Attachment B- Geo Report - 69692000 PhIV Rdwy Soil Survey Report 2025-11-20.pdf

PDF 7 MB Posted

Attached to
Big Bend Road from US 41 to Covington Garden Dr.
Solicitation number
IFB-26-00378
Issued by
Hillsborough County, Florida

About this file

This is a Roadway Soil Survey Report prepared by Tierra, Inc. for Hillsborough County, Florida, addressing geotechnical conditions along Big Bend Road (CR 672) from US Highway 41 to Covington Garden Drive. The report supports the roadway design and widening project, which entails converting the existing four-lane divided rural highway into a six-lane urban typical section with curb and gutter, closed drainage system, and ten-foot sidewalks on each side. The geotechnical study was performed to obtain subsurface information and groundwater data to inform the construction plans for the roadway and drainage improvements. Services included review of published soil and geological data, development of a boring location plan, field exploration consisting of hand auger borings, Standard Penetration Test borings, asphalt pavement cores at nine locations, bulk soil sampling, and laboratory testing on collected samples. The report documents soil stratification, organic soil locations requiring removal, groundwater table measurements, and seasonal high groundwater table estimates throughout the project corridor.

The report identifies seven distinct soil strata encountered along the project alignment, ranging from sand and silty sand to organic muck and weathered limestone, with AASHTO classifications provided for each stratum. Organic soils were encountered at specific stations and require removal in accordance with Florida Department of Transportation standards, except where located outside the design control line. Two proposed wet ponds on the south side of Big Bend Road were evaluated geotechnically; stability and seepage analyses indicate the berms will be stable and prevent daylight seepage provided construction follows Hillsborough County and FDOT specifications, though the proposed designs deviate from standard criteria regarding maintenance berm width and freeboard due to right-of-way constraints. Pavement design recommendations include a Modulus of Resilience value of 9,500 psi based on Limerock Bearing Ratio testing. The report emphasizes that embankment settlement is anticipated to be minimal, slope stability should be maintained with appropriate geometries, and groundwater control measures may be necessary during construction, particularly during wet season operations.

View the file

Other files

File Type Posted
Attachment E- 69692000 BigBendWest Drainage Design Documentation Vol. II Final.pdf PDF
21-Attachment B- Geo Report - 69692000 100P Misc Structures 2025-11-20.pdf PDF
Attachment I- Utility Relocation Schedule 69647.000 Spectrum Revised URS 7.13.2026 TR LS.pdf PDF
Attachment B- Geo Report - 69692000 100P Misc Structures 2025-11-20.pdf PDF
Attachment H- Plans- Lighting.pdf PDF
41-Attachment L- CSX Coordination.pdf PDF
Attachment G- FDOT Grant Agreement.pdf PDF
Attachment I- Utility Relocation Schedule CIP 69647.000 Utility Cert Letter 7.15.26.pdf PDF
27-Attachment I- Utility Relocation Schedule 69647.000 100% REVISED - TEC UWS - REV4 7.13.26 TR LS.pdf PDF
13-AFFIDAVIT OF COMPLIANCE - Denying Doing Business with a Foreign Country of Concern 02.26.2026.docx DOCX document
2-Florida Trench Safety Act, Certification and Disclosure Statement.pdf.pdf PDF
43-Attachment M- Work Class Percentage.pdf PDF
34-Attachment I- Utility Relocation Schedule 69647.000 Spectrum Revised URS 7.13.2026 TR LS.pdf PDF
46-Attachment G- FDOT Grant Agreement.pdf PDF
40-Attachment K- Insurance Requirements.pdf PDF
52-Attachment H- Plans- ITS.pdf PDF
48-Attachment H- Location Map.pdf PDF
Attachment I- Utility Relocation Schedule 69647.000 100% REVISED - TEC UWS - REV4 7.13.26 TR LS.pdf PDF
Attachment H- Location Map.pdf PDF
11-Direct Deposit Authorization Form 5.15.2025.pdf.pdf PDF
AFFIDAVIT OF COMPLIANCE - Denying Doing Business with a Foreign Country of Concern 02.26.2026.docx DOCX document
3-Allowance Authorization Release Form.pdf.pdf PDF
29-Attachment I- Utility Relocation Schedule CIP 69647.000 100% URS PGS7-10-2026 REV 1SignedTR.pdf PDF
Attachment D- Permits - SWFWMD ERP 43024488.004 Approved.pdf PDF
17-Attachment F- 69692000 6050BigBend ROE ChildcareBrandon 10-9-25 Signed.pdf PDF
Agreement - Construction - Stand Alone.docx.pdf PDF
54-Attachment K- CSX Insurance Receipt.pdf PDF
Attachment I- Utility Relocation Schedule 69647.000 BIG BEND US 41 TO COVINGTON FTR URS 071426 TR LS.pdf PDF
39-Attachment J- CSX1036508- Agreement.pdf PDF
Attachment B- Geo Report - 69692000 Kings Lake Dr Misc Struc 100% Geo Report SS.pdf PDF
8-Change Order Form.pdf.pdf PDF
42-Agreement - Construction - Stand Alone.docx.pdf PDF
Attachment E- 69692000 BigBendWest Drainage Design Documentation Vol. I Final SS (1).pdf PDF
14-Attachment D- Permits - SWFWMD ERP 43024488.004 Approved.pdf PDF
23-Attachment E- 69692000 Waterset-Kings Lake Drainage Memo.pdf PDF
Attachment F- 669692000 6089BigBend ROE HomeDepot 10-9-25 signed.pdf PDF
20-Attachment B- Geo Report - 69692000 PhIV Rdwy Soil Survey Report 2025-11-20.pdf PDF
Attachment B- Geo Report - 69692000 Waterset Trail 100% RSS SS.pdf PDF
47-Attachment H- Clear Letters 2.pdf PDF
18-Attachment F- 669692000 BayIndustrial ROE 10-9-25. signed.pdf PDF
30-Attachment I- Utility Relocation Schedule CIP 69647.000 URS Uniti Fiber REV 3 7.10.26 TR LS.pdf PDF
Attachment F- 669692000 BayIndustrial ROE 10-9-25. signed.pdf PDF
Attachment I- Utility Relocation Schedule CIP 69647.000 100% URS PGS7-10-2026 REV 1SignedTR.pdf PDF
36-Bid Bond.doc.doc DOC document
9-Insurance Certificate.doc.doc DOC document
31-Attachment I- Utility Relocation Schedule MCI 69647.000 100% URS WSP-8-26 LS.pdf PDF
Attachment A- Construction Sign 2026.pdf PDF
32-Attachment I- Utility Relocation SchedCIP 69647 000 US 41 to Covington Garden Drive Zayo UWS 71326 TR LS.pdf PDF
1-Drug Free Workplace Form.doc.doc DOC document
Attachment E- 69692000 Waterset-Kings Lake Drainage Memo.pdf PDF
Show 40 more

Latest 50 of 89 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tierra, Inc.

7351 Temple Terrace Highway • Tampa, Florida 33637

Phone (813) 989-1354

November 20, 2025

WSP USA

5411 SkyCenter Drive, Suite 650 Tampa, Florida 33607

Attn: Danny Carnley, P.E.

RE: Roadway Soil Survey Report

Big Bend Rd. (CR 672) from US Hwy. 41 to Covington Garden Dr.

Hillsborough County, Florida CIP No.: 69647000 Tierra Project No.: 6511-21-076

Mr. Carnley:

Tierra, Inc. (Tierra) has completed a Roadway Soil Survey Report for the above referenced project. This report is being provided to support the Roadway Plans submittal. The results of our field exploration program and laboratory testing performed to date and subsequent geotechnical recommendations are presented herein.

Tierra appreciates the opportunity to be of service to WSP USA (WSP) on this project. If you have any questions or comments regarding this report, please contact our office at your earliest convenience.

Respectfully Submitted, TIERRA, INC.

Kaitlyn C. Waterman, P.E. Kevin H. Scott, P.E.

Geotechnical Engineer Senior Geotechnical Engineer Florida License No. 96615 Florida License No. 65514

Table of Contents

1.0 PROJECT INFORMATION

1.1 Project Authorization

1.2 Project Description

1.3 General Site Description

2.0 PURPOSE AND SCOPE OF SERVICES

3.0 REVIEW OF PUBLISHED DATA

3.1 Regional Geology

3.2 USDA Soil Survey

3.3 USGS Quadrangle Maps

3.4 Potentiometric Surface Elevation

4.0 SUBSURFACE EXPLORATION

4.1 Boring Locations

4.2 Soil Borings

4.3 Asphalt Pavement Cores

4.4 Bulk Sampling and Limerock Bearing Ratio Testing

5.0 LABORATORY TESTING

5.1 General

5.2 Test Designation

6.0 RESULTS OF SUBSURFACE EXPLORATION

6.1 General Soil Conditions

6.2 Organic Soils

6.3 Groundwater

6.4 Seasonal High Groundwater Table Estimates

7.0 ENGINEERING EVALUATIONS AND RECOMMENDATIONS

7.1 General

7.2 Organic Soils

7.3 Asphalt/Limerock Fragments with Sand

7.4 Pond Recommendations

7.5 Embankment Settlement

7.6 Slope Stability

7.7 Pavement Design Considerations

7.8 Temporary Slopes and Trenches

7.9 Groundwater Control

7.10 On-Site Soil Suitability

7.11 General Roadway Construction

8.0 REPORT LIMITATIONS

Table of Contents

APPENDIX A

USDA Soil Survey & USGS Quadrangle Maps Summary of USDA Soil Survey

APPENDIX B

Roadway Soil Survey Sheet Boring Location Plan Roadway Soil Profiles Pond Soil Survey Sheets Muck Delineation Plan

APPENDIX C

Summary of Seasonal High Groundwater Table Estimates

APPENDIX D

Pavement Data Table Design LBR Calculation

APPENDIX E

Summary of Laboratory Test Results for Soil Classification Summary of Laboratory Test Results for Environmental Classification Summary of Limerock Bearing Ratio Test Results

APPENDIX F

Results of Global Stability Analyses for Pond Berms Seepage Analyses for Pond Berms

Roadway Soil Survey Report Big Bend Rd. (CR 672) from US Hwy. 41 to Covington Garden Dr.

Hillsborough County, Florida CIP No.: 69647000

1.0 PROJECT INFORMATION

1.1 Project Authorization

Authorization to proceed with this project was issued by WSP in accordance with the Subconsultant Agreement.

1.2 Project Description

The project consists of the widening and reconstruction of Big Bend Road from east of US Highway 41 to Covington Garden Drive in Hillsborough County, Florida.

The purpose of this report is to provide geotechnical (i.e. soil and groundwater) input to the design team to assist in the design of the proposed roadway and drainage improvements. This report is provided to be included with the Roadway Plans submittal. The geotechnical report for miscellaneous structures is provided under separate cover.

1.3 General Site Description

The existing Big Bend Road (CR 672) within the project limits consists of a four-lane, two-way road separated by a grassed median. Land use adjacent to the project generally consists of residential and commercial developments and undeveloped wetland areas. The existing Big Bend roadway crosses the CFX railroad corridor that spans in the N-S direction near the mid-point of the proposed roadway widening.

2.0 PURPOSE AND SCOPE OF SERVICES

This geotechnical study was performed to obtain information on the existing subsurface conditions along the limits of the proposed roadway and drainage improvements to assist in design of the construction plans for the project. The following services were provided:

1. Reviewed published soil information obtained from the Soil Survey of Hillsborough County, Florida published by the United States Department of Agriculture (USDA) Natural Resources Conservation Service (NRCS). Reviewed topographic data obtained from the “Riverview, Florida” quadrangle map and potentiometric information obtained from the “Upper Floridan Aquifer Potentiometric Surface” maps published by the United States Geological Survey (USGS).

2. Developed a Boring Location Plan for borings to be performed along the proposed roadway alignment and within the proposed ponds.

3. Conducted a visual reconnaissance of the project site and coordinated utility clearances via Sunshine State One Call.

4. Performed a geotechnical field study for the proposed improvements consisting of hand auger borings, Standard Penetration Test (SPT) borings, subsurface sampling and field-testing.

Hillsborough County, Florida CIP No.: 69647000

5. Measured groundwater depths at the boring locations.

6. Estimated the Seasonal High Groundwater Table (SHGWT) levels at selected boring locations along the proposed roadway alignment and within the ponds.

7. Delineated encountered organic soils with hand auger borings.

8. Coordinated with Hillsborough County to obtain a Right-of-Way use permit to perform pavement cores within the travel lanes of Big Bend Road.

9. Performed nine (9) pavement cores within the existing Big Bend Road. Coordinated and performed Maintenance of Traffic (MOT) operations to facilitate the pavement coring.

10. Collected and tested four (4) bulk soil samples of the existing subgrade materials along the roadway corridor to determine a design Limerock Bearing Ratio (LBR) value for use in pavement design.

11. Visually examined and classified soil samples recovered from the borings using the American Association of State Highway and Transportation Officials (AASHTO) soil classification system.

12. Conducted laboratory testing on selected soil samples obtained from the borings to confirm the visual soil classifications and evaluate the corrosive nature of the soil.

13. Coordinated with the project surveyor to obtain survey data (locations and elevations) for the borings performed to estimate the SHGWT levels.

14. Prepared this Roadway Soil Survey Report for the project.

3.0 REVIEW OF PUBLISHED DATA

3.1 Regional Geology

Hillsborough County Geology has been paraphrased from the Florida Geological Survey, Open- File Report 80, 2001 and other geologic references.

The near surface geologic deposits and formations from youngest to oldest in Hillsborough County include: Undifferentiated sediments (Qu, TQu), Shelly sediments (TQsu), the Hawthorn Group Peace River Formation (Thp), the Hawthorn Group Peace River Formation Bone Valley Member (Thpb), the Hawthorn Group Arcadia Formation (Tha), and the Hawthorn Group Arcadia Formation Tampa Member (That).

The Undifferentiated sediments are siliciclastics that are light gray to tan, brown to black in color, unconsolidated to poorly consolidated, clean to clayey silty, unfossiliferous with variably organic-bearing sands and poorly to moderately consolidated sandy to silty clays. The Shelly sediments are variably calcareous and fossiliferous quartz sands to well indurated sandy, fossiliferous limestones with clayey sands and sandy clays present.

Hillsborough County, Florida CIP No.: 69647000

The Peace River Formation is primarily found near the surface in northwestern Hillsborough County and is composed of interbedded sands, clays and carbonates. The sands are generally light gray to olive gray in color, poorly consolidated, clayey, variably dolomitic, very fine to medium grained and phosphatic. The clays are yellowish gray to olive gray in color, poorly to moderately consolidated, sandy to silty, phosphatic and dolomitic. The carbonates are light gray to yellowish gray in color, poorly to well indurated, variably sandy and clayey and phosphatic.

The Peace River Formation is a semi-confining unit and forms an intermediate aquifer system in eastern Hillsborough County.

The carbonates often include opaline chert. The Bone Valley Member is a clastic unit consisting of sand-sized and larger phosphate grains in a matrix of quartz sand, silt and clay. The lithology is highly variable ranging from sands, silts, phosphatic clays and relatively pure clays to clayey, phosphatic sand to sandy, clayey phosphorites and is found within 50 feet of the surface in eastern Hillsborough County.

The Arcadia Formation is predominantly a carbonate unit with a variable siliciclastic component.

The Arcadia Formation is composed of yellow-gray to light olive-gray to light brown colored micro to finely crystalline sands with clayey and phosphatic fossiliferous limestones and dolostones. Thin beds of sand and clay are common. The sands are yellowish gray in color, very fine to medium grained, poorly to moderately indurated, clayey, dolomitic and phosphatic.

The clays are yellowish gray to light olive gray in color, poorly to moderately indurated, sandy, silty, phosphatic and dolomitic.

The Tampa member of the Arcadia Formation is white to yellowish gray in color, fossiliferous with variably sandy and clayey mudstone, wackestone and packstone with minor to no phosphate grains. In Hillsborough County the Tampa member is found about 300 feet below land surface (BLS), is approximately 100 to 150 feet thick and is part of the Floridan Aquifer System.

3.2 USDA Soil Survey

Based on a review of the Hillsborough County Soil Survey published by the USDA, it appears there are five (5) primary soil-mapping units noted within the project corridor. A reproduction of the USDA Soil Survey Map and a summary of each soil unit are provided in Appendix A.

It should be noted that information contained in the USDA Soil Survey may not be reflective of actual soil and groundwater conditions, particularly if development in the project vicinity has modified soil conditions or surface/subsurface drainage.

3.3 USGS Quadrangle Maps

Based on a review of the “Riverview, Florida” USGS quadrangle map, it appears that the ground elevation in the project vicinity is on the order of +5 feet to +35 feet National Geodetic Vertical Datum of 1929 (NGVD 29). This is reasonably consistent with the site specific boring elevation data provided by the project surveyor. A reproduction of the USGS Quadrangle Map for the project vicinity is provided in Appendix A.

Hillsborough County, Florida CIP No.: 69647000

3.4 Potentiometric Surface Elevation

Based on a review of the “Upper Floridan Aquifer Potentiometric Surface” maps published by the USGS, the potentiometric surface elevation in the project vicinity ranges up to approximately +15 feet, NGVD 29 (+14.5 feet, NAVD 88). As stated in Section 3.3, the natural ground elevation in the project vicinity is on the order of +5 to +35 feet, NGVD 29. Artesian conditions were not encountered during the field exploration. The Contractor should be prepared to address and handle potentiometric levels up to +15 feet, NGVD 29 (+14.5 feet, NAVD 88) at no additional cost to Hillsborough County.

4.0 SUBSURFACE EXPLORATION

4.1 Boring Locations

Prior to commencing our subsurface exploration, a boring location plan for the proposed roadway alignment and ponds was produced. The boring location plan was generated based on a review of the project design files provided by WSP, general guidance provided in the FDOT “Soils and Foundations Handbook” and our engineering judgment.

The boring locations were estimated by Tierra in the field using hand-held, non-survey grade Global Positioning System (GPS) equipment with a manufacturer’s reported accuracy of ±10 feet. The boring locations should be considered approximate. Following completion of the field work, the borings performed to estimate SHGWT levels were survey-located by the project land surveyor. Station and offset of the boring locations was determined using the surveyed/estimated GPS coordinates in conjunction with project design files provided by WSP.

The boring locations are provided on the Boring Location Plan sheets in Appendix B.

4.2 Soil Borings

Tierra performed hand auger borings and SPT borings along the proposed roadway alignment and within the proposed ponds to evaluate the existing subsurface conditions and groundwater levels.

The hand auger borings were performed by manually twisting and advancing a bucket auger into the ground, typically in 6-inch increments. As each soil type was revealed, representative samples were collected and returned to our office for confirmation of the field classification by a geotechnical engineer. The hand auger borings advanced to depths of less than 5 feet were terminated due to shallow groundwater levels resulting in cave-in of the borehole or auger refusal on asphalt and/or limerock debris.

The SPT borings were performed using mechanical drilling equipment utilizing bentonite mud drilling procedures. The soil sampling was performed in general accordance with the American Society for Testing and Materials (ASTM) test designation D-1586. Except at locations where the initial 6 feet of the SPT borings were manually advanced with a hand auger to verify utility clearances, SPT resistance N-values were taken continuously to a depth of 10 feet and on intervals of 5 feet thereafter to the boring termination depths. As each soil type was revealed, representative samples were placed in glass jars and returned to our office for classification and

Hillsborough County, Florida CIP No.: 69647000 laboratory testing. The results of the borings are shown on the Roadway Soil Profiles sheets in Appendix B.

4.3 Asphalt Pavement Cores

Tierra performed nine (9) pavement cores at select locations along the roadway alignment to determine the conditions of the existing pavement section, base materials and subgrade materials at the core locations. The pavement cores were performed with the use of a 4-inch outside diameter core bit. A hand auger boring was performed at each core location to identify the subgrade materials present. The cores and base samples were transported to our laboratory for visual classification, measurements and analysis. The results of the pavement cores are provided in the Pavement Data Table in Appendix D.

4.4 Bulk Sampling and Limerock Bearing Ratio Testing

Bulk soil samples were retrieved for LBR testing at four (4) locations along the proposed roadway alignment. In general, these samples were collected from the top 1 to 2 feet of the near-surface soils encountered. The samples were delivered to Tierra’s laboratory for LBR testing. The LBR testing was performed in accordance with FSTM FM 5-515 “Florida Method of Test for Limerock Bearing Ratio (LBR)”. The results of the LBR testing are provided in Appendix E of this report.

5.0 LABORATORY TESTING

5.1 General

Representative soil samples collected from the borings were classified and stratified in general accordance with the AASHTO soil classification system. Our classification was based on visual observations, using the results from the laboratory testing as confirmation. These tests included grain-size analyses, fines content, organic content, Atterberg limits and natural moisture content determination. Environmental corrosion tests were performed on selected soil samples to evaluate the corrosive nature of the subsurface soils encountered. Limerock Bearing Ratio (LBR) testing was also completed on bulk soil samples of the existing subgrade materials obtained along the project alignment.

5.2 Test Designation

The following list summarizes the laboratory tests performed by Tierra and the respective test methods utilized.

• Grain-Size Analyses/Fines Content - The grain-size analyses and fines content tests were conducted in general accordance with the AASHTO test designation T-088 (ASTM test designations D-6913 and D-1140).

• Atterberg Limits - The liquid limit and the plastic limit tests ("Atterberg Limits") were conducted in general accordance with the AASHTO test designations T-089 and T-090, respectively (ASTM test designation D-4318).

Hillsborough County, Florida CIP No.: 69647000

• Organic Content - The organic content tests were conducted in general accordance with the AASHTO test designation T-267.

• Natural Moisture Content - The moisture content tests were conducted in general accordance with the AASHTO test designation T-265 (ASTM test designation D-2216).

• Environmental Corrosion - The environmental corrosion tests were conducted in general accordance with the FDOT test designations FM 5-550, FM 5-551, FM 5-552 and FM 5- 553.

• LBR Testing – LBR tests were conducted in general accordance with FSTM FM 5-515 “Florida Method of Test for Limerock Bearing Ratio (LBR)”.

A summary of the laboratory test results for each soil stratum encountered along the project alignment is presented on the Roadway Soil Survey sheet in Appendix B. This sheet includes ranges of laboratory test results for different stratum soil samples collected from the borings.

Detailed summaries of the laboratory test results are presented in Appendix E.

6.0 RESULTS OF SUBSURFACE EXPLORATION

6.1 General Soil Conditions

The soil types encountered during this exploration have been assigned a stratum number. The stratum numbers and soil types associated with the roadway and drainage improvements for the project to date are provided in the table below:

Stratum Number

Typical Soil Description

AASHTO

Classification

1 Gray to Brown SAND to SAND with Silt to Silty SAND A-3/A-2-4

2 Gray to Brown Silty SAND A-2-4

3 Gray to Dark Brown SAND to SAND with Silt with Trace Organics A-3/A-2-4

Dark Brown Organic SAND with Silt to Organic Silty Sand to

MUCK

A-8

5 Green to Gray to Brown SILT to CLAY A-7-5/A-7-6

6 Asphalt and Limerock Fragments with SAND A-1/A-3

7 Calcareous Clay to Weathered Limestone ---(1)

(1)AASHTO does not provide classification for weathered limestone

A geotechnical engineer bases soil stratification on a visual review of the recovered samples, laboratory testing and interpretation of the field boring logs. The boring stratification lines represent the approximate boundaries between soil types of significantly different engineering properties; however, the actual transition may be gradual. In some cases, small variations in properties within the same boring not considered pertinent to our engineering evaluation may have been abbreviated or omitted for clarity. The boring profiles represent the conditions at the

Hillsborough County, Florida CIP No.: 69647000 particular boring location and variations did occur among the borings. The results of the borings performed for this study are presented on the Roadway Soil Profiles sheets in Appendix B.

6.2 Organic Soils

Organic soils (Stratum 4, A-8) were encountered within several borings preformed along the roadway alignment at approximate Stations 1082+00 RT., 1110+00 to 1115+00 RT., and 1118+00 LT. (C/L Const. CR 672). Organic soils were also encountered on the west side of Covington Garden Dr. The organic soils were generally surficial and were encountered at depths ranging from the ground surface to approximately 1½ feet below the existing ground surface. At approximate Station 1118+00 LT., buried organic soils were encountered at a depth of 5 to 6½ feet below existing grade. Based on the results of laboratory testing, the organic content of these soils ranges from 6 to 38 percent.

The organic soils encountered along the mainline roadway alignment were delineated with auger borings to estimate the horizontal and vertical limits of the organic soils. The results of muck delineation borings are presented on the Roadway Soil Profiles sheets and Muck Delineation Plan in Appendix B and are discussed further in the report sections below.

6.3 Groundwater

The groundwater table was measured at the boring locations performed along the roadway alignment and within the ponds at depths ranging from above the ground surface to a depth of approximately 6½ feet below the existing ground surface. The depths to the encountered groundwater table are presented on the Roadway Soil Profiles sheets in Appendix B.

Within some auger borings, groundwater was not encountered within the boring prior to the boring termination depth. Groundwater Not Encountered (GNE) is indicated adjacent to these soil profiles on the Roadway Soil Profiles sheets in Appendix B.

Groundwater conditions will vary with environmental variations and seasonal conditions, such as the frequency and magnitude of rainfall patterns, as well as man-made influences (i.e., existing water management canals, swales, drainage ponds, underdrains, and areas of covered soils, such as paved parking lots and sidewalks).

6.4 Seasonal High Groundwater Table Estimates

SHGWT levels were estimated at select boring locations performed along the proposed roadway alignment and within the proposed ponds. The SHGWT levels were estimated based on a review of the soil samples including natural soil indicators such as stain lines, mottles, the depth to the root layer, measured groundwater levels in the borings, information provided in the USDA Soil Survey published by the NRCS, existing wetland information provided by WSP, and the surrounding topography. The estimated SHGWT levels are presented on the Roadway Soil Profiles sheets in Appendix B and are summarized in the Summary of Seasonal High Groundwater Table Estimates tables included in Appendix C.

Hillsborough County, Florida CIP No.: 69647000

The SHGWT levels reported in the attached table are estimated historic levels. Man-made influences, such as existing water management ditches, swales, and drainage ponds will affect groundwater levels but are not considered when determining the historical SHGWT.

7.0 ENGINEERING EVALUATIONS AND RECOMMENDATIONS

7.1 General

In general, the existing subsurface soils encountered in the borings performed are suitable for supporting the proposed construction after proper subgrade preparation. If buried organic soils, debris or unsuitable fills are encountered during construction, they should be removed and replaced with clean, compacted, sandy (SELECT) soils in accordance with Hillsborough County guidelines and the FDOT Standard Plans.

Site preparation should consist of normal clearing and grubbing followed by compaction of subgrade soils. Backfill should consist of materials conforming to and compacted in accordance with Hillsborough County guidelines and the FDOT Specifications.

7.2 Organic Soils

Organic soils (Stratum 4, A-8) were encountered within several borings preformed along the roadway alignment as detailed in the subsection above. The organic soils should be removed in accordance with the FDOT Standard Plans. The removal limits for organic soils encountered between Station 1110+00 and 1115+00 RT. are depicted on the Roadway Cross-Sections and Muck Delineation Plan sheet. The organic soils encountered at Station 1082+00 RT., Station 1118+00 LT., and along Covington Garden Drive were encountered outside of the 1V:2H control line as referenced in the FDOT Standard Plans and therefore may remain in place.

7.3 Asphalt/Limerock Fragments with Sand

Buried asphalt and limerock fragments with sand (Stratum 6, A-1/A-3) was encountered at various locations along the roadway alignment. This material appears satisfactory for use in the embankment when utilized in accordance with Standard Plans, Index 120-001. This material is very hard/dense. Variability in the depth and relative density of this material should be anticipated. Excavation into and through this material will be difficult and will require non-conventional construction techniques and the mobilization of specialized equipment. A note alerting the Contractor of the presence of this material is provided on the Roadway Soil Survey sheet in Appendix B.

7.4 Pond Recommendations

Based on our understanding, the current drainage design for the project includes two ponds on the south side of Big Bend Road. Based on our understanding, the ponds are being designed to function as “wet” ponds. Tierra performed hand auger borings, SPT borings, obtained groundwater readings, and estimated the SHGWT levels within the proposed ponds. A detailed summary of the SHGWT estimates is provided in the Summary of Seasonal High Groundwater Table Estimates table in Appendix C. The results of the pond borings are provided on the Pond Soil Survey sheets in Appendix B.

Hillsborough County, Florida CIP No.: 69647000

Based on coordination with WSP, the proposed pond designs for Ponds 1A South and 1B South deviate from Hillsborough County and FDOT design criteria relating to the required maintenance berm width and freeboard. Per the Hillsborough County and FDOT design criteria, the minimum berm width and freeboard for ponds are 15 feet and 1 foot, respectively. The design deviations are required for the ponds due to limited right of way (ROW) space and storage volume requirements. The maintenance berm widths for Ponds 1A South and 1B South are proposed at 10 feet with 1V:4H front and back slopes. The freeboard distance from the 25-year DHW to the upper berm elevations ranges from 0.64 to 0.7 foot.

Tierra performed global stability analyses of the southern pond berms adjacent to the ROW limits to assess the stability of the berms. The stability analyses were completed using the software program “ReSSA 3.0” developed by ADAMA Engineering, Inc. Based on the proposed berm geometry and 25-year DHW values provided by WSP, slope stability factors of safety will exceed 1.5 provided the berms are constructed in accordance with Hillsborough County guidelines and FDOT Specifications. The Results of Stability Analyses for Pond Berms are provided in Appendix F.

Tierra also performed seepage analyses of the southern pond berms by constructing flow nets based on Laplace’s equation of continuity. The flow nets were constructed utilizing the proposed berm geometry including the reduced freeboard and berm widths, and the 25-year DHW values provided by WSP. Based on the results of the seepage analyses, free water that stages up within the ponds to the 25-year DHW will not “daylight” out of the southern pond berms provided that the berms are constructed in accordance with Hillsborough County guidelines and FDOT Specifications. The Seepage Analyses for Pond Berms are provided in Appendix F.

7.5 Embankment Settlement

Roadway cross-sections were not available at the time of this report. Based on the results of the borings and the anticipated maximum new embankment fill heights, the majority of the total settlements should occur predominately during and shortly after embankment construction and are anticipated to be on the order of 1 inch or less. Long-term settlement is anticipated to be on the order of ½ inch or less.

Based on proper subgrade preparation and that adequate fill materials are utilized, we do not anticipate conditions that would pose limitations to the construction of the proposed embankments. Embankment fill soils should be placed and compacted in accordance with Hillsborough County guidelines and FDOT Specifications. Settlement analyses will be completed and presented for the next plans submittal.

7.6 Slope Stability

Roadway cross-sections were not available at the time of this report. Considering that the embankments will be constructed in accordance with Hillsborough County guidelines and FDOT Specifications, it is anticipated that embankment slopes above the water table with a geometry of 2H:1V or flatter will not pose limitations to roadway performance.

Hillsborough County, Florida CIP No.: 69647000

It is recommended that cuts into or below the groundwater table are constructed at slopes of 3H:1V or flatter. Slope stability analyses will be completed and presented for the next plans submittal.

7.7 Pavement Design Considerations

The pavement design engineer should review the current FDOT Flexible Pavement Design Manual and Hillsborough County guidelines for roadway design to ensure an adequate Structural Number (SN) value is obtained based on the corresponding ESAL value over the design life of the roadway improvements. Based on the results of the LBR tests performed on bulk soil samples obtained from along the proposed roadway alignment and the FDOT ± 2% Method, a design Modulus of Resilience (MR) value of 9,500 psi is recommended for use in flexible pavement design. The Design LBR Calculation table is provided in Appendix D. It should be noted that the design MR value obtained from the tests performed may not be representative of borrow materials which may support some of the proposed roadway.

In accordance with FDOT and Hillsborough County guidelines, grades for this type of roadway should be ideally set to provide a minimum separation required for the proposed roadways between the bottom of the base and the estimated seasonal high groundwater levels. The design of the pavement section should be in accordance with Hillsborough County guidelines, the FDOT Flexible Pavement Manual and the FDOT Design Manual.

7.8 Temporary Slopes and Trenches

Temporary side slopes and excavations should comply with the Occupational Safety and Health Administration’s (OSHA) trench safety standards, 29 C.F.R., s. 1926.650, Subpart P, all subsequent revisions or updates of OSHA’s referenced standard adopted by the Department of Labor and Employment Security and Florida’s Trench Safety Act, Section 553.62, Florida Statutes. Excavated materials should not be stockpiled at the top of the slope within a horizontal distance equal to the excavation depth.

7.9 Groundwater Control

Depending upon groundwater levels at the time of construction, some form of dewatering may be required to achieve the required compaction. Due to groundwater levels during the wet season of the year, seepage may enter the bottom and sides of excavated areas. Such seepage will act to loosen soils and create difficult working conditions. Groundwater levels should be determined immediately prior to construction. Shallow groundwater should be kept below the lowest working area to facilitate proper material placement and compaction in accordance with Hillsborough County guidelines and the FDOT Specifications.

7.10 On-Site Soil Suitability

The general suitability and preliminary evaluations of the soils encountered during our geotechnical exploration is presented on the Roadway Soil Survey sheet in Appendix B.

FDOT Standard Plans, Indices 120-001 and 120-002 of the Design Standards should be consulted to determine the specific use/suitability of the soil types present within the project limits.

Hillsborough County, Florida CIP No.: 69647000

7.11 General Roadway Construction

The overall site preparation and mechanical densification work for the construction of the proposed roadway should be in accordance with the FDOT Specifications and Hillsborough County requirements.

8.0 REPORT LIMITATIONS

Our services have been performed, our findings obtained, and our recommendations prepared in accordance with generally accepted geotechnical engineering principles and practices at the time of this report. Our geotechnical engineering evaluation of the site and subsurface conditions with respect to the planned roadway construction, and our recommendations are based upon the following: (1) site observations, (2) the field exploratory test data obtained during the geotechnical study, and (3) our understanding of the project information and anticipated grades as presented in this report. This company is not responsible for the conclusions, opinions or recommendations made by others based on these data.

The scope of the exploration was intended to evaluate soil conditions within the influence of the proposed roadway construction. The analyses and recommendations submitted in this report are based upon the anticipated location and type of construction and data obtained from the soil borings performed at the locations indicated and does not reflect any variations which may occur among these borings. If any variations become evident during the course of construction, a re-evaluation of the recommendations contained in this report will be necessary after we have had an opportunity to observe the characteristics of the conditions encountered.

The scope of services, included herein, did not include any environmental assessment for the presence or absence of hazardous or toxic materials in the soil, surface water, groundwater, or air, on the site, below, and around the site. Any statements in this report or on the boring logs regarding odors, colors, unusual or suspicious items and conditions are strictly for the information of WSP and Hillsborough County.

APPENDIX A

USDA Soil Survey & USGS Quadrangle Maps

Summary of USDA Soil Survey

CAPITAL PROGRAMS DEPARTMENT

601 E. KENNEDY BLVD.

TAMPA, FLORIDA 33602

P.E. LICENSE NUMBER 65514

KEVIN H. SCOTT, P.E.

TIERRA, INC.

7351 TEMPLE TERRACE HIGHWAY

TAMPA, FLORIDA 33637

DESCRIPTIONDATE DESCRIPTION DATE

REVISIONS

SHT. NO.CIP NO.

USGS QUADRANGLE MAPS

USDA SOIL SURVEY &

J:\6511\2021 Files\6511-21-076 Big Bend Widening\Microstation\Geotech\USDA_USGS_West01.dgnbsawaska 4/11/2023 4:19:55 PM Default

P

E N

T B

L L

P

L T

D R

V L

APPROXIMATE BEGIN PROJECT

APPROXIMATE END PROJECT

CR 672

0 100 400

Feet

0 200 800

Feet

SECTION:

RANGE:

TOWNSHIP:

REFERENCE: USDA SOIL SURVEY OF HILLSBOROUGH COUNTY, FLORIDA

REFERENCE: USGS QUADRANGLE MAP OF "RIVERVIEW, FLORIDA"

7, 8, 17, 18

20E

31S

N

G A

R D

E N

D R

C O

V I N

G T

O N

W A

T E

R S

T

B L

V D

U S

APPROXIMATE BEGIN PROJECT

APPROXIMATE END PROJECT

N

U S

G A

R D

C O

V I N

G T

O N

69647000

BIG BEND RD (US 41 TO COVINGTON GDN DR)

CR 672

USCS AASHTO

Depth

(feet) Months

0-7 SP A-3 6.0 - 20.0 3.5-7.3

7-28 SP, SP-SM A-2-4, A-3 6.0 - 20.0 3.5-7.3

28-42 SP, SP-SM A-2-4, A-3 6.0 - 20.0 3.5-7.3

42-80 SP, SP-SM A-2-4, A-3 6.0 - 20.0 3.5-7.3

0-6 SP, SP-SM A-3 6.0 - 20.0 5.1-7.3

6-52 SP, SP-SM A-3 6.0 - 20.0 5.1-7.3

52-80 SC-SM, SM A-2-4 0.2 - 2.0 5.1-8.4

0-34 PT A-8 6.0 - 20.0 4.5-5.5

34-80 SM, SP, SP-SM A-2-4, A-3 6.0 - 20.0 3.5-5.5

0-5 SM, SP-SM A-2-4, A-3 6.0 - 20.0 5.1-7.0

5-17 SM, SP-SM A-3, A-2-4 6.0 - 20.0 5.1-8.0

17-42 SM, SP-SM A-2-4, A-3 6.0 - 20.0 5.1-8.0

42-59 SC-SM, SC, CL A-2-4, A-6, A-4 2.0 - 6.0 3.8-8.0

59-80 SM A-4, A-2-4 6.0 - 20.0 5.1-8.0

0-6 SP-SM, SM A-2-4, A-3 6.0 - 20.0 3.5-6.5

6-20 SP-SM, SM A-2-4, A-3 6.0 - 20.0 3.5-6.5

20-36 SP-SM, SM A-2-4, A-3 0.6 - 6.0 3.5-6.5

36-80 SP-SM, SM A-2-4, A-3 6.0 - 20.0 3.5-6.5

0-4 SP-SM, SM A-2-4, A-3 6.0 - 20.0 4.5-6.0

4-22 SP-SM, SM A-2-4, A-3 0.6 - 2.0 4.5-6.0

22-80 SP-SM, SM A-2-4, A-3 6.0 - 20.0 4.5-6.0

0-4 SP-SM, SM A-2-4, A-3 6.0 - 20.0 4.4-6.5

4-16 SM, SP-SM A-2-4, A-3 6.0 - 20.0 4.4-6.5

16-28 SM, SP-SM A-2-4, A-3 6.0 - 20.0 4.4-6.5

28-32 SM, SP-SM A-2-4, A-3 6.0 - 20.0 5.0-8.4

32-48 SC-SM, SC, CL A-2-4, A-6, A-4 2.0 - 6.0 5.0-8.4

48-80 SM A-4, A-2-4 6.0 - 20.0 7.6-8.4

Jun-Nov

(5)

Basinger -

Holopaw -

Samsula

+2.0-0.0 Jun-Sept

+2.0-0.0 Jun-Sept

+2.0-0.0 Jun-Oct

(27)

Malabar 0.3-1.5 Jul-Oct

(57)

Wabasso 0.5-1.5 Jun-Nov

Summary of USDA Soil Survey

Hillsborough County, Florida

USDA Map

Symbol and Soil

Name

Depth

(in)

Soil Classification pH

Seasonal High

Water TablePermeability

(in/hr)

(29)

Myakka 0.5-1.5 Jun-Nov

(33)

Ona 0.5-1.5

APPENDIX B

Roadway Soil Survey Sheet

Boring Location Plan

Roadway Soil Profiles

Pond Soil Survey Sheets

Muck Delineation Plan

CAPITAL PROGRAMS DEPARTMENT

601 E. KENNEDY BLVD.

TAMPA, FLORIDA 33602

CROSS SECTION SOIL SURVEY FOR THE DESIGN OF ROADS

CONTENT

ORGANIC

CONTENT

MOISTURE

PERCENT PASS (%)

SIEVE ANALYSIS RESULTS

MESH

MESH

LIMIT

LIQUID

DATE OF SURVEY:

SURVEY MADE BY:

SUBMITTED BY: COUNTY:

ROAD NO.:

LIMITS (%)

ATTERBERG

TESTS

NO. OF

INDEX

PLASTIC

GROUP

AASHTO

CONTENT

MOISTURE DESCRIPTION

TESTS

NO. OF

CORROSION TEST RESULTS

pH

2-14 78-100 15-26 524 46-85 21-54 NP 75-97 NP 8 1,600-8,000 15-105 <5-123 6.1-7.2 1.5-2.2 8 1 33

EMBANKMENT AND SUBGRADE MATERIAL

- WATER TABLE ENCOUNTERED

GNE - GROUNDWATER NOT ENCOUNTERED

A-3/A-2-4

TIERRA, INC.

MESH

MESH

MESH

TESTS

NO. OF

TESTS

NO. OF

ORGANIC

TESTS

NO. OF

NO.

STRATUM

ohm-cm

RESISTIVITY

ppm

CHLORIDE

ppm

SULFATES

NOTES:

- ESTIMATED SEASONAL HIGH GROUNDWATER TABLE

CR 672

16 -- 18 1 1 -- -- NP -- NP -- 1 2 -- A-2-4

4-12 -- 8-46 --11 -- -- -- -- -- -- -- -- -- -- 2.4-4.4 11 3 11 A-3/A-2-4

6-75 -- 27-327 --15 -- -- -- -- -- -- -- -- -- -- 5.6-38 15 4 15 A-8

53-98 -- 41-88 9 9 -- -- 27-76 -- 52-114 -- 9 5 --

-- -- -- ---- -- -- -- -- -- -- -- 6 -- A-1/A-3

HILLSBOROUGH

ROADWAY SOIL SURVEY

P.E. LICENSE NUMBER 65514

KEVIN H. SCOTT, P.E.

TIERRA, INC.

7351 TEMPLE TERRACE HIGHWAY

TAMPA, FLORIDA 33637

KEVIN H. SCOTT, P.E.

THE "--" INDICATES AN UNMEASURED PARAMETER.

STRATA BOUNDARIES ARE APPROXIMATE. MAKE FINAL CHECK AFTER GRADING.

GRAY TO BROWN SILTY SAND

ORGANICS

GRAY TO DARK BROWN SAND TO SAND WITH SILT WITH TRACE

GRAY TO BROWN SAND TO SAND WITH SILT TO SILTY SAND

BIG BEND RD (US 41 TO COVINGTON GDN DR)

69647000

SHT. NO.CIP NO.

J:\6511\2021 Files\6511-21-076 Big Bend Widening\Microstation\Geotech\SSUVRD_West01.dgnbsawaska 11/19/2025 2:16:35 PM Default

P

E N

T B

L L

P

L T

D R

V L

DESCRIPTIONDATE DESCRIPTION DATE

REVISIONS

T H

O F

F I

C I

A

C O

I

S

E E

T

E C

T R

O N

C

G I

T A

L

Y

G N

A L

U

D

L E

G

A

C

5.

4.

3.

2.

1.

GREEN TO GRAY TO BROWN SILT TO CLAY

SAND TO MUCK

DARK BROWN ORGANIC SAND WITH SILT TO ORGANIC SILTY

ASPHALT AND LIMEROCK FRAGMENTS WITH SAND

CALCAREOUS CLAY TO WEATHERED LIMETONE -- -- -- ---- -- -- -- -- -- -- ---- -- -- -- -- -- --

A-7-5/A-7-6

8.

7.

6.

JUNE 2022 TO NOVEMBER 2025

CAPITAL PROGRAMS DEPARTMENT

PUBLIC WORKS ADMINISTRATION

HILLSBOROUGH COUNTY

CIP : 69647000

FROM US 41 TO COVINGTON GARDEN DRIVE

BIG BEND ROAD

ADDITIONAL COST TO HILLSBOROUGH COUNTY.

POTENTIOMETRIC LEVELS UP TO +15 FEET, NGVD 29 (+14.5 FEET, NAVD 88) AT NO

EXPLORATION. THE CONTRACTOR SHOULD BE PREPARED TO ADDRESS AND HANDLE

NAVD 88). ARTESIAN CONDITIONS WERE NOT ENCOUNTERED DURING THE FIELD

PROJECT VICINITY RANGES UP TO APPROXIMATELY +15 FEET, NGVD 29 (+14.5 FEET,

MAPS PUBLISHED BY THE USGS, THE POTENTIOMETRIC SURFACE ELEVATION IN THE

BASED ON A REVIEW OF THE “UPPER FLORIDAN AQUIFER POTENTIOMETRIC SURFACE”

LIMESTONE IS POROUS AND DIFFICULT TO DE-WATER.

TECHNIQUES AND THE MOBILIZATION OF SPECIALIZED EQUIPMENT. IN ADDITION,

MATERIAL WILL BE DIFFICULT AND WILL REQUIRE NON-CONVENTIONAL CONSTRUCTION

MATERIAL SHOULD BE ANTICIPATED. EXCAVATION INTO AND THROUGH THIS

THIS MATERIAL IS ROCK. VARIABILITY IN THE DEPTH AND HARDNESS OF THIS

THE MATERIAL FROM STRATUM 7 IS CALCAREOUS CLAY TO WEATHERED LIMESTONE.

TECHNIQUES AND THE MOBILIZATION OF SPECIALIZED EQUIPMENT.

MATERIAL WILL BE DIFFICULT AND WILL REQUIRE NON-CONVENTIONAL CONSTRUCTION

OF THIS MATERIAL SHOULD BE ANTICIPATED. EXCAVATION INTO AND THROUGH THIS

MATERIAL IS VERY HARD/DENSE. VARIABILITY IN THE DEPTH AND RELATIVE DENSITY

WHEN UTILIZED IN ACCORDANCE WITH STANDARD PLANS, INDEX 120-0001. THIS

SAND (A-1/A-3). THIS MATERIAL APPEARS SATISFACTORY FOR USE IN THE EMBANKMENT

THE MATERIAL FROM STRATUM 6 IS ASPHALT AND LIMEROCK FRAGMENTS WITH

ACCORDANCE WITH STANDARD PLANS, INDEX 120-001.

REMOVED IN ACCORDANCE WITH STANDARD PLANS, INDEX 120-002 AND UTILIZED IN

THE MATERIAL FROM STRATUM 5 (A-7-5/A-7-6) IS HIGH PLASTIC MATERIAL AND SHALL BE

ROADWAY CROSS-SECTIONS AND ON THE MUCK DELINEATION PLAN SHEET.

WITH STANDARD PLANS, INDEX 120-001. THE REMOVAL LIMITS ARE DEPICTED ON THE

IN ACCORDANCE WITH STANDARD PLANS, INDEX 120-002 AND UTILIZED IN ACCORDANCE

THE MATERIAL FROM STRATUM 4 (A-8) IS MUCK MATERIAL AND SHALL BE REMOVED

ROADBED DUE TO ITS ORGANIC CONTENT.

HOWEVER, THIS MATERIAL MAY NOT BE USED IN THE SUBGRADE PORTION OF THE

EMBANKMENT WHEN UTILIZED IN ACCORDANCE WITH STANDARD PLANS, INDEX 120-001.

THE MATERIAL FROM STRATUM 3 (A-3/A-2-4) APPEARS SATISFACTORY FOR USE IN THE

EMBANKMENT ABOVE THE WATER LEVEL EXISTING AT THE TIME OF CONSTRUCTION.

AND MAY BE DIFFICULT TO DRY AND COMPACT. IT SHOULD BE USED IN THE

INDEX 120-001. HOWEVER, THIS MATERIAL IS LIKELY TO RETAIN EXCESS MOISTURE

THE EMBANKMENT WHEN UTILIZED IN ACCORDANCE WITH STANDARD PLANS,

THE MATERIAL FROM STRATUM 2 (A-2-4) APPEARS SATISFACTORY FOR USE IN

INDEX 120-001.

IN THE EMBANKMENT WHEN UTILIZED IN ACCORDANCE WITH STANDARD PLANS,

THE MATERIAL FROM STRATUM 1 (A-3/A-2-4) APPEARS SATISFACTORY FOR USE

80 85

ELEC

CAPITAL PROGRAMS DEPARTMENT

601 E. KENNEDY BLVD.

TAMPA, FLORIDA 33602

SH-77R

B-78R

SH-80L

SH-82R

SH-84L

SH-87R

SH-87L

AB-79R AB-80R

AB-81L

AB-81R

AB-82L

AB-84R

AB-85L

AB-85R

AB-85R2

AB-86L

AB-86R

AB-87L

AB-88R

B-83L

B-86R

£ SURVEY CR 672 (OLD BIG BEND RD.)

U S

B A

Y

I N

D U

S T

R I

I V

E

M-82R-1

M-82R-2

M-82R-3 M-82R-4 M-82R-5

M-82R-6

M-82R-7

M-82R-8 M-82R-9

M-82R-10

M-82R-11

M-82R-12

P.E. LICENSE NUMBER 65514

KEVIN H. SCOTT, P.E.

TIERRA, INC.

7351 TEMPLE TERRACE HIGHWAY

TAMPA, FLORIDA 33637

CIP NO. SHT. NO.

APPROXIMATE SPT BORING LOCATION

APPROXIMATE AUGER BORING LOCATION

LEGEND

69647000

BIG BEND RD (US 41 TO COVINGTON GDN DR)

Feet

100200

N

J:\6511\2021 Files\6511-21-076 Big Bend Widening\Microstation\Geotech\ABORRD_West01.dgnbsawaska 10/30/2024 8:43:46 AM Default

P

E N

T B

L L

P

L T

D R

V L

DESCRIPTIONDATE DESCRIPTION DATE

BORING LOCATION PLAN (1)

90 95 100

WATER

ELEC

CAPITAL PROGRAMS DEPARTMENT

601 E. KENNEDY BLVD.

TAMPA, FLORIDA 33602

PBA-1AW-91L

PBA-1AS-92R

PBA-1AN-94L

PBA-1AS-96R

PBA-1AN-97L

PBA-1BS-101R

PBA-1BN-102L

AB-100R AB-101R

AB-102L

AB-102R

AB-103L

AB-103R

AB-104L

AB-104R

AB-90L

AB-90R AB-91R

AB-93L

AB-93R

AB-94L

AB-94R

AB-95L

AB-95R

AB-96L

AB-97L AB-98L

AB-98R

B-101L

B-92L

AB-96R2

B-96R

AB-96R2B

AB-96R5

AB-96R6

AB-96R7

AB-97R

AB-96R1AB-96R4

AB-96R3

AB-95R1

£ SURVEY CR 672 (OLD BIG BEND RD.)

POND-1A SOUTH

POND-1B SOUTH

DBA-105L-1

DBA-105L-2

DBA-105L-3

P.E. LICENSE NUMBER 65514

KEVIN H. SCOTT, P.E.

TIERRA, INC.

7351 TEMPLE TERRACE HIGHWAY

TAMPA, FLORIDA 33637

CIP NO. SHT. NO.

APPROXIMATE SPT BORING LOCATION

APPROXIMATE AUGER BORING LOCATION

LEGEND

69647000

BIG BEND RD (US 41 TO COVINGTON GDN DR)

Feet

100200

N

J:\6511\2021 Files\6511-21-076 Big Bend Widening\Microstation\Geotech\ABORRD_West02.dgnbsawaska 10/30/2024 8:43:47 AM Default

P

E N

T B

L L

P

L T

D R

V L

DESCRIPTIONDATE DESCRIPTION DATE

BORING LOCATION PLAN (2)

105 110 115

ELEC

CAPITAL PROGRAMS DEPARTMENT

601 E. KENNEDY BLVD.

TAMPA, FLORIDA 33602

PBA-1BS-105R

PBA-1BN-105L SH-109L

SH-109R

SH-113L

SH-113R

SH-1B

SH-1C

AB-105L

AB-105R

AB-106L

AB-107L

AB-108L

AB-111L

AB-112L

AB-113L AB-114L

AB-115L

AB-118L5

AB-118R AB-119R

B-106R

B-110L

B-114R

B-119L

AB-119L

AB-111R AB-112R AB-113R

AB-115R

AB-110R2

AB-109R

AB-118L2

AB-118L3

AB-118L4

AB-118L6

AB-118L7 AB-118L8

AB-118L

AB-114+60R

AB-114+80R

AB-110+50R

AB-110R

AB-111+50R

AB-111R2

AB-112+50R

AB-112R2

AB-109+80R

AB-109+60R

AB-113+80R

AB-114R2

AB-114+20R

AB-114+40R

K I N

G

L

A K

£ SURVEY CR 672 (OLD BIG BEND RD.)

£ SURVEY CR 672 (BIG BEND RD.)

K I N

G

O S

S I

I V

E

DBA-105L-4

DBA-105L-5

DBA-105L-6 DBA-105L-7

DBA-105L-8

P.E. LICENSE NUMBER 65514

KEVIN H. SCOTT, P.E.

TIERRA, INC.

7351 TEMPLE TERRACE HIGHWAY

TAMPA, FLORIDA 33637

CIP NO. SHT. NO.

APPROXIMATE SPT BORING LOCATION

APPROXIMATE AUGER BORING LOCATION

LEGEND

69647000

BIG BEND RD (US 41 TO COVINGTON GDN DR)

Feet

100200

N

J:\6511\2021 Files\6511-21-076 Big Bend Widening\Microstation\Geotech\ABORRD_West03.dgnbsawaska 10/30/2024 8:43:47 AM Default

P

E N

T B

L L

P

L T

D R

V L

DESCRIPTIONDATE DESCRIPTION DATE

BORING LOCATION PLAN (3)

120 125 130 135

120 125 130

CAPITAL PROGRAMS DEPARTMENT

601 E. KENNEDY BLVD.

TAMPA, FLORIDA 33602

SH-120L

SH-124L SH-127L

SH-12

SH-2B

SH-126

SH-3A

SH-128

AB-120R

AB-121L

AB-121R

AB-122L

AB-122R

AB-123L

AB-123R

AB-124L

AB-125L

AB-125R

AB-126L

AB-128L

AB-128R

AB-127R

B-127R2

C O

V I N

G T

R D

£ SURVEY CR 672 (OLD BIG BEND RD.)

£ SURVEY CR 672 (BIG BEND RD.)

DBA-128R-1

DBA-128R-2

DBA-128R-3

DBA-128R-4

AB-OBB-125L

AB-OBB-126L

AB-OBB-128L

AB-OBB-129L

AB-OBB-130L AB-OBB-131L

AB-OBB-132L AB-OBB-133L

AB-OBB-134L

P.E. LICENSE NUMBER 65514

KEVIN H. SCOTT, P.E.

TIERRA, INC.

7351 TEMPLE TERRACE HIGHWAY

TAMPA, FLORIDA 33637

CIP NO. SHT. NO.

APPROXIMATE SPT BORING LOCATION

APPROXIMATE AUGER BORING LOCATION

LEGEND

69647000

BIG BEND RD (US 41 TO COVINGTON GDN DR)

Feet

100200

N

J:\6511\2021 Files\6511-21-076 Big Bend Widening\Microstation\Geotech\ABORRD_West04.dgnbsawaska 10/30/2024 8:43:48 AM Default

P

E N

T B

L L

P

L T

D R

V L

DESCRIPTIONDATE DESCRIPTION DATE

BORING LOCATION PLAN (4)

E L

E C

CAPITAL PROGRAMS DEPARTMENT

601 E. KENNEDY BLVD.

TAMPA, FLORIDA 33602

SH-KING-1

SH-KING-2

KING LAKE DR

£ SURVEY CR 672 (OLD BIG BEND RD.)

£ SURVEY CR 672 (BIG BEND RD.)

P.E. LICENSE NUMBER 65514

KEVIN H. SCOTT, P.E.

TIERRA, INC.

7351 TEMPLE TERRACE HIGHWAY

TAMPA, FLORIDA 33637

CIP NO. SHT. NO.

APPROXIMATE SPT BORING LOCATION

APPROXIMATE AUGER BORING LOCATION

LEGEND

69647000

BIG BEND RD (US 41 TO COVINGTON GDN DR)

Feet

100200

J:\6511\2021 Files\6511-21-076 Big Bend Widening\Microstation\Geotech\ABORRD_West05.dgnbsawaska 10/30/2024 8:43:49 AM Default

P

E N

T B

L L

P

L T

D R

V L

DESCRIPTIONDATE DESCRIPTION DATE

BORING LOCATION PLAN (5)

CAPITAL PROGRAMS DEPARTMENT

601 E. KENNEDY BLVD.

TAMPA, FLORIDA 33602

SH-COV-3

SH-COV-2

SH-COV-1

COVINGTON GARDEN DR

£ SURVEY CR 672 (OLD BIG BEND RD.)

£ SURVEY CR 672 (BIG BEND RD.)

P.E. LICENSE NUMBER 65514

KEVIN H. SCOTT, P.E.

TIERRA, INC.

7351 TEMPLE TERRACE HIGHWAY

TAMPA, FLORIDA 33637

CIP NO. SHT. NO.

APPROXIMATE SPT BORING LOCATION

APPROXIMATE AUGER BORING LOCATION

LEGEND

69647000

BIG BEND RD (US 41 TO COVINGTON GDN DR)

Feet

100200

J:\6511\2021 Files\6511-21-076 Big Bend Widening\Microstation\Geotech\ABORRD_West06.dgnbsawaska 10/30/2024 8:43:50 AM Default

P

E N

T B

L L

P

L T

D R

V L

DESCRIPTIONDATE DESCRIPTION DATE

BORING LOCATION PLAN (6)

TAMPA, FLORIDA 33602 69647000

BIG BEND RD (US 41 TO COVINGTON GDN DR)

12 to 24

6 to 12

24 to 40

8 to 24

(BLOWS/FT.)

(BLOWS/FT.)

GREATER THAN 24

LESS THAN 3

GREATER THAN 40

LESS THAN 1

3 to 6

1 to 3

3 to 8

8 to 15

30 to 50

10 to 30

4 to 10

(BLOWS/FT.)

SPT N-VALUE

(BLOWS/FT.)

GREATER THAN 30

LESS THAN 4

GREATER THAN 50

LESS THAN 2

VERY LOOSE

HARD

VERY STIFF

STIFF

SILTS AND CLAYS

CONSISTENCY

FIRM

SOFT

VERY SOFT

LOOSE

DENSE

VERY DENSE

4 to 8

2 to 4

RELATIVE DENSITY

GRANULAR MATERIALS-

SAFETY HAMMER AUTOMATIC HAMMER

GROUNDWATER NOT ENCOUNTEREDGNE

LEGEND

FIELD EXPLORATIONS

GROUNDWATER LEVEL ENCOUNTERED DURING

SPT N-VALUE

SPT N-VALUE SPT N-VALUE

15 to 30

ESTIMATED SEASONAL HIGH GROUNDWATER TABLE

CAVE-IN

MEDIUM DENSE

CAVE-IN DUE TO SHALLOW GROUNDWATER INTRUSION

P.E. LICENSE NUMBER 65514

KEVIN H. SCOTT, P.E.

TIERRA, INC.

7351 TEMPLE TERRACE HIGHWAY

TAMPA, FLORIDA 33637

6.

5.

4.

3.

2.

1.

HAND AUGERED TO VERIFY UTILITY CLEARANCE

(UNLESS OTHERWISE NOTED).

SPT VALUE FOR 12 INCHES OF PENETRATION

NUMBERS TO THE LEFT OF BORINGS INDICATE

VISUAL REVIEW.

ON SELECTED SAMPLES FOR CONFIRMATION OF

BY VISUAL REVIEW AND LABORATORY TESTING

AASHTO GROUP SYMBOL AS DETERMINED

HA

N

A-3

REFUSAL

ABOVE EXISTING GRADE

ESTIMATED SEASONAL HIGH GROUNDWATER TABLE

EXISTING GRADE

GROUNDWATER LEVEL ENCOUNTERED ABOVE

¡ CR 672

DEBRIS

AUGER REFUSAL ON LIMEROCK AND/OR ASPHALT

NOTES:

2.

1.

AUTOMATIC HAMMER.

THE SPT BORINGS WERE PERFORMED USING AN

APPROXIMATE.

ACCURACY OF ± 10 FEET AND SHOULD BE CONSIDERED

GPS EQUIPMENT WITH A MANUFACTURE'S REPORTED

THE FIELD USING HAND-HELD, NON-SURVEY GRADE

REMAINING BORING LOCATIONS WERE ESTIMATED IN

(*) WERE PROVIDED BY THE PROJECT SURVEYOR. THE

THE BORING LOCATIONS DENOTED WITH AN ASTERISK

(BIG BEND RD.)

CENTERLINE CONSTRUCTION OF CR 672

(A-1/A-3)

ASPHALT AND LIMEROCK FRAGMENTS WITH SAND

GREEN TO GRAY TO BROWN SILT TO CLAY (A-7-5/A-7-6)

ORGANIC SILTY SAND TO MUCK (A-8)

DARK BROWN ORGANIC SAND WITH SILT TO

WITH TRACE ORGANICS (A-3/A-2-4)

GRAY TO DARK BROWN SAND TO SAND WITH SILT

GRAY TO BROWN SILTY SAND (A-2-4)

SILTY SAND (A-3/A-2-4)

GRAY TO BROWN SAND TO SAND WITH SILT TO

D E

P T

H

I N

F

E E

T

D E

P T

H

I N

F

E E

T

D E

P T

H

I N

F

E E

T

D E

P T

H

I N

F

E E

T

D E

P T

H

I N

F

E E

T

D E

P T

H

I N

F

E E

T

J:\6511\2021 Files\6511-21-076 Big Bend Widening\Microstation\Geotech\ABORRDProf_West01.dgnbsawaska 11/19/2025 2:19:11 PM Default

P

E N

T B

L L

P

L T

D R

V

ROADWAY SOIL PROFILES (1)

D E

P T

H

I N

F

E E

T

D E

P T

H

I N

F

E E

T

SH-77R

STA. 1077 + 52

89' RT.

7/18/2022

CAVE-IN

B-78R

STA. 1077 + 75

82' RT.

3/13/2023

AB-79R

STA. 1078 + 90

65' RT.

3/6/2023

AB-80R

STA. 1079 + 89

65' RT.

3/6/2023

SH-80L

STA. 1080 + 07

50' LT.

7/19/2022

CAVE-IN

AB-81L

STA. 1080 + 96

60' LT.

3/6/2023

AB-81R

STA. 1080 + 97

71' RT.

3/6/2023

M-82R-1

STA. 1081 + 32

75' RT.

1/19/2024

SH-82R

STA. 1081 + 96

74' RT.

7/18/2023

CAVE-IN

AB-82L

STA. 1082 + 08

56' LT.

3/6/2023

M-82R-2

STA. 1082 + 31

76' RT.

1/19/2024

CAVE-IN

M-82R-3

STA. 1082 + 73

77' RT.

1/19/2024

CAVE-IN

B-83L

STA. 1083 + 09

60' LT.

3/13/2023

M-82R-4

STA. 1083 + 46

78' RT.

1/19/2024

CAVE-IN

AB-84R

STA. 1083 + 92

65' RT.

3/6/2023

M-82R-5

STA. 1084 + 08

80' RT.

1/18/2024

CAVE-IN

SH-84L

STA. 1084 + 11

54' LT.

7/19/2023

CAVE-IN

M-82R-6

STA. 1084 + 54

78' RT.

1/22/2024

CAVE-IN

AB-85R

STA. 1084 + 94

39' RT.

3/6/2023

GNE

AB-85R2

STA. 1084 + 95

82' RT.

3/6/2023

AB-85L

STA. 1084 + 96

59' LT.

3/6/2023

M-82R-7

STA. 1085 + 10

76' RT.

1/22/2024

CAVE-IN

M-82R-8

STA. 1085 + 56

75' RT.

1/22/2024

CAVE-IN

B-86R

STA. 1085 + 82

40' RT.

2/22/2023

AB-86R

STA. 1085 + 92

66' RT.

3/6/2023

AB-86L

STA. 1085 + 95

63' LT.

3/6/2023

M-82R-9

STA. 1086 + 15

73' RT.

1/22/2024

CAVE-IN

M-82R-10

STA. 1086 + 67

78' RT.

1/22/2024

CAVE-IN

AB-87L

STA. 1086 + 90

62' LT.

3/6/2023

SH-87R

STA. 1086 + 98

66' RT.

7/18/2023

CAVE-IN

SH-87L

STA. 1087 + 04

75' LT.

7/19/2023

CAVE-IN

M-82R-11

STA. 1087 + 20

76' RT.

1/22/2024

CAVE-IN

AB-88R

STA. 1087 + 45

28' RT.

3/6/2023

M-82R-12

STA. 1087 + 73

78' RT.

1/22/2024

CAVE-IN

AB-90R

STA. 1089 + 81

52' RT.

3/7/2023

AB-90L

STA. 1090 + 04

74' LT.

3/3/2023

PBA-1AW-91L

STA. 1091 + 05

73' LT.

7/19/2023

CAVE-IN

AB-91R

STA. 1091 + 18

51' RT.

3/7/2023

B-92L

STA. 1092 + 06

48' LT.

2/22/2023

PBA-1AS-92R

STA. 1092 + 12

64' RT.

7/18/2023

CAVE-IN

¡ CR 672

¡ CR 672

¡ CR 672

¡ CR 672

¡ CR 672

¡ CR 672

¡ CR 672

¡ CR 672¡ CR 672¡ CR 672

¡ CR 672

¡ CR 672 ¡ CR 672 ¡ CR 672 ¡ CR 672 ¡ CR 672

¡ CR 672 ¡ CR 672

¡ CR 672

¡ CR 672 ¡ CR 672

¡ CR 672

¡ CR 672 ¡ CR 672

¡ CR 672¡ CR 672

¡ CR 672

¡ CR 672

¡ CR 672

¡ CR 672 ¡ CR 672¡ CR 672

¡ CR 672

¡ CR 672

¡ CR 672¡ CR 672

¡ CR 672

¡ CR 672¡ CR 672

¡ CR 672

HA

HA

HA

N

HA

HA

HA

N

HA

HA

HA

N

HA

HA

HA

TAMPA, FLORIDA 33602 69647000

BIG BEND RD (US 41 TO COVINGTON GDN DR)

12 to 24

6 to 12

24 to 40

8 to 24

(BLOWS/FT.)

(BLOWS/FT.)

GREATER THAN 24

LESS THAN 3

GREATER THAN 40

LESS THAN 1

3 to 6

1 to 3

3 to 8

8 to 15

30 to 50

10 to 30

4 to 10

(BLOWS/FT.)

SPT N-VALUE

(BLOWS/FT.)

GREATER THAN 30

LESS THAN 4

GREATER THAN 50

LESS THAN 2

VERY LOOSE

HARD

VERY STIFF

STIFF

SILTS AND CLAYS

CONSISTENCY

FIRM

SOFT

VERY SOFT

LOOSE

DENSE

VERY DENSE

4 to 8

2 to 4

RELATIVE DENSITY

GRANULAR MATERIALS-

SAFETY HAMMER AUTOMATIC HAMMER

GROUNDWATER NOT ENCOUNTEREDGNE

LEGEND

FIELD EXPLORATIONS

GROUNDWATER LEVEL ENCOUNTERED DURING

SPT N-VALUE

SPT N-VALUE SPT N-VALUE

15 to 30

ESTIMATED SEASONAL HIGH GROUNDWATER TABLE

CAVE-IN

MEDIUM DENSE

CAVE-IN DUE TO SHALLOW GROUNDWATER INTRUSION

P.E. LICENSE NUMBER 65514

KEVIN H. SCOTT, P.E.

TIERRA, INC.

7351 TEMPLE TERRACE HIGHWAY

TAMPA, FLORIDA…

This is the start of the file's text. The full file is on GovTribe.