36C24619B0039-003.pdf

PDF Posted

Attached to
Construct New Clinical Lab Expansion (VA-18-00152139) Federal contract opportunity
Solicitation number
36C24619B0039
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6

About this file

This document package includes construction drawings and specifications for a federal contract opportunity. The Department of Veterans Affairs is seeking a qualified Service Disabled Veteran Owned Small Business construction company to provide all labor, materials, equipment, transportation and supervision required to construct a new 18,050 square foot clinical lab expansion at the H.H. McGuire VA Medical Center in Richmond, Virginia. The project number is 652-319 and is to be completed within 680 calendar days of the notice to proceed. The estimated cost is between $5-10 million. The solicitation will be issued on or around August 15th, 2019 and include the drawings and specifications. A pre-proposal site visit will also be scheduled. Questions must be emailed to the contracting officer by the specified due date. This procurement is 100% set-aside for Service-Disabled Veteran-Owned Small Businesses.

36C24619B0039 S02 GENERAL_Bid_Documents.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Construct New Clinical Lab Expansion (VA-18-00152139), newest first.
File Type Posted
36C24619B0039-0003002.pdf PDF
36C24619B0039-0003003.pdf PDF
36C24619B0039-0003001.pdf PDF
36C24619B0039-0003000.docx DOCX document
36C24619B0039-0003001.pdf PDF
36C24619B0039-0003003.pdf PDF
36C24619B0039-0003002.pdf PDF
36C24619B0039-0003000.docx DOCX document
36C24619B0039-0002000.docx DOCX document
36C24619B0039-0002000.docx DOCX document
36C24619B0039-0001000.docx DOCX document
36C24619B0039-0001000.docx DOCX document
36C24619B0039-004.pdf PDF
36C24619B0039-001.docx DOCX document
36C24619B0039-011.pdf PDF
36C24619B0039-010.pdf PDF
36C24619B0039-007.pdf PDF
36C24619B0039-005.pdf PDF
36C24619B0039-002.docx DOCX document
36C24619B0039-006.pdf PDF
36C24619B0039-012.pdf PDF
36C24619B0039-013.pdf PDF
36C24619B0039-009.pdf PDF
36C24619B0039-008.pdf PDF
36C24619B0039-011.pdf PDF
36C24619B0039-001.docx DOCX document
36C24619B0039-004.pdf PDF
36C24619B0039-003.pdf PDF
36C24619B0039-002.docx DOCX document
36C24619B0039-013.pdf PDF
36C24619B0039-012.pdf PDF
36C24619B0039-010.pdf PDF
36C24619B0039-009.pdf PDF
36C24619B0039-005.pdf PDF
36C24619B0039-008.pdf PDF
36C24619B0039-006.pdf PDF
36C24619B0039-007.pdf PDF
36C24619B0039-000.docx DOCX document
36C24619B0039-000.docx DOCX document
Show all 39

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cofer Rd

N Hopkins Rd

Belt Blvd

Holly Spring Ave.

Jefferson D avis H w y

Hull S t..

Hull S t..

N H op ki ns R d

Bro ad

R oc k Blvd

Hunter Holmes Mcguire VA

Medical Center

Bro ad

R oc k Blvd

PROJECT SITE

N

PROJECT NUMBER

BUILDING

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF SEALCONSULTAN

321 4 5 6 7 8 9 10

DWG. 1 OF 162

NAME:

FULLY SPRINKLERED

PROJECT DIRECTOR

FULL SIZE DWG: 30x42

PHONE:

EMAIL:

TINA DEBELLA, PE

804.675.5494

Tina.Debella@va.gov

NEW CLINICAL LAB FOR

SURGICAL EXPANSION

RICHMOND, VIRGINIA

652-319

8/

/2

9:

:4

A

M

GI000

COVER SHEET

AUGUST 2018 DHH LMF

BID DOCUMENTS

NEW CLINICAL LAB FOR SURGICAL

EXPANSION PROJECT

HUNTER HOLMES MCGUIRE VA MEDICAL CENTER

RICHMOND, VIRGINIA

DEPARTMENT OF VETERANS AFFAIRS

CONTRACT NO. VA246-13-D-0101

PROJECT NO. 652-319

VICINITY MAP

HUNTER HOLMES

MCGUIRE VA MEDICAL

CENTER

NEW LAB EXPANSION

LAYDOWN AREA

REVISIONS DATE

SCALE: ?

SCALE: ?

SYMBOLS

SECTION

ELEVATION

EXTERIOR

INTERIOR

DRAWING

DETAIL OR ENLARGED

PLAN

GRID

ROOM

KEYNOTE

NORTH

WINDOW TAG

DOOR

REVISION

SECTION NUMBER

SHEET NUMBER

ELEVATION NUMBER

SHEET NUMBER

ELEVATION NUMBER

SHEET NUMBER

DRAWING TITLE

DRAWING SCALE

DRAWING TITLE

DRAWING SCALE

SHEET NUMBER

DETAIL NUMBER

SHEET NUMBER

ROOM NUMBER

GRAPHIC SCALE

EQUIPMENT

VIEW

VIEW

8'0 4' 16'

SCALE:1/8"=1'-0"

TN

N

MATERIALS

UNDISTURBED EARTH

SAND

GRAVEL

CONCRETE

STEEL

MASONRY

WOOD

PLYWOOD

RIGID INSULATION

BATT INSULATION

DISTURBED EARTH

PROJECT NUMBER

BUILDING

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE

ARCHITECT/ENGINEER OF SEALCONSULTAN

321 4 5 6 7 8 9 10

DWG. 2 OF 162

NAME:

FULLY SPRINKLERED

PROJECT DIRECTOR

FULL SIZE DWG: 30x42

PHONE:

EMAIL:

TINA DEBELLA, PE

804.675.5494

Tina.Debella@va.gov

NEW CLINICAL LAB FOR

SURGICAL EXPANSION

RICHMOND, VIRGINIA

652-319

8/

/2

9:

:2

A

M

GI001

SHEET INDEX, SYMBOLS AND

LEGENDS

AUGUST 2018 DHH LMF

BID DOCUMENTS

SHEET

NUMBER SHEET NAME #

PL133 3RD FLOOR INTERSTITIAL SPACE PLUMBING

SANITARY WASTE AND VENT

PL141 ROOF PLUMBING 115

PP123 2ND FLOOR INTERSTITIAL SPACE PLUMBING

SUPPLY PIPING

PP131 3RD FLOOR PLUMBING SUPPLY PIPING 117

PP133 3RD FLOOR INTERSTITIAL SPACE SUPPLY PIPING 118

PL501 PLUMBING DETAILS 119

PL601 PLUMBING SCHEDULES 120

PL602 PNEUMATIC TUBE SYSTEM SCHEMATIC DIAGRAM 121

REF-1 SWISSLOG - REFERENCE DRAWING 1 122

REF-2 SWISSLOG - REFERENCE DRAWING 2 123

ELECTRICAL

EP001 ELECTRICAL GENERAL NOTES 124

EP002 ELECTRICAL GRAPHICS, SYMBOLS AND

ABBREVIATIONS

ES101 ELECTRICAL SITE PLAN (PARTIAL) 126

EL131 3RD FLOOR LIGHTING PLAN AND SCHEDULE 127

EL131.2 3RD FLOOR LIGHTING PLAN DEDUCTIVE BID

ALTERNATE 4,5 &6

EL132 3RD FLOOR INTERSTITIAL LIGHTING PLAN 129

EL501 LIGHTING SCHEDULE AND DETAILS 130

EP101 BASEMENT POWER PLAN 131

EP111 1ST FLOOR POWER PLAN 132

EP131 3RD FLOOR POWER PLAN POST FURNITURE

CONSTRUCTION

EP131.1 3RD FLOOR POWER PLAN PRE FURNITURE

CONSTRUCTION

EP131.2 3RD FLOOR POWER PLAN DEDUCTIVE BID

ALTERNATE 4, 5 & 6

EP132 ENLARGED POWER PLANS POST FURNITURE

CONSTRUCTION

EP132.1 ENLARGED POWER PLANS PRE FURNITURE

CONSTRUCTION

EP133 ENLARGED POWER PLANS POST FURNITURE

CONSTRUCTION

EP133.1 ENLARGED POWER PLANS PRE FURNITURE

CONSTRUCTION

EP134 3RD FLOOR INTERSTITIAL POWER PLAN 140

EP141 ROOF POWER PLAN 141

EP142 LIGHTNING PROTECTION PLAN 142

EP501 PANEL SCHEDULES 143

EP502 PANEL SCHEDULES 144

EP601 ONE-LINE DIAGRAM 145

EP602 POWER DETAILS 146

EP603 POWER DETAILS 147

TELECOMMUNICATION

TN001 TELECOMMUNICATION ABBREVIATIONS,

SYMBOLS, & GENERAL NOTES

TN111 1ST FLOOR TELECOMMUNICATION PLAN 149

TN121 2ND FLOOR INTERSTITIAL TELECOMMUNICATION

PLAN

TN131 3RD FLOOR TELECOMMUNICATION PLAN 151

TN131.1 3RD FLOOR TELECOMMUNICATIONS BID

ALTERNATE #2

TN131.2 3RD FLOOR TELECOMMUNICATIONS BID

ALTERNATE #2, 4, 5, 6

TN132 3RD FLOOR CONNECTION TELECOMMUNICATION

PLAN

TN431 3RD FLOOR ENLARGED PLANS 155

TN432 TELECOM ELEVATIONS 156

TN501 TELECOMMUNICATION DETAILS 157

TN502 TELECOMMUNICATION DETAILS 158

TN503 TELECOMMUNICATION DETAILS 159

TN601 TELECOMMUNICATION SCHEDULES 160

TN602 TELECOMMUNICATION SCHEDULES 161

TN603 TELECOMMUNICATION RISER DIAGRAM 162

SHEET

NUMBER SHEET NAME #

AI404 INTERIOR ELEVATIONS 62

AI405 INTERIOR ELEVATIONS 63

AI406 INTERIOR ELEVATIONS 64

AI407 INTERIOR ELEVATIONS 65

AI431 ENLARGED EQUIPMENT PLANS 66

AI432 ENLARGED EQUIPMENT PLANS 67

AI433 ENLARGED EQUIPMENT PLANS 68

AI434 ENLARGED EQUIPMENT PLANS 69

AI435 ENLARGED FINISH PLANS 70

AI436 ENLARGED FINISH PLANS 71

AI437 ENLARGED FINISH PLANS 72

AI438 ENLARGED FINISH PLANS 73

AI601 DOOR SCHEDULE AND DETAILS 74

AI602 DOOR AND WALL PROTECTION DETAILS 75

AI611 ROOM FINISH LEGEND 76

AI612 ROOM FINISH SCHEDULES 77

AI613 SIGNAGE DETAILS & SCHEDULE 78

AI631 EQUIPMENT SCHEDULES 79

FIRE PROTECTION

FA001 PROJECT INFORMATION FIRE ALARM SYSTEM 80

FA131 3RD FLOOR PLAN FIRE ALARM SYSTEM 81

FA132 3RD FLOOR INTERSTITIAL FIRE ALARM SYSTEM 82

FA133 3RD FLOOR PLAN FIRE ALARM SYSTEM ALT# 4 83

FA134 3RD FLOOR PLAN FIRE ALARM SYSTEM ALT #4,

#5

FA135 3RD FLOOR PLAN FIRE ALARM SYSTEM ALT #4,

#5, #6

FX001 PROJECT INFORMATION FIRE SPRINKLER

SYSTEM

FX131 3RD FLOOR PLAN FIRE SPRINKLER SYSTEM 87

FX501 FIRE SPRINKLER SYSTEM DETAILS, FIRE

SPRINKLER SYSTEM

FX502 FIRE SPRINKLER SYSTEM DETAILS, FIRE

SPRINKLER SYSTEM, INTERIOR FIRE MAIN PIPING

FX601 3RD FLOOR PLAN FIRE SPRINKLER SYSTEM

DEDUCTIVE BID ALTERNATE #4

FX602 3RD FLOOR PLAN FIRE SPRINKLER SYSTEM

DEDUCTIVE BID ALTERNATE #4 AND #5

FX603 3RD FLOOR PLAN FIRE SPRINKLER SYSTEM

DEDUCTIVE BID ALTERNATE #4, #5 AND 6

MECHANICAL

MH001 MECHANICAL ABBREVIATIONS 93

MH002 MECHANICAL SYMBOLS 94

MH131 3RD FLOOR MECHANICAL DUCTING 95

MH133 3RD FLOOR INSTERSTITIAL MECHANICAL

DUCTING

MH141 ROOF MECHANICAL 97

MH431 3RD FLOOR MECHANICAL ROOM DUCTING DEMO

AND NEW WORK

MP133 3RD FLOOR INTERSTITIAL MECHANICAL PIPING 99

MH501 MECHANICAL DETAILS 100

MH502 MECHANICAL DETAILS 101

MH503 MECHANICAL DETAILS 102

MH504 MECHANICAL DETAILS 103

MH505 MECHANICAL DETAILS 104

MH506 MECHANICAL DETAILS 105

MH507 MECHANICAL DETAILS 106

MH601 MECHANICAL SCHEDULES 107

MH602 MECHANICAL SCHEDULES 108

MH701 TC CONTROL DIAGRAM 109

MH702 TC CONTROL DIAGRAM 110

PLUMBING

PL001 PLUMBING ABBREVIATIONS & SYMBOLS 111

PL123 2ND FLOOR INTERSTITIAL SPACE PLUMBING

SANITARY WASTE AND VENT

PL131 3RD FLOOR PLUMBING SANITARY WASTE AND

VENT

SHEET

NUMBER SHEET NAME #

GENERAL

GI000 COVER SHEET 1

GI001 SHEET INDEX, SYMBOLS AND LEGENDS 2

GX001 BUILDING CODE SUMMARY 3

GX002 DEDUCTIVE BID ALTERNATES PLAN 4

GX003 SITE PLAN - LAYDOWN AREA 5

GX131 3RD FLOOR LIFE SAFETY PLAN 6

AS101 ABATEMENT PLAN 7

AS201 ABATEMENT ELEVATION 8

STRUCTURAL

SE001 GENERAL STRUCTURAL NOTES 9

SE002 SPECIAL INSPECTIONS 10

SE003 ABBREVIATIONS AND SYMBOLS 11

SE101 FOUNDATION PLAN 12

SE131 LEVEL 3 FRAMING PLAN 13

SE132 TOPPING SLAB PLAN 14

SE133 INTERSTITIAL LEVEL FRAMING PLAN 15

SE141 ROOF LEVEL FRAMING PLAN 16

SE201 BUILDING FRAME ELEVATIONS 17

SE202 BRACE FRAME ELEVATIONS 18

SE203 BRACE FRAME ELEVATIONS 19

SE301 WALL SECTIONS AND DETAILS 20

SE501 FOOTING MODIFICATIONS 21

SE502 MASONRY DETAILS 22

SE503 ROOF AND DECK DETAILS 23

SE504 TYPICAL DETAILS 24

SE505 FRAMING SECTIONS AND DETAILS 25

SE601 COLUMN AND BASEPLATE SCHEDULE 26

SE701 OPERABLE PARTITION DETAILS 27

SE702 MISCELLANEOUS DETAILS 28

SE801 SNOW LOADING DIAGRAM 29

ARCHITECTURAL

AE001 ARCHITECTURAL GENERAL NOTES 30

AD101 ARCHITECTURAL DEMOLITION 31

AD201 DEMOLITION ELEVATION 32

AE131 3RD FLOOR PLAN 33

AE132 3RD FLOOR REFLECTED CEILING PLAN 34

AE133 3RD FLOOR INTERSTITIAL PLAN 35

AE141 ROOF PLAN 36

AE201 EXTERIOR ELEVATION - NORTH 37

AE202 EXTERIOR ELEVATION - EAST 38

AE203 EXTERIOR ELEVATION - SOUTH 39

AE301 BUILDING SECTION 40

AE302 BUILDING SECTION 41

AE303 BUILDING SECTION 42

AE311 WALL SECTIONS 43

AE401 STAIR SECTION AND ENLARGED STAIR PLAN 44

AE402 ENLARGED PLANS 45

AE501 ROOF DETAILS 46

AE511 DETAILS - EXTERIOR 47

AE521 INTERIOR WALL DETAILS 48

AE531 CEILING DETAILS 49

AE601 WINDOW TYPES 50

AE602 WINDOW DETAILS 51

INTERIORS

AI001 INTERIOR GENERAL NOTES 52

AI131.1 3RD FLOOR FINISH PLAN 53

AI131.2 3RD FLOOR FURNITURE PLAN 54

AI131.3 3RD FLOOR EQUIPMENT PLAN 55

AI131.4 3RD FLOOR SIGNAGE PLAN 56

AI301 CASEWORK/MILLWORK SECTIONS 57

AI302 CASEWORK/MILLWORK SECTIONS 58

AI401 INTERIOR ELEVATIONS 59

AI402 INTERIOR ELEVATIONS 60

AI403 INTERIOR ELEVATIONS 61

REVISIONS DATE

GENERAL NOTES

1. CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE LOCAL, STATE AND

FEDERAL LAWS AND REGULATIONS.

2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING OR VERIFYNG THAT

ALL PERMITS AND APPROVALS ARE OBTAINED FROM THE RESPECTIVE CITY

COUNTY AND STATE AGENCIES PRIOR TO STARTING CONSTRUCTION.

3. ANY DISCREPANCIES OR CONFLICTS WHICH BECOME APPARENT BEFORE OR

DURING CONSTRUCTION SHALL BE BROUGHT TO THE ATTENTION OF THE

ENGINEER OF RECORD AND COR PRIOR TO CONSTRUCTION SO THAT REDESIGN

OR CLARIFICATION MAY OCCUR.

4. THE ACTIVE EMERGENCY ROOM ENTRY MAY NOT BE BLOCKED FOR ANY

REASON, ER OPERATES 24/7.

T

T

T

T

T

T

T

T

T

T T

T T

T

T

T

W

W

W

W W

W

W

W

W

W

W

W W

W W

W W

W W

W W W W

W

W

W

W

SD

SD

SD

SD

SD

SD

S

D

S

D

S

D

S D

S D

S D

S D

S D

S D

S D

S D

S D

S D

S

D

S

D

S

D

S

D

S

D

S

D

S

D

S

D

S

D

S

D

S

D

S

D

S

D

S

D

S

D

S

D

S

D

SS

SS

SS

SS

SS

SS

SS

SS

SSSS

SS

S

S

S

S

S

S

S

D

S

D

SD

SD

S D

BOLD BOUNDARY INDICATES

NEW LAB AREA (3RD FLOOR)

DIESEL

GENERATOR

REFER TO BID

DEDUCTIVE

ALTERNATE #1

ACTIVE

EMERGENCY

ROOM

ENTRANCE

CANOPY

LAYDOWN AREA

ANTICIPATED

CONSTRUCTION

ENTRANCE

FENCE

PARKING GARAGE

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

F i l e

P a t h

FULLY

SPRINKLERED

Office of

Construction and Facilities

Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:

ARCHITECT/ENGINEER OF RECORD

SEAL

CONSULTANT

321 4 5 6 7 8 9 10

NEW CLINICAL LAB FOR

SURGICAL EXPANSION

RICHMOND, VIRGINIA

652-319

PROJECT DIRECTOR

AUGUST 2018

REVISIONS: DATE:

Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

BID DOCUMENTS

DWG. OF 162

NAME: TINA DEBELLA, PE

PHONE: 804.675.5495

EMAIL: Tina.DeBella@va.gov

SITE PLAN - LAYDOWN AREA

GX003

SCALE:

GX003

PARTIAL SITE PLAN - LAYDOWN AREA

1/16" = 1'-0"

KEYPLAN PLAN

NORTH

N

TN

16'0 8' 32'

SCALE:1/16"=1'-0"

AutoCAD SHX Text

AutoCAD SHX Text

1. ALL ASBESTOS ABATEMENT WORK SHALL BE PERFORMED IN ACCORDANCE WITH ALL

GOVERNMENT REGULATIONS. THE CONTRACTOR SHALL USE MANUAL WET METHODS TO

CONTROL THE RELEASE OF DUST WHEN PERFORMING THE REMOVAL OF ALL ASBESTOS

AND NON-ASBESTOS MATERIALS FROM THE WORK AREA.

2. ALL INTERIOR ASBESTOS REMOVAL WORK SHALL BE CONDUCTED WITHIN A NEGATIVE

PRESSURE ENCLOSURE. A NEGATIVE AIR PRESSURE OF AT LEAST -0.02 INCHES OF

WATER COLUMN, AS MEASURED AT ANY WORK AREA PERIMETER LOCATION, SHALL BE

PROVIDED AT ALL TIMES DURING ASBESTOS REMOVAL. NEGATIVE AIR PRESSURE SHALL

BE CREATED IN THE WORK AREA USING HEPA FILTERED EXHAUST AND EXHAUSTED TO

THE OUTDOORS. THESE HEPA FILTERED EXHAUST UNITS WILL BE USED TO GENERATE AT

LEAST FOUR AIR CHANGES PER HOUR INSIDE THE WORK AREA. NEGATIVE AIR PRESSURE

IN THE WORK AREA SHALL BE CONTINUOUSLY MONITORED THROUGH THE USE OF

DIGITAL MANOMETERS POSTED OUTSIDE THE WORK AREA.

3. THE CONTRACTOR SHALL REMOVE HAZARDOUS MATERIALS THAT EXIST WITHIN WORK

AREAS PRIOR TO THE START OF WORK WITHIN EACH WORK AREA. REFER TO

SPECIFICATIONS FOR REMOVAL PROCEDURES.

4. WORK AREAS WERE PREVIOUSLY SURVEYED TO IDENTIFY HAZARDOUS MATERIALS.

REFER TO FROEHLING & ROBERTSON, INC, LIMITED ASBESTOS SAMPLING REPORT DATED

DECEMBER 21, 2015 FOR ADDITIONAL INFORMATION. NOT ALL AREAS MAY HAVE BEEN

ACCESSIBLE OR INCLUDED IN THE SURVEY. HAZARDOUS MATERIALS MAY EXIST WHICH

HAVE NOT BEEN IDENTIFIED. IF SUSPECT MATERIALS ARE DISCOVERED WHICH HAVE NOT

BEEN PREVIOUSLY IDENTIFIED, THE CONTRACTOR SHALL NOT DISTURB THOSE

MATERIALS AND SHALL IMMEDIATELY NOTIFY THE COTR.

5. INTERSTITIAL DUCT MASTIC IS KNOWN TO CONTAIN ASBESTOS AND SHOULD BE

PROTECTED OR ABATED PRIOR TO DISTURBANCE.

6. IT IS ASSUMED THAT LEAD PAINT IS WITHIN THE PROJECT AREA. CONDUCT DEMOLITION

WITH THE ASSUMPTION THAT PAINTED SURFACES MAY CONTAIN LEAD.

THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF THE FOLLOWING

ASBESTOS CONTAINING MATERIALS PRIOR TO BEING DISTURBED BY PROJECT WORK;

ACM 12”x12” FLOOR TILE AND ASSOCIATED MASTIC (MULTIPLE COLORS)

ACM CHEMICAL DRY RACK

ACM WINDOW SILLS

ACM VENT HOOD PANELS

PROPOSED LOCATION OF CONTRACTOR’S SERVICE SCAFFOLDING.

EXISTING STARIWELL SHALL REMAIN SERVICABLE AND IN USE FOR OCCUPANTS ON

FIRST AND SECOND FLOORS.

1. ALL ASBESTOS ABATEMENT WORK SHALL BE PERFORMED IN ACCORDANCE WITH ALL

GOVERNMENT REGULATIONS. THE CONTRACTOR SHALL USE MANUAL WET METHODS TO

CONTROL THE RELEASE OF DUST WHEN PERFORMING THE REMOVAL OF ALL ASBESTOS

AND NON-ASBESTOS MATERIALS FROM THE WORK AREA.

2. ALL INTERIOR ASBESTOS REMOVAL WORK SHALL BE CONDUCTED WITHIN A NEGATIVE

PRESSURE ENCLOSURE. A NEGATIVE AIR PRESSURE OF AT LEAST -0.02 INCHES OF

WATER COLUMN, AS MEASURED AT ANY WORK AREA PERIMETER LOCATION, SHALL BE

PROVIDED AT ALL TIMES DURING ASBESTOS REMOVAL. NEGATIVE AIR PRESSURE SHALL

BE CREATED IN THE WORK AREA USING HEPA FILTERED EXHAUST AND EXHAUSTED TO

THE OUTDOORS. THESE HEPA FILTERED EXHAUST UNITS WILL BE USED TO GENERATE AT

LEAST FOUR AIR CHANGES PER HOUR INSIDE THE WORK AREA. NEGATIVE AIR PRESSURE

IN THE WORK AREA SHALL BE CONTINUOUSLY MONITORED THROUGH THE USE OF

DIGITAL MANOMETERS POSTED OUTSIDE THE WORK AREA.

3. THE CONTRACTOR SHALL REMOVE HAZARDOUS MATERIALS THAT EXIST WITHIN WORK

AREAS PRIOR TO THE START OF WORK WITHIN EACH WORK AREA. REFER TO

SPECIFICATIONS FOR REMOVAL PROCEDURES.

4. WORK AREAS WERE PREVIOUSLY SURVEYED TO IDENTIFY HAZARDOUS MATERIALS.

REFER TO FROEHLING & ROBERTSON, INC, LIMITED ASBESTOS SAMPLING REPORT DATED

DECEMBER 21, 2015 FOR ADDITIONAL INFORMATION. NOT ALL AREAS MAY HAVE BEEN

ACCESSIBLE OR INCLUDED IN THE SURVEY. HAZARDOUS MATERIALS MAY EXIST WHICH

HAVE NOT BEEN IDENTIFIED. IF SUSPECT MATERIALS ARE DISCOVERED WHICH HAVE NOT

BEEN PREVIOUSLY IDENTIFIED, THE CONTRACTOR SHALL NOT DISTURB THOSE

MATERIALS AND SHALL IMMEDIATELY NOTIFY THE COTR.

5. INTERSTITIAL DUCT MASTIC IS KNOWN TO CONTAIN ASBESTOS AND SHOULD BE

PROTECTED OR ABATED PRIOR TO DISTURBANCE.

6. IT IS ASSUMED THAT LEAD PAINT IS WITHIN THE PROJECT AREA. CONDUCT DEMOLITION

WITH THE ASSUMPTION THAT PAINTED SURFACES MAY CONTAIN LEAD.

GI000 - COVER SHEET
GI001 - SHEET INDEX, SYMBOLS AND LEGENDS
GX001 - BUILDING CODE SUMMARY
GX002- BID ALTERNATES PLAN
GX003- SITE PLAN -LAYDOWN AREA
GX131 - 3RD FLOOR LIFE SAFETY PLAN
AS101 - ABATEMENT PLAN
AS201 -ABATEMENT ELEVATION

File details come from the government source that posted it. Updated .