36C24619B0039-009.pdf

PDF Posted

Attached to
Construct New Clinical Lab Expansion (VA-18-00152139) Federal contract opportunity
Solicitation number
36C24619B0039
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6

About this file

This solicitation package includes construction drawings and specifications for the Construct New Clinical Lab Expansion project located at the H.H. McGuire VA Medical Center in Richmond, Virginia. The Department of Veterans Affairs seeks a Service-Disabled Veteran-Owned Small Business to provide all labor, materials, equipment, supervision, and construction services required for the approximately 18,050 square foot renovation and addition project. Services include a partial renovation of an existing medical center building and construction of an addition. The estimated construction cost is between $5,000,000 and $10,000,000. The NAICS code is 236220 with a small business size standard of $36.5 million. The project shall be completed within 680 calendar days of receiving the notice to proceed. Questions must be submitted by email to the Contracting Officer by the stated deadline. The procurement is fully set aside for Service-Disabled Veteran-Owned Small Businesses. Offers will only be accepted from SDVOSBs.

36C24619B0039 S02 INTERIORS_Bid Documents.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Construct New Clinical Lab Expansion (VA-18-00152139), newest first.
File Type Posted
36C24619B0039-0003002.pdf PDF
36C24619B0039-0003003.pdf PDF
36C24619B0039-0003001.pdf PDF
36C24619B0039-0003000.docx DOCX document
36C24619B0039-0003002.pdf PDF
36C24619B0039-0003000.docx DOCX document
36C24619B0039-0003001.pdf PDF
36C24619B0039-0003003.pdf PDF
36C24619B0039-0002000.docx DOCX document
36C24619B0039-0002000.docx DOCX document
36C24619B0039-0001000.docx DOCX document
36C24619B0039-0001000.docx DOCX document
36C24619B0039-004.pdf PDF
36C24619B0039-001.docx DOCX document
36C24619B0039-011.pdf PDF
36C24619B0039-012.pdf PDF
36C24619B0039-013.pdf PDF
36C24619B0039-008.pdf PDF
36C24619B0039-003.pdf PDF
36C24619B0039-010.pdf PDF
36C24619B0039-007.pdf PDF
36C24619B0039-005.pdf PDF
36C24619B0039-002.docx DOCX document
36C24619B0039-006.pdf PDF
36C24619B0039-011.pdf PDF
36C24619B0039-001.docx DOCX document
36C24619B0039-004.pdf PDF
36C24619B0039-003.pdf PDF
36C24619B0039-010.pdf PDF
36C24619B0039-009.pdf PDF
36C24619B0039-005.pdf PDF
36C24619B0039-008.pdf PDF
36C24619B0039-006.pdf PDF
36C24619B0039-007.pdf PDF
36C24619B0039-002.docx DOCX document
36C24619B0039-013.pdf PDF
36C24619B0039-012.pdf PDF
36C24619B0039-000.docx DOCX document
36C24619B0039-000.docx DOCX document
Show all 39

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

10-05-2018

6'

4"

OPEN

TO

BEYOND

4 8

4" 6'

0"

6'

0"

6'

0"

6'

0"

4" 6'

0"

REF-28 REF-29

4" 6'

0"

3 6

4" 6'

0" WB-1 CW-1REF-1 REF-2 REF-3 FRZ-1

66 7

6'

0"

COMP

OPEN

TO

BEYOND

6'

0"

SF-1

MIC-1

COMP

AV-1

6'

0" CF-1

INC-2

BB-1

INC-1SF-2

MIC-1

COMP

AV-2AV-1

AV-4

MIC-1

SF-4

AV-3

COMP

MIC-1

SF-3COMP

SF-3

MIC-1

COMP SF-4

MIC-1

COMP

UNDERCOUNTER REFRIGERATOR

AV-3

AV-4

PROJECT

BUILDING

DRAWING

PROJECT

LOCATION

ISSUE CHECKED DRAWN

DRAWING TITLE

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD SEALCONSULTANT

321 4 5 6 7 8 9 10

NAME:

FULLY SPRINKLERED

PROJECT DIRECTOR

FULL SIZE DWG:

PHONE

EMAIL

TINA DEBELLA, PE

804.675.5494 Tina.Debella@va.gov

NEW CLINICAL LAB FOR

SURGICAL EXPANSION

RICHMOND, VIRGINIA

652-319

DWG ___ OF 1628/

/2

7:

:4

PM

AI403

INTERIOR ELEVATIONS

AUGUST 2018 TJK KMM

BID DOCUMENTS

1/4" = 1'-0"1 ACCESSIONING - PLAN NORTH

1/4" = 1'-0"2 ACCESSIONING - PLAN SOUTH

1/4" = 1'-0"3 ACCESSIONING - PLAN WEST

1/4" = 1'-0"4 ANCILLARY TESTING - PLAN EAST

1/4" = 1'-0"5 ANCILLARY TESTING - PLAN NORTH

1/4" = 1'-0"6 ANCILLARY TESTING - PLAN SOUTH

1/4" = 1'-0"7 ANCILLARY TESTING - PLAN WEST

1/4" = 1'-0"8 BLOOD BANK - PLAN EAST

1/4" = 1'-0"9 BLOOD BANK - PLAN NORTH

1/4" = 1'-0"10 BLOOD BANK - PLAN SOUTH

1/4" = 1'-0"11 BLOOD BANK - PLAN WEST

1/4" = 1'-0"12 BLOOD BANK ISLAND - PLAN EAST

1/4" = 1'-0"13 BLOOD BANK ISLAND - PLAN WEST

KEY NOTES

1 PNEUMATIC TUBE SYSTEM. CONTRACTOR TO COORDINATE

WITH SWISS-LOG VENDOR FOR INSTALLATION.

2 30" x 42" ALUMINUM-FRAMED WINDOW WITH WIRED GLASS.

3 ICE MAKER.

4 FIBERGLASS REINFORCED PLASTIC (FRP) WALL PANELS. ALL

JOINTS AND TOP CAP TO BE SEALED PER DETAIL

DRAWINGS.

5 INTEGRAL COVE BASE WITH TOP JOINT SEALED WITH

EPOXY.

6 CORNER GUARDS, SEE FINISH LEGEND AND

SPECIFICATIONS FOR MORE INFORMATION.

7 PAINTED GWB ABOVE FRP PANELS, TYP.

8 WALL MOUNTED SHARPS CONTAINER.

9 MAIN LAB ENTRY DOORS, AUTOMATICALLY LOCKING. LOCK

RELEASE AT ACCESSIONING DESK. DOORS AUTOMATICALLY

OPEN FOR LAB ROBOT.

10 COMBINATION EMERGENCY EYEWASH AND SHOWER.

11 ACID STORAGE CABINET.

12 BIOSAFETY HOOD.

13 WALL MOUNTED STAINLESS STEEL SHELVES, WITH

ADJUSTABLE BRACKETS AND STANDARDS.

REVISIONS DATE 61

OPEN

TO

BEYOND

OPEN

TO

BEYOND

REF-27 REF-24 REF-21 REF-20 REF-19 REF-17

REF-23REF-25REF-26 REF-18

FRZ-7

FRZ-9 FRZ-8

CENTERLINK

WORKSTATION

WORKSTATION

#3

CF-12 UA-4

BGA-1

BGA-2

CF-15

CF-14

CF-16

OSM-2

OSM-1

HB-1

OPEN

TO

BEYOND

3 33

OPEN

TO

BEYOND

OPEN

TO

BEYOND

WORKSTATION

#2

WORKSTATION

#1

PRINTER

SINK

UA-1

UA-3

UA-1

OPEN

TO BLOOD

BANK

BEYOND

OPEN

TO

BEYOND7

OPEN

TO

BEYOND

3 3

4" 6'

0"

TP-1

FAX

PRINTER

ACCESSIONING

WORKSTATION

CF-17

CF-18

CF-19

OPEN TO BEYOND

MODULAR LAB BENCHING SYSTEM

WORKSTATION

#1

CF-20 CF-21 OPEN

TO

BEYOND

REFRIGERATION UNIT FOR COURIERS

MODULAR WALL PANEL

OPEN

TO

BEYOND

IMPACT RESISTANT WALL ASSEMBLY,

DASHED LINE INDICATES EXTENT.8' - 1 1/2"

5 4

IMPACT RESISTANT WALL ASSEMBLY, DASHED LINE INDICATES EXTENT.5' - 0"

6'

0"

WORKSTATION

#2

AI602

5-PANEL AUTOMATED OPERABLE

PARTITION WITH 2 GLAZED PANELS.

OPERABLE PARTITION FOLDS UP

INTO THE CEILING WHEN IN OPEN

POSITION.

CONTROL SWITCH TO BE

LOCATED ADJACENT TO

OPERABLE PARTITION, ON

PERPENDICULAR WALL. SEE

ELEC AND EQUIPMENT PLANS

FOR COORDINATION.

FIBERGLASS REINFORCED

PLASTIC PANELS ON LAB

WALLS, TYP.

PROJECT

BUILDING

DRAWING

PROJECT

LOCATION

ISSUE CHECKED DRAWN

DRAWING TITLE

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD SEALCONSULTANT

321 4 5 6 7 8 9 10

NAME:

FULLY SPRINKLERED

PROJECT DIRECTOR

FULL SIZE DWG:

PHONE

EMAIL

TINA DEBELLA, PE

804.675.5494 Tina.Debella@va.gov

NEW CLINICAL LAB FOR

SURGICAL EXPANSION

RICHMOND, VIRGINIA

652-319

DWG ___ OF 1628/

/2

7:

:5

PM

AI404

INTERIOR ELEVATIONS

AUGUST 2018 TJK KMM

BID DOCUMENTS

1/4" = 1'-0"1 CHEMISTRY - FREESTANDING REFRIGERATION - PLAN SOUTH

1/4" = 1'-0"2 CHEMISTRY - PLAN NORTH

1/4" = 1'-0"3 CHEMISTRY - PLAN WEST

1/4" = 1'-0"4 CHEMISTRY - URINALYSIS LINE- PLAN SOUTH

1/4" = 1'-0"5 CHEMISTRY - WALK-IN - PLAN NORTH

1/4" = 1'-0"6 CYTOLOGY - PLAN SOUTH

1/4" = 1'-0"7 FEE BASIS - PLAN EAST

1/4" = 1'-0"8 FEE BASIS - PLAN NORTH

1/4" = 1'-0"9 FEE BASIS - PLAN SOUTH

1/4" = 1'-0"10 FEE BASIS - PLAN WEST

KEY NOTES

1 INTEGRAL COVE BASE WITH TOP JOINT SEALED WITH

EPOXY.

2 FIBERGLASS REINFORCED PLASTIC (FRP) WALL PANELS. ALL

JOINTS AND TOP CAP TO BE SEALED PER DETAIL

DRAWINGS.

3 CORNER GUARDS, SEE FINISH LEGEND AND

SPECIFICATIONS FOR MORE INFORMATION.

4 PAINTED GWB ABOVE FRP PANELS, TYP.

5 WALL MOUNTED STAINLESS STEEL SHELVES, WITH

ADJUSTABLE BRACKETS AND STANDARDS.

6 WALL MOUNTED LAV WITH BATTERY OPERATED FAUCET.

7 SELF CLOSING, INSULATED GLASS DOORS FOR

REFRIGERATED WALK-IN.

8 REFRIGERATED WALK-IN TO BE CONSTRUCTED OF

PRE-MANUFACTURED MODULAR PANELS FOR WALLS,

CEILING, AND FLOOR.

9 BIOSAFETY HOOD.

10 UNDERCOUNTER REFRIGERATOR.

11 COUNTERTOP MICROWAVE.

1/4" = 1'-0"11 OPERABLE PARTITION AT LAB

REVISIONS DATE 62

BEYOND

OPEN

TO

BEYONDCA-2

WORKSTATION

#3

ESR-1

ESR-2

1 2

WORKSTATION

#4

WORKSTATION

STUDENT

OPEN BELOW

PFA-1

OPEN

TO

BEYOND

OPEN

TO

BEYOND

WORKSTATION

#1A1C-2

A1C-1WORKSTATION

#2

REF-16

DDB-1

SM-1

CF-10 CF-8

VOR-1

CF-7 MIC-7 ST-5CS-1 CS-2

AM-1

IHC-2IHC-1

PRT-1

OPEN

TO

BEYOND

4" 6'

0"

TT-4 TT-5

FRZ-6

SW-1

WB-2

CR-1

MT-1

SW-2

WB-3

CR-2

MT-2OV-2

OPEN

TO

BEYOND

OPEN

TO

BEYOND

SW-3

WB-4

CR-3

MT-3

SW-4

WB-5

CR-4

MT-4

SW-5

WB-6 CR-5 MT-5BLOC-1

MT-6

6'

0"

CRY-1 CRY-2

FH-3

ACCESSIONING

DESK FOR

GROSSING

DEPARTMENT

6'

0"

REF-14

MOP-4

PRT-2

COMP-4

6 6

OV-3

TT-2 TT-1

MOP-6MOP-5

OPEN

TO

BEYOND

OPEN

TO

BEYOND

ST-6ST-7

OPEN STORAGE BELOW

REF-15

FRZ-2 FRZ-3

PARKING AREA FOR MOBILE COOLERS

SMALL REFRIGERATOR, SAMPLE STORAGE

FOR COURIERS

PROJECT

BUILDING

DRAWING

PROJECT

LOCATION

ISSUE CHECKED DRAWN

DRAWING TITLE

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD SEALCONSULTANT

321 4 5 6 7 8 9 10

NAME:

FULLY SPRINKLERED

PROJECT DIRECTOR

FULL SIZE DWG:

PHONE

EMAIL

TINA DEBELLA, PE

804.675.5494 Tina.Debella@va.gov

NEW CLINICAL LAB FOR

SURGICAL EXPANSION

RICHMOND, VIRGINIA

652-319

DWG ___ OF 1628/

/2

7:

:0

PM

AI405

INTERIOR ELEVATIONS

AUGUST 2018 TJK KMM

BID DOCUMENTS

1/4" = 1'-0"2 HEMATOLOGY - PLAN NORTH

1/4" = 1'-0"3 HEMATOLOGY - PLAN SOUTH

1/4" = 1'-0"4 HEMATOLOGY ISLAND - PLAN SOUTH

1/4" = 1'-0"5 HISTOLOGY - STAINING - PLAN NORTH

1/4" = 1'-0"6 HISTOLOGY CUTTING AREA - PLAN NORTH

1/4" = 1'-0"7 HISTOLOGY CUTTING AREA - PLAN SOUTH

1/4" = 1'-0"8 HISTOLOGY GROSSING - PLAN EAST

1/4" = 1'-0"9 HISTOLOGY GROSSING - PLAN NORTH

1/4" = 1'-0"10 HISTOLOGY GROSSING - PLAN SOUTH

KEY NOTES

1 COMBINATION EMERGENCY EYEWASH AND SHOWER.

2 INTEGRAL COVE BASE WITH TOP JOINT SEALED WITH

EPOXY.

3 FIBERGLASS REINFORCED PLASTIC (FRP) WALL PANELS. ALL

JOINTS AND TOP CAP TO BE SEALED PER DETAIL

DRAWINGS.

4 CORNER GUARDS, SEE FINISH LEGEND AND

SPECIFICATIONS FOR MORE INFORMATION.

5 PAINTED GWB ABOVE FRP PANELS, TYP.

6 BIOSAFETY HOOD.

7 UNDERCOUNTER REFRIGERATOR.

1/4" = 1'-0"11 HISTOLOGY IHC LINE - PLAN SOUTH

1/4" = 1'-0"1 FEE BASIS COURIER STORAGE - PLAN WEST

REVISIONS DATE 63

BEYOND

OPEN

TO

BEYOND

ST-3 ST-4 1

6'

0"

REF-5 REF-4

BSC-1

WORKSTATION

#3

6'

0"

WORKSTATION

#1

WORKSTATION

#2

ANA-1

WORKSTATION

STUDENT

CORNER SINK

REF-5

BD-1

3 7

6'

0"

CORNER SINK

GE-1

CE-1

ANA-1

OPEN

TO

BEYOND

OPEN

TO

BEYOND

OPEN

TO

BEYOND

(3) BACTEC FX UNITS

SIDE VIEW OF

REFRIGERATION LINE

REF-10 BD-3/4

BD-5

BSC-5

OPEN

TO

BEYOND

77 7

8CORROSIVE WASTE

BSC-5

CE-2

6'

0" 9

4" 6'

0"

SS-1

INC-4/10

4" 6'

0" 6 6

BSC-4

INC-11/12INC-4/10

6'

0"

SINK W/ EYEWASH

OV-1

CF-4

PROJECT

BUILDING

DRAWING

PROJECT

LOCATION

ISSUE CHECKED DRAWN

DRAWING TITLE

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD SEALCONSULTANT

321 4 5 6 7 8 9 10

NAME:

FULLY SPRINKLERED

PROJECT DIRECTOR

FULL SIZE DWG:

PHONE

EMAIL

TINA DEBELLA, PE

804.675.5494 Tina.Debella@va.gov

NEW CLINICAL LAB FOR

SURGICAL EXPANSION

RICHMOND, VIRGINIA

652-319

DWG ___ OF 1628/

/2

7:

:2

PM

AI406

INTERIOR ELEVATIONS

AUGUST 2018 TJK KMM

BID DOCUMENTS

1/4" = 1'-0"1 HISTOLOGY STAINING LINE - PLAN NORTH

1/4" = 1'-0"2 IMMUNOLOGY - PLAN EAST

1/4" = 1'-0"3 IMMUNOLOGY - PLAN NORTH

1/4" = 1'-0"4 IMMUNOLOGY - PLAN SOUTH

1/4" = 1'-0"5 IMMUNOLOGY - PLAN WEST

1/4" = 1'-0"6 MICROBIOLOGY - PLAN EAST

1/4" = 1'-0"7 MICROBIOLOGY - PLAN WEST

1/4" = 1'-0"8 MICROBIOLOGY ANTE ROOM - PLAN NORTH

1/4" = 1'-0"9 MICROBIOLOGY ANTE ROOM - PLAN SOUTH

1/4" = 1'-0"10 MICROBIOLOGY BSL-3 LAB - PLAN EAST

1/4" = 1'-0"11 MICROBIOLOGY BSL-3 LAB - PLAN NORTH

1/4" = 1'-0"12 MICROBIOLOGY BSL-3 LAB - PLAN SOUTH

KEY NOTES

1 BIOSAFETY HOOD.

2 INTEGRAL COVE BASE WITH TOP JOINT SEALED WITH

EPOXY.

3 PAINTED GWB ABOVE FRP PANELS, TYP.

4 FIBERGLASS REINFORCED PLASTIC (FRP) WALL PANELS. ALL

JOINTS AND TOP CAP TO BE SEALED PER DETAIL

DRAWINGS.

5 OVEN.

6 INCUBATORS.

7 CORNER GUARDS, SEE FINISH LEGEND AND

SPECIFICATIONS FOR MORE INFORMATION.

8 COMBINATION EMERGENCY EYEWASH AND SHOWER.

9 WALL MOUNTED LAV WITH BATTERY OPERATED FAUCET.

10 WALL MOUNTED HOOKS FOR LAB COATS.

REVISIONS DATE 64

BEYOND

OPEN

TO

BEYOND

WORKSTATION

#3

WORKSTATION

#2

WORKSTATION

#1

WORKSTATION

#4BOOKSHELVES

ST-2 ST-1

BD-2

BD-3/4

BD-5

CE-2

11 11

BSC-5

REF-7

BSC-6

INC-3/5INC-6/7INC-8/9

DORROSIVE WASTE

CONTAINER

MALDI

OPEN

TO

BEYOND

OPEN

TO

BEYOND

REF-10 REF-9 REF-8

REF-12

FRZ-5 REF-13

BSC-3

FILING CABINETS

REF-11 FRZ-4

11 1

OPEN

TO

BEYOND

OPEN

TO

BEYOND

OPEN

TO

BEYOND

4" 6'

0"

REF-10 BD-3/4

BD-5

BSC-5

PROJECT

BUILDING

DRAWING

PROJECT

LOCATION

ISSUE CHECKED DRAWN

DRAWING TITLE

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD SEALCONSULTANT

321 4 5 6 7 8 9 10

NAME:

FULLY SPRINKLERED

PROJECT DIRECTOR

FULL SIZE DWG:

PHONE

EMAIL

TINA DEBELLA, PE

804.675.5494 Tina.Debella@va.gov

NEW CLINICAL LAB FOR

SURGICAL EXPANSION

RICHMOND, VIRGINIA

652-319

DWG ___ OF 1628/

/2

7:

:3

PM

AI407

INTERIOR ELEVATIONS

AUGUST 2018 TJK KMM

BID DOCUMENTS

1/4" = 1'-0"1 MICROBIOLOGY ISLAND - PLAN SOUTH

1/4" = 1'-0"2 MICROBIOLOGY PLANTING LINE - PLAN SOUTH

1/4" = 1'-0"3 MICROBIOLOGY REFRIGERATION - PLAN NORTH

1/4" = 1'-0"4 PHLEBOTOMY STORAGE - PLAN EAST

KEY NOTES

1 CORNER GUARDS, SEE FINISH LEGEND AND

SPECIFICATIONS FOR MORE INFORMATION.

2 COMBINATION EMERGENCY EYEWASH AND SHOWER.

3 FIBERGLASS REINFORCED PLASTIC (FRP) WALL PANELS. ALL

JOINTS AND TOP CAP TO BE SEALED PER DETAIL

DRAWINGS.

4 INTEGRAL COVE BASE WITH TOP JOINT SEALED WITH

EPOXY.

5 WALL MOUNTED STAINLESS STEEL SHELVES, WITH

ADJUSTABLE BRACKETS AND STANDARDS.

6 BIOSAFETY HOOD.

7 INCUBATORS.

REVISIONS DATE 65

PF

PNEUMATIC

TUBE

STATION

CENTRIFUGE

ACID

CABINET

HOOD

FEE BASIS SUPPLIES

COMPUTER

PRINTER

COMPUTER

PRINTER WASTE

WASTE

SHARPS

SHARPS

WORKSTATION

#1

WORKSTATION

#2

ROBOT

PARKING

SPOT

WORKSTATION

#2

WORKSTATION

#1

CENTRIFUGE

COMPUTER, TYP.

PRINTER, TYP.

LABEL

PRINTER, TYP.

PH

LE

BO

TO

M Y

PH

LE

BO

TO

M Y

FRZ-2

FRZ-3REF-6

OVERHEAD

SHELVING

ACCESSIONING

STATION

PASS-

THROUGH

AI403

AI407 4

AI404

387 SF

ACCESSIONING

3F-106a

467 SF

FEE BASIS

3F-106b

REF-22

CF-3

AI4051

REF-1

REF-2

REF-3

ICE-1

COMPUTER

COMPUTER

SUPPLIES

U/C FRIDGE

SINK

PTS

FRZ-1

AI40311

AI403 8

CW-1

AV-1

AV-2

BB-1

CF-1

SF-1

SF-2

SF-3

SF-4

PC-1

PA-1

MIC-1

MIC-1

MIC-1

MIC-1

INC-2

INC-1

WB-1

AV-3

AV-4

PROJECT

BUILDING

DRAWING

PROJECT

LOCATION

ISSUE CHECKED DRAWN

DRAWING TITLE

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD SEALCONSULTANT

321 4 5 6 7 8 9 10

NAME:

FULLY SPRINKLERED

PROJECT DIRECTOR

FULL SIZE DWG:

PHONE

EMAIL

TINA DEBELLA, PE

804.675.5494 Tina.Debella@va.gov

NEW CLINICAL LAB FOR

SURGICAL EXPANSION

RICHMOND, VIRGINIA

652-319

DWG ___ OF 1628/

/2

7:

:4

PM

AI431

ENLARGED EQUIPMENT PLANS

AUGUST 2018 TJK KMM

BID DOCUMENTS

1/4" = 1'-0"DI EQUIPMENT PLAN - ACCESSIONING AND FEE BASIS

1/4" = 1'-0"D6 EQUIPMENT PLAN - BLOOD BANK

4' 8'0 2'

SCALE:1/4"=1'-0"

REVISIONS DATE 66

U

SIEMENS AUTOMATED CHEMISTRY

WORKSTATION

#1

WORKSTATION

#2

WORKSTATION

#3

URINALYSIS LINE

SINK

REF-23 REF-25

REF-26

FRZ-8

FRZ-9

REF-18

REF-17

REF-20

REF-19

REF-21 REF-24 REF-27

FRZ-7

PRINTER

BELOW COUNTER

CENTERLINK

CENTRIFUGE

ON MOBILE

CART

W O

R

KS

TA

TI

O N

#4

1529 SF

CHEMISTRY

3F-106f

AI404

AI404

AI404

ACL-1-4

UA-4

BGA-1

BGA-2 CF-14

CF-15

CF-16

CF-13

CF-12

OSM-2

OSM-1

HB-1

UA-1

UA-3

UA-1

MIC-11

UA-2

UA-2

AI4051

ARCHIVE

WORKSTATION

#1

WORKSTATION

#2

SYSMEX AMERICA AUTOMATED LINE

MANUAL

PROCESSING

REF-16

WKSTA

#4

WKSTA

STUDENTOPEN

BELOW

WORKSTATION

#3

AI405

AI405

1015 SF

HEMATOLOGY

3F-106e

A1C-1 A1C-2

ATL-1

CA-1

CA-2

PFA-1

ESR-1

ESR-2

OPEN BELOW FOR

CARBOY STORAGE

MIC-7

MIC-8

MIC-9

MIC-10

CF-11

CF-10CF-7

CF-8

CF-9

PROJECT

BUILDING

DRAWING

PROJECT

LOCATION

ISSUE CHECKED DRAWN

DRAWING TITLE

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD SEALCONSULTANT

321 4 5 6 7 8 9 10

NAME:

FULLY SPRINKLERED

PROJECT DIRECTOR

FULL SIZE DWG:

PHONE

EMAIL

TINA DEBELLA, PE

804.675.5494 Tina.Debella@va.gov

NEW CLINICAL LAB FOR

SURGICAL EXPANSION

RICHMOND, VIRGINIA

652-319

DWG ___ OF 1628/

/2

7:

:5

PM

AI432

ENLARGED EQUIPMENT PLANS

AUGUST 2018 TJK KMM

BID DOCUMENTS

1/4" = 1'-0"D1 EQUIPMENT PLAN - CHEMISTRY

1/4" = 1'-0"D8 EQUIPMENT PLAN - HEMATOLOGY

4' 8'0 2'

REVISIONS DATE 67

R7200SINK,

DIRTY MWFAX,

ABOVE

SINK,

CLEAN

CENTRIFUGE

HOODWORKSTATION

ACCESSIONING

AI404

TP-1

XYR-1

ST-4ST-3

ST-5

ST-6 ST-7

ACCESSIONING

LAYOUT SPACE

STAINING

LINE

FRZ-6

IHC LINE

IHC

UNDERCOUNTER STORAGE

FOR IHC LINE

REF-15

STAINING LINE

CART PARKING

1560 SF

HISTOLOGY

3F-106g

AI405

AI405

AI405

AI406

REF-14

MOP-4

MOP-5MOP-6

FH-3

COMP-4

PRT-2 CRY-1

CRY-2

OV-3

TT-2TT-1

TT-4

CR-1

MT-1

CR-2

MT-2

CR-3MT-3CR-4MT-4CR-5MT-5

SW-5 SW-4 SW-3

SW-1 SW-2

WB-6 WB-5 WB-4

WB-2 WB-3

CS-1 CS-2

MON-1MON-1

AM-1

BLOC-1

IHC-2

IHC-1LE-1

MT-6

OV-2

PROJECT

BUILDING

DRAWING

PROJECT

LOCATION

ISSUE CHECKED DRAWN

DRAWING TITLE

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD SEALCONSULTANT

321 4 5 6 7 8 9 10

NAME:

FULLY SPRINKLERED

PROJECT DIRECTOR

FULL SIZE DWG:

PHONE

EMAIL

TINA DEBELLA, PE

804.675.5494 Tina.Debella@va.gov

NEW CLINICAL LAB FOR

SURGICAL EXPANSION

RICHMOND, VIRGINIA

652-319

DWG ___ OF 1628/

/2

7:

:0

PM

AI433

ENLARGED EQUIPMENT PLANS

AUGUST 2018 TJK KMM

BID DOCUMENTS

1/4" = 1'-0"C1 EQUIPMENT PLAN - CYTOLOGY AND ARCHIVE

1/4" = 1'-0"E6 EQUIPMENT PLAN - HISTOLOGY

4' 8'0 2'

REVISIONS DATE 68

CORROSIVE WASTE

CONTAINER

SHELF ABOVE

WITH PRINTER

WORK COUNTER,

SHELVING ABOVE

WORKSTATION

#4

WORKSTATION

#5

WORKSTATION

#6

WORKSTATION

#2

BOOK

SHELVES

WORKSTATION

#1

WORKSTATION

#3

SINK

BOOK

SHELVES

SINK

PLANTING LINE

FILING

CABINETS

REF-12

REF-9REF-10 REF-13

REF-7

REF-8

FRZ-5

BACTEC

FX

147 SF

BSL-3 LAB

3F-129

93 SF

GAS TANK ROOM

3F-127

125 SF

ANTE ROOM

3F-128

AI407

AI407

AI4067 6

AI406

AI406

BSC-5 BSC-6

BSC-3

BSC-4 INC-4/10

INC-11/12

CF-4

OV-1

SS-1

CE-2

INC-3/5 INC-6/7 INC-8/9

BD-5

BD-3/4

MALDI

BD-2

ST-1 ST-2

REF-11

FRZ-4

AP-1

ANA-3

WORKSTATION

#1

WORKSTATION

#2

WORKSTATION

#3

WORKSTATION

#4

U

TI

LI

TY

C

AR

T

U

TI

LI

TY

C

AR

T

REF-30 REF-29

REF-28

SINK,

CLEAN

SINK, DIRTY

AI4037

AI403 4

SINK

SINK

WORKSTATION

STUDENT

WORKSTATION

#3

WORKSTATION

#2

REF-5

REF-4

WORKSTATION

#1

511 SF

IMMUNOLOGY

3F-107

AI406

5 2

AI406

ANA-1

CE-1

GE-1

FC-1

FIT-1 BSC-1

BD-1

PROJECT

BUILDING

DRAWING

PROJECT

LOCATION

ISSUE CHECKED DRAWN

DRAWING TITLE

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEARCHITECT/ENGINEER OF RECORD SEALCONSULTANT

321 4 5 6 7 8 9 10

NAME:

FULLY SPRINKLERED

PROJECT DIRECTOR

FULL SIZE DWG:

PHONE

EMAIL

TINA DEBELLA, PE

804.675.5494 Tina.Debella@va.gov

NEW CLINICAL LAB FOR

SURGICAL EXPANSION

RICHMOND, VIRGINIA

652-319

DWG ___ OF 1628/

/2

7:

:1

PM

AI434

ENLARGED EQUIPMENT PLANS

AUGUST 2018 TJK KMM

BID DOCUMENTS

1/4" = 1'-0"F1 EQUIPMENT PLAN - MICROBIOLOGY

1/4" = 1'-0"C1 EQUIPMENT PLAN - ANCILLARY TESTING

4' 8'0 2'

SCALE:1/4"=1'-0"

1/4" = 1'-0"C2 EQUIPMENT PLAN - IMMUNOLOGY

REVISIONS DATE 69

8-13-2018

AI001 - INTERIOR GENERAL NOTES
AI131-1 - 3RD FLOOR FINISH PLAN
AI131-2 - 3RD FLOOR FURNITURE PLAN
AI131-3 - 3RD FLOOR EQUIPMENT PLAN
AI131-4 - 3RD FLOOR SIGNAGE PLAN
AI301 - CASEWORK-MILLWORK SECTIONS
AI302 - CASEWORK-MILLWORK SECTIONS
AI401 - INTERIOR ELEVATIONS
AI402 - INTERIOR ELEVATIONS
AI403 - INTERIOR ELEVATIONS
AI404 - INTERIOR ELEVATIONS
AI405 - INTERIOR ELEVATIONS
AI406 - INTERIOR ELEVATIONS
AI407 - INTERIOR ELEVATIONS
AI431 - ENLARGED EQUIPMENT PLANS
AI432 - ENLARGED EQUIPMENT PLANS
AI433 - ENLARGED EQUIPMENT PLANS
AI434 - ENLARGED EQUIPMENT PLANS
AI435 - ENLARGED FINISH PLANS
AI436 - ENLARGED FINISH PLANS
AI437 - ENLARGED FINISH PLANS
AI438 - ENLARGED FINISH PLANS
AI601 - DOOR SCHEDULE AND DETAILS
AI602 - DOOR AND WALL PROTECTION DETAILS
AI611 - ROOM FINISH LEGEND
AI612 - ROOM FINISH SCHEDULES
AI613 - SIGNAGE DETAILS & SCHEDULE
AI631 - EQUIPMENT SCHEDULES

File details come from the government source that posted it. Updated .