Instructions Instructions:
| General | Proposers should fill in the yellow shaded cells on tabs 1a, 1b, 2a, 2b and 3b. |
| Tabs 3a and 3b (summary tabs) will automatically populate with entries from the prior tabs. |
| Selected proposers will be asked to provide a detailed break-out of costs at some point in the procurement process, but not with their initial price proposal. |
| Tab 1a | Proposers should enter the total implementation costs for the CBOS Implementation Tasks listed in Items 1 through 7. These tasks are tied directly to the tasks listed in the CBOS SOW. The implementation costs should be all-inclusive, fixed price by task. |
| In the Other Up-Front Costs rows, proposers can propose other costs which will be incurred prior to Go-Live which they would like called out separately. If the proposal is moved forward, these tasks will need to be negotiated. |
| Tab 1b | ODOT is allowing the proposer to be compensated by a flat monthly fee, by a per transacation fee, by a per registered account fee, and by pass-through costs. Proposer can utilize any and all methods for proposed compensation. If any method is not utilized, simply place place zeros in the cells. |
| ODOT has provided expected transaction volumes and registered account volumes for each contract year. |
| Rates are allowed to change each year of the contract and according to changes in volume. Proposers should enter per unit rates by volume in the appropriate cells. Proposers can change the volume ranges. Alternatively, proposers can provide one range or do not have to provide any range if they are proposing only a fixed monthly fee. |
| For Direct Costs, ODOT chose not to estimate volumes by year. The proposer should use an average quantity that they estimate for each Direct Cost item by year. The per unit rate provided should be all-inclusive, excluding Postage and third-party DMV lookups, which are pass-through costs. |
| Tab 2a | Same as 1a. |
| Tab 2b | Same as 1b. |
| Tab 3a | Proposers are responsible to validate that all O&M totals transfer to this tab and that formulas are correctly calculating total costs. |
| Tab 3b | Proposers are responsible to validate that all O&M and Implementation totals transfer to this tab and that formulas are correctly calculating total costs. |
1a - CBOS Implementation Costs
| 1a - CBOS Implementation Costs | | |
| Item # | Description | Total Cost ($) |
| Base Contract | | |
| 1 | Project Management | $ - |
| 2 | Planning | $ - |
| 3 | Design | $ - |
| 4 | Test Planning, Development and Configuration, Testing | $ - |
| 5 | Training | $ - |
| 6 | Pre Go-Live End-to-End Acceptance Testing | $ - |
| 7 | Go-Live | $ - |
| CBOS Implementation Costs | | $ - |
| Other Up-Front Costs | |
| Add equipment and other upfront costs | $ - 0 |
| Item 2 | $ - 0 |
| Item 3 | $ - 0 |
| Add as many lines as needed | $ - 0 |
| Up-Front Costs | $ - 0 |
| Total CBOS Implementation Costs | $ - |
1b - CBOS O&M Price
| 1b - CBOS Operations & Maintenance Monthly Transaction Price | | | | | | | | | | | | |
| Description of Items | Monthly Transactions Greater Than | Monthly Transactions Up To | Cost Per Transaction ($) | | | | | | | | | |
| Monthly Pricing per range | | | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Year 6 | Year 7 | Year 8 | Year 9 | Year 10 |
| Fixed Fee | 0 | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Range 1 | 0 | 1,000,000 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Range 2 | 1,000,001 | 3,000,000 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Range 3 | 3,000,001 | 5,000,000 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Range 4 | 5,000,001 | 999,999,999 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Estimated Transaction Volumes per month | - | - | 2,876,218 | 5,105,142 | 21,303,328 | 43,059,072 | 43,284,616 | 43,511,389 | 43,707,102 | 44,032,549 | |
| Monthly Fee per month (based on fixed fee and expected volumes) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| * Implementation | * Implementation | | | | | | | | | |
| 1b - CBOS Operations & Maintenance Monthly Registered Account Price | | | | | | | | | | | | |
| Description of Items | Monthly Registered Accounts Greater Than | Monthly Registered Accounts Up To | Cost Per Account ($) | | | | | | | | | |
| Monthly Pricing per range | | | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Year 6 | Year 7 | Year 8 | Year 9 | Year 10 |
| Range 1 | 0 | 200,000 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Range 2 | 200,000 | 300,000 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Range 3 | 300,000 | 500,000 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Range 4 | 500,000 | 999,999,999 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Estimated Account Volumes per month | - | - | 145,819 | 332,853 | 680,679 | 1,362,742 | 1,739,885 | 1,882,974 | 1,979,312 | 2,073,102 | |
| Monthly Fee per month (based on expected volumes) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| * Implementation | * Implementation | | | | | | | | | |
| 1b - Annual Direct Costs | | | | | | | | | | | | | |
| Description of Items | Event | Annual Quantity | Direct Costs ($) | | | | | | | | | | |
| | | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Year 6 | Year 7 | Year 8 | Year 9 | Year 10 | |
| Printing and Mail Insertion | Mailed Item | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Postage (Pass-Through) | Mailed Item | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| DMV Lookup (Pass-Through) | Out of state lookup | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Skip Tracing | Returned mail | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Email | Email Sent | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| SMS | Text Message Sent | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Other | | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Other | | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Total Annual Direct Costs | | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| | | * Implementation | * Implementation | | | | | | | | | $ - 0 |
| Note: use an average quantity per year based on proposer's estimates. | | | | | | | | | | | | | |
Note: these ranges can be changed as part of your proposal. Yellow boxes can be updated.
2a - CSC Implementation Costs
| 2a - CSC Operations Implementation Costs | | |
| Item # | Description | Total Price ($) |
| Base Contract | | |
| 1 | Project Management | $ - |
| 2 | Planning | $ - |
| 3 | Design and SOPS | $ - |
| 4 | Testing support prep for operations | $ - |
| 5 | Training | $ - |
| 6 | Final End-to-End Testing | $ - |
| 7 | Go-live | $ - |
| Total CSC Operations Implementation Price | | $ - |
| Other Up-Front Costs | |
| Add equipment and other upfront costs | $ - 0 |
| Item 2 | $ - 0 |
| Item 3 | $ - 0 |
| Add as many lines as needed | $ - 0 |
| Up-Front Costs | $ - 0 |
| Total Implementation Costs | | $ - |
2b - CSC O&M Price
| 2b - CSC Operations & Maintenance Monthly Transaction Price | | | | | | | | | | | | |
| Description of Items | Monthly Transactions Greater Than | Monthly Transactions Up To | Cost Per Transaction ($) | | | | | | | | | |
| Monthly Pricing per range | | | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Year 6 | Year 7 | Year 8 | Year 9 | Year 10 |
| Fixed Fee | 0 | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Range 1 | 0 | 1,000,000 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Range 2 | 1,000,000 | 3,000,000 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Range 3 | 3,000,000 | 5,000,000 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Range 4 | 5,000,000 | 999,999,999 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Estimated Transaction Volumes per month | - | - | 2,876,218 | 5,105,142 | 21,303,328 | 43,059,072 | 43,284,616 | 43,511,389 | 43,707,102 | 44,032,549 | |
| Monthly Fee per month (based on estimated volumes) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| * Implementation | * Implementation | | | | | | | | | |
| 2b - CSC Operations & Maintenance Monthly Registered Accounts | | | | | | | | | | | | |
| Description of Items | Monthly Registered Accounts Greater Than | Monthly Registered Accounts Up To | Cost Per Account ($) | | | | | | | | | |
| Monthly Pricing per range | | | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Year 6 | Year 7 | Year 8 | Year 9 | Year 10 |
| Range 1 | 0 | 200,000 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Range 2 | 200,000 | 300,000 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Range 3 | 300,000 | 500,000 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Range 4 | 500,000 | 999,999,999 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Estimated Registered ccount Volumes per month | - | - | 145,819 | 332,853 | 680,679 | 1,362,742 | 1,739,885 | 1,882,974 | 1,979,312 | 2,073,102 | |
| Monthly Fee per month (based on estimated volumes) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| * Implementation | * Implementation | | | | | | | | | |
| 2b - Annual Direct Costs | | | | | | | | | | | | | |
| Description of Items | Unit of Measure | Annual Quantity | Direct Costs ($) | | | | | | | | | | |
| | | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Year 6 | Year 7 | Year 8 | Year 9 | Year 10 | |
| NOCP Labor | NOCP | - 0 | | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Facility Lease - In Person Center - I-205 | | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Facility Lease - In Person Center - IBR | | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Facility Lease - Main Processing Center | | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Other | | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Other | | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Other | | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Total | | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| | | * Implementation | * Implementation | | | | | | | | | $ - 0 |
| Note: use an average quantity per year based on proposer's estimates. | | | | | | | | | | | | | |
Note: these ranges can be changed as part of your proposal. Yellow boxes can be updated.
3a - O&M Price Summary
| 3a - CBOS Operations & Maintenance Price Summary | | |
| Item # | Description of Maintenance Cost Item | Transaction Price ($) |
| (Sheet 1b) | Account Price | | |
| (Sheet 1b) | Direct Costs ($) | | | | | |
| (Sheet 1b) | Total ($) | | | | | |
| Base Contract | | | | | |
| 1 | Year 1 | $ - | $ - | $ - | $ - |
| 2 | Year 2 | $ - | $ - | $ - | $ - |
| 3 | Year 3 | $ - | $ - | $ - | $ - |
| 4 | Year 4 | $ - | $ - | $ - | $ - |
| 5 | Year 5 | $ - | $ - | $ - | $ - |
| Total Base Contract Cost (Years 1-5) | | $ - | $ - | $ - | $ - |
| Optional Extensions (Years 6 - 10) | | | | | |
| 8 | Year 6 | $ - | $ - | $ - | $ - |
| 9 | Year 7 | $ - | $ - | $ - | $ - |
| 10 | Year 8 | $ - | $ - | $ - | $ - |
| 11 | Year 9 | $ - | $ - | $ - | $ - |
| 12 | Year 10 | $ - | $ - | $ - | $ - |
| Total Optional Extensions Cost (Years 6-10) | | $ - | $ - | $ - | $ - |
| Total Base & Optional Extensions Cost (Years 1-10) | | $ - | $ - | $ - | $ - |
| 3a - CSC Operations and Maintenance Price Summary | | | | | |
| Item # | Description of Maintenance Cost Item | Transaction Price ($) | | | |
| (Sheet 2b) | Account Price | | | | | |
| (Sheet 2b) | Direct Costs ($) | | | | | |
| (Sheet 2b) | Total ($) | | | | | |
| Base Contract | | | | | |
| 1 | Year 1 | $ - | $ - | $ - | $ - |
| 2 | Year 2 | $ - | $ - | $ - | $ - |
| 3 | Year 3 | $ - | $ - | $ - | $ - |
| 4 | Year 4 | $ - | $ - | $ - | $ - |
| 5 | Year 5 | $ - | $ - | $ - | $ - |
| Total Base Contract Cost (Years 1-5) | | $ - | $ - | $ - | $ - |
| Optional Extension (Years 6 - 10) | | | | | |
| 8 | Year 6 | $ - | $ - | $ - | $ - |
| 9 | Year 7 | $ - | $ - | $ - | $ - |
| 10 | Year 8 | $ - | $ - | $ - | $ - |
| 11 | Year 9 | $ - | $ - | $ - | $ - |
| 12 | Year 10 | $ - | $ - | $ - | $ - |
| Total Optional Extensions Cost (Years 6-10) | | $ - | $ - | $ - | $ - |
| Total Base & Optional Extensions Cost (Years 1-10) | | $ - | $ - | $ - | $ - |
3b - Total Price Summary
| 3b - Project Price Summary | | |
| Description of Services | | Total Cost ($) |
| Implementation Costs | | |
| CBOS Implementation Summary Costs (Sheet 1a) | | $ - |
| CSC Implementation Summary Costs (Sheet 2a) | | $ - |
| Total Implementation Costs | | $ - |
| Operations and Maintenance Base Contract (Years 1 - 5) | | |
| CBOS Operations and Maintenance (Sheet 1b) | | $ - |
| CSC Operations and Maintenance (Sheet 2b) | | $ - |
| Total Operations and Maintenance Base (Years 1-5) | | $ - |
| Total Evaluation Calculation | $ - 0 |
| Optional Extensions (Years 6 - 10) | | |
| CBOS Operations and Maintenance (Sheet 1b) | | $ - |
| CSC Operations and Maintenance (Sheet 2b) | | $ - |
| Total Optional Extensions (Years 6 - 10) | | $ - |
| Proposer Officer: | | |
| Company Name: | | |
| Date: | | |