24-8265_Exhibit_L-16_-_Utilities_Clear_16th_St_Ne_Bridge_dm.pdf
PDF 249 KB Posted
- Attached to
- 16th Street NE Bridge Project (LAP) GRANT FUNDED
- Solicitation number
- 24-8265
- Issued by
- Collier County, Florida
About this file
This is a Utilities Clear certification document from Collier County, Florida, certifying project readiness for the 16th Street NE Bridge Project (LAP), a comprehensive roadway and bridge construction initiative. The project involves constructing a new 147-foot, 50-foot-5-inch-wide bridge over the Golden Gate Main Canal and widening approximately 3.3 miles of roadway from Golden Gate Boulevard to Randall Boulevard. The proposed improvements include two 12-foot travel lanes with 6-foot shoulders on the bridge, an 11-foot travel lane with 6-foot shoulders along the widened roadway, and a 6-foot sidewalk on the west side. Additional work includes minor drainage modifications to existing roadside swales, installation of new concrete driveways to the existing right-of-way, and associated utility coordination. Sealed bids for Bid No. 24-8265 were due November 20, 2025, at 3:00 p.m. local time, with a non-mandatory pre-bid meeting held on October 21, 2025, at 10:00 a.m. in Naples, Florida. Prospective bidders were required to register on the county's procurement portal and obtain complete project documents electronically. Contractors must achieve substantial completion within 520 consecutive calendar days with final completion within 30 calendar days after punch list delivery, subject to liquidated damages of $7,442 per calendar day for non-compliance.
The project is funded through federal highway administration grants under the Local Agency Program (LAP) with a total budget of approximately $26,361,418. Prospective bidders must be pre-qualified by the Florida Department of Transportation in specific work classes including minor bridges, pavement marking, roadway signing, traffic signals, and sidewalk work, and must submit a 5% bid bond with their proposal. The project includes a disadvantaged business enterprise (DBE) goal of 10.54%. Contractors must comply with federal regulations including Davis-Bacon wage requirements, Buy America provisions, and equal employment opportunity standards. Environmental compliance requirements include mitigation for 2.35 acres of wetland impacts through credits from the Panther Island Mitigation Bank Expansion and coordination with wildlife conservation authorities to protect endangered species including the Florida black bear, gopher tortoise, and eastern indigo snake. The Utilities Clear certification, dated April 9, 2024, confirms that all utility work has been completed or necessary arrangements have been made to undertake and complete the project as required for proper coordination with the physical construction schedule.
View the file
Other files
Show 40 more
Latest 50 of 157 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2885 Horseshoe Drive South · Naples, Florida 34104 · 239-252-8192 · www.colliercountyfl.gov
DATE: April 9, 2024
TO: Zoe Giannopoulos, FDOT LAP Design Project Manager
FROM: Dennis F. McCoy, Project Manager III
SUBJECT: Utilities Clear Agency: Collier County FM #: 451283-1-58-01, 16th Street NE Bridge
PROJECT DESCRIPTION: The proposed roadway improvements for this project consist of adding a new bridge and providing additional lane width and shoulders by widening to the west of the existing roadway. The widening will provide 11- foot travel lanes with 6-foot shoulders (4-foot paved plus 2-foot unpaved) along the entire length of the project. A 6-foot sidewalk will be constructed to the west of the roadway. The typical section of the proposed bridge consists of two 12-foot travel lanes, a 6-foot shoulder and a 6-foot sidewalk on the west side and a 12-foot shoulder on the east side of the bridge. The proposed bridge width and length are 50 feet, 5.0 inches, and 147 feet 0.5 inches. The improvements will include minor drainage modifications to existing roadside swales and the installation of new concrete driveways up to the existing right-of-way.
This is to certify that all utility work has been completed or necessary arrangements made to undertake and complete this project as required for proper coordination with the physical construction schedule.
Local Agency Project Manager Date
| 2024-04-09T15:21:24-0400 | |
| McCoyDennis |