BE 3/4"

UNLESS OTHERWISE NOTED. THIS INCLUDES BRANCHES THAT

SERVE ONE VAV.

2. ALL PIPE WILL BE COPPER FOR 2 1/2" AND BELOW AND IRON FOR 3"

AND ABOVE.

3. HW AND CW PIPING CONTROL VALVES TO OPEN 1 HR/WEEK TO

CIRCULATE WATER WITH CENTRAL PLANT DURING OFF HOURS.

SCALE:

MP133

3RD FLOOR INTERSTITIAL MECHANICAL PIPING

1/8" = 1'-0"

NPQRSTUVW

OA INTAKE

EA OUT

2 3

HE-1

HE-2

HWP-1

HWP-2

6" CWS/R AND

4" HWS/HWR UP

FROM BELOW

4"

4"

1" 1 1/4" 2"

4"

4"

1"

2 1/2"

1"

2 1/2"

1"

2 1/2"

2"

2"2"

1"

2"

2 1/2"

2" 2 1/2"

2 1/2"

2 1/2"

3"4"

1 1/2"

1 1/2"

VAV2-1

VAV2-3

VAV2-4

VAV2-5

VAV2-7

VAV2-14

VAV2-16

VAV2-17

VAV2-6

VAV1-8

VAV1-16

VAV1-15

VAV1-9

VAV1-17

VAV1-10

VAV1-3

VAV1-4

VAV1-6

VAV1-20

VAV1-11

VAV1-1

VAV1-18

VAV1-2

VAV1-14

VAV1-19

VAV1-12

VAV1-13

VAV2-2

VAV1-5

VAV2-15

VAV2-9

VAV2-11

120 VAV2-13

VAV2-12

VAV2-10

VAV1-7

VAV2-8

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

F i t h

FULLY

SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:

ARCHITECT/ENGINEER OF RECORD

SEAL

CONSULTANT

321 4 5 6 7 8 9 10

NEW CLINICAL LAB FOR

SURGICAL EXPANSION

RICHMOND, VIRGINIA

652-319

PROJECT DIRECTOR

AUGUST 2018

REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

BID DOCUMENTS

DWG. OF 162

KEYPLAN

LAB EXPANSION

PLAN

NORTH

NAME: TINA DEBELLA, PE

PHONE: 804.675.5495

EMAIL: Tina.DeBella@va.gov

TN

N

3RD FLOOR INTERSTITIAL

MECHANICAL PIPING

MP133

CDLPFM

8'0 4' 16'

SCALE:1/8"=1'-0"

13 Aug 2018

AutoCAD SHX Text

MECHANICAL

AutoCAD SHX Text

SERVICE BAY

AutoCAD SHX Text 'A'

AutoCAD SHX Text

ELEC.

AutoCAD SHX Text

SERVICE

AutoCAD SHX Text

BAY

AutoCAD SHX Text

MYCOLOGY

AutoCAD SHX Text T.B.

AutoCAD SHX Text

TRANSFER RM.

AutoCAD SHX Text

CO ROOM

AutoCAD SHX Text

AutoCAD SHX Text 3A-173

AutoCAD SHX Text 4D-1

AutoCAD SHX Text 3A-172

AutoCAD SHX Text 4D-1

AutoCAD SHX Text 3A-171

AutoCAD SHX Text 1N-7

AutoCAD SHX Text 3A-170

AutoCAD SHX Text 1N-7

AutoCAD SHX Text

MECH.

AutoCAD SHX Text

SERVICE

AutoCAD SHX Text

BAY

AutoCAD SHX Text

TRASH

AutoCAD SHX Text 3A-183

AutoCAD SHX Text 4D-1

NOTES:

1. PROVIDE ANCHORS ONLY

WHERE SHOWN ON

DRAWINGS.

2. EXTEND SLEEVE ABOVE

FLOOR WHERE SPECIFIED.

INSULATION

BOLT (TYPICAL)

FLOOR

SLAB

FIRE-STOPPING

MATERIAL

BOLT

PIPEPIPE SLEEVE WHERE

SPECIFIED

RISER

CLAMP

RISER

PIPE SLEEVE

WHERE

SPECIFIED RISER CLAMP.

BOTTOM CLAMP

REQUIRED AT

ANCHOR POINTS

ONLY.ELEVATION

PLAN

RISER

CLAMP

ANCHOR BOLTS

N=NUMBER

S=SIZE

DRILLØ=S+1/16"

D=PIPE O.D.

INSULATE AS INDICATED FOR ALL

CHILLED WATER. INSULATE PIPE

ONLY FOR STEAM & CONDENSATE

D+3 3/4"

D+1 1/2"

5/16" P

D

STL PIPE OR

COPPER TUBE

NOTE A

C

D+2 1/2"

D+4 3/4"

D+[25]

[8]

D+1"

DRILLØ=S+[2]

D+[38]

D+[95]

D+[64]

D+[121]

NOTES:

1. WHERE USED FOR COPPER TUBE OR PIPE, BRAZE TO

FABRICATED STEEL ANCHOR

PIPE ANCHOR SCHEDULE

D P C N S

BOLT

PATTERN

IN MM IN MM IN MM IN MM IN MM

4 102 5/8 16 3/4 19 4 102 3/4 19

3 76 1/2 13 1/2 13 4 102 5/8 16

2 1/2 64 3/8 10 3/8 10 4 102 5/8 16

2 51 3/8 10 3/8 10 4 102 5/8 16

1 1/2 38 3/8 10 1/4 6 4 102 1/2 13

STEAM TRAP ASSEMBLY

6"

[1 m m

M

IN

2"

[3 m m

M

IN

6"

[1 m m

M

IN

[3 m m

M

IN

2"

DRIP LEG (TYP.)

3/4" [20mm] DRAIN

(ALTERNATE LOCATIONS)

(TYPICAL)

STEAM LINE

(TYPICAL)

CAP (TYPICAL)

PIPE T0 STEAM

TRAP (TYPICAL)

NOTE:

DRIP POCKET PIPE SIZE SAME

AS STEAM MAIN UNLESS

OTHERWISE NOTED.

STEAM LINE DRIP POCKET

3/4" [20mm] MIN.

FROM DRIP

CONNECTION

DRIP

RETURN

3/8" [10mm] TEST

CONNECTION

NOTES:

1. THE ABOVE DETAIL SHOWS REQUIRED PIPING FOR TWO HEAT EXCHANGERS IN PARALLEL.

2. PROVIDE SADDLE SUPPORTS AND LEGS OR HANGERS FOR HEAT EXCHANGER. MOUNTING HEIGHT

SHALL BE ADJUSTED TO FACILITATE GRAVITY RETURN OF STEAM CONDENSATE.

3. MAKE THE BYPASS THE SAME SIZE AS THE CONNECTIONS TO THE CONTROL VALVES.

4. CONTROL VALVES SHALL BE IN A 1/3 AND 2/3 SIZE ARRANGEMENT.

TEST

PLUG

(TYP.)

THERMOMETER

(TYP.)

MPS

STEAM

SUPPLY

HEAT EXCHANGER

(TYP.)

D

D

"M

IN

[3 m m

(T

Y P

6" M

IN

[1 m m

(T

Y P

RUN DRAIN LINE FROM

RELIEF VALVE TO NEAREST

FLOOR DRAIN. (TYP.)

HWR

HWS

MPR TO FLASH

TANK (T

YP.)

1/2" [15mm] CHECK

VALVE VACUUM

BREAKER (TYP.)

SCALE POCKET

(TYP.)

DDC

TEMPERATURE

SENSORS

SEE SCHEDULES FOR RELIEF

VALVE SETTING

TT

- TT

PI

PI

THERMOSTATIC AIR

VENT (T

YP.)

CONTROL VALVES IN

2/3 & 1/3

SIZE ARRANGEMENT, T

YP.

BYPASS

SCALE:

MH501

HEAT EXCHANGER - STEAM TO HOT WATER

: NTS SCALE:

MH501

SMALL PIPE ANCHOR 1 1/2" - 4"

: NTS

SCALE:

MH501

SUPPORT/ANCHOR FOR PIPE RISERS

: NTS

SCALE:

MH501

STEAM TRAP ASSEMBLY

STEAM LINE DRIP POCKET

: NTS

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

F i t h

FULLY

SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:

ARCHITECT/ENGINEER OF RECORD

SEAL

CONSULTANT

321 4 5 6 7 8 9 10

NEW CLINICAL LAB FOR

SURGICAL EXPANSION

RICHMOND, VIRGINIA

652-319

PROJECT DIRECTOR

AUGUST 2018

REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

BID DOCUMENTS

DWG. OF 162

NAME: TINA DEBELLA, PE

PHONE: 804.675.5495

EMAIL: Tina.DeBella@va.gov

MECHANICAL DETAILS

MH501

WHERE X = STATIC PRESSURE IN PAN

DRAIN LINE SHALL BE AT LEAST THE SAME SIZE AS

THE NIPPLE ON THE DRAIN PAN

PIPING SHALL BE RIGID COPPER TYPE L OR TYPE M

UNLESS NOTE BELOW IS MET

PITCH DOWN

TOWARD DRAIN

CLEAN OUT

FLOOR SINK

DRAIN

PAN

NOTES:

1. CPVC PIPE MAY BE USED ONLY IF INDOORS, APPROVED BY LOCAL

VA, AND DOES NOT PASS THROUGH RATED BARRIERS.

2. DIELECTRIC FITTING TO BE USED WHEN TWO DISSIMILAR METALS

ARE TO BE CONNECTED.

A B

[2 5m m

DIELECTRIC

FITTING

1"

UNIT TYPE A B

DRAW THRU

2" [50MM]

PLUS X

X

BLOW THRU

1" [25MM]

MINIMUM

2X

SIDE VIEW TRAPEZE HANGER FOR UP TO

1000 LB. [453KG] UNIFORM LOAD

ADJUSTABLE CLEVIS HANGER TYPE 1

- SEE SPECIFICATIONS

ADJUSTABLE CLEVIS HANGER TYPE

43 - SEE SPECIFICATIONS

PROVIDE INSULATION SHIELD

& INSERT FOR ALL PIPING

(8" [200mm] MIN.)

BAND

1-5/8" [43mm] 12 GAUGE CHANNEL OR 2"x2"x1/4" [50x50x6.4mm] ANGLE

1/2" [15mm] DIA.

HANGER RODS WITH

36" [900mm] MAX.

SPACING ON EACH

CHANNEL

WELD

SADDLE

INSULATION SHIELD

AT HANGER

PROVIDE HIGH

COMPRESSIVE STRENGTH

INSULATION (9 PSF MIN.

DENSITY) UNDER

INSULATION SHIELD

INSULATION (VAPOR

BARRIER TYPE IS

REQUIRED FOR LOW

TEMPERATURE PIPE)

HANGER ROD

[2 5m m

1" M

A X

NOTES:

SEE SPECIFER FOR DETAILED

HANGER REQUIREMENTS

MAXIMUM PIPE/TUBING SUPPORT SPACING

NOM. SIZE IN.

mm

THRU 3/4

THRU 20

1 1/4

1 1/2

2 1/2

4 100

PIPE IN.

mm

TUBING IN.

mm

5 FT

NOTE: FOR TRAPEZE HANGER, TAKE SPACING OF SMALLEST SIZE ON TRAPEZE

NOTES:

1. INSTALLATION OF SENSORS AND TRANSMITTERS SHALL

CONFORM TO RECOMMENDATIONS OF MANUFACTURER OF

TRANSMITTERS.

1/2" [15mm] STEEL PIPE OR

STEEL TUBING TO SENSORS

DIFFERENTIAL PRESSURE

TRANSMITTER (FLOW,

LEVEL)

BLOWDOWN

PT

ELEVATION

ABOVE 2" [50mm] DIA. PIPE 2" [50mm] DIA. & SMALLER

VERTICAL

2 1/2" [65mm] DIA.

ABOVE 2" [50mm] DIA. PIPE 2" [50mm] DIA. & SMALLER

HORIZONTAL

2 1/2" [65mm] DIA.

PIPE ALIGNMENT GUIDES

(TYPICAL)

W + 50 FT. [7.6m]

APPROXIMATE MINIMUM

PLAN

EXPANSION LOOP

LOOP NO.

100-ELI

EXPANSION LOOP DETAIL

SUPPLY

RETURN

D (PIPE NPS)

1 11

--- 2 15

NOTES:

1.

2.

PROVIDE IN CHILLED WATER MAIN AND IN CONDENSER WATER MAIN.

LOCATE PILOT TUBE TAPS 20 PIPE DIAMETERS DOWNSTREAM AND 10

PIPE DIAMETERS UPSTREAM FROM THE NEAREST PIPE FITTING.

EITHER TOP OR SIDE LOCATION. BOTH ARE NOT REQUIRED AT SAME

LOCATION.

90°

PLUG

1 1/2" [40mm]

FULL PORT BALL

VALVE

1 1/2"Øx2" LONG [40x50mm] PIPE

1 1/2" [40mm] FULL

PORT BALL VALVE

PLUG

WELD (TYP)

SCALE:

MH502

PITOT TEST CONNECTIONS

: NTS

SCALE:

MH502

AIR HANDLING UNIT DRAIN TRAP

: NTS

SCALE:

MH502

PRESSURE TRANSMITTER INSTALLATION

: NTS

SCALE:

MH502

PIPE HANGERS

: NTSSCALE:

MH502

EXPANSION LOOP DETAIL

: NTSSCALE:

MH502

THERMOMETER WELL INSTALLATION

: NTS

R (LOOP RAD)

R [IN]

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

F i t h

FULLY

SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:

ARCHITECT/ENGINEER OF RECORD

SEAL

CONSULTANT

321 4 5 6 7 8 9 10

NEW CLINICAL LAB FOR

SURGICAL EXPANSION

RICHMOND, VIRGINIA

652-319

PROJECT DIRECTOR

AUGUST 2018

REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

BID DOCUMENTS

DWG. OF 162

NAME: TINA DEBELLA, PE

PHONE: 804.675.5495

EMAIL: Tina.DeBella@va.gov

MECHANICAL DETAILS

MH502

1. SEE EXPANSION TANK

SYSTEM SCHEDULE FOR

COMPONENT SIZES.

2. FOR HOT WATER

SYSTEMS 2" [50mm] AND

SMALLER AND CHILLED

WATER SYSTEMS USE

IN-LINE AIR PURGER IN

LIEU OF AIR SEPARATOR.

3. SET PRESSURE REDUCING

VALVE SO PRESSURE AT

HIGHEST POINT IN

SYSTEM HAS A MINIMUM

OF 4 PSIG [28kPa].

D

FLOOR MOUNTING BASE RING

WITH DRAIN ACCESS OPENING

SHOWN. ANGLE IRON LEGS MAY

BE USED AS AN OPTION.

6" [150mm]

HOUSEKEEPING

PAD

COLD WATER FILL LINE.

SEE EXPANSION TANK

SCHEDULE FOR SIZE

DRAIN

FROM SYSTEM

RUN DRAIN LINE TO

NEAREST FD UNLESS

INDICATED

OTHERWISE

DRAIN

TO PUMP

SUCTION

AIR

SEPARATOR

SEE NOTES

3 & 4

HANGER

RODS (TYP)

CONNECTOR PIPE.

BLADDER

EXPANSION

TANK

REDUCED PRESSURE

BACKFLOW PREVENTER

NC

BUTTERFLY

OR BALL

ISOLATION

VALVE

D

RUN DRAIN

LINE TO

NEAREST FD

AIR CHARGING

SCHRADER VALVE

MV

AUTO. AIR VENT TO DRAIN

PI

SINGLE COIL

WATER COIL

AIR VENT WHEN

COIL IS NOT

SELF-VENTING

DRAIN WHEN COIL IS

NOT SELF-DRAINING

TEST PLUG

(TYP.)

PIPE HANGER SHALL SUPPORT

PIPING INDEPENDENT OF COIL

REDUCER, IF REQUIRED

DRAIN

WATER COIL

AIR VENT WHEN

COIL IS NOT

SELF-VENTING

TEST PLUG

(TYP.)

PIPE HANGER SHALL SUPPORT

PIPING INDEPENDENT OF COIL

WATER COIL

REDUCER, IF REQUIRED

FLOW ELEMENT

DRAIN WHEN COIL IS

NOT SELF-DRAINING

DRAIN

DOUBLE COIL

NOTES:

1. WHEN COIL IS INCLUDED IN CASING MOUNTED ON VIBRATION ISOLATORS THE FIRST 2 HANGERS FOR EACH PIPE SHALL BE SPRING & NEOPRENE TYPE. TYPE "H" FOR 4" [100mm]Ø PIPE & SMALLER. TYPE "H-P" FOR 5" [125mm]Ø PIPE & LARGER.

2. PIPING SHALL BE INSTALLED IN SUCH MANNER THAT IT WILL NOT BLOCK THE SWING OR USE OF ACCESS DOORS OR PANELS; NEITHER SHALL IT BLOCK THE SERVICING OF FILTERS, VALES, OR

EQUIPMENT.

3. THE FLOW ELEMENT MAY BE INSTALLED IN THE SUPPLY PIPING IF THE REQUIRED MINIMUM UPSTREAM

AND DOWNSTREAM DIMENSIONS CANNOT BE OBTAINED IN THE RETURN PIPING.

FE

MV

MV

MV

MV MVMV

FE

TI

TI

TEMPERATURE INDICATION

TO ECC SEE CONTROL

DIAGRAM

MV

NOTES:

1. SIZE AND SELECT COIL FOR PARALLEL

FLOW AND MINIMUM TUBE WATER

VELOCITY OF 3.0 FEET PER SECOND

MODULATING CONTROL

VALVE

HWS/GHS

HWR/GHR

INLINE PUMP

AV

AUTO. AIR VENT TO DRAIN, TYP

AV

SHUTOFF VALVE

FULL SIZE

CONNECTIONS

TO ALL COIL HEADER

TAPPINGS

BALANCING

DEVICE

MANUAL

BYPASS

VALVE

PREHEAT

COIL

AIR

MANUAL BYPASS VALVE

THERMOMETER

UNDER CANOPY

FLOW SWITCH

FLEXIBLE

CONNECTORS

IF REQUIRED

TEST PLUGS

CHS

EVAPORATOR

CHR

DDC

TEMPERATURE

SENSOR TO ECC

PRESSURE

GAUGE

FS

TT TT

SCALE:

MH503

PREHEAT COIL (HOT WATER) - PIPING CONNECTIONS

: NTS SCALE:

MH503

AIR COOLED CHILLER - PIPING CONNECTIONS

: NTS

SCALE:

MH503

WATER COILS - PIPING CONNECTIONS

: NTSSCALE:

MH503

PIPING CONNECTIONS

FLOOR MOUNTED EXPANSION TANK-

: NTS

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

F i t h

FULLY

SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:

ARCHITECT/ENGINEER OF RECORD

SEAL

CONSULTANT

321 4 5 6 7 8 9 10

NEW CLINICAL LAB FOR

SURGICAL EXPANSION

RICHMOND, VIRGINIA

652-319

PROJECT DIRECTOR

AUGUST 2018

REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

BID DOCUMENTS

DWG. OF 162

NAME: TINA DEBELLA, PE

PHONE: 804.675.5495

EMAIL: Tina.DeBella@va.gov

MECHANICAL DETAILS

MH503

TYPICAL MANUAL AIR VENT ELEVATION

TYPICAL CHILLED AND HOT WATER PIPING DRAIN

VALVE CONNECTION ELEVATIONS

THREADED PIPING WELDED PIPING

TYPICAL WATER PIPING

REDUCER, IF REQUIRED

3/4" [20mm] BALL VALVE

ADAPTER TO 3/4" [20mm] HOSE

THREAD-PROVIDE HOSE CAP NUT

NOTES:

1. DRAIN ALL LOW POINTS AS INDICATED ABOVE.

2. WHERE SCALE POCKETS ARE SHOWN ON PIPE RISER DIAGRAMS AND/OR

PLANS LOCATE DRAIN AT BOTTOM OF SCALE POCKET.

AIR VENT

1/2" [15mm]

BALL VALVE

1/4" [8mm]

COPPER TUBING

1/2" [15mm] x 4" [100mm]

NIPPLE

CIRCULATING WATER PIPING

NOTES:

1. VENT ALL HIGH POINTS INDICATED ABOVE.

2. IF AUTOMATIC AIR VENTS ARE USED, PIPE DISCHARGE TO DRAIN.

MV

OR

AV

SECTION A-A

(BASE NOT POURED WITH SLAB)

SECTION A-A

(BASE POURED WITH FLOOR SLAB)

PLAN

TYPICAL ANCHOR BOLT

NUT & WASHER

SECTION B-B

EQUIPMENT BASE PLATE

PROVIDE #3 BARS 12" [300mm] O.C.

EACH WAY IN THE BASE & DOWEL

BASE TO FLOOR

EQUIPMENT BASE PLATE

PROVIDE DOUBLE SLAB

REINFORCING IN BASE AREA

WELD HEAD TO PLATE OR

BEND OVER END 5D

FLOOR

PIPE SLEEVE (5D, 3"

[75mm] MIN.)

ANCHOR

BOLT (TYP)

CONCRETE BASE

NOTES:

L & W DIMENSIONS SHALL

BE 6" [150mm] GREATER

THAN THE EQUIPMENT

BASE PLATE.

L

W

A

A

BB

D

2D

[400mm] 16"

5" M

IN

[1 m m

L /1

5"

M

IN

[1 m m

L /1

5D

TYPICAL ANCHOR BOLT

NUT & WASHER

[2 5m m

5D

COIL

TEST PLUG (TYP.)

REDUCER, IF REQUIRED

WATER RETURN

MANUAL AIR VENT

UNION CONNECTIONS

(TYP.)

WATER SUPPLY

SHUT OFF VALVE

DRAIN WITH HOSE

CONNECTION

MV

MODULATION CONTROL VALVE

FIRST 3 HANGERS FOR EACH PIPE AND

BRANCH SHALL BE SPRING & NEOPRENE

TYPE. TYPE "H" FOR 4" [100mm] DIA.

PIPE & SMALLER. TYPE "H-P" FOR 5"

[125mm] DIA. PIPE & LARGER.

RIGID PIPE

HANGER

INSTALL HANGER AS CLOSE

TO PIPE ELBOW AS POSSIBLE

(TYPICAL)

1/2" [15mm]

FLEXIBLE CONNECTOR (TYPICAL)

PUMP

FLOOR

VIBRATION

ISOLATOR

(TYPICAL)

1" [25mm] MIN.

DIA. PIPE STAND

CONCRETE INERTIA

BASE

DRAIN

SUCTION DIFFUSER

WITH BUILT IN STRAINER.

OPTIONAL: LONG RADIUS

ELBOW AND INLET

STRAINER WITH 3XDIAM

STRAIGHT INLET TO PUMP

1/2" [15mm]

PRESSURE GAUGE

RIGID PIPE

HANGER

OPTIONAL STRAINER

BUTTERFLY OR BALL

SHUT OFF VALVE, TYP.

CHECK VALVE

SCALE:

MH504

(HYDRONIC SYSTEMS)

DRAIN VALVE AND AIR VENT CONNECTIONS

: NTS SCALE:

MH504

CONCRETE EQUIPMENT BASES

: NTS

SCALE:

MH504

CONNECTIONS WITH FLEXIBLE CONNECTORS

SINGLE SUCTION FLOOR-MOUNTED PUMPS -

: NTS

SCALE:

MH504

PIPING CONNECTIONS

TERMINAL UNIT WATER COILS-

: NTS

TO MICU

EXPANSION

TO LAB

EXPANSION

CAP FOR FUTURE

EXPANSION

6" CWS/R FROM

BASEMENT 4" HWS/R FROM

BASEMENT

SCALE:

MH504

PIPING CONNECTIONS

CWS/R AND HWS/R SYSTEM

: NTS

EXISTING CONSTRUCTION AS

PART OF MICU EXPANSION

TO BAS

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

F i t h

FULLY

SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:

ARCHITECT/ENGINEER OF RECORD

SEAL

CONSULTANT

321 4 5 6 7 8 9 10

NEW CLINICAL LAB FOR

SURGICAL EXPANSION

RICHMOND, VIRGINIA

652-319

PROJECT DIRECTOR

AUGUST 2018

REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

BID DOCUMENTS

DWG. OF 162

NAME: TINA DEBELLA, PE

PHONE: 804.675.5495

EMAIL: Tina.DeBella@va.gov

MECHANICAL DETAILS

MH504

SECTION "A-A"

"B" "B"

NOTES:

1. LATCHES SHALL BE OF THE WEDGE TYPE TO CLOSE DOORS TIGHTLY.

2. HINGES ON THE ACCESS DOORS SHALL HAVE NON-CORROSIVE PINS.

3. SEE SMACNA 2005, FIGURE 9-15

ACCESS PANEL

ACCESS DOOR

CASING

GASKET

HANDLE INSIDE

FLEXIBLE

WASHER

FACTORY

FABRICATED

LATCH

SECTION "B-B"

INSULATION

DUCT

GASKET

INSULATION

INSULATION

"A"

"A"

NOTES:

1. RIGID STRAIGHT TERMINAL UNIT INLET LENGTH SHALL BE A MINIMUM OF 3 TIMES

THE DIAMETER OF INLET

2. A FLEXIBLE AIR DUCT CONNECTOR IS NOT MANDATORY FOR INLET TO THIS BOX,

BUT ALLOWED TO ACCOMMODATE MINOR OFFSETS. MAXIMUM LENGTH 3'-0"

[900mm].

3. A BRANCH DUCT SERVING AN INDIVIDUAL BOX MAY BE THE SAME SIZE AS THE BOX

INLET, PROVIDED THE EQUIVALENT LENGTH OF THE BRANCH DUCT, AS SHOWN,

DOES NOT EXCEED 10 FEET (3 METERS). FOR LONGER LENGTHS, INCREASE THE

DUCT SIZE AND PROVIDE A DUCT TRANSITION TO MAINTAIN THE DUCT STATIC

PRESSURE DROP AT OR BELOW 0.2"/100' [1.64Pa/m].

4. FLEXIBLE AIR DUCT CONNECTORS, WHEN USED FROM TERMINAL UNIT SUPPLY AIR

DUCT TO DIFFUSER, SHALL NOT EXCEED 5'-0" [1500mm]. USE RIGID ELBOWS FOR

CHANGE OF DIRECTION GREATER THAN 45°.

5. COMPONENT ARRANGEMENT MAY VARY BY MANUFACTURER. PROVIDE INSULATION

W/VAPOR BARRIER FOR CONNECTING DUCT SECTIONS.

6. USE OF THE FLEXIBLE AIR DUCT CONNECTORS ARE NOT PERMITTED FOR THE

DEDICATED AHU SERVING THE SURGICAL SUITE.

AIR TERMINAL UNIT

(CV OR VAV)

REHEAT COIL

SOUND ATTENUATOR

SEE EQUIPMENT

SCHEDULE

FLEXIBLE AIR DUCT

CONNECTOR. SEE DETAIL

DIFFUSER (TYP.)

SEE SPECIFICATIONS FOR

CLAMPS AND SEALANT (TYP.)

SEE NOTE 5

S E

E N

O T

E

SEE NOTE 3

SEE NOTE 2

SEE NOTE 1

ROUND FLEXIBLE CONNECTION

RECTANGULAR FLEXIBLE CONNECTION

FLANGED CONNECTION

ON FAN SIDE

WASHER 1-1/2" [40mm] MIN. TO 3" [75mm] MAX.

INSTALLED. 6" [150mm] NOMINAL WITH

MATERIAL TAUT

FLEXIBLE

MATERIAL AS

SPECIFIED

1"x1/8" [25x3mm] DRAW BAND

1"x1/8" [25x3mm] BAND IRON

BOLT ON 4" [100mm] CENTERS

5/16" [8mm] FLANGE

DUCT

SHEET METAL SCREWS ON

12" [300mm] CENTERS

RIVET ON 4"

[100mm] CENTERS

SHEET METAL AS

SPECIFIED FOR

DUCTWORK.

1"x1/8" [25x3mm] BAND IRON

BOLT ON 4" [100mm] CENTERS

1" [25mm] FLANGE & HEMALTERNATE

POSITION

OF BOLT

1 1/2" [40mm]

POCKET SLIP

DUCT

SHEET METAL AS

SPECIFIED FOR

DUCTWORK.

1/2" [15mm]

1/2" [15mm]

1 1/2" [40mm]

1 1/2" [40mm] MIN. TO 3" [75mm] MAX.

INSTALLED. 6" [150mm] NOMINAL WITH

MATERIAL TAUT

FLANGED

CONNECTION

ON FAN SIDE

WASHER

FLEXIBLE MATERIAL AS

SPECIFIED

NOTES:

TABULATED DATA FROM SMACNA ALLOWS FOR DUCT

REINFORCING AND INSULATION, BUT NO EXTERNAL LOAD.

BAND

OVER 50" [1250mm]Ø

HANGER RODS

BAND SAME SIZE

AS HANGER

STRAP

LOAD RATED

FASTENERS

50" [1250mm]Ø & UNDER

HANGER STRAPS OR RODS

MAX DUCT Ø

IN. [mm]

QUANTITY/SIZE

IN. [mm]

MAX LOAD

LBS [kg]

MAX SPACING

IN. [mm]

26 [650] ONE 1" [25] X 22 GA STRAP 260 [119] 144 [360]

36 [900] ONE 1" [25] X 18 GA STRAP 420 [190] 144 [360]

50 [1250] ONE 1" [25] X 16 GA STRAP 700 [317] 144 [360]

60 [1500] TWO 3/8" [10]Ø RODS 1320 [598] 144 [360]

84 [2100] TWO 1/2" [13]Ø RODS 2500 [1133] 144 [360]

SCALE:

MH505

ROUND DUCT HANGERS

: NTS SCALE:

MH505

POWER ROOF VENTILATOR

: NTS

SCALE:

MH505

DUCT CONNECTIONS - AIR TERMINAL UNITS

: NTS

SCALE:

MH505

ACCESS PANEL AND DOOR DETAIL

: NTSSCALE:

MH505

FLEXIBLE DUCT CONNECTIONS

: NTS

NOTE:

1.

2.

3.

SECURE CURB CAP TO WOOD NAILING STRIP WITH 3/8" [10mm] CADMIUM PLATED LAG BOLTS NOT OVER 12" [300mm] ON CENTER.

SECURE ROOF CURB, DUCTWORK AND DAMPER TO ROOF WITH EXPANSION BOLTS

(CONCRETE ROOF) OR RUST RESISTANT BOLTS (METAL DECK AND BAR JOIST ROOF).

RUN ELECTRICAL LINES THROUGH CLEARANCE HOLE PROVIDED IN GRAVITY DAMPER,

THEN THROUGH VENTILATOR ELECTRICAL CONDUIT GUIDE.

GRAVITY BACKDRAFT DAMPER

RIGID CONDUIT TO

ACCOMMODATE

ELECTRICAL WIRES

SEE NOTE 2

PREFABRICATED ROOF CURB

WOOD NAILING STRIP

ELECTRICAL CONDUIT GUIDE

MOTOR HOUSING

DUCT

TRANSITION DUCT TO FULL

SIZE OF DAMPER SUPPLIED

WITH ROOF VENTILATOR

ROOF

SEE NOTE 2

SEE NOTE 1

CURB CAP

FOR LAB HOODS, BOI CABINETS, AUTOPSY, MRI AND

NEGATIVE ISOLATION ROOMS EXHAUST FANS

SIZE TO MAINTAIN 4000 FPM

(20.3 M/S) OUTLET VELOCITY

WHERE INDICATED ON

DRAWINGS.

18 GAGE GALVANIZED

STEEL EXHAUST STACK

1" (25 MM) GALVANIZED

STEEL STRAP SECURED TO

EXHAUST STACK

GUY WIRE (4 REQUIRED)

DRIP LIP

TRANSITION (AS

REQUIRED)

F.C.

ROOF

EXHAUST

FAN

SECURE STACK TO ROOF

(TYPICAL)

DRAIN, 1/2" (15 MM)

WELDED COUPLING

WELDED JOINT

15°

MIN. 10'-0" (3.0 M)

AS REQUIRED

SCALE:

MH505

LABOROTORY HOOD FAN DISCHARGE

: NTS

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

F i t h

FULLY

SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:

ARCHITECT/ENGINEER OF RECORD

SEAL

CONSULTANT

321 4 5 6 7 8 9 10

NEW CLINICAL LAB FOR

SURGICAL EXPANSION

RICHMOND, VIRGINIA

652-319

PROJECT DIRECTOR

AUGUST 2018

REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

BID DOCUMENTS

DWG. OF 162

NAME: TINA DEBELLA, PE

PHONE: 804.675.5495

EMAIL: Tina.DeBella@va.gov

MECHANICAL DETAILS

MH505

UNLESS OTHERWISE INDICATED ON PLANS, MAXIMUM ANGLES SHOWN SHALL APPLY.

M

AX.

30° M

A X

E Q

U

IP

M E

N T

AIR

FLOW

AIR

FLOW

DUCTWORK TRANSITION

PLAN OR SIDE VIEW

DUCTWORK TRANSITION W/

EQUIPMENT IN DUCT

PLAN OR SIDE VIEW

M A

X

15° M

A X

M A

X

M A

X

AIR

FLOW

FROM STRUCTURE

12"

CEILING

SUPPORT SADDLE

VOLUME DAMPER W/

LOCKING QUADSADDLE

SHEET METAL

CONICAL OUTLET

BRANCH DUCT

[300mm]

SEE SPECIFICATIONS FOR CLAMPS AND

SEALANT (TYP.)

NOTES:

THE USE OF FLEXIBLE AIR DUCT CONNECTORS ARE NOT PERMITTED FOR THE

DEDICATED AHU SERVING THE SURGICAL SUITE.

TYPICAL DIFFUSER

OR REGISTER IN

LAY-IN CLG.

THERMAL INSULATION

SEE SPECIFICATIONS

MAIN EXHAUST OR RETURN

PLAN VIEW

AIR

FLOW AIR

FLOW

W

PROVIDE VOLUME DAMPER

AT EACH BRANCH DUCT

1/4W OR 4" [100mm]

MIN.

BRANCH DUCT

VD

A

IR

F

LO

W

HOUSING WELDED

TO DUCT SECTION

ROUND OR FLAT OVAL

DUCT SECTION

COVER WITH HANDLE

AND CHAIN RETAINER

GASKETED AND

PRESSURE SEALED

SMACNA FIGURE 4-6

45° LEED IN

RIGID DUCT TO AIR

TERMINAL UNIT.

MAIN SUPPLY

PLAN VIEW

FLOW

F

LO

W

FLOW

NOTES:

1. THE SUPPLY REGISTER TAKE-OFF MAY BE USED FOR UP TO 25% OF THE MAIN DUCT CFM. THE

BRANCH DUCT TAKE-OFF MAY BE USED FOR UP TO 15% OF THE MAIN DUCT CFM ANYTIME AND

UP TO 40% WHEN THE MAIN DUCT VELOCITY IS 1000 FPM [5.1 M/S] OR LESS. THE AIR SPLIT DUCT

TAKE-OFF SHALL BE USED IN ALL OTHER CASES AND MAY BE USED AT ANYTIME.

2. SHOW ALL VOLUME DAMPERS ON FLOOR PLANS.

AIR SPLIT DUCT TAKE-OFF

PLAN VIEW

BRANCH DUCT TAKE-OFF PLAN

VIEW

SUPPLY REGISTER TAKE-OFF

PLAN VIEW

AIR FLOW

AIR

FLOW

A

IR

F

LO

W

SUPPLY REGISTER

OR BRANCH DUCT

TURNING VANES

MAIN

SUPPLY

DUCT

SEE FLOOR PLAN FOR

SPLIT DIMENSION

PROVIDE VOLUME

DAMPER

PROVIDE

VOLUME

DAMPER

ADJUSTABLE

METAL ROD

OR LINKAGE

TOP REGISTER

MAIN

SUPPLY

DUCT

VOLUME EXTRACTOR; ADJUSTABLE

FROM FULLY CLOSED POSITION TO

CFM NOTED ON FLOOR PLANS

AIR

FLOW

AIR

FLOW

1/4 W OR 4" [100mm]

MIN.

AIR

FLOW

MAIN SUPPLY

DUCT

W

A

IR

F

LO

W

NOTES:

1. DELETE INSULATION STAND-OFF ON DUCTWORK WITHOUT EXTERIOR

INSULATION.

2. DETAIL SHOWS SINGLE BLADE DAMPER. DAMPER INSTALLATION SHALL BE

SIMILAR FOR MULTI-BLADE DAMPERS & ROUND DAMPERS.

INSULATION SEE

SPEC 23 07 11

DAMPER BLADE

1/8" [6mm]

CLEARANCE

ALL AROUND

OUTSIDE END BEARING

INSIDE END BEARING

HANDLE WITH

LOCKING

QUADRANT

INSULATION

STAND-OFF

1/2" [15mm] ROUND

ROD PIN

DUCT

STIFFEN BLADE

AS REQUIRED

SIDE ELEVATION SECTION

SCALE:

MH506

ALTERNATE SUPPLY DUCT TAKE OFF

: NTS

SCALE:

MH506

EQUIPMENT MOUNTED IN DUCT

DUCTWORK TRANSITIONS WITH

: NTSSCALE:

MH506

VOLUME DAMPER

: NTS SCALE:

MH506

ACCESS SECTION FOR ROUND/OVAL DUCT

: NTS

SCALE:

MH506

FLEXIBLE AIR DUCT CONNECTOR

: NTS

SCALE:

MH506

EXHAUST OR RETURN BRANCH DUCTWORK

: NTS

SCALE:

MH506

SUPPLY DUCTWORK TAKE-OFFS

: NTS

FLEX DUCT

HARD DUCT

THRU SLAB

FIRE SEAL

HARD DUCT

FROM STRUCTURE

12"

SUPPORT SADDLE

VOLUME DAMPER W/

LOCKING QUADSADDLE

SHEET METAL

CONICAL OUTLET

BRANCH DUCT

[300mm]

SEE SPECIFICATIONS FOR CLAMPS AND

SEALANT (TYP.)

NOTES:

THE USE OF FLEXIBLE AIR DUCT CONNECTORS ARE NOT PERMITTED FOR THE

DEDICATED AHU SERVING THE SURGICAL SUITE.

THERMAL INSULATION

SEE SPECIFICATIONS

SCALE:

MH506

HARD DUCT MOUNTED DIFFUSER

: NTS

HARD DUCT

THRU SLAB

FIRE SEAL

HARD DUCT

TYPICAL DIFFUSER

DUCT MOUNTED

15" [380mm] GYPSUM BOARD

(IF MOUNTED)

(9'0" AFF)

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

F i t h

FULLY

SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:

ARCHITECT/ENGINEER OF RECORD

SEAL

CONSULTANT

321 4 5 6 7 8 9 10

NEW CLINICAL LAB FOR

SURGICAL EXPANSION

RICHMOND, VIRGINIA

652-319

PROJECT DIRECTOR

AUGUST 2018

REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

BID DOCUMENTS

DWG. OF 162

NAME: TINA DEBELLA, PE

PHONE: 804.675.5495

EMAIL: Tina.DeBella@va.gov

MECHANICAL DETAILS

MH506

VANE

VANE

NOTES:

1. THE INTERIOR SURFACE OF ALL RADIUS ELBOWS SHALL BE MADE ROUND.

2. ALL STANDARD RADIUS ELBOWS CAN BE SUBSTITUTED WITH SHORT RADIUS ELBOWS.

ALL SHORT RADIUS ELBOWS SHALL HAVE VANES. VANES SHALL BE CONSTRUCTED,

SUPPORTED AND FASTENED AS RECOMMENDED BY SMACNA.

R SHALL

EQUAL OR BE

GREATER

THAN W.

R SHALL

EQUAL OR BE

GREATER

THAN 1/3W.

W

R

R

2/3W

1/ 3W

R SHALL

EQUAL OR BE

GREATER

THAN 1/6W.

STANDARD RADIUS OR

LONG RADIUS ELBOW

SHORT RADIUS ELBOW

WITH ONE VANE

SHORT RADIUS ELBOW

WITH TWO VANES

W W

1/2W

1/ 3W

1/6W

R

NOTES:

1. ALL VANE ELBOWS SHALL BE CONSTRUCTED AND INSTALLED AS DETAILED BY

SMACNA.

2. WHEN W1 DOES NOT EQUAL W2, VANE SHALL BE SINGLE THICKNESS VANE TYPE

REGARDLESS OF W DIMENSION.

3. ALL SINGLE THICKNESS VANES SHALL HAVE A 2" [50mm] RADIUS, 1 1/2" [40mm] MAXIMUM SPACE BETWEEN VANES AND A 3/4" [20mm] TRAILING EDGE.

4. WHEN W EQUALS W2 AND W1 IS GREATER THAN 20" [500mm] VANES SHALL BE

DOUBLE VANE TYPE.

W

W1

RIGID DUCT TO AIR TERMINAL

UNIT.

ROUND SHEET METAL

DUCT.

MAIN SUPPLY

"D"

45°M A

X

PLAN VIEW

FLOWFLOW

NOTES:

1. ALL DRIP POINTS ON STEAM MAINS SHALL BE PROVIDED WITH A 12" MINIMUM HIGH DRIP

LEG FROM BOTTOM OF STEAM MAIN TO TRAP INLET. DRIP LEG SHALL HAVE 6" SCALE

POCKET BELOW TRAP INLET.

TO RETURN MAIN

PIPE SIZE SHALL BE SAME SIZE AS

TRAP

FLOAT AND THERMOSTATIC

TRAP. SEE PLANS, AND

SCHEDULES

DIELECTRIC FITTING

WHERE RETURN IS

COPPER PIPE

FLOW

SCHEDULE 80

STEEL PIPE

BYPASS-INSTALL IN HORIZONTAL

PLANE LEVEL WITH TRAP OR IN

VERTICAL PLANE & BELOW TRAP

PROVIDE BYPASS PIPING FOR ALL

TRAPS 1" AND LARGER.

M

IN

6"

M

IN

DRIP LEG OR EQUIPMENT

CONNECTION. MAKE THE SAME

SIZE AS THE SUPPLY MAIN OR

EQUIPMENT CONNECTION. SEE

NOTE 1 [3

m m

[1 m m

SCHEDULE 80 STEEL PIPE

SEE DRAWINGS FOR PIPE SIZES

1" GATE

VALVE

NOTES:

1. ALL DRIP POINTS ON STEAM MAINS SHALL BE PROVIDED WITH A 12" MINIMUM HIGH

DRIP LEG FROM BOTTOM OF STEAM MAIN TO TRAP INLET. DRIP LEG SHALL HAVE 6"

SCALE POCKET BELOW TRAP INLET.

2. PROVIDE BYPASS PIPING.

SEE DRAWINGS FOR PIPE SIZES

TO RETURN MAIN

SCHEDULE 80 STEEL PIPE

PIPE SIZE SHALL BE SAME SIZE AS

TRAP

INVERTED BUCKET TRAP.

SEE PLANS, AND

SCHEDULES

DIELECTRIC FITTING

WHERE RETURN IS

COPPER PIPE

FLOW

SCHEDULE 80

STEEL PIPE

BYPASS-INSTALL IN HORIZONTAL

PLANE LEVEL WITH TRAP OR IN

VERTICAL PLANE & BELOW TRAP

M

IN

6"

M

IN

DRIP LEG OR EQUIPMENT

CONNECTION. MAKE THE SAME SIZE

AS THE SUPPLY MAIN OR EQUIPMENT

CONNECTION. SEE NOTE 1

[3 m m

[1 m m

1" GATE

VALVE

CONDENSATE

TO DRAIN

MV

MANUAL

AIR VENT

TO BUILDING

LOAD

INVERTED BUCKET

TRAP ASSEMBLY

WELDED

TEE

STEAM PIPE

12"[300 MM]

6"[150 MM]

SCHEDULE 80 STEEL PIPE

1" GATE VALVE

SCALE:

MH507

DUCTWORK SQUARE VANE ELBOWS

: NTS SCALE:

MH507

INVERTED BUCKET STEAM TRAP ASSEMBLY

: NTS SCALE:

MH507

END STEAM LINE DRIP TRAP

: NTS

SCALE:

MH507

ALTERNATE SUPPLY DUCT TAKE OFF

: NTSSCALE:

MH507

DUCTWORK RADIUS ELBOWS

: NTSSCALE:

MH507

STEAM TRAP ASSEMBLY

FLOAT AND THERMOSTATIC

: NTS

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

F i t h

FULLY

SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:

ARCHITECT/ENGINEER OF RECORD

SEAL

CONSULTANT

321 4 5 6 7 8 9 10

NEW CLINICAL LAB FOR

SURGICAL EXPANSION

RICHMOND, VIRGINIA

652-319

PROJECT…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .