This is a Roadway Soil Survey Report prepared by Tierra, Inc. for Hillsborough County, Florida, addressing geotechnical conditions along Big Bend Road (CR 672) from US Highway 41 to Covington Garden Drive. The report supports the roadway design and widening project, which entails converting the existing four-lane divided rural highway into a six-lane urban typical section with curb and gutter, closed drainage system, and ten-foot sidewalks on each side. The geotechnical study was performed to obtain subsurface information and groundwater data to inform the construction plans for the roadway and drainage improvements. Services included review of published soil and geological data, development of a boring location plan, field exploration consisting of hand auger borings, Standard Penetration Test borings, asphalt pavement cores at nine locations, bulk soil sampling, and laboratory testing on collected samples. The report documents soil stratification, organic soil locations requiring removal, groundwater table measurements, and seasonal high groundwater table estimates throughout the project corridor.
The report identifies seven distinct soil strata encountered along the project alignment, ranging from sand and silty sand to organic muck and weathered limestone, with AASHTO classifications provided for each stratum. Organic soils were encountered at specific stations and require removal in accordance with Florida Department of Transportation standards, except where located outside the design control line. Two proposed wet ponds on the south side of Big Bend Road were evaluated geotechnically; stability and seepage analyses indicate the berms will be stable and prevent daylight seepage provided construction follows Hillsborough County and FDOT specifications, though the proposed designs deviate from standard criteria regarding maintenance berm width and freeboard due to right-of-way constraints. Pavement design recommendations include a Modulus of Resilience value of 9,500 psi based on Limerock Bearing Ratio testing. The report emphasizes that embankment settlement is anticipated to be minimal, slope stability should be maintained with appropriate geometries, and groundwater control measures may be necessary during construction, particularly during wet season operations.
View the file
Other files
Show 40 more
Latest 50 of 89 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tierra, Inc.
7351 Temple Terrace Highway • Tampa, Florida 33637
Phone (813) 989-1354
November 20, 2025
WSP USA
5411 SkyCenter Drive, Suite 650 Tampa, Florida 33607
Attn: Danny Carnley, P.E.
RE: Roadway Soil Survey Report
Big Bend Rd. (CR 672) from US Hwy. 41 to Covington Garden Dr.
Hillsborough County, Florida CIP No.: 69647000 Tierra Project No.: 6511-21-076
Mr. Carnley:
Tierra, Inc. (Tierra) has completed a Roadway Soil Survey Report for the above referenced project. This report is being provided to support the Roadway Plans submittal. The results of our field exploration program and laboratory testing performed to date and subsequent geotechnical recommendations are presented herein.
Tierra appreciates the opportunity to be of service to WSP USA (WSP) on this project. If you have any questions or comments regarding this report, please contact our office at your earliest convenience.
Respectfully Submitted, TIERRA, INC.
Kaitlyn C. Waterman, P.E. Kevin H. Scott, P.E.
Geotechnical Engineer Senior Geotechnical Engineer Florida License No. 96615 Florida License No. 65514
Table of Contents
1.0 PROJECT INFORMATION
1.1 Project Authorization
1.2 Project Description
1.3 General Site Description
2.0 PURPOSE AND SCOPE OF SERVICES
3.0 REVIEW OF PUBLISHED DATA
3.1 Regional Geology
3.2 USDA Soil Survey
3.3 USGS Quadrangle Maps
3.4 Potentiometric Surface Elevation
4.0 SUBSURFACE EXPLORATION
4.1 Boring Locations
4.2 Soil Borings
4.3 Asphalt Pavement Cores
4.4 Bulk Sampling and Limerock Bearing Ratio Testing
5.0 LABORATORY TESTING
5.1 General
5.2 Test Designation
6.0 RESULTS OF SUBSURFACE EXPLORATION
6.1 General Soil Conditions
6.2 Organic Soils
6.3 Groundwater
6.4 Seasonal High Groundwater Table Estimates
7.0 ENGINEERING EVALUATIONS AND RECOMMENDATIONS
7.1 General
7.2 Organic Soils
7.3 Asphalt/Limerock Fragments with Sand
7.4 Pond Recommendations
7.5 Embankment Settlement
7.6 Slope Stability
7.7 Pavement Design Considerations
7.8 Temporary Slopes and Trenches
7.9 Groundwater Control
7.10 On-Site Soil Suitability
7.11 General Roadway Construction
8.0 REPORT LIMITATIONS
Table of Contents
APPENDIX A
USDA Soil Survey & USGS Quadrangle Maps Summary of USDA Soil Survey
APPENDIX B
Roadway Soil Survey Sheet Boring Location Plan Roadway Soil Profiles Pond Soil Survey Sheets Muck Delineation Plan
APPENDIX C
Summary of Seasonal High Groundwater Table Estimates
APPENDIX D
Pavement Data Table Design LBR Calculation
APPENDIX E
Summary of Laboratory Test Results for Soil Classification Summary of Laboratory Test Results for Environmental Classification Summary of Limerock Bearing Ratio Test Results
APPENDIX F
Results of Global Stability Analyses for Pond Berms Seepage Analyses for Pond Berms
Roadway Soil Survey Report Big Bend Rd. (CR 672) from US Hwy. 41 to Covington Garden Dr.
Hillsborough County, Florida CIP No.: 69647000
1.0 PROJECT INFORMATION
1.1 Project Authorization
Authorization to proceed with this project was issued by WSP in accordance with the Subconsultant Agreement.
1.2 Project Description
The project consists of the widening and reconstruction of Big Bend Road from east of US Highway 41 to Covington Garden Drive in Hillsborough County, Florida.
The purpose of this report is to provide geotechnical (i.e. soil and groundwater) input to the design team to assist in the design of the proposed roadway and drainage improvements. This report is provided to be included with the Roadway Plans submittal. The geotechnical report for miscellaneous structures is provided under separate cover.
1.3 General Site Description
The existing Big Bend Road (CR 672) within the project limits consists of a four-lane, two-way road separated by a grassed median. Land use adjacent to the project generally consists of residential and commercial developments and undeveloped wetland areas. The existing Big Bend roadway crosses the CFX railroad corridor that spans in the N-S direction near the mid-point of the proposed roadway widening.
2.0 PURPOSE AND SCOPE OF SERVICES
This geotechnical study was performed to obtain information on the existing subsurface conditions along the limits of the proposed roadway and drainage improvements to assist in design of the construction plans for the project. The following services were provided:
1. Reviewed published soil information obtained from the Soil Survey of Hillsborough County, Florida published by the United States Department of Agriculture (USDA) Natural Resources Conservation Service (NRCS). Reviewed topographic data obtained from the “Riverview, Florida” quadrangle map and potentiometric information obtained from the “Upper Floridan Aquifer Potentiometric Surface” maps published by the United States Geological Survey (USGS).
2. Developed a Boring Location Plan for borings to be performed along the proposed roadway alignment and within the proposed ponds.
3. Conducted a visual reconnaissance of the project site and coordinated utility clearances via Sunshine State One Call.
4. Performed a geotechnical field study for the proposed improvements consisting of hand auger borings, Standard Penetration Test (SPT) borings, subsurface sampling and field-testing.
Hillsborough County, Florida CIP No.: 69647000
5. Measured groundwater depths at the boring locations.
6. Estimated the Seasonal High Groundwater Table (SHGWT) levels at selected boring locations along the proposed roadway alignment and within the ponds.
7. Delineated encountered organic soils with hand auger borings.
8. Coordinated with Hillsborough County to obtain a Right-of-Way use permit to perform pavement cores within the travel lanes of Big Bend Road.
9. Performed nine (9) pavement cores within the existing Big Bend Road. Coordinated and performed Maintenance of Traffic (MOT) operations to facilitate the pavement coring.
10. Collected and tested four (4) bulk soil samples of the existing subgrade materials along the roadway corridor to determine a design Limerock Bearing Ratio (LBR) value for use in pavement design.
11. Visually examined and classified soil samples recovered from the borings using the American Association of State Highway and Transportation Officials (AASHTO) soil classification system.
12. Conducted laboratory testing on selected soil samples obtained from the borings to confirm the visual soil classifications and evaluate the corrosive nature of the soil.
13. Coordinated with the project surveyor to obtain survey data (locations and elevations) for the borings performed to estimate the SHGWT levels.
14. Prepared this Roadway Soil Survey Report for the project.
3.0 REVIEW OF PUBLISHED DATA
3.1 Regional Geology
Hillsborough County Geology has been paraphrased from the Florida Geological Survey, Open- File Report 80, 2001 and other geologic references.
The near surface geologic deposits and formations from youngest to oldest in Hillsborough County include: Undifferentiated sediments (Qu, TQu), Shelly sediments (TQsu), the Hawthorn Group Peace River Formation (Thp), the Hawthorn Group Peace River Formation Bone Valley Member (Thpb), the Hawthorn Group Arcadia Formation (Tha), and the Hawthorn Group Arcadia Formation Tampa Member (That).
The Undifferentiated sediments are siliciclastics that are light gray to tan, brown to black in color, unconsolidated to poorly consolidated, clean to clayey silty, unfossiliferous with variably organic-bearing sands and poorly to moderately consolidated sandy to silty clays. The Shelly sediments are variably calcareous and fossiliferous quartz sands to well indurated sandy, fossiliferous limestones with clayey sands and sandy clays present.
Hillsborough County, Florida CIP No.: 69647000
The Peace River Formation is primarily found near the surface in northwestern Hillsborough County and is composed of interbedded sands, clays and carbonates. The sands are generally light gray to olive gray in color, poorly consolidated, clayey, variably dolomitic, very fine to medium grained and phosphatic. The clays are yellowish gray to olive gray in color, poorly to moderately consolidated, sandy to silty, phosphatic and dolomitic. The carbonates are light gray to yellowish gray in color, poorly to well indurated, variably sandy and clayey and phosphatic.
The Peace River Formation is a semi-confining unit and forms an intermediate aquifer system in eastern Hillsborough County.
The carbonates often include opaline chert. The Bone Valley Member is a clastic unit consisting of sand-sized and larger phosphate grains in a matrix of quartz sand, silt and clay. The lithology is highly variable ranging from sands, silts, phosphatic clays and relatively pure clays to clayey, phosphatic sand to sandy, clayey phosphorites and is found within 50 feet of the surface in eastern Hillsborough County.
The Arcadia Formation is predominantly a carbonate unit with a variable siliciclastic component.
The Arcadia Formation is composed of yellow-gray to light olive-gray to light brown colored micro to finely crystalline sands with clayey and phosphatic fossiliferous limestones and dolostones. Thin beds of sand and clay are common. The sands are yellowish gray in color, very fine to medium grained, poorly to moderately indurated, clayey, dolomitic and phosphatic.
The clays are yellowish gray to light olive gray in color, poorly to moderately indurated, sandy, silty, phosphatic and dolomitic.
The Tampa member of the Arcadia Formation is white to yellowish gray in color, fossiliferous with variably sandy and clayey mudstone, wackestone and packstone with minor to no phosphate grains. In Hillsborough County the Tampa member is found about 300 feet below land surface (BLS), is approximately 100 to 150 feet thick and is part of the Floridan Aquifer System.
3.2 USDA Soil Survey
Based on a review of the Hillsborough County Soil Survey published by the USDA, it appears there are five (5) primary soil-mapping units noted within the project corridor. A reproduction of the USDA Soil Survey Map and a summary of each soil unit are provided in Appendix A.
It should be noted that information contained in the USDA Soil Survey may not be reflective of actual soil and groundwater conditions, particularly if development in the project vicinity has modified soil conditions or surface/subsurface drainage.
3.3 USGS Quadrangle Maps
Based on a review of the “Riverview, Florida” USGS quadrangle map, it appears that the ground elevation in the project vicinity is on the order of +5 feet to +35 feet National Geodetic Vertical Datum of 1929 (NGVD 29). This is reasonably consistent with the site specific boring elevation data provided by the project surveyor. A reproduction of the USGS Quadrangle Map for the project vicinity is provided in Appendix A.
Hillsborough County, Florida CIP No.: 69647000
3.4 Potentiometric Surface Elevation
Based on a review of the “Upper Floridan Aquifer Potentiometric Surface” maps published by the USGS, the potentiometric surface elevation in the project vicinity ranges up to approximately +15 feet, NGVD 29 (+14.5 feet, NAVD 88). As stated in Section 3.3, the natural ground elevation in the project vicinity is on the order of +5 to +35 feet, NGVD 29. Artesian conditions were not encountered during the field exploration. The Contractor should be prepared to address and handle potentiometric levels up to +15 feet, NGVD 29 (+14.5 feet, NAVD 88) at no additional cost to Hillsborough County.
4.0 SUBSURFACE EXPLORATION
4.1 Boring Locations
Prior to commencing our subsurface exploration, a boring location plan for the proposed roadway alignment and ponds was produced. The boring location plan was generated based on a review of the project design files provided by WSP, general guidance provided in the FDOT “Soils and Foundations Handbook” and our engineering judgment.
The boring locations were estimated by Tierra in the field using hand-held, non-survey grade Global Positioning System (GPS) equipment with a manufacturer’s reported accuracy of ±10 feet. The boring locations should be considered approximate. Following completion of the field work, the borings performed to estimate SHGWT levels were survey-located by the project land surveyor. Station and offset of the boring locations was determined using the surveyed/estimated GPS coordinates in conjunction with project design files provided by WSP.
The boring locations are provided on the Boring Location Plan sheets in Appendix B.
4.2 Soil Borings
Tierra performed hand auger borings and SPT borings along the proposed roadway alignment and within the proposed ponds to evaluate the existing subsurface conditions and groundwater levels.
The hand auger borings were performed by manually twisting and advancing a bucket auger into the ground, typically in 6-inch increments. As each soil type was revealed, representative samples were collected and returned to our office for confirmation of the field classification by a geotechnical engineer. The hand auger borings advanced to depths of less than 5 feet were terminated due to shallow groundwater levels resulting in cave-in of the borehole or auger refusal on asphalt and/or limerock debris.
The SPT borings were performed using mechanical drilling equipment utilizing bentonite mud drilling procedures. The soil sampling was performed in general accordance with the American Society for Testing and Materials (ASTM) test designation D-1586. Except at locations where the initial 6 feet of the SPT borings were manually advanced with a hand auger to verify utility clearances, SPT resistance N-values were taken continuously to a depth of 10 feet and on intervals of 5 feet thereafter to the boring termination depths. As each soil type was revealed, representative samples were placed in glass jars and returned to our office for classification and
Hillsborough County, Florida CIP No.: 69647000 laboratory testing. The results of the borings are shown on the Roadway Soil Profiles sheets in Appendix B.
4.3 Asphalt Pavement Cores
Tierra performed nine (9) pavement cores at select locations along the roadway alignment to determine the conditions of the existing pavement section, base materials and subgrade materials at the core locations. The pavement cores were performed with the use of a 4-inch outside diameter core bit. A hand auger boring was performed at each core location to identify the subgrade materials present. The cores and base samples were transported to our laboratory for visual classification, measurements and analysis. The results of the pavement cores are provided in the Pavement Data Table in Appendix D.
4.4 Bulk Sampling and Limerock Bearing Ratio Testing
Bulk soil samples were retrieved for LBR testing at four (4) locations along the proposed roadway alignment. In general, these samples were collected from the top 1 to 2 feet of the near-surface soils encountered. The samples were delivered to Tierra’s laboratory for LBR testing. The LBR testing was performed in accordance with FSTM FM 5-515 “Florida Method of Test for Limerock Bearing Ratio (LBR)”. The results of the LBR testing are provided in Appendix E of this report.
5.0 LABORATORY TESTING
5.1 General
Representative soil samples collected from the borings were classified and stratified in general accordance with the AASHTO soil classification system. Our classification was based on visual observations, using the results from the laboratory testing as confirmation. These tests included grain-size analyses, fines content, organic content, Atterberg limits and natural moisture content determination. Environmental corrosion tests were performed on selected soil samples to evaluate the corrosive nature of the subsurface soils encountered. Limerock Bearing Ratio (LBR) testing was also completed on bulk soil samples of the existing subgrade materials obtained along the project alignment.
5.2 Test Designation
The following list summarizes the laboratory tests performed by Tierra and the respective test methods utilized.
• Grain-Size Analyses/Fines Content - The grain-size analyses and fines content tests were conducted in general accordance with the AASHTO test designation T-088 (ASTM test designations D-6913 and D-1140).
• Atterberg Limits - The liquid limit and the plastic limit tests ("Atterberg Limits") were conducted in general accordance with the AASHTO test designations T-089 and T-090, respectively (ASTM test designation D-4318).
Hillsborough County, Florida CIP No.: 69647000
• Organic Content - The organic content tests were conducted in general accordance with the AASHTO test designation T-267.
• Natural Moisture Content - The moisture content tests were conducted in general accordance with the AASHTO test designation T-265 (ASTM test designation D-2216).
• Environmental Corrosion - The environmental corrosion tests were conducted in general accordance with the FDOT test designations FM 5-550, FM 5-551, FM 5-552 and FM 5- 553.
• LBR Testing – LBR tests were conducted in general accordance with FSTM FM 5-515 “Florida Method of Test for Limerock Bearing Ratio (LBR)”.
A summary of the laboratory test results for each soil stratum encountered along the project alignment is presented on the Roadway Soil Survey sheet in Appendix B. This sheet includes ranges of laboratory test results for different stratum soil samples collected from the borings.
Detailed summaries of the laboratory test results are presented in Appendix E.
6.0 RESULTS OF SUBSURFACE EXPLORATION
6.1 General Soil Conditions
The soil types encountered during this exploration have been assigned a stratum number. The stratum numbers and soil types associated with the roadway and drainage improvements for the project to date are provided in the table below:
Stratum Number
Typical Soil Description
AASHTO
Classification
1 Gray to Brown SAND to SAND with Silt to Silty SAND A-3/A-2-4
2 Gray to Brown Silty SAND A-2-4
3 Gray to Dark Brown SAND to SAND with Silt with Trace Organics A-3/A-2-4
Dark Brown Organic SAND with Silt to Organic Silty Sand to
MUCK
A-8
5 Green to Gray to Brown SILT to CLAY A-7-5/A-7-6
6 Asphalt and Limerock Fragments with SAND A-1/A-3
7 Calcareous Clay to Weathered Limestone ---(1)
(1)AASHTO does not provide classification for weathered limestone
A geotechnical engineer bases soil stratification on a visual review of the recovered samples, laboratory testing and interpretation of the field boring logs. The boring stratification lines represent the approximate boundaries between soil types of significantly different engineering properties; however, the actual transition may be gradual. In some cases, small variations in properties within the same boring not considered pertinent to our engineering evaluation may have been abbreviated or omitted for clarity. The boring profiles represent the conditions at the
Hillsborough County, Florida CIP No.: 69647000 particular boring location and variations did occur among the borings. The results of the borings performed for this study are presented on the Roadway Soil Profiles sheets in Appendix B.
6.2 Organic Soils
Organic soils (Stratum 4, A-8) were encountered within several borings preformed along the roadway alignment at approximate Stations 1082+00 RT., 1110+00 to 1115+00 RT., and 1118+00 LT. (C/L Const. CR 672). Organic soils were also encountered on the west side of Covington Garden Dr. The organic soils were generally surficial and were encountered at depths ranging from the ground surface to approximately 1½ feet below the existing ground surface. At approximate Station 1118+00 LT., buried organic soils were encountered at a depth of 5 to 6½ feet below existing grade. Based on the results of laboratory testing, the organic content of these soils ranges from 6 to 38 percent.
The organic soils encountered along the mainline roadway alignment were delineated with auger borings to estimate the horizontal and vertical limits of the organic soils. The results of muck delineation borings are presented on the Roadway Soil Profiles sheets and Muck Delineation Plan in Appendix B and are discussed further in the report sections below.
6.3 Groundwater
The groundwater table was measured at the boring locations performed along the roadway alignment and within the ponds at depths ranging from above the ground surface to a depth of approximately 6½ feet below the existing ground surface. The depths to the encountered groundwater table are presented on the Roadway Soil Profiles sheets in Appendix B.
Within some auger borings, groundwater was not encountered within the boring prior to the boring termination depth. Groundwater Not Encountered (GNE) is indicated adjacent to these soil profiles on the Roadway Soil Profiles sheets in Appendix B.
Groundwater conditions will vary with environmental variations and seasonal conditions, such as the frequency and magnitude of rainfall patterns, as well as man-made influences (i.e., existing water management canals, swales, drainage ponds, underdrains, and areas of covered soils, such as paved parking lots and sidewalks).
6.4 Seasonal High Groundwater Table Estimates
SHGWT levels were estimated at select boring locations performed along the proposed roadway alignment and within the proposed ponds. The SHGWT levels were estimated based on a review of the soil samples including natural soil indicators such as stain lines, mottles, the depth to the root layer, measured groundwater levels in the borings, information provided in the USDA Soil Survey published by the NRCS, existing wetland information provided by WSP, and the surrounding topography. The estimated SHGWT levels are presented on the Roadway Soil Profiles sheets in Appendix B and are summarized in the Summary of Seasonal High Groundwater Table Estimates tables included in Appendix C.
Hillsborough County, Florida CIP No.: 69647000
The SHGWT levels reported in the attached table are estimated historic levels. Man-made influences, such as existing water management ditches, swales, and drainage ponds will affect groundwater levels but are not considered when determining the historical SHGWT.
7.0 ENGINEERING EVALUATIONS AND RECOMMENDATIONS
7.1 General
In general, the existing subsurface soils encountered in the borings performed are suitable for supporting the proposed construction after proper subgrade preparation. If buried organic soils, debris or unsuitable fills are encountered during construction, they should be removed and replaced with clean, compacted, sandy (SELECT) soils in accordance with Hillsborough County guidelines and the FDOT Standard Plans.
Site preparation should consist of normal clearing and grubbing followed by compaction of subgrade soils. Backfill should consist of materials conforming to and compacted in accordance with Hillsborough County guidelines and the FDOT Specifications.
7.2 Organic Soils
Organic soils (Stratum 4, A-8) were encountered within several borings preformed along the roadway alignment as detailed in the subsection above. The organic soils should be removed in accordance with the FDOT Standard Plans. The removal limits for organic soils encountered between Station 1110+00 and 1115+00 RT. are depicted on the Roadway Cross-Sections and Muck Delineation Plan sheet. The organic soils encountered at Station 1082+00 RT., Station 1118+00 LT., and along Covington Garden Drive were encountered outside of the 1V:2H control line as referenced in the FDOT Standard Plans and therefore may remain in place.
7.3 Asphalt/Limerock Fragments with Sand
Buried asphalt and limerock fragments with sand (Stratum 6, A-1/A-3) was encountered at various locations along the roadway alignment. This material appears satisfactory for use in the embankment when utilized in accordance with Standard Plans, Index 120-001. This material is very hard/dense. Variability in the depth and relative density of this material should be anticipated. Excavation into and through this material will be difficult and will require non-conventional construction techniques and the mobilization of specialized equipment. A note alerting the Contractor of the presence of this material is provided on the Roadway Soil Survey sheet in Appendix B.
7.4 Pond Recommendations
Based on our understanding, the current drainage design for the project includes two ponds on the south side of Big Bend Road. Based on our understanding, the ponds are being designed to function as “wet” ponds. Tierra performed hand auger borings, SPT borings, obtained groundwater readings, and estimated the SHGWT levels within the proposed ponds. A detailed summary of the SHGWT estimates is provided in the Summary of Seasonal High Groundwater Table Estimates table in Appendix C. The results of the pond borings are provided on the Pond Soil Survey sheets in Appendix B.
Hillsborough County, Florida CIP No.: 69647000
Based on coordination with WSP, the proposed pond designs for Ponds 1A South and 1B South deviate from Hillsborough County and FDOT design criteria relating to the required maintenance berm width and freeboard. Per the Hillsborough County and FDOT design criteria, the minimum berm width and freeboard for ponds are 15 feet and 1 foot, respectively. The design deviations are required for the ponds due to limited right of way (ROW) space and storage volume requirements. The maintenance berm widths for Ponds 1A South and 1B South are proposed at 10 feet with 1V:4H front and back slopes. The freeboard distance from the 25-year DHW to the upper berm elevations ranges from 0.64 to 0.7 foot.
Tierra performed global stability analyses of the southern pond berms adjacent to the ROW limits to assess the stability of the berms. The stability analyses were completed using the software program “ReSSA 3.0” developed by ADAMA Engineering, Inc. Based on the proposed berm geometry and 25-year DHW values provided by WSP, slope stability factors of safety will exceed 1.5 provided the berms are constructed in accordance with Hillsborough County guidelines and FDOT Specifications. The Results of Stability Analyses for Pond Berms are provided in Appendix F.
Tierra also performed seepage analyses of the southern pond berms by constructing flow nets based on Laplace’s equation of continuity. The flow nets were constructed utilizing the proposed berm geometry including the reduced freeboard and berm widths, and the 25-year DHW values provided by WSP. Based on the results of the seepage analyses, free water that stages up within the ponds to the 25-year DHW will not “daylight” out of the southern pond berms provided that the berms are constructed in accordance with Hillsborough County guidelines and FDOT Specifications. The Seepage Analyses for Pond Berms are provided in Appendix F.
7.5 Embankment Settlement
Roadway cross-sections were not available at the time of this report. Based on the results of the borings and the anticipated maximum new embankment fill heights, the majority of the total settlements should occur predominately during and shortly after embankment construction and are anticipated to be on the order of 1 inch or less. Long-term settlement is anticipated to be on the order of ½ inch or less.
Based on proper subgrade preparation and that adequate fill materials are utilized, we do not anticipate conditions that would pose limitations to the construction of the proposed embankments. Embankment fill soils should be placed and compacted in accordance with Hillsborough County guidelines and FDOT Specifications. Settlement analyses will be completed and presented for the next plans submittal.
7.6 Slope Stability
Roadway cross-sections were not available at the time of this report. Considering that the embankments will be constructed in accordance with Hillsborough County guidelines and FDOT Specifications, it is anticipated that embankment slopes above the water table with a geometry of 2H:1V or flatter will not pose limitations to roadway performance.
Hillsborough County, Florida CIP No.: 69647000
It is recommended that cuts into or below the groundwater table are constructed at slopes of 3H:1V or flatter. Slope stability analyses will be completed and presented for the next plans submittal.
7.7 Pavement Design Considerations
The pavement design engineer should review the current FDOT Flexible Pavement Design Manual and Hillsborough County guidelines for roadway design to ensure an adequate Structural Number (SN) value is obtained based on the corresponding ESAL value over the design life of the roadway improvements. Based on the results of the LBR tests performed on bulk soil samples obtained from along the proposed roadway alignment and the FDOT ± 2% Method, a design Modulus of Resilience (MR) value of 9,500 psi is recommended for use in flexible pavement design. The Design LBR Calculation table is provided in Appendix D. It should be noted that the design MR value obtained from the tests performed may not be representative of borrow materials which may support some of the proposed roadway.
In accordance with FDOT and Hillsborough County guidelines, grades for this type of roadway should be ideally set to provide a minimum separation required for the proposed roadways between the bottom of the base and the estimated seasonal high groundwater levels. The design of the pavement section should be in accordance with Hillsborough County guidelines, the FDOT Flexible Pavement Manual and the FDOT Design Manual.
7.8 Temporary Slopes and Trenches
Temporary side slopes and excavations should comply with the Occupational Safety and Health Administration’s (OSHA) trench safety standards, 29 C.F.R., s. 1926.650, Subpart P, all subsequent revisions or updates of OSHA’s referenced standard adopted by the Department of Labor and Employment Security and Florida’s Trench Safety Act, Section 553.62, Florida Statutes. Excavated materials should not be stockpiled at the top of the slope within a horizontal distance equal to the excavation depth.
7.9 Groundwater Control
Depending upon groundwater levels at the time of construction, some form of dewatering may be required to achieve the required compaction. Due to groundwater levels during the wet season of the year, seepage may enter the bottom and sides of excavated areas. Such seepage will act to loosen soils and create difficult working conditions. Groundwater levels should be determined immediately prior to construction. Shallow groundwater should be kept below the lowest working area to facilitate proper material placement and compaction in accordance with Hillsborough County guidelines and the FDOT Specifications.
7.10 On-Site Soil Suitability
The general suitability and preliminary evaluations of the soils encountered during our geotechnical exploration is presented on the Roadway Soil Survey sheet in Appendix B.
FDOT Standard Plans, Indices 120-001 and 120-002 of the Design Standards should be consulted to determine the specific use/suitability of the soil types present within the project limits.
Hillsborough County, Florida CIP No.: 69647000
7.11 General Roadway Construction
The overall site preparation and mechanical densification work for the construction of the proposed roadway should be in accordance with the FDOT Specifications and Hillsborough County requirements.
8.0 REPORT LIMITATIONS
Our services have been performed, our findings obtained, and our recommendations prepared in accordance with generally accepted geotechnical engineering principles and practices at the time of this report. Our geotechnical engineering evaluation of the site and subsurface conditions with respect to the planned roadway construction, and our recommendations are based upon the following: (1) site observations, (2) the field exploratory test data obtained during the geotechnical study, and (3) our understanding of the project information and anticipated grades as presented in this report. This company is not responsible for the conclusions, opinions or recommendations made by others based on these data.
The scope of the exploration was intended to evaluate soil conditions within the influence of the proposed roadway construction. The analyses and recommendations submitted in this report are based upon the anticipated location and type of construction and data obtained from the soil borings performed at the locations indicated and does not reflect any variations which may occur among these borings. If any variations become evident during the course of construction, a re-evaluation of the recommendations contained in this report will be necessary after we have had an opportunity to observe the characteristics of the conditions encountered.
The scope of services, included herein, did not include any environmental assessment for the presence or absence of hazardous or toxic materials in the soil, surface water, groundwater, or air, on the site, below, and around the site. Any statements in this report or on the boring logs regarding odors, colors, unusual or suspicious items and conditions are strictly for the information of WSP and Hillsborough County.
APPENDIX A
USDA Soil Survey & USGS Quadrangle Maps
Summary of USDA Soil Survey
CAPITAL PROGRAMS DEPARTMENT
601 E. KENNEDY BLVD.
TAMPA, FLORIDA 33602
P.E. LICENSE NUMBER 65514
KEVIN H. SCOTT, P.E.
TIERRA, INC.
7351 TEMPLE TERRACE HIGHWAY
TAMPA, FLORIDA 33637
DESCRIPTIONDATE DESCRIPTION DATE
REVISIONS
SHT. NO.CIP NO.
USGS QUADRANGLE MAPS
USDA SOIL SURVEY &
J:\6511\2021 Files\6511-21-076 Big Bend Widening\Microstation\Geotech\USDA_USGS_West01.dgnbsawaska 4/11/2023 4:19:55 PM Default
P
E N
T B
L L
P
L T
D R
V L
APPROXIMATE BEGIN PROJECT
APPROXIMATE END PROJECT
CR 672
0 100 400
Feet
0 200 800
Feet
SECTION:
RANGE:
TOWNSHIP:
REFERENCE: USDA SOIL SURVEY OF HILLSBOROUGH COUNTY, FLORIDA
REFERENCE: USGS QUADRANGLE MAP OF "RIVERVIEW, FLORIDA"
7, 8, 17, 18
20E
31S
N
G A
R D
E N
D R
C O
V I N
G T
O N
W A
T E
R S
T
B L
V D
U S
APPROXIMATE BEGIN PROJECT
APPROXIMATE END PROJECT
N
U S
G A
R D
C O
V I N
G T
O N
69647000
BIG BEND RD (US 41 TO COVINGTON GDN DR)
CR 672
USCS AASHTO
Depth
(feet) Months
0-7 SP A-3 6.0 - 20.0 3.5-7.3
7-28 SP, SP-SM A-2-4, A-3 6.0 - 20.0 3.5-7.3
28-42 SP, SP-SM A-2-4, A-3 6.0 - 20.0 3.5-7.3
42-80 SP, SP-SM A-2-4, A-3 6.0 - 20.0 3.5-7.3
0-6 SP, SP-SM A-3 6.0 - 20.0 5.1-7.3
6-52 SP, SP-SM A-3 6.0 - 20.0 5.1-7.3
52-80 SC-SM, SM A-2-4 0.2 - 2.0 5.1-8.4
0-34 PT A-8 6.0 - 20.0 4.5-5.5
34-80 SM, SP, SP-SM A-2-4, A-3 6.0 - 20.0 3.5-5.5
0-5 SM, SP-SM A-2-4, A-3 6.0 - 20.0 5.1-7.0
5-17 SM, SP-SM A-3, A-2-4 6.0 - 20.0 5.1-8.0
17-42 SM, SP-SM A-2-4, A-3 6.0 - 20.0 5.1-8.0
42-59 SC-SM, SC, CL A-2-4, A-6, A-4 2.0 - 6.0 3.8-8.0
59-80 SM A-4, A-2-4 6.0 - 20.0 5.1-8.0
0-6 SP-SM, SM A-2-4, A-3 6.0 - 20.0 3.5-6.5
6-20 SP-SM, SM A-2-4, A-3 6.0 - 20.0 3.5-6.5
20-36 SP-SM, SM A-2-4, A-3 0.6 - 6.0 3.5-6.5
36-80 SP-SM, SM A-2-4, A-3 6.0 - 20.0 3.5-6.5
0-4 SP-SM, SM A-2-4, A-3 6.0 - 20.0 4.5-6.0
4-22 SP-SM, SM A-2-4, A-3 0.6 - 2.0 4.5-6.0
22-80 SP-SM, SM A-2-4, A-3 6.0 - 20.0 4.5-6.0
0-4 SP-SM, SM A-2-4, A-3 6.0 - 20.0 4.4-6.5
4-16 SM, SP-SM A-2-4, A-3 6.0 - 20.0 4.4-6.5
16-28 SM, SP-SM A-2-4, A-3 6.0 - 20.0 4.4-6.5
28-32 SM, SP-SM A-2-4, A-3 6.0 - 20.0 5.0-8.4
32-48 SC-SM, SC, CL A-2-4, A-6, A-4 2.0 - 6.0 5.0-8.4
48-80 SM A-4, A-2-4 6.0 - 20.0 7.6-8.4
Jun-Nov
(5)
Basinger -
Holopaw -
Samsula
+2.0-0.0 Jun-Sept
+2.0-0.0 Jun-Sept
+2.0-0.0 Jun-Oct
(27)
Malabar 0.3-1.5 Jul-Oct
(57)
Wabasso 0.5-1.5 Jun-Nov
Summary of USDA Soil Survey
Hillsborough County, Florida
USDA Map
Symbol and Soil
Name
Depth
(in)
Soil Classification pH
Seasonal High
Water TablePermeability
(in/hr)
(29)
Myakka 0.5-1.5 Jun-Nov
(33)
Ona 0.5-1.5
APPENDIX B
Roadway Soil Survey Sheet
Boring Location Plan
Roadway Soil Profiles
Pond Soil Survey Sheets
Muck Delineation Plan
CAPITAL PROGRAMS DEPARTMENT
601 E. KENNEDY BLVD.
TAMPA, FLORIDA 33602
CROSS SECTION SOIL SURVEY FOR THE DESIGN OF ROADS
CONTENT
ORGANIC
CONTENT
MOISTURE
PERCENT PASS (%)
SIEVE ANALYSIS RESULTS
MESH
MESH
LIMIT
LIQUID
DATE OF SURVEY:
SURVEY MADE BY:
SUBMITTED BY: COUNTY:
ROAD NO.:
LIMITS (%)
ATTERBERG
TESTS
NO. OF
INDEX
PLASTIC
GROUP
AASHTO
CONTENT
MOISTURE DESCRIPTION
TESTS
NO. OF
CORROSION TEST RESULTS
pH
2-14 78-100 15-26 524 46-85 21-54 NP 75-97 NP 8 1,600-8,000 15-105 <5-123 6.1-7.2 1.5-2.2 8 1 33
EMBANKMENT AND SUBGRADE MATERIAL
- WATER TABLE ENCOUNTERED
GNE - GROUNDWATER NOT ENCOUNTERED
A-3/A-2-4
TIERRA, INC.
MESH
MESH
MESH
TESTS
NO. OF
TESTS
NO. OF
ORGANIC
TESTS
NO. OF
NO.
STRATUM
ohm-cm
RESISTIVITY
ppm
CHLORIDE
ppm
SULFATES
NOTES:
- ESTIMATED SEASONAL HIGH GROUNDWATER TABLE
CR 672
16 -- 18 1 1 -- -- NP -- NP -- 1 2 -- A-2-4
4-12 -- 8-46 --11 -- -- -- -- -- -- -- -- -- -- 2.4-4.4 11 3 11 A-3/A-2-4
6-75 -- 27-327 --15 -- -- -- -- -- -- -- -- -- -- 5.6-38 15 4 15 A-8
53-98 -- 41-88 9 9 -- -- 27-76 -- 52-114 -- 9 5 --
-- -- -- ---- -- -- -- -- -- -- -- 6 -- A-1/A-3
HILLSBOROUGH
ROADWAY SOIL SURVEY
P.E. LICENSE NUMBER 65514
KEVIN H. SCOTT, P.E.
TIERRA, INC.
7351 TEMPLE TERRACE HIGHWAY
TAMPA, FLORIDA 33637
KEVIN H. SCOTT, P.E.
THE "--" INDICATES AN UNMEASURED PARAMETER.
STRATA BOUNDARIES ARE APPROXIMATE. MAKE FINAL CHECK AFTER GRADING.
GRAY TO BROWN SILTY SAND
ORGANICS
GRAY TO DARK BROWN SAND TO SAND WITH SILT WITH TRACE
GRAY TO BROWN SAND TO SAND WITH SILT TO SILTY SAND
BIG BEND RD (US 41 TO COVINGTON GDN DR)
69647000
SHT. NO.CIP NO.
J:\6511\2021 Files\6511-21-076 Big Bend Widening\Microstation\Geotech\SSUVRD_West01.dgnbsawaska 11/19/2025 2:16:35 PM Default
P
E N
T B
L L
P
L T
D R
V L
DESCRIPTIONDATE DESCRIPTION DATE
REVISIONS
T H
O F
F I
C I
A
C O
I
S
E E
T
E C
T R
O N
C
G I
T A
L
Y
G N
A L
U
D
L E
G
A
C
5.
4.
3.
2.
1.
GREEN TO GRAY TO BROWN SILT TO CLAY
SAND TO MUCK
DARK BROWN ORGANIC SAND WITH SILT TO ORGANIC SILTY
ASPHALT AND LIMEROCK FRAGMENTS WITH SAND
CALCAREOUS CLAY TO WEATHERED LIMETONE -- -- -- ---- -- -- -- -- -- -- ---- -- -- -- -- -- --
A-7-5/A-7-6
8.
7.
6.
JUNE 2022 TO NOVEMBER 2025
CAPITAL PROGRAMS DEPARTMENT
PUBLIC WORKS ADMINISTRATION
HILLSBOROUGH COUNTY
CIP : 69647000
FROM US 41 TO COVINGTON GARDEN DRIVE
BIG BEND ROAD
ADDITIONAL COST TO HILLSBOROUGH COUNTY.
POTENTIOMETRIC LEVELS UP TO +15 FEET, NGVD 29 (+14.5 FEET, NAVD 88) AT NO
EXPLORATION. THE CONTRACTOR SHOULD BE PREPARED TO ADDRESS AND HANDLE
NAVD 88). ARTESIAN CONDITIONS WERE NOT ENCOUNTERED DURING THE FIELD
PROJECT VICINITY RANGES UP TO APPROXIMATELY +15 FEET, NGVD 29 (+14.5 FEET,
MAPS PUBLISHED BY THE USGS, THE POTENTIOMETRIC SURFACE ELEVATION IN THE
BASED ON A REVIEW OF THE “UPPER FLORIDAN AQUIFER POTENTIOMETRIC SURFACE”
LIMESTONE IS POROUS AND DIFFICULT TO DE-WATER.
TECHNIQUES AND THE MOBILIZATION OF SPECIALIZED EQUIPMENT. IN ADDITION,
MATERIAL WILL BE DIFFICULT AND WILL REQUIRE NON-CONVENTIONAL CONSTRUCTION
MATERIAL SHOULD BE ANTICIPATED. EXCAVATION INTO AND THROUGH THIS
THIS MATERIAL IS ROCK. VARIABILITY IN THE DEPTH AND HARDNESS OF THIS
THE MATERIAL FROM STRATUM 7 IS CALCAREOUS CLAY TO WEATHERED LIMESTONE.
TECHNIQUES AND THE MOBILIZATION OF SPECIALIZED EQUIPMENT.
MATERIAL WILL BE DIFFICULT AND WILL REQUIRE NON-CONVENTIONAL CONSTRUCTION
OF THIS MATERIAL SHOULD BE ANTICIPATED. EXCAVATION INTO AND THROUGH THIS
MATERIAL IS VERY HARD/DENSE. VARIABILITY IN THE DEPTH AND RELATIVE DENSITY
WHEN UTILIZED IN ACCORDANCE WITH STANDARD PLANS, INDEX 120-0001. THIS
SAND (A-1/A-3). THIS MATERIAL APPEARS SATISFACTORY FOR USE IN THE EMBANKMENT
THE MATERIAL FROM STRATUM 6 IS ASPHALT AND LIMEROCK FRAGMENTS WITH
ACCORDANCE WITH STANDARD PLANS, INDEX 120-001.
REMOVED IN ACCORDANCE WITH STANDARD PLANS, INDEX 120-002 AND UTILIZED IN
THE MATERIAL FROM STRATUM 5 (A-7-5/A-7-6) IS HIGH PLASTIC MATERIAL AND SHALL BE
ROADWAY CROSS-SECTIONS AND ON THE MUCK DELINEATION PLAN SHEET.
WITH STANDARD PLANS, INDEX 120-001. THE REMOVAL LIMITS ARE DEPICTED ON THE
IN ACCORDANCE WITH STANDARD PLANS, INDEX 120-002 AND UTILIZED IN ACCORDANCE
THE MATERIAL FROM STRATUM 4 (A-8) IS MUCK MATERIAL AND SHALL BE REMOVED
ROADBED DUE TO ITS ORGANIC CONTENT.
HOWEVER, THIS MATERIAL MAY NOT BE USED IN THE SUBGRADE PORTION OF THE
EMBANKMENT WHEN UTILIZED IN ACCORDANCE WITH STANDARD PLANS, INDEX 120-001.
THE MATERIAL FROM STRATUM 3 (A-3/A-2-4) APPEARS SATISFACTORY FOR USE IN THE
EMBANKMENT ABOVE THE WATER LEVEL EXISTING AT THE TIME OF CONSTRUCTION.
AND MAY BE DIFFICULT TO DRY AND COMPACT. IT SHOULD BE USED IN THE
INDEX 120-001. HOWEVER, THIS MATERIAL IS LIKELY TO RETAIN EXCESS MOISTURE
THE EMBANKMENT WHEN UTILIZED IN ACCORDANCE WITH STANDARD PLANS,
THE MATERIAL FROM STRATUM 2 (A-2-4) APPEARS SATISFACTORY FOR USE IN
INDEX 120-001.
IN THE EMBANKMENT WHEN UTILIZED IN ACCORDANCE WITH STANDARD PLANS,
THE MATERIAL FROM STRATUM 1 (A-3/A-2-4) APPEARS SATISFACTORY FOR USE
80 85
ELEC
CAPITAL PROGRAMS DEPARTMENT
601 E. KENNEDY BLVD.
TAMPA, FLORIDA 33602
SH-77R
B-78R
SH-80L
SH-82R
SH-84L
SH-87R
SH-87L
AB-79R AB-80R
AB-81L
AB-81R
AB-82L
AB-84R
AB-85L
AB-85R
AB-85R2
AB-86L
AB-86R
AB-87L
AB-88R
B-83L
B-86R
£ SURVEY CR 672 (OLD BIG BEND RD.)
U S
B A
Y
I N
D U
S T
R I
I V
E
M-82R-1
M-82R-2
M-82R-3 M-82R-4 M-82R-5
M-82R-6
M-82R-7
M-82R-8 M-82R-9
M-82R-10
M-82R-11
M-82R-12
P.E. LICENSE NUMBER 65514
KEVIN H. SCOTT, P.E.
TIERRA, INC.
7351 TEMPLE TERRACE HIGHWAY
TAMPA, FLORIDA 33637
CIP NO. SHT. NO.
APPROXIMATE SPT BORING LOCATION
APPROXIMATE AUGER BORING LOCATION
LEGEND
69647000
BIG BEND RD (US 41 TO COVINGTON GDN DR)
Feet
100200
N
J:\6511\2021 Files\6511-21-076 Big Bend Widening\Microstation\Geotech\ABORRD_West01.dgnbsawaska 10/30/2024 8:43:46 AM Default
P
E N
T B
L L
P
L T
D R
V L
DESCRIPTIONDATE DESCRIPTION DATE
BORING LOCATION PLAN (1)
90 95 100
WATER
ELEC
CAPITAL PROGRAMS DEPARTMENT
601 E. KENNEDY BLVD.
TAMPA, FLORIDA 33602
PBA-1AW-91L
PBA-1AS-92R
PBA-1AN-94L
PBA-1AS-96R
PBA-1AN-97L
PBA-1BS-101R
PBA-1BN-102L
AB-100R AB-101R
AB-102L
AB-102R
AB-103L
AB-103R
AB-104L
AB-104R
AB-90L
AB-90R AB-91R
AB-93L
AB-93R
AB-94L
AB-94R
AB-95L
AB-95R
AB-96L
AB-97L AB-98L
AB-98R
B-101L
B-92L
AB-96R2
B-96R
AB-96R2B
AB-96R5
AB-96R6
AB-96R7
AB-97R
AB-96R1AB-96R4
AB-96R3
AB-95R1
£ SURVEY CR 672 (OLD BIG BEND RD.)
POND-1A SOUTH
POND-1B SOUTH
DBA-105L-1
DBA-105L-2
DBA-105L-3
P.E. LICENSE NUMBER 65514
KEVIN H. SCOTT, P.E.
TIERRA, INC.
7351 TEMPLE TERRACE HIGHWAY
TAMPA, FLORIDA 33637
CIP NO. SHT. NO.
APPROXIMATE SPT BORING LOCATION
APPROXIMATE AUGER BORING LOCATION
LEGEND
69647000
BIG BEND RD (US 41 TO COVINGTON GDN DR)
Feet
100200
N
J:\6511\2021 Files\6511-21-076 Big Bend Widening\Microstation\Geotech\ABORRD_West02.dgnbsawaska 10/30/2024 8:43:47 AM Default
P
E N
T B
L L
P
L T
D R
V L
DESCRIPTIONDATE DESCRIPTION DATE
BORING LOCATION PLAN (2)
105 110 115
ELEC
CAPITAL PROGRAMS DEPARTMENT
601 E. KENNEDY BLVD.
TAMPA, FLORIDA 33602
PBA-1BS-105R
PBA-1BN-105L SH-109L
SH-109R
SH-113L
SH-113R
SH-1B
SH-1C
AB-105L
AB-105R
AB-106L
AB-107L
AB-108L
AB-111L
AB-112L
AB-113L AB-114L
AB-115L
AB-118L5
AB-118R AB-119R
B-106R
B-110L
B-114R
B-119L
AB-119L
AB-111R AB-112R AB-113R
AB-115R
AB-110R2
AB-109R
AB-118L2
AB-118L3
AB-118L4
AB-118L6
AB-118L7 AB-118L8
AB-118L
AB-114+60R
AB-114+80R
AB-110+50R
AB-110R
AB-111+50R
AB-111R2
AB-112+50R
AB-112R2
AB-109+80R
AB-109+60R
AB-113+80R
AB-114R2
AB-114+20R
AB-114+40R
K I N
G
L
A K
£ SURVEY CR 672 (OLD BIG BEND RD.)
£ SURVEY CR 672 (BIG BEND RD.)
K I N
G
O S
S I
I V
E
DBA-105L-4
DBA-105L-5
DBA-105L-6 DBA-105L-7
DBA-105L-8
P.E. LICENSE NUMBER 65514
KEVIN H. SCOTT, P.E.
TIERRA, INC.
7351 TEMPLE TERRACE HIGHWAY
TAMPA, FLORIDA 33637
CIP NO. SHT. NO.
APPROXIMATE SPT BORING LOCATION
APPROXIMATE AUGER BORING LOCATION
LEGEND
69647000
BIG BEND RD (US 41 TO COVINGTON GDN DR)
Feet
100200
N
J:\6511\2021 Files\6511-21-076 Big Bend Widening\Microstation\Geotech\ABORRD_West03.dgnbsawaska 10/30/2024 8:43:47 AM Default
P
E N
T B
L L
P
L T
D R
V L
DESCRIPTIONDATE DESCRIPTION DATE
BORING LOCATION PLAN (3)
120 125 130 135
120 125 130
CAPITAL PROGRAMS DEPARTMENT
601 E. KENNEDY BLVD.
TAMPA, FLORIDA 33602
SH-120L
SH-124L SH-127L
SH-12
SH-2B
SH-126
SH-3A
SH-128
AB-120R
AB-121L
AB-121R
AB-122L
AB-122R
AB-123L
AB-123R
AB-124L
AB-125L
AB-125R
AB-126L
AB-128L
AB-128R
AB-127R
B-127R2
C O
V I N
G T
R D
£ SURVEY CR 672 (OLD BIG BEND RD.)
£ SURVEY CR 672 (BIG BEND RD.)
DBA-128R-1
DBA-128R-2
DBA-128R-3
DBA-128R-4
AB-OBB-125L
AB-OBB-126L
AB-OBB-128L
AB-OBB-129L
AB-OBB-130L AB-OBB-131L
AB-OBB-132L AB-OBB-133L
AB-OBB-134L
P.E. LICENSE NUMBER 65514
KEVIN H. SCOTT, P.E.
TIERRA, INC.
7351 TEMPLE TERRACE HIGHWAY
TAMPA, FLORIDA 33637
CIP NO. SHT. NO.
APPROXIMATE SPT BORING LOCATION
APPROXIMATE AUGER BORING LOCATION
LEGEND
69647000
BIG BEND RD (US 41 TO COVINGTON GDN DR)
Feet
100200
N
J:\6511\2021 Files\6511-21-076 Big Bend Widening\Microstation\Geotech\ABORRD_West04.dgnbsawaska 10/30/2024 8:43:48 AM Default
P
E N
T B
L L
P
L T
D R
V L
DESCRIPTIONDATE DESCRIPTION DATE
BORING LOCATION PLAN (4)
E L
E C
CAPITAL PROGRAMS DEPARTMENT
601 E. KENNEDY BLVD.
TAMPA, FLORIDA 33602
SH-KING-1
SH-KING-2
KING LAKE DR
£ SURVEY CR 672 (OLD BIG BEND RD.)
£ SURVEY CR 672 (BIG BEND RD.)
P.E. LICENSE NUMBER 65514
KEVIN H. SCOTT, P.E.
TIERRA, INC.
7351 TEMPLE TERRACE HIGHWAY
TAMPA, FLORIDA 33637
CIP NO. SHT. NO.
APPROXIMATE SPT BORING LOCATION
APPROXIMATE AUGER BORING LOCATION
LEGEND
69647000
BIG BEND RD (US 41 TO COVINGTON GDN DR)
Feet
100200
J:\6511\2021 Files\6511-21-076 Big Bend Widening\Microstation\Geotech\ABORRD_West05.dgnbsawaska 10/30/2024 8:43:49 AM Default
P
E N
T B
L L
P
L T
D R
V L
DESCRIPTIONDATE DESCRIPTION DATE
BORING LOCATION PLAN (5)
CAPITAL PROGRAMS DEPARTMENT
601 E. KENNEDY BLVD.
TAMPA, FLORIDA 33602
SH-COV-3
SH-COV-2
SH-COV-1
COVINGTON GARDEN DR
£ SURVEY CR 672 (OLD BIG BEND RD.)
£ SURVEY CR 672 (BIG BEND RD.)
P.E. LICENSE NUMBER 65514
KEVIN H. SCOTT, P.E.
TIERRA, INC.
7351 TEMPLE TERRACE HIGHWAY
TAMPA, FLORIDA 33637
CIP NO. SHT. NO.
APPROXIMATE SPT BORING LOCATION
APPROXIMATE AUGER BORING LOCATION
LEGEND
69647000
BIG BEND RD (US 41 TO COVINGTON GDN DR)
Feet
100200
J:\6511\2021 Files\6511-21-076 Big Bend Widening\Microstation\Geotech\ABORRD_West06.dgnbsawaska 10/30/2024 8:43:50 AM Default
P
E N
T B
L L
P
L T
D R
V L
DESCRIPTIONDATE DESCRIPTION DATE
BORING LOCATION PLAN (6)
TAMPA, FLORIDA 33602 69647000
BIG BEND RD (US 41 TO COVINGTON GDN DR)
12 to 24
6 to 12
24 to 40
8 to 24
(BLOWS/FT.)
(BLOWS/FT.)
GREATER THAN 24
LESS THAN 3
GREATER THAN 40
LESS THAN 1
3 to 6
1 to 3
3 to 8
8 to 15
30 to 50
10 to 30
4 to 10
(BLOWS/FT.)
SPT N-VALUE
(BLOWS/FT.)
GREATER THAN 30
LESS THAN 4
GREATER THAN 50
LESS THAN 2
VERY LOOSE
HARD
VERY STIFF
STIFF
SILTS AND CLAYS
CONSISTENCY
FIRM
SOFT
VERY SOFT
LOOSE
DENSE
VERY DENSE
4 to 8
2 to 4
RELATIVE DENSITY
GRANULAR MATERIALS-
SAFETY HAMMER AUTOMATIC HAMMER
GROUNDWATER NOT ENCOUNTEREDGNE
LEGEND
FIELD EXPLORATIONS
GROUNDWATER LEVEL ENCOUNTERED DURING
SPT N-VALUE
SPT N-VALUE SPT N-VALUE
15 to 30
ESTIMATED SEASONAL HIGH GROUNDWATER TABLE
CAVE-IN
MEDIUM DENSE
CAVE-IN DUE TO SHALLOW GROUNDWATER INTRUSION
P.E. LICENSE NUMBER 65514
KEVIN H. SCOTT, P.E.
TIERRA, INC.
7351 TEMPLE TERRACE HIGHWAY
TAMPA, FLORIDA 33637
6.
5.
4.
3.
2.
1.
HAND AUGERED TO VERIFY UTILITY CLEARANCE
(UNLESS OTHERWISE NOTED).
SPT VALUE FOR 12 INCHES OF PENETRATION
NUMBERS TO THE LEFT OF BORINGS INDICATE
VISUAL REVIEW.
ON SELECTED SAMPLES FOR CONFIRMATION OF
BY VISUAL REVIEW AND LABORATORY TESTING
AASHTO GROUP SYMBOL AS DETERMINED
HA
N
A-3
REFUSAL
ABOVE EXISTING GRADE
ESTIMATED SEASONAL HIGH GROUNDWATER TABLE
EXISTING GRADE
GROUNDWATER LEVEL ENCOUNTERED ABOVE
¡ CR 672
DEBRIS
AUGER REFUSAL ON LIMEROCK AND/OR ASPHALT
NOTES:
2.
1.
AUTOMATIC HAMMER.
THE SPT BORINGS WERE PERFORMED USING AN
APPROXIMATE.
ACCURACY OF ± 10 FEET AND SHOULD BE CONSIDERED
GPS EQUIPMENT WITH A MANUFACTURE'S REPORTED
THE FIELD USING HAND-HELD, NON-SURVEY GRADE
REMAINING BORING LOCATIONS WERE ESTIMATED IN
(*) WERE PROVIDED BY THE PROJECT SURVEYOR. THE
THE BORING LOCATIONS DENOTED WITH AN ASTERISK
(BIG BEND RD.)
CENTERLINE CONSTRUCTION OF CR 672
(A-1/A-3)
ASPHALT AND LIMEROCK FRAGMENTS WITH SAND
GREEN TO GRAY TO BROWN SILT TO CLAY (A-7-5/A-7-6)
ORGANIC SILTY SAND TO MUCK (A-8)
DARK BROWN ORGANIC SAND WITH SILT TO
WITH TRACE ORGANICS (A-3/A-2-4)
GRAY TO DARK BROWN SAND TO SAND WITH SILT
GRAY TO BROWN SILTY SAND (A-2-4)
SILTY SAND (A-3/A-2-4)
GRAY TO BROWN SAND TO SAND WITH SILT TO
D E
P T
H
I N
F
E E
T
D E
P T
H
I N
F
E E
T
D E
P T
H
I N
F
E E
T
D E
P T
H
I N
F
E E
T
D E
P T
H
I N
F
E E
T
D E
P T
H
I N
F
E E
T
J:\6511\2021 Files\6511-21-076 Big Bend Widening\Microstation\Geotech\ABORRDProf_West01.dgnbsawaska 11/19/2025 2:19:11 PM Default
P
E N
T B
L L
P
L T
D R
V
ROADWAY SOIL PROFILES (1)
D E
P T
H
I N
F
E E
T
D E
P T
H
I N
F
E E
T
SH-77R
STA. 1077 + 52
89' RT.
7/18/2022
CAVE-IN
B-78R
STA. 1077 + 75
82' RT.
3/13/2023
AB-79R
STA. 1078 + 90
65' RT.
3/6/2023
AB-80R
STA. 1079 + 89
65' RT.
3/6/2023
SH-80L
STA. 1080 + 07
50' LT.
7/19/2022
CAVE-IN
AB-81L
STA. 1080 + 96
60' LT.
3/6/2023
AB-81R
STA. 1080 + 97
71' RT.
3/6/2023
M-82R-1
STA. 1081 + 32
75' RT.
1/19/2024
SH-82R
STA. 1081 + 96
74' RT.
7/18/2023
CAVE-IN
AB-82L
STA. 1082 + 08
56' LT.
3/6/2023
M-82R-2
STA. 1082 + 31
76' RT.
1/19/2024
CAVE-IN
M-82R-3
STA. 1082 + 73
77' RT.
1/19/2024
CAVE-IN
B-83L
STA. 1083 + 09
60' LT.
3/13/2023
M-82R-4
STA. 1083 + 46
78' RT.
1/19/2024
CAVE-IN
AB-84R
STA. 1083 + 92
65' RT.
3/6/2023
M-82R-5
STA. 1084 + 08
80' RT.
1/18/2024
CAVE-IN
SH-84L
STA. 1084 + 11
54' LT.
7/19/2023
CAVE-IN
M-82R-6
STA. 1084 + 54
78' RT.
1/22/2024
CAVE-IN
AB-85R
STA. 1084 + 94
39' RT.
3/6/2023
GNE
AB-85R2
STA. 1084 + 95
82' RT.
3/6/2023
AB-85L
STA. 1084 + 96
59' LT.
3/6/2023
M-82R-7
STA. 1085 + 10
76' RT.
1/22/2024
CAVE-IN
M-82R-8
STA. 1085 + 56
75' RT.
1/22/2024
CAVE-IN
B-86R
STA. 1085 + 82
40' RT.
2/22/2023
AB-86R
STA. 1085 + 92
66' RT.
3/6/2023
AB-86L
STA. 1085 + 95
63' LT.
3/6/2023
M-82R-9
STA. 1086 + 15
73' RT.
1/22/2024
CAVE-IN
M-82R-10
STA. 1086 + 67
78' RT.
1/22/2024
CAVE-IN
AB-87L
STA. 1086 + 90
62' LT.
3/6/2023
SH-87R
STA. 1086 + 98
66' RT.
7/18/2023
CAVE-IN
SH-87L
STA. 1087 + 04
75' LT.
7/19/2023
CAVE-IN
M-82R-11
STA. 1087 + 20
76' RT.
1/22/2024
CAVE-IN
AB-88R
STA. 1087 + 45
28' RT.
3/6/2023
M-82R-12
STA. 1087 + 73
78' RT.
1/22/2024
CAVE-IN
AB-90R
STA. 1089 + 81
52' RT.
3/7/2023
AB-90L
STA. 1090 + 04
74' LT.
3/3/2023
PBA-1AW-91L
STA. 1091 + 05
73' LT.
7/19/2023
CAVE-IN
AB-91R
STA. 1091 + 18
51' RT.
3/7/2023
B-92L
STA. 1092 + 06
48' LT.
2/22/2023
PBA-1AS-92R
STA. 1092 + 12
64' RT.
7/18/2023
CAVE-IN
¡ CR 672
¡ CR 672
¡ CR 672
¡ CR 672
¡ CR 672
¡ CR 672
¡ CR 672
¡ CR 672¡ CR 672¡ CR 672
¡ CR 672
¡ CR 672 ¡ CR 672 ¡ CR 672 ¡ CR 672 ¡ CR 672
¡ CR 672 ¡ CR 672
¡ CR 672
¡ CR 672 ¡ CR 672
¡ CR 672
¡ CR 672 ¡ CR 672
¡ CR 672¡ CR 672
¡ CR 672
¡ CR 672
¡ CR 672
¡ CR 672 ¡ CR 672¡ CR 672
¡ CR 672
¡ CR 672
¡ CR 672¡ CR 672
¡ CR 672
¡ CR 672¡ CR 672
¡ CR 672
HA
HA
HA
N
HA
HA
HA
N
HA
HA
HA
N
HA
HA
HA
TAMPA, FLORIDA 33602 69647000
BIG BEND RD (US 41 TO COVINGTON GDN DR)
12 to 24
6 to 12
24 to 40
8 to 24
(BLOWS/FT.)
(BLOWS/FT.)
GREATER THAN 24
LESS THAN 3
GREATER THAN 40
LESS THAN 1
3 to 6
1 to 3
3 to 8
8 to 15
30 to 50
10 to 30
4 to 10
(BLOWS/FT.)
SPT N-VALUE
(BLOWS/FT.)
GREATER THAN 30
LESS THAN 4
GREATER THAN 50
LESS THAN 2
VERY LOOSE
HARD
VERY STIFF
STIFF
SILTS AND CLAYS
CONSISTENCY
FIRM
SOFT
VERY SOFT
LOOSE
DENSE
VERY DENSE
4 to 8
2 to 4
RELATIVE DENSITY
GRANULAR MATERIALS-
SAFETY HAMMER AUTOMATIC HAMMER
GROUNDWATER NOT ENCOUNTEREDGNE
LEGEND
FIELD EXPLORATIONS
GROUNDWATER LEVEL ENCOUNTERED DURING
SPT N-VALUE
SPT N-VALUE SPT N-VALUE
15 to 30
ESTIMATED SEASONAL HIGH GROUNDWATER TABLE
CAVE-IN
MEDIUM DENSE
CAVE-IN DUE TO SHALLOW GROUNDWATER INTRUSION
P.E. LICENSE NUMBER 65514
KEVIN H. SCOTT, P.E.