This is a Gopher Tortoise Burrow Map supporting the 16th Street NE Bridge Project (LAP) administered by Collier County, Florida. The map identifies the location and status of gopher tortoise burrows along the 16th Street NE Bridge corridor extending from Golden Gate Boulevard to Randall Boulevard in Collier County. The project encompasses approximately 3.3 miles of roadway widening and includes construction of a 147-foot bridge with two 12-foot travel lanes, a 6-foot sidewalk on the west side, new traffic signals, and associated drainage and utility modifications. Sealed bids for Bid No. 24-8265 are due by November 20, 2025, at 3:00 p.m. local time, with a non-mandatory pre-bid meeting scheduled for October 21, 2025, at 10:00 a.m. in Naples, Florida. Prospective bidders must register on Collier County's procurement portal to obtain complete project documents and must be pre-qualified by the Florida Department of Transportation in specified work classes.
The project budget is approximately $26,361,418 and is primarily funded through federal highway administration grants under the Local Agency Program (LAP). Contractors must comply with federal regulations including Davis-Bacon wage requirements, Buy America provisions, and equal employment opportunity standards. The project includes a significant disadvantaged business enterprise (DBE) goal of 10.54% and requires submission of a 5% bid bond with proposals. Substantial completion is required within 520 consecutive calendar days with liquidated damages assessed at $7,442 per calendar day for failure to meet the deadline. Environmental compliance is critical, including mitigation for 2.35 acres of wetland impacts and strict protections for endangered species such as the gopher tortoise, Florida black bear, and eastern indigo snake, as documented in the burrow location map prepared by Kisinger Campo & Associates, Corp.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Begin Project
End Project Do ubleEa gle TRL
Golden Gate BLVD E
Approach
BLVD
th
ST
S
E th
ST
S
E th
ST
S
E th
ST
S
E 18 th ST SE
24th AVE NE
22nd AVE NE
20th AVE NE
10th AVE NE
12th AVE NE
16th AVE NE
14th AVE NE
Jung BLVD E 18th AVE NE
Randall BLVD
Birdie DR th
ST
N
E th
ST
N
E th
ST
N
E th
ST
N
E th
ST
N
E th
ST
N
E
Figure 4-1 Path: C:\Users\abesenerchia\GIS Projects - W\_Unsorted\16th Street Collier\Maps\Figures\16th St - Collier - GT Burrow Location Map.mxd 4/3/2023
Kisinger Campo & Associates, Corp.
201 N. Franklin Street, Suite 400
Tampa, FL 33602 Phone: 813/871-5331 www.kisingercampo.com
2,500 0 2,5001,250 Feetµ
GT3-AB
GT2-PO
GT1-PO
Legend Project Location
Gopher Tortoise Burrow - Potentially Occupied
Gopher Tortoise Burrow - Abandoned
Gopher Tortoise Burrow Map 16th Street Bridge NE from Golden Gate
Boulevard to Randall Boulevard Collier County, Florida Project No.: 60212.1
16th Street NE Bridge from Golden Gate Boulevard to Randall Boulevard
Exhibit AExhibit A