33-Attachment I- Utility Relocation Schedule CIP 69647.000 Utility Cert Letter 7.15.26.pdf
PDF 17 KB Posted
- Attached to
- Big Bend Road from US 41 to Covington Garden Dr.
- Solicitation number
- IFB-26-00378
- Issued by
- Hillsborough County, Florida
About this file
This is a Utility Certification letter dated July 15, 2026, issued by Tamishe Rodriguez, P.E., Engineer of Record, to Manuel Santos, Hillsborough County Project Manager, regarding CIP 69647.000 for Big Bend Road from US 41 to Covington Garden Drive in Hillsborough County, Florida. The certification confirms that all utility negotiations have been completed and necessary arrangements have been made for utility coordination with the physical construction schedule. The letter documents utility relocation schedules for eight entities: Frontier Florida LLC, Level 3 Communications LLC, MCI Metro Access Transmission Services LLC, Peoples Gas System Inc., Spectrum Sunshine State LLC, Tampa Electric Company, Uniti Fiber LLC, and Zayo Group LLC. The letter also identifies Verizon Wireless as having no conflicts and CenturyLink Communications LLC and Peoples Gas System Inc. Transmission as not involved in the project.
The certification serves as formal notification that all required utility work has been coordinated and scheduled in conjunction with the project's construction timeline. Appropriate notification identifying all utility work requirements, status, and completion schedules have been incorporated into the Special Provisions Plans Package. The correspondence was copied to Jeanna Dean, Utility Coordinator at Harbor Coordination Solutions, Inc., indicating third-party coordination oversight.
View the file
Other files
Show 40 more
Latest 50 of 89 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
July 15, 2026
TO: Manuel Santos Hillsborough County Project Manager 601 E. Kennedy Blvd Tampa, FL 33602
SUBJECT : Utility Certification
CIP : 69647.000
County : Hillsborough Description : Big Bend Road from US 41 to Covington Garden Drive
Dear Mr. Santos, This CERTIFICATION means that all UTILITY negotiations have been completed and/or that the necessary arrangements have been made for the work to be undertaken and completed, as required, for proper coordination with the physical Construction Schedule. Appropriate notification which identifies all the UTILITY Work required for this Project, together with the status and/or schedule of completion, have been made a part of the Special Provisions Plans Package.
Utility Relocation Schedules: Frontier Florida, LLC Level 3 Communications, LLC MCI Metro Access Transmission Services, LLC Peoples Gas System, Inc Spectrum Sunshine State LLC Tampa Electric Company Uniti Fiber, LLC Zayo Group, LLC
No Conflicts: Verizon Wireless
Not Involved: CenturyLink Communications, LLC Peoples Gas System, Inc. – Transmission Tampa Bay Water
Sincerely
Tamishe Rodriguez, P.E.
Engineer of Record
Enclosures
CC: Jeanna Dean, Utility Coordinator, Harbor Coordination Solutions, Inc.