36C24619B0039-003.pdf
PDF 3 MB Posted
- Attached to
- Construct New Clinical Lab Expansion (VA-18-00152139) Federal contract opportunity
- Solicitation number
- 36C24619B0039
About this file
This document package includes construction drawings and specifications for a federal contract opportunity. The Department of Veterans Affairs is seeking a Service Disabled Veteran Owned Small Business to provide all labor, materials, equipment and supervision required to construct a new 18,050 square foot clinical lab expansion at the H.H. McGuire VA Medical Center in Richmond, Virginia. The project number is 652-319 and is to be completed within 680 calendar days of the Notice to Proceed. The estimated cost is between $5-10 million. The NAICS code is 236220 with a small business size standard of $36.5 million. Questions must be emailed to the Contracting Officer by the response due date listed in the solicitation. This is a 100% set-aside for SDVOSBs. The drawings and specifications were prepared by AES Group, Inc. and will be uploaded as part of the solicitation on August 15, 2019.
36C24619B0039 S02 GENERAL_Bid_Documents.pdf
View the file
Other files for this federal contract opportunity
Show all 39
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cofer Rd
N Hopkins Rd
Belt Blvd
Holly Spring Ave.
Jefferson D avis H w y
Hull S t..
Hull S t..
N H op ki ns R d
Bro ad
R oc k Blvd
Hunter Holmes Mcguire VA
Medical Center
Bro ad
R oc k Blvd
PROJECT SITE
N
PROJECT NUMBER
BUILDING
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF SEALCONSULTAN
321 4 5 6 7 8 9 10
DWG. 1 OF 162
NAME:
FULLY SPRINKLERED
PROJECT DIRECTOR
FULL SIZE DWG: 30x42
PHONE:
EMAIL:
TINA DEBELLA, PE
804.675.5494
Tina.Debella@va.gov
NEW CLINICAL LAB FOR
SURGICAL EXPANSION
RICHMOND, VIRGINIA
652-319
8/
/2
9:
:4
A
M
GI000
COVER SHEET
AUGUST 2018 DHH LMF
BID DOCUMENTS
NEW CLINICAL LAB FOR SURGICAL
EXPANSION PROJECT
HUNTER HOLMES MCGUIRE VA MEDICAL CENTER
RICHMOND, VIRGINIA
DEPARTMENT OF VETERANS AFFAIRS
CONTRACT NO. VA246-13-D-0101
PROJECT NO. 652-319
VICINITY MAP
HUNTER HOLMES
MCGUIRE VA MEDICAL
CENTER
NEW LAB EXPANSION
LAYDOWN AREA
REVISIONS DATE
SCALE: ?
SCALE: ?
SYMBOLS
SECTION
ELEVATION
EXTERIOR
INTERIOR
DRAWING
DETAIL OR ENLARGED
PLAN
GRID
ROOM
KEYNOTE
NORTH
WINDOW TAG
DOOR
REVISION
SECTION NUMBER
SHEET NUMBER
ELEVATION NUMBER
SHEET NUMBER
ELEVATION NUMBER
SHEET NUMBER
DRAWING TITLE
DRAWING SCALE
DRAWING TITLE
DRAWING SCALE
SHEET NUMBER
DETAIL NUMBER
SHEET NUMBER
ROOM NUMBER
GRAPHIC SCALE
EQUIPMENT
VIEW
VIEW
8'0 4' 16'
SCALE:1/8"=1'-0"
TN
N
MATERIALS
UNDISTURBED EARTH
SAND
GRAVEL
CONCRETE
STEEL
MASONRY
WOOD
PLYWOOD
RIGID INSULATION
BATT INSULATION
DISTURBED EARTH
PROJECT NUMBER
BUILDING
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF SEALCONSULTAN
321 4 5 6 7 8 9 10
DWG. 2 OF 162
NAME:
FULLY SPRINKLERED
PROJECT DIRECTOR
FULL SIZE DWG: 30x42
PHONE:
EMAIL:
TINA DEBELLA, PE
804.675.5494
Tina.Debella@va.gov
NEW CLINICAL LAB FOR
SURGICAL EXPANSION
RICHMOND, VIRGINIA
652-319
8/
/2
9:
:2
A
M
GI001
SHEET INDEX, SYMBOLS AND
LEGENDS
AUGUST 2018 DHH LMF
BID DOCUMENTS
SHEET
NUMBER SHEET NAME #
PL133 3RD FLOOR INTERSTITIAL SPACE PLUMBING
SANITARY WASTE AND VENT
PL141 ROOF PLUMBING 115
PP123 2ND FLOOR INTERSTITIAL SPACE PLUMBING
SUPPLY PIPING
PP131 3RD FLOOR PLUMBING SUPPLY PIPING 117
PP133 3RD FLOOR INTERSTITIAL SPACE SUPPLY PIPING 118
PL501 PLUMBING DETAILS 119
PL601 PLUMBING SCHEDULES 120
PL602 PNEUMATIC TUBE SYSTEM SCHEMATIC DIAGRAM 121
REF-1 SWISSLOG - REFERENCE DRAWING 1 122
REF-2 SWISSLOG - REFERENCE DRAWING 2 123
ELECTRICAL
EP001 ELECTRICAL GENERAL NOTES 124
EP002 ELECTRICAL GRAPHICS, SYMBOLS AND
ABBREVIATIONS
ES101 ELECTRICAL SITE PLAN (PARTIAL) 126
EL131 3RD FLOOR LIGHTING PLAN AND SCHEDULE 127
EL131.2 3RD FLOOR LIGHTING PLAN DEDUCTIVE BID
ALTERNATE 4,5 &6
EL132 3RD FLOOR INTERSTITIAL LIGHTING PLAN 129
EL501 LIGHTING SCHEDULE AND DETAILS 130
EP101 BASEMENT POWER PLAN 131
EP111 1ST FLOOR POWER PLAN 132
EP131 3RD FLOOR POWER PLAN POST FURNITURE
CONSTRUCTION
EP131.1 3RD FLOOR POWER PLAN PRE FURNITURE
CONSTRUCTION
EP131.2 3RD FLOOR POWER PLAN DEDUCTIVE BID
ALTERNATE 4, 5 & 6
EP132 ENLARGED POWER PLANS POST FURNITURE
CONSTRUCTION
EP132.1 ENLARGED POWER PLANS PRE FURNITURE
CONSTRUCTION
EP133 ENLARGED POWER PLANS POST FURNITURE
CONSTRUCTION
EP133.1 ENLARGED POWER PLANS PRE FURNITURE
CONSTRUCTION
EP134 3RD FLOOR INTERSTITIAL POWER PLAN 140
EP141 ROOF POWER PLAN 141
EP142 LIGHTNING PROTECTION PLAN 142
EP501 PANEL SCHEDULES 143
EP502 PANEL SCHEDULES 144
EP601 ONE-LINE DIAGRAM 145
EP602 POWER DETAILS 146
EP603 POWER DETAILS 147
TELECOMMUNICATION
TN001 TELECOMMUNICATION ABBREVIATIONS,
SYMBOLS, & GENERAL NOTES
TN111 1ST FLOOR TELECOMMUNICATION PLAN 149
TN121 2ND FLOOR INTERSTITIAL TELECOMMUNICATION
PLAN
TN131 3RD FLOOR TELECOMMUNICATION PLAN 151
TN131.1 3RD FLOOR TELECOMMUNICATIONS BID
ALTERNATE #2
TN131.2 3RD FLOOR TELECOMMUNICATIONS BID
ALTERNATE #2, 4, 5, 6
TN132 3RD FLOOR CONNECTION TELECOMMUNICATION
PLAN
TN431 3RD FLOOR ENLARGED PLANS 155
TN432 TELECOM ELEVATIONS 156
TN501 TELECOMMUNICATION DETAILS 157
TN502 TELECOMMUNICATION DETAILS 158
TN503 TELECOMMUNICATION DETAILS 159
TN601 TELECOMMUNICATION SCHEDULES 160
TN602 TELECOMMUNICATION SCHEDULES 161
TN603 TELECOMMUNICATION RISER DIAGRAM 162
SHEET
NUMBER SHEET NAME #
AI404 INTERIOR ELEVATIONS 62
AI405 INTERIOR ELEVATIONS 63
AI406 INTERIOR ELEVATIONS 64
AI407 INTERIOR ELEVATIONS 65
AI431 ENLARGED EQUIPMENT PLANS 66
AI432 ENLARGED EQUIPMENT PLANS 67
AI433 ENLARGED EQUIPMENT PLANS 68
AI434 ENLARGED EQUIPMENT PLANS 69
AI435 ENLARGED FINISH PLANS 70
AI436 ENLARGED FINISH PLANS 71
AI437 ENLARGED FINISH PLANS 72
AI438 ENLARGED FINISH PLANS 73
AI601 DOOR SCHEDULE AND DETAILS 74
AI602 DOOR AND WALL PROTECTION DETAILS 75
AI611 ROOM FINISH LEGEND 76
AI612 ROOM FINISH SCHEDULES 77
AI613 SIGNAGE DETAILS & SCHEDULE 78
AI631 EQUIPMENT SCHEDULES 79
FIRE PROTECTION
FA001 PROJECT INFORMATION FIRE ALARM SYSTEM 80
FA131 3RD FLOOR PLAN FIRE ALARM SYSTEM 81
FA132 3RD FLOOR INTERSTITIAL FIRE ALARM SYSTEM 82
FA133 3RD FLOOR PLAN FIRE ALARM SYSTEM ALT# 4 83
FA134 3RD FLOOR PLAN FIRE ALARM SYSTEM ALT #4,
#5
FA135 3RD FLOOR PLAN FIRE ALARM SYSTEM ALT #4,
#5, #6
FX001 PROJECT INFORMATION FIRE SPRINKLER
SYSTEM
FX131 3RD FLOOR PLAN FIRE SPRINKLER SYSTEM 87
FX501 FIRE SPRINKLER SYSTEM DETAILS, FIRE
SPRINKLER SYSTEM
FX502 FIRE SPRINKLER SYSTEM DETAILS, FIRE
SPRINKLER SYSTEM, INTERIOR FIRE MAIN PIPING
FX601 3RD FLOOR PLAN FIRE SPRINKLER SYSTEM
DEDUCTIVE BID ALTERNATE #4
FX602 3RD FLOOR PLAN FIRE SPRINKLER SYSTEM
DEDUCTIVE BID ALTERNATE #4 AND #5
FX603 3RD FLOOR PLAN FIRE SPRINKLER SYSTEM
DEDUCTIVE BID ALTERNATE #4, #5 AND 6
MECHANICAL
MH001 MECHANICAL ABBREVIATIONS 93
MH002 MECHANICAL SYMBOLS 94
MH131 3RD FLOOR MECHANICAL DUCTING 95
MH133 3RD FLOOR INSTERSTITIAL MECHANICAL
DUCTING
MH141 ROOF MECHANICAL 97
MH431 3RD FLOOR MECHANICAL ROOM DUCTING DEMO
AND NEW WORK
MP133 3RD FLOOR INTERSTITIAL MECHANICAL PIPING 99
MH501 MECHANICAL DETAILS 100
MH502 MECHANICAL DETAILS 101
MH503 MECHANICAL DETAILS 102
MH504 MECHANICAL DETAILS 103
MH505 MECHANICAL DETAILS 104
MH506 MECHANICAL DETAILS 105
MH507 MECHANICAL DETAILS 106
MH601 MECHANICAL SCHEDULES 107
MH602 MECHANICAL SCHEDULES 108
MH701 TC CONTROL DIAGRAM 109
MH702 TC CONTROL DIAGRAM 110
PLUMBING
PL001 PLUMBING ABBREVIATIONS & SYMBOLS 111
PL123 2ND FLOOR INTERSTITIAL SPACE PLUMBING
SANITARY WASTE AND VENT
PL131 3RD FLOOR PLUMBING SANITARY WASTE AND
VENT
SHEET
NUMBER SHEET NAME #
GENERAL
GI000 COVER SHEET 1
GI001 SHEET INDEX, SYMBOLS AND LEGENDS 2
GX001 BUILDING CODE SUMMARY 3
GX002 DEDUCTIVE BID ALTERNATES PLAN 4
GX003 SITE PLAN - LAYDOWN AREA 5
GX131 3RD FLOOR LIFE SAFETY PLAN 6
AS101 ABATEMENT PLAN 7
AS201 ABATEMENT ELEVATION 8
STRUCTURAL
SE001 GENERAL STRUCTURAL NOTES 9
SE002 SPECIAL INSPECTIONS 10
SE003 ABBREVIATIONS AND SYMBOLS 11
SE101 FOUNDATION PLAN 12
SE131 LEVEL 3 FRAMING PLAN 13
SE132 TOPPING SLAB PLAN 14
SE133 INTERSTITIAL LEVEL FRAMING PLAN 15
SE141 ROOF LEVEL FRAMING PLAN 16
SE201 BUILDING FRAME ELEVATIONS 17
SE202 BRACE FRAME ELEVATIONS 18
SE203 BRACE FRAME ELEVATIONS 19
SE301 WALL SECTIONS AND DETAILS 20
SE501 FOOTING MODIFICATIONS 21
SE502 MASONRY DETAILS 22
SE503 ROOF AND DECK DETAILS 23
SE504 TYPICAL DETAILS 24
SE505 FRAMING SECTIONS AND DETAILS 25
SE601 COLUMN AND BASEPLATE SCHEDULE 26
SE701 OPERABLE PARTITION DETAILS 27
SE702 MISCELLANEOUS DETAILS 28
SE801 SNOW LOADING DIAGRAM 29
ARCHITECTURAL
AE001 ARCHITECTURAL GENERAL NOTES 30
AD101 ARCHITECTURAL DEMOLITION 31
AD201 DEMOLITION ELEVATION 32
AE131 3RD FLOOR PLAN 33
AE132 3RD FLOOR REFLECTED CEILING PLAN 34
AE133 3RD FLOOR INTERSTITIAL PLAN 35
AE141 ROOF PLAN 36
AE201 EXTERIOR ELEVATION - NORTH 37
AE202 EXTERIOR ELEVATION - EAST 38
AE203 EXTERIOR ELEVATION - SOUTH 39
AE301 BUILDING SECTION 40
AE302 BUILDING SECTION 41
AE303 BUILDING SECTION 42
AE311 WALL SECTIONS 43
AE401 STAIR SECTION AND ENLARGED STAIR PLAN 44
AE402 ENLARGED PLANS 45
AE501 ROOF DETAILS 46
AE511 DETAILS - EXTERIOR 47
AE521 INTERIOR WALL DETAILS 48
AE531 CEILING DETAILS 49
AE601 WINDOW TYPES 50
AE602 WINDOW DETAILS 51
INTERIORS
AI001 INTERIOR GENERAL NOTES 52
AI131.1 3RD FLOOR FINISH PLAN 53
AI131.2 3RD FLOOR FURNITURE PLAN 54
AI131.3 3RD FLOOR EQUIPMENT PLAN 55
AI131.4 3RD FLOOR SIGNAGE PLAN 56
AI301 CASEWORK/MILLWORK SECTIONS 57
AI302 CASEWORK/MILLWORK SECTIONS 58
AI401 INTERIOR ELEVATIONS 59
AI402 INTERIOR ELEVATIONS 60
AI403 INTERIOR ELEVATIONS 61
REVISIONS DATE
GENERAL NOTES
1. CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE LOCAL, STATE AND
FEDERAL LAWS AND REGULATIONS.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING OR VERIFYNG THAT
ALL PERMITS AND APPROVALS ARE OBTAINED FROM THE RESPECTIVE CITY
COUNTY AND STATE AGENCIES PRIOR TO STARTING CONSTRUCTION.
3. ANY DISCREPANCIES OR CONFLICTS WHICH BECOME APPARENT BEFORE OR
DURING CONSTRUCTION SHALL BE BROUGHT TO THE ATTENTION OF THE
ENGINEER OF RECORD AND COR PRIOR TO CONSTRUCTION SO THAT REDESIGN
OR CLARIFICATION MAY OCCUR.
4. THE ACTIVE EMERGENCY ROOM ENTRY MAY NOT BE BLOCKED FOR ANY
REASON, ER OPERATES 24/7.
T
T
T
T
T
T
T
T
T
T T
T T
T
T
T
W
W
W
W W
W
W
W
W
W
W
W W
W W
W W
W W
W W W W
W
W
W
W
SD
SD
SD
SD
SD
SD
S
D
S
D
S
D
S D
S D
S D
S D
S D
S D
S D
S D
S D
S D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
SS
SS
SS
SS
SS
SS
SS
SS
SSSS
SS
S
S
S
S
S
S
S
D
S
D
SD
SD
S D
BOLD BOUNDARY INDICATES
NEW LAB AREA (3RD FLOOR)
DIESEL
GENERATOR
REFER TO BID
DEDUCTIVE
ALTERNATE #1
ACTIVE
EMERGENCY
ROOM
ENTRANCE
CANOPY
LAYDOWN AREA
ANTICIPATED
CONSTRUCTION
ENTRANCE
FENCE
PARKING GARAGE
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
VA FORM 08 - 6231
A
F i l e
P a t h
FULLY
SPRINKLERED
Office of
Construction and Facilities
Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE:
ARCHITECT/ENGINEER OF RECORD
SEAL
CONSULTANT
321 4 5 6 7 8 9 10
NEW CLINICAL LAB FOR
SURGICAL EXPANSION
RICHMOND, VIRGINIA
652-319
PROJECT DIRECTOR
AUGUST 2018
REVISIONS: DATE:
Group, Inc.
11031 SOUTH PIKES PEAK DRIVE #202
PARKER, COLORADO 80138
PH: 303.841.3922
WWW.AES-GRP.COM
BID DOCUMENTS
DWG. OF 162
NAME: TINA DEBELLA, PE
PHONE: 804.675.5495
EMAIL: Tina.DeBella@va.gov
SITE PLAN - LAYDOWN AREA
GX003
SCALE:
GX003
PARTIAL SITE PLAN - LAYDOWN AREA
1/16" = 1'-0"
KEYPLAN PLAN
NORTH
N
TN
16'0 8' 32'
SCALE:1/16"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
1. ALL ASBESTOS ABATEMENT WORK SHALL BE PERFORMED IN ACCORDANCE WITH ALL
GOVERNMENT REGULATIONS. THE CONTRACTOR SHALL USE MANUAL WET METHODS TO
CONTROL THE RELEASE OF DUST WHEN PERFORMING THE REMOVAL OF ALL ASBESTOS
AND NON-ASBESTOS MATERIALS FROM THE WORK AREA.
2. ALL INTERIOR ASBESTOS REMOVAL WORK SHALL BE CONDUCTED WITHIN A NEGATIVE
PRESSURE ENCLOSURE. A NEGATIVE AIR PRESSURE OF AT LEAST -0.02 INCHES OF
WATER COLUMN, AS MEASURED AT ANY WORK AREA PERIMETER LOCATION, SHALL BE
PROVIDED AT ALL TIMES DURING ASBESTOS REMOVAL. NEGATIVE AIR PRESSURE SHALL
BE CREATED IN THE WORK AREA USING HEPA FILTERED EXHAUST AND EXHAUSTED TO
THE OUTDOORS. THESE HEPA FILTERED EXHAUST UNITS WILL BE USED TO GENERATE AT
LEAST FOUR AIR CHANGES PER HOUR INSIDE THE WORK AREA. NEGATIVE AIR PRESSURE
IN THE WORK AREA SHALL BE CONTINUOUSLY MONITORED THROUGH THE USE OF
DIGITAL MANOMETERS POSTED OUTSIDE THE WORK AREA.
3. THE CONTRACTOR SHALL REMOVE HAZARDOUS MATERIALS THAT EXIST WITHIN WORK
AREAS PRIOR TO THE START OF WORK WITHIN EACH WORK AREA. REFER TO
SPECIFICATIONS FOR REMOVAL PROCEDURES.
4. WORK AREAS WERE PREVIOUSLY SURVEYED TO IDENTIFY HAZARDOUS MATERIALS.
REFER TO FROEHLING & ROBERTSON, INC, LIMITED ASBESTOS SAMPLING REPORT DATED
DECEMBER 21, 2015 FOR ADDITIONAL INFORMATION. NOT ALL AREAS MAY HAVE BEEN
ACCESSIBLE OR INCLUDED IN THE SURVEY. HAZARDOUS MATERIALS MAY EXIST WHICH
HAVE NOT BEEN IDENTIFIED. IF SUSPECT MATERIALS ARE DISCOVERED WHICH HAVE NOT
BEEN PREVIOUSLY IDENTIFIED, THE CONTRACTOR SHALL NOT DISTURB THOSE
MATERIALS AND SHALL IMMEDIATELY NOTIFY THE COTR.
5. INTERSTITIAL DUCT MASTIC IS KNOWN TO CONTAIN ASBESTOS AND SHOULD BE
PROTECTED OR ABATED PRIOR TO DISTURBANCE.
6. IT IS ASSUMED THAT LEAD PAINT IS WITHIN THE PROJECT AREA. CONDUCT DEMOLITION
WITH THE ASSUMPTION THAT PAINTED SURFACES MAY CONTAIN LEAD.
THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF THE FOLLOWING
ASBESTOS CONTAINING MATERIALS PRIOR TO BEING DISTURBED BY PROJECT WORK;
ACM 12”x12” FLOOR TILE AND ASSOCIATED MASTIC (MULTIPLE COLORS)
ACM CHEMICAL DRY RACK
ACM WINDOW SILLS
ACM VENT HOOD PANELS
PROPOSED LOCATION OF CONTRACTOR’S SERVICE SCAFFOLDING.
EXISTING STARIWELL SHALL REMAIN SERVICABLE AND IN USE FOR OCCUPANTS ON
FIRST AND SECOND FLOORS.
1. ALL ASBESTOS ABATEMENT WORK SHALL BE PERFORMED IN ACCORDANCE WITH ALL
GOVERNMENT REGULATIONS. THE CONTRACTOR SHALL USE MANUAL WET METHODS TO
CONTROL THE RELEASE OF DUST WHEN PERFORMING THE REMOVAL OF ALL ASBESTOS
AND NON-ASBESTOS MATERIALS FROM THE WORK AREA.
2. ALL INTERIOR ASBESTOS REMOVAL WORK SHALL BE CONDUCTED WITHIN A NEGATIVE
PRESSURE ENCLOSURE. A NEGATIVE AIR PRESSURE OF AT LEAST -0.02 INCHES OF
WATER COLUMN, AS MEASURED AT ANY WORK AREA PERIMETER LOCATION, SHALL BE
PROVIDED AT ALL TIMES DURING ASBESTOS REMOVAL. NEGATIVE AIR PRESSURE SHALL
BE CREATED IN THE WORK AREA USING HEPA FILTERED EXHAUST AND EXHAUSTED TO
THE OUTDOORS. THESE HEPA FILTERED EXHAUST UNITS WILL BE USED TO GENERATE AT
LEAST FOUR AIR CHANGES PER HOUR INSIDE THE WORK AREA. NEGATIVE AIR PRESSURE
IN THE WORK AREA SHALL BE CONTINUOUSLY MONITORED THROUGH THE USE OF
DIGITAL MANOMETERS POSTED OUTSIDE THE WORK AREA.
3. THE CONTRACTOR SHALL REMOVE HAZARDOUS MATERIALS THAT EXIST WITHIN WORK
AREAS PRIOR TO THE START OF WORK WITHIN EACH WORK AREA. REFER TO
SPECIFICATIONS FOR REMOVAL PROCEDURES.
4. WORK AREAS WERE PREVIOUSLY SURVEYED TO IDENTIFY HAZARDOUS MATERIALS.
REFER TO FROEHLING & ROBERTSON, INC, LIMITED ASBESTOS SAMPLING REPORT DATED
DECEMBER 21, 2015 FOR ADDITIONAL INFORMATION. NOT ALL AREAS MAY HAVE BEEN
ACCESSIBLE OR INCLUDED IN THE SURVEY. HAZARDOUS MATERIALS MAY EXIST WHICH
HAVE NOT BEEN IDENTIFIED. IF SUSPECT MATERIALS ARE DISCOVERED WHICH HAVE NOT
BEEN PREVIOUSLY IDENTIFIED, THE CONTRACTOR SHALL NOT DISTURB THOSE
MATERIALS AND SHALL IMMEDIATELY NOTIFY THE COTR.
5. INTERSTITIAL DUCT MASTIC IS KNOWN TO CONTAIN ASBESTOS AND SHOULD BE
PROTECTED OR ABATED PRIOR TO DISTURBANCE.
6. IT IS ASSUMED THAT LEAD PAINT IS WITHIN THE PROJECT AREA. CONDUCT DEMOLITION
WITH THE ASSUMPTION THAT PAINTED SURFACES MAY CONTAIN LEAD.
| GI000 - COVER SHEET |
| GI001 - SHEET INDEX, SYMBOLS AND LEGENDS |
| GX001 - BUILDING CODE SUMMARY |
| GX002- BID ALTERNATES PLAN |
| GX003- SITE PLAN -LAYDOWN AREA |
| GX131 - 3RD FLOOR LIFE SAFETY PLAN |
| AS101 - ABATEMENT PLAN |
| AS201 -ABATEMENT ELEVATION |