24-8265_–_Gopher_Tortoise_Burrow_Map.pdf
PDF 3 MB Posted
- Attached to
- 16th Street NE Bridge Project (LAP) GRANT FUNDED
- Solicitation number
- 24-8265
- Issued by
- Collier County, Florida
About this file
This is a Gopher Tortoise Burrow Map prepared by Kissinger Campo & Associates, Corp. for Collier County, Florida, supporting the 16th Street NE Bridge Project from Golden Gate Boulevard to Randall Boulevard. The map identifies and locates gopher tortoise burrows within the project area, designating them as either potentially occupied or abandoned. The project encompasses approximately 3.3 miles of roadway widening and includes construction of a 147-foot bridge over the Golden Gate Main Canal. A non-mandatory pre-bid meeting is scheduled for October 21, 2025, at 10:00 a.m. in Naples, Florida, with sealed bids due November 20, 2025, at 3:00 p.m. local time. The contract term requires substantial completion within 520 consecutive calendar days, with final completion required within 30 calendar days following punch list delivery.
The project budget is approximately $26,361,418 and is funded through federal highway administration grants under the Local Agency Program (LAP). Contractors must comply with federal regulations including Davis-Bacon wage requirements, Buy America provisions, and equal employment opportunity standards. The project includes a 10.54% disadvantaged business enterprise (DBE) goal and requires a 5% bid bond submission. Environmental compliance is critical, including mitigation for 2.35 acres of wetland impacts and protection of endangered species including the gopher tortoise, Florida black bear, and eastern indigo snake. Prospective bidders must be pre-qualified by the Florida Department of Transportation in work classes including minor bridges, pavement marking, roadway signing, traffic signals, and sidewalk work. Liquidated damages are assessed at $7,442 per calendar day for failure to achieve substantial completion.
View the file
Other files
Show 40 more
Latest 50 of 158 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Begin Project
End Project Do ubleEa gle TRL
Golden Gate BLVD E
Approach
BLVD
th
ST
S
E th
ST
S
E th
ST
S
E th
ST
S
E 18 th ST SE
24th AVE NE
22nd AVE NE
20th AVE NE
10th AVE NE
12th AVE NE
16th AVE NE
14th AVE NE
Jung BLVD E 18th AVE NE
Randall BLVD
Birdie DR th
ST
N
E th
ST
N
E th
ST
N
E th
ST
N
E th
ST
N
E th
ST
N
E
Figure 4-1 Path: C:\Users\abesenerchia\GIS Projects - W\_Unsorted\16th Street Collier\Maps\Figures\16th St - Collier - GT Burrow Location Map.mxd 4/3/2023
Kisinger Campo & Associates, Corp.
201 N. Franklin Street, Suite 400
Tampa, FL 33602 Phone: 813/871-5331 www.kisingercampo.com
2,500 0 2,5001,250 Feetµ
GT3-AB
GT2-PO
GT1-PO
Legend Project Location
Gopher Tortoise Burrow - Potentially Occupied
Gopher Tortoise Burrow - Abandoned
Gopher Tortoise Burrow Map 16th Street Bridge NE from Golden Gate
Boulevard to Randall Boulevard Collier County, Florida Project No.: 60212.1
16th Street NE Bridge from Golden Gate Boulevard to Randall Boulevard
Exhibit AExhibit A
File details come from the government source that posted it. Updated .