24-8265_Exhibit_L-17_-_TECO_UWS_Signed.pdf

PDF 375 KB Posted

Attached to
16th Street NE Bridge Project (LAP) GRANT FUNDED
Solicitation number
24-8265
Issued by
Collier County, Florida

About this file

This is a Utility Work Schedule document from the Florida Department of Transportation (FDOT) for the 16th Street NE Bridge Project in Collier County, Florida. The schedule establishes the timeline and coordination requirements for TECO Peoples Gas to relocate or adjust its utility infrastructure in accordance with FDOT project plans dated April 2023. The utility work involves an 8-inch coated steel gas main extending from station 504+41 to station 524+58, which is to remain in place with zero days of work required prior to FDOT project construction and zero days during construction. The utility agency project representative is Alex Mcfarlane (813-557-6134), with field representation provided by Nicholas Foster (239-898-9230). The document was signed by FDOT's Roadway Engineer of Record and Utility Coordinator, Jesse E. Gill, P.E., on February 14, 2024.

The utility work schedule indicates that no utility relocation activities are required for this project, as the existing 8-inch gas main is designated to remain in its current location. The TECO Peoples Gas utility agency agreed to comply with all requirements of the 2017 Utility Accommodation Manual and to notify FDOT and the contractor in writing prior to initiating, stopping, resuming, or completing any work activities. The financial project identification number is 45123-1-58-01, and the schedule acknowledges that the utility agency is not responsible for events beyond its reasonable control that could not be anticipated or avoided through due diligence.

View the file

Other files

File Type Posted
24-8265_–_Gopher_Tortoise_Burrow_Map.pdf PDF
24-8265_Exhibit_M-5_-_Structures_Plans_S&S.pdf PDF
Construction_Bid_Instructions_Version_1.pdf PDF
24-8265_Exhibit_J-3_-_Specifications_SS_4.16.25.pdf PDF
24-8265_Exhibit_L-10_-_UWS_CenturyLink_Signed.pdf PDF
24-8265_Exhibit_L-14_-_City_of_Naples_No_Conflict.pdf PDF
24-8265_Exhibit_L-1_-_BHR_Signed.pdf PDF
24-8265_Exhibit_L-2_-_Geotechnical_Report_Mast_Arm_Signed.pdf PDF
24-8265_Exhibit_L-7_-_Scope_of_Work.pdf PDF
24-8265_Exhibit_M-3_-_Signalization_Plans_S&S.pdf PDF
PO_Terms_and_Conditions_Rev.3.pdf PDF
24-8265_Exhibit_K-1_-_ERP_No._11-108960_Permit.pdf PDF
24-8265_Exhibit_K-2_-_ROW_16774-R_Permit.pdf PDF
24-8265_Exhibit_L-10_-_UWS_CenturyLink_Signed.pdf PDF
24-8265_Exhibit_L-11_-_SummitBB_No_Conflict.pdf PDF
24-8265_Exhibit_L-12_-_Comcast_No_Conflict.pdf PDF
24-8265_Exhibit_L-14_-_City_of_Naples_No_Conflict.pdf PDF
24-8265_Exhibit_L-18_-_Structure_Geotech_Report_3.19.25.pdf PDF
24-8265_Exhibit_L-19_-_Roadway_Geotechnical_Report_Signed.pdf PDF
24-8265_Exhibit_L-1_-_BHR_Signed.pdf PDF
24-8265_Exhibit_L-20_-_Railroad_Clear_16th_st_ne_bridge_dm.pdf PDF
24-8265_Exhibit_L-4_-Pavement_Design_Memorandum_S&S.pdf PDF
24-8265_Exhibit_L-6_-_Structures_Load_Rating_Signed.pdf PDF
24-8265_Exhibit_M-3_-_Signalization_Plans_S&S.pdf PDF
24-8265_Federal_Provisions_Package.pdf PDF
24-8265_Federal_Provisions_Package.pdf PDF
24-8265_Authorization_to_Advertise.pdf PDF
24-8265_Exhibit_L-11_-_SummitBB_No_Conflict.pdf PDF
24-8265_Exhibit_L-16_-_Utilities_Clear_16th_St_Ne_Bridge_dm.pdf PDF
24-8265_Exhibit_L-18_-_Structure_Geotech_Report_3.19.25.pdf PDF
24-8265_Exhibit_L-19_-_Roadway_Geotechnical_Report_Signed.pdf PDF
24-8265_Exhibit_M-3_-_Signalization_Plans_S&S.pdf PDF
24-8265_Exhibit_M-5_-_Structures_Plans_S&S.pdf PDF
24-8265_Exhibit_N_-_EHS_Contractor_Requirements_Master_2021_rev.pdf PDF
24-8265_Exhibit_M-3_-_Signalization_Plans_S&S.pdf PDF
24-8265_Exhibit_M-5_-_Structures_Plans_S&S.pdf PDF
24-8265_Exhibit_N_-_EHS_Contractor_Requirements_Master_2021_rev.pdf PDF
24-8265_Exhibit_J-1_-_Collier_County_Signalization_Technical_Special_Provisions.pdf PDF
24-8265_Exhibit_K-2_-_ROW_16774-R_Permit.pdf PDF
24-8265_Exhibit_K-4_-_SFWMD_230510-38578_Permit.pdf PDF
24-8265_Exhibit_L-10_-_UWS_CenturyLink_Signed.pdf PDF
24-8265_Exhibit_L-3_-_LDAR_Signed.pdf PDF
24-8265_Exhibit_L-6_-_Structures_Load_Rating_Signed.pdf PDF
Construction_Services_LAP_Agreement_2024_version_1-FLAT_w-Exhibits.pdf PDF
24-8265_Exhibit_J-3_-_Specifications_SS_4.16.25.pdf PDF
24-8265_Exhibit_L-10_-_UWS_CenturyLink_Signed.pdf PDF
24-8265_Exhibit_L-2_-_Geotechnical_Report_Mast_Arm_Signed.pdf PDF
24-8265_Exhibit_L-3_-_LDAR_Signed.pdf PDF
24-8265_Exhibit_L-8_-_Drainage_Design_Documentation_S&S.pdf PDF
24-8265_Exhibit_L-9_-_UWS_FPL_Distribution_Signed.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rule 14-46.001 F.A.C

FLORIDA DEPARTMENT OF TRANSPORTATION

UTILITY WORK SCHEDULE

December 14, 2016

Pursuant to Section 337.403 F.S., the UAO and FDOT agree to the UAO’s need for relocation or adjustment to its utilities and FDOT’s need for a schedule for the UAO to effect the relocation or adjustment. This utility work schedule is based on FDOT plans dated in the project information box below. Any deviation by FDOT or its contractor from these plans, may void this utility work schedule. Upon notification by FDOT of a change to these plans, the UAO may negotiate a new utility work schedule. The UAO agrees to notify FDOT and the contractor in writing prior to starting, stopping, resuming, and completing work in accordance with this utility work schedule. The UAO shall obtain a utility permit and comply with requirements of the 2017 Utility Accommodation Manual (UAM) for all work done under this utility work schedule. The UAO is not responsible for events beyond the control of the UAO that could not be reasonably anticipated by the UAO and which could not be avoided by the UAO with exercise of due diligence at the time of the occurrence.

FDOT PROJECT INFORMATION

Financial Project ID: 45123-1-58-01 Federal Project ID:

State Road Number: County: Collier FDOT Plans Dated: April 2023 District Document No.:

UTILITY AGENCY/OWNER (UAO)

Utility Company: TECO Peoples Gas UAO Project Rep: Alex Mcfarlane Phone: 813-557-6134 E-mail: amcfarlane@tecoenergy.com UAO Field Rep: Nicholas Foster Phone: 239-898-9230 E-mail: NfFoster@tecoenergy.com

UTILITY SIGNATURE

I have reviewed the FDOT plans referenced above and submit this utility work schedule in compliance with UAM Section 5 and agree to be bound by the terms of this utility work schedule.

UAO Rep. Date 5 / 15 / 2023 Name Alex Mcfarlane Title Propject Manager

ENGINEER OF RECORD SIGNATURE

I attest this utility work schedule is compatible with the FDOT plans referenced above.

EOR. Date / / Name Title

APPROVAL BY DISTRICT UTILITIES

This utility work schedule is complete and acceptable to FDOT.

FDOT Rep. Date / / Name Title

SECTION A: SUMMARY OF UTILITY WORK

The below days are the total numbers of days shown for all activities in Section C of this utility work schedule. The breakdown of how these days are to be incorporated into the FDOT project and the dependence of these days upon the completion of other activities by the UAO or others is shown in Section C.

Days prior to FDOT project construction: 0 Days during FDOT project construction: 0 jgill Text Box Jesse E. Gill, P.E.

jgill Text Box Roadway EOR / Utility Coordinator jgill Text Box 02 14 2024

FLORIDA DEPARTMENT OF TRANSPORTATION

UTILITY WORK SCHEDULE

December 14, 2016

Financial Project ID: 45123-1-58-01 Utility Company: TECO Peoples Gas FDOT Plans Dated: April 2023

SECTION B: UAO SPECIAL CONDITIONS/CONSTRAINTS

FLORIDA DEPARTMENT OF TRANSPORTATION

UTILITY WORK SCHEDULE

December 14, 2016

Financial Project ID: 45123-1-58-01 Utility Company: TECO Peoples Gas FDOT Plans Dated: April 2023

SECTION C: UAO’s WORK ACTIVITIES

Act.

No.

Utility Facility (type, size, material, status)

From Station/ Offset

To Station/ Offset

Utility Work Activity Description

Dependent Activity TCP Phase

Consecutive Calendar Days

Prior to During Const. Const.

1 8” Coated Steel Gas Main

504+41 / 50’ Rt

524+58 / 50’ Rt To Remain N/A N/A 0 0

2024-02-14T09:19:23-0500
Jesse E Gill

File details come from the government source that posted it. Updated .